Floating platform device, floating platform system and construction method

By using the concealed waters surrounded by peripheral wave-removing facilities in marine engineering, the complex problem of module joint stress of super-large floating bodies under the action of sea waves is solved, the stable installation and low-cost construction of the floating platform are achieved, and the structural Durability and stability.

CN118928680APending Publication Date: 2024-11-12CHINA COMMUNICATIONS CONSTRUCTION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411279951.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2022-06-30
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In marine engineering, the super-large volume floating body has complex forces under the action of sea waves, and the force transmission mechanism is difficult to describe, making it difficult to quantitatively analyze the force transmission, and the main structure has high durability and corrosion protection requirements and high cost.

Method used

The concealed water area surrounded by at least one circle of wave-removing facilities is used to reduce the wave amplitude through the wave-removing facilities, form a calm and quiet environment, reduce the difficulty of making the floating platform, and use prefabricated concrete cylinders and steel through modular prefabrication and installation processes. The combination of cylinders enables stable installation of the floating platform.

Benefits of technology

It effectively reduces the impact of wind and waves on the floating platform, reduces the difficulty and cost of production, improves the stability and durability of the structure, simplifies the construction process, and reduces the impact on the marine ecological environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928680A_ABST
    Figure CN118928680A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of ocean engineering, in particular to a floating platform device, a floating platform system and a construction method.The floating platform device comprises a covering water area defined by at least one part of wave dissipation facilities, a floating platform is arranged in the covering water area, and the wave dissipation facilities are used for reducing the wave amplitude. The influence of adverse environmental load on the covered water area is effectively reduced or eliminated, and then the manufacturing difficulty of the floating platform is effectively reduced. The material consumption of the floating platform can be greatly saved; the construction difficulty is greatly reduced; the use number of open sea large ships is reduced; and a constructable window period is increased, a place with water depth and far away from the shore can be selected for construction, and the influence on the existing coast and coastal city environment is reduced. The influence on the surrounding environment of the ocean is reduced, the influence of water flow is reduced to the minimum, and the original ocean water quality is protected. And large-scale offshore construction is avoided, so that the influence on the offshore ecological environment can be reduced to the greatest extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of marine engineering, and in particular to a floating platform device, a floating platform system and a construction method. Background Art

[0002] At present, the concept of floating airport has been proposed for more than 80 years. Except for the terminal building of an airport in Japan that adopts floating structure, there is no concept put into use. The main technical problems are:

[0003] 1. Deep water conditions and large waves. To prevent overtopping, the airport road surface elevation can reach 15 meters, resulting in a large volume of the lower floating body.

[0004] Second, the main structure is mostly made of steel structure, the durability problem in the water level change area is prominent, and the long-term use requires high anti-corrosion and high cost.

[0005] 3. The super-large floating body is prefabricated and installed in a modular manner. In the sea, the waves are generally very large. Under the action of the waves, the joints between the modules are subjected to complex forces, and the force transmission mechanism is difficult to describe and quantitatively analyze. Summary of the invention

[0006] The purpose of the present invention is to provide a floating platform device, a floating platform system and a construction method to address the problem that super-large floating bodies in the background technology are prefabricated and installed in a modular manner. In the sea, the waves are generally very large, the forces on the joints between the modules are complex under the action of the waves, and the force transmission mechanism is difficult to describe and quantitatively analyze.

[0007] In order to achieve the above object, the technical solution adopted by the present invention is:

[0008] A floating platform device comprises a sheltered water area surrounded by at least a part of wave-breaking facilities, wherein a floating platform is arranged in the sheltered water area, and the wave-breaking facilities are used to reduce the amplitude of waves.

[0009] The floating platform device described in the present application effectively reduces or eliminates the impact of adverse environmental loads (mainly wind, wave and current environmental loads) on the sheltered water area through at least one circle of wave-breaking facilities on the periphery, so that the sheltered water area is very little affected by the wind and wave environment, forming a calm sheltered water area, thereby effectively reducing the difficulty of manufacturing the floating platform.

[0010] The sheltered water area may be partially or completely surrounded by wave-breaking facilities.

[0011] Preferably, an airport is provided on the floating platform.

[0012] Preferably, the airport comprises a runway and a taxiway, and a drainage slope is provided between the runway and the taxiway, facing one side of the taxiway.

[0013] Preferably, a first grid component is provided at the lower part of the runway, a second grid component is provided at the lower part of the drainage slope, a top of the second grid component is provided with a slope toward one side of the taxiway, the first grid component is connected to the second grid component, and the first grid component and the second grid component are both connected to the floating platform.

[0014] Preferably, the floating platform comprises a plurality of pontoon units arranged in an array.

[0015] Preferably, the first grid member is provided on at least two of the buoyancy tank units.

[0016] Preferably, the second grid member is provided on at least two of the buoyancy tank units.

[0017] Preferably, the pontoon unit comprises at least two partition walls, and the lattice longitudinal walls of the first lattice member are arranged on the partition walls.

[0018] That is, a drainage slope is needed between the airport runway and the taxiway. This application solves this problem by using cast-in-place lattice concrete on the pontoon unit. The middle is the airport runway, and the two sides are lattices with slopes. Considering the structural force transmission, the lattice longitudinal wall is set above the pontoon unit partition wall, and its transverse wall is arranged at intervals.

[0019] Preferably, a first ship berth is arranged in the floating platform, and a navigation channel for ships to enter and exit the first ship berth is arranged on one side of the first ship berth.

[0020] Preferably, a second ship berth is provided between the floating platform and the wave-breaking facility.

[0021] Preferably, a buoy for docking ships is provided between the floating platform and the wave-breaking facility.

[0022] Preferably, a third ship berth is provided on the wave-removing side of the wave-breaking facility.

[0023] Preferably, the wave-breaking facility is provided with a command tower, a helipad, a wind power device or a lighthouse.

[0024] Preferably, the wave-breaking facility is provided with an entrance and exit for ships to enter and exit the sheltered waters.

[0025] Preferably, the inlet and outlet are arranged on the wave-removing side of the wave-breaking facility.

[0026] Preferably, the wave-breaking facility is provided with an extension portion extending toward the wave-hiding side, and the extension portion is located at the entrance and exit.

[0027] The floating platform device described in the present application has an extension portion used for wave breaking in the other direction of the entrance and exit, so that ships can smoothly enter and exit the wave breaking facility.

[0028] Preferably, a suspension tunnel is provided between the floating platform and the wave-breaking facility, and a traffic passage is provided in the suspension tunnel.

[0029] The floating tunnel is located below the water surface and will not interfere with the passage of ships between the floating platform and the wave-breaking facility.

[0030] Preferably, the floating tunnel comprises a transverse channel and a vertical channel that are connected, the traffic channel is located in the transverse channel, and the vertical channel is connected to the traffic channel.

[0031] Preferably, the vertical channels are provided at both ends of the floating tunnel.

[0032] Preferably, a lifting device connected to the traffic channel is provided in the vertical channel.

[0033] The lifting device can be used to transport people or vehicles in the traffic channel to the top of the vertical channel, thereby achieving the purpose of moving people or vehicles from a height below the water surface to a height above the water surface.

[0034] Preferably, a first channel is connected between the upper portion of the vertical channel and the floating platform, and the first channel is in communication with the lifting device;

[0035] Preferably, a first channel is connected between the upper portion of the vertical channel and the wave-breaking facility, and the first channel is communicated with the lifting device.

[0036] Under this scheme, people or vehicles move from the position where the wave-breaking facility is located above the water surface to the lifting device at the end of the floating tunnel through the first channel, then descend through the lifting device to the horizontal channel below the water surface, and then reach the lifting device at the vertical channel at the other end through the traffic channel, and then rise to the upper part of the vertical channel above the water surface through the lifting device at this end, and then reach the floating platform through the first channel at this end. During the whole process, the first channels at both ends of the floating tunnel are located above the water surface, so that there is no need to set an underwater connection part between the floating tunnel and the wave-breaking facility or floating platform of this type, thereby fundamentally solving the problem of sealing and water stopping between the floating tunnel and the wave-breaking facility or floating platform.

[0037] Specifically, the first channel is overlapped with a suspended tunnel, a floating platform or a wave-breaking facility.

[0038] Preferably, a weight adjustment chamber is provided in the suspension tunnel, and a weight adjustment medium is stored in the weight adjustment chamber. The buoyancy and inclination of the suspension tunnel can be adjusted by adjusting the weight of the weight adjustment medium in the weight adjustment chamber.

[0039] Preferably, the weight adjustment chamber is located at the lower part of the suspension tunnel, and the traffic channel is located above the weight adjustment chamber.

[0040] The weight adjustment chamber is located at the lower part of the suspension tunnel, so that the center of gravity of the suspension tunnel is located at the lower part of the suspension tunnel, so that the overall stability and anti-overturning ability of the suspension tunnel are stronger.

[0041] Preferably, a floating bridge is connected between the floating platform and the wave-breaking facility.

[0042] Preferably, the floating bridge and the wave-breaking facility are rotatably connected via a rotating device;

[0043] Preferably, the floating bridge and the floating platform are rotatably connected via a rotating device.

[0044] Preferably, the wave-breaking facility comprises at least two foundations arranged at intervals, a first wave-breaking structure is arranged between adjacent foundations, the first wave-breaking structure is used to reduce the net width of the channel between adjacent foundations, and a wave-breaking box is arranged on the top support of adjacent foundations.

[0045] The floating platform device described in the present application forms the foundation of the wave-breaking dam through the foundations arranged at intervals, and then a first wave-breaking structure for wave-breaking is arranged between the adjacent foundations. The first wave-breaking structure reduces the net width of the channel of the adjacent foundations to increase the flow length of the water particles caused by the waves inside and outside the wave-breaking dam, thereby playing a role in quickly consuming the wave energy. The combination of the foundation and the first wave-breaking structure is used to reduce the channel area of ​​the wave, while changing the wave forward path, increasing the flow length of the wave water particles, thereby achieving the purpose of reducing the wave height. At the same time, since the first wave-breaking structure can only reduce the net width of the channel of the adjacent foundation, but does not completely isolate the channel of the adjacent foundation, the air permeability of the two sides of the wave-breaking dam described in the present application can be effectively guaranteed, thereby achieving the purpose of being water-permeable but not wave-permeable, thereby greatly reducing the impact on the marine ecological environment. At the same time, the wave-breaking box is used to form the adjacent foundations into a whole, which not only plays a role in reducing overtopping and preventing waves from turning over from the top, but also increases the synergistic force of the wave-breaking dam, and the overall stability is better during extreme weather in the open sea.

[0046] Preferably, all the first wave-breaking structures between adjacent foundations form a multi-bend channel, thereby changing the forward path of the wave current into a multi-bend path, thereby achieving the purpose of reducing the height of the wave current.

[0047] Preferably, the foundation includes a cylinder filled with filler, the cylinder includes a reinforced concrete cylinder and a steel cylinder arranged in sequence along the length direction of the cylinder, the reinforced concrete cylinder is located above the steel cylinder, the reinforced concrete cylinder and the steel cylinder are closed, and the first wave-breaking structure is connected to the reinforced concrete cylinder.

[0048] Preferably, a second wave-breaking structure is further provided at the lower portion of the first wave-breaking structure, and the second wave-breaking structure is flexibly connected to at least one of the steel cylinders.

[0049] The present application also discloses a floating platform system, characterized in that it comprises at least one floating platform device as described in the present application, wherein an anchor cable is connected to the lower part of the floating platform, and a part of the floating platform device floats on the water surface.

[0050] The floating platform system described in the present application effectively reduces or eliminates the impact of adverse environmental loads (mainly wind, wave and current environmental loads) on the sheltered waters through at least one circle of wave-breaking facilities on the periphery, so that the sheltered waters are very little affected by the wind and wave environment, forming a calm sheltered waters, so that the construction of the floating platform can be carried out in the sheltered waters, and the position of the floating platform is limited by anchor cables, allowing the floating platform to have a slight up and down displacement and a slight left and right displacement with the ebb and flow of the tide, thereby greatly reducing the cost of fixing the floating platform in the water. Compared with the existing fill-type platform, it greatly saves the material consumption of the floating platform; and greatly reduces the difficulty of construction.

[0051] The lower part of the anchor cable is fixed to the bottom of the water.

[0052] Preferably, the lower part of the wave-breaking facility is inserted into the water bottom surface.

[0053] The present application also discloses a construction method for the floating platform device, comprising the following steps:

[0054] S1, constructing the wave-breaking facilities, and using the wave-breaking facilities to enclose the sheltered water area;

[0055] S2. constructing the floating platform in the sheltered waters.

[0056] The construction method for the floating platform device described in the present application first forms a sheltered water area by surrounding a circle of wave-breaking facilities on the outside, thereby forming a calm water area, and constructing a floating platform in the water area. This allows the construction of the floating platform to avoid being affected by large winds and waves, greatly increasing the window period for the construction of the floating platform.

[0057] Specifically, the floating platform includes a plurality of pontoon units arranged in an array, and the wave-breaking facility includes a prefabricated cylinder;

[0058] After the cylinder is prefabricated on the assembly line of the prefabrication factory, the assembly line can also prefabricate the buoyancy unit.

[0059] The wave-breaking facilities and floating platforms are all prefabricated and installed in a modular manner. Flexible prefabrication is achieved on one or more assembly lines. After the concrete cylinder is prefabricated on the assembly line of the prefabrication plant, the assembly line can also be used to prefabricate the pontoon unit, thereby greatly reducing the overall cost of the prefabrication stage.

[0060] Specifically, the cylinder is filled with fillers, and the cylinder comprises a reinforced concrete cylinder and a steel cylinder arranged in sequence along the length direction of the cylinder, the reinforced concrete cylinder is located above the steel cylinder, and the reinforced concrete cylinder and the steel cylinder are sealed;

[0061] Step S1 specifically includes the following steps:

[0062] S1. The concrete cylinder is prefabricated on the assembly line of the prefabrication plant, and the concrete cylinder and the steel cylinder are transported to the vicinity of the installation location;

[0063] S2. Connect the concrete cylinder to the top of the steel cylinder to form a cylinder;

[0064] S3. Lift the entire cylinder to the installation location;

[0065] S4. lowering the cylinder so that it sinks to the designed elevation by its own weight, wherein a portion of the concrete cylinder is submerged in the water, the entire steel cylinder is submerged in the water, and the bottom of the steel cylinder is submerged in the water bottom;

[0066] S5. Fill the cylinder with filler;

[0067] S6. Repeat steps S1-S5 to complete the construction of the wave dissipation facilities;

[0068] After the cylinder is prefabricated on the assembly line of the prefabrication factory, the assembly line can prefabricate at least a portion of the buoyancy unit.

[0069] The present application discloses a construction method for the floating platform device, in which the concrete cylinder and the steel cylinder are prefabricated separately. Compared with the existing integrally prefabricated concrete cylinder or steel cylinder, the prefabricated specifications of the single piece are greatly reduced, the prefabrication difficulty is greatly reduced, and compared with the integrally prefabricated reinforced concrete cylinder, the requirements for the transportation tools are greatly reduced. At the same time, during the sinking process, the combined cylinder combines the advantages of the large weight of the upper concrete cylinder (because the concrete has a small strength-to-weight ratio and the part above the water surface is dry bulk density) and the small friction resistance of the lower steel cylinder in the underwater soil. It can sink to the designed elevation by its own weight and be installed in place. Compared with the integrally prefabricated steel cylinder that requires special vibration equipment to vibrate and sink, the construction cost and construction difficulty are greatly reduced.

[0070] Specifically, a first wave-breaking structure for breaking waves is provided between adjacent concrete cylinders;

[0071] In S1, the first wave-breaking structure and the concrete cylinder are prefabricated as one piece.

[0072] Specifically, a high-pressure water facility and an air curtain are provided at the lower part of the cylinder. In step S4, during the sinking process of the cylinder, the high-pressure water facility and the air curtain are turned on. The high-pressure water facility is used to reduce the end resistance of the underwater soil to the cylinder, and the air curtain is used to reduce the side resistance of the underwater soil to the cylinder.

[0073] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0074] 1. The floating platform device described in the present application effectively reduces or eliminates the impact of adverse environmental loads (mainly wind, wave and current environmental loads) on the sheltered water area through at least one circle of wave-breaking facilities on the periphery, so that the sheltered water area is very little affected by the wind and wave environment, forming a calm sheltered water area, thereby effectively reducing the difficulty of making the floating platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] Figure 1 The present invention is a schematic top view of a floating platform device covering a water area.

[0076] Figure 2 It is a schematic top view of the arrangement of a floating platform device of the present invention (first ship berth).

[0077] Figure 3 It is a three-dimensional schematic diagram of the layout of a floating platform device of the present invention (second ship berth).

[0078] Figure 4 It is a vertical cross-sectional schematic diagram of a floating platform device of the present invention.

[0079] Figure 5 It is a structural stereoscopic schematic diagram of a floating platform device of the present invention.

[0080] Figure 6 It is a three-dimensional schematic diagram of the connection between the first grid member, the second grid member and the buoyancy unit of the present invention.

[0081] Figure 7 It is a front view schematic diagram of the connection between the first grid member, the second grid member and the buoyancy unit of the present invention.

[0082] Figure 8 It is an exploded schematic diagram of the cooperation between the first grid component, the second grid component and the pontoon unit of the present invention.

[0083] Fig. 9It is an exploded schematic diagram of the cooperation between the second grid component and the pontoon unit of the present invention.

[0084] Fig.10 It is a schematic cross-sectional top view of the buoyancy unit of the present invention.

[0085] Fig.11 It is a schematic diagram of the construction process of the assembly line of the present invention for simultaneously prefabricating reinforced concrete cylinders and pontoon units.

[0086] Fig.12 It is a schematic diagram of the construction process of all prefabricated pontoon units of the assembly line of the present invention.

[0087] Fig.13 It is a schematic diagram of the main structure of a wave-breaking facility of the present invention.

[0088] Fig.14 This invention is attached Fig.13 Schematic diagram of the BB cross-section.

[0089] Fig.15 This invention is attached Fig.13 Enlarged schematic diagram of part A in the middle.

[0090] Fig.16 It is a top view schematic diagram of the cooperation between the foundation of the present invention and the first wave-breaking structure.

[0091] Fig.17 It is a schematic diagram of the cooperation between the second wave-breaking structure and the first flexible member (the whole cylinder) of the present invention.

[0092] Fig.18 It is a schematic diagram of the cooperation between the plurality of second wave-breaking structural units and the first flexible member (cylinder) of the present invention.

[0093] Fig.19 It is a schematic diagram of the cooperation between the plurality of second wave-breaking structural units and the first flexible member (plate body) of the present invention.

[0094] Fig. 20 It is a schematic diagram (sphere) of the cooperation between the plurality of second wave-breaking structural units and the first flexible member of the present invention.

[0095] Fig.21 It is a schematic diagram of the force of the cylinder body of the present invention in use.

[0096] Fig. 22 It is a schematic diagram of the normal earth pressure generated by the filler of the present invention on the wall of the steel cylinder.

[0097] Fig.23 It is a schematic diagram of the micro-segment research on the wall of the steel cylinder of the present invention.

[0098] Fig.24 It is a schematic diagram of a vertical cross-section of the structure of a cylinder of the present invention.

[0099] Fig.25 This invention is attached Fig.24 Schematic diagram of the AA section.

[0100] Fig.26 This invention is attached Fig.25 Schematic diagram of the CC section.

[0101] Fig. 27 This invention is attached Fig.25 Schematic diagram of the DD section.

[0102] Fig.28 This invention is attached Fig.24 Enlarged schematic diagram of part B in the middle.

[0103] Fig.29 It is a schematic diagram of adjusting the cylinder posture of the air curtain and high-pressure water facilities of the present invention.

[0104] Fig.30 The present invention discloses a wave-breaking effect test cloud chart of a wave-breaking facility.

[0105] Fig.31 It is a front view of a wave-breaking effect test of a wave-breaking facility of the present invention (before wave-breaking).

[0106] Fig.32 It is a front view of a wave-breaking effect test of a wave-breaking facility of the present invention (during wave-breaking).

[0107] Fig.33 It is a front view of a wave-breaking effect test of a wave-breaking facility of the present invention (after wave-breaking).

[0108] Fig.34 It is a schematic diagram of conveying reinforced concrete cylinders in a construction method of a wave-breaking dam according to the present invention.

[0109] Fig.35 It is a schematic diagram of steel cylinder transportation in a construction method of a wave-breaking dam according to the present invention.

[0110] Fig.36 It is a schematic diagram of integrally hoisting a reinforced concrete cylinder and a steel cylinder in a construction method of a wave-breaking dam according to the present invention.

[0111] Fig.37 It is a schematic diagram of the overall sinking of a reinforced concrete cylinder and a steel cylinder in a construction method of a wave-breaking dam according to the present invention.

[0112] Fig.38 It is a schematic diagram of a construction method of a wave-breaking dam according to the present invention in which a reinforced concrete cylinder and a steel cylinder are integrally sunk to a designed elevation position.

[0113] Fig.39 It is a schematic diagram of the construction of filler in a construction method of a wave-breaking dam according to the present invention.

[0114] Fig.40 It is a construction schematic diagram of pouring a compensating concrete cushion layer in a construction method of a wave-breaking dam of the present invention. DETAILED DESCRIPTION

[0115] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0116] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0117] Example 1

[0118] like Figure 1-10 As shown, a floating platform device described in this embodiment includes a sheltered water area 71 surrounded by at least a portion of wave-breaking facilities 5, a floating platform 7 is arranged in the sheltered water area 71, and the wave-breaking facilities 5 are used to reduce the wave amplitude.

[0119] The sheltered water area 71 may be partially surrounded by the wave-breaking facilities 5 or entirely surrounded by the wave-breaking facilities 5 .

[0120] Specifically, part of the structure in the circle that encloses the sheltered water area 71 is the wave-breaking facility 5 , and the other part is other structural facilities, such as the coast or other large objects, or all of the structure in the circle that encloses the sheltered water area 71 is the wave-breaking facility 5 .

[0121] An airport 72 is provided on the floating platform 7 .

[0122] The airport 72 includes a runway 713 and a taxiway 79 , and a drainage slope 710 is provided between the runway 713 and the taxiway 79 toward one side of the taxiway 79 .

[0123] A first grid component 711 is provided at the lower portion of the runway 713, a second grid component 712 is provided at the lower portion of the drainage slope 710, a top of the second grid component 712 is provided with a slope toward one side of the taxiway 79, the first grid component 711 is connected to the second grid component 712, and the first grid component 711 and the second grid component 712 are both connected to the floating platform 7.

[0124] The floating platform 7 includes a plurality of pontoon units 1 arranged in an array.

[0125] The pontoon unit 1 is also provided with a ballast tank 13, in which ballast medium is stored. The buoyancy and inclination of the pontoon unit 1 can be adjusted by adjusting the weight of the ballast medium in the ballast tank 13. The ballast tank 13 is arranged on both sides or corners of the pontoon unit 1.

[0126] The ballast medium includes oil, and the buoyancy and tilt of the pontoon unit 1 are adjusted by adjusting the amount of ballast medium in the ballast tank 13. The ballast medium includes oil or water. When oil is selected, the buoyancy and tilt of the pontoon unit 1 can be adjusted, and oil can be stored.

[0127] The first grid member 711 is disposed on at least two of the buoyancy tank units 1 .

[0128] The second grid member 712 is disposed on at least two of the buoyancy tank units 1 .

[0129] Specifically, the first grid member 711 and the second grid member 712 are integrally provided.

[0130] The pontoon unit 1 includes at least two partition walls 715 , and the lattice longitudinal walls 714 of the first lattice member 711 are arranged on the partition walls 715 .

[0131] The adjacent partition walls 715 directly form an inner cavity 11, which is used as a room, a passage, etc.

[0132] That is, a drainage slope is needed between the airport runway and the taxiway. This application solves this problem by using cast-in-place lattice concrete on the pontoon unit. The middle is the airport runway, and the two sides are lattices with slopes. Considering the structural force transmission, the lattice longitudinal wall is set above the pontoon unit partition wall, and its transverse wall is arranged at intervals.

[0133] A first ship berth 73 is arranged in the floating platform 7 , and a navigation channel 75 for ships to enter and exit the first ship berth 73 is arranged on one side of the first ship berth 73 .

[0134] A second ship berth 74 is provided between the floating platform 7 and the wave-breaking facility 5 .

[0135] A buoy 76 for ships to dock is provided between the floating platform 7 and the wave-breaking facility 5 .

[0136] A third ship berth 77 is provided on the wave-receiving side of the wave-breaking facility 5 .

[0137] The wave-breaking facility 5 is provided with a control tower 78, a helipad, wind power equipment or a lighthouse.

[0138] The wave-breaking facility 5 is provided with an entrance and exit 503 for ships to enter and exit the sheltered water area 71. The entrance and exit 503 and the exit 504 are arranged on the wave-dorsal side of the wave-breaking facility 5. The wave-breaking facility is provided with an extension portion 505 extending toward the wave-dorsal side. The extension portion 505 is located at the entrance and exit 503. For the floating platform device described in the present application, the extension portion 505 is used for wave breaking in the other direction of the entrance and exit 503, so that ships can smoothly enter and exit the wave-breaking facility 5.

[0139] The floating platform 7 and the wave-breaking facility 5 are preferably connected by a suspended tunnel 65 or a floating bridge 8 as a passage for people or vehicles, as follows:

[0140] In the form of a suspended tunnel 65, a suspended tunnel 65 is provided between the floating platform 7 and the wave-breaking facility 5, and a traffic channel 62 is provided in the suspended tunnel 65. The suspended tunnel 65 is located below the water surface and will not interfere with the passage of ships between the floating platform 7 and the wave-breaking facility 5.

[0141] The floating tunnel 65 includes a transverse channel 653 and a vertical channel 652 that are connected. The traffic channel 62 is located in the transverse channel 653, and the vertical channel 652 is connected to the traffic channel 62. The vertical channels 652 are provided at both ends of the floating tunnel 65. A lifting device 610 connected to the traffic channel 62 is provided in the vertical channel 652. The lifting device 610 can transport people or vehicles in the traffic channel 62 to the top of the vertical channel 652, thereby achieving the purpose of moving people or vehicles from a height below the water surface to a height above the water surface.

[0142] Specifically, the lifting device 610 includes a lifting platform or an elevator.

[0143] A first channel 654 is connected between the upper part of the vertical channel 652 and the floating platform 7, and the first channel 654 is communicated with the lifting device 610; a first channel 654 is connected between the upper part of the vertical channel 652 and the wave-breaking facility 5, and the first channel 654 is communicated with the lifting device 610.

[0144] Under this scheme, a person or a vehicle moves from the position of the wave-breaking facility 5 above the water surface to the lifting device 610 at the end of the floating tunnel 65 through the first channel 654, then descends through the lifting device 610 to the horizontal channel 653 below the water surface, and then reaches the lifting device 610 at the vertical channel 652 at the other end through the traffic channel 62, and then rises to the upper part of the vertical channel 652 above the water surface through the lifting device 610 at this end, and then reaches the floating platform 7 through the first channel 654 at this end. During the whole process, the first channels 654 at both ends of the floating tunnel 65 are above the water surface, so that there is no need to set an underwater connection part between the floating tunnel 65 and the wave-breaking facility 5 or the floating platform 7 of this type, thereby fundamentally solving the sealing and water-stopping problem between the floating tunnel 65 and the wave-breaking facility 5 or the floating platform 7.

[0145] Specifically, the first channel 654 is overlapped with the floating tunnel 65 , the floating platform 7 or the wave-breaking facility 5 .

[0146] The suspension tunnel 65 is provided with a weight adjustment chamber 651, in which a weight adjustment medium is stored. The buoyancy and inclination of the suspension tunnel 65 can be adjusted by adjusting the weight of the weight adjustment medium in the weight adjustment chamber 651. The weight adjustment chamber 651 is located at the lower part of the suspension tunnel 65, and the traffic channel 62 is located above the weight adjustment chamber 651. The weight adjustment chamber 651 is located at the lower part of the suspension tunnel 65, so that the center of gravity of the suspension tunnel 65 is located at the lower part of the suspension tunnel 65, so that the overall stability and anti-overturning ability of the suspension tunnel 65 are stronger.

[0147] The weight adjusting medium is preferably water.

[0148] Floating bridge 8 mode: a floating bridge 8 is connected between the floating platform 7 and the wave-breaking facility 5 .

[0149] The floating bridge 8 is overlapped with the wave-breaking facility 5; the floating bridge 8 is overlapped with the sheltered water area 71. The floating bridge 8 is rotatably connected with the wave-breaking facility 5 via a rotating device 81; the floating bridge 8 is rotatably connected with the floating platform 7 via a rotating device 81.

[0150] Furthermore, the floating bridge 8 is rotatably connected to the wave-breaking facility 5 via a rotating device 81, and the floating bridge 8 is overlapped with the floating platform 7; the floating bridge 8 is rotatably connected to the floating platform 7 via a rotating device 81, and the floating bridge 8 is overlapped with the wave-breaking facility 5.

[0151] Specifically, the rotating device 81 can be a molded rotating equipment, such as a large rotating motor, or the following method is adopted: the rotating device includes an upper rotating support and a lower rotating support, and the upper rotating support and the lower rotating support are rotated with each other through a rotating bearing, the floating bridge is connected to the upper rotating support, and the lower rotating support is connected to the floating platform 7 or the wave-breaking facility 5. The upper rotating support is connected to a rotating motor, and the output end of the rotating motor is driven and connected to an output gear. A rotating ring gear is provided on the outer side of the outer ring of the rotating bearing, and the rotating ring gear is relatively fixed to the lower rotating support, and the output gear is meshed with the rotating ring gear.

[0152] The output gear is driven to rotate by a rotary motor, and the output gear meshes and rotates with the rotary gear ring, and then cooperates with a rotary bearing to achieve the purpose of relative rotation of the upper slewing support and the lower slewing support. The floating bridge is connected to the upper slewing support, and the lower slewing support is connected to the floating platform 7 or the wave-breaking facility 5, so as to achieve the purpose of rotation of the floating bridge relative to the floating platform 7 or the wave-breaking facility 5.

[0153] Beneficial effects of this embodiment: The floating platform device described in the present application effectively reduces or eliminates the impact of adverse environmental loads (mainly wind, wave and current environmental loads) on the sheltered water area 71 through at least one circle of wave-breaking facilities 5 on the periphery, so that the sheltered water area 71 is very little affected by the wind and wave environment, forming a calm sheltered water area 71, thereby effectively reducing the difficulty of manufacturing the floating platform 7.

[0154] Compared with the traditional island construction scheme, the floating platform device described in this application has the following additional benefits: 1. The use of floating platforms 7 (such as floating airports) can be selected to be built in places with deep water and far from the shore, reducing the impact on the existing coastal and coastal urban environment. 2. Through the "air-permeable" design of wave-breaking facilities and floating platforms, the impact on the surrounding environment of the ocean is minimized to the greatest extent, the impact of water flow is minimized as much as possible, and the original ocean water quality is protected. 3. Through the scheme, large-scale offshore construction can be avoided, and the impact on the marine ecological environment can be minimized. 4. After the 100-year operation period, the floating platform can be dismantled or rebuilt if necessary, and environmental restoration is reversible.

[0155] Example 2

[0156] like Figure 13-16 As shown, a floating platform device described in this embodiment is different from that in Embodiment 1 in that: the wave-breaking facility 5 includes at least two foundations 3 spaced apart, a first wave-breaking structure 41 is arranged between adjacent foundations 3, the first wave-breaking structure 41 is used to reduce the net width of the channel between adjacent foundations 3, and a wave-breaking box 54 is arranged on the top support of adjacent foundations 3.

[0157] A wave-breaking dam described in the present application forms the foundation of the wave-breaking dam by means of foundations 3 arranged at intervals, and a first wave-breaking structure 41 for wave breaking is arranged between adjacent foundations 3. The first wave-breaking structure 41 reduces the net width of the channel adjacent to the foundations 3, and the combination of the foundation 3 and the first wave-breaking structure 41 is used to reduce the channel area of ​​the waves, while changing the wave advancing path, thereby achieving the purpose of reducing the wave height. At the same time, since the first wave-breaking structure 41 only reduces the net width of the channel adjacent to the foundation 3, but does not completely isolate the channel adjacent to the foundation 3, the air permeability on both sides of the wave-breaking dam described in the present application can be effectively guaranteed, thereby achieving the purpose of being water-permeable but not wave-permeable, thereby greatly reducing the impact on the marine ecological environment.

[0158] At the same time, a wave-breaking box 54 is provided on the top support of the adjacent foundation 3, and the adjacent foundation 3 is formed into a whole through the wave-breaking box 54, so that the whole structure is more stable and has better impact resistance. At the same time, the wave-breaking box 54 of a certain height can increase the purpose of the wave-breaking dam described in this embodiment to reduce higher waves. Moreover, a plurality of functional rooms, passages and other places are arranged in the wave-breaking box 54 for daily life and work.

[0159] All the first wave-breaking structures 41 between the adjacent foundations 3 form a multi-bend channel, thereby changing the forward path of the wave current into a multi-bend path, thereby achieving the purpose of reducing the height of the wave current.

[0160] In the above scheme, the foundation 3 includes a cylinder 30, which is filled with a filler 31. The cylinder 30 includes a reinforced concrete cylinder 32 and a steel cylinder 33 arranged in sequence along the length direction of the cylinder 30. The reinforced concrete cylinder 32 is located above the steel cylinder 33. The reinforced concrete cylinder 32 and the steel cylinder 33 are closed, and the first wave-breaking structure 41 is connected to the reinforced concrete cylinder 32.

[0161] like Fig.13 and 17 As shown, a second wave-breaking structure 42 is further provided at the lower part of the first wave-breaking structure 41 , and the second wave-breaking structure 42 is flexibly connected to at least one of the foundations 3 , specifically, the second wave-breaking structure 42 is flexibly connected to at least one of the steel cylinders 33 .

[0162] Since the second wave-breaking structure 42 is located below the first wave-breaking structure 41, during construction, the second wave-breaking structure 42 is often below the water surface to reduce the strength of the waves below the water surface. At this time, the difficulty of installation by the installers below the water surface is greatly reduced through the hanging method; at the same time, the swing of the second wave-breaking structure 42 can also enhance the effect of reducing the strength of the waves below the water surface without having a significant impact on the water permeability.

[0163] The second wave-breaking structure 42 is connected to the first wave-breaking structure 41 .

[0164] Specifically, the first flexible member 44 is a flexible rope or a spring rope, and the outside of the flexible rope or the spring rope can be wrapped with anti-corrosion plastic to increase the anti-corrosion probability of the flexible rope or the spring rope.

[0165] like Fig.16 As shown, each of the adjacent foundations 3 is provided with the first wave-breaking structure 41 extending toward the other foundation 3. The first wave-breaking structures 41 on each foundation 3 may be one, two, or more. In this case, a better solution is to change the advancing path of the waves into a multi-bend path, thereby achieving the purpose of reducing the wave height.

[0166] The cross-sectional area of ​​the foundation 3 can be of any shape, which can be circular or rectangular, wherein the cross-sectional area of ​​the foundation 3 is preferably circular, and the first wave-breaking structure 41 is arranged along the normal direction of the circle. The cross-sectional area of ​​the foundation 3 is circular, and its arc-shaped side surface can effectively reduce the impact of waves on the foundation 3. Moreover, the first wave-breaking structure 41 is arranged along the normal direction of the circle, so that under the condition of achieving the same wave-breaking effect, the required extension length of the first wave-breaking structure 41 is shorter and its cost is lower.

[0167] A portion of the foundation 3 is located below the water surface 37 , and the bottom of the foundation 3 is inserted into the water bottom surface 39 .

[0168] Since the second wave-breaking structure 42 is located below the first wave-breaking structure 41, the second wave-breaking structure 42 is often below the water surface 37. The second wave-breaking structure 42 is flexibly connected to at least one side of the steel cylinder 33, so that when the surge waves below the low water surface 37 hit the second wave-breaking structure 42, the second wave-breaking structure 42 swings, thereby disturbing the surge waves below the low water surface 37, thereby achieving the purpose of reducing the intensity of the surge waves below the water surface 37.

[0169] There is a gap between the second wave-breaking structure 42 and the adjacent steel cylinder 33, so that the second wave-breaking structure 42 can also achieve the purpose of being water-permeable but not wave-permeable, thereby greatly reducing the impact on the marine ecological environment.

[0170] The steel cylinder 33 is provided with an attachment 43, the second wave-breaking structure 42 is correspondingly connected with a first flexible member 44, the second wave-breaking structure 42 is flexibly connected to at least one side of the steel cylinder 33 through the first flexible member 44, and the first flexible member 44 is hung with the corresponding attachment 43. Compared with the method of welding the second wave-breaking structure 42 to the steel cylinder 33, the installation difficulty of the installer under the water surface can be greatly reduced by hanging the first flexible member 44 with the corresponding attachment 43.

[0171] The first flexible member 44 and the corresponding attachment member 43 may also be interlocked.

[0172] Since the second wave-breaking structure 42 is located below the first wave-breaking structure 41, during construction, the second wave-breaking structure 42 is often below the water surface to reduce the strength of the waves below the water surface. At this time, the difficulty of installation by the installers below the water surface is greatly reduced through the hanging method; at the same time, the swing of the second wave-breaking structure 42 can also enhance the effect of reducing the strength of the waves below the water surface, and will not have a significant impact on the water permeability. Specifically, the first flexible member 44 is a flexible rope or a spring rope, and the outside of the flexible rope or the spring rope can be provided with an anti-corrosion plastic package to increase the anti-corrosion probability of the flexible rope or the spring rope.

[0173] like Figure 18-20 As shown, on the basis of the above, a further preferred manner is that the second wave-breaking structure 42 includes second wave-breaking structure units 45 arranged in sequence along the vertical direction, and the first flexible member 44 is connected to the second wave-breaking structure unit 45. During installation, the second wave-breaking structure unit 45 can be installed separately below the water surface, which is easier to manufacture and install than installing the second wave-breaking structure 42 as a whole below the water surface.

[0174] The second wave-breaking structure 42 includes second wave-breaking structure units 45 arranged in sequence along the vertical direction, and the first flexible member 44 is connected to the second wave-breaking structure unit 45. During installation, the second wave-breaking structure unit 45 can be installed separately below the water surface, which is easier to manufacture and install than installing the second wave-breaking structure 42 as a whole below the water surface. At least two adjacent second wave-breaking structure units 45 are flexibly connected by a second flexible member 46. The second flexible member 46 is a flexible rope or a spring rope, and the outside of the flexible rope or the spring rope can be wrapped with anti-corrosion plastic to increase the anti-corrosion probability of the flexible rope or the spring rope. The second wave-breaking structure unit 45 is a plate, a sphere or a cylinder. When the second wave-breaking structure unit 45 is a cylinder, the two ends of the second wave-breaking structure unit 45 are open. Thereby, the swinging mass of the second wave-breaking structure unit 45 is increased to achieve a better wave-breaking effect.

[0175] During production, the concrete cylinder 32 and the first wave-breaking structure 41 can be prefabricated as a whole; the concrete cylinder 32 is preferably a reinforced concrete cylinder. The first wave-breaking structure 41 can increase the radial rigidity of the concrete cylinder 32; a portion of the concrete cylinder 32 is located above the water surface 37, and the remaining portion is located below the water surface 37; the steel cylinder 33 is entirely located above the water surface 37, and the lower portion is inserted into the bottom surface 39 of the water.

[0176] A third flexible member 453 is vertically connected to the upper portion of the second wave-breaking structure 42 for vertically fixing the second wave-breaking structure 42. The upper portion of the third flexible member 453 is connected to the upper portion of the reinforced concrete cylinder 32 located above the water surface 37.

[0177] like Fig.21 As shown, when waves or sea wind apply lateral external load F to the upper part of the cylinder 30, 外 The soil below the water bottom 39 can exert an external load F on the cylinder 30. 外 The opposite passive earth pressure F 被 , so that the overall deadweight of the large-diameter combined cylinder described in this embodiment can provide the external load F 外 Most of the resistance capacity can meet the requirements without providing resistance to external loads F 外 The overall resistance capacity of the large diameter combined cylinder can be effectively reduced under relative force requirements.

[0178] Both ends of the concrete cylinder 32 are open, and both ends of the steel cylinder 33 are also open.

[0179] According to the wave height of the water surface 37, the length of the concrete cylinder 32 along its length direction is A, 7m≤A≤30m, so that it can meet the height direction from +2 to +12m above the water surface 37 to -15 to -5m below the water surface 37, so as to meet the widespread use of a large-diameter combined cylinder in the ocean of this application.

[0180] On the basis of the above, in a further preferred embodiment, the maximum outer diameter of the steel cylinder 33 is 20.5m≤R1≤40m. The wall thickness of the steel cylinder 33 is T1, 0.01m≤T1≤0.05m.

[0181] After repeated experiments, it is found that the maximum outer diameter R1 of the steel cylinder 33 of the present application is ≥20.5m, and the wall thickness T1 is only 0.01m≤T1≤0.05m, so that the steel cylinder 33 can produce a "bag" effect, which combines the advantages of a large monopile and a traditional gravity breakwater revetment:

[0182] Since the materials used for large-scale monopile are man-made materials such as concrete or steel, and the large-diameter combined cylinder of the present application is filled with more fillers 31, such as silt, medium-coarse sand, etc., in the steel cylinder 33, it is more environmentally friendly and thus saves costs;

[0183] Since the filling material of the conventional gravity breakwater revetment is formed by free collapse, the large-diameter combined tube of the present application can save more than two-thirds of the internal filling material.

[0184] At the same time, if Fig. 22 As shown, the filler 31 will generate normal earth pressure on the wall of the steel cylinder 33.

[0185] like Fig.23 As shown, a micro-segment study on the wall of the steel cylinder 33 shows that due to the "cloth bag" effect of the steel cylinder 33, the normal earth pressure brings about a circumferential tension on the wall of the steel cylinder 33, so that the internal filler and the cylinder form an integral effect. The tension brings additional cylinder stiffness like a cloth bag filled with sand, which strengthens the structural stiffness and overall stability of the steel cylinder 33.

[0186] The concrete cylinder 32 is preferably made of reinforced concrete, and its cross section may be circular, elliptical, square or polygonal, and its length direction may be uniform or variable.

[0187] The cross section of the steel cylinder 33 is preferably circular, elliptical, square or polygonal, etc., and can be of a constant cross section or a variable cross section in the length direction. The steel cylinder 33 is coaxially arranged with the concrete cylinder 32 .

[0188] On the basis of the above, in a further preferred manner, the second wave-breaking structure 42 comprises second wave-breaking structure units 45 arranged in sequence along the vertical direction, and the first flexible member 44 is connected to the second wave-breaking structure unit 45 .

[0189] At least two adjacent second wave-breaking structure units 45 are connected, preferably flexibly connected.

[0190] At least two adjacent second wave-breaking structure units 45 are flexibly connected via a second flexible member 46 .

[0191] Specifically, the second flexible member 46 is a flexible rope or a spring rope, and the outside of the flexible rope or the spring rope can be wrapped with anti-corrosion plastic to increase the anti-corrosion probability of the flexible rope or the spring rope.

[0192] On the basis of the above, a further preferred method is that the wall thickness of the concrete cylinder 32 is T2, 10≤T2 / T1≤200. Under the condition of the same outer diameter specification, since the wall thickness required for the steel cylinder 33 is much smaller than the wall thickness of the concrete cylinder 32, the overall weight of the large-diameter combined cylinder of the present application is much lighter than that of the reinforced concrete cylinder with the same outer diameter specification, thereby enabling more existing prefabricated construction processes and equipment to meet its transportation and sinking construction.

[0193] like Figure 24-27 As shown, a transverse limiting device is provided between the concrete cylinder 32 and the steel cylinder 33 , and the transverse limiting device is used to limit the horizontal lateral movement of the concrete cylinder 32 relative to the steel cylinder 33 .

[0194] Specifically, the lateral limiting device includes a groove 322 and a protrusion 332 that cooperates with the groove 322. The groove 322 is arranged on one of the concrete cylinder 32 and the steel cylinder 33, and the protrusion 332 is arranged on the other of the concrete cylinder 32 and the steel cylinder 33 to control the lateral movement of the concrete cylinder 32 relative to the steel cylinder 33.

[0195] Specifically, the groove 322 is disposed at the bottom of the concrete cylinder 32 , and the protrusion 332 is disposed at the top of the steel cylinder 33 .

[0196] Specifically, the grooves 322 are arranged along the circumference of the wall of the concrete cylinder 32 , and the protrusions 332 are arranged along the circumference of the wall of the steel cylinder 33 , so that the cooperation between the grooves 322 and the protrusions 332 can realize a closed setting between the concrete cylinder 32 and the steel cylinder 33 .

[0197] On the basis of the above, in a further preferred manner, the groove 322 is filled with a flexible filling layer 323 , and the flexible filling layer 323 is filled on both sides of the protrusion 332 .

[0198] During construction, due to construction errors, the protrusion 332 of the top of the steel cylinder 33 inserted into the groove 322 cannot be completely and accurately matched with the groove 322. At this time, the groove 322 is filled with a flexible filling layer 323, which can achieve a better sealing effect between the concrete cylinder 32 and the steel cylinder 33. At the same time, because the concrete cylinder 32 and the steel cylinder 33 are generally large in size, during the installation of the concrete cylinder 32 and the steel cylinder 33, when the groove 322 and the protrusion 332 are installed in coordination, they can play a shock-absorbing role to reduce the impact and vibration between the concrete cylinder 32 and the steel cylinder 33. Specifically, the flexible filling layer 323 includes materials such as asphalt and rubber.

[0199] On the basis of the above, in a further preferred manner, the bottom of the concrete cylinder 32 is connected to the steel cylinder 33. This mainly plays two roles: first, the concrete cylinder 32 is connected to the steel cylinder 33, which facilitates the integral lifting of the concrete cylinder 32 and the steel cylinder 33; second, it serves as a specific measure to limit the lateral movement of the concrete cylinder 32 relative to the steel cylinder 33.

[0200] Specifically, an embedded part 324 is provided at the bottom of the concrete cylinder 32, and a connecting part 333 is connected to the steel cylinder 33. The embedded part 324 and the connecting part 333 are detachably connected and / or welded. Specifically, the embedded part 324 and the connecting part 333 are connected by bolts, and their outer circles are welded to each other. Specifically, a reinforcing rib 334 is connected between the connecting part 333 and the steel cylinder 33. The embedded part 324 is arranged in a circle along the circumference of the cylinder wall of the concrete cylinder 32, and the connecting part 333 is arranged in a circle along the circumference of the cylinder wall of the steel cylinder 33, so that the connection between the embedded part 324 and the connecting part 333 can realize a closed setting between the concrete cylinder 32 and the steel cylinder 33.

[0201] like Fig.28 As shown, on the basis of the above, in a further preferred manner, a drag reduction facility is provided at the lower portion of the cylinder 30, and the drag reduction facility is used to reduce the resistance during the sinking process of the cylinder 30.

[0202] The drag reduction facility includes a high-pressure water facility 34, which is arranged at the lower part of the steel cylinder 33. The high-pressure water facility 34 is used to reduce the resistance of the sinking end of the steel cylinder 33, wherein the high-pressure water facility 34 is preferably a high-pressure water gun.

[0203] An air curtain 35 is provided at the lower part of the steel cylinder 33 , and the air curtain 35 is used to reduce the side resistance of the steel cylinder 33 when sinking.

[0204] During the sinking process of the cylinder 30 , the high-pressure water facility 34 and the air curtain 35 are turned on. The high-pressure water facility 34 is used to reduce the end resistance of the soil under the water surface to the cylinder 30 , and the air curtain 35 is used to reduce the side resistance of the soil under the water surface to the cylinder 30 .

[0205] Furthermore, a GPS and / or an inclinometer is installed on the upper part of the cylinder 30 , and the inclination of the cylinder 30 is adjusted by using the GPS and / or the inclinometer, a high-pressure water facility 34 and an air curtain 35 .

[0206] For example: Fig.29 As shown, when the cylinder 30 sinks and tilts to the right, the pressure of the left high-pressure water facility 34 and the air curtain 35 is increased, or the pressure of the right high-pressure water facility 34 and the air curtain 35 is reduced. By adjusting the pressure released by the drag reduction facilities at different parts of the bottom of the barrel, combined with the monitoring data feedback from the inclinometer or GPS of the cylinder 30, the sinking posture of the cylinder 30 can be dynamically adjusted.

[0207] like Figure 30-33 As shown, the wave-breaking facility 5 has been verified through experiments to have a wave-breaking effect of more than 90%, which is much greater than the wave transmittance of 30-40% of the floating wave-breaking facility.

[0208] Example 3

[0209] like Figure 1-10 As shown, the floating platform 7 device described in this embodiment is different from the embodiment 1 or 2 in that: a sheltered water area 71 is formed in the open sea through the wave-breaking facility 5. The floating platform 7 is constructed under sheltering conditions. The wave-breaking facility 5 can be 1 to 20 km long and can be divided into a wave-facing side and a wave-back side. One or two gates are set on the wave-back side for the entrance and exit 503 of ships. The width of the gate is set to 50 to 300 m, taking into account the size of the passing ship and the speed limit of the navigable water flow at the gate.

[0210] The wave dissipation facilities 5 on the back side can be used to moor ships inside and outside. A port wharf can be set inside. The port wharf can also be built into the internal waters of the floating platform 7.

[0211] The wave-breaking facility 5 and the floating platform 7 are connected by a floating bridge 8 or a suspended tunnel 65. When ships need to pass, the suspended tunnel 65 is given priority. The floating bridge adopts a two-float pontoon or a multi-float pier scheme. The suspended tunnel adopts a double-tube (considering two-way traffic from the wave-breaking facility 5 to the floating platform 7 and the floating platform 7 to the wave-breaking facility 5) two to three pontoons or more than one pontoon scheme to anchor the main structure of the tunnel above the water surface. Among them, the pontoons at both ends are equipped with vertical elevators to facilitate traffic from the pontoons above the water surface to the submerged tunnel body (transverse channel 653).

[0212] The distance between the wave-breaking facility 5 and the floating platform 7 is preferably set to 50-200m when no harbor is required, which is mainly controlled by factors such as the mooring system layout, overtopping amount, and the platform's allowable plane cost. When a harbor is required, it is 100-500m, mainly considering the ship berthing width.

[0213] The runway is arranged along the length direction of the platform. The terminal building, hangar, oil depot, etc. can be arranged on the top surface or in the cavity of the floating platform 7. The airport control tower and the helicopter landing pad can be arranged on the wave dissipation facility 5.

[0214] Example 4

[0215] like Figure 1-33 As shown, the present application described in this embodiment also discloses a floating platform system, characterized in that it includes at least one floating platform device as described in Example 1, 2 or 3, the lower part of the floating platform 7 is connected to an anchor cable 68, a part of the floating platform device floats above the water surface 37, and the lower part of the anchor cable 68 is fixed to the bottom of the water.

[0216] On the basis of the above, in a further preferred manner, the lower portion of the wave-breaking facility 5 is inserted into the water bottom surface 39 .

[0217] The floating platform system described in the present application effectively reduces or eliminates the impact of adverse environmental loads (mainly wind, wave and current environmental loads) on the sheltered waters 71 through at least one circle of wave-breaking facilities 5 on the periphery, so that the sheltered waters 71 are very little affected by the wind and wave environment, forming a calm sheltered waters 71, so that the sheltered waters 71 can be used for the construction of the floating platform 7, and the anchor cable 68 is used to limit the position of the floating platform 7, allowing the floating platform 7 to have a slight up and down displacement and a slight left and right displacement with the ebb and flow of the tide, thereby greatly reducing the cost of fixing the floating platform 7 in the water. Compared with the existing fill-type platform, it greatly saves the material consumption of the floating platform; and greatly reduces the difficulty of construction.

[0218] Example 5

[0219] like Figure 1-12As shown, the present application described in this embodiment also discloses a construction method for the floating platform device described in embodiment 1, 2 or 3, comprising the following steps:

[0220] S1, constructing the wave-breaking facilities 5, and using the wave-breaking facilities 5 to enclose the sheltered water area 71;

[0221] S2. Constructing the floating platform 7 in the sheltered water area 71.

[0222] The construction method for the floating platform device described in the present application first forms a sheltered water area 71 by surrounding a circle of wave-breaking facilities 5 to form a calm water area, and then constructs a floating platform 7 in the water area. This allows the construction of the floating platform 7 to avoid being affected by large winds and waves, greatly increasing the window period for the construction of the floating platform 7.

[0223] Specifically, the floating platform 7 includes a plurality of pontoon units 1 arranged in an array, and the wave-breaking facility 5 includes a prefabricated cylinder 30;

[0224] After the concrete barrel 32 is prefabricated on the assembly line 10 of the prefabrication factory, the assembly line 10 can also prefabricate the pontoon unit 1 .

[0225] The wave-breaking facility 5 and the floating platform 7 are both prefabricated and installed in a modular manner. On one or more assembly lines 10, flexible assembly line prefabrication is achieved. After the cylinder 30 is prefabricated on the assembly line 10 of the prefabrication plant, the assembly line 10 can also be used to prefabricate the pontoon unit 1, thereby greatly reducing the overall cost of the prefabrication stage.

[0226] Specifically, the cylinder 30 is filled with a filler 31, and the cylinder 30 includes a reinforced concrete cylinder 32 and a steel cylinder 33 sequentially arranged along the length direction of the cylinder 30, the reinforced concrete cylinder 32 is located above the steel cylinder 33, and the reinforced concrete cylinder 32 and the steel cylinder 33 are sealed.

[0227] like Figure 34-40 As shown, step S1 specifically includes the following steps:

[0228] S1. The concrete cylinder 32 is prefabricated on the assembly line 10 of the prefabrication plant, and the concrete cylinder 32 and the steel cylinder 33 are transported to the vicinity of the installation position;

[0229] S2. The concrete cylinder 32 is connected to the top of the steel cylinder 33 to form a cylinder 30;

[0230] S3. The cylinder 30 is hoisted as a whole to the installation position;

[0231] S4. Lower the cylinder 30 so that the cylinder 30 sinks to the designed elevation by its own weight, wherein a portion of the concrete cylinder 32 is submerged in the water surface 37, the steel cylinder 33 is completely submerged in the water surface 37, and the bottom of the steel cylinder 33 is sunk to the bottom surface 39 of the water;

[0232] S5. Filling the filler 31 in the cylinder 30;

[0233] S6. Repeat steps S1-S5 to complete the construction of the wave dissipation facility 5;

[0234] After the cylinder 30 is prefabricated on the assembly line 10 of the prefabrication factory, the assembly line 10 can prefabricate at least a portion of the buoyancy unit 1.

[0235] The principle of the cylinder 30 during and after sinking is shown in the following equation:

[0236] –L+Gc+Gs–Bc–Bs+S–T–F=0

[0237] In the above formula, L is the hanging force, Gc is the gravity of the concrete cylinder 32, Gs is the gravity of the steel cylinder 33, Bc is the buoyancy of the concrete cylinder 32, Bs is the buoyancy of the steel cylinder 33, S is the suction force when necessary, T is the end resistance of the steel cylinder 33, which depends on the soil parameters of the formation and the drag reduction effect of high-pressure water, and F is the side wall resistance of the steel cylinder 33, which depends on the friction angle and height of the backfill material, as well as the soil formation outside the cylinder 30 and the drag reduction effect of the air curtain 35.

[0238] The gravity of the cylinder 30 is G, G=Gc+Gs; the buoyancy of the cylinder 30 is B, B=Bc+Bs.

[0239] After the combined cylinder 30 sinks to the designed elevation, the high-pressure water facility 34 and the air curtain 35 are stopped. The cylinder sinking posture control is controlled by combining the pressure adjustment of the high-pressure water facility 34 and the air curtain 35 at different positions and the GPS+inclinometer set on the top of the cylinder. After completion, the cylinder is filled with sand or partially filled with sand, and vibrated when necessary (the height of the sand filling and the necessity of vibration depend on the size of the offshore load). The anti-scouring structure 310 is piled up on the outside of the steel cylinder 33, and the inside of the cylinder 30 is filled with silt and partially solidified (the necessity of solidification depends on the size of the offshore load). At the same time, the second wave-breaking structure 42 is sunk underwater, and the operator flexibly connects the second wave-breaking structure 42 with the corresponding attachment 43.

[0240] The present application discloses a construction method for the floating platform device, in which the concrete cylinder 32 and the steel cylinder 33 are prefabricated separately. Compared with the existing integrally prefabricated concrete cylinder 32 or steel cylinder 33, the prefabricated specifications of a single piece are greatly reduced, the difficulty of prefabrication is greatly reduced, and compared with the integrally prefabricated reinforced concrete cylinder, the requirements for transportation tools are greatly reduced. At the same time, during the sinking process, the combined cylinder combines the advantages of the heavy weight of the upper concrete cylinder 32 because the concrete strength-to-weight ratio is small, and the part above the water surface 37 is dry bulk density, and the lower steel cylinder 33 has a small frictional resistance when sinking in the underwater soil. It can sink to the designed elevation by its own weight and be installed in place. Compared with the integrally prefabricated steel cylinder that requires special vibration equipment to vibrate and sink, the construction cost and difficulty are greatly reduced.

[0241] Specifically, a first wave-breaking structure 41 is provided between adjacent concrete cylinders 32 , and the first wave-breaking structure 41 is used to reduce the net width of the channel adjacent to the foundation 3 ; in S1 , the first wave-breaking structure 41 is prefabricated integrally with the concrete cylinder 32 .

[0242] Specifically, a high-pressure water facility 34 and an air curtain 35 are provided at the lower part of the cylinder 30. In step S4, during the sinking process of the cylinder 30, the high-pressure water facility 34 and the air curtain 35 are turned on. The high-pressure water facility 34 is used to reduce the end resistance of the underwater soil to the cylinder 30, and the air curtain 35 is used to reduce the side resistance of the underwater soil to the cylinder 30.

[0243] Example 6

[0244] like Figure 11-12 As shown, the construction method for the floating platform device described in this embodiment is different from that in embodiment 5 in that the wave-breaking facility 5 and the floating platform 7 are both prefabricated and installed in a modular manner. On one or more assembly lines 10, flexible flow prefabrication is achieved. For example, six assembly lines 10 are used. Figure 3 As shown. The prefabrication technology of assembly line 10 is adopted, and the overall process from the beginning to the end is divided into steel bar binding or steel bar cage assembly, formwork installation, concrete pouring, concrete curing, and outfitting.

[0245] Afterwards, the pontoon can be transported by a semi-submersible barge on the dock at the front of the assembly line 10 or transported by launching and self-floating to the site for installation.

[0246] like Figure 3 The two right-hand assembly lines 10 shown in the figure produce wave-breaking facilities, and the four left-hand assembly lines 10 produce floating platforms; after all wave-breaking equipment assembly lines 10 are prefabricated, they are all put into the floating platform prefabrication.

[0247] The wave-breaking facility can be equipped with a lower prefabricated cylinder 30 + an upper prefabricated wave-breaking box 54 + on-site hoisting. During offshore installation, several large floating crane groups are used to achieve rapid installation.

[0248] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A floating platform device, characterized in that: It comprises a sheltered water area (71) surrounded by at least a portion of wave-breaking facilities (5), wherein a floating platform (7) is arranged in the sheltered water area (71), and the wave-breaking facilities (5) are used to reduce the amplitude of waves.

2. A floating platform device according to claim 1, characterized in that: An airport (72) is arranged on the floating platform (7).

3. A floating platform device according to claim 2, characterized in that: The airport (72) comprises a runway (713) and a taxiway (79), and a drainage slope (710) facing one side of the taxiway (79) is arranged between the runway (713) and the taxiway (79).

4. A floating platform device according to claim 3, characterized in that: A first grid member (711) is provided at the lower part of the runway (713), a second grid member (712) is provided at the lower part of the drainage slope (710), a top of the second grid member (712) is provided with a slope toward one side of the taxiway (79), the first grid member (711) is connected to the second grid member (712), and the first grid member (711) and the second grid member (712) are both connected to the floating platform (7).

5. A floating platform device according to claim 4, characterized in that: The floating platform (7) comprises a plurality of pontoon units (1) arranged in an array, wherein: The first grid member (711) is arranged on at least two of the buoyancy tank units (1); and / or, The second grid member (712) is arranged on at least two of the buoyancy tank units (1).

6. A floating platform device according to claim 5, characterized in that: The buoyancy unit (1) comprises at least two partition walls (715), and the lattice longitudinal walls (714) of the first lattice member (711) are arranged on the partition walls (715).

7. A floating platform device according to claim 1, characterized in that: A first ship berth (73) is arranged in the floating platform (7), and a navigation channel (75) for ships to enter and exit the first ship berth (73) is arranged on one side of the first ship berth (73); and / or, A second ship berth (74) is provided between the floating platform (7) and the wave-breaking facility (5); and / or, A buoy (76) for docking ships is provided between the floating platform (7) and the wave-breaking facility (5); and / or, A third ship berth (77) is provided on the wave-repelling side of the wave-removing facility (5); and / or, The wave-breaking facility (5) is provided with a command tower (78), a helipad, wind power equipment or a lighthouse.

8. The floating platform device according to claim 1, characterized in that: The wave-breaking facility (5) is provided with an entrance (503) for ships to enter and exit the sheltered water area (71).

9. A floating platform device according to claim 8, characterized in that: The inlet and outlet (503) and the outlet (504) are arranged on the wave-removing side of the wave-breaking facility (5).

10. A floating platform device according to claim 9, characterized in that: The wave-breaking facility is provided with an extension portion (505) extending toward the wave-repelling side, and the extension portion (505) is located at the inlet and outlet (503).

11. A floating platform device according to claim 1, characterized in that: A floating tunnel (65) is provided between the floating platform (7) and the wave-breaking facility (5), and a traffic passage (62) is provided in the floating tunnel (65).

12. A floating platform device according to claim 11, characterized in that: The floating tunnel (65) comprises a transverse channel (653) and a vertical channel (652) which are connected to each other. The traffic channel (62) is located in the transverse channel (653), and the vertical channel (652) is connected to the traffic channel (62).

13. A floating platform device according to claim 12, characterized in that: The vertical channels (652) are provided at both ends of the floating tunnel (65).

14. A floating platform device according to claim 13, characterized in that: A lifting device (610) connected to the traffic channel (62) is arranged in the vertical channel (652).

15. A floating platform device according to claim 14, characterized in that: A first channel (654) is connected between the upper portion of the vertical channel (652) and the floating platform (7), and the first channel (654) is in communication with the lifting device (610); and / or, A first channel (654) is connected between the upper portion of the vertical channel (652) and the wave-breaking facility (5), and the first channel (654) is in communication with the lifting device (610).

16. The floating platform device according to claim 11, characterized in that: The suspension tunnel (65) is provided with a weight adjustment chamber (651), and a weight adjustment medium is stored in the weight adjustment chamber (651). The buoyancy and inclination of the suspension tunnel (65) can be adjusted by adjusting the weight of the weight adjustment medium in the weight adjustment chamber (651).

17. A floating platform device according to claim 16, characterized in that: The weight adjustment chamber (651) is located at the lower part of the suspension tunnel (65), and the traffic channel (62) is located above the weight adjustment chamber (651).

18. The floating platform device according to claim 1, characterized in that: A floating bridge (8) is connected between the floating platform (7) and the wave-breaking facility (5).

19. A floating platform device according to claim 18, characterized in that: The floating bridge (8) is rotatably connected to the wave-breaking facility (5) via a rotating device (81); or, The floating bridge (8) and the floating platform (7) are rotatably connected via a rotating device (81).

20. A floating platform device according to any one of claims 1 to 19, characterized in that: The wave-breaking facility (5) comprises at least two foundations (3) arranged at intervals, a first wave-breaking structure (41) is arranged between adjacent foundations (3), the first wave-breaking structure (41) is used to reduce the net width of the channel between adjacent foundations (3), and a wave-breaking box (54) is arranged on the top support of adjacent foundations (3).

21. A floating platform device according to claim 20, characterized in that: All the first wave-breaking structures (41) between adjacent foundations (3) form a multi-bend channel.

22. A floating platform device according to claim 21, characterized in that: The foundation (3) comprises a cylinder (30), the cylinder (30) is filled with a filler (31), the cylinder (30) comprises a reinforced concrete cylinder (32) and a steel cylinder (33) arranged in sequence along the length direction of the cylinder (30), the reinforced concrete cylinder (32) is located above the steel cylinder (33), the reinforced concrete cylinder (32) and the steel cylinder (33) are closed, and the first wave-breaking structure (41) is connected to the reinforced concrete cylinder (32).

23. A floating platform device according to claim 22, characterized in that: A second wave-breaking structure (42) is also provided at the lower part of the first wave-breaking structure (41), and the second wave-breaking structure (42) is flexibly connected to at least one of the steel cylinders (33).

24. A floating platform system, characterized in that: It comprises at least one floating platform device according to any one of claims 1 to 23, wherein the lower part of the floating platform (7) is connected with an anchor cable (68), and a part of the floating platform device floats on the water surface (37).

25. A floating platform system according to claim 24, characterized in that: The lower part of the wave-breaking facility (5) is inserted into the water bottom surface (39).

26. A construction method for the floating platform device according to any one of claims 1 to 23, characterized in that: The following steps are involved: S1, constructing the wave-breaking facility (5), and using the wave-breaking facility (5) to enclose the sheltered water area (71); S2. constructing the floating platform (7) in the sheltered water area (71).

27. A construction method for the floating platform device according to claim 26, characterized in that: The floating platform (7) comprises a plurality of pontoon units (1) arranged in an array, and the wave-breaking facility (5) comprises a prefabricated cylinder (30); After the cylinder (30) is prefabricated on the assembly line (10) of the prefabrication factory, the assembly line (10) can also prefabricate the buoyancy unit (1).

28. A construction method for the floating platform device according to claim 27, characterized in that: The cylinder (30) is filled with a filler (31), and the cylinder (30) comprises a reinforced concrete cylinder (32) and a steel cylinder (33) which are sequentially arranged along the length direction of the cylinder (30), the reinforced concrete cylinder (32) is located above the steel cylinder (33), and the reinforced concrete cylinder (32) and the steel cylinder (33) are sealed. Step S1 specifically includes the following steps: S1. The concrete cylinder (32) is prefabricated on the assembly line (10) of the prefabrication plant, and the concrete cylinder (32) and the steel cylinder (33) are transported to the vicinity of the installation location; S2. The concrete cylinder (32) is connected to the top of the steel cylinder (33) to form a cylinder (30); S3. The cylinder (30) is hoisted as a whole to the installation position; S4. lowering the cylinder (30) so that the cylinder (30) sinks to the designed elevation by its own weight, wherein a portion of the concrete cylinder (32) is submerged in the water surface (37), the steel cylinder (33) is completely submerged in the water surface (37), and the bottom of the steel cylinder (33) is sunk to the bottom surface (39) of the water; S5. Filling the filler (31) in the cylinder (30); S6. Repeat steps S1-S5 in sequence to complete the construction of the wave dissipation facility (5); After the cylinder (30) is prefabricated on the assembly line (10) of the prefabrication factory, the assembly line (10) can prefabricate at least a portion of the buoyancy unit (1).

29. A construction method for the floating platform device according to claim 27, characterized in that: A first wave-breaking structure (41) for breaking waves is arranged between adjacent concrete cylinders (32); In S1, the first wave-breaking structure (41) and the concrete cylinder (32) are prefabricated as one piece.

30. A construction method for the floating platform device according to claim 27, characterized in that: A high-pressure water facility (34) and an air curtain (35) are provided at the lower part of the cylinder (30). In step S4, during the sinking process of the cylinder (30), the high-pressure water facility (34) and the air curtain (35) are turned on. The high-pressure water facility (34) is used to reduce the end resistance of the underwater soil to the cylinder (30), and the air curtain (35) is used to reduce the side resistance of the underwater soil to the cylinder (30).