Biogas system capable of realizing first-in first-out of fermentation materials

By using the carrier tank and fermentation broth circulation mechanism in the anaerobic fermentation system, the problems of excessive water volume, scum crust and acidification in full-mixed and dry fermentation are solved, and the sequential treatment of fermented materials and environmental control are realized. Improve material utilization and reaction stability.

CN118931707APending Publication Date: 2024-11-12ANYANG LIPU SILO ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310539113.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing fully mixed and dry anaerobic fermentation technologies have problems such as excessive water volume, difficulty in cleaning up the scum crust, blockage of deposition, low material utilization, and easy acidification in the anaerobic environment.

Method used

The fermentation material is circulated by a carrier tank and a fermentation broth circulation mechanism. The fermentation material is sequentially brought into and out through the carrier tank to avoid the mixing of new and old materials. The fermentation material is buried under the liquid surface, reducing the amount of water, and regulating the anaerobic environment through the fermentation broth circulation.

Benefits of technology

The fermented materials are first in and first out, which avoids scum crust, reduces water volume, improves material utilization, and is easy to control the anaerobic reaction environment and avoids acidification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118931707A_ABST
    Figure CN118931707A_ABST
Patent Text Reader

Abstract

The invention provides a biogas system capable of realizing first-in first-out of fermentation materials, the biogas system comprises an anaerobic fermentation tank, a raw material conveying line is arranged in the anaerobic fermentation tank, the raw material conveying line is used for sequential feeding and discharging of a plurality of material loading tanks, the material loading tanks are filled with the fermentation materials, and holes are formed in the material loading tanks; and the material loading tank is communicated with fermentation liquor of the anaerobic fermentation tank through the pores. According to the invention, the materials are fed in sequence by utilizing the material loading tank, so that the first-in first-out of the fermented materials is realized, the materials are fully utilized, crusting is avoided, and the water consumption is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of anaerobic fermentation of crops such as straws, and in particular to a biogas system that realizes first-in-first-out of fermented materials. Background Art

[0002] The anaerobic fermentation of crop straw is divided into wet fermentation and dry fermentation. If a fully mixed digester is used for fermentation, the following problems will occur: 1. Large tanks are required, which use a lot of water. In addition, the straw floats on the reaction surface, and the scum forms a crust, which is very difficult to clean, making it difficult to maintain the fermentation; 2. Sediments are easily formed at the bottom of the tank, which eventually causes the anaerobic fermentation reactor to be blocked; 3. In addition, after the new material enters the tank, it is scattered everywhere and mixed with the fermented material. There is no order in which the slag is discharged, and the utilization rate of the new and old materials discharged at the same time is low. The existing dry fermentation method is prone to acidification of the anaerobic environment in the early stage, which is difficult to control and adjust. Summary of the invention

[0003] The present invention provides a biogas system that realizes first-in-first-out of fermented materials. The material loading tank is used to put materials in order, so that the fermented materials are first-in-first-out, the materials are fully utilized, no crust is formed, and the water consumption is small.

[0004] The technical solution of the present invention is achieved as follows: a biogas system that realizes the first-in-first-out of fermented materials, including an anaerobic fermentation tank, a raw material conveying line is arranged in the anaerobic fermentation tank, the raw material conveying line is used for the sequential entry and exit of a plurality of loading tanks, the loading tanks are filled with fermented materials, and pores are arranged on the loading tanks, through which the loading tanks and the fermentation liquid of the anaerobic fermentation tank are communicated.

[0005] The above structure adopts a loading tank to allow the fermentation materials to enter and exit in sequence to avoid mixing new and old materials; and the fermentation materials are loaded in the loading tank so that the fermentation materials are buried under the liquid surface to avoid floating of the materials and solve the problem of scum crusting; at the same time, the above structure greatly reduces the water consumption and the amount of fermentation liquid. With the same dry mass, the footprint is small. Although it uses slightly more water than dry fermentation, the fermentation reaction is easy to control.

[0006] Furthermore, the material loading tank comprises a cylinder, both ends of which are provided with end covers, and both the cylinder and the end covers are provided with pores. The size of the fermentation material is larger than the pores, and the fermentation material cannot go out of the pores.

[0007] Furthermore, a feeding station, several loading stations and a discharging station are sequentially arranged along the conveying direction on the raw material conveying line. A stepping mechanism is also arranged on the raw material conveying line. The stepping mechanism pushes the loading tank to move so that the loading tank enters the discharging station from the feeding station and several loading stations in sequence.

[0008] Furthermore, the fermentation liquid circulation mechanism is included, and the fermentation liquid circulation mechanism makes the fermentation liquid circulate back and forth in the anaerobic fermentation tank. The fermentation liquid circulation mechanism is used to adjust the environment of anaerobic fermentation and prevent the liquid from acidification.

[0009] Furthermore, the raw material conveying line includes a feed conveying line and a discharge conveying line arranged in parallel, and a transverse movement mechanism is arranged between the feed conveying line and the discharge conveying line, and the transverse movement mechanism is used to convey the loading tank from the feed conveying line to the discharge conveying line.

[0010] Furthermore, both the feeding station and the discharging station are provided with a lifting mechanism for the loading tank.

[0011] Furthermore, openable covering films are provided on the liquid surfaces at the feeding station and the discharging station, which are opened only during loading and unloading to reduce the amount of oxygen dissolved.

[0012] Furthermore, a sealed top cover is arranged on the upper side of the anaerobic fermentation tank, and a biogas outlet is arranged on the sealed top cover.

[0013] Beneficial effects of the present invention:

[0014] The present invention utilizes a loading tank to allow materials to be put in sequentially, so that the fermented materials are first-in-first-out and the materials are fully utilized; compared with a fully mixed anaerobic digester, it uses less water, does not form crusts, is convenient for material input and output, and has a small volume; compared with dry fermentation, it is not easy to be acidified and the reaction is easy to maintain; the biogas system of the present invention is an anaerobic fermentation biogas device between dry fermentation and wet fermentation. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 It is a front view of the biogas system of the present invention;

[0017] Figure 2 for Figure 1 A top view of

[0018] Figure 3 for Figure 1 Left view of;

[0019] Figure 4 It is a three-dimensional diagram of a fermentation tank;

[0020] Figure 5 It is a structural schematic diagram of the cylinder;

[0021] Figure 6 It is a schematic diagram of the structure of the end cover.

[0022] Anaerobic fermentation tank 1, sealing top cover 2, biogas outlet 3, loading tank 4, feeding station 5, loading station 6, discharging station 7, cylinder 8, end cover 9, stepping mechanism 10, feeding conveying line 11, discharging conveying line 12, transverse movement mechanism 13, transverse hydraulic cylinder 14, push plate 15, fermentation liquid circulation mechanism 16. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] like Figure 1-3 As shown, a biogas system that realizes first-in-first-out of fermented materials includes an anaerobic fermentation tank 1, in which fermentation liquid is stored, a sealed top cover 2 is arranged on the upper side of the anaerobic fermentation tank 1, a biogas outlet 3 is arranged on the sealed top cover 2, a biogas output pipe is installed at the biogas outlet 3, the biogas output pipe extends below the fermentation liquid surface, so that the fermentation liquid surface and the sealed top cover 2 form a closed space, and the depth of the end cover extending below the liquid surface should allow a loading tank 4 to pass smoothly.

[0025] A raw material conveying line is provided in the anaerobic fermentation tank 1, and the raw material conveying line is used for sequentially entering and exiting a plurality of loading tanks 4, and the loading tanks 4 are filled with fermentation materials, such as Figure 4-6 As shown, the loading tank 4 includes a cylinder 8, and end caps 9 are installed at both ends of the cylinder 8. There are holes on the cylinder 8 and the end caps 9, and the loading tank 4 is connected with the fermentation liquid in the anaerobic fermentation tank 1 through the holes. The size of the fermentation material is larger than the hole, and the fermentation material cannot go out of the hole. The cylinder 8 can be round or rectangular, which can be set according to needs.

[0026] like Figure 2 As shown, the material conveying line is provided with a feed station 5, a plurality of loading stations 6 and a discharge station 7 in sequence along the conveying direction. The number of the loading stations 6 is multiple and can be set according to needs. The material conveying line includes a conveying guide rail 8, on which a stepping mechanism 10 is provided. The stepping mechanism 10 is a rocker-type conveyor belt, which is used to push the loading tank to shift. The loading tank 4 is sent from the feed station 5 and a plurality of loading stations 6 to the discharge station 7 through the stepping mechanism 10. The loading tank 4 is fished out at the discharge station 7, and then the waste is cleaned to complete a tank working cycle.

[0027] In one embodiment, Figure 2 and 3As shown, the raw material conveying line includes a feed conveying line 11 and a discharge conveying line 12 arranged in parallel in the longitudinal direction, and a transverse movement mechanism 13 is arranged between the feed conveying line 11 and the discharge conveying line 12, and the transverse movement mechanism 13 is used to convey the material carrying tank 4 from the feed conveying line 11 to the discharge conveying line 12. The transverse movement mechanism 13 is located at the right end of the feed conveying line 11 and the discharge conveying line 12, the feed station 5 is located at the left end of the feed conveying line 11, and the discharge station 7 is located at the left end of the discharge conveying line 12. Both the feed conveyor line 11 and the discharge conveyor line 12 include a conveying guide rail 8, and a stepping mechanism is provided on the conveying guide rail 8. The loading tank 4 is first placed on the feed station 5, and then driven by the stepping mechanism to be sent from the left end to the right end along the feed conveyor line 11. The transverse movement mechanism 13 sends the loading tank 4 from the feed conveyor line 11 to the discharge conveyor line 12, and the stepping mechanism of the discharge conveyor line 12 sends the loading tank 4 from the right end to the discharge station 7 at the left end.

[0028] The transverse movement mechanism 13 includes a transverse hydraulic cylinder 14 , and a push plate 15 is fixed to the working end of the transverse hydraulic cylinder 14 . The contraction of the transverse hydraulic cylinder 14 drives the push plate 15 to push the material carrying tank 4 on the feeding conveyor line 11 to the discharging conveyor line 12 .

[0029] In one embodiment, both the feeding station 5 and the discharging station 7 are provided with a lifting mechanism for the loading tank 4, and the lifting mechanism is a winch or an electric hoist. The lifting mechanism of the feeding station 5 delivers the loading tank 4 to the feeding station 5, and the lifting mechanism of the discharging station 7 lifts the loading tank 4 from the discharging station 7 out of the anaerobic fermentation tank 1.

[0030] Openable covering films are provided on the liquid surfaces at the feeding station 5 and the discharging station 7, which are opened only during loading and unloading to reduce the amount of oxygen dissolved.

[0031] In one embodiment, Figure 2 As shown, a biogas system that realizes first-in-first-out of fermented materials also includes a fermentation liquid circulation mechanism 16, which allows the fermentation liquid to circulate back and forth in the anaerobic fermentation tank 1. The fermentation liquid circulation mechanism 16 includes a circulation pump, one end of which is connected to the side of the anaerobic fermentation tank 1 close to the discharge conveying, and the other end is connected to the side of the anaerobic fermentation tank 1 close to the feeding station 5, and the fermentation liquid on the discharge conveying line 12 is delivered to the position of the feeding conveying line 11 close to the feeding station 5. The fermentation liquid circulation mechanism 16 is used to adjust the environment of anaerobic fermentation to prevent the liquid from acidifying.

[0032] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A biogas system for achieving first-in-first-out of fermented materials, comprising an anaerobic fermentation tank, Features: A raw material conveying line is provided in the anaerobic fermentation tank, and the raw material conveying line is used for sequential entry and exit of several loading tanks, the loading tanks are filled with fermentation materials, and holes are provided on the loading tanks, through which the loading tanks are connected with the fermentation liquid in the anaerobic fermentation tank.

2. A biogas system according to claim 1 that realizes first-in-first-out of fermented materials, Features: The material loading tank comprises a cylinder, both ends of which are provided with end covers, and both the cylinder and the end covers are provided with holes.

3. A biogas system according to claim 1 that realizes first-in-first-out of fermented materials, Features: A feeding station, several loading stations and a discharging station are arranged in sequence along the conveying direction of the raw material conveying line. A stepping mechanism is also arranged on the raw material conveying line. The stepping mechanism pushes the loading tank to move so that the loading tank enters the discharging station from the feeding station and several loading stations in sequence.

4. A biogas system according to any one of claims 1 to 3 that realizes first-in-first-out of fermented materials, Features: The utility model also comprises a fermentation liquid circulation mechanism, which makes the fermentation liquid circulate back and forth in the anaerobic fermentation tank.

5. A biogas system according to any one of claims 1 to 3 that realizes first-in-first-out of fermented materials, Features: The raw material conveying line comprises a feed conveying line and a discharge conveying line arranged in parallel, a transverse movement mechanism is arranged between the feed conveying line and the discharge conveying line, and the transverse movement mechanism is used to convey the loading tank from the feed conveying line to the discharge conveying line.

6. A biogas system according to claim 3 that realizes first-in-first-out of fermented materials, Features: Both the feeding station and the discharging station are provided with a lifting mechanism for the loading tank.

7. A biogas system according to claim 3 that realizes first-in-first-out of fermented materials, Features: Openable covering films are provided on the liquid surfaces at the feeding station and the discharging station.

8. A biogas system according to claim 1 that realizes first-in-first-out of fermented materials, Features: A sealed top cover is arranged on the upper side of the anaerobic fermentation tank, and a biogas outlet is arranged on the sealed top cover.