High-lift matrix type gear rack ship lift navigation facility

By adopting high-lift matrix gear rack and rack hoisting in vertical hoisting, using two-wire parallel and series design, the problem that single-carrying cabin type is difficult to meet the needs of large-scale fleets is achieved, and efficient navigation capabilities are achieved and reduce operating costs.

CN118932965AActive Publication Date: 2024-11-12CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411148747.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-12
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

The single-carrier type of existing vertical lifts is difficult to meet the needs of large-scale fleets and high-speed navigation heads, and single-line lifts are difficult to meet the requirements of annual passability.

Method used

High-lift matrix type rack and rack lifter, through two lines parallel rack lifter routes, each route operates independently, including tower column structure, top computer room, series rack lifter, and ship bearing The cabin, counterweight, drive mechanism and safety mechanism can connect the waters of the two ships through wire rope suspension and U-shaped sealing frame, and support series or single-seat carrier operation.

Benefits of technology

It has achieved navigation capabilities for large-scale fleets, reduced operating costs, improved navigation efficiency, and ensured the stability of lifting and lowering operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932965A_ABST
    Figure CN118932965A_ABST
Patent Text Reader

Abstract

The invention discloses a high-lift matrix type gear rack ship lift navigation facility which comprises two identical gear rack ship lift routes which are connected in parallel, and each ship lift route can operate independently. Each ship lift route comprises an upper lock head working door, an upper lock head hoist, a ship chamber, a lower lock head working door and a lower lock head hoist. In the process that any ship lift route is in butt joint with an upstream lock head and a downstream lock head, a gap between ship reception chambers of the two gear rack ship lifts on the same line is pushed out through a U-shaped sealing frame at the end of the ship reception chamber on one side and is tightly attached to a vertical water stopping plane at the end of the ship reception chamber on the other side to be sealed, and ship reception chambers are sealed by opening ship chamber doors at the two ends of the ship reception chambers. The water areas of the two ship chambers are communicated, so that the two ships sequentially enter the water areas of the two ship reception chambers which are arranged in series, and the series lifting operation of the two ship lifters is realized. The large ship passing scale and the high navigation water head can be met, the operation cost is reduced, and the navigation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ship lifts, and more specifically to a navigation facility of a high-lift matrix rack and pinion ship lift. Background Art

[0002] As a navigation facility, vertical ship lifts are increasingly widely used in water conservancy hubs because of their short ship passing time and suitability for high dam navigation. Vertical ship lifts can be classified into wire rope winch type and rack and pinion type according to the lifting device. Compared with wire rope winch type ship lifts, rack and pinion ship lifts have higher safety and reliability, and can adapt to larger ship passing scales and higher navigation heads. The increase in ship passing scale and lifting height has a much smaller impact on the layout and scale of the core equipment of the rack and pinion ship lift than the wire rope winch type, and has basically no effect on the stability of the cabin lifting operation.

[0003] However, the cabin sections of existing vertical ship lifts all adopt the single-carriage type. As the size of ships becomes larger and the navigation head becomes higher, the scale, manufacturing and installation difficulty of the core equipment of the rack and pinion ship lift will inevitably increase at the same time. At the same time, due to the size of some core ship lift parts, the single-carriage type ship lift cannot meet the navigation needs of longer fleets. In addition, with the growing demand for navigation facilities, the navigation facilities of single-line ship lifts are difficult to meet the annual throughput requirements. Summary of the invention

[0004] In order to overcome the above-mentioned defects of the prior art, the present invention provides a high-lift matrix rack and pinion ship lift navigation facility to solve the above-mentioned problems.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a high-lift matrix rack and pinion ship lift navigation facility, comprising two identical rack and pinion ship lift routes connected in parallel, each ship lift route operating independently, each ship lift route comprising an upper lock working door and an upper lock hoist, a cabin room, a lower lock working door and a lower lock hoist, characterized in that: the cabin room of each ship lift route comprises a tower column structure and a machine room at its top, and two rack and pinion ship lifts connected in series; each rack and pinion ship lift comprises a ship bearing cabin, a counterweight, a drive mechanism rack and a safety mechanism nut column, and a counterweight guide rail and a longitudinal guide rail of the ship compartment; the ship compartment is balanced by a counterweight of the same weight, suspended by a steel wire rope bypassing the pulley group of the top machine room, and is lifted and lowered in the ship compartment room surrounded by the inner side of the tower structure and the upper and lower gate working doors; when one of the ship lift routes is in a docking state, the gap between the two ship compartments of the two rack and pinion ship lifts is sealed by a U-shaped sealing frame, and the water areas of the two ship compartments are connected by opening the ship compartment doors at both ends of the ship compartment, so that the two ships successively enter the water areas of the two serially arranged ship compartments; when the docking process of the ship lift on this line is completed, the lifting process of the ship lift can be started.

[0006] Preferably, for the two ship lifts in each ship lift route, four sets of drive mechanism pinions and four sets of safety mechanism short screws are symmetrically arranged on both sides of the ship holding compartment, and their positions correspond to the four grooves of the tower column structure. On the wall of each groove, one set of drive mechanism racks and one set of safety mechanism nut columns are laid respectively. Through the operation of the drive mechanism pinions along the racks, the ship holding compartment is vertically lifted and lowered along the longitudinal guide rails of the compartment.

[0007] Preferably, for the two ship lifts on each ship lift route, when the driving mechanism pinion of the ship holding box climbs along the driving mechanism rack, the short screw of the safety mechanism running synchronously with the driving mechanism on the ship holding box idles in the safety mechanism nut column. When an accident occurs in which the balance is destroyed, the ship holding box can be safely locked on the nut column by the short screw of the safety mechanism.

[0008] Preferably, for the two ship lifts on each ship lift route, one end of the steel wire rope is connected to the ship holding chamber and is guided through a pulley block, and then the other end is connected to the counterweight.

[0009] Preferably, for any ship lift of each ship lift route, the counterweight is vertically raised and lowered along the counterweight guide rail.

[0010] Preferably, for the two ship lifts of each ship lift route, the ship holding compartment and both ends of the ship holding compartment are provided with cabin doors.

[0011] Preferably, for the two ship lifts of each ship lift route, U-shaped sealing frames are provided at both ends of the ship holding chamber, and a U-shaped sealing frame is provided at one end of the ship holding chamber close to the downstream side.

[0012] Preferably, for the two ship lifts on each ship lift route, the U-shaped sealing frames at both ends of the ship holding chamber are pushed by the driving cylinder, and the end water-stop rubbers thereof are respectively pressed against the upper gate working door and the stainless steel vertical water-stop panel at the end of the ship holding chamber, so as to form a gap sealing space connecting the end of the ship holding chamber with the upper gate working door and the end of the ship holding chamber.

[0013] Preferably, for the two ship lifts on each ship lift route, the U-shaped sealing frame on the downstream side of the ship holding compartment is pushed by the driving cylinder, and its end water-stop rubber is docked with the stainless steel vertical water-stop panel of the lower gate working door to form a gap sealing space connecting the end of the ship holding compartment and the lower gate working door.

[0014] Technical effects and advantages of the present invention:

[0015] The overall design of the present invention is simple and the structural design is reasonable. The two parallel rack and pinion ship lift routes operate independently. The two rack and pinion ship lifts on a single ship lift route can flexibly adopt two ship holding compartments to operate in series or a single ship holding compartment according to the size of the fleet. The matrix-type four-seat rack and pinion ship lift can meet the purpose of large-scale fleets sailing at the same time, reducing operating costs and improving navigation efficiency; at the same time, the rack and pinion ship lift ensures the stability of the lifting and lowering operation of the high-lift ship lift. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a longitudinal sectional view of the overall structure of the present invention;

[0017] Figure 2 It is a side view of the overall structure of the present invention;

[0018] Figure 3 It is a top view of the overall structure of the present invention;

[0019] Figure 4 For the present invention Figure 2 The enlarged structural diagram at B in the middle;

[0020] Figure 5 For the present invention Figure 2 The enlarged structural diagram at C in the middle;

[0021] Figure 6 This is a schematic structural diagram of a ship-carrying compartment (7) of the present invention;

[0022] Figure 7 This is a schematic structural diagram of a ship-carrying compartment (8) of the present invention;

[0023] Figure 8For the present invention Figure 6 Middle D-direction view;

[0024] Fig. 9 For the present invention Figure 7 Middle E-direction view;

[0025] Fig.10 It is a schematic diagram of the connection between the upper lock working door and the ship receiving compartment (7) of the present invention;

[0026] Fig.11 It is a schematic diagram of the docking of the ship-carrying box (7) and the ship-carrying box (8) of the present invention;

[0027] Fig.12 It is a schematic diagram of the docking of the ship-carrying compartment (8) of the present invention with the working door of the lower lock head;

[0028] The reference numerals are described as follows:

[0029] 1. Working door of upper gate; 2. Hoist of upper gate; 3. Working door of lower gate; 4. Hoist of lower gate; 5. Tower structure; 6. Machine room at the top; 7. Ship compartment; 8. Ship compartment; 9. Counterweight; 10. Drive mechanism rack; 11. Safety mechanism nut column; 12. Wire rope; 13. Pulley block; 14. U-shaped sealing frame; 15. Carriage door; 16. Drive mechanism pinion; 17. Safety mechanism short screw; 18. Drive cylinder; 19. Carriage longitudinal guide rail; 20. Counterweight guide rail; 21. Waterstop rubber; 22. Stainless steel vertical waterstop panel. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] The embodiment of the present invention provides a high-lift matrix rack and pinion ship lift navigation facility, which adopts two rack and pinion ship lift routes running in parallel, and the ship-carrying compartments of the two ship lifts of each ship lift route can run in series. This high-lift matrix rack and pinion ship lift navigation facility can meet the needs of larger ship passing scale and higher navigation head, reduce operating costs, and improve navigation efficiency. The specific structural settings of each mechanism and component are as follows:

[0032] In some embodiments, Figure 1-12As shown, two identical rack and pinion ship lift routes are connected in parallel, and each ship lift route can be operated independently. Each ship lift route includes an upper gate working door 1 and an upper gate hoist 2, a cabin room, a lower gate working door 3 and a lower gate hoist 4. The cabin room of each ship lift route is composed of a tower structure 5 and its top machine room 6, and two rack and pinion ship lifts connected in series. Each rack and pinion ship lift is composed of a ship holding cabin (7, 8), a counterweight 9, a drive mechanism rack 10 and a safety mechanism nut column 11, a counterweight guide rail 20 and a cabin longitudinal guide rail 19. The ship holding cabin (7, 8) is balanced by a counterweight 9 of the same weight, and is suspended by a steel wire rope 12 bypassing a pulley block 13 at the top machine room 6, and is lifted and lowered in the cabin room surrounded by the inner side of the tower structure 5 and the upper gate working door 1 and the lower gate working door 3. When one of the ship lift routes is in a docking state, the gap between the two ship carriages (7, 8) of the two rack and pinion ship lifts is sealed by a U-shaped sealing frame 14, and the ship carriage doors 15 at both ends of the ship carriages are opened to achieve the connection of the water areas of the two ship carriages (7, 8), so that the two ships successively enter the water areas of the two ship carriages (7, 8) arranged in series. When the docking process of the ship lift on this line is completed, the lifting process of the ship lift can be started.

[0033] In some embodiments, Figure 1-5 As shown, four sets of driving mechanism pinions 16 and four sets of safety mechanism short screws 17 are symmetrically arranged on both sides of the ship-carrying compartment (7, 8), and their positions correspond to the four grooves of the tower column structure 5. On the wall of each groove, a set of driving mechanism racks 10 and a set of safety mechanism nut columns 11 are laid respectively. Through the operation of the driving mechanism pinions 16 along the racks 10, the ship-carrying compartment (7, 8) is vertically lifted and lowered along the longitudinal guide rails 19 of the compartment. When the driving mechanism pinions 16 of the ship-carrying compartment (7, 8) climb along the driving mechanism racks 10, the safety mechanism short screws 17 on the ship-carrying compartment (7, 8) that run synchronously with the driving mechanism are idle in the safety mechanism nut columns 11. When an accident occurs in which the balance is destroyed, the ship-carrying compartment (7, 8) can be safely locked on the nut columns 11 through the safety mechanism short screws 17.

[0034] In some embodiments, Figure 1-2 As shown, one end of the steel wire rope 12 is connected to the ship-bearing compartment (7, 8), and after being guided by a pulley block 13, the other end is connected to a counterweight 9. The counterweight 9 is vertically lifted and lowered along a counterweight guide rail 20.

[0035] In some embodiments, Figure 6-7 As shown, cabin doors 15 are provided at both ends of the cabin 7 and the cabin 8.

[0036] In some embodiments, Figure 6-12As shown, U-shaped sealing frames 14 are provided at both ends of the ship-carrying chamber 7, and a U-shaped sealing frame 14 is provided at one end of the ship-carrying chamber 8 close to the downstream side. Under the push of the driving cylinder 18, the end water-stop rubbers 21 of the U-shaped sealing frames 14 at both ends of the ship-carrying chamber 7 are respectively pressed against the upper gate working door 1 and the stainless steel vertical water-stop panel 22 at the end of the ship-carrying chamber 8, forming a gap sealing space connecting the end of the ship-carrying chamber 7 with the upper gate working door 1 and the end of the ship-carrying chamber 8. Under the push of the driving cylinder 18, the end water-stop rubber 21 of the U-shaped sealing frame 14 on the downstream side of the ship-carrying chamber 8 is docked with the stainless steel vertical water-stop panel 22 of the lower gate working door 3, forming a gap sealing space connecting the end of the ship-carrying chamber 8 with the lower gate working door 3.

[0037] Working principle of the present invention:

[0038] When two ship lifts on a certain ship lift route are running at the same time, taking the downward movement of the ship carriage as an example, the ship carriage 7 is in a docking state with the upper lock working door 1, and the water area of ​​the ship carriage 7 is connected with the upstream pilot channel water area. At this time, the cabin doors 15 at both ends of the ship carriage 7, the upstream cabin door 15 of the ship carriage 8 and the upper lock working door 1 are all opened, and the U-shaped sealing frames 14 at both ends of the ship carriage 7 are docked with the upper lock working door 1 and the ship carriage 8 respectively, and the downstream cabin door 15 of the ship carriage 8 is in a closed position. The two ships are untied from the upstream pilot channel berthing position and then go down, and then enter the ship carriage 7 and the ship carriage 8 in turn, and then moor and tie up. Close the upper lock working door 1, and at the same time close the cabin door 15 of the ship carriage (7, 8), and retract the U-shaped sealing frame 14. Start the driving mechanism to drive the two ship carriages (7, 8) to move downward. When the ship-carrying compartments (7, 8) are lowered to a set elevation, the U-shaped sealing frame 14 on the downstream side of the ship-carrying compartment 7 is pushed out to dock with the ship-carrying compartment 8, the U-shaped sealing frame 14 on the downstream side of the ship-carrying compartment 8 is pushed out to dock with the lower lock head working door 3, the downstream side compartment door 15 of the ship-carrying compartment 7, the compartment doors 15 at both ends of the ship-carrying compartment 8 and the lower lock head working door 3 are opened, and the ship is untied from the compartment and sails into the downstream pilot channel.

[0039] When a single-seat ship lift of a certain ship lift route is in operation, taking the downward movement of the ship carriage as an example, the ship carriage 7 is in a docking state with the upper lock head, and the ship carriage water area is connected with the upstream pilot channel water area. At this time, the cabin doors 15 at both ends of the ship carriage 7, the upstream cabin door 15 of the ship carriage 8 and the upper lock head working door 1 are all opened, and the U-shaped sealing frames 14 at both ends of the ship carriage 7 are docked with the upper lock head working door 1 and the ship carriage 8 respectively, and the downstream cabin door 15 of the ship carriage 8 is in a closed position. A ship is untied from the upstream pilot channel berthing position and then goes down, and then enters the ship carriage 8 and moors and ties up. Close the upper lock head working door 1, and at the same time close the cabin door 15 of the ship carriage (7, 8), and retract the U-shaped sealing frame 14. Start the driving mechanism to drive the ship carriage 8 to move downward. When the ship-carrying compartment 8 descends to the set elevation, the U-shaped sealing frame 14 on the downstream side of the ship-carrying compartment 8 is pushed out to dock with the lower lock head working door 3, the downstream side cabin door 15 of the ship-carrying compartment 8 and the lower lock head working door 3 are opened, and the ship is untied from the compartment and enters the downstream pilot channel.

[0040] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0041] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;

[0042] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A high-lift matrix rack and pinion ship lift navigation facility, comprising two identical rack and pinion ship lift routes connected in parallel, each ship lift route operating independently, each ship lift route comprising an upper lock head working door (1) and an upper lock head hoist (2), a cabin room, a lower lock head working door (3) and a lower lock head hoist (4), characterized in that: The cabin room of each ship lift route comprises a tower structure (5) and a top machine room (6) thereof, and two rack and pinion ship lifts connected in series; each rack and pinion ship lift comprises a ship cabin (7, 8), a counterweight (9), a drive mechanism rack (10) and a safety mechanism nut column (11), a counterweight guide rail (20) and a ship cabin longitudinal guide rail (19); the ship cabin (7, 8) is balanced by a counterweight (9) of the same weight, and is suspended by a steel wire rope (12) passing through a pulley block (13) of the top machine room (6), and is arranged in the tower structure (5). The ship lifts are operated in a cabin room surrounded by the upper and lower lock working doors (1) and the lower lock working door (3); when one of the ship lift routes is in a docking state, the gap between the two ship holding cabins (7, 8) of the two rack and pinion ship lifts is sealed by a U-shaped sealing frame (14), and the cabin doors (15) at both ends of the ship holding cabins are opened to realize the connection of the water areas of the two ship holding cabins (7, 8), so that the two ships successively enter the water areas of the two ship holding cabins (7, 8) arranged in series; when the docking process of the ship lifts on this line is completed, the lifting process of the ship lift can be started.

2. A high lift matrix rack and pinion ship lift navigation facility according to claim 1, characterized in that: For the two ship lifts in each ship lift route, four sets of driving mechanism pinions (16) and four sets of safety mechanism short screws (17) are symmetrically arranged on both sides of the ship support box (7, 8), and their positions correspond to the four grooves of the tower column structure (5). On the wall of each groove, a set of driving mechanism racks (10) and a set of safety mechanism nut columns (11) are laid respectively. Through the operation of the driving mechanism pinions (16) along the racks (10), the ship support box (7, 8) is vertically lifted and lowered along the longitudinal guide rails (19) of the ship box.

3. The high lift matrix rack and pinion ship lift navigation facility according to claim 2, characterized in that: For the two ship lifts on each ship lift route, when the driving mechanism pinion (16) of the ship support box (7, 8) climbs along the driving mechanism rack (10), the safety mechanism short screw (17) on the ship support box (7, 8) running synchronously with the driving mechanism rotates idly in the safety mechanism nut column (11). When an accident occurs in which the balance is destroyed, the ship support box (7, 8) can be safely locked on the nut column (11) through the safety mechanism short screw (17).

4. The high lift matrix rack and pinion ship lift navigation facility according to claim 1, characterized in that: For the two ship lifts on each ship lift route, one end of the steel wire rope (12) is connected to the ship support box (7, 8), and after being guided by a pulley block (13), the other end is connected to the counterweight (9).

5. The high lift matrix rack and pinion ship lift navigation facility according to claim 1, characterized in that: For any ship lift on each ship lift route, the counterweight (9) is vertically raised and lowered along the counterweight guide rail (20).

6. The high lift matrix rack and pinion ship lift according to claim 1, characterized in that: For the two ship lifts on each ship lift route, both ends of the ship holding compartment (7) and the ship holding compartment (8) are provided with a compartment door (15).

7. The high lift matrix rack and pinion ship lift according to claim 1, characterized in that: For the two ship lifts on each ship lift route, U-shaped sealing frames (14) are provided at both ends of the ship support box (7), and a U-shaped sealing frame (14) is provided at one end of the ship support box (8) close to the downstream side.

8. The high lift matrix rack and pinion ship lift according to claim 7, characterized in that: For the two ship lifts on each ship lift route, the U-shaped sealing frames (14) at both ends of the ship holding chamber (7) are pushed by the driving cylinder (18), and the end water-stop rubbers (21) thereof are respectively pressed against the upper gate working door (1) and the stainless steel vertical water-stop panels (22) at the ends of the ship holding chamber (8), thereby forming a gap sealing space connecting the ends of the ship holding chamber (7) and the upper gate working door (1) and the ends of the ship holding chamber (8).

9. The high lift matrix rack and pinion ship lift according to claim 7, characterized in that: For the two ship lifts on each ship lift route, the U-shaped sealing frame (14) on the downstream side of the ship holding chamber (8) is pushed by the driving cylinder (18), and its end water-stop rubber (21) is docked with the stainless steel vertical water-stop panel (22) at the end of the lower gate working door (3), so as to form a gap sealing space connecting the end of the ship holding chamber (8) and the lower gate working door (3).

Citation Information

Patent Citations

  • Gear rack vertical ship lifting device

    CN102146670A

  • Vertical ship lifting machine docking device and method

    CN110374079A

  • Ship lock ship lifting system

    CN114134874A

  • Canal lift, has rack comprising two toothed faces that are oriented along different orientations, where each toothed face is operated with two pinions, and support element for supporting ferry

    FR2963367A1

  • An apparatus for ship lift using variable counter-weight

    KR1020090117376A