Manufacturing method for producing large nuclear power container forge piece through novel rolling technology

By combining free forging and ring rolling technology, the dimension limitation and accuracy problems in the manufacturing of large nuclear capacitor forgings are solved, efficient production is achieved, construction period is shortened and product quality is improved.

CN118926847APending Publication Date: 2024-11-12YANTAI TAIHAI MANOIR NUCLEAR EQUIP CO LTD

Patent Information

Application Number
CN202411277308.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The prior art cannot effectively manufacture large nuclear capacitor forgings, and there are problems such as size limitations, large processing allowance, high ovality and poor surface quality, resulting in long production cycles and low product dimensional accuracy.

Method used

Combining free forging and ring rolling technology, large nuclear capacitor forgings are processed using ring rolling technology. The construction period is shortened, the surface and dimensional accuracy is improved, and the performance is improved through heat treatment.

Benefits of technology

The production of nuclear capacitor forgings with ultra-high and ultra-large diameters has been achieved, shortened the construction period by 30 days, improved the surface accuracy and pass rate of the product, reduced the processing allowance, and improved economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118926847A_ABST
    Figure CN118926847A_ABST
Patent Text Reader

Abstract

The invention provides a manufacturing method for producing a large nuclear power container forge piece by using a novel rolling technology, which comprises the following steps: forging, and manufacturing by adopting a free forging method to obtain a blank A of which the head cutting rate is greater than or equal to 18%, the tail cutting rate is greater than or equal to 5% and the total forging ratio is greater than or equal to 4; performing annealing and surface precision treatment on the blank A to obtain a blank B; ring rolling is conducted, specifically, the blank B is heated through a heating furnace, and the rolling temperature of the blank B is 1250-850 DEG C; the total rolling time is 20-30 minutes; the rolling speed ranges from 800 mm / s to 1200 mm / s, and the rolling ratio ranges from 1.7 to 2.3. According to the method, machining of the products through the ring rolling technology is the first case, compared with a traditional technology, the construction period is greatly shortened, the manufactured large nuclear power container has the advantages of being high in surface precision, high in size precision, good in surface quality and low in ovality, the qualified rate of the products is increased, and economic benefits are greatly increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear power product production, and in particular to a method for producing large nuclear power capacitor forgings by utilizing a novel rolling technology. Background Art

[0002] Large nuclear capacitors usually refer to those with a diameter greater than 5m and a height greater than 2.5m. At present, nuclear capacitor forgings manufactured at home and abroad are all produced by free forging. The diameter and height dimensions are limited by the structural dimensions of the free forging press and cannot meet the size requirements of large nuclear capacitor forgings. In addition, large nuclear capacitor forgings are prepared by free forging, and there are disadvantages such as large machining allowance, large ovality, and poor surface quality, which not only results in a long production cycle, but also affects the dimensional accuracy of the product and the product's pass rate. Summary of the invention

[0003] In view of this, the present invention provides a method for producing large nuclear capacitor forgings using a new rolling technology, in which free forging and ring rolling are combined to obtain large nuclear capacitor forgings with ultra-high and ultra-large diameters. This method is the first to use the ring rolling process to process such products. Compared with the traditional process, the construction period is greatly shortened, and the prepared large nuclear capacitor has the advantages of high surface accuracy, high dimensional accuracy, good surface quality and low ovality, which improves the qualified rate of the product and greatly increases the economic benefits.

[0004] The technical solution of the present invention is as follows: A method for producing large nuclear capacitor forgings using a new rolling technology, including smelting, forging, ring rolling, heat treatment, sampling, testing, and finishing; Forging, manufactured by free forging method, the obtained billet A has a head cutting rate ≥18%, a tail cutting rate ≥5%, and a total forging ratio ≥4; After annealing and surface finishing of billet A, billet B is obtained. The surface of billet B has no defects such as cracks, folds, and obvious pits. Ring rolling, the process is: During the transfer and loading process, the crane, heating furnace and sling work together stably to meet the transfer requirements; the operating temperature and insulation effect of the heating furnace meet the process requirements; The billet B is heated in a heating furnace, and the rolling temperature of the billet B is 1250-850°C; the total rolling time is 20-30 minutes; the rolling speed is 800-1200 mm / s, and the rolling ratio is 1.7-2.3, to obtain the billet A.

[0005] By adopting the above-mentioned manufacturing method, the manufacture of large-scale nuclear capacitors is realized, and the processing allowance of each part is effectively reduced during the manufacturing process. The surface of the nuclear capacitor obtained is highly flat, defect-free and crack-free, so that the product has good surface quality; at the same time, the production period is shortened. Compared with the existing process, the construction period is shortened by about 30 days.

[0006] Preferably, the smelting includes electric furnace (EAF) + refining (LF) + vacuum casting (VC); Among them, during the refining, the vacuum degassing (VD) treatment time of the three packages of molten steel is ≥15min, and the steel-out temperature is 1630-1670℃, which is well controlled.

[0007] Preferably, during the vacuum degassing and vacuum pouring process, the vacuum degree is controlled to be less than 67Pa.

[0008] Preferably, the vacuum casting process adopts three-bag casting. After vacuum casting, the weight percentage of each chemical element in the obtained steel ingot is as follows: C≤0.25%, Si 0.15-0.30%, Mn 1.20-1.50%, P≤0.008%, S≤0.008%, Cr≤0.20%, Ni0.60-0.90%, Mo 0.45-0.60%, Cu≤0.10%, Co≤0.02%, V≤0.05%, Ti≤0.015%, Nb≤0.01%, Al≤0.035 %, Ca≤0.015%, B≤5ppm, As≤0.010%, Sn≤0.010%, Sb≤0.002%, ΔG≤0, Ceq, O, N, H.

[0009] Preferably, in vacuum pouring, the opening temperature of the three-bag pouring is 1570-1590°C, the diffusion of molten steel is good, and the pouring speed is 6.6-7.0 T / min, ultimately forming a steel ingot with pure metal, dense structure and uniform composition.

[0010] Preferably, during forging, the forging equipment is a 12,500-ton hydraulic press, including a drawing process and a roughening process; during forging, it is required to leave enough deformation and the deformation should be uniform to achieve the purpose of uniform grain refinement, so that the obtained billet A has good ultrasonic penetrability.

[0011] Preferably, in the ring rolling, the starting rolling temperature of the billet B is 1150°C, the final rolling temperature is 900°C; the rolling fire is 1 time, the total rolling time is 25 minutes; the rolling speed is 1000 mm / s, and the rolling ratio is 2.0.

[0012] Preferably, in ring rolling, the rolling mill equipment parameters are: maximum radial rolling pressure 50000KN, maximum axial rolling pressure 15000KN, maximum rolling height 5000mm, rolling diameter 3000-16000mm, maximum single piece weight 350T.

[0013] Preferably, the manufacturing method further comprises heat treatment, through which the performance of the blank A is improved; two thermocouple temperature measuring instruments are fixed on the blank A, one is located on the inner side of the blank A and close to the top of the blank A, and the other is located on the outer side of the blank A and close to the bottom of the blank A; the two thermocouples are arranged diagonally; The heat treatment includes normalizing, quenching and tempering. After the heat treatment, a blank B is obtained; the temperature control of normalizing, quenching and tempering is all measured by a thermocouple thermometer; During quenching, the blank A is heated to a temperature above the austenitizing temperature and kept warm, and then quenched by immersing in water. During quenching, the transfer time of the blank A from cooling out of the furnace to completely entering the water shall not exceed 5 minutes.

[0014] Preferably, normalizing, the heating rate is 18°C / h, the holding temperature is 900-909°C, and the holding time is 5h; after normalizing, the blank A is cooled to a surface temperature of 160°C±10°C; Preferably, during quenching, the heating rate is 20°C / h, the holding temperature is 850-910°C, and the holding time is 5h; the blank A is cooled in water until the surface temperature is 35±5°C; the water temperature before entering the water is 14±1°C, and the water temperature after cooling is 20±2°C; the cooling effect is good at this temperature.

[0015] Preferably, for tempering, the heating rate is 20°C / h, the holding temperature is 610-680°C, the holding time is 10h, and after tempering, the product is taken out of the furnace and air-cooled.

[0016] Preferably, the finishing includes turning the inner hole, the outer circle and the end face.

[0017] Compared with the prior art, the beneficial effects of the present invention are: The manufacturing method provided by the present invention applies the ring rolling process to the preparation of large-scale nuclear capacitors for the first time, combines free forging with ring rolling, and effectively shortens the construction period. Compared with the traditional forging of ordinary nuclear capacitors, the construction period is shortened by at least 30 days; and the large-scale nuclear capacitors obtained by the manufacturing method of the present invention have high surface accuracy, good quality, and low ovality. Compared with traditional processes, the rough machining amount can be effectively reduced or even the rough machining process can be skipped, thereby improving the qualified rate of large-scale nuclear capacitor processing.

[0018] The preparation method of the present invention can solve the problem that large presses cannot manufacture large pressure vessel cylinders with high precision and high level, and realizes high-quality manufacturing of large nuclear capacitors through a new process route combining free forging and ring rolling. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0020] Figure 1 It is a process flow chart of the present invention.

[0021] Figure 2 This is the C-axis SEM image of the steel ingot in Example 1.

[0022] Figure 3 This is the A-axis SEM image of the steel ingot in Example 1.

[0023] Figure 4 This is the R-direction SEM image of the steel ingot in Example 1.

[0024] Figure 5 This is a photo of the ingot being stretched during free forging.

[0025] Figure 6 This is a photo of the ingot roughening during free forging.

[0026] Figure 7 This is a photo of billet B during ring rolling.

[0027] Figure 8 This is a photo of billet B during ring rolling when rolling is completed.

[0028] Fig. 9 Schematic diagram of the position of the thermocouple temperature measuring instrument and blank A.

[0029] Fig.10 This is a photo of blank B after heat treatment (i.e. after tempering is completed).

[0030] Fig.11 This is a photo of the forging after forging of Comparative Example 1. DETAILED DESCRIPTION

[0031] In order to enable those skilled in the art to better understand the technical solutions of the present invention, the technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0032] Example 1 Combination Figure 1-Figure 10This embodiment provides a method for producing large nuclear capacitor forgings using a new rolling technology, and the process is as follows: (1) Smelting Including electric furnace (EAF) + refining (LF) + vacuum pouring (VC); During refining, the vacuum degassing (VD) treatment time of the three ladles of molten steel was 15 min, and the tapping temperature was 1650°C, which was well controlled; During vacuum degassing and vacuum pouring, the vacuum degree is controlled at 5Pa; The steel ingot is vacuum cast in three batches, with the weights of the three batches being 75 tons, 75 tons and 50 tons respectively; the weight of the steel ingot is 200 tons (material: SA-508 Gr.3 Cl.1); After vacuum casting, the chemical elements and weight percentages in the obtained steel ingots are shown in Tables 1 and 2; During vacuum pouring, the opening temperatures of the three-pack pouring were 1655℃, 1635℃, and 1635℃ respectively. The molten steel diffused well and the pouring speed was 7.0T / min. Finally, a steel ingot with pure metal, dense structure and uniform composition was formed. The structure test diagram of the steel ingot is shown in Figure 2-Figure 4 ; (2) Forging The forging equipment is a 12,500-ton hydraulic press, which includes a drawing process and a roughening process. During forging, it is required to leave enough deformation and the deformation should be uniform to achieve the purpose of uniform grain refinement, so that the obtained billet A has good ultrasonic penetration. The billet A is manufactured by free forging. After the drawing process and the roughing process, the head cutting rate is 18%, the tail cutting rate is 5%, and the total forging ratio is 4. The drawing of billet A is shown in the photo. Figure 5 For the roughening photo of billet A, see Figure 6 ; In the free forging process, the processes not described in detail, such as the drawing process, are all prior art and will not be described in detail; After annealing and surface finishing of billet A, billet B is obtained. The surface of billet B has no defects such as cracks, folds, and obvious pits. The dimensions of billet B are 3480~6800mm in outer diameter, 3080~6400mm in inner diameter, and 2500~5000mm in height, which meet the design requirements of ring-rolled billets; (3) Ring rolling During the transfer and loading process, the crane, heating furnace and sling work together stably to meet the transfer requirements; the operating temperature and insulation effect of the heating furnace meet the process requirements; Rolling mill equipment parameters: maximum radial rolling pressure 50000KN, maximum axial rolling pressure 15000KN, maximum rolling height 5000mm, rolling diameter 3000-16000mm, maximum single piece weight 350T; The billet B is heated by a heating furnace, the starting rolling temperature of the billet B is 1100°C, the final rolling temperature is 850°C; the total rolling time is 25 minutes; the rolling speed is 1000 mm / s, the rolling ratio is 2.0, and the billet A is obtained; see Figure 7-Figure 8 ; (4) Performance heat treatment Improve the properties of blank A through heat treatment; Two thermocouple temperature measuring instruments are fixed on the blank A, one is located on the inner side of the blank A and close to the top of the blank A, and the other is located on the outer side of the blank A and close to the bottom of the blank A; the two thermocouples are set diagonally; see Fig. 9 ; The heat treatment includes normalizing, quenching and tempering, and the temperature control of normalizing, quenching and tempering is all measured by thermocouple temperature measuring instrument; During quenching, the blank A is heated to a temperature above the austenitizing temperature and kept warm, and then quenched by immersion in water. During quenching, the transportation time of the blank A from cooling out of the furnace to completely entering the water shall not exceed 5 minutes; Normalizing, heating rate is 18℃ / h, holding temperature is 905℃, holding time is 5h; after normalizing, cooling to the surface temperature of blank A is 165℃; Quenching, heating rate is 20℃ / h, holding temperature is 890℃, holding time is 5h; cooling in water until the surface temperature of blank A is 35℃; the water temperature before entering water is 14±1℃, and the water temperature after cooling is 20±2℃; the cooling effect is good at this temperature; Tempering, heating rate is 20℃ / h, holding temperature is 650℃, holding time is 10h, after tempering, take out of the furnace and air cool; After heat treatment, blank B is obtained; see Fig.10 ; (5) Testing, inspection and finishing After the blank B is sampled, tested, and turned into an inner hole, an outer circle, and an end face, a large nuclear capacitor with a diameter of 3-5m and a height of 2-5m is obtained; the test results are shown in Table 1. The above processing processes are all existing technologies and will not be repeated here.

[0033] Table 1 Test results of large nuclear capacitors

[0034] Five test blocks were prepared by the same preparation method as in Example 1. The test blocks in Example 1 were test block A (Example 1), test block D, test block G, test block J, test block N and test block Q. The elemental compositions of test block A, test block D, test block G, test block J, test block N and test block Q are shown in Tables 2-3.

[0035] Table 2 Element composition and weight percentage of the steel ingots of Example 1 to Example 6

[0036] Table 3 Element composition and weight percentage of molten steel in Example 1 to Example 6

[0037] Comparative Example 1 The difference from Example 1 is that the ring rolling treatment in step (3) is not performed, and the blank B is obtained by free forging. Fig.11 .

[0038] Although the present invention has been described in detail by reference to the preferred embodiments, the present invention is not limited thereto. Without departing from the spirit and essence of the present invention, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the present invention, and these modifications or substitutions shall be within the scope of the present invention. Any person of ordinary skill in the art may easily think of changes or substitutions within the technical scope disclosed by the present invention, and these shall be within the scope of protection of the present invention. Therefore, the scope of protection of the present invention shall be subject to the scope of protection of the claims.

Claims

1. A method for producing large nuclear capacitor forgings using a new rolling technology, It is characterized in that Including smelting, forging, ring rolling, heat treatment, sampling, testing, and finishing; Forging, manufactured by free forging method, the obtained billet A has a head cutting rate ≥18%, a tail cutting rate ≥5%, and a total forging ratio ≥4; The blank A is annealed and surface treated to obtain the blank B; Ring rolling, the process is: During the transfer and loading process, the crane, heating furnace and sling work together stably to meet the transfer requirements; the operating temperature and insulation effect of the heating furnace meet the process requirements; The billet B is heated in a heating furnace, and the rolling temperature of the billet B is 1250-850°C; the total rolling time is 20-30 minutes; the rolling speed is 800-1200 mm / s, and the rolling ratio is 1.7-2.3, to obtain the billet A.

2. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 1, It is characterized in that The smelting includes electric furnace (EAF) + refining (LF) + vacuum casting (VC); Among them, during the refining, the vacuum degassing (VD) treatment time of the three packages of molten steel is ≥15min, and the steel-out temperature is 1630-1670℃.

3. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 2, It is characterized in that During the vacuum degassing and vacuum pouring process, the vacuum degree is controlled to be less than 67Pa.

4. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 2, It is characterized in that The vacuum casting process adopts three-pack casting. After vacuum casting, the weight percentage of each chemical element in the obtained steel ingot is as follows: C≤0.25%, Si 0.15-0.30%, Mn 1.20-1.50%, P≤0.008%, S≤0.008%, Cr≤0.20%, Ni0.60-0.90%, Mo 0.45-0.60%, Cu≤0.10%, Co≤0.02%, V≤0.05%, Ti≤0.015%, Nb≤0.01%, Al≤0.035 %, Ca≤0.015%, B≤5ppm, As≤0.010%, Sn≤0.010%, Sb≤0.002%, ΔG≤0, Ceq, O, N, H.

5. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 2, It is characterized in that During vacuum pouring, the opening temperature of the three-pack pouring is 1570-1590℃, the molten steel diffuses well, and the pouring speed is 6.6-7.0T / min, eventually forming a steel ingot with pure metal, dense structure and uniform composition.

6. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 1, It is characterized in that During forging, the forging equipment is a 12,500-ton hydraulic press, including a drawing process and a roughening process; during forging, it is required to leave enough deformation and the deformation should be uniform to achieve the purpose of uniform grain refinement, so that the obtained billet A has good ultrasonic penetrability.

7. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 1, It is characterized in that In the ring rolling, the starting rolling temperature of billet B is 1150°C, and the final rolling temperature is 900°C; the rolling fire is 1 time, the total rolling time is 25 minutes; the rolling speed is 1000 mm / s, and the rolling ratio is 2.

0.

8. The method for producing large nuclear capacitor forgings using a novel rolling technology as claimed in claim 7, It is characterized in that In ring rolling, the rolling mill equipment parameters are: maximum radial rolling pressure 50000KN, maximum axial rolling pressure 15000KN, maximum rolling height 5000mm, rolling diameter 3000-16000mm, maximum single piece weight 350T.

9. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 1, It is characterized in that The manufacturing method also includes heat treatment, through which the performance of the blank A is improved; two thermocouple temperature measuring instruments are fixed on the blank A, one is located on the inner side of the blank A and close to the top of the blank A, and the other is located on the outer side of the blank A and close to the bottom of the blank A; the two thermocouples are arranged diagonally; The heat treatment includes normalizing, quenching and tempering. After the heat treatment, a blank B is obtained; the temperature control of normalizing, quenching and tempering is all measured by a thermocouple thermometer; During quenching, the blank A is heated to a temperature above the austenitizing temperature and kept warm, and then quenched by immersing in water. During quenching, the transfer time of the blank A from cooling out of the furnace to completely entering the water shall not exceed 5 minutes.

10. The method for producing large nuclear capacitor forgings using a new rolling technology as claimed in claim 9, It is characterized in that Normalizing, heating rate is 18℃ / h, holding temperature is 900-909℃, holding time is 5h; after normalizing, cool to the surface temperature of blank A is 160℃±10℃; Quenching, heating rate is 20℃ / h, holding temperature is 850-910℃, holding time is 5h; cooling in water until the surface temperature of blank A is 35±5℃; the water temperature before entering water is 14±1℃, and the water temperature after cooling is 20±2℃; Tempering, heating rate is 20℃ / h, holding temperature is 610-680℃, holding time is 10h, after tempering, take out of the furnace and air cool.

Citation Information

Patent Citations

  • Machining process of ultra-large bearing ferrule blank

    CN102489637A

  • Manufacturing method of super-large-tonnage high cylinder type ring forged piece

    CN109022686A

  • Large forge piece for pressure vessel and smelting method of large forge piece

    CN114959414A

  • Rolling forming process for cylinder with ultra-large specification and ultra-large wall thickness

    CN116786739A

  • A method for making ring forging component

    WO2008095446A1

Cited By

  • Steel for ultrahigh-strength mining round-link chain and preparation method thereof

    CN119710456A