Method for judging blanking time of blast furnace charging bucket

By recording and adjusting the opening of the material flow valve, the problems of incomplete material feeding and timing mismatch in the blast furnace hopper were solved, ensuring material flow stability and production efficiency, and avoiding resource waste.

CN118932125APending Publication Date: 2024-11-12TIANJIN TIANGANG UNITED SPECIAL STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310515464.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In existing technologies, incomplete or mismatched feeding times in blast furnace feed hoppers can lead to valves failing to close in a timely manner, affecting subsequent processes and resulting in resource waste.

Method used

By recording parameters such as the time it takes for the furnace charge to rotate in the airtight box, the time it takes for the hopper to empty, and the friction time at the center of the material flow valve, the opening of the material flow valve is adjusted to match the feeding time and the valve closing time. Gamma rays are used to detect the furnace charge and a stethoscope is used to record the friction time to ensure accurate feeding time.

Benefits of technology

This achieves continuous and stable material flow, avoids problems such as material blockage and valve failure to close, improves production efficiency, and saves resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932125A_ABST
    Figure CN118932125A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of blast furnaces, and relates to a method for judging the blanking time of a blast furnace material tank, which comprises the following steps: recording the time when a furnace material passes through a rotating chute in an airtight box to obtain the actual blanking time; recording the first time required for emptying the furnace burden in the charging bucket; comparing the actual blanking time with the first time; recording second time of continuous friction between the furnace burden and a central opening of the material flow valve; and the valve opening degree of the material flow valve is adjusted, and the actual discharging time is recorded again till the actual discharging time is the same as the second time. The method has the beneficial effects that the valve opening degree of the material flow valve is adjusted according to the second time, so that the blanking time is matched with opening and closing of the valve, continuous and stable material flow and normal proceeding of subsequent procedures are guaranteed, and the problem that furnace burden is not completed within the specified time and is damaged is solved by accurately judging the blanking time of the blast furnace. And part of materials block the charging bucket or the valve, so that the valve cannot be closed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of blast furnaces and relates to a method for judging the unloading time of a blast furnace material tank. Background Art

[0002] The blast furnace charge tank is an important equipment on the top of the blast furnace. In normal production, the charge in the charge tank needs to be added to the blast furnace. How to accurately judge the state of the charge in the charge tank is directly related to the subsequent opening and closing of the valve. If the charge in the charge tank is not unloaded within the specified time, part of the material is blocked in the charge tank or the valve, which will cause the valve to fail to close, affecting the normal progress of the subsequent process; if the charge in the charge tank is unloaded in less than the specified time, the efficiency is low and a lot of resources are wasted. Therefore, a new method for judging the unloading time of the blast furnace charge tank is needed to solve the above problems. Summary of the invention

[0003] In order to solve the above-mentioned technical problems, the present invention provides a method for judging the unloading time of a blast furnace charge tank, which solves the problem that the charge in the charge tank cannot be unloaded within the specified time, and some materials are blocked in the charge tank or the valve, resulting in the valve being unable to close.

[0004] The technical solution adopted by the present invention is: a method for judging the unloading time of a blast furnace charging tank, characterized in that it comprises the following steps:

[0005] Record the time it takes for the charge to pass through the rotating chute in the airtight box to obtain the actual unloading time;

[0006] Record the first time required for the tank to be emptied of the charge;

[0007] Comparing the actual unloading time with the first time;

[0008] Record the second time that the furnace charge and the central opening of the material flow valve continue to rub against each other;

[0009] The valve opening of the material flow valve is adjusted, and the actual material unloading time is re-recorded until the actual material unloading time is the same as the second time.

[0010] Furthermore, a method for determining the unloading time of a blast furnace material tank is characterized by comprising the following steps:

[0011] Record the time it takes for the charge to pass through the rotating chute in the airtight box to obtain the actual unloading time;

[0012] Record the first time required for the tank to be emptied of the charge;

[0013] Comparing the actual unloading time with the first time;

[0014] Record the second time that the furnace charge and the central opening of the material flow valve continue to rub against each other;

[0015] The valve opening of the material flow valve is adjusted, and the actual material unloading time is re-recorded until the actual material unloading time is the same as the second time.

[0016] Furthermore, the position data of the rotating chute is collected in real time, and the number of rotations, the rotation time and the time required for one rotation are recorded, so as to calculate the actual unloading time.

[0017] Furthermore, the charge in the material tank is detected by gamma rays, and the residence time of the charge, ie, the first time, is recorded.

[0018] Furthermore, the actual material discharge time and the first time are continuously compared, and the valve opening of the material flow valve is adjusted according to the difference between the two.

[0019] Furthermore, if the actual material discharge time is greater than the first time, the valve opening of the material flow valve is increased.

[0020] Furthermore, if the actual material discharge time is less than the first time, the valve opening of the material flow valve is reduced.

[0021] Furthermore, a listening needle is provided on the outer side of the flow valve for recording the second time.

[0022] Furthermore, the stethoscope comprises a probe, a stethoscope tube and an ear tube, one end of the probe is connected to the material flow valve, and the other end is connected to the ear tube through the stethoscope tube.

[0023] Furthermore, an ear plug is provided at the end of the ear tube away from the auditory tube.

[0024] The present invention relates to a method for judging the unloading time of a blast furnace charge tank. Using this method, the second time of continuous friction between the charge and the central waiting port of the charge flow valve is used as a condition for adjusting the valve opening of the charge flow valve, so that the unloading time of the charge tank matches the opening and closing time of the valve, ensuring the continuous stability of the charge flow and the normal progress of subsequent processes. In addition, by accurately judging the unloading time of the blast furnace, not only is the problem that the charge in the charge tank cannot be unloaded within the specified time, and part of the material is blocked in the charge tank or the valve, resulting in the valve being unable to close, solved, but also production efficiency is improved and waste of resources is avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a flow chart of an embodiment provided by the present invention. DETAILED DESCRIPTION

[0026] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0027] Reference Figure 1 As shown, a method for determining the unloading time of a blast furnace charging tank is characterized by comprising the following steps:

[0028] Record the time it takes for the charge to pass through the rotating chute in the airtight box to obtain the actual unloading time;

[0029] Record the first time it takes for the tank to be emptied of charge;

[0030] Compare the actual unloading time with the first time;

[0031] Record the second time when the furnace charge and the center port of the material flow valve continue to rub against each other;

[0032] Adjust the valve opening of the material flow valve and re-record the actual unloading time until the actual unloading time is the same as the second time. During the unloading process of the blast furnace, the charge rubs against the central waiting port of the material flow valve (the so-called central waiting port refers to the sleeve in the center of the valve, through which the charge passes), which will continue to produce noise. When the noise stops, the charge in the material tank has been fully added to the blast furnace, so the valve can be closed and the release valve can be opened for release to prepare for the next loading. According to the second time, the valve opening of the material flow valve is adjusted so that the unloading time matches the opening and closing of the valve, ensuring the continuous stability of the material flow and the normal progress of subsequent processes. Of course, by accurately judging the unloading time of the blast furnace, it not only solves the problem that the charge in the material tank cannot be unloaded within the specified time, and some materials are blocked in the material tank or valve, resulting in the valve being unable to close, but also improves production efficiency, shortens the idling time of the blast furnace, and avoids waste of resources.

[0033] Preferably, the position data of the rotating chute is collected in real time, and the number of rotations, the rotation time, and the time required for one rotation are recorded, so as to calculate the actual material unloading time. In this embodiment, the number of rotations of the rotating chute in the airtight box determines the actual unloading time required. For example, if the material can be unloaded normally in 11 rotations, but it is used up in 9 rotations, it is necessary to reduce the opening of the material flow valve and extend the unloading time, and the corresponding duration of the listening needle will increase; if the material is not used up in 11 rotations, it is necessary to increase the opening of the material flow valve and shorten the unloading time, and the corresponding duration of the listening needle will decrease.

[0034] Preferably, the charge in the material tank is detected by gamma rays, and the time the charge stays is recorded, i.e., the first time. The gamma rays are used to detect whether there is charge in the material tank. When no charge is detected, it indicates that the material tank is empty of charge. The time from the start of charging to the emptying of charge is the first time.

[0035] Preferably, the actual material discharge time is continuously compared with the first time, and the valve opening of the material flow valve is adjusted according to the difference between the two.

[0036] Preferably, if the actual material discharge time is greater than the first time, the valve opening of the material flow valve is increased.

[0037] Preferably, if the actual unloading time is less than the first time, the valve opening of the material flow valve is reduced. In this embodiment, the second time of continuous friction between the furnace charge and the central waiting mouth of the material flow valve is used as a condition for adjusting the valve opening of the material flow valve, so that the unloading time of the material tank matches the opening and closing time of the valve. If the actual unloading time is greater than the first time, the valve opening of the material flow valve is increased; if the actual unloading time is less than the first time, the valve opening of the material flow valve is reduced. When the actual unloading time is the same as the second time, the valve of the material flow valve is opened to the set opening. When distributing the material, the material flow valve is opened to the set opening, and the furnace charge in the material tank flows to the rotating rotary chute through the material flow valve. At this time, the unloading time is the most reasonable, the efficiency is the highest, and the cost is saved.

[0038] Preferably, the airtight box is provided with a feed port at the top and a discharge port at the bottom, and is connected to a material flow valve through the feed port and to a blast furnace through the discharge port. A material tank is provided at the end of the material flow valve away from the feed port.

[0039] Preferably, an upper sealing valve is provided between the flow valve and the airtight box.

[0040] Preferably, a lower sealing valve is provided between the airtight box and the blast furnace.

[0041] Preferably, the upper sealing valve, the lower sealing valve and the rotary chute are started at the same time. When a material distribution signal is issued, the sealing valve opens, the material flow valve is opened, and the rotary chute is opened at the same time. At this time, the material flow valve is opened to a set opening, and material distribution can be carried out according to the batch weight and the specified material distribution program, so as to achieve uniform and stable material flow.

[0042] Preferably, a rotating sleeve for installing a rotating chute is provided in the airtight box, and the two ends of the rotating sleeve are respectively connected to the feed port and the discharge port. The airtight box is the core component of the blast furnace top charging equipment, which is mainly used to drive and control the rotation and tilting of the rotating chute around the center line of the blast furnace, thereby completing the blast furnace charging. In the present embodiment, the airtight box is communicated with the blast furnace mouth through the discharge port opened on the bottom plate thereof, and the airtight box is communicated with the material tank through the feed port opened on the top plate thereof, and a rotating sleeve for installing a rotating chute is movably sealed in the airtight box shell, and the upper end of the rotating sleeve is sealably and movably connected with the airtight box shell, the upper end of the rotating sleeve faces the feed port on the top plate of the airtight box shell, and the lower end of the rotating sleeve faces the discharge port on the bottom plate of the airtight box shell, and a cavity is formed between the rotating sleeve and the airtight box shell, and a driving component for controlling the rotation of the rotating sleeve and the tilting of the distribution chute is arranged in the cavity, and the driving component is a transmission gear arranged in the airtight box, which is the prior art in this field, and its specific structure and function will not be elaborated in detail.

[0043] Preferably, a cavity is formed between the rotating sleeve and the shell of the airtight box, and a driving component for controlling the rotation of the rotating sleeve and the tilting of the rotating chute around the center line of the blast furnace is provided in the cavity. In this embodiment, the rotating chute is adjusted by the gear of the airtight box. Under normal circumstances, the blast furnace is distributed in an annular manner. The rotating chute rotates at a certain speed. During the rotation process, by changing the up and down angles of the rotating chute, multi-ring distribution can be achieved.

[0044] Preferably, a listening needle is provided on the outside of the flow valve for recording the second time.

[0045] Preferably, the exterior of the stethoscope is wrapped with an insulating layer to ensure safety during on-site use.

[0046] Preferably, the listening needle comprises a probe, a listening tube and an ear tube, one end of the probe is connected to the flow valve, and the other end is connected to the ear tube through the listening tube.

[0047] Preferably, an earplug is provided at the end of the ear tube away from the hearing tube. In this embodiment, the hearing tube is a PVC hose, the length of which can be flexibly adjusted according to the actual scene, convenient to carry, and not easily damaged by bumps. Listening to the sound through the earplug solves the problems of inconvenient operation and inaccurate judgment due to lack of experience of on-site staff. It has a simple structure, good sound transmission effect, small footprint, and convenient movement and storage.

[0048] The present invention relates to a method for judging the unloading time of a blast furnace charge tank. Using this method, the second time of continuous friction between the charge and the central waiting port of the charge flow valve is used as a condition for adjusting the valve opening of the charge flow valve, so that the unloading time of the charge tank matches the opening and closing time of the valve, ensuring the continuous stability of the charge flow and the normal progress of subsequent processes. In addition, by accurately judging the unloading time of the blast furnace, not only is the problem that the charge in the charge tank cannot be unloaded within the specified time, and part of the material is blocked in the charge tank or the valve, resulting in the valve being unable to close, solved, but also production efficiency is improved and waste of resources is avoided.

[0049] The embodiments of the present invention are described in detail above, but the contents described are only preferred embodiments of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A method for determining the unloading time of a blast furnace charging tank, It is characterized in that The steps include: Record the time it takes for the charge to pass through the rotating chute in the airtight box to obtain the actual unloading time; Record the first time required for the tank to be emptied of the charge; Comparing the actual unloading time with the first time; Record the second time that the furnace charge and the central opening of the material flow valve continue to rub against each other; The valve opening of the material flow valve is adjusted, and the actual material unloading time is re-recorded until the actual material unloading time is the same as the second time.

2. The method for determining the unloading time of a blast furnace batch tank according to claim 1, Features: The position data of the rotating chute is collected in real time, and the number of rotations, the rotation time and the time required for one rotation are recorded, so as to calculate the actual unloading time.

3. The method for determining the unloading time of a blast furnace batch tank according to claim 2, Features: The charge in the charge tank is detected by gamma rays, and the residence time of the charge, ie, the first time, is recorded.

4. The method for determining the unloading time of a blast furnace batch tank according to claim 3, Features: The actual material discharge time is continuously compared with the first time, and the valve opening of the material flow valve is adjusted according to the difference between the two.

5. The method for determining the unloading time of a blast furnace charging tank according to claim 4, Features: If the actual material discharge time is greater than the first time, the valve opening of the material flow valve is increased.

6. The method for determining the unloading time of a blast furnace charging tank according to claim 4, Features: If the actual material discharge time is less than the first time, the valve opening of the material flow valve is reduced.

7. The method for determining the unloading time of a blast furnace charging tank according to any one of claims 1 to 6, Features: A listening needle is arranged on the outside of the material flow valve for recording the second time.

8. The method for determining the unloading time of a blast furnace charging tank according to claim 7, Features: The stethoscope comprises a probe, a stethoscope tube and an ear tube. One end of the probe is connected to the material flow valve, and the other end is connected to the ear tube through the stethoscope tube.

9. The method for determining the unloading time of a blast furnace charging tank according to claim 8, Features: An ear plug is arranged at the end of the ear tube away from the auditory tube.