Two sets of blast furnace replacement methods

The second set of blast furnaces was gradually pulled out through the large hook vibration method, combined with the use of restwind mud and refractory mud, which solved the problems of time-consuming and labor-intensive and environmental pollution of traditional methods, and achieved improvements in replacement efficiency and environmental protection.

CN118932132APending Publication Date: 2024-11-12HUNAN VALIN LIANYUAN IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411264362.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The second set of traditional blast furnace replacement methods require the burning of the first half with oxygen, which is time-consuming and labor-intensive, and produces smoke and residue, affecting environmental protection.

Method used

Use a large hook to hook the lower edge of the two sets, and gradually pull out the two sets through vibration to avoid using oxygen welding, use resting air mud and refractory clay for blocking and cleaning, reducing labor intensity and environmental pollution.

Benefits of technology

It shortens the replacement time, reduces labor intensity, reduces environmental pollution, makes cleaning easier, and avoids the generation of smoke and residue.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a method for replacing two sets of blast furnaces, which comprises the following steps of: 1, organizing and preparing, and coordinating and arranging the maintenance progress in advance when the two sets of blast furnaces need to be replaced during each maintenance; secondly, tool materials are prepared; step 3, preparation of constructors; fourthly, after backflow damping down, the belly pipe and the third tuyere set are detached, the front ends of the tuyeres are blocked with mud, the belly pipe and the third tuyere set are hoisted away from the tuyere area, and a spacious operation site is created; 5, the cavity after the tuyere is unloaded is tightly plugged with damping down mud, and coke is prevented from collapsing when the second sleeve is unloaded; and 6, the four ejector rods of the two sets are detached through a flat-opening short steel chisel, a gas welder cuts off the sealing rings of the two sets through a cutting gun, and baffles of the tuyere ejector rods are detached. The invention relates to the field of blast furnace use, in particular to two sets of blast furnace replacement methods.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of blast furnace use, and in particular to a method for replacing two sets of blast furnaces. Background Art

[0002] The ironmaking plant has 28 tuyere in 6# blast furnace, 32 tuyere in 7# blast furnace and 32 tuyere in 8# blast furnace. The traditional method of replacing them is to burn the front half of the two sets with oxygen and then withdraw them. It is time-consuming and laborious. For example, during the overhaul of 7# blast furnace, two sets of 32 tuyere need to be replaced. The task is heavy and the time is tight. We boldly explored and verified a new method of replacing the two sets of tuyere, that is, hook the lower edge of the two sets with a large hook and vibrate to withdraw the two sets.

[0003] Traditional method of replacing two sets: The hollow in front of the second set is sealed tightly with air-stopping mud until it is blocked to 50-100mm from the front edge of the second set. Compressed air is used to blow away the accumulated water in the second set. Mud and sand are laid in the large set. The top rod baffle of the tuyere is covered with air-stopping mud to prevent the slag iron flowing out during oxygen burning from burning the large set or condensing accessories. After the oxygen is ignited, it is burned from the lower part of the front end of the second set. It is also possible to extend the ignited oxygen pipe from the inlet and outlet pipes of the second set into the front end of the second set. After the second set is melted, it is burned from the melted part. When the bottom of the front end of the second set is melted, the two sides of the second set are burned. After the two sides of the front end of the second set are burned, the oxygen pipe gradually moves backward. The top of the second set does not need an oxygen pipe to burn directly. Because the space in front of the second set is blocked with air-stopping mud, the two oxygen pipes burn at the same time, and the fire in the second set is raging, with a temperature of more than 1,000 degrees. When the two sides are burned, the remaining parts above the two sides are naturally melted. When the rear end of the second set is burned to only 300mm, stop burning oxygen, quickly use a plugging rake to scoop out the liquid slag iron that has not flowed out, and pull out the large pieces of residue in the large set as soon as possible. When burning the second set, be careful not to burn the contact surface of the large set, and be careful to blast when releasing residual copper, slag, and molten iron. Summary of the invention

[0004] The technical problem to be solved by the present invention is that the traditional replacement method is to burn the front halves of the two sets with oxygen and then withdraw them, which is time-consuming and labor-intensive.

[0005] To solve the above problems, the technical solution adopted by the present invention is as follows: The present invention is a method for replacing two sets of blast furnaces, comprising the following steps: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Preparation of tools and materials; Step 3: Preparation of construction personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set with the big hook, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the two sets; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

[0006] Furthermore, the tool and material preparation include large hook, small hook, long and short steel drills, sledgehammer, pipe clamp, manual hoist, wire rope, half-moon plugging rake, pneumatic pick, pneumatic pick drill, oxygen tube, leather hose, clamp, shovel, wind mud, river sand and axial flow fan.

[0007] Furthermore, each tuyere has two sets of 10 furnace replacement personnel, two sets of sealing and removal personnel, and contact personnel for grouting.

[0008] Furthermore, when replacing, the lower edge of the second set is hooked, and the second set is pulled back to its original position by vibration first, and then the second set is vibrated loose and withdrawn. The whole process including the preparation work to the replacement of the second set takes a short time, has low labor intensity, does not produce thick smoke, and is beneficial to environmental protection.

[0009] Preferably, in order to replace the two sets quickly and orderly, a plan for replacing the two sets is first formulated, a set of special tools for fixing the large hook is made, and an ear for hanging the steel rope is welded at the tail end of the large hook.

[0010] The beneficial effects achieved by the present invention using the above structure are as follows: 1. Because the new method does not require oxygen burning, no residue, residual iron, smoke and dust are produced, it is easy to clean, and the cleaning environment is better than the oxygen burning and retreating two sets.

[0011] 2. The new method of replacing two sets saves the time of replacing two sets to less than 4 hours, and greatly reduces the labor intensity in front of the furnace, and is also more dust-free and environmentally friendly. DETAILED DESCRIPTION

[0012] The present invention is a method for replacing two sets of blast furnaces. Example 1

[0013] The 7# blast furnace was repaired. Two and three sets of 8 sets were removed on the same day. The following steps were used: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Tools and materials preparation, including large hook, small hook, long and short steel chisels, sledgehammer, pipe clamp, manual hoist, wire rope, half-moon plugging rake, pneumatic pick, pneumatic pick chisel, oxygen tube, leather hose, fixture, shovel, wind-blown mud, river sand and axial flow fan; Step 3: Preparation of construction personnel: organize 10 furnace replacement personnel for each tuyere, two sets of sealing and removal personnel, and contact grouting personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set with the big hook, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the two sets; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

[0014] When replacing, hook the lower edge of the second set. First, vibrate to pull the second set back to its original position, and then vibrate the second set loose and withdraw it.

[0015] The entire process of this embodiment 1, including the preparation work to the second set of replacement, takes 3 hours. Example 2

[0016] The 7# blast furnace was overhauled and replaced with two sets of 21 sets. The following steps were used: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Tools and materials preparation, including large hook, small hook, long and short steel chisels, sledgehammer, pipe clamp, manual hoist, wire rope, half-moon plugging rake, pneumatic pick, pneumatic pick chisel, oxygen tube, leather hose, fixture, shovel, wind-blown mud, river sand and axial flow fan; Step 3: Preparation of construction personnel: organize 10 furnace replacement personnel for each tuyere, two sets of sealing and removal personnel, and contact grouting personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set with the big hook, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the two sets; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

[0017] When replacing, hook the lower edge of the second set. First, vibrate to pull the second set back to its original position, and then vibrate the second set loose and withdraw it.

[0018] The entire process of Example 2, including preparation work to the replacement of the second set, was completed in 3 days, taking a total of 12 hours. Example 3

[0019] Replace the second set of tuyere in 6# blast furnace using the following steps: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Tools and materials preparation, including large hook, small hook, long and short steel chisels, sledgehammer, pipe clamp, manual hoist, wire rope, half-moon plugging rake, pneumatic pick, pneumatic pick chisel, oxygen tube, leather hose, fixture, shovel, wind-blown mud, river sand and axial flow fan; Step 3: Preparation of construction personnel: organize 10 furnace replacement personnel for each tuyere, two sets of sealing and removal personnel, and contact grouting personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set with the big hook, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the two sets; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

[0020] When replacing, hook the lower edge of the second set. First, vibrate to pull the second set back to its original position, and then vibrate the second set loose and withdraw it.

[0021] The entire process of Example 3, including preparation work to changing into the second set, takes a total of 2.5 hours. Example 4

[0022] Replace the second set of tuyere in 6# blast furnace using the following steps: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Tools and materials preparation, including large hook, small hook, long and short steel chisels, sledgehammer, pipe clamp, manual hoist, wire rope, half-moon plugging rake, pneumatic pick, pneumatic pick chisel, oxygen tube, leather hose, fixture, shovel, wind-blown mud, river sand and axial flow fan; Step 3: Preparation of construction personnel: organize 10 furnace replacement personnel for each tuyere, two sets of sealing and removal personnel, and contact grouting personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set with the big hook, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the two sets; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

[0023] When replacing, hook the lower edge of the second set. First, vibrate to pull the second set back to its original position, and then vibrate the second set loose and withdraw it.

[0024] The entire process of Example 4, including preparation work to changing into the second set, takes a total of 130 minutes. Example 5

[0025] Replace the second set of tuyere in 7# blast furnace using the following steps: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Tools and materials preparation, including large hook, small hook, long and short steel chisels, sledgehammer, pipe clamp, manual hoist, wire rope, half-moon plugging rake, pneumatic pick, pneumatic pick chisel, oxygen tube, leather hose, fixture, shovel, wind-blown mud, river sand and axial flow fan; Step 3: Preparation of construction personnel: organize 10 furnace replacement personnel for each tuyere, two sets of sealing and removal personnel, and contact grouting personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set with the big hook, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the two sets; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

[0026] When replacing, hook the lower edge of the second set. First, vibrate to pull the second set back to its original position, and then vibrate the second set loose and withdraw it.

[0027] The entire process of Example 5, including preparation work to changing into the second set, takes a total of 165 minutes. Example 6

[0028] Replace the second set of tuyere in 7# blast furnace using the following steps: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Tools and materials preparation, including large hook, small hook, long and short steel chisels, sledgehammer, pipe clamp, manual hoist, wire rope, half-moon plugging rake, pneumatic pick, pneumatic pick chisel, oxygen tube, leather hose, fixture, shovel, wind-blown mud, river sand and axial flow fan; Step 3: Preparation of construction personnel: organize 10 furnace replacement personnel for each tuyere, two sets of sealing and removal personnel, and contact grouting personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set with the big hook, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the two sets; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

[0029] When replacing, hook the lower edge of the second set. First, vibrate to pull the second set back to its original position, and then vibrate the second set loose and withdraw it.

[0030] The entire process of Example 6, including preparation work to changing into the second set, takes a total of 160 minutes.

[0031] It should be understood that although this specification is described according to implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.

Claims

1. A method for replacing two sets of blast furnaces, characterized in that: The steps include: Step 1: Organization and preparation: When two sets of equipment need to be replaced each time for maintenance, coordination should be made in advance to arrange the maintenance schedule; Step 2: Preparation of tools and materials; Step 3: Preparation of construction personnel; Step 4: After the backflow stops, remove the direct blowing pipe and three sets of tuyere, block the front end of the tuyere with mud, and lift the direct blowing pipe and three sets of tuyere away from the tuyere area to create a spacious work site; Step 5: Use the air stop mud to seal the empty space after removing the tuyere to prevent the coke from collapsing when the second set is withdrawn; Step 6: Use a short flat steel chisel to remove the four push rods of the two sets. The gas welder uses a cutting gun to cut off the sealing rings of the two sets and remove the baffle of the tuyere push rod; Step 7: The pipe fitter removes the two sets of inlet and outlet pipes and short pipes; Step 8: Extend the big hook into the second set of air outlets, hook the lower edge of the second set, hook the lifting ear at the tail end of the big hook with an electric hoist, adjust the height, pull the sliding hammer, and strike repeatedly to achieve the purpose of loosening and pulling down the second set; Step 9. After the second set is pulled out, knock off the raised bricks with a wind hook, level the pit with refractory mud, clean it up, and check whether the contact surface of the large set is damaged, so as to facilitate the smooth installation of the second set; Step ten, use manual hoist and electric hoist to pull the new two sets into the big set, support the inlet and outlet pipes, use two small hooks to hit left and right at the same time, move the two sets into place, align and tighten to ensure tightness. If necessary, a circle of wind-proof mud can be applied on the outer edge of the front end of the two sets to prevent the slurry from flowing into the furnace during grouting.

2. The method for replacing two sets of blast furnaces according to claim 1, characterized in that: The tools and materials prepared in step 2 include large hooks, small hooks, long and short steel chisels, sledgehammers, pipe clamps, manual hoists, wire ropes, half-moon plugging rakes, pneumatic picks, pneumatic pick chisels, oxygen tubes, leather hoses, fixtures, shovels, wind-blown mud, river sand and axial flow fans.

3. The method for replacing two sets of blast furnaces according to claim 1, characterized in that: In the step three, for each tuyere, two sets of 10 furnace replacement personnel, two sets of sealing and removal personnel are organized to contact the grouting personnel.

4. The method for replacing two sets of blast furnaces according to claim 1, characterized in that: When replacing, the lower edge of the second set is hooked. First, the second set is pulled back to its original position by vibration, and then the second set is vibrated loose and removed. The whole process including the preparation work to the replacement of the second set takes a short time, has low labor intensity, does not produce thick smoke, and is beneficial to environmental protection.