Error correction method of crossing railing automatic program

By determining and handling false or true faults in the automatic program of the intersection railing, the rise of the intersection railing is directly controlled, which solves the problem of misjudgment and closure caused by railway transportation retracement operations, and achieves timely clearance of traffic order and normal operation of procedures.

CN118928509APending Publication Date: 2024-11-12WUHAN IRON & STEEL GRP ECHENG IRON & STEEL CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411006438.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-12

Smart Images

  • Figure CN118928509A_ABST
    Figure CN118928509A_ABST
Patent Text Reader

Abstract

The invention discloses an error correction method for an automatic program of a crossing railing, which comprises the following steps of: after the automatic program of the crossing railing runs for a preset time, acquiring the current state of the crossing railing and extracting a signal of a B end of a track sensor and interlocking information of a railway microcomputer; if the current state of the crossing handrail is a rod falling closed state, and when the crossing handrail automatic program runs to a preset time, a signal of the B end of a track taking sensor is not obtained, and meanwhile, the obtained railway microcomputer interlocking information shows that the railway is idle, it is judged that the crossing handrail automatic program has a true fault; and directly controlling the crossing handrail to rise when the automatic program of the crossing handrail is judged to have a true fault. Once it is judged that the crossing handrail is in an abnormal state, the crossing handrail can cross an automatic program of the crossing handrail, and the crossing handrail is directly controlled to rise so as to dredge crossing traffic, and the problems that program misjudgment is caused by railway transportation turn-back operation, and manual interference is needed after program faults are effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of railway crossing guardrail control, and in particular relates to an error correction method for an automatic program of a crossing guardrail. Background Art

[0002] The control of railway crossings in industrial and mining enterprises is crucial to safe production. In the past, when locomotives in the factory passed through railway crossings, they were generally controlled by humans at the crossing duty station to manually control the rise and fall of the crossing guardrails, close and open the crossing. With the natural reduction of employees in enterprises, the problem of job vacancies has become increasingly prominent. There is an urgent need to use automation to realize equipment instead of human operation, so as to alleviate the problem of staff shortage faced by enterprises.

[0003] After research and development, sensors were installed on the railway lines on both sides of the crossing. When one of the sensors was triggered, the control end controlled the crossing guardrail to automatically drop. After the sensor on the other side was triggered after passing the crossing, the control end controlled the crossing guardrail to automatically raise to ensure the normal operation of the crossing.

[0004] However, with the actual application, it was found that there are still some problems: due to the large number of railway transport return operations on the railway line (that is, only the sensor on one side of the crossing is triggered, but it does not pass through the crossing and cannot trigger the sensor on the other side of the crossing), the background control program of the crossing often misjudges that a locomotive has passed, thereby controlling the crossing guardrail to automatically drop. When an erroneous operation occurs, the crossing guardrail will remain in a closed state and upload an alarm message to the remote control end. After the worker sees the alarm message, the guardrail is remotely controlled. However, since the remote control end is not set up with a dedicated operator, it is necessary to wait until someone finds the alarm message before the guardrail can be remotely controlled to rise. However, this situation will cause a long-term interruption of the traffic order at the crossing, affecting the normal traffic order at the crossing. Summary of the invention

[0005] The purpose of the present invention is to provide an error correction method for an automatic program of a road crossing barrier in view of the problems existing in the prior art, so as to solve the problem that the traffic order is interrupted for a long time due to a program failure, affecting the normal traffic order at the road crossing.

[0006] To achieve the above object, the invention adopts the following technical solution: a method for correcting errors in an automatic program of a crossing guardrail, comprising the following steps: After the automatic program of the crossing guardrail runs to the preset time, the current state of the crossing guardrail is obtained and the signal of the track sensor B end and the information of the railway microcomputer interlocking are extracted; If the current state of the crossing guardrail is the closed state, and the signal from the track sensor B is obtained within the preset time when the automatic program of the crossing guardrail runs, and the information obtained from the railway microcomputer interlocking shows that the railway is occupied, then the automatic program of the crossing guardrail is determined to be normal; If the current state of the crossing guardrail is the closed state, and the signal from the track sensor B is not obtained within the preset time of the crossing guardrail automatic program, and the railway microcomputer interlocking information obtained shows that the railway is occupied, then the crossing guardrail automatic program is judged to be a false fault; If the current state of the crossing guardrail is the closed state, and the crossing guardrail automatic program runs for a predetermined time, and no signal is obtained from the track sensor B terminal, and the railway microcomputer interlocking information obtained at the same time shows that the railway is idle, then the crossing guardrail automatic program is determined to be a real fault; When it is determined that the automatic program of the crossing guardrail has a false fault, the crossing guardrail is controlled to rise when the information obtained from the railway microcomputer interlocking indicates that the railway is idle; When it is determined that the automatic program of the crossing guardrail is truly faulty, the crossing guardrail is directly controlled to rise.

[0007] Through the above method, each time the automatic program of the crossing guardrail runs to the preset time, the automatic error correction program will be started, and the current state of the crossing guardrail will be judged in combination with the actual situation. If it is normal, there is no problem. Once it is determined that the crossing guardrail is in an abnormal state, the automatic program of the crossing guardrail will be bypassed, and the raising of the crossing guardrail will be directly controlled to ease the traffic at the crossing. This effectively solves the problem of program misjudgment caused by the return operation of railway transportation, which requires manual intervention after the program fails. It can promptly release the abnormal blockade of the crossing, effectively reducing the impact on the traffic order at the crossing.

[0008] Optionally, if a railway occupied signal, railway open information, or crossing closed signal is received, the railway microcomputer interlocking information is that the railway is occupied; if a railway unoccupied signal, railway closed information, or crossing open signal is received, the railway microcomputer interlocking information is that the railway is idle.

[0009] Optionally, the automatic method of the automatic crossing guardrail program comprises the following steps: After receiving the signal detected by the track sensor A, the crossing guardrail is controlled to be lowered, and the crossing is blocked; Receives the signal detected by the B end of the track sensor, and controls the crossing guardrail to rise after the signal is lost for a buffer time.

[0010] Optionally, the crossing blocking time is greater than a predetermined time.

[0011] Optionally, when it is determined that the automatic program of the crossing guardrail has a false fault and after the crossing guardrail is controlled to rise, the automatic program of the crossing guardrail is initialized.

[0012] Based on the specification, the present invention provides, on one hand, an error correction system for an automatic program of a crossing guardrail, including a timing linkage module, a retrieval module, a comparison and judgment module, and an error correction execution module; The timing linkage module is used to start timing when the automatic program of the crossing barrier is started, and start other modules of the error correction program after reaching a predetermined time; The retrieval module is used to retrieve the current state of the crossing guardrail, the information of the railway microcomputer interlocking, and the signal of the track sensor B end; The comparison and judgment module is used to compare the current state of the crossing guardrail retrieved by the retrieval module, the information of the railway microcomputer interlocking, and the signal of the track sensor B end, and then judge the state of the automatic program of the crossing guardrail; The error correction execution module is used to send and execute control commands and control actions for the crossing guardrail according to the determined state of the automatic program of the crossing guardrail.

[0013] Optionally, the current status of the crossing guardrail includes: a closed state with the bar dropped, and an open state with the bar raised; the information of the railway microcomputer interlocking includes: railway occupancy information, railway opening operation information, and a crossing opening signal.

[0014] Optionally, the railway occupancy information includes: railway occupied signal, railway unoccupied signal; the railway open operation information includes: railway open information, railway closed information; the crossing open information includes: crossing open signal, crossing closed signal.

[0015] Optionally, the automatic program of the crossing guardrail includes three operating states: normal, false fault, and true fault.

[0016] Compared with the prior art, the beneficial effects of the present invention are: 1. Each time the automatic program of the crossing guardrail runs to a predetermined time, the automatic error correction program will be started to judge the current state of the crossing guardrail in combination with the actual situation. If it is normal, there is no problem. Once it is determined that the crossing guardrail is in an abnormal state, the automatic program of the crossing guardrail will be bypassed to directly control the raising of the crossing guardrail to ease the traffic at the crossing, effectively solving the problem of program misjudgment caused by the return operation of railway transportation, which requires manual intervention after the program fails, and can promptly unlock the abnormal blockade of the crossing, effectively reducing the impact on the traffic order at the crossing; 2. After the error correction program bypasses the automatic program of the crossing guardrail to directly control the raising of the crossing guardrail, the automatic program of the crossing guardrail can be initialized and the automatic program of the crossing guardrail can continue to be used. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A schematic flow chart of an error correction method for an automatic program of a crossing guardrail according to an embodiment of the present invention; DETAILED DESCRIPTION

[0018] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] In the description of the present invention, it should be noted that the directions or positional relationships indicated by terms such as "middle", "upper", "lower", "left", "right", "inside" and "outside" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0020] In this embodiment, the automatic method of the road crossing guardrail automatic program comprises the following steps: After receiving the signal detected by the track sensor A, the crossing guardrail is controlled to be lowered, and the crossing is blocked; Receives the signal detected by the B end of the track sensor, and controls the crossing guardrail to rise after the signal is lost for a buffer time.

[0021] In this embodiment, a complete process is considered to be a step from lowering to raising the crossing guardrail. Once one is missing, it means that the crossing guardrail automatic program may fail. In the event of a failure, the crossing guardrail will always be in a closed state at the lower crossing.

[0022] In this embodiment, the buffer time is 5 to 8 seconds.

[0023] like Figure 1 As shown, the specific scheme of the embodiment is as follows: A method for correcting errors in an automatic program of a crossing guardrail comprises the following steps: After the automatic program of the crossing guardrail runs to the preset time, the current state of the crossing guardrail is obtained and the signal of the track sensor B end and the information of the railway microcomputer interlocking are extracted; If the current state of the crossing guardrail is the closed state, and the signal from the track sensor B is obtained within the preset time when the automatic program of the crossing guardrail runs, and the information obtained from the railway microcomputer interlocking shows that the railway is occupied, then the automatic program of the crossing guardrail is determined to be normal; What needs to be said here is that the crossing closure time is longer than the scheduled time.

[0024] If the current state of the crossing guardrail is the closed state, and the signal from the track sensor B is not obtained within the preset time of the crossing guardrail automatic program, and the railway microcomputer interlocking information obtained shows that the railway is occupied, then the crossing guardrail automatic program is judged to be a false fault; This situation occurs when the train is reversing at the crossing. When reversing, that is, the train passes the crossing but does not start the sensor B and turns back. The train will not trigger the track sensor B, but will occupy the crossing for a long time, so the barrier cannot be raised.

[0025] Therefore, when it is determined that the automatic program of the crossing guardrail has a false fault, the crossing guardrail is controlled to rise when the information obtained from the railway microcomputer interlocking indicates that the railway is idle; If the current state of the crossing guardrail is the closed state, and the crossing guardrail automatic program runs for a predetermined time, and no signal is obtained from the track sensor B terminal, and the railway microcomputer interlocking information obtained at the same time shows that the railway is idle, then the crossing guardrail automatic program is determined to be a real fault; After a true fault occurs, the crossing guardrail will remain in the closed state and cannot return to the normal state naturally. Therefore, when the crossing guardrail automatic program determines that the fault is true, the crossing guardrail is directly controlled to rise.

[0026] In this embodiment, when the automatic program of the crossing barrier reaches the preset time, which is tentatively set at 120 seconds, and the blocking time is generally 150 seconds, the error correction program starts running when the automatic program of the crossing barrier is normal and the train has not completely passed through the crossing, so as to shorten the waiting time for faults as much as possible.

[0027] It should be noted that in this embodiment, if the control end receives a railway occupied signal, railway open information, or a crossing closed signal, the railway microcomputer interlocking information is that the railway is occupied; if it receives a railway unoccupied signal, railway closed information, or a crossing open signal, the railway microcomputer interlocking information is that the railway is idle.

[0028] When it is determined that the automatic program of the crossing guardrail has a false fault and after the crossing guardrail is controlled to rise, the automatic program of the crossing guardrail is initialized.

[0029] Once the crossing barrier automatic program is initialized, it will be restored to its original state and continue to be used.

[0030] Based on the same technical concept as the above embodiments, the present invention provides, on one hand, an error correction system for an automatic program of a crossing guardrail, comprising a timing linkage module, a retrieval module, a comparison and judgment module, and an error correction execution module; The timing linkage module is used to start timing when the automatic program of the crossing barrier is started, and to start other modules of the error correction program after reaching the preset time; The retrieval module is used to retrieve the current status of the crossing guardrail, the information of the railway microcomputer interlocking, and the signal of the track sensor B end; The comparison and judgment module is used to compare the current state of the crossing guardrail retrieved by the retrieval module, the information of the railway microcomputer interlocking, and the signal of the track sensor B end, and then judge the state of the crossing guardrail automatic program; The error correction execution module is used to send and execute control commands and control actions for the crossing guardrail according to the determined state of the automatic program of the crossing guardrail.

[0031] The current status of the crossing guardrail includes: closed state of the lowered guardrail and open state of the raised guardrail; the information of the railway microcomputer interlocking includes: railway occupancy information, railway opening operation information, and crossing opening signal.

[0032] Railway occupation information includes: railway occupation signal and railway non-occupied signal; railway open operation information includes: railway open information and railway closed information; crossing open information includes: crossing open signal and crossing closed signal.

[0033] The automatic program of the crossing guardrail includes three operating states: normal, false fault and true fault.

[0034] This system automatically runs during a period of time when the automatic program of the crossing guardrail runs, and supervises the automatic program of the crossing guardrail. If there is no error, it will pass. If there is an error, the fault will be judged and analyzed for the error of the automatic program of the crossing guardrail. If it is determined to be a false fault or a real fault, the automatic program of the crossing guardrail will be directly bypassed. After the conditions are met, this system will directly control the crossing guardrail to raise it, and this system will initialize the automatic program of the crossing guardrail so that the automatic program of the crossing guardrail can run normally afterwards.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for correcting errors in the automatic program of a crossing guardrail. Its characteristics are: The following steps are involved: After the automatic program of the crossing guardrail runs to the preset time, the current state of the crossing guardrail is obtained and the signal of the track sensor B end and the information of the railway microcomputer interlocking are extracted; If the current state of the crossing guardrail is the closed state, and the signal from the track sensor B is obtained within the preset time when the automatic program of the crossing guardrail runs, and the information obtained from the railway microcomputer interlocking shows that the railway is occupied, then the automatic program of the crossing guardrail is determined to be normal; If the current state of the crossing guardrail is the closed state, and the signal from the track sensor B is not obtained within the preset time of the crossing guardrail automatic program, and the railway microcomputer interlocking information obtained shows that the railway is occupied, then the crossing guardrail automatic program is judged to be a false fault; If the current state of the crossing guardrail is the closed state, and the crossing guardrail automatic program runs for a predetermined time, and no signal is obtained from the track sensor B terminal, and the railway microcomputer interlocking information obtained at the same time shows that the railway is idle, then the crossing guardrail automatic program is determined to be a real fault; When it is determined that the automatic program of the crossing guardrail has a false fault, the crossing guardrail is controlled to rise when the information obtained from the railway microcomputer interlocking indicates that the railway is idle; When it is determined that the automatic program of the crossing guardrail is truly faulty, the crossing guardrail is directly controlled to rise.

2. A method for correcting errors in an automatic program of a crossing guardrail according to claim 1, Its characteristics are: If a railway occupation signal, railway opening information, or crossing closure signal is received, the railway microcomputer interlocking information is railway occupation; If a railway unoccupied signal, railway closed information, or crossing open signal is received, the railway microcomputer interlocking information is that the railway is idle.

3. The error correction method for the automatic program of a crossing guardrail according to claim 1, Its characteristics are: The automatic method of the road crossing guardrail automatic program comprises the following steps: After receiving the signal detected by the track sensor A, the crossing guardrail is controlled to be lowered, and the crossing is blocked; Receives the signal detected by the B end of the track sensor, and controls the crossing guardrail to rise after the signal is lost for a buffer time.

4. The error correction method for the automatic program of a crossing guardrail according to claim 3, Its characteristics are: The crossing blocking time is greater than a predetermined time.

5. The method for correcting errors in the automatic program of a crossing guardrail according to claim 1, Its characteristics are: When it is determined that the automatic program of the crossing guardrail has a false fault and after the crossing guardrail is controlled to rise, the automatic program of the crossing guardrail is initialized.

6. An error correction system for the automatic program of the crossing guardrail, Its characteristics are: It includes timing linkage module, retrieval module, comparison and judgment module, and error correction execution module; The timing linkage module is used to start timing when the automatic program of the crossing barrier is started, and start other modules of the error correction program after reaching a predetermined time; The retrieval module is used to retrieve the current state of the crossing guardrail, the information of the railway microcomputer interlocking, and the signal of the track sensor B end; The comparison and judgment module is used to compare the current state of the crossing guardrail retrieved by the retrieval module, the information of the railway microcomputer interlocking, and the signal of the track sensor B end, and then judge the state of the automatic program of the crossing guardrail; The error correction execution module is used to send and execute control commands and control actions for the crossing guardrail according to the determined state of the automatic program of the crossing guardrail.

7. The error correction system for the automatic program of the crossing guardrail according to claim 6, Its characteristics are: The current status of the crossing guardrail includes: a closed state of the lowered guardrail and an open state of the raised guardrail; the information of the railway microcomputer interlocking includes: railway occupancy information, railway opening operation information, and a crossing opening signal.

8. The error correction system for the automatic program of the crossing guardrail according to claim 7, Its characteristics are: The railway occupation information includes: railway occupation signal and railway non-occupied signal; the railway opening operation information includes: railway opening information and railway closing information; the crossing opening information includes: crossing opening signal and crossing closing signal.

9. The error correction system for the automatic program of a crossing guardrail according to claim 1, Its characteristics are: The automatic program of the crossing guardrail includes three operating states: normal, false fault and true fault.