Method for judging circulation condition of injection passage of continuous casting crystallizer
Through a comprehensive analysis of the crystallizer liquid level image and plug rod stroke changes, the problem of timely identification of the flow path blocked or melt damage in continuous casting production is solved, and accurate judgment and alarm of abnormal circulation conditions are achieved, and accidents are avoided The occurrence of
Patent Information
- Application Number
- CN202310522093.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-12
AI Technical Summary
During continuous casting production, the flow path of the crystallizer is prone to blockage or erosion of refractory materials, resulting in uncontrollable flow of the steel, which leads to abnormal final pouring accidents. The existing technology relies on manual observation to identify abnormal signs in the first time, resulting in delays in accident handling of accidents. .
By acquiring the image of the crystallizer liquid level for analysis, combining the change trend of the plug rod stroke, comprehensively judge the circulation status of the injection flow path, and promptly issue an alarm signal to avoid accidents.
It realizes the accurate judgment of the blockage or melt loss status of the crystallizer flow path at the first time, and promptly alarm, reducing the incidence of abnormal final casting accidents, and ensuring the stability of continuous casting production.
Smart Images

Figure CN118926499A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pouring control of a slab continuous casting crystallizer, and in particular to a method for judging the flow condition of a pouring passage of a continuous casting crystallizer. Background Art
[0002] During the continuous casting process, molten steel flows from the ladle into the tundish, from which it is then poured into the mold to form ingots. The tundish is equipped with a stopper mechanism and a submerged nozzle at its lower portion for pouring the molten steel. Molten steel is poured from the tundish into the mold through the submerged nozzle. The flow rate into the mold is controlled by controlling the stopper opening. The path through which the molten steel flows from the tundish to the mold is called the "mold flow path."
[0003] The current problem is that during the normal production process, two abnormal situations often occur. One abnormal situation is that the crystallizer injection channel is blocked by foreign matter and the molten steel cannot be injected into the crystallizer through the crystallizer injection channel. The other situation is that the refractory material in the crystallizer injection channel is corroded and the flow rate of the injected molten steel cannot be controlled. Both of these abnormal situations will cause the continuous casting production to be unable to continue, thereby leading to accidents such as abnormal final pouring.
[0004] In reality, the two aforementioned abnormalities do have early warning signs, primarily manifested in argon bubbles on the mold surface and changes in the stopper opening. Currently, these warning signs can be detected manually. However, due to varying levels of skill among operators, they often fail to detect these warning signs immediately, missing the golden window for incident response and potentially leading to accidents such as abnormal final pouring. Summary of the Invention
[0005] The object of the present invention is to provide a method for judging the flow condition of a continuous casting crystallizer flow passage, which can accurately judge the abnormal flow condition of the crystallizer flow passage in the first time.
[0006] In order to achieve the above technical objectives, the present invention adopts the following technical solutions: A method for judging the flow condition of a continuous casting mold flow passage, the method comprising: Acquiring an image of the mold liquid surface, performing image analysis on the acquired mold liquid surface image, and determining a flow condition sign of the mold inlet flow passage based on the mold liquid surface image analysis result to obtain a first flow condition sign determination result; Analyze the change trend of the stopper rod stroke, judge the flow condition sign of the crystallizer injection flow passage based on the change trend of the stopper rod stroke, and obtain the second judgment result of the flow condition sign; A comprehensive judgment is made by combining the first judgment result of the flow condition sign and the second judgment result of the flow condition sign, and finally the flow condition of the crystallizer injection flow path is determined.
[0007] Further, The method of acquiring an image of the mold liquid surface, performing image analysis on the acquired mold liquid surface image, and judging the flow condition of the mold flow passage according to the analysis result of the mold liquid surface image includes: Acquire real-time crystallizer liquid surface images through camera photography; Perform image analysis on the acquired real-time crystallizer liquid level image to obtain the crystallizer liquid level status; The flow condition of the crystallizer flow passage is judged based on the analyzed crystallizer liquid level condition.
[0008] Furthermore, the method of performing image analysis on the acquired real-time crystallizer liquid level image to obtain the crystallizer liquid level status by analysis includes: Pre-set a reference image for comparison; Comparing the real-time mold level image with the reference image; If the number of argon bubbles on one side of the mold liquid surface displayed by the real-time mold liquid surface image is less than 20% or more than that of the reference image, the mold liquid surface condition is judged to be too little argon bubbles; If the number of argon bubbles around the submerged nozzle shown in the real-time mold level image is more than 10% more than that in the reference image, the mold level condition is judged to be excessive concentration of argon bubbles around the nozzle. If the number of argon bubbles on the mold surface displayed in the real-time mold surface image is more than 15% more than that in the reference image, it is determined that the current mold surface condition is excessive argon bubbles. If the size of the argon blowing bubbles on one side of the crystallizer displayed in the real-time crystallizer liquid level image is 1 times or more of the size of the argon blowing bubbles in the reference image, it is determined that the crystallizer liquid level condition is that the liquid level has a biased flow.
[0009] Furthermore, the method of judging the flow condition signs of the crystallizer flow passage based on the analyzed crystallizer liquid level condition includes: If the crystallizer liquid level condition obtained by analysis shows that the amount of argon bubbles is too small, it is determined that the crystallizer injection flow passage is blocked; If the analysis shows that the crystallizer liquid level condition is too concentrated around the water inlet, it is determined that the crystallizer flow passage is blocked. If the analysis shows that the crystallizer liquid level condition has too many argon bubbles, it is determined that there is a sign of melt damage in the crystallizer injection passage; If the analysis shows that the liquid level in the crystallizer is biased, it is determined that there is a sign of blockage in the crystallizer flow passage.
[0010] Furthermore, the analysis of the change trend of the stopper rod stroke and the judgment of the flow condition of the crystallizer flow passage based on the change trend of the stopper rod stroke are specifically implemented by the following methods: Construct a benchmark stopper opening calculation model; During normal production, the reference stopper opening calculation model continuously calculates the reference calculated opening value; During normal production, the real-time stopper opening value is constantly compared with the reference calculated opening value. If the real-time stopper opening value exceeds the reference calculated opening value by more than 4mm, it is determined that there is a sign of blockage in the crystallizer injection passage; If the real-time stopper rod opening value is lower than the reference calculated opening value by more than 3 mm, it is determined that there is a sign of melt damage in the crystallizer injection passage.
[0011] Furthermore, the method for performing comprehensive judgment by combining the first circulation status sign judgment result and the second circulation status sign judgment result includes: If the first flow condition sign determination result and the second flow condition sign determination result both indicate that the mold flow passage is blocked, it is determined that the mold flow passage is blocked. If the first flow condition sign determination result and the second flow condition sign determination result are both signs of melt damage in the mold flow passage, it is determined that the mold flow passage has a melt damage condition.
[0012] Furthermore, when it is determined that the injection flow passage of the crystallizer is blocked or damaged, an alarm signal is issued.
[0013] In the judgment method of the present invention, the flow condition signs of the crystallizer flow passage are judged based on the crystallizer liquid level image analysis results, and the flow condition signs of the crystallizer flow passage are judged based on the change trend of the stopper rod stroke. Finally, a comprehensive judgment is made by combining the above two judgment results, and ultimately the abnormal flow condition of the crystallizer flow passage can be accurately judged at the first time.
[0014] Compared with the prior art, the judgment method of the present invention has the following advantages: it can accurately judge the blockage or melting damage condition of the crystallizer injection passage at the first time, and after issuing the alarm information in time, the operator can take countermeasures as soon as possible, thereby avoiding the continuous expansion of the blockage or melting damage condition, reducing the occurrence rate of abnormal final pouring accidents, and ensuring stable and continuous continuous casting production. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1Schematic diagram of the flow chart of the method for judging the flow condition of the injection passage of the continuous casting crystallizer of the present invention; Figure 2 This is a schematic diagram of the liquid level in the crystallizer when the amount of argon bubbles is too small; Figure 3 This is a schematic diagram of the liquid level in the crystallizer with concentrated argon blowing around the water inlet; Figure 4 This is a schematic diagram of the liquid level in the crystallizer when the amount of argon bubbles is too much; Figure 5 Schematic diagram of the liquid level condition in a crystallizer with liquid level deviation.
[0016] In the figure: 1-crystallizer, 2-immersed nozzle, 3-argon bubble blowing. Implementation Method
[0017] The present invention will be further described below with reference to the accompanying drawings and specific embodiments: This embodiment provides a method for determining the flow condition of a continuous casting mold inlet flow passage, which can promptly and accurately determine the abnormal flow condition of the mold inlet flow passage.
[0018] The continuous casting machine involved in this embodiment is a slab continuous casting machine, and a production process control computer is provided for the continuous casting machine. The operation process of the continuous casting machine is controlled by the production process control computer.
[0019] The "mold flow passage" mentioned in this embodiment refers to the flow passage of molten steel injected from the tundish into the mold through the submerged nozzle.
[0020] The "circulation condition of the crystallizer flow passage" mentioned in this embodiment mainly refers to two conditions of the crystallizer flow passage, namely, a blockage condition and a melting damage condition. The blockage condition refers to the condition where "the crystallizer flow passage is blocked by foreign matter, and the molten steel cannot be injected into the crystallizer through the crystallizer flow passage." The melting damage condition refers to the condition where "the refractory material in the crystallizer flow passage is eroded." The erosion of the refractory material here mainly refers to the enlargement of the inner diameter of the submerged nozzle. If the crystallizer flow passage is neither blocked nor melted, the crystallizer flow passage is said to be in a normal condition.
[0021] The crystallizer, tundish, submerged nozzle, continuous casting steel throughput, stopper rod, stopper rod opening, pouring, casting speed, casting section, etc. mentioned in this article are all terms in this field, and ordinary technicians in this field can determine the meanings of these terms without any doubt.
[0022] See also Figure 1 The judgment method of this embodiment includes the following steps S1 to S3.
[0023] S1. During normal production, an image of the liquid surface of the crystallizer is acquired in real time, and image analysis is performed on the acquired image of the liquid surface of the crystallizer. Based on the analysis result of the image of the liquid surface of the crystallizer, signs of the flow condition of the crystallizer flow passage are judged, and whether there are signs of blockage or melting damage in the crystallizer flow passage is judged; the result of the judgment at this time is called the "first judgment result of the flow condition sign".
[0024] Specifically, step S1 includes the following steps S11 to S13.
[0025] S11, a camera pre-installed next to the crystallizer is used to obtain a real-time image of the mold liquid level. For ease of description, the mold liquid level image obtained by the camera is referred to as a "real-time mold liquid level image."
[0026] It should be noted that the camera is connected to the production process control computer via a signal transmission cable, and the production process control computer can receive the real-time crystallizer liquid surface image captured by the camera.
[0027] S12, the "crystallizer liquid level image analysis module" pre-set in the production process control computer performs image analysis on the real-time crystallizer liquid level image obtained in step S11, and obtains the crystallizer liquid level status through analysis.
[0028] It should be noted that the mold liquid level conditions analyzed here mainly refer to four conditions: "too few argon bubbles", "liquid surface deviation", "too concentrated argon blowing around the water inlet", and "excessive argon bubbles". If the mold liquid level condition does not fall into any of the above four conditions, it is considered normal, that is, there is no abnormality.
[0029] More specifically, The "too little amount of argon bubbles" mentioned above means that "compared to normal conditions, the amount of argon bubbles in the crystallizer is too little". Figure 2 As shown in the figure, a crystallizer 1, an immersion water nozzle 2 and argon blowing bubbles 3 on the liquid surface of the crystallizer are shown. The arrow A in the figure indicates that the amount of argon blowing bubbles is too small.
[0030] The “excessive concentration of argon blowing around the nozzle” refers to the situation where “compared to normal conditions, the amount of argon blowing bubbles on the liquid surface around the submerged nozzle in the crystallizer is significantly greater than the amount of argon blowing bubbles on the liquid surface at other locations in the crystallizer.” In other words, the amount of argon blowing bubbles on the liquid surface in the crystallizer is mostly concentrated around the submerged nozzle. Figure 3 As shown in the figure, a crystallizer 1, an immersed nozzle 2 and argon blowing bubbles 3 on the liquid surface of the crystallizer are shown. The arrow B in the figure indicates that the argon blowing around the nozzle is too concentrated.
[0031] The "excessive amount of argon bubbles" mentioned above refers to the situation where "compared to normal conditions, the amount of argon bubbles in the crystallizer is too much". Figure 4 As shown in the figure, a crystallizer 1, an immersion nozzle 2 and argon blowing bubbles 3 on the liquid surface of the crystallizer are shown. The arrow C in the figure indicates a situation where the amount of argon blowing bubbles is too much.
[0032] The “liquid level deviation” mentioned above refers to the situation where “the liquid level on one side of the crystallizer is more turbulent than that on the other side”. Figure 5 As shown in the figure, a crystallizer 1, an immersed water nozzle 2 and argon bubbles 3 on the liquid surface of the crystallizer are shown. The arrow D in the figure indicates that there is a deviation in the liquid surface.
[0033] The "Mold Surface Image Analysis Module" is a software module dedicated to analyzing mold surface images. This module has image recognition capabilities and can identify argon bubbles on the mold surface. This module primarily analyzes the churning of argon bubbles on the mold surface.
[0034] In addition, it should be noted that the use of image recognition technology to identify argon blowing bubbles on the liquid surface of the crystallizer is an existing technology. Simply put, the argon blowing bubbles on the liquid surface of the crystallizer are displayed as white in the image. Therefore, the identification of argon blowing bubbles in the image is essentially to identify the white area in the image. The higher the proportion of the white area in the image, the more argon blowing bubbles there are on the liquid surface of the crystallizer.
[0035] The mold level image analysis module performs image analysis on the real-time mold level image, including the following steps S121 to S126.
[0036] S121, pre-setting a "reference reference image" in the mold liquid level image analysis module. The reference reference image is also a mold liquid level image, and the reference reference image is a mold liquid level image with normal liquid level conditions.
[0037] It should be noted that, in actual work, a large number of crystallizer liquid surface images are stored in the database, and these images can all be used as reference images. However, which image is selected as the reference image can be determined based on the differences in refractory materials, different argon blowing methods, and different molten steel treatment methods.
[0038] S122, comparing the "real-time mold liquid level image obtained in step S11" with the "pre-set reference image", and determining the mold liquid level condition based on the comparison result.
[0039] S123, if the number of argon bubbles on the liquid surface on one side of the crystallizer displayed in the real-time crystallizer liquid level image is less than 20% or more than that in the reference image, then the current crystallizer liquid level condition is determined to be "too little argon bubbles".
[0040] S124, if: the real-time mold liquid level image shows that the number of argon blowing bubbles around the submerged nozzle is more than 10% more than that in the reference image, then: the current mold liquid level condition is determined to be "argon blowing is too concentrated around the nozzle".
[0041] S125, if the number of argon bubbles on the mold surface displayed in the real-time mold surface image is more than 15% as compared with the reference image, then the current mold surface condition is determined to be "excessive argon bubbles".
[0042] S126, if the size of the argon blowing bubbles on one side of the crystallizer displayed in the real-time crystallizer liquid level image is 1 times or more the size of the argon blowing bubbles in the reference image, and the churning on one side of the crystallizer is serious, then the current crystallizer liquid level condition is determined to be "liquid level deviation".
[0043] It should be noted that, at present, the use of image recognition and analysis technology to identify the status of equipment or production lines is already a relatively mature technology. In other implementations, other mature image analysis methods can also be used to analyze and determine the liquid level condition of the crystallizer, as long as the four conditions of "too few argon bubbles", "liquid surface deviation", "too concentrated argon blowing around the water nozzle" and "too many argon bubbles" can be analyzed.
[0044] S13, judging the flow condition sign of the crystallizer flow passage based on the crystallizer liquid level condition obtained by analyzing the crystallizer liquid level image, and the judged flow condition sign of the crystallizer flow passage is used as the first judgment result of the flow condition sign.
[0045] The step S13 specifically includes the following steps S131 to S134.
[0046] S131, when the crystallizer liquid level status obtained by the crystallizer liquid level image analysis module is "too little argon bubble volume", it is determined that there is a sign of blockage in the crystallizer injection passage. S132: When the mold liquid level condition analyzed by the mold liquid level image analysis module is "the argon blowing around the water inlet is too concentrated", it is determined that there is a sign of blockage in the crystallizer flow passage. S133: When the mold level image analysis module analyzes that the mold level condition is "excessive argon bubble volume", it is determined that there is a sign of melt damage in the mold injection passage. S134: When the mold liquid level status obtained by the mold liquid level image analysis module is "liquid level deviation", it is determined that there is a sign of blockage in the mold injection passage. S2, during normal production, analyze the changing trend of the stopper rod stroke in real time, and judge the flow condition signs of the crystallizer flow passage based on the changing trend of the stopper rod stroke, and judge whether there are signs of blockage or melting damage in the crystallizer flow passage; the result of this judgment is called "the second judgment result of the flow condition sign".
[0047] More specifically, step S2 includes the following steps S21 to S23.
[0048] S21, pre-constructing a mathematical calculation model for calculating the stopper rod opening, wherein the mathematical calculation model can calculate the stopper rod opening value based on a given continuous casting steel throughput.
[0049] This mathematical calculation model is constructed based on the "stopper opening value" and "continuous casting steel flow rate value" at the initial mold pouring. The stopper opening value calculated by this mathematical calculation model serves as a reference. Therefore, this mathematical calculation model is called the "baseline stopper opening calculation model," and the stopper opening value calculated by this benchmark stopper opening calculation model is called the "baseline calculated opening value." Generally speaking, for a tundish pouring operation, the reference stopper rod opening calculation model will not change unless the tundish is replaced. During the new tundish pouring operation, the reference stopper rod opening calculation model will be re-determined.
[0050] It should be noted that the term "continuous casting throughput" is a professional term in this field, referring to the amount (usually volume) of ingot cast per unit time. Those skilled in the art will understand that the term "continuous casting throughput" is calculated based on relevant data related to continuous casting production, such as the casting speed and casting cross-section.
[0051] S22. During normal production, the production process control computer continuously inputs the current real-time continuous casting steel throughput data into the benchmark stopper opening calculation model. The benchmark stopper opening calculation model continuously calculates the current real-time benchmark calculation opening value based on the current real-time continuous casting steel throughput. The benchmark calculation opening value is used for subsequent comparisons.
[0052] S23, during normal production, the production process control computer continuously compares the current real-time stopper opening value with the current real-time reference calculated opening value. If the current real-time stopper opening value exceeds the reference calculated opening value by more than 4mm, it is determined that there is a sign of blockage in the injection flow passage of the crystallizer; If the current real-time stopper rod opening value is lower than the reference calculated opening value by more than 3 mm, it is determined that there are signs of melt damage in the injection flow passage of the crystallizer.
[0053] The flow condition sign of the mold infusion passage determined at this time is used as the second flow condition sign determination result.
[0054] S3, combining the "first judgment result of the flow condition sign obtained in step S1" and the "second judgment result of the flow condition sign obtained in step S2" to make a comprehensive judgment, and finally judge the flow condition of the crystallizer flow passage, that is, finally judge whether the condition of the crystallizer flow passage is "normal", "blocked" or "melted".
[0055] Specifically, If the first flow condition sign determination result and the second flow condition sign determination result are both determined to be "a sign of blockage in the crystallizer flow passage," then it is determined that "blockage in the crystallizer flow passage exists." If the first flow condition sign determination result and the second flow condition sign determination result are both determined to be "a sign of melt damage in the mold flow passage exists", then it is determined that "a melt damage condition exists in the mold flow passage"; In other cases except the above two conditions, it is determined that "the crystallizer injection flow path is normal."
[0056] In addition, when it is determined that "the crystallizer injection passage is blocked" or "the crystallizer injection passage is melted", the production process control computer uses the existing alarm system to send an alarm signal, including image display alarm and sound signal alarm, to warn the operator to take targeted measures immediately.
[0057] In the judgment method of this embodiment, the flow condition signs of the crystallizer flow passage are judged based on the crystallizer liquid level image analysis results, and the flow condition signs of the crystallizer flow passage are judged based on the change trend of the stopper rod stroke. Finally, a comprehensive judgment is made by combining the above two judgment results, and ultimately the abnormal flow condition of the crystallizer flow passage can be accurately judged in the first time, that is, the blockage condition or melting damage condition of the crystallizer flow passage can be judged, and an alarm message can be issued in time to warn the operating personnel to take countermeasures as soon as possible, so as to avoid the continuous expansion of the blockage condition or melting damage condition, reduce the occurrence rate of abnormal final pouring accidents, and make the continuous casting production stable and continuous.
[0058] It should be noted that, in this embodiment, there is no absolute time sequence between the steps.
[0059] It should be noted that the judgment method of this embodiment is set in the production process control computer in the form of a program. During the normal continuous casting production process, the judgment method of this embodiment is implemented by executing the program through the production process control computer.
[0060] The above are only preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for judging the flow condition of a continuous casting mold flow passage, characterized in that: The determination method comprises: Acquire an image of the liquid surface of the crystallizer, perform image analysis on the acquired image of the liquid surface of the crystallizer, determine the flow condition sign of the crystallizer injection passage according to the analysis result of the image of the liquid surface of the crystallizer, and obtain a first determination result of the flow condition sign; Analyze the change trend of the stopper rod stroke, judge the flow condition sign of the crystallizer injection flow passage according to the change trend of the stopper rod stroke, and obtain the second judgment result of the flow condition sign; A comprehensive judgment is made by combining the first judgment result of the flow condition sign and the second judgment result of the flow condition sign, and finally the flow condition of the crystallizer injection flow passage is determined.
2. The method for judging the flow condition of the flow passage of the continuous casting crystallizer according to claim 1, characterized in that: The method of acquiring an image of the crystallizer liquid surface, performing image analysis on the acquired crystallizer liquid surface image, and judging the flow condition signs of the crystallizer injection passage according to the crystallizer liquid surface image analysis result includes: Acquire real-time crystallizer liquid surface images through camera photography; Perform image analysis on the acquired real-time crystallizer liquid level image to obtain the crystallizer liquid level status; The flow condition of the crystallizer injection passage is judged based on the analyzed crystallizer liquid level condition.
3. The method for judging the flow condition of the flow passage of the continuous casting crystallizer according to claim 2, characterized in that: The method of performing image analysis on the acquired real-time crystallizer liquid level image to obtain the crystallizer liquid level status by analysis includes: Pre-set a reference image; Comparing the real-time mold liquid level image with the reference baseline image; If the number of argon bubbles on the liquid surface on one side of the crystallizer displayed in the real-time crystallizer liquid surface image is less than 20% or more than that in the reference image, the crystallizer liquid surface condition is judged to be too little argon bubbles; If the number of argon bubbles around the submerged nozzle shown in the real-time mold surface image is more than 10% more than that in the reference image, the mold surface condition is judged to be excessive concentration of argon around the nozzle; If the real-time crystallizer liquid level image shows that the argon blowing bubbles on the crystallizer liquid level are more than 15% more than the reference image, it is determined that the current crystallizer liquid level condition is that the amount of argon blowing bubbles is too much; If the size of the argon blowing bubbles on one side of the crystallizer displayed in the real-time crystallizer liquid level image is 1 times or more of the size of the argon blowing bubbles in the reference image, it is determined that the crystallizer liquid level condition is that the liquid surface has a biased flow.
4. The method for judging the flow condition of the flow passage of the continuous casting crystallizer according to claim 2, characterized in that: The method of judging the flow condition sign of the crystallizer injection flow passage according to the crystallizer liquid level condition obtained by analysis includes: If the crystallizer liquid level condition obtained by analysis is that the amount of argon bubbles is too small, it is determined that there is a sign of blockage in the crystallizer injection flow passage; If the crystallizer liquid level condition obtained by analysis shows that the argon blowing around the water inlet is too concentrated, it is determined that there is a sign of blockage in the crystallizer injection flow passage; If the crystallizer liquid level condition obtained by analysis shows that there are too many argon bubbles, it is determined that there are signs of melting damage in the crystallizer injection passage; If the analysis shows that the liquid level in the crystallizer is biased, it is determined that there are signs of blockage in the crystallizer injection passage.
5. The method for judging the flow condition of the flow passage of the continuous casting crystallizer according to claim 1, characterized in that: The method of analyzing the change trend of the stopper rod stroke and judging the flow condition of the crystallizer injection passage according to the change trend of the stopper rod stroke includes: Construct a benchmark stopper opening calculation model; During normal production, the reference stopper opening calculation model continuously calculates the reference calculated opening value; During normal production, the real-time stopper opening value is constantly compared with the reference calculated opening value. If the actual stopper opening value exceeds the reference calculated opening value by more than 4 mm, it is determined that there is a sign of blockage in the injection passage of the crystallizer; If the actual stopper rod opening value is lower than the reference calculated opening value by more than 3 mm, it is determined that there are signs of melting damage in the injection passage of the crystallizer.
6. The method for judging the flow condition of the flow passage of the continuous casting mold according to claim 1, characterized in that: The method of combining the first circulation condition sign determination result and the second circulation condition sign determination result to make a comprehensive determination includes: If the first flow condition sign determination result and the second flow condition sign determination result are both signs of blockage in the crystallizer injection flow passage, it is determined that the crystallizer injection flow passage is blocked; If the first flow condition sign determination result and the second flow condition sign determination result are both signs of melt damage in the crystallizer injection passage, it is determined that the crystallizer injection passage has a melt damage condition.
7. The method for judging the flow condition of the flow passage of the continuous casting crystallizer according to claim 6, characterized in that: When it is determined that the injection passage of the crystallizer is blocked or melted, an alarm signal is issued.
Citation Information
Patent Citations
Treatment method and treatment device for continuous casting submersed nozzle blockage
CN111185583A
Method for judging nozzle clogging and solution loss according to variation trend of opening degree of stopper rod
CN113134587A
Continuous casting method
JP1990235556A
Method for continuously casting steel with tundish stopper
JP1992333355A
Droplet discharge device, system for controlling droplet discharge device and method for maintaining droplet discharge device
JP2017177423A
