Combined barge and assembly method thereof

By designing a detachable ship beam and ship side combination, the problem of barges being limited by channel width due to excessive size is solved, and the tow requirements for different channel widths are adapted to ensure the smooth progress of the project.

CN118928666APending Publication Date: 2024-11-12SHANGHAI ZHENHUA HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411300678.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The barge is limited by the width of the channel due to its excessive size, which affects the development of the engineering project.

Method used

Design a combined barge, including detachable ship beams and ship sideways, through the ship beam connecting parts and ship side connections, to form a ship beam assembly and ship side combination, to adapt to different Width of the channel requirement.

Benefits of technology

The barges can meet cargo transportation needs in a combined state and can be split to adapt to different widths of waterways to ensure the smooth development of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928666A_ABST
    Figure CN118928666A_ABST
Patent Text Reader

Abstract

The invention discloses a combined barge and an assembly method thereof, the combined barge comprises two beams and two sides, the two beams are respectively a first beam and a second beam, and the two sides are respectively a first side and a second side; the first ship beam, the first ship side, the second ship beam and the second ship side can be connected end to end to define a barge; the ship beams and the ship sides can be separated from each other, so that the two ship beams are detachably connected, and the two ship sides are detachably connected. Thus, the combined barge can meet the working requirements of cargo transportation and the like in the combined state, and the combined barge can also be split into the ship beam assembly and the ship side assembly so as to meet the towing requirements of channels with different widths, and smooth engineering development is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of hull assembly, and in particular to a modular barge and an assembly method thereof. Background Art

[0002] Barges are cargo ships that have no self-propulsion capability and need to be towed by tugboats or pushboats. They are characterized by simple equipment, shallow draft, and large cargo capacity. Barges are generally non-motorized ships that form a barge fleet with tugboats or pushboats. They can be organized at any time according to cargo transportation requirements and are suitable for cargo transportation between inland ports.

[0003] However, barges are usually relatively large in size and are therefore often limited by the width of the waterway during towing, which affects the implementation of engineering projects. Summary of the invention

[0004] The present invention is made to solve the above technical problems, and its purpose is to provide a modular barge and an assembly method thereof, which can solve the problem in the related art that the barge is limited by the width of the channel and cannot smoothly carry out the project.

[0005] In a first aspect, the present invention discloses a modular barge, comprising two beams and two sides, the two beams are respectively a first beam and a second beam, and the two sides are respectively a first side and a second side; the first beam, the first side, the second beam and the second side can be connected end to end to form a barge; the beam and the side can be separated from each other so that the two beams can be detachably connected, and the two sides can be detachably connected.

[0006] Optionally, beam connectors are provided at both ends of the beam, and side connectors are provided at both ends of the side; the beam can be detachably connected to the side of the ship through the beam connector and the side connector; the two beams can be detachably connected through the beam connector; the two sides of the ship can be detachably connected through the side connector.

[0007] Optionally, the ship beam includes a beam body and an extension plate, an extension plate is provided at each end of the beam body, the space area defined between the beam body and the extension plate is a first avoidance gap, the end of the ship's side is accommodated in the first avoidance gap, at least part of the beam body is limited between the two ship's sides, and the bottom surface of the extension plate and the top surface of the ship's side are arranged to face each other.

[0008] Optionally, a mounting boss is provided at each end of the top of the ship's side, and the extension plate is overlapped on the mounting boss.

[0009] Optionally, the ship beam is provided with a ship beam main positioning part, the ship side is provided with a ship side main positioning part, the ship beam main positioning part corresponds to the ship side main positioning part, and the ship beam cooperates with the ship side limit through the ship beam main positioning part and the ship side main positioning part; the ship beam is provided with a ship beam pre-positioning part, the ship side is provided with a ship side pre-positioning part, the ship beam pre-positioning part corresponds to the ship side pre-positioning part, and the ship beam cooperates with the ship side limit through the ship beam pre-positioning part and the ship side pre-positioning part.

[0010] Optionally, ballast water tanks are provided in the side of the ship.

[0011] In a second aspect, the present invention discloses a method for assembling a barge, which is applied to the above-mentioned barge, wherein the two ship beams are respectively a first ship beam and a second ship beam, and the first ship beam and the second ship beam are detachably connected to form a ship beam assembly, and the two ship sides are respectively a first ship side and a second ship side, and the first ship side and the second ship side are detachably connected to form a ship side assembly, and the assembling method comprises:

[0012] Splitting the ship side assembly into a first ship side and a second ship side;

[0013] Performing a first ship beam connection process includes: pulling the ship side so that a first end of the first ship side is connected to a first end of a first ship beam, and so that a first end of the second ship side is connected to a second end of the first ship beam;

[0014] The second ship beam connection process is performed, including: splitting the ship beam assembly and pulling the second ship beam so that the first end of the second ship beam is connected to the second end of the first ship side, and the second end of the second ship beam is connected to the second end of the second ship side.

[0015] Optionally, a ballast water tank is provided in the ship's side, and before performing the first ship beam connection process, the assembly method further includes:

[0016] placing the beam assembly, the first ship side and the second ship side in water;

[0017] Adjusting the positions of the ship beam assembly and the ship side so that the ship beam assembly extends in a first direction, the first ship beam and the second ship beam are connected to each other in a second direction, and the ship side extends in the second direction, the first ship side and the second ship side are arranged opposite to each other in the first direction; the first direction and the second direction are different;

[0018] adjusting the ballast water in the first ship side and the second ship side so that the first ship side and the second ship side are submerged below the beam assembly;

[0019] The first beam connection process includes:

[0020] Performing the first ship beam pairing step includes: pulling the first ship side and the second ship side so that the first end of the first ship side is arranged opposite to the first end of the first ship beam, and the first end of the second ship side is arranged opposite to the second end of the first ship beam;

[0021] Performing the first ship beam positioning step includes: adjusting ballast water in the first ship side and the second ship side so that the first ship side and the second ship side float upward, and the first end of the first ship side approaches the first end of the first ship beam, and the first end of the second ship side approaches the second end of the first ship beam;

[0022] The first ship beam installation step is performed, including: connecting the first end of the first ship side and the first end of the first ship beam, and connecting the first end of the second ship side and the second end of the first ship beam.

[0023] Optionally, before performing the second ship beam connection process, the method further includes:

[0024] adjusting the ballast water in the first ship side and the second ship side so that the beam assembly submerges along with the first ship side and the second ship side;

[0025] The second ship beam connection process includes:

[0026] Splitting the ship beam assembly so that the second ship beam floats up and is separated from the first ship beam;

[0027] The second beam pairing step includes: pulling the second beam so that the first end of the second beam is arranged opposite to the second end of the first ship side, and the second end of the second beam is arranged opposite to the second end of the second ship side;

[0028] Executing the second ship beam positioning step includes: adjusting the ballast water in the first ship side and the second ship side so that the first ship side and the second ship side float upward, and the first end of the second ship beam approaches the second end of the first ship side, and the second end of the second ship beam approaches the second end of the second ship side;

[0029] The second ship beam installation step is performed, including: connecting the first end of the second ship beam with the second end of the first ship side, and connecting the second end of the second ship beam with the second end of the second ship side.

[0030] Optionally, the ship beam is provided with a ship beam main positioning part, the ship side is provided with a ship side main positioning part, the ship beam main positioning part corresponds to the ship side main positioning part, and the ship beam cooperates with the ship side limit through the ship beam main positioning part and the ship side main positioning part; the ship beam is provided with a ship beam pre-positioning part, the ship side is provided with a ship side pre-positioning part, the ship beam pre-positioning part corresponds to the ship side pre-positioning part, and the ship beam cooperates with the ship side limit through the ship beam pre-positioning part and the ship side pre-positioning part;

[0031] The first beam positioning step includes:

[0032] adjusting the ballast water in the first ship side and the second ship side so that the first ship side and the second ship side float to a first height position, so that the ship side pre-positioning portion at the first end of the first ship side is positioned in the ship beam pre-positioning portion at the first end of the first ship beam, and the ship side pre-positioning portion at the first end of the second ship side is positioned in the ship beam pre-positioning portion at the second end of the first ship beam;

[0033] adjusting the ballast water in the first side and the second side so that the first side and the second side float to a second height position, so that the side main positioning part at the first end of the first side is positioned in the beam main positioning part at the first end of the first beam, and the side main positioning part at the first end of the second side is positioned in the beam main positioning part at the second end of the first beam;

[0034] The second beam positioning step includes:

[0035] adjusting the ballast water in the first ship side and the second ship side so that the first ship side and the second ship side float to a first height position, positioning the ship side pre-positioning portion at the second end of the first ship side to the ship beam pre-positioning portion at the first end of the second ship beam, and positioning the ship side pre-positioning portion at the second end of the second ship side to the ship beam pre-positioning portion at the second end of the second ship beam,

[0036] The ballast water in the first side and the second side is adjusted to float the first side and the second side to a second height position, so as to position the side main positioning part at the second end of the first side in the main positioning part of the beam at the first end of the second beam, and to position the side main positioning part at the second end of the second side in the main positioning part of the beam at the second end of the second beam.

[0037] The beneficial effects of the present invention are as follows:

[0038] The combined barge disclosed in the present application comprises two ship beams and two ship sides, wherein the two ship beams are respectively a first ship beam and a second ship beam, and the two ship sides are respectively a first ship side and a second ship side; the first ship beam, the first ship side, the second ship beam and the second ship side can be connected end to end to form a barge; the ship beam and the ship side can be separated from each other so that the two ship beams can be detachably connected to each other, and the two ship sides can be detachably connected to each other.

[0039] In this way, the modular barge can meet the needs of cargo transportation and other work in the assembled state. The modular barge can also be disassembled into a beam assembly and a side assembly to adapt to the towing needs of waterways of different widths and ensure the smooth progress of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The above features and advantages of the present invention can be better understood after reading the detailed description of the embodiments of the present disclosure in conjunction with the following drawings. In the drawings, the components are not necessarily drawn to scale, and components with similar related properties or features may have the same or similar reference numerals.

[0041] Figure 1 It is a structural diagram of the barge of the present invention;

[0042] Figure 2 The present invention Figure 1 A magnified view of point I;

[0043] Figure 3 It is a structural diagram of the ship beam of the present invention;

[0044] Figure 4 It is a structural diagram of the ship's side of the present invention;

[0045] Figure 5 This is a schematic diagram of the pre-positioning of the ship beam and the ship side of the present invention;

[0046] Figure 6 This is a schematic diagram of the precise positioning of the ship beam and the ship side of the present invention;

[0047] Figure 7 This is a schematic diagram of the connection between the ship beam and the ship side of the present invention;

[0048] Figure 8 is a first assembly process diagram of the barge of the present invention;

[0049] Fig. 9 is a second assembly process diagram of the barge of the present invention;

[0050] Fig.10 is a third assembly process diagram of the barge of the present invention;

[0051] Fig.11 It is a fourth assembly process diagram of the barge of the present invention.

[0052] Description of reference numerals:

[0053] X-first direction, Y-second direction,

[0054] 1-Ship beam assembly,

[0055] 101-first ship beam, 1011-first end of the first ship beam, 1012-second end of the first ship beam,

[0056] 102-second ship beam, 1021-first end of the second ship beam, 1022-second end of the second ship beam,

[0057] 10-Ship beam,

[0058] 11- beam body, 12- extension plate, 13- first avoidance gap,

[0059] 2-Ship side assembly,

[0060] 201-first ship side, 2011-first ship side first end, 2012-first ship side second end,

[0061] 202-second ship side, 2021-second ship side first end, 2022-second ship side second end,

[0062] 20- ship side, 21- second avoidance gap, 22- mounting boss,

[0063] 31- ship beam connector, 32- ship side connector, 33- bolt fastening assembly,

[0064] 41- ship beam main positioning part, 42- ship side main positioning part,

[0065] 51- ship beam pre-positioning part, 52- ship side pre-positioning part, 53- cylindrical pin. DETAILED DESCRIPTION

[0066] The present invention is further described below in conjunction with specific embodiments and drawings. More details are elaborated in the following description to facilitate a full understanding of the present invention. However, the present invention can obviously be implemented in a variety of other ways different from the description herein. Those skilled in the art can make similar generalizations and deductions based on actual application situations without violating the connotation of the present invention. Therefore, the protection scope of the present invention should not be limited by the content of this specific embodiment.

[0067] It should be noted that these and other subsequent drawings are only examples and are not drawn to scale, and should not be used to limit the actual scope of protection required by the present invention.

[0068] The barges in the related art are usually of relatively large size, so they are often limited by the width of the waterway during towing, which affects the development of engineering projects. In order to solve such problems, the technical solution of the present invention is produced. Figures 1 to 11 To elaborate.

[0069] The present invention discloses a combined barge, comprising two ship beams 10 and two ship sides 20; the two ship beams 10 are respectively a first ship beam 101 and a second ship beam 102, one of the first ship beam 101 and the second ship beam 102 can be understood as a bow beam, and the other can be understood as a stern beam; the two ship sides 20 are respectively a first ship side 201 and a second ship side 202, one of the first ship side 201 and the second ship side 202 can be understood as a left ship side, and the other can be understood as a right ship side.

[0070] like Figure 1 As shown, in the combined state of the combined barge, the first beam 101, the first side 201, the second beam 102 and the second side 202 are connected end to end to form a barge with a rectangular frame structure, wherein the first beam 101 and the second beam 102 are relatively arranged along the longitudinal direction of the barge, and the first beam 101 and the second beam 102 are both extended along the transverse direction of the barge, the first side 201 and the second side 202 are relatively arranged along the transverse direction of the barge, and the first side 201 and the second side 202 are both extended along the longitudinal direction of the barge, and the barge is used to meet the needs of cargo transportation, etc.

[0071] like Figure 8As shown, the modular barge can also be disassembled. Specifically, when the barge is disassembled, the beam 10 and the side 20 will be separated from each other, and the two beams 10 will be detachably connected, and the two sides 20 will also be detachably connected, that is, the first beam 101 and the second beam 102 are connected to each other to form a beam assembly 1, and the first side 201 and the second side 202 are connected to each other to form a side assembly 2.

[0072] In this way, the modular barge can meet the needs of cargo transportation and other work in the assembled state, and the modular barge can also be disassembled into the ship beam assembly 1 and the ship side assembly 2 to adapt to the towing requirements of waterways of different widths and ensure the smooth progress of the project.

[0073] Optionally, the ship beam 10 is provided with a first side surface, and the ship side 20 is provided with a second side surface. Wherein, when the two ship beams 10 are connected to each other as a ship beam assembly 1, the first side surfaces of the two ship beams 10 are arranged to face each other; when the two ship sides 20 are connected to each other as a ship side assembly 2, the second side surfaces of the two ship sides 20 are arranged to face each other; when the two ship beams 10 and the two ship sides 20 are combined into a barge, the first side surfaces of the two ship beams 10 are arranged to face each other, and the second side surfaces of the two ship sides 20 are arranged to face each other, so as to limit the structure of the barge in the disassembled state, so as to facilitate the barge to meet the towing requirements after being disassembled.

[0074] Optionally, the connection between the ship beam assembly 1 and the ship side assembly 2 can be achieved by lashing with a hoop, lashing with a rope, etc., and the present invention adopts the following scheme:

[0075] like Figure 1 to Figure 4 As shown, beam connectors 31 are provided at both ends of the beam 10 , and side connectors 32 are provided at both ends of the side 20 . Both the beam connector 31 and the side connector 32 are provided with flange holes for passing bolt fastening assemblies 33 .

[0076] The ship beam 10 can be detachably connected to the ship side 20 through the ship beam connector 31 and the ship side connector 32, that is, by inserting a bolt fastening assembly 33 between the ship beam connector 31 and the ship side connector 32, so that the first ship beam 101, the first ship side 201, the second ship beam 102 and the second ship side 202 are connected end to end to form an assembled state of the barge, as shown in the specific example. Figure 1 , Figure 2 and Figure 7 As shown.

[0077] The two ship beams 10 can be detachably connected through the ship beam connector 31, that is, by inserting the bolt fastening assembly 33, the ship beam connector 31 of the first ship beam 101 can be detachably connected to the ship beam connector 31 of the second ship beam 102, so that the first ship beam 101 and the second ship beam 102 form a ship beam. Figure 8 The ship-beam assembly 1 is shown.

[0078] The two sidewalls 20 can be detachably connected through the sidewall connector 32, that is, by inserting the bolt fastening assembly 33, the sidewall connector 32 of the first sidewall 201 can be detachably connected to the sidewall connector 32 of the second sidewall 202, so that the first sidewall 201 and the second sidewall 202 form a Figure 8 The ship side assembly 2 is shown.

[0079] It can be seen that the arrangement of the ship beam connector 31 and the ship side connector 32 can facilitate the switching of the barge between the assembled state and the disassembled state, making it easy to use.

[0080] Optionally, the beam connector 31 may be a flange provided on the beam 10, and a plurality of flange holes are provided on the beam connector 31; the side connector 32 may be a flange provided on the side 20, and a plurality of flange holes are provided on the side connector 32; by inserting a bolt fastening assembly 33 on the flange, the beam connector 31 and the side connector 32 are detachably connected, or the two beam connectors 31 are detachably connected, or the two side connectors 32 are detachably connected. Of course, the beam connector 31 and the side connector 32 may also be other structures for achieving connection, such as plywood, hoop, mortise and tenon fittings, etc., which will not be described in detail here.

[0081] Alternatively, if Figure 1 to Figure 4 As shown, the ship beam 10 includes a beam body 11 and an extension plate 12. An extension plate 12 is provided at each end of the beam body 11, and the extension plate 12 is arranged near the top of the ship beam 10. The space area defined between the beam body 11 and the extension plate 12 is a first avoidance gap 13. The first avoidance gap 13 and the extension plate 12 on the same side of the beam body 11 are arranged in sequence along the height direction of the barge. The end of the ship side 20 is accommodated in the first avoidance gap 13, the bottom surface of the extension plate 12 and the top surface of the ship side 20 are arranged facing each other, and at least part of the beam body 11 is limited between the two ship sides 20. In this way, the shaking of the ship beam 10 along its own extension direction and the shaking of the ship side 20 along its own width direction in the assembled state of the barge can be reduced, and the assembled state structure of the barge is more stable.

[0082] Alternatively, if Figure 1 to Figure 4As shown, the beam connector 31 is arranged at the periphery of the bottom surface of the extension plate 12 and at the periphery of the end surface of the beam body 11. The setting position of the side connector 32 corresponds to the beam connector 31. Specifically, the side connector 32 is arranged at the periphery of the top surface of the mounting boss 22 to connect the beam connector 31 at the periphery of the bottom surface of the extension plate 12, and the side connector 32 is arranged at the periphery of the second side surface of the mounting boss 22 to connect the beam connector 31 arranged at the periphery of the end surface of the beam body 11. The second side surface is the side surface where the two side rails 20 face each other. In this way, more side connectors 32 and beam connectors 31 can be arranged at the intersection of the beam 10 and the side rail 20 for connection, thereby making the assembled state structure of the barge more stable.

[0083] Alternatively, if Figure 1 to Figure 4 As shown, a mounting boss 22 is provided at each end of the top of the ship side 20, a second avoidance gap 21 is formed between the two mounting bosses 22, and the extension plate 12 is overlapped on the mounting boss 22. This arrangement is to facilitate the assembly of the barge, and is specifically described as follows:

[0084] The barge is assembled in water. Fig. 9 and Fig.10 As shown, the side assembly 2 is split into a first side 201 and a second side 202, and then, while the beam assembly 1 is not split, the mounting boss 22 at the first end 2011 of the first side and the mounting boss 22 at the first end 2021 of the second side are respectively connected to the extension plates 12 at both ends of the first beam 101.

[0085] like Fig.10 and Fig.11 As shown, after the first ship beam 101 is respectively connected to the first ship side 201 and the second ship side 202, the ship beam assembly 1 is split to pull the second ship beam 102 to the side away from the first ship beam 101, and the mounting boss 22 at the second end 2012 of the first ship side and the mounting boss 22 at the second end 2022 of the second ship side are respectively connected to the extension plates 12 at both ends of the second ship beam 102 to complete the barge assembly.

[0086] It can be seen that the second avoidance gap 21 generated by the arrangement of the two mounting bosses 22 can prevent the second beam 102 from colliding with the first ship side 201 and the second ship side 202 during the towing process of the second beam 102, thereby ensuring that the second beam 102 can be smoothly towed to the installation position and ensure the smooth assembly of the barge. Fig.10 In the assembly process shown, the first ship side 201 and the second ship side 202 will directly pass through the second ship beam 102 to connect with the first ship beam 101, that is, the design of the first avoidance gap 13 can avoid installation interference during the assembly process.

[0087] Alternatively, if Figure 3 , Figure 4 , Fig.10 and Fig.11 As shown, the depth of the first avoidance gap 13 is less than or equal to the depth of the second avoidance gap 21, the depth direction of the first avoidance gap 13 and the depth of the second avoidance gap 21 are consistent with the height direction of the barge, and the second avoidance gap 21 and the ship beam 10 are staggered from each other in the extension direction of the ship beam 10. In this way, the abnormality of colliding with the first ship side 201 and the second ship side 202 during the towing process of the second ship beam 102 can be further avoided.

[0088] Alternatively, if Figure 1 to Figure 4 As shown, the ship beam 10 is provided with a ship beam main positioning portion 41, and the ship side 20 is provided with a ship side main positioning portion 42. The ship beam main positioning portion 41 corresponds to the ship side main positioning portion 42, and the ship beam 10 is limitedly matched with the ship side 20 through the ship beam main positioning portion 41 and the ship side main positioning portion 42.

[0089] For example, the main positioning portion 42 of the ship's side is a tapered pin provided on the top surface of the mounting boss 22, and the main positioning portion 41 of the ship's beam is a tapered hole provided on the bottom surface of the extension plate 12, or the main positioning portion 42 of the ship's side is a tapered hole provided on the top surface of the mounting boss 22, and the main positioning portion 41 of the ship's beam is a tapered pin provided on the bottom surface of the extension plate 12, and the main positioning portion 41 of the ship's beam and the main positioning portion 42 of the ship's side are taperedly matched, thereby realizing the limited matching between the ship's beam 10 and the ship's side 20.

[0090] Multiple beam main positioning parts 41 and side main positioning parts 42 can be provided, for example, two beam main positioning parts 41 and two side main positioning parts 42 are provided respectively, and the connecting line between the two beam main positioning parts 41 and the connecting line between the side main positioning parts 42 are inclined to be different from the extension direction of the beam 10 and the extension direction of the side 20, so as to improve the effect of limiting cooperation.

[0091] like Figure 2 and Figure 5 As shown, the ship beam 10 is provided with a ship beam pre-positioning portion 51, and the ship side 20 is provided with a ship side pre-positioning portion 52. The ship beam pre-positioning portion 51 corresponds to the ship side pre-positioning portion 52, and the ship beam 10 is limitedly matched with the ship side 20 through the ship beam pre-positioning portion 51 and the ship side pre-positioning portion 52.

[0092] For example, the beam pre-positioning portion 51 is a lug provided on the periphery of the extension plate 12, and the side pre-positioning portion 52 is a lug provided on the periphery of the mounting boss 22, and the lug is provided with a positioning hole, and the positioning hole of the beam pre-positioning portion 51 and the positioning hole of the side pre-positioning portion 52 are sequentially penetrated by a cylindrical pin 53 to achieve the limited matching of the beam 10 and the side 20. Multiple beam pre-positioning portions 51 and side pre-positioning portions 52 can be provided to ensure the effect of limited matching.

[0093] In summary, by setting the beam main positioning part 41 and the side main positioning part 42, as well as by setting the beam pre-positioning part 51 and the side pre-positioning part 52, the beam 10 and the side 20 can be quickly positioned, reducing the time for position correction of the beam 10 and the side 20 and improving the assembly speed of the barge.

[0094] Optionally, a ballast water tank is provided in the ship's side 20 to facilitate adjustment of the draft in the water for ease of use.

[0095] The following describes the combination method of the barge, which includes:

[0096] Step S50: Prepare a ship side assembly 2 and a ship beam assembly 1, as follows: Figure 8 shown.

[0097] Step S100: At a construction site underwater or on the shore, the ship side assembly 2 is split into a first ship side 201 and a second ship side 202; Fig. 9 shown.

[0098] Step S200: placing the ship-beam assembly 1, the first ship side 201 and the second ship side 202 in water.

[0099] Step S300: Adjust the positions of the beam assembly 1 and the side 20, so that the beam assembly 1 extends along the first direction X, the first beam 101 and the second beam 102 are connected to each other along the second direction Y, and the side 20 extends along the second direction Y, the first side 201 and the second side 202 are arranged relatively along the first direction X, and the first side 201 and the second side 202 are both located on the side of the second beam 102 away from the first beam 101, so as to facilitate the subsequent towing of the second beam 102; the first direction X and the second direction Y are different, for example, the first direction X is the transverse direction of the barge, and the second direction Y is the longitudinal direction of the barge, and such position adjustment is convenient for subsequent assembly.

[0100] Step S400: adjusting the ballast water in the first ship side 201 and the second ship side 202, that is, filling the ballast water tanks of the first ship side 201 and the second ship side 202 with ballast water so that the first ship side 201 and the second ship side 202 are submerged below the beam assembly 1.

[0101] Step S500: Execute the first ship beam 101 connection process, including:

[0102] Step S510: performing the first ship beam 101 pairing process, including: pulling the first ship side 201 and the second ship side 202, so that the first ship side first end 2011 is arranged opposite to the first ship beam first end 1011, and the second ship side first end 2021 is arranged opposite to the first ship beam second end 1012; that is, the first ship side first end 2011 is located directly below the first ship beam first end 1011, and the second ship side first end 2021 corresponds to below the first ship beam second end 1012, specifically Fig.10 It should be noted that the first side first end 2011, the second side first end 2021, and the first side second end 2012 and the second side second end 2022 in the following text are all the locations of the mounting boss 22 on the side 20; and the first beam first end 1011, the first beam second end 1012, and the second beam first end 1021 and the second beam second end 1022 in the following text are all the locations of the extension plate 12 on the beam 10; the extension plate 12 is overlapped on the mounting boss 22, thereby realizing the mutual connection between the side 20 and the beam 10.

[0103] Step S520: executing the first ship beam 101 positioning step, including:

[0104] like Figure 5 and Fig.10 As shown, the pre-positioning of the first ship beam 101 and the first ship side 201 and the second ship side 202 is completed, including: adjusting the ballast water in the first ship side 201 and the second ship side 202 to make the first ship side 201 and the second ship side 202 float to a first height position, and sequentially penetrating the ship beam pre-positioning portion 51 and the ship side pre-positioning portion 52 through the cylindrical pin 53 to position the ship side pre-positioning portion 52 at the first end 2011 of the first ship side to the ship beam pre-positioning portion 51 at the first end 1011 of the first ship beam, and positioning the ship side pre-positioning portion 52 at the first end 2021 of the second ship side to the ship beam pre-positioning portion 51 at the second end 1012 of the first ship beam.

[0105] like Figure 6 and Fig.10 As shown, the precise positioning between the first ship beam 101 and the first ship side 201 and the second ship side 202 is completed, including: adjusting the ballast water in the first ship side 201 and the second ship side 202 to make the first ship side 201 and the second ship side 202 float to the second height position, so that the ship side main positioning part 42 of the tapered pin structure is taperedly matched with the ship beam main positioning part 41 of the tapered hole structure, so as to position the ship side main positioning part 42 at the first end 2011 of the first ship side in the ship beam main positioning part 41 at the first end 1011 of the first ship beam, and to position the ship side main positioning part 42 at the first end 2021 of the second ship side in the ship beam main positioning part 41 at the second end 1012 of the first ship beam.

[0106] Step S530: Figure 7 , Fig. 9 and Fig.10 As shown, the first ship beam 101 installation step is performed, including: connecting the ship side connector 32 at the first end 2011 of the first ship side and the ship beam connector 31 at the first end 1011 of the first ship beam by inserting a bolt fastening assembly 33, and connecting the ship side connector 32 at the first end 2021 of the second ship side and the ship beam connector 31 at the second end 1012 of the first ship beam.

[0107] Step S600: adjusting the ballast water in the first ship side 201 and the second ship side 202 so that the ship beam assembly 1 dives below the first height along with the first ship side 201 and the second ship side 202.

[0108] Step S700: Execute the second ship beam 102 connection process, including:

[0109] Step S710: Disassemble the ship beam assembly 1 so that the second ship beam 102 floats and is separated from the first ship beam 101. At this time, the draft of the first ship beam 101, the first ship side 201 and the second ship side 202 is greater than the draft of the second ship beam 102, and the height of the second ship beam 102 is higher.

[0110] Step S720: Fig.11 As shown, the second beam 102 pairing step is performed, including: pulling the second beam 102 so that the first end 1021 of the second beam is arranged opposite to the second end 2012 of the first ship side, and the second end 1022 of the second beam is arranged opposite to the second end 2022 of the second ship side; that is, the second end 2012 of the first ship side is located directly below the first end 1021 of the second beam, and the second end 2022 of the second ship side is located directly below the second end 1022 of the second beam.

[0111] Step S730: executing the second ship beam 102 positioning step, including:

[0112] like Figure 5 and Fig.11 As shown, the pre-positioning of the second ship beam 102 with the first ship side 201 and the second ship side 202 is completed, including: adjusting the ballast water in the first ship side 201 and the second ship side 202 to make the first ship side 201 and the second ship side 202 float to a first height position, and sequentially penetrating the ship beam pre-positioning portion 51 and the ship side pre-positioning portion 52 through the cylindrical pin 53, so as to position the ship side pre-positioning portion 52 at the second end 2012 of the first ship side in the ship beam pre-positioning portion 51 at the first end 1021 of the second ship beam, and to position the ship side pre-positioning portion 52 at the second end 2022 of the second ship side in the ship beam pre-positioning portion 51 at the second end 1022 of the second ship beam.

[0113] like Figure 6 and Fig.11 As shown, the precise positioning of the second ship beam 102 and the first ship side 201 and the second ship side 202 is completed, including: adjusting the ballast water in the first ship side 201 and the second ship side 202 to make the first ship side 201 and the second ship side 202 float to the second height position, so that the ship side main positioning part 42 of the tapered pin structure is taperedly matched with the ship beam main positioning part 41 of the tapered hole structure, so as to position the ship side main positioning part 42 at the second end 2012 of the first ship side in the ship beam main positioning part 41 at the first end 1021 of the second ship beam, and to position the ship side main positioning part 42 at the second end 2022 of the second ship side in the ship beam main positioning part 41 at the second end 1022 of the second ship beam.

[0114] Step S740: Figure 7 and Fig.11 As shown, the second ship beam 102 installation step is performed, including: connecting the ship beam connector 31 on the first end 1021 of the second ship beam with the ship side connector 32 on the second end 2012 of the first ship side by inserting a bolt fastening assembly 33, and connecting the ship beam connector 31 on the second end 1022 of the second ship beam with the ship side connector 32 on the second end 2022 of the second ship side.

[0115] Although the present invention is disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art may make possible changes and modifications without departing from the spirit and scope of the present invention. Therefore, any modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the protection scope defined by the claims of the present invention.

Claims

1. A modular barge, characterized in that: The invention comprises two ship beams (10) and two ship sides (20), wherein the two ship beams (10) are respectively a first ship beam (101) and a second ship beam (102), and the two ship sides (20) are respectively a first ship side (201) and a second ship side (202); The first ship beam (101), the first ship side (201), the second ship beam (102) and the second ship side (202) can be connected end to end to form the barge; The ship beam (10) and the ship side (20) can be separated from each other so that the two ship beams (10) can be detachably connected to each other, and the two ship sides (20) can be detachably connected to each other.

2. The barge according to claim 1, characterized in that: Both ends of the ship beam (10) are provided with ship beam connectors (31), and both ends of the ship side (20) are provided with ship side connectors (32); The ship beam (10) can be detachably connected to the ship side (20) via the ship beam connecting member (31) and the ship side connecting member (32); The two ship beams (10) can be detachably connected via the ship beam connecting piece (31); The two ship sides (20) can be detachably connected via the ship side connecting piece (32).

3. The barge according to claim 2, characterized in that: The ship beam (10) comprises a beam body (11) and an extension plate (12), wherein the extension plate (12) is provided at each end of the beam body (11). The space area defined between the beam body (11) and the extension plate (12) is a first avoidance gap (13), the end of the ship side (20) is accommodated in the first avoidance gap (13), at least part of the beam body (11) is limited between the two ship sides (20), and the bottom surface of the extension plate (12) and the top surface of the ship side (20) are arranged to face each other.

4. The barge according to claim 3, characterized in that A mounting boss (22) is respectively arranged at two ends of the top of the ship side (20), and the extension plate (12) is overlapped on the mounting boss (22).

5. The barge according to claim 1, characterized in that: The ship beam (10) is provided with a ship beam main positioning portion (41), the ship side (20) is provided with a ship side main positioning portion (42), the ship beam main positioning portion (41) corresponds to the ship side main positioning portion (42), and the ship beam (10) is limitedly matched with the ship side (20) through the ship beam main positioning portion (41) and the ship side main positioning portion (42); The ship beam (10) is provided with a ship beam pre-positioning portion (51), and the ship side (20) is provided with a ship side pre-positioning portion (52). The ship beam pre-positioning portion (51) corresponds to the ship side pre-positioning portion (52), and the ship beam (10) is limitedly matched with the ship side (20) through the ship beam pre-positioning portion (51) and the ship side pre-positioning portion (52).

6. The barge according to claim 1, characterized in that A ballast water tank is provided in the ship's side (20).

7. A method for assembling a barge, characterized in that: Applied to the barge according to claim 1, the first ship beam (101) and the second ship beam (102) are detachably connected to form a ship beam assembly (1), and the first ship side (201) and the second ship side (202) are detachably connected to form a ship side assembly (2), and the assembly method comprises: Splitting the ship side assembly (2) into the first ship side (201) and the second ship side (202); Executing a first ship beam (101) connection process, comprising: pulling the ship side (20) so that the first ship side first end (2011) is connected to a first ship beam first end (1011), and so that the second ship side first end (2021) is connected to a first ship beam second end (1012); The second ship beam (102) connection process is performed, comprising: splitting the ship beam assembly (1) and pulling the second ship beam (102) so that the first end (1021) of the second ship beam is connected to the second end (2012) of the first ship side, and the second end (1022) of the second ship beam is connected to the second end (2022) of the second ship side.

8. The combination method according to claim 7, characterized in that: The ship side (20) is provided with a ballast water tank, and before performing the first ship beam (101) connection process, the assembly method further comprises: Placing the ship beam assembly (1), the first ship side (201) and the second ship side (202) in water; Adjusting the positions of the ship beam assembly (1) and the ship side (20) so that the ship beam assembly (1) extends in a first direction, the first ship beam (101) and the second ship beam (102) are connected to each other in a second direction, and the ship side (20) extends in the second direction, the first ship side (201) and the second ship side (202) are arranged opposite to each other in the first direction; the first direction and the second direction are different; adjusting the ballast water in the first ship side (201) and the second ship side (202) so that the first ship side (201) and the second ship side (202) are submerged below the ship beam assembly (1); The first ship beam (101) connection process comprises: Executing a first ship beam (101) pairing step, comprising: pulling the first ship side (201) and the second ship side (202) so that the first end (2011) of the first ship side is arranged opposite to the first end (1011) of the first ship beam, and the first end (2021) of the second ship side is arranged opposite to the second end (1012) of the first ship beam; Executing a first ship beam (101) positioning step, comprising: adjusting ballast water in the first ship side (201) and the second ship side (202) so that the first ship side (201) and the second ship side (202) float, and the first end (2011) of the first ship side approaches the first end (1011) of the first ship beam, and the first end (2021) of the second ship side approaches the second end (1012) of the first ship beam; The first ship beam (101) installation step is performed, including: connecting the first ship side first end (2011) and the first ship beam first end (1011), and connecting the second ship side first end (2021) and the first ship beam second end (1012).

9. The combined method according to claim 8, characterized in that: Before performing the second ship beam (102) connection process, the method further comprises: adjusting the ballast water in the first ship side (201) and the second ship side (202) so that the ship beam assembly (1) submerges along with the first ship side (201) and the second ship side (202); The second ship beam (102) connection process comprises: Disassembling the ship beam assembly (1) so that the second ship beam (102) floats up and is separated from the first ship beam (101); Executing a second ship beam (102) pairing step, comprising: pulling the second ship beam (102) so that the first end (1021) of the second ship beam is arranged opposite to the second end (2012) of the first ship side, and so that the second end (1022) of the second ship beam is arranged opposite to the second end (2022) of the second ship side; Executing a second ship beam (102) positioning step, comprising: adjusting ballast water in the first ship side (201) and the second ship side (202) so that the first ship side (201) and the second ship side (202) float, and the first end (1021) of the second ship beam approaches the second end (2012) of the first ship side, and the second end (1022) of the second ship beam approaches the second end (2022) of the second ship side; The second ship beam (102) installation step is performed, including: connecting the first end (1021) of the second ship beam with the second end (2012) of the first ship side, and connecting the second end (1022) of the second ship beam with the second end (2022) of the second ship side.

10. The combination method according to claim 9, characterized in that: The ship beam (10) is provided with a ship beam main positioning portion (41), the ship side (20) is provided with a ship side main positioning portion (42), the ship beam main positioning portion (41) corresponds to the ship side main positioning portion (42), and the ship beam (10) is limitedly matched with the ship side (20) through the ship beam main positioning portion (41) and the ship side main positioning portion (42); the ship beam (10) is provided with a ship beam pre-positioning portion (51), the ship side (20) is provided with a ship side pre-positioning portion (52), the ship beam pre-positioning portion (51) corresponds to the ship side pre-positioning portion (52), and the ship beam (10) is limitedly matched with the ship side (20) through the ship beam pre-positioning portion (51) and the ship side pre-positioning portion (52); The first ship beam (101) positioning step comprises: Regulating the ballast water in the first ship side (201) and the second ship side (202) so that the first ship side (201) and the second ship side (202) float to a first height position, so as to position the ship side pre-positioning portion (52) at the first end (2011) of the first ship side in the ship beam pre-positioning portion (51) at the first end (1011) of the first ship beam, and to position the ship side pre-positioning portion (52) at the first end (2021) of the second ship side in the ship beam pre-positioning portion (51) at the second end (1012) of the first ship beam; Regulating the ballast water in the first ship side (201) and the second ship side (202) so that the first ship side (201) and the second ship side (202) float to a second height position, so that the ship side main positioning portion (42) at the first end (2011) of the first ship side is positioned in the ship beam main positioning portion (41) at the first end (1011) of the first ship beam, and the ship side main positioning portion (42) at the first end (2021) of the second ship side is positioned in the ship beam main positioning portion (41) at the second end (1012) of the first ship beam; The second ship beam (102) positioning step comprises: adjusting the ballast water in the first ship side (201) and the second ship side (202) so that the first ship side (201) and the second ship side (202) float to a first height position, so that the ship side pre-positioning portion (52) at the second end (2012) of the first ship side is positioned at the ship beam pre-positioning portion (51) at the first end (1021) of the second ship beam, and the ship side pre-positioning portion (52) at the second end (2022) of the second ship side is positioned at the ship beam pre-positioning portion (51) at the second end (1022) of the second ship beam, The ballast water in the first side (201) and the second side (202) is adjusted so that the first side (201) and the second side (202) float to a second height position, so that the side main positioning portion (42) at the second end (2012) of the first side is positioned in the beam main positioning portion (41) at the first end (1021) of the second beam, and the side main positioning portion (42) at the second end (2022) of the second side is positioned in the beam main positioning portion (41) at the second end (1022) of the second beam.