Annular pressure relief device and method for injection-production well of gas storage

The combined device of high-pressure hose and conversion joints achieves closed discharge in the gas storage injection and production well, solving the safety hazards and inconvenient operation of the annular pressure belt, and realizing the safe injection and production operation of the gas storage and environmentally friendly discharge.

CN118933669APending Publication Date: 2024-11-12PETROCHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310532070.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-11
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively solve the safety hazards of annular zone pressure during the high-speed injection and mining operation of the gas storage storage injection and mining wells. The traditional discharge method has the risks of environmental pollution and high-cost transformation, and is inconvenient to operate.

Method used

Use high-pressure hose to connect from the A/B/C annular oil pressure gauge to the wellhead oil pressure gauge of the injection and production well, and realizes closed discharge through a single well injection and production pipeline. Use a combination of converter and pressure gauge devices to ensure simple and convenient operation and Confined.

Benefits of technology

It realizes closed pressure release throughout the process, reduces costs, improves safety performance and environmental protection, meets the long life cycle of gas storage, and eliminates safety hazards of annular pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933669A_ABST
    Figure CN118933669A_ABST
Patent Text Reader

Abstract

The invention relates to a gas storage injection and production well annulus pressure relief device which comprises an injection and production gas tree, an oil pressure gauge is fixedly connected to the injection and production gas tree, a first conversion connector is fixedly connected to a connector of the oil pressure gauge, and a second conversion connector is further fixedly connected to the injection and production gas tree. A three-way connector is fixedly connected to one port, away from the gas injection and production tree, of the second conversion connector, a pressure gauge is fixedly connected to one port, away from the second conversion connector, of the three-way connector, and a high-pressure hose is further fixedly connected to the other port of the three-way connector. A third adapter can be installed at the pressure gauge connector of any one of the annulus A, the annulus B and the annulus C, and the third adapter is oppositely communicated with the high-pressure hose. The annular pressure relief device has the effects that the annular pressure is subjected to closed relief, and the long-life-cycle safe gas injection and production operation of the gas storage is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of oil and gas storage and transportation, and in particular to a device and method for releasing annular pressure of injection and production wells in a gas storage reservoir. Background Art

[0002] The injection and production wells of underground gas storage are operated at a high speed with "big swallowing and big spitting". The problem of pressure in the annulus of gas storage injection and production is becoming increasingly prominent, which poses a major hidden danger to the safe injection and production operation of gas storage. In order to promptly eliminate the hidden dangers of production under pressure, the current traditional practices are generally divided into the following two types:

[0003] 1. When there is no release process, open pressure release is mainly carried out through the vent port of the wellhead pressure gauge valve group. Although this method can release the annular pressure in time and eliminate the risk of natural gas leakage caused by long-term pressure, it is very easy to cause on-site environmental pollution. The release of high-pressure natural gas during open-air pressure release is prone to flammable and explosive risks. This method has been prohibited according to the requirements of the "Operation and Management Specifications for Oil and Gas Reservoir-Type Gas Storage Facilities Part 2: Well Operation Management".

[0004] 2. If the process is modified, closed pressure relief can be achieved in two ways: ① Install venting pipelines and flares at the well site, install pipelines and valves on the side gates of the A / B / C annulus casing head of the injection and production wells, connect them to the venting pipeline, confirm the gas composition during venting, and ignite and burn. ② Install pipelines and valves on the side gates of the A / B / C annulus casing head of the injection and production wells, and connect them to the injection and production pipelines of the single well for pressure relief. However, the transformation process requires increased investment and is costly. There are many process transformation points, increased risk points of pipeline corrosion and freezing in winter, and weak gas leakage points at the pipeline opening welding points, which increases the difficulty of manual management.

[0005] The invention patent with application number 201811364237.2 provides a method for processing the annular pressure of a gas storage injection and production well. The method for processing the annular pressure of a gas storage injection and production well includes: determining the safety limit value of the annular pressure of the gas storage injection and production well; monitoring the annular pressure when injecting and producing gas in the gas storage injection and production well; when the annular pressure of the gas storage injection and production well is greater than the safety limit value, the annular pressure is released and the annular pressure is monitored at the same time; according to the change of the annular pressure, the pressure source is identified to determine the cause of the annular pressure; according to the cause of the annular pressure, the gas storage injection and production well is managed after pressure relief.

[0006] With regard to the above-mentioned related technologies, the inventors believe that the on-site timely and effective safety solution to the safety hazard of annular pressure during the "large-scale swallowing and spitting" high-speed injection and production operation of gas storage injection and production wells is not ideal, the process is relatively cumbersome, and the on-site operability is not convenient enough. Summary of the invention

[0007] In order to release the annular pressure in a closed manner and meet the requirements of safe gas injection and production operation over a long life cycle of a gas storage, the present application provides an annular pressure release device and method for injection and production wells of a gas storage.

[0008] The present application provides a gas storage reservoir injection and production well annulus pressure relief device, which adopts the following technical solution:

[0009] A gas storage reservoir injection and production well annulus pressure relief device comprises an injection and production gas tree, an oil pressure gauge is fixedly connected to the injection and production gas tree, a first conversion joint is fixedly connected to the interface of the oil pressure gauge, a second conversion joint is also fixedly connected to the injection and production gas tree, a port of the second conversion joint away from the injection and production gas tree is fixedly connected to a three-way joint, a port of the three-way joint away from the second conversion joint is fixedly connected to a pressure gauge, and another port of the three-way joint is also fixedly connected to a high-pressure hose, and according to different annulus pressure relief purposes, a third conversion joint can be installed at the pressure gauge interface of any annulus A, B, or C, and the third conversion joint is relatively connected to the high-pressure hose.

[0010] By adopting the above technical solution, a high-pressure hose is used to connect the A / B / C annulus oil pressure gauge to the wellhead oil pressure gauge of the injection and production well, and the pressure of the A / B / C annulus is transmitted to the wellhead oil pressure gauge. The gas completes the pressure release of the A / B / C annulus through the single-well injection and production pipeline. The operation is simple and convenient, and the annulus pressure can be released in a closed manner, which meets the requirements of safe injection and production gas operation over the long life cycle of the gas storage.

[0011] Optionally, the pressure resistance grade of the high-pressure hose meets the process conditions of injection and production operation at the gas storage injection and production site, and has the function of resisting acidic hydrogen sulfide and carbon dioxide in natural gas.

[0012] Optionally, the pressure resistance rating and working pressure of the first conversion joint, the second conversion joint, the third conversion joint, the pressure gauge and the three-way joint meet the upper operating pressure limit of the injection and production well.

[0013] Optionally, both ends of the high-pressure hose are respectively fixedly connected with protection ropes, and the protection ropes are relatively fixed to the injection and production gas tree.

[0014] By adopting the above technical solution, the protective rope can effectively reduce the situation where the connections at both ends of the high-pressure hose are detached and swinging.

[0015] The present application also provides a method for releasing annular pressure of injection and production wells in a gas storage reservoir, which comprises the following steps:

[0016] S01, discharge the A annulus;

[0017] S02, confirm that the pressure of the single well injection and production pipeline is 0 MPa. If there is pressure, release the pressure to 0 MPa;

[0018] S03, close the inner production valve, open the outer production valve, close the root valve of the oil pressure gauge, disassemble the oil pressure gauge, and install the first conversion joint, the second conversion joint, the pressure gauge and one end of the high-pressure hose in sequence;

[0019] S04, closing the root valve of the A annulus pressure gauge valve group, disassembling the A annulus detection pressure gauge, and sequentially installing the third conversion joint and the other end of the high-pressure hose;

[0020] S05, open the root valve of the annulus pressure gauge valve group A, perform pressure charging and leak detection on the annulus pressure relief device, and after the leak detection is qualified, open the root valve of the oil pressure gauge to start pressure relief;

[0021] S06, if it is necessary to release the B annulus pressure, perform the B annulus pressure release; if it is not necessary, remove the annulus pressure release devices in sequence.

[0022] Optionally, after the pressure is released to within 80% of the maximum allowable working pressure as observed by the pressure gauge, the pressure relief of annulus A is completed.

[0023] Optional, S01, prepare for B annulus release;

[0024] S02, confirm that the pressure of the single well injection and production pipeline is 0 MPa. If there is pressure, release the pressure to 0 MPa; close the root valve of the A annulus pressure gauge valve group and the root valve of the oil pressure gauge valve group, and remove the high-pressure hose and the third conversion joint at the end of the A annulus pressure gauge in turn;

[0025] S03, closing the root valve of the B annulus pressure gauge valve group, disassembling the B annulus detection pressure gauge, and sequentially installing the third conversion joint and the other end of the high-pressure hose;

[0026] S04, open the root valve of the annular pressure gauge valve group B, and perform pressure testing on the annular pressure relief device. After the leak test is qualified, open the root valve of the oil pressure gauge valve group to start pressure relief;

[0027] S05, if it is necessary to release the C annulus pressure, perform the C annulus pressure release; if it is not necessary, remove the annulus pressure release devices in sequence.

[0028] Optionally, after the pressure is released to within 80% of the maximum allowable working pressure as observed by the pressure gauge, the pressure relief of annulus B is completed.

[0029] Optional, S01, prepare for C annulus venting;

[0030] S02, confirm that the pressure of the single well injection and production pipeline is 0 MPa. If there is pressure, release the pressure to 0 MPa; close the root valve of the B annulus pressure gauge valve group and the root valve of the oil pressure gauge valve group, and remove the high-pressure hose and the third conversion joint at the end of the B annulus pressure gauge in turn;

[0031] S03, closing the root valve of the C annulus pressure gauge valve group, disassembling the C annulus detection pressure gauge, and sequentially installing the third conversion joint and the other end of the high-pressure hose;

[0032] S04, open the root valve of the C annular pressure gauge valve group, and perform pressure testing on the annular pressure relief device. After the leak test is qualified, open the root valve of the oil pressure gauge valve group and start pressure relief;

[0033] S05, remove the annular pressure relief devices one by one.

[0034] Optionally, after the pressure is released to within 80% of the maximum allowable working pressure as observed by the pressure gauge, the C annulus pressure relief is completed.

[0035] In summary, the present application includes at least one of the following beneficial technical effects:

[0036] 1. It can realize closed pressure release throughout the whole process, with convenient operation, low cost, high safety performance, environmental protection and reliability, and can meet the long life cycle of gas storage safe gas injection and production operation.

[0037] 2. In view of the fact that the domestic gas storage facilities in service were not equipped with the annulus depressurization process for injection and production wells during construction, a new depressurization method was invented without any process modification in order to meet the requirements of closed depressurization.

[0038] 3. Use a high-pressure hose to connect the A / B / C annulus oil pressure gauge to the wellhead oil pressure gauge of the injection and production well, and transmit the pressure of the A / B / C annulus to the wellhead oil pressure gauge. The gas completes the pressure release of the A / B / C annulus through the single-well injection and production pipeline. The operation is simple and convenient, and the annulus pressure can be released in a closed manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a structural schematic diagram of an annulus pressure relief device for injection and production wells of a gas storage reservoir in an embodiment of the present application.

[0040] Explanation of the reference numerals: 1. high-pressure hose; 2. first conversion joint; 3. second conversion joint; 4. three-way joint; 5. pressure gauge; 6. protective rope; 7. injection and production gas tree. DETAILED DESCRIPTION

[0041] The following is combined with Figure 1 This application is described in further detail.

[0042] The present application embodiment discloses a gas storage reservoir injection and production well annulus pressure relief device and method. Figure 1 A gas storage reservoir injection and production well annulus pressure relief device includes an injection and production gas tree 7, an oil pressure gauge is fixedly installed on the injection and production gas tree 7, the other port of the oil pressure gauge is fixedly connected to a first conversion joint 2, and the first conversion joint 2 and the oil pressure gauge are relatively connected.

[0043] The injection and production gas tree 7 is also fixedly connected with a second conversion joint 3, and a tee joint 4 is fixedly connected to the end of the second conversion joint 3 away from the injection and production gas tree 7, and the port of the tee joint 4 is relatively connected to the port of the second conversion joint 3. A pressure gauge 5 is fixedly connected to the end of the tee joint 4 that is relatively away from the second conversion joint 3.

[0044] The other end of the three-way joint 4 is fixedly connected with a high-pressure hose 1, so that the interior of the high-pressure hose 1 is relatively connected to the three-way joint 4. The pressure resistance level of the high-pressure hose 1 should be able to meet the on-site injection and production operation process conditions of the gas storage injection and production wells. The material should meet the relevant requirements of GB / T10544-2022 and have functions such as resistance to acidic hydrogen sulfide and carbon dioxide in natural gas. Its length should meet the connection length of each level of annulus and oil pressure gauge. According to the purpose of different annulus pressure relief, a third conversion joint is fixedly connected to the interface of the pressure gauge 5 of any annulus on A, B, and C, and the other end of the third conversion joint is relatively connected to the high-pressure hose 1.

[0045] The pressure resistance rating and working pressure of the first conversion joint 2, the second conversion joint 3, the third conversion joint, the pressure gauge 5 and the three-way joint 4 should meet the upper limit pressure of the injection and production well operation, and they should be functional materials that are resistant to acidic hydrogen sulfide and carbon dioxide in natural gas.

[0046] Protective ropes 6 are respectively provided at both ends of the high-pressure hose 1. The end of the protective rope 6 facing away from the high-pressure hose 1 is fixedly connected to the injection and production gas tree 7. The protective rope 6 can prevent the connection from being detached and swinging. The pressure resistance level of the protective rope 6 should be able to meet the on-site safe injection and production operation process conditions of the injection and production well of the gas storage reservoir.

[0047] The present application also discloses a method for releasing annular pressure of a gas storage injection and production well, comprising the following construction steps:

[0048] S01, discharge the A annulus;

[0049] S02, confirm that the pressure of the single well injection and production pipeline is 0 MPa. If there is pressure, release the pressure to 0 MPa;

[0050] S03, close the inner production valve, open the outer production valve, close the root valve of the oil pressure gauge, disassemble the oil pressure gauge, and install the first conversion joint 2, the second conversion joint 3, the pressure gauge 5 and one end of the high-pressure hose 1 in sequence;

[0051] S04, close the root valve of the valve group A annulus pressure gauge 5, remove the A annulus detection pressure gauge 5, and install the third conversion joint and the other end of the high-pressure hose 1 in sequence;

[0052] S05, open the root valve of the A annulus pressure gauge 5 valve group, and perform pressure testing on the annulus pressure relief device. After the leak test is qualified, open the root valve of the oil pressure gauge and start pressure relief; observe through the pressure gauge 5, and after the pressure is released to within 80% of the maximum allowable working pressure, the A annulus pressure relief is completed. During the pressure relief process, gas detection and sampling can be carried out through the vent valve of the A annulus pressure gauge 5 valve group.

[0053] S06. If it is necessary to release the pressure of annulus B, release the pressure of annulus B. If it is not necessary to release the pressure, remove the annulus pressure release devices one by one.

[0054] When it is necessary to release the B annulus pressure, perform the following steps:

[0055] S01, prepare for B annulus release;

[0056] S02, confirm that the pressure of the single well injection and production pipeline is 0MPa. If there is pressure, release the pressure to 0MPa; close the root valve of the A annulus pressure gauge 5 valve group and the root valve of the oil pressure gauge valve group, and remove the high-pressure hose 1 and the third conversion joint at the A annulus pressure gauge 5 end in turn;

[0057] S03, close the root valve of the valve group of the B annulus pressure gauge 5, disassemble the B annulus detection pressure gauge 5, and install the third conversion joint and the other end of the high-pressure hose 1 in sequence;

[0058] S04, open the root valve of the B annulus pressure gauge 5 valve group, and perform pressure testing on the annulus pressure relief device. After the leak test is qualified, open the root valve of the oil pressure gauge valve group and start pressure relief; observe through the pressure gauge 5, and after the pressure is released to within 80% of the maximum allowable working pressure, the B annulus pressure relief is completed. During the pressure relief process, gas detection and sampling can be carried out through the vent valve of the B annulus pressure gauge 5 valve group.

[0059] S05, if it is necessary to release the C annulus pressure, perform the C annulus pressure release; if it is not necessary, remove the annulus pressure release devices in sequence.

[0060] When it is necessary to release the C annulus pressure, perform the following steps:

[0061] S01, prepare for C annulus release;

[0062] S02, confirm that the pressure of the single well injection and production pipeline is 0MPa. If there is pressure, release the pressure to 0MPa; close the root valve of the B annulus pressure gauge 5 valve group and the root valve of the oil pressure gauge valve group, and remove the high-pressure hose 1 and the third conversion joint at the end of the B annulus pressure gauge 5 in turn;

[0063] S03, close the root valve of the C annulus pressure gauge 5 valve group, remove the C annulus detection pressure gauge 5, and install the third conversion joint and the other end of the high-pressure hose 1 in sequence;

[0064] S04, open the root valve of C annulus pressure gauge 5 valve group, and perform pressure test on the annulus pressure relief device. After the leak test is qualified, open the root valve of the oil pressure gauge valve group and start pressure relief. Observe through pressure gauge 5 that the pressure is released to within 80% of the maximum allowable working pressure, and the C annulus pressure relief is completed. During the pressure relief process, gas detection and sampling can be carried out through the vent valve of C annulus pressure gauge 5 valve group.

[0065] S05, remove the annular pressure relief devices one by one.

[0066] On this basis, the pressure gauge 5 and other accessories removed from the wellhead device of the gas storage reservoir injection and production well were reinstalled.

[0067] Comprehensively judge the annular pressure source through various means:

[0068] 1. During the pressure relief process, observe and record the linkage of pressure changes in other annuli, and make a preliminary judgment on whether there are signs of leakage between different annuli according to the linkage situation;

[0069] 2. Based on the pressure recovery of different annuli, draw a pressure recovery curve to determine the depth of the leakage point from the wellhead;

[0070] 3. During the pressure relief process, take samples and compare and analyze the sources of the annular gases based on the test results of different annular fluid components;

[0071] 4. Combined with the results of fiber optic logging interpretation, a comprehensive analysis of different sources of annular pressure is conducted to provide technical reference for the next step of annular pressure control in injection and production wells.

[0072] The implementation principle of the annular pressure relief device and method of the injection and production well of the present application is as follows: a high-pressure hose 1 is used to connect the A / B / C annular oil pressure gauge to the wellhead oil pressure gauge of the injection and production well, and the pressure of the A / B / C annulus is transmitted to the wellhead oil pressure gauge. The gas is discharged through the single well injection and production pipeline to complete the pressure relief of the A / B / C annulus. The operation is simple and convenient, and the annular pressure is discharged in a closed manner. It can effectively solve the problem of full-process closed pressure relief under the premise that the injection and production well annular pressure relief process is not installed when the domestic gas storage in service is built. The operation is simple and convenient, and it meets the safety of high-speed injection and production of the "large swallowing and large spitting" injection and production well of the underground gas storage, and timely eliminates the safety hazards of the injection and production annulus pressure of the gas storage, so as to realize the safe and normal injection and production operation of the gas storage.

[0073] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A gas storage reservoir injection and production well annulus pressure relief device, characterized in that: The invention comprises a gas injection and production tree (7), to which an oil pressure gauge is fixedly connected, and a first conversion joint (2) is fixedly connected to the interface of the oil pressure gauge, and a second conversion joint (3) is also fixedly connected to the gas injection and production tree (7), and a three-way joint (4) is fixedly connected to a port of the second conversion joint (3) away from the gas injection and production tree (7), and a pressure gauge (5) is fixedly connected to a port of the three-way joint (4) away from the second conversion joint (3), and a high-pressure hose (1) is also fixedly connected to another port of the three-way joint (4). According to different annular space pressure relief purposes, a third conversion joint can be installed at the interface of the pressure gauge (5) of any annulus A, B, or C, and the third conversion joint is relatively connected to the high-pressure hose (1).

2. The annular pressure relief device for injection and production wells of a gas storage reservoir according to claim 1 is characterized by: The pressure resistance grade of the high-pressure hose (1) meets the process conditions for injection and production operation at the injection and production site of the gas storage reservoir, and has the function of resisting acidic hydrogen sulfide and carbon dioxide in natural gas.

3. The annular pressure relief device for injection and production wells of a gas storage reservoir according to claim 1 is characterized in that: The pressure-resistant grade working pressures of the first conversion joint (2), the second conversion joint (3), the third conversion joint, the pressure gauge (5) and the three-way joint (4) meet the upper limit pressure of the injection and production well operation.

4. The annular pressure relief device for injection and production wells of a gas storage reservoir according to claim 1, characterized in that: Both ends of the high-pressure hose (1) are respectively fixedly connected with protection ropes (6), and the protection ropes (6) are relatively fixed to the injection and production gas tree (7).

5. A method for releasing annular pressure of a gas storage injection and production well according to any one of claims 1 to 4, characterized in that: S01, discharge the A annulus; S02, confirm that the pressure of the single well injection and production pipeline is 0 MPa. If there is pressure, release the pressure to 0 MPa; S03, close the inner production valve, open the outer production valve, close the root valve of the oil pressure gauge, disassemble the oil pressure gauge, and install the first conversion joint (2), the second conversion joint (3), the pressure gauge (5) and one end of the high-pressure hose (1) in sequence; S04, closing the root valve of the valve group of the A annulus pressure gauge (5), disassembling the A annulus detection pressure gauge (5), and sequentially installing the third conversion joint and the other end of the high-pressure hose (1); S05, opening the root valve of the valve group A annulus pressure gauge (5), and performing pressure charging and leak detection on the annulus pressure relief device. After the leak detection is qualified, opening the root valve of the oil pressure gauge and starting pressure relief; S06, if it is necessary to release the B annulus pressure, perform the B annulus pressure release; if it is not necessary, remove the annulus pressure release devices in sequence.

6. A method for releasing annular pressure of a gas storage injection and production well according to claim 5, characterized in that: After the pressure is released to within 80% of the maximum permissible working pressure as observed by the pressure gauge (5), the pressure release of the A annulus is completed.

7. A method for releasing annular pressure of a gas storage injection and production well according to claim 5, characterized in that: S01, prepare for B annulus release; S02, confirm that the pressure of the single well injection and production pipeline is 0 MPa. If there is pressure, release the pressure to 0 MPa; close the root valve of the valve group of the A annulus pressure gauge (5) and the root valve of the oil pressure gauge valve group, and remove the high-pressure hose (1) and the third conversion joint at the end of the A annulus pressure gauge (5) in turn; S03, closing the root valve of the valve group of the B annulus pressure gauge (5), disassembling the B annulus detection pressure gauge (5), and sequentially installing the third conversion joint and the other end of the high-pressure hose (1); S04, open the root valve of the B annulus pressure gauge (5) valve group, and perform pressure testing on the annulus pressure relief device. After the leak test is qualified, open the root valve of the oil pressure gauge valve group to start pressure relief; S05, if it is necessary to release the C annulus pressure, perform the C annulus pressure release; if it is not necessary, remove the annulus pressure release devices in sequence.

8. A method for releasing annular pressure of injection and production wells in a gas storage reservoir according to claim 7, characterized in that: After the pressure is released to within 80% of the maximum permissible working pressure as observed by the pressure gauge (5), the pressure release of the B annulus is completed.

9. A method for releasing annular pressure of a gas storage injection and production well according to claim 7, characterized in that: S01, prepare for C annulus release; S02, confirm that the pressure of the single well injection and production pipeline is 0 MPa. If there is pressure, release the pressure to 0 MPa; close the root valve of the valve group of the B annulus pressure gauge (5) and the root valve of the oil pressure gauge valve group, and remove the high-pressure hose (1) and the third conversion joint at the end of the B annulus pressure gauge (5) in turn; S03, closing the root valve of the C annulus pressure gauge (5) valve group, disassembling the C annulus detection pressure gauge (5), and sequentially installing the third conversion joint and the other end of the high-pressure hose (1); S04, open the root valve of the C annulus pressure gauge (5) valve group, and perform pressure testing on the annulus pressure relief device. After the leak test is qualified, open the root valve of the oil pressure gauge valve group to start pressure relief; S05, remove the annular pressure relief devices one by one.

10. A method for releasing annular pressure of injection and production wells in a gas storage reservoir according to claim 9, characterized in that: After the pressure is released to within 80% of the maximum permissible working pressure as observed by the pressure gauge (5), the pressure release of the C annulus is completed.