Open caisson method rotational flow shaft wall structure and construction method
By setting a thickened protective layer on the tip of the cyclone wellbore wall, the problem of difficulty in sinking the cylinder wall in the caisson method is solved, the smooth sinking of the cylinder wall and the construction period are achieved, the friction is reduced, and the construction efficiency is improved.
Patent Information
- Application Number
- CN202411317431.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the construction of a caisson method cyclone well, the friction between the cylinder wall and the soil is greater than the self-weight of the cylinder wall, which makes it difficult for the cylinder wall to sink. Common methods increase costs and extend construction period.
By providing a thickened protective layer outside the tip cylinder wall, the strength and stiffness of the tip cylinder wall are increased, the friction between the upper cylinder wall and the soil is reduced, and the smooth sinking of the cylinder wall is achieved.
No other sinking measures are required to shorten the construction period, increase the sinking speed, save costs, and achieve smooth sinking of the cylinder wall and reasonable structural stress.
Smart Images

Figure CN118933081A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vortex well construction, and in particular to a swirl well wall structure and a construction method thereof. Background Art
[0002] As an important building of the public auxiliary system in the field of metallurgical construction, the vortex well is generally a circular reinforced concrete structure with a large diameter (about 18 to 35 meters), a thick wall (between 1 and 1.5 meters), and a deep burial (about 20 to 35 meters). It is a key and difficult point in construction. Common construction methods include large excavation, reverse construction and caisson method, among which the caisson method is more common. However, during the caisson process, when the soil at the bottom of the blade foot is hollowed out, the wall of the cylinder is difficult to sink, mainly because the friction between the wall of the cylinder and the soil is greater than the dead weight of the wall of the cylinder. At this time, the commonly used method is to take measures such as oiling the outside of the wall of the cylinder, injecting water, adding counterweights, or step-type excavation around the surface to assist the wall of the cylinder to sink smoothly. Although the above methods have certain effects, they will increase costs and extend construction time. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides a swirl shaft wall structure and construction method for the caisson method, which increases the thickness of the tip wall and can reduce the friction between the upper wall and the ground during sinking, thereby achieving smooth sinking of the swirl shaft wall.
[0004] To achieve this technical purpose, the present invention adopts the following scheme: In the first aspect, the present invention provides a swirl shaft wall structure of a caisson method, comprising a tip shaft wall and an upper shaft wall arranged above the tip shaft wall, the tip shaft wall and the upper shaft wall are both provided with a protective layer on the outside, a blade foot steel guard plate is provided at the blade foot of the tip shaft wall, and the thickness of the outer protective layer of the tip shaft wall is greater than the thickness of the protective layer of the upper shaft wall.
[0005] Furthermore, the thickness of the outer protective layer of the tip cylinder wall is 20-30 mm greater than the thickness of the outer protective layer of the upper cylinder wall, and the outer protective layer of the upper cylinder wall is constructed according to the drawings.
[0006] Compared with the prior art, the present invention has the following beneficial effects: The swirl well wall structure of the caisson method of the present invention sets a thickened protective layer on the outside of the tip wall to increase the strength and rigidity of the tip wall. During the sinking process, the friction between the upper wall and the soil is reduced, so that the wall can sink smoothly. This method does not require other sinking-aiding measures, the tip wall strength and rigidity are increased, the sinking speed is accelerated, the construction period is shortened, and the effect is remarkable.
[0007] In a second aspect, the present invention provides a swirl well construction method using a caisson method, comprising the following steps: Step 1: Tie the steel bars of the tip tube wall and install the blade foot steel guard plate: Install the steel plate of the tip wall of the vortex well and the steel guard plate of the bottom blade foot according to the design drawings; Step 2: Close and reinforce the tip tube wall template: The inner template of the tip tube wall is normally supported, and the outer template is closed to increase the protective layer, forming a thickened outer protective layer of the tip tube wall, and then locked and reinforced; Step 3: Concrete pouring of the tip tube wall: Pour the concrete cylinder wall evenly in layers, and vibrate it with a vibrating rod to ensure that the concrete is vibrated and compacted; Step 4: Construction of upper cylinder wall: When the concrete of the tip wall reaches the required strength, the upper sections of the wall are manufactured, and the outer side of the tip wall and the upper wall are offset. Step 5: Sinking of the cylinder wall: When the tip cylinder wall reaches a certain strength, the soil below the blade foot is excavated. When the deadweight of the cylinder wall is greater than the friction between the cylinder wall and the soil, the cylinder wall begins to gradually sink to the designed position and then stops sinking.
[0008] When the caisson is in place, if there are gaps on the outside of the wall, water tamping or sand filling can be used to fill the gaps and make them dense.
[0009] Furthermore, after the vortex shaft wall is sunk into place, the bottom plate, inner tube and structural platform are constructed.
[0010] Furthermore, in the second step, the thickness of the outer protective layer of the tip cylinder wall is 20-30 mm greater than the thickness of the outer protective layer of the upper cylinder wall, and the outer protective layer of the upper cylinder wall is designed and constructed according to the drawings.
[0011] Furthermore, a steel plate water stop strip is provided between adjacent cylinder walls.
[0012] The present invention sets a thickened protective layer on the outer side of the tip cylinder wall to increase the strength and rigidity of the tip cylinder wall. As the tip cylinder wall cuts soil and sinks, the plastic deformation of the soil around the upper part is constrained. When the upper cylinder wall sinks through this area, the soil around the cylinder wall cannot fit tightly. At this time, the friction between the cylinder wall and the soil in this section is much smaller than the friction between the tip of the cylinder wall and the soil. Even if the friction between the cylinder wall and the soil increases with the sinking depth, the increase is much smaller than the increase in the deadweight of the cylinder wall, so that the cylinder wall can sink smoothly. This method does not need to take other sinking-aiding measures, the strength and rigidity of the tip cylinder wall are increased, the sinking speed is accelerated, the construction period is shortened, and the effect is remarkable.
[0013] Compared with the prior art, the present invention has the following beneficial effects: 1. Compared with the conventional caisson method, the friction between the upper cylinder wall and the soil is reduced, the caisson speed is accelerated, and the construction period is shortened; 2. Compared with the conventional caisson method, no other sinking aids are required, thus saving the cost of measures; 3. The strength and rigidity of the tip tube wall are enhanced, which is conducive to smooth soil cutting and reasonable structural stress. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the cyclone shaft wall structure of the caisson method according to an embodiment of the present invention; Markings in the figure are: 1. Tip cylinder wall; 2. Upper cylinder wall; 3. Blade foot steel guard plate; 4. Outer protective layer of tip cylinder wall; 5. Bottom plate; 6. Steel plate waterstop; 7. Inner cylinder. DETAILED DESCRIPTION
[0015] In order to fully understand the purpose, features and effects of the present invention, the present invention is described in detail through the following specific implementation methods, but the present invention is not limited thereto.
[0016] It should be noted that when an element is referred to as being "fixed to" or "set on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" or "laid on" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0017] It should be understood that the orientation or position relationship indicated by terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0018] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0019] See also Figure 1 The present invention provides a swirl shaft wall structure of a caisson method, comprising a tip shaft wall 1 and an upper shaft wall 2 arranged above the tip shaft wall 1, the tip shaft wall 1 and the upper shaft wall 2 are both provided with protective layers on the outside, a blade foot steel guard plate 3 is provided at the blade foot of the tip shaft wall 1, and the thickness of the outer protective layer 4 of the tip shaft wall is greater than the thickness of the protective layer of the upper shaft wall 2.
[0020] Generally, the wall thickness of the vortex shaft is between 1000 and 1500 mm, and the protective layer is 40 mm. According to the depth of the shaft wall and the geological survey, the embodiment of the present invention appropriately increases the outer protective layer of the tip shaft wall 1 by a few centimeters, and the total thickness of the outer protective layer 4 of the tip shaft wall is controlled between 60 and 70 mm. When the sinking depth is deep, the soil friction is large, and the geology is difficult to sink, the protective layer can be appropriately increased, and the outer protective layer 4 of the tip shaft wall is 70 mm thick; on the contrary, when it is easy to sink, the protective layer can be appropriately reduced, and the outer protective layer 4 of the tip shaft wall is 60 mm thick.
[0021] The present invention also provides a swirl well construction method using the caisson method, comprising the following steps: Step 1: Tie the steel bars of the tip tube wall 1 and install the blade foot steel guard plate 3: According to the design drawings, the steel bar sheet of the vortex well tip wall 1 and the bottom blade foot steel guard plate 3 are installed.
[0022] Step 2: Close and reinforce the tip tube wall 1 template: The inner template of the tip tube wall 1 is normally supported, and the protective layer is enlarged when the outer template is closed to form a thickened outer protective layer 4 of the tip tube wall, and then the tension screws are inserted to cooperate with the dovetail clamp and the outer keel of the template for locking and reinforcement; The thickness of the outer protective layer 4 of the tip barrel wall is determined according to the depth of the vortex wellbore wall and the geological survey conditions.
[0023] Step 3: Concrete pouring of the tip tube wall 1: Pour the concrete cylinder wall evenly in layers, and vibrate it with a vibrating rod to ensure that the concrete is vibrated and compacted; In the embodiment of the present invention, a car pump is used to evenly pour the concrete cylinder wall in layers, and the pouring thickness of each layer is controlled within 500 mm. The vibrating rod can be set with a scale control to ensure that the concrete is vibrated and compacted.
[0024] Step 4: Construction of upper cylinder wall 2: When the concrete of the tip wall 1 reaches the required strength, the upper wall sections are manufactured, and the outer side of the tip wall 1 and the upper wall 2 are offset by 20-30 mm. Furthermore, a steel plate water stop strip 6 is provided between adjacent cylinder walls.
[0025] Step 5: Sinking of the cylinder wall: When the tip cylinder wall 1 reaches a certain strength, the soil below the blade foot is excavated. When the deadweight of the cylinder wall is greater than the friction between the cylinder wall and the soil, the cylinder wall begins to gradually sink to the designed position and then stops sinking.
[0026] Due to the increase of the protective layer on the outside of the tip cylinder wall 1, as the tip cylinder wall 1 cuts and sinks, the plastic deformation of the upper surrounding soil is constrained. When the upper cylinder wall 2 sinks through this area, due to the 20-30mm misalignment between the outside of the tip cylinder wall 1 and the upper cylinder wall 2, the soil around the upper cylinder wall 2 cannot fit tightly. At this time, the friction between the cylinder wall and the soil in this section is much smaller than the friction between the tip of the cylinder wall and the soil at that time. Even if the friction between the cylinder wall and the soil increases with the sinking depth, it is still much smaller than the increase in the deadweight of the cylinder wall, and the sinking is achieved smoothly.
[0027] When the caisson is in place, if there are gaps on the outside of the wall, water tamping or sand filling can be used to fill the gaps and make them dense.
[0028] Furthermore, after the vortex shaft wall is sunk into place, the bottom plate 5, the inner tube 7 and the structural platform are constructed in sequence.
[0029] The present invention increases the strength and rigidity of the tip cylinder wall 1 by arranging a thickened protective layer on the outside of the tip cylinder wall 1. As the tip cylinder wall 1 cuts the soil and sinks, the plastic deformation of the soil around the upper part is constrained. When the upper cylinder wall 2 sinks through this area, the soil around the cylinder wall cannot fit tightly. At this time, the friction between the cylinder wall and the soil in this section is much smaller than the friction between the tip of the cylinder wall and the soil. Even if the friction between the cylinder wall and the soil increases with the sinking depth, the increase is much smaller than the increase in the deadweight of the cylinder wall, so that the cylinder wall can sink smoothly. This method does not require other sinking-aiding measures, the strength and rigidity of the tip cylinder wall 1 are increased, the sinking speed is accelerated, the construction period is shortened, and the effect is remarkable.
[0030] Compared with the prior art, the present invention has the following beneficial effects: 1. Compared with the conventional caisson method, the friction between the upper cylinder wall 2 and the soil is reduced, the caisson speed is accelerated, and the construction period is shortened; 2. Compared with the conventional caisson method, no other sinking aids are required, thus saving the cost of measures; 3. The strength and rigidity of the tip tube wall 1 are enhanced, which is conducive to smooth soil cutting and reasonable structural stress.
[0031] Finally, it should be noted that the above are only preferred embodiments of the present invention. Of course, those skilled in the art can make changes and modifications to the present invention. If these modifications and variations fall within the scope of the claims of the present invention and their equivalent technologies, they should be considered to be within the scope of protection of the present invention.
Claims
1. A swirl well wall structure for a caisson method, comprising a tip wall (1) and an upper wall (2) arranged above the tip wall (1), wherein the tip wall (1) and the upper wall (2) are both provided with a protective layer on the outside. It is characterized in that A blade foot steel guard plate (3) is provided at the blade foot of the tip cylinder wall (1), and the thickness of the outer protective layer (4) of the tip cylinder wall is greater than the thickness of the protective layer of the upper cylinder wall (2).
2. The swirl well wall structure of the caisson method according to claim 1, It is characterized in that The thickness of the outer protective layer (4) of the tip cylinder wall is 20-30 mm greater than the thickness of the protective layer of the upper cylinder wall.
3. A swirl well construction method using a caisson method comprising the swirl well wall structure according to claim 1 or 2, It is characterized in that The following steps are involved: Step 1: Tie the steel bars of the tip tube wall (1) and install the blade foot steel guard plate (3): Install the steel plate of the top wall (1) of the vortex well and the bottom blade steel guard plate (3) according to the design drawings; Step 2: The tip wall (1) is sealed and reinforced with template: The inner template of the tip tube wall (1) is normally supported, and the outer template is closed to increase the protective layer, thereby forming a thickened outer protective layer (4) of the tip tube wall, which is then locked and reinforced; Step 3: Concrete pouring of the tip wall (1): Pour the concrete cylinder wall evenly in layers, and vibrate it with a vibrating rod to ensure that the concrete is vibrated and compacted; Step 4: Construction of the upper tube wall (2): When the concrete of the tip cylinder wall (1) reaches a certain strength, the upper sections of the cylinder wall are manufactured, and the outer side of the tip cylinder wall (1) and the upper cylinder wall (2) are offset; Step 5: Sinking of the cylinder wall: When the tip cylinder wall (1) reaches a certain strength, the soil below the blade foot is excavated. When the deadweight of the cylinder wall is greater than the friction between the cylinder wall and the soil, the cylinder wall begins to gradually sink to the designed position and then stops sinking.
4. The caisson swirl well construction method according to claim 3, It is characterized in that After the vortex shaft wall is sunk into place, the bottom plate (5), inner tube (7) and structural platform are constructed in sequence.
5. The caisson swirl well construction method according to claim 3, It is characterized in that In the second step, the thickness of the outer protective layer (4) of the tip tube wall is 20-30 mm greater than the thickness of the outer protective layer of the upper tube wall.
6. The caisson swirl well construction method according to claim 3, It is characterized in that A steel plate water stop strip (6) is provided between adjacent cylinder walls.
Citation Information
Patent Citations
Process for the production of a manhole lining or parts of such and equipment therefor
AT190475B
Self-sinking type prefabricated hollow slide-resistant pile and construction method thereof
CN110144881A
Replacement type open caisson construction method suitable for soft foundation
CN112144558A
Open caisson method for rotational flow well in high-water-level silt foundation soil
CN116427443A
Rotational flow shaft wall open caisson and reverse construction integrated construction method
CN117211321A