Beach static sounding testing device and method
Through the beach sea static touch detection test device combining drilling technology and static touch detection technology in the beach sea area, the problems of large-diameter pile foundation depth and cost of offshore fixed platforms are solved, and fast and low-cost submarine geology is achieved. Data acquisition ensures the accuracy of the test and the economics of the equipment.
Patent Information
- Application Number
- CN202310527934.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-11
- Publication Date
- 2024-11-12
AI Technical Summary
The existing marine geotechnical engineering survey technology has high cost in deep-water sea areas and is difficult to meet the depth requirements of large-diameter pile foundations of offshore fixed platforms. Especially in beach sea areas, there are problems such as expensive equipment and shallow water depth.
A beach static touch detection test device was designed, combining drilling technology and static touch detection technology, using vacuum extraction devices and water-displacement pipe columns to conduct static touch detection tests through drilling ships to ensure that the test components are stable on the seabed and Unaffected by waves, enhance data accuracy and reduce equipment investment costs.
It realizes fast and low-cost static touch detection tests in the beach sea area, meets the depth and accuracy requirements of offshore fixed platforms and offshore wind power large-diameter pile foundations, provides reliable subsea geological data, and reduces equipment investment costs.
Smart Images

Figure CN118932966A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of marine geotechnical engineering investigation, and in particular to a beach sea static penetration testing device and method. Background Art
[0002] The development of offshore oil and gas in shallow waters, the construction of offshore wind farms and large-scale marine transportation facilities all require marine geotechnical engineering surveys on the site, so as to provide basic data such as seabed soil stratification and soil physical and mechanical parameters for pile foundation design. Due to the particularity of marine engineering, it is very difficult to take samples on site and maintain the stress state of the original soil. Marine in-situ testing technology is increasingly used in marine engineering geological surveys.
[0003] The use of static penetration technology in the field of marine engineering at home and abroad is becoming more and more common, and it plays an increasingly important role in marine engineering geological surveys. Conducting static penetration in-situ tests has little disturbance to the soil, and can directly penetrate into the soil to test the performance parameters of the soil. The test data has high accuracy, good reproducibility and small repeatability errors.
[0004] At present, static penetration testing is mainly divided into two categories: seabed static penetration testing and underground static penetration testing. Seabed static penetration testing is a continuous penetration static penetration testing equipment with high working efficiency, continuous and relatively accurate data. Its main feature is that after the seabed static penetration testing base is placed on the seabed, the probe is directly and continuously penetrated into the seabed through the propulsion device to obtain data. However, due to the strength of the probe rod and the thrust of the propulsion device, the test depth of seabed static penetration testing is generally within 40m, while the large-diameter pile foundation of the offshore fixed platform has a mud depth of up to 80m-90m. Therefore, the test depth of seabed static penetration testing cannot meet the bearing capacity requirements of the large-diameter pile foundation of the offshore fixed platform. Underground static penetration testing, also known as drilling static penetration testing, is an in-situ testing system that can perform static penetration testing at the bottom of the borehole. It is a cyclic propulsion method combined with drilling. It is currently widely used in the engineering geological survey of the large-diameter pile foundation site of the offshore fixed platform, and the test depth can reach 120m or more. At present, drilling static penetration in deep waters mainly relies on large professional drilling ships equipped with DP positioning systems and wave hydraulic compensation systems, which are expensive, and key equipment still needs to rely on foreign technology. In tidal sea areas, the above professional drilling ships may be unable to enter the well site due to shallow waters. In addition, offshore static penetration can also be carried out on self-elevating drilling platforms, but the cost of self-elevating drilling platforms is still high, and they are difficult and expensive to mobilize. They need to be towed by ships to reach the hole position, and the positioning process is complicated. There is also the problem of ship draft. Summary of the invention
[0005] In view of this, the present invention proposes a beach sea static penetration test device and method, aiming to provide a drilling type static penetration test method with fast construction and low cost for beach sea geotechnical engineering investigation. In one aspect, the present invention provides a beach static penetration test device, comprising: a drilling vessel and a drilling rig assembly, a lowering assembly and a static penetration test assembly arranged thereon; wherein: The drilling vessel is also provided with a vacuum device, which is connected to the lowering assembly and is used to vacuum the lowering assembly; The drilling vessel is also provided with a crane, which is connected to the lowering assembly and is used to lower it to the seabed mud surface; A watertight pipe column is arranged in the lowering assembly along the vertical direction, the static penetration test assembly is arranged above the lowering assembly and higher than the drilling floor platform of the drilling rig assembly, and the probe unit of the static penetration test assembly is penetrated inside the watertight pipe column; The drilling rig assembly is arranged on one side of the static penetration test assembly, and is used for cleaning the hole and protecting the wall after the static penetration test assembly completes the current test task, and can assist the static penetration test assembly in lowering and pulling out the probe unit.
[0006] Furthermore, in the above-mentioned beach static penetration test device, the lowering assembly comprises: a cylinder with an opening at the bottom; wherein, The cylinder is provided with a passage inside for passing the watertight pipe column; and the cylinder is provided with an interface connected with the vacuum extraction device.
[0007] Furthermore, in the above-mentioned beach static penetration test device, the cylinder contains at least one partition to separate the cylinder into at least two cavities; the side wall of the watertight pipe column is connected to each of the partitions; A plurality of vacuum connection ports are respectively provided in the area corresponding to each of the cavities on the upper cover plate of the cylinder, so as to connect each of the cavities with the vacuum extraction device.
[0008] Furthermore, in the above-mentioned beach static penetration testing device, the cylinder is provided with four partitions to separate the cylinder into four cavities.
[0009] Furthermore, in the above-mentioned beach sea static penetration test device, the static penetration test assembly includes: a static penetration work platform and a static penetration penetrator; wherein, The static penetration operation platform is connected to the top of the watertight pipe column; the probe unit of the static penetration operation is arranged on the static penetration penetrator, and the probe unit passes through the watertight pipe column.
[0010] The static penetration machine can be slidably arranged on the static penetration work platform.
[0011] Furthermore, in the above-mentioned beach static penetration testing device, a slide rail is provided on the static penetration working platform to provide a sliding track for the static penetration machine.
[0012] Furthermore, in the above-mentioned beach static penetration test device, the watertight pipe column is formed by connecting a plurality of watertight pipe sections.
[0013] Furthermore, in the above-mentioned beach static penetration test device, a plurality of lifting ears are arranged on the watertight pipe column for connecting with the drilling vessel through pulling ropes.
[0014] The beach static penetration test device in the present invention evacuates the lowering component through a vacuum device so that it can stand stably on the seabed, and the static penetration test component is arranged above the lowering component and higher than the drilling platform of the drilling rig component, so that it is not affected by sea waves and ship shaking during the test, which can enhance the authenticity and accuracy of the formation measurement data, meet the current exploration depth and accuracy requirements of offshore fixed platforms or offshore wind power large-diameter pile foundations, and also reduce the equipment investment cost.
[0015] On the other hand, the present invention also proposes a shallow sea static penetration test method, which comprises the following steps: step 1, connecting a vacuum pump on a drilling vessel to a lowering assembly, lowering the lowering assembly below the seabed mud surface, and installing a watertight pipe column section by section during the lowering process; Step 2, installing a static penetration test assembly above the lowering assembly, and moving the probe unit of the static penetration test assembly to above the watertight pipe column in the lowering assembly; Step 3, lowering the probe unit through the watertight pipe column to a preset depth below the mud surface, starting the penetration test, and recording the penetration depth and the test data of the probe; Step 4, pull the probe unit out of the watertight pipe column, and use the drilling rig assembly to clean the hole and protect the wall to the first preset depth; repeat steps 3 and 4 again, and cycle in sequence to the specified test depth.
[0016] Furthermore, in the above-mentioned shallow water static penetration test method, in the step 2, the static penetration test assembly is installed to an area above the drilling platform on the outside of the ship's side that is higher than the drilling rig assembly.
[0017] The shallow sea static penetration test method provided by the present invention combines the drilling technology with the static penetration test technology, thereby achieving the purpose of in-situ testing. The test process is not affected by sea waves, the test results are reliable and accurate, and the seabed geological data required for pile foundation bearing capacity analysis can be provided for the offshore jacket platform site. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings: Figure 1 A schematic diagram of the structure of a beach static penetration test device provided by an embodiment of the present invention; Figure 2 An elevation view of a beach sea static penetration test device provided by an embodiment of the present invention; Figure 3 A top view of a lowering assembly in a beach static penetration test device provided by an embodiment of the present invention; Figure 4 A top view of a static penetration testing platform in a beach static penetration testing device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0019] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0020] See also Figure 1 The beach static penetration test device of the embodiment of the present invention comprises: a drilling vessel 1 and a drilling rig assembly 2, a lowering assembly 3 and a static penetration test assembly 4 arranged thereon; wherein the drilling vessel 1 is also provided with a vacuum device 5, the vacuum device 5 is connected to the lowering assembly 3, and is used to vacuum the lowering assembly 3; the drilling vessel 1 is also provided with a crane (not shown in the figure), the crane is connected to the lowering assembly 3, and is used to lower it below the seabed mud surface; a watertight pipe column 31 is arranged in the lowering assembly 3 in the vertical direction, the static penetration test assembly 4 is arranged above the lowering assembly 3, and is higher than the drilling platform of the drilling rig assembly, and the probe unit 41 of the static penetration test assembly 4 is penetrated inside the watertight pipe column 31; the drilling rig assembly 2 is arranged on one side of the static penetration test assembly 4, and is used to clean the hole and protect the wall after the static penetration test assembly completes the current test task, and can assist the static penetration test assembly in lowering and pulling out the probe unit 41 Specifically, the deck of the drilling vessel 1 can be equipped with a drilling rig assembly 2, a lowering assembly 3, a static penetration test assembly 4, a crane and a vacuum device 5. In this embodiment, the drilling vessel 1 can be a conventional drilling vessel 1, which has a flexible and efficient operation mode, low cost, simple operation, and fast mobilization and demobilization. In case of sudden bad weather during the operation, the operators can take the drilling vessel 1 to quickly leave the site.
[0021] The lowering assembly 3 is an auxiliary tool for sinking the static penetration test assembly 4 to the target test depth, and its shape can be square, round, etc. The crane can lift the lowering assembly 3. A watertight pipe column 31 is set in the lowering assembly 3, and the watertight pipe column 31 can be a hollow pipe to allow the probe unit 41 of the static penetration test assembly 4 to pass through. The diameter of the watertight pipe column 31 can be selected according to the actual project, and can be 40-100 cm, preferably 50 cm.
[0022] Combination Figure 2 The watertight pipe column 31 is formed by connecting a plurality of watertight pipe sections, and two adjacent watertight pipe sections can be connected by threaded connection or welding. The length of each watertight pipe section can be 2m, 1m or 0.5m, etc. Watertight pipe sections of different lengths can be selected for splicing according to the actual situation on site.
[0023] Preferably, the watertight riser 31 is provided with a plurality of lifting ears 8 for connecting to the drilling vessel 1 via a pulling rope, thereby playing a protective role. The pulling rope may be in a taut state during installation, but should be in a relaxed state during testing.
[0024] The vacuum device 5 may be a vacuum pump, and the number of vacuum pumps may be determined according to the volume of the lowering assembly 3. By extracting seawater and air from the lowering assembly 3, a negative pressure environment is formed in the lowering assembly 3. In practice, the lowering assembly 3 will sink to a certain depth by its own weight, and after stabilization, air will be extracted by the vacuum device, and under the action of negative pressure, the lowering assembly 3 can sink to the seabed.
[0025] The static penetration test assembly 4 can be any existing static penetration test device, and its probe unit 41 includes: a probe rod 411 and a probe (not shown in the figure) connected to the bottom of the probe rod 411. In this embodiment, the static penetration test assembly 4 has a hydraulic system, which can lower and pull up the probe unit 41. The drilling rig assembly is arranged on one side of the static penetration test assembly, which can assist the static penetration test assembly 4 in lowering and pulling out the probe rod and the probe unit 41.
[0026] The drilling rig assembly 2 includes: a drilling rig 21 and a hoisting bracket 22; wherein the drilling rig 21 is provided with a hoisting device (not shown in the figure), and the hoisting bracket 22 is connected to the hoisting device through a hoisting rope 23. The drilling rig 21 is provided with a drill rod (not shown in the figure), and after the static penetration test assembly 4 completes the test task, the drill rod can be hoisted into the watertight pipe column 31 and lowered to the test depth below the mud surface of the mud seabed to perform hole cleaning and wall protection operations.
[0027] The drilling rig assembly 2 further includes: a drilling platform 20; wherein the drilling platform is arranged on the drilling vessel 1, and the drilling rig 21 and the hoisting bracket 22 are both arranged on the drilling platform.
[0028] It can be obviously concluded from the above that the beach static penetration test device provided in this embodiment, by vacuuming the lowering component through the vacuum device, makes it stand firmly on the seabed, and arranges the static penetration test component above the lowering component and higher than the drilling platform of the drilling rig component, so that it is not affected by sea waves and ship shaking during the test, which can enhance the authenticity and accuracy of the formation measurement data, and can meet the current exploration depth and accuracy requirements of offshore fixed platforms or large-diameter pile foundations of offshore wind power, while also reducing the equipment investment cost.
[0029] Combination Figure 1 and Figure 2 In the above-mentioned embodiment, the lowering component 3 includes: a cylinder 34 with an opening at the bottom; wherein a channel is provided inside the cylinder 34 for passing the watertight pipe column 31; and an interface connected to the vacuum pumping device 5 is provided on the cylinder 34.
[0030] Specifically, the lowering assembly 3 is a cylindrical shape with an opening at the bottom, and the watertight pipe column 31 is inserted to be flush with the bottom surface of the lowering assembly 3. A connection port is provided on the top of the cylinder 34 to allow the watertight pipe column 31 to be inserted, and a vacuum connection port is provided on the top cover of the cylinder 34 to communicate with the vacuum device 5.
[0031] For further information, see Figure 3 The cylinder 34 contains at least one partition 32 to separate the cylinder 34 into at least two cavities 30; the side walls of the watertight pipe column 31 are connected to each of the partitions 32; and a plurality of vacuum connection ports 33 are respectively provided on the upper cover plate of the cylinder 34 in the area corresponding to each of the cavities to connect each of the cavities with the vacuum extraction device 5.
[0032] Specifically, the side wall of the watertight pipe column 31 can be welded to the side wall of each partition 32. The vacuum equipment is connected to different cavities of the lowering assembly 3 through the corresponding vacuum connection ports, which is conducive to adjusting the balance of the lowering assembly 3.
[0033] More preferably, the cylinder 34 has four partitions 32 to separate the cylinder 34 into four cavities. The four cavities are evenly distributed, and the vacuum degree in each area can be adjusted more conveniently and flexibly. Each cavity is connected to the corresponding vacuum device 5 through a corresponding vacuum connection port and an exhaust pipeline.
[0034] See also Figure 4 The static penetration test assembly 4 includes: a static penetration work platform 42 and a static penetration penetrator 43; wherein the static penetration work platform 42 is connected to the top of the watertight pipe column 31; the probe unit 41 of the static penetration work is arranged on the static penetration penetrator 43, and the probe unit 41 passes through the watertight pipe column 31; the static penetration penetrator 43 is slidably arranged on the static penetration work platform 42. The hydraulic system on the static penetration penetrator clamps the probe unit through the probe rod to lower or pull the probe unit out through the watertight pipe.
[0035] Specifically, the static penetration work platform 42 can be a square base or a round base made of steel plate. The static penetration work platform 42 can be connected to the watertight pipe column 31 through a flange. The static penetration work platform 42 is located on the outside of the ship's side and should be higher than the drilling platform 20. A connecting hole is opened on the static penetration work platform 42 at a position corresponding to the watertight pipe column 31, so that the probe can pass through the watertight pipe column 31. The diameter of the connecting hole can be consistent with the caliber of the watertight pipe column 31, and larger than the diameter of the probe and the probe rod 411.
[0036] Rollers can be arranged at the bottom of the static penetration machine 43, and a slide rail 6 is provided on the static penetration work platform 42 to provide a sliding track for the static penetration machine 43, so as to facilitate the movement of the static penetration machine 43. The static penetration machine 43 can be a static penetration hydraulic penetration machine. The probe unit 41 can be arranged in the middle of the static penetration machine 43.
[0037] Method Example: The present invention also provides a shallow sea static penetration test method, comprising the following steps: Step 1, connect the vacuum device on the drilling vessel 1 to the lowering assembly 3, lower the lowering assembly 3 to below the seabed mud surface, and during the lowering process, install the watertight pipe column 31 section by section.
[0038] Specifically, the lowering assembly 3, the drilling rig assembly 2 and the static penetration assembly are hoisted on the deck of the drilling vessel 1. After the drilling vessel 1 reaches the target hole position, the four anchors are positioned, and the lowering assembly 3 is hoisted and placed below one side of the vessel by the crane on the vessel, and the anchor cable of the drilling vessel 1 is twisted to position the lowering assembly 3 above the predetermined hole position, and the lowering assembly 3 is lowered to the seabed mud surface. During the lowering process, the watertight pipe column 31 is installed section by section. Before lowering, the vacuum device is connected to the lowering assembly 3 through the exhaust pipe 7.
[0039] After the lowering assembly 3 reaches the mud surface, it sinks into the soft soil on the seabed surface under the action of its own weight. After being leveled by the crane, the vacuum pump installed on the deck of the drilling vessel 1 is turned on to start extracting the air and seawater in the four empty chambers of the lowering assembly 3. Under the action of negative pressure and its own weight, the lowering assembly 3 gradually penetrates below the mud surface. During the penetration process, the inclination of the watertight pipe column 31 is observed to adjust the inclination of the lowering assembly 3. If necessary, a loading block can be installed on the top of the lowering assembly 3 to increase its stability.
[0040] Step 2, install the static penetration test assembly 4 above the lowering assembly 3, and move the probe unit 41 of the static penetration test assembly 4 to above the watertight pipe column 31 in the lowering assembly.
[0041] Specifically, after the lowering assembly 3 penetrates into the mud surface and stabilizes, the static penetration test assembly 4 is installed to the area above the drilling platform on the outside of the ship's side and higher than the drilling rig assembly 2. More specifically, the static penetration work platform 42 is made to be about 1.0m higher than the drilling platform, so that it is separated from the drilling vessel 1 and is not affected by waves. In this embodiment, the static penetration work platform 42 is 1.5m long and 1m wide. During operation, 2-3 operators are required on the platform.
[0042] Step 3, lower the probe unit 41 through the watertight pipe column 31 to a preset depth below the mud surface, start the penetration test, and record the penetration depth and the test data of the probe.
[0043] During the specific implementation, the static penetration machine 43 is first moved to the top of the watertight pipe column 31 through the slide rail 6, and the static penetration probe unit 41 is lowered from the watertight pipe column 31. After reaching the mud surface, the penetration test is started. After the test is completed, the penetration depth and the test data of the probe are recorded.
[0044] Step 4, pull the probe unit 41 out of the watertight pipe column 31, and use the drilling rig assembly to clean the hole and protect the wall to the first preset depth; repeat steps 3 and 4 again, and cycle in sequence to the specified test depth.
[0045] During the specific implementation, the hoisting equipment on the drilling rig 21 is used to assist the static sounding penetration machine 43 to pull out the static sounding probe unit 41 from the hole section by section, and the static sounding penetration machine 43 is moved away by the slide rail 6. The casing and drill rod of the drilling rig 21 are lowered from the watertight pipe column 31 to carry out hole cleaning and wall protection operations to the depth of static sounding penetration.
[0046] Move the static penetration machine 43 to the top of the watertight pipe column 31 through the slide rail 6 again, and start the penetration test until the test is completed. Pull out the static penetration probe unit 41, move the static penetration machine 43 away through the slide rail 6, lower the drill pipe from the watertight pipe column 31, follow up with the static penetration casing, and perform hole cleaning and wall protection operations to the depth of static penetration. According to the above operation process, cycle to the specified test depth in sequence.
[0047] The related parts of the method embodiment and the above-mentioned device embodiment can be referred to each other and will not be described in detail here.
[0048] In summary, the shallow sea static penetration test method provided by the present invention combines the drilling technology with the static penetration technology, thereby achieving the purpose of in-situ testing. The test process is not affected by sea waves, the test results are reliable and accurate, and can provide the seabed geological data required for pile foundation bearing capacity analysis for the offshore jacket platform site.
[0049] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A beach sea static penetration test device, characterized in that: include: Drilling vessels and drilling rig components, lowering components and static penetration test components installed thereon; among which, The drilling vessel is also provided with a vacuum device, which is connected to the lowering assembly and is used to vacuum the lowering assembly; The drilling vessel is also provided with a crane, which is connected to the lowering assembly and is used to lower it to the seabed mud surface; A watertight pipe column is arranged in the lowering assembly along the vertical direction, the static penetration test assembly is arranged above the lowering assembly and higher than the drilling floor platform of the drilling rig assembly, and the probe unit of the static penetration test assembly is penetrated inside the watertight pipe column; The drilling rig assembly is arranged on one side of the static penetration test assembly, and is used for cleaning the hole and protecting the wall after the static penetration test assembly completes the current test task, and can assist the static penetration test assembly in lowering and pulling out the probe unit.
2. The beach sea static penetration test device according to claim 1, characterized in that: The lowering assembly comprises: a cylinder with an opening at the bottom; wherein, The cylinder is provided with a passage inside for passing the watertight pipe column; and the cylinder is provided with an interface connected with the vacuum extraction device.
3. The beach sea static penetration test device according to claim 2, characterized in that: The cylinder contains at least one partition to separate the cylinder into at least two cavities; the side walls of the watertight pipe column are connected to each of the partitions; A plurality of vacuum connection ports are respectively provided in the area corresponding to each of the cavities on the upper cover plate of the cylinder, so as to connect each of the cavities with the vacuum extraction device.
4. The beach sea static penetration test device according to claim 3, characterized in that: The cylinder is provided with four partitions to divide the cylinder into four cavities.
5. The beach sea static penetration test device according to claim 1, characterized in that: The static penetration test assembly includes: a static penetration work platform and a static penetration penetrator; wherein, The static penetration operation platform is connected to the top of the watertight pipe column; the probe unit of the static penetration operation is arranged on the static penetration penetrator, and the probe unit passes through the watertight pipe column; The static penetration machine can be slidably arranged on the static penetration work platform.
6. The beach sea static penetration test device according to claim 5, characterized in that: The static penetration test working platform is provided with a slide rail for providing a slide track for the static penetration test penetrator.
7. The beach sea static penetration test device according to claim 1, characterized in that: The watertight pipe column is formed by connecting a plurality of watertight pipe sections.
8. The beach sea static penetration test device according to claim 1, characterized in that: The watertight pipe column is provided with a plurality of lifting ears for connecting with the drilling vessel through pulling ropes.
9. The shallow sea static penetration test method according to claim 1, characterized in that: The following steps are involved: Step 1, connect the vacuum device on the drilling vessel to the lowering assembly, lower the lowering assembly below the seabed mud surface, and install the watertight pipe string section by section during the lowering process; Step 2, installing a static penetration test assembly above the lowering assembly, and moving the probe unit of the static penetration test assembly to above the watertight pipe column in the lowering assembly; Step 3, lowering the probe unit through the watertight pipe column to a preset depth below the mud surface, starting the penetration test, and recording the penetration depth and the test data of the probe; Step 4, pull the probe unit out of the watertight pipe column, and use the drilling rig assembly to clean the hole and protect the wall to the first preset depth; repeat steps 3 and 4 again, and cycle in sequence to the specified test depth.
10. The beach sea static penetration test device according to claim 9, characterized in that: In the step 2, the static penetration test assembly is installed on the outer side of the ship and above the drilling platform of the drilling rig assembly.