Shale oil reservoir yield increasing and cost reducing fracturing optimization design method

Through technical means such as high-density fine-cutting, pre-pressure clean water replenishment and nano-oil-repellent-to-sliding and slippery water fracturing fluid, the fracturing design of shale oil reservoirs is optimized, and the shale oil reservoirs in low-cost development have been solved The problem of increasing production and reducing costs has achieved efficient use of shale oil reservoirs and improved economic benefits.

CN118933688AActive Publication Date: 2024-11-12PETROCHINA CO LTD

Patent Information

Application Number
CN202310517620.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-09
Publication Date
2024-11-12
Estimated Expiration
2043-05-09

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively improve the production and cost reduction of shale oil reservoirs under low cost conditions, especially for shale oil reservoirs with low original formation pressure coefficient, low rock brittleness index and low natural production capacity. The crack optimization design method fails to comprehensively consider the concept of increasing production, main process and parameter optimization, and ignores the contradiction between increasing production and reducing costs.

Method used

High-density fine-cut cutting and seam formation, clean water before pressing supplements formation energy, nano-oil-repelling and slippery water fracturing fluid accelerates suction and replacement, combined with fully soluble metal foils and current-limited perforation dense seams, optimizes perforation clusters The economic evaluation system for key engineering transformation parameters was established through the statistical regression of the mine site and the sensitivity analysis of economic indicators. The horizontal segment dessert was selected for large-scale segmented multi-cluster volume fracturing transformation.

Benefits of technology

The increase in production and cost reduction of shale oil reservoirs has been achieved, the contradiction between production and cost reduction in shale oil development has been balanced, and the degree of mobilization and economic benefits of shale oil reservoirs have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933688A_ABST
    Figure CN118933688A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of petroleum and natural gas development, and particularly relates to a shale oil reservoir yield increasing and cost reducing fracturing optimization design method. According to the method, the crack spacing, the single-section underground liquid amount and the well closing time range are obtained through high-density subdivision cutting crack forming, stratum energy supplementation through clear water before fracturing and imbibition replacement acceleration through an oil displacement agent; the perforation cluster number, the single-cluster hole number, the single-hole flow, the plugging agent adding amount and temporary plugging series parameters are obtained through soluble ball seat hard packing, flow-limiting perforation dense seams and temporary plugging steering soft clustering, and the optimal economic range of key engineering transformation parameters is determined in combination with mine field big data statistical regression, single-well EUR comprehensive measurement and calculation and economic index sensitivity analysis; horizontal section desserts are selected by establishing a horizontal section reservoir subsection grading evaluation standard; and the production-increasing cost-reducing fracturing optimization design of the targeted shale oil reservoir in the target block solves the problem of shale oil reservoir scale benefit development.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of oil and gas development, and in particular relates to a fracturing optimization design method for increasing production and reducing costs in shale oil reservoirs. Background Art

[0002] Horizontal well volume fracturing technology is the core technology for increasing the production of unconventional resources such as shale oil in North America. China has learned from the successful experience of volume transformation abroad, carried out reservoir exploration and field tests based on its own shale oil characteristics, and innovatively formed horizontal well subdivision and cutting volume fracturing technology, and achieved good production increase results. However, since 2020, the cliff-like drop in international oil prices has brought a huge impact on the large-scale and efficient development of shale oil. Shale oil development faces technical difficulties such as "increasing production, improving efficiency, and reducing costs", especially for shale oil reservoirs with low original formation pressure coefficient, low rock brittleness index, and low natural production capacity. It is very difficult to achieve large-scale and efficient development. Therefore, it is particularly important to carry out technical research around this type of shale oil reservoirs and form a fracturing optimization design method that can guide the creation of a new model for efficient development of shale oil.

[0003] For shale oil reservoirs with low original formation pressure coefficient, low rock brittleness index and low natural production capacity, in order to supplement formation energy, improve fracture control, reduce production decline and increase recovery, a variety of methods can be used for fracturing optimization design, including optimizing fracturing construction parameters, predicting fracture extension trajectory, evaluating reservoir compressibility, etc. At present, there are mainly the following methods for shale oil reservoir fracturing optimization design:

[0004] (1) Yang Zhaozhong et al. (A method for predicting crack extension and optimizing design parameters for dense-cut fracturing in horizontal wells, patent number: 202110822145.X) used the collected formation parameters, construction parameters, completion parameters, etc. to establish a pseudo-three-dimensional fluid-solid fully coupled model for multi-fracture extension in dense-cut fracturing in horizontal wells, to accurately predict the fracture extension trajectory and accurately calculate the fracture geometric parameters, ultimately achieving the purpose of optimizing fracturing design parameters and increasing single-well production. However, no targeted fracturing optimization design method was proposed for the efficient development of large platforms.

[0005] (2) Lu Cong et al. (A method for optimizing the design of hydraulic fracturing in tight oil and gas reservoirs based on compressibility evaluation, patent number: 202010124893.6) used the basic geological parameters of the reservoir fracturing layer to calculate the reservoir compressibility index, and based on the index, optimized the perforation position, adjusted the fracturing fluid viscosity and proppant density to ensure that the hydraulic fracturing formed a complex fracture network and achieved effective placement of the proppant in the fractures. However, the influence of the fracturing construction parameters on the final production capacity was ignored.

[0006] (3) Lei Qun et al. (Lei Qun, Weng Dingwei, Guan Baoshan, Mu Lijun, Xu Yun, Wang Zhen, Guo Ying, Li Shuai. Tight oil reservoir reconstruction method based on fracture-controlled fracturing optimization design [J]. Petroleum Exploration and Development, 2020, 47(03): 592-599) proposed a tight oil reservoir reconstruction method based on fracture-controlled fracturing optimization design, taking into account the characteristics of stress interference caused by the expansion of multiple fractures, matrix wettability reversal caused by the entry of large-scale fracturing fluid into the reservoir, and changes in reservoir physical properties. By optimizing the fracture spacing, the number of clusters in a segment, the construction scale, the fracture expansion state, etc., the maximum utilization of the reserves in the well control unit is achieved. However, the reconstruction idea of ​​this method is mainly to optimize the fracturing transformation parameters and increase the fracture-controlled reserves, ignoring the technical and economic optimization of the platform.

[0007] The above three methods have not considered the contradiction between increasing production and reducing costs under the conditions of low-cost development strategy, and have not studied and formed a shale oil reservoir fracturing optimization design method based on comprehensive consideration of production increase concepts, main processes, and parameter optimization. Summary of the invention

[0008] The present invention provides a shale oil reservoir production increase and cost reduction fracturing optimization design method, the purpose of which is to provide a fracturing design method that can not only solve the problem of increasing production in shale oil reservoirs with low original formation pressure coefficient, low rock brittleness index and low natural productivity, but also balance the contradiction between production increase and cost reduction under the new situation of shale oil development.

[0009] To achieve the above object, the technical solution adopted by the present invention is:

[0010] A shale oil reservoir production increase and cost reduction fracturing optimization design method comprises the following steps:

[0011] Step 1: Combine high-density subdivision cutting and cracking, replenish formation energy with clear water before fracturing, and use nano-oil displacement variable viscosity slippery water fracturing fluid as an oil displacement agent to accelerate the infiltration and replacement, optimize the fracture spacing, the amount of liquid entering the ground in a single section, and the time range of well blocking;

[0012] Step 2: Use fully soluble metal ball seats to perform volumetric fracturing of long horizontal wells, use flow-limiting perforation to distribute slits and temporary plugging to shift to soft clustering, and optimize the parameters of horizontal well perforation cluster number, single cluster hole number, single hole flow rate, plugging agent dosage, and temporary plugging level;

[0013] Step 3: Combine the statistical regression of mine big data, comprehensive calculation of single well EUR and sensitivity analysis of economic indicators to establish an economic evaluation system for key engineering transformation parameters and determine the economic optimal range of each key engineering transformation parameter;

[0014] Step 4: Use a large well cluster multi-layer system to set up three-dimensional wells, establish a horizontal reservoir segmentation and grading evaluation standard, select the horizontal sweet spot of each horizontal well according to the reservoir segmentation and grading evaluation results, and carry out large-scale segmented multi-cluster volume fracturing stimulation respectively;

[0015] Step 5: Based on the results obtained from steps 1 to 5, conduct targeted shale oil reservoir fracturing optimization design to increase production and reduce costs in the target block.

[0016] The specific method of obtaining the crack spacing range by high-density subdivision cutting and slitting in step 1 is as follows:

[0017] Step 1: By inputting reservoir boundary conditions, ground stress, elastic modulus, Poisson's ratio, permeability, porosity, fracturing fluid viscosity, filtration coefficient, construction displacement, pumping time, and fracture location parameters into the three-dimensional finite element analysis software 3D-FEM, a multi-cluster fracture expansion map of horizontal wells in shale oil reservoirs with different fracture spacings is obtained. The fracture spacing that forms the complex fracture network with the largest contact area with the reservoir is selected through the fracture expansion map;

[0018] Step 2: Calculate the effective seepage distance of the matrix using the following one-dimensional linear seepage pressure distribution equation (1) for low permeability reservoirs, and select the fracture spacing that minimizes the seepage distance of the fluid in the matrix;

[0019]

[0020] Where:

[0021] P——formation pressure, MPa;

[0022] Pe——original formation pressure, MPa;

[0023] Pw——bottom hole pressure, MPa;

[0024] Pc——casing pressure, MPa;

[0025] G——starting pressure gradient, MPa / m;

[0026] s——skin factor, the pollution factor caused by the change of permeability in the near-wellbore area;

[0027] x——the distance from the bottom of the horizontal wellbore, m;

[0028] L——horizontal well length, m;

[0029] Step 3: Use Mangrove fracturing software to establish a multi-cluster fracturing complex fracture network model, simulate the relationship between different fracture spacing and production when the horizontal section length is certain, and select the fracture spacing with the largest cumulative production;

[0030] Step 4: Use the intersection of the crack spacing in steps 1 to 3 as the crack spacing range for high-density subdivision cutting and slitting.

[0031] The specific method for supplementing the formation energy with pre-pressure water in step 1 to obtain the range of liquid volume entering the ground in a single stage is as follows:

[0032] Step 1: Obtain and analyze microseismic monitoring results, establish a relationship chart between the amount of liquid entering the ground in a single section and the length of the fracture zone, and select the amount of liquid entering the ground in a single section that meets the fracture creation requirements under the corresponding well spacing conditions according to the principle of full fracture coverage;

[0033] Step 2: Based on the single-stage liquid volume obtained in the first step, the relationship between the liquid volume and the formation pressure in reservoir engineering (2) is used to calculate the single-stage liquid volume required to increase the formation pressure coefficient to a preset value under the corresponding well spacing conditions, and the increment of the single-stage liquid volume that can supplement the formation energy is selected;

[0034] ΔV=C t ·V·ΔP (2)

[0035] Where:

[0036] V——fracture transformation volume-in-ground fluid volume, m 3 ;

[0037] Ct——comprehensive compression coefficient, MPa -1 ;

[0038] ΔV——the amount of liquid to be added, m 3 ;

[0039] ΔP——Increased formation pressure, MPa.

[0040] Step 3: Superimpose the single-stage liquid volume entered into the ground obtained in the first step and the increment of the single-stage liquid volume entered into the ground obtained in the second step, that is, obtain the liquid volume entered into the ground for replenishing formation energy with clear water before pressure.

[0041] The specific method for accelerating the imbibition displacement of the oil displacement agent in step 1 to obtain the time range of the well being blocked is as follows:

[0042] Step 1: Use nuclear magnetic resonance and imaging systems to conduct static imbibition experiments on horizontal well cores, establish imbibition velocity and time relationship charts, imbibition recovery rate and time relationship charts, and select the well-clogging time when the imbibition effect reaches equilibrium;

[0043] Step 2: Use the mathematical analysis software Matlab to simulate the imbibition process of the fracturing fluid in the matrix, establish a graph of the relationship between the well blocking time and the invasion distance, and select the well blocking time when the fracturing fluid invasion distance reaches a balance;

[0044] Step 3: Take the intersection of the well-clogging time obtained in the first and second steps as the well-clogging time range for accelerating the oil-water replacement efficiency by using nano-oil-displacing variable-viscosity slippery water fracturing fluid.

[0045] The specific method of the flow-limiting perforation dense seam in step 2 adopts the following steps:

[0046] Step 1: Obtain the operation displacement, number of perforations, diameter of perforations, friction parameters of perforations and near-wellbore areas, and input the parameters into Fracpro PT fracturing software to calculate perforation friction;

[0047] Step 2: Draw the calculation chart of hole friction resistance under different displacement and hole number;

[0048] Step 3: According to the range of inter-cluster stress difference, use current limiting to overcome the inter-cluster stress difference and select the number of single-segment clusters, the number of single-cluster holes and the single-hole flow value.

[0049] The specific method of temporary blocking and soft clustering in step 2 is as follows:

[0050] Step 1: Obtain the mine temporary plugging construction data and temporary plugging steering physical model test data;

[0051] Step 2: Based on the data obtained in the first step, establish a distribution chart of the amount of temporary plugging agent added and the temporary plugging pressure increase value;

[0052] Step 3: Based on the distribution chart of temporary plugging agent addition amount and temporary plugging pressure rise value obtained in step 2, the average plugging agent dosage corresponding to the temporary plugging pressure rise value ≥ 10MPa is used as the single-stage temporary plugging agent addition amount;

[0053] Step 4: Use numerical simulation software Meyer to simulate the fracture morphology after temporary plugging and fracturing at different levels under different cluster numbers, and select the single-stage temporary plugging level.

[0054] The detailed process of establishing the economic evaluation system of key engineering transformation parameters by combining the statistical regression of mine big data, comprehensive calculation of single well EUR and sensitivity analysis of economic indicators in step 3 is as follows:

[0055] Step 1: Collect the number of sections, number of clusters, fracture density, amount of liquid entering the ground, amount of sand added, liquid inflow intensity, sand addition intensity, displacement and production data of the engineering transformation parameters of shale oil horizontal wells in the mine, and establish the relationship chart between each engineering transformation parameter and the cumulative oil production of the 100-meter horizontal section in half a year, analyze the positive correlation between each engineering transformation parameter and the cumulative oil production of the 100-meter horizontal section in half a year, and select the top three engineering transformation parameters with positive correlation as the key engineering transformation parameters;

[0056] Step 2: Based on the key engineering transformation parameters obtained in the first step, the economically effective recoverable reserves of a single well under different key engineering transformation parameters are calculated, and a relationship chart between each key engineering transformation parameter and the economically effective recoverable reserves of a single well is established;

[0057] Step 3: Based on the relationship between the key engineering transformation parameters and the economically effective recoverable reserves of a single well obtained in the second step, establish an economic recommendation chart for different key engineering transformation parameters, and select the area corresponding to the technical and economic balance point of each parameter, which is the interval range for economic maximization of each parameter.

[0058] In step 4, the horizontal reservoir segmentation and classification evaluation criteria are established, and the specific method for selecting the horizontal segment sweet spot is as follows:

[0059] Step 1: Obtain logging interpretation data for the entire horizontal well section, including depth, vertical depth, acoustic time difference, density, gamma, shale content, effective porosity, and oil saturation;

[0060] Step 2: Input the parameters obtained in the first step into Fracpro PT fracturing software to calculate rock mechanics parameters and obtain the minimum horizontal principal stress and brittleness index parameters;

[0061] Step 3: Based on the reservoir quality parameters effective porosity and oil saturation in the first step and the engineering quality parameters minimum horizontal principal stress and brittleness index in the second step, establish the evaluation standard for horizontal reservoir segmentation and classification;

[0062] Step 4: Select the horizontal sweet spot of the target well according to the horizontal reservoir segmentation and classification evaluation criteria.

[0063] The horizontal reservoir segmentation and grading evaluation standard is to divide the reservoir quality into three levels of I, II, and III, and the engineering quality into three levels of A, B, and C according to the effective porosity, oil saturation, minimum horizontal principal stress and brittleness index. When the reservoir quality is I and the engineering quality is A, it indicates that the overall quality is good; when the reservoir quality is III or the engineering quality is C, it indicates that the overall quality is poor; the rest indicates that the overall quality is medium.

[0064] Beneficial effects:

[0065] The present invention adopts high-density subdivision cutting to create fractures + pre-pressure clear water to supplement formation energy + oil-displacing agent to accelerate the absorption and replacement to obtain the fracture spacing, single-stage liquid volume entering the ground, and well blocking time range; adopts soluble ball seat hard isolation + flow-limiting perforation dense seams + temporary plugging and turning soft clustering to obtain the parameters of perforation cluster number, single cluster hole number, single hole flow, plugging agent addition, and temporary plugging level; combines the statistical regression of mine big data + single well EUR comprehensive measurement + economic indicator sensitivity analysis to determine the economic optimal range of key engineering transformation parameters; selects the horizontal section sweet spot by establishing a horizontal section reservoir segmentation and grading evaluation standard; and adopts the steps of targeted shale oil reservoir production increase and cost reduction fracturing optimization design in the target block, which not only solves the problem of production increase of shale oil reservoirs with low original formation pressure coefficient, low rock brittleness index and low natural productivity, but also balances the contradiction between production increase and cost reduction under the new situation of shale oil development, and has broad applicability.

[0066] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0068] Figure 1 It is a flow chart of the present invention.

[0069] Figure 2 This is a diagram showing the cumulative oil production changes under different fracture spacings when the horizontal section length is 80 m in a specific embodiment of the present invention.

[0070] Figure 3 This is a relationship diagram between the amount of liquid entering the ground in a single section of a horizontal well and the length of the fracture zone in a specific embodiment of the present invention.

[0071] Figure 4 It is a relationship diagram between the imbibition speed and the imbibition time in a specific embodiment of the present invention.

[0072] Figure 5 It is a relationship diagram between the imbibition recovery rate and the imbibition time in a specific embodiment of the present invention.

[0073] Figure 6 It is a relationship diagram between the well blocking time and the invasion distance in a specific embodiment of the present invention.

[0074] Figure 7 This is a calculation chart of eyelet friction under different displacements and eyelet numbers in a specific embodiment of the present invention.

[0075] Figure 8 It is a distribution diagram of the amount of temporary plugging agent added and the temporary plugging pressure increase value in a specific embodiment of the present invention.

[0076] Fig. 9 This is a relationship diagram between fracture density and single well EUR in a specific embodiment of the present invention.

[0077] Fig.10 It is a relationship diagram between the liquid injection intensity and the single well EUR in a specific embodiment of the present invention.

[0078] Fig.11 This is a graph showing the relationship between sand addition intensity and single well EUR in a specific embodiment of the present invention.

[0079] Fig.12This is a recommended chart for economic optimization of crack density in a specific embodiment of the present invention.

[0080] Fig.13 This is a recommended chart for economic liquid inlet strength in a specific embodiment of the present invention.

[0081] Fig.14 It is a recommended plate for economical addition of sand strength in a specific embodiment of the present invention.

[0082] Fig.15 It is a schematic diagram of three-dimensional development of shale oil reservoirs in a specific embodiment of the present invention. DETAILED DESCRIPTION

[0083] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0084] Embodiment 1:

[0085] according to Figure 1 A shale oil reservoir production increase and cost reduction fracturing optimization design method is shown, comprising the following steps:

[0086] Step 1: Combine high-density subdivision cutting and cracking, replenish formation energy with clear water before fracturing, and use nano-oil displacement variable viscosity slippery water fracturing fluid as an oil displacement agent to accelerate the infiltration and replacement, optimize the fracture spacing, the amount of liquid entering the ground in a single section, and the time range of well blocking;

[0087] Step 2: Use fully soluble metal ball seats to perform volumetric fracturing of long horizontal wells, use flow-limiting perforation to distribute slits and temporary plugging to shift to soft clustering, and optimize the parameters of horizontal well perforation cluster number, single cluster hole number, single hole flow rate, plugging agent dosage, and temporary plugging level;

[0088] Step 3: Combine the statistical regression of mine big data, comprehensive calculation of single well EUR and sensitivity analysis of economic indicators to establish an economic evaluation system for key engineering transformation parameters and determine the economic optimal range of each key engineering transformation parameter;

[0089] Step 4: Use a large well cluster multi-layer system to set up three-dimensional wells, establish a horizontal reservoir segmentation and grading evaluation standard, select the horizontal sweet spot of each horizontal well according to the reservoir segmentation and grading evaluation results, and carry out large-scale segmented multi-cluster volume fracturing stimulation respectively;

[0090] Step 5: Based on the results obtained from steps 1 to 5, conduct targeted shale oil reservoir fracturing optimization design to increase production and reduce costs in the target block.

[0091] The adoption of the technical solution of the present invention not only solves the problem of increasing production of shale oil reservoirs with low original formation pressure coefficient, low rock brittleness index and low natural productivity, but also balances the contradiction between increasing production and reducing costs under the new situation of shale oil development, and has broad applicability.

[0092] The EUR is the abbreviation of Estimated Ultimate Recovery, and the Chinese meaning of EUR is estimated ultimate recovery.

[0093] Embodiment 2:

[0094] according to Figure 1 The method for optimizing the design of fracturing to increase production and reduce costs in a shale oil reservoir shown in the embodiment is different from that in the first embodiment in that the specific method for obtaining the range of the fracture spacing by high-density segmented cutting and slitting in the first step is as follows:

[0095] Step 1: By inputting reservoir boundary conditions, ground stress, elastic modulus, Poisson's ratio, permeability, porosity, fracturing fluid viscosity, filtration coefficient, construction displacement, pumping time, and fracture location parameters into the three-dimensional finite element analysis software 3D-FEM, a multi-cluster fracture expansion map of horizontal wells in shale oil reservoirs with different fracture spacings is obtained. The fracture spacing that forms the complex fracture network with the largest contact area with the reservoir is selected through the fracture expansion map;

[0096] Step 2: Calculate the effective seepage distance of the matrix using the following one-dimensional linear seepage pressure distribution equation (1) for low permeability reservoirs, and select the fracture spacing that minimizes the seepage distance of the fluid in the matrix;

[0097]

[0098] Where:

[0099] P——formation pressure, MPa;

[0100] Pe——original formation pressure, MPa;

[0101] Pw——bottom hole pressure, MPa;

[0102] Pc——casing pressure, MPa;

[0103] G——starting pressure gradient, MPa / m;

[0104] s——skin factor, the pollution factor caused by the change of permeability in the near-wellbore area;

[0105] x——the distance from the bottom of the horizontal wellbore, m;

[0106] L——horizontal well length, m;

[0107] Step 3: Use Mangrove fracturing software to establish a multi-cluster fracturing complex fracture network model, simulate the relationship between different fracture spacing and production when the horizontal section length is certain, and select the fracture spacing with the largest cumulative production;

[0108] Step 4: Use the intersection of the crack spacing in steps 1 to 3 as the crack spacing range for high-density subdivision cutting and slitting.

[0109] The present invention utilizes complex fracture expansion, reservoir engineering, numerical simulation and other methods to comprehensively optimize the fracture spacing with the goal of "maximum contact area, shortest seepage distance, and highest cumulative production".

[0110] The nano-oil-displacing viscous and slippery water fracturing fluid in this embodiment uses the nano-oil-displacing viscous and slippery water fracturing fluid with patent number US201815956617. The nano-oil-displacing viscous and slippery water fracturing fluid targets the shale reservoir imbibition displacement mechanism, has the advantages of variable viscosity sand carrying, nano-oil displacement, online mixing, and circulating liquid preparation, and enhances the micro-nano pore imbibition oil displacement efficiency, providing conditions for the dense shale oil fluid displacement in the reservoir, and becoming another important tool for the shale oil horizontal well volume fracturing 2.0 process.

[0111] High-density subdivision cutting and framing is an optimized framing method for horizontal well volume fracturing. High-density subdivision cutting of horizontal sections is achieved by densely arranging framing with multiple clusters of perforations, thereby increasing the degree of framing network coverage. In order to achieve the best effect of framing network coverage, this embodiment optimizes the optimal fracture spacing range of high-density subdivision cutting and framing, and realizes the one-time full utilization of the reservoir.

[0112] The three-dimensional finite element analysis software 3D-FEM and the fracturing design software Mangrove are both existing technologies. The 3D-FEM finite element analysis software integrates multiple data comprehensive fracture modeling functions and is used to analyze and simulate the initiation and expansion of natural fractures and three-dimensional composite fractures in layered reservoirs.

[0113] Embodiment three:

[0114] according to Figure 1 The method for optimizing the design of fracturing to increase production and reduce costs in a shale oil reservoir shown in the embodiment is different from that in the first embodiment in that the specific method for supplementing the formation energy with clear water before fracturing in the first step to obtain the range of the liquid volume entering the ground in a single stage is as follows:

[0115] Step 1: Obtain and analyze microseismic monitoring results, establish a relationship chart between the amount of liquid entering the ground in a single section and the length of the fracture zone, and select the amount of liquid entering the ground in a single section that meets the fracture creation requirements under the corresponding well spacing conditions according to the principle of full fracture coverage;

[0116] Step 2: Based on the single-stage liquid volume obtained in the first step, the relationship between the liquid volume and the formation pressure in reservoir engineering (2) is used to calculate the single-stage liquid volume required to increase the formation pressure coefficient to a preset value under the corresponding well spacing conditions, and the increment of the single-stage liquid volume that can supplement the formation energy is selected;

[0117] ΔV=C t ·V·ΔP (2)

[0118] Where:

[0119] V——fracture transformation volume-in-ground fluid volume, m 3 ;

[0120] Ct——comprehensive compression coefficient, MPa -1 ;

[0121] ΔV——the amount of liquid to be added, m 3 ;

[0122] ΔP——Increased formation pressure, MPa.

[0123] Step 3: Superimpose the single-stage liquid volume entered into the ground obtained in the first step and the increment of the single-stage liquid volume entered into the ground obtained in the second step, that is, obtain the liquid volume entered into the ground for replenishing formation energy with clear water before pressure.

[0124] The present invention utilizes microseismic monitoring result analysis and reservoir engineering methods to comprehensively optimize the range of liquid volume entering the ground with the goal of "increasing fracture transformation volume and replenishing deep formation energy".

[0125] The microseismic monitoring technology in this embodiment is a crack monitoring method in the prior art.

[0126] Embodiment 4:

[0127] according to Figure 1 The method for optimizing the design of fracturing for increasing production and reducing costs in a shale oil reservoir shown in the embodiment is different from that in the first embodiment in that: the specific method for accelerating the imbibition displacement of the oil displacement agent in the first step to obtain the time range for blocking the well is as follows:

[0128] Step 1: Use nuclear magnetic resonance and imaging systems to conduct static imbibition experiments on horizontal well cores, establish imbibition velocity and time relationship charts, imbibition recovery rate and time relationship charts, and select the well-clogging time when the imbibition effect reaches equilibrium;

[0129] Step 2: Use the mathematical analysis software Matlab to simulate the imbibition process of the fracturing fluid in the matrix, establish a graph of the relationship between the well blocking time and the invasion distance, and select the well blocking time when the fracturing fluid invasion distance reaches a balance;

[0130] Step 3: Take the intersection of the well-clogging time obtained in the first and second steps as the well-clogging time range for accelerating the oil-water replacement efficiency by using nano-oil-displacing variable-viscosity slippery water fracturing fluid.

[0131] The present invention utilizes high-pressure imbibition displacement experiments, numerical simulation analysis, mine field big data analysis and other methods to accelerate the oil-water displacement efficiency and comprehensively optimize the post-pressure well blocking time range of shale oil reservoirs.

[0132] Embodiment five:

[0133] according to Figure 1 The method for optimizing the design of fracturing to increase production and reduce costs in a shale oil reservoir shown in the embodiment is different from that in the first embodiment in that the specific method of densely distributing seams with limited flow perforations in the second step adopts the following steps:

[0134] Step 1: Obtain the operation displacement, number of perforations, diameter of perforations, friction parameters of perforations and near-wellbore areas, and input the parameters into Fracpro PT fracturing software to calculate perforation friction;

[0135] Step 2: Draw the calculation chart of hole friction resistance under different displacement and hole number;

[0136] Step 3: According to the range of inter-cluster stress difference, use current limiting to overcome the inter-cluster stress difference and select the number of single-segment clusters, the number of single-cluster holes and the single-hole flow value.

[0137] The present invention uses hydraulic fracturing design and analysis software Fracpro PT to calculate the perforation friction resistance, draws perforation friction resistance calculation charts under different displacements and perforation numbers, utilizes current limiting to overcome the stress difference between clusters, optimizes the number of single-stage clusters, the number of single-cluster holes and the single-hole flow rate, and effectively improves the fracture initiation efficiency in the segmented multi-cluster fracturing mode.

[0138] Fracpro PT in this embodiment is the English abbreviation of hydraulic fracturing design and analysis software, which is the prior art.

[0139] Embodiment six:

[0140] according to Figure 1 The method for optimizing the design of fracturing to increase production and reduce costs in a shale oil reservoir shown in the embodiment is different from that in the first embodiment in that the specific method of temporarily plugging and turning to soft clustering in the second step adopts the following steps:

[0141] Step 1: Obtain the mine temporary plugging construction data and temporary plugging steering physical model test data;

[0142] Step 2: Based on the data obtained in the first step, establish a distribution chart of the amount of temporary plugging agent added and the temporary plugging pressure increase value;

[0143] Step 3: Based on the distribution chart of temporary plugging agent addition amount and temporary plugging pressure rise value obtained in step 2, the average plugging agent dosage corresponding to the temporary plugging pressure rise value ≥ 10MPa is used as the single-stage temporary plugging agent addition amount;

[0144] Step 4: Use numerical simulation software Meyer to simulate the fracture morphology after temporary plugging and fracturing at different levels under different cluster numbers, and select the single-stage temporary plugging level.

[0145] According to the results of field tests on different temporary plugging parameters, physical model tests on temporary plugging of fractures, numerical simulation analysis, etc., the present invention optimizes the parameters of plugging agent dosage and temporary plugging level, thus providing support for the subsequent shale oil reservoir fracturing optimization design to improve the efficiency of multi-cluster fracture initiation.

[0146] The numerical simulation software Meyer in this embodiment is prior art.

[0147] Embodiment seven:

[0148] according to Figure 1 The method for optimizing the design of fracturing for increasing production and reducing costs in shale oil reservoirs shown in the figure is different from that in the first embodiment in that the detailed process of establishing the economic evaluation system of key engineering transformation parameters by combining the statistical regression of mine big data, the comprehensive calculation of single well EUR and the sensitivity analysis of economic indicators in step three is as follows:

[0149] Step 1: Collect the number of sections, number of clusters, fracture density, amount of liquid entering the ground, amount of sand added, liquid inflow intensity, sand addition intensity, displacement and production data of the engineering transformation parameters of shale oil horizontal wells in the mine, and establish the relationship chart between each engineering transformation parameter and the cumulative oil production of the 100-meter horizontal section in half a year, analyze the positive correlation between each engineering transformation parameter and the cumulative oil production of the 100-meter horizontal section in half a year, and select the top three engineering transformation parameters with positive correlation as the key engineering transformation parameters;

[0150] Step 2: Based on the key engineering transformation parameters obtained in the first step, the economically effective recoverable reserves of a single well under different key engineering transformation parameters are calculated, and a relationship chart between each key engineering transformation parameter and the economically effective recoverable reserves of a single well is established;

[0151] Step 3: Based on the relationship between the key engineering transformation parameters and the economically effective recoverable reserves of a single well obtained in the second step, establish an economic recommendation chart for different key engineering transformation parameters, and select the area corresponding to the technical and economic balance point of each parameter, which is the interval range for economic maximization of each parameter.

[0152] The technical solution of the present invention establishes an economic evaluation system for key engineering transformation parameters by designing "mine big data statistical regression + single well EUR comprehensive calculation + economic indicator sensitivity analysis", obtains the economic optimal range of key engineering transformation parameters, and fully considers the contradiction between increasing production and reducing costs under the conditions of low-cost development strategy, providing strong data support for the subsequent targeted shale oil reservoir production increase and cost reduction fracturing optimization design in the target blocks.

[0153] Embodiment eight:

[0154] according to Figure 1 The method for optimizing the design of fracturing to increase production and reduce costs for shale oil reservoirs shown in the embodiment is different from that in the first embodiment in that: in the step 4, a horizontal reservoir segmentation and classification evaluation standard is established, and the specific method for selecting the horizontal segment sweet spot is as follows:

[0155] Step 1: Obtain logging interpretation data for the entire horizontal well section, including depth, vertical depth, acoustic time difference, density, gamma, shale content, effective porosity, and oil saturation;

[0156] Step 2: Input the parameters obtained in the first step into Fracpro PT fracturing software to calculate rock mechanics parameters and obtain the minimum horizontal principal stress and brittleness index parameters;

[0157] Step 3: Based on the reservoir quality parameters effective porosity and oil saturation in the first step and the engineering quality parameters minimum horizontal principal stress and brittleness index in the second step, establish the evaluation standard for horizontal reservoir segmentation and classification;

[0158] Step 4: Select the horizontal sweet spot of the target well according to the horizontal reservoir segmentation and classification evaluation criteria.

[0159] Furthermore, the horizontal reservoir segmentation and grading evaluation standard is to divide the reservoir quality into three levels of I, II, and III, and divide the engineering quality into three levels of A, B, and C according to the effective porosity, oil saturation, minimum horizontal principal stress and brittleness index. When the reservoir quality is I and the engineering quality is A, it indicates that the overall quality is good; when the reservoir quality is III or the engineering quality is C, it indicates that the overall quality is poor; and the rest indicates that the overall quality is medium.

[0160] The specific standards for the horizontal reservoir segmentation and classification evaluation are as follows:

[0161]

[0162] In the table:

[0163] Φe——effective porosity, %;

[0164] So——oil saturation, %;

[0165] σh——minimum horizontal principal stress, MPa;

[0166] BI——brittleness index, %.

[0167] The technical solution of the present invention enables the subsequent targeted shale oil reservoir fracturing optimization design for increasing production and reducing costs in the target blocks, which not only comprehensively considers the production increase concept and the main process, but also refers to the parameter optimization results, thereby forming a high-quality shale oil reservoir fracturing optimization design solution, which can greatly improve the economic benefits.

[0168] Embodiment nine:

[0169] Reference Figure 1-Figure 15 , an application example of a fracturing optimization design method for increasing production and reducing costs in shale oil reservoirs.

[0170] The reservoir porosity of a certain oil reservoir block in my country is 4.6-13.2%, with an average of 10.5%, and the permeability is 0.01-1.25×10 -3 μm 2 , an average of 0.39×10 -3 μm 2 , crude oil saturation 38%, reservoir burial depth 1968m, initial formation pressure 24.3MPa, formation temperature 88.9℃, shale oil reservoir physical properties and oil content are poor, and the rock brittleness index is low, horizontal stress difference is large, natural fracture development is low, and single well production is low. The mine big data shows that the initial production of the block is 9.6t / d, and the annual cumulative oil production is 2380t. Based on the urgent form of shale oil scale efficiency development, it is urgent to carry out fracturing optimization design work to increase production and reduce costs.

[0171] This example provides a complete set of optimized design methods for fracturing to increase production and reduce costs in shale oil reservoirs. Its specific implementation includes practicing the concept of integrated development and production increase, supporting the main process technology, designing an economic evaluation system for key engineering transformation parameters, and proposing optimized design methods for fracturing to increase production and reduce costs in shale oil reservoirs.

[0172] 1. Practice the concept of integrated development and production increase through pressure-drive production: Starting from the three perspectives of high-density subdivision cutting and fracture creation, replenishing formation energy with clear water before pressure, and accelerating the absorption and replacement of oil displacement agents, key parameters such as fracture spacing, amount of liquid entering the ground, and well blocking time are optimized respectively.

[0173] (1) High-density subdivision cutting and seaming:

[0174] ① By inputting reservoir boundary conditions, geostress, elastic modulus, Poisson's ratio, permeability, porosity, fracturing fluid viscosity, filtration coefficient, construction displacement, pumping time, and fracture location parameters into the three-dimensional finite element analysis software 3D-FEM, the expansion of multiple clusters of fractures under different fracture spacings was simulated. The obtained multi-cluster fracture expansion diagram shows that when the fracture spacing is 5 to 10 m, the stress interference generated between fractures can increase the complexity of the fracture network, thereby increasing the contact area between the fractures and the reservoir, and the smaller the fracture spacing, the more obvious the stress interference.

[0175] ② Considering the matrix permeability, production pressure difference and starting pressure gradient of shale oil reservoir, the one-dimensional linear seepage pressure distribution equation of low permeability reservoir was used to calculate that the matrix permeability is in the range of 0.03-0.3mD, the effective seepage distance of shale oil reservoir matrix is ​​3-5m, and the optimized fracture spacing is 6-10m.

[0176] ③ The Mangrove fracturing software was used to establish a multi-cluster fracturing complex fracture network model to simulate the cumulative oil production when the horizontal section length was 80m and the fracture spacing was 2.5m, 5.0m, 10m, 15m, and 20m. The simulation results are as follows: Figure 2 As shown, it can be seen that the cumulative oil production is the highest when the fracture spacing is 5 to 10 m, and the shale oil can be fully transformed.

[0177] ④ Based on the above results, the optimal crack spacing range for high-density subdivision cutting and slitting is optimized to be 6 to 10 m.

[0178] (2) Clean water before pressure replenishes formation energy:

[0179] ① Obtain and analyze microseismic monitoring results, and establish a relationship chart between the amount of liquid entering the ground and the length of the fracture zone in a single section, such as Figure 3 As shown in Figure 2, according to the principle of full fracture coverage, the amount of liquid entering the ground in a single section needs to reach 600 to 1000 m when the well spacing is 400 to 600 m. 3 .

[0180] ②According to step (2)①, the single-stage liquid volume under the condition of 400-600m well spacing is 600-1000m 3 , using the reservoir engineering formula ΔV=C t ·V·ΔP calculation shows that when the formation energy within the fracture transformation volume reaches 1.2 times of the original formation pressure, the single-stage fluid volume under the corresponding well spacing conditions should increase by 300-500m 3 .

[0181] ③Combining the above results, the optimal single-stage liquid volume range for replenishing formation energy with clean water before pressure injection is 900-1500m 3 .

[0182] (3) Oil displacement agent accelerates the imbibition and replacement:

[0183] ①Use nuclear magnetic resonance and imaging system to carry out static imbibition experiment of horizontal well core, establish the relationship chart between imbibition velocity and imbibition time, and the relationship chart between imbibition recovery rate and imbibition time, such as Figure 4 and Figure 5 As shown, the results show that the imbibition effect can reach equilibrium in a short time, the imbibition effect weakens after 40 days, the imbibition rate and imbibition recovery rate do not change much, and the optimized wellbore sealing time for the imbibition effect to reach equilibrium is 40 to 60 days.

[0184] ② Use the mathematical analysis software Matlab to simulate the imbibition process of the fracturing fluid in the matrix and establish a chart showing the relationship between the wellbore time and the invasion distance, such as Figure 6 As shown, the results show that with the increase of well blocking time, the imbibition front of the fracturing fluid in the matrix continues to advance. When the well blocking time reaches 40 to 60 days, the invasion distance of the fracturing fluid changes slowly. The optimized well blocking time for the fracturing fluid invasion distance to reach equilibrium is 40 to 60 days.

[0185] ③ Based on the above results, the optimal well blocking time range for accelerating the oil-water replacement efficiency using the new nano-oil displacement variable viscosity slippery water fracturing fluid system is optimized to be 40 to 60 days.

[0186] 2. Main process technology of volume fracturing with soluble ball seat segmentation and cutting: Starting from the three angles of soluble ball seat hard isolation, flow-limiting perforation dense seams, and temporary plugging and turning to soft clustering, the parameters of horizontal well perforation cluster number, single cluster hole number, single hole flow rate, plugging agent dosage, and temporary plugging level are optimized respectively.

[0187] (1) Soluble ball seat hard isolation: Use fully soluble metal ball seats to perform subdivided cutting volume fracturing in long horizontal wells, achieve unlimited-stage fracturing of horizontal wells and rapid post-fracturing cleaning, and improve the engineering operation capacity of subdivided cutting volume fracturing.

[0188] (2) Flow-limiting perforation and dense seams: Obtain the construction displacement, number of perforation holes, diameter of perforation holes, and friction parameters of perforation holes and near-wellbore area, input the parameters into Fracpro PT fracturing software to calculate the perforation friction resistance, and draw the perforation friction resistance calculation chart under different displacement and number of holes, such as Figure 7 As shown in the figure, according to the inter-cluster stress difference range of 2-3 MPa, the inter-cluster stress difference is overcome by current limiting, and the number of clusters in a single section is optimized to be 8-12 clusters, the number of holes in a single cluster is 2-9 holes / cluster, and the flow rate of a single hole is 0.3-0.4m 3 / min.

[0189] (3) Temporary plugging and soft clustering: Based on the temporary plugging construction data of the mine and the temporary plugging and physical model test data, a distribution chart of the amount of temporary plugging agent added and the temporary plugging pressure rise value is established, such as Figure 8As shown in the figure, the average plugging agent dosage corresponding to the optimized temporary plugging boost value ≥10MPa is 25-45kg, which is the single-stage temporary plugging agent dosage; the numerical simulation software Meyer is used to simulate the fracture morphology after different levels of temporary plugging and fracturing under different cluster numbers (8-12 clusters), and the single-stage temporary plugging of 1-2 levels is optimized. When 8≤single-stage cluster number<10, level 1 temporary plugging is performed, and when the single-stage cluster number is ≥10, level 2 temporary plugging is performed.

[0190] 3. Establish an economic evaluation system for key engineering transformation parameters: Optimize the economic optimal range of key engineering transformation parameters from three perspectives: statistical regression of mine big data, comprehensive calculation of single well EUR, and sensitivity analysis of economic indicators.

[0191] (1) Statistical regression of big data of mines: The number of sections, number of clusters, fracture density, amount of liquid entering the ground, amount of sand added, liquid injection intensity, sand addition intensity, displacement and production data of the engineering transformation parameters of shale oil horizontal wells in the mines were collected, and the cumulative oil production of a hundred-meter horizontal section in half a year was established. The relationship between each engineering transformation parameter and the cumulative oil production of a hundred-meter horizontal section in half a year was analyzed, and the positive correlation between each engineering transformation parameter and the cumulative oil production of a hundred-meter horizontal section in half a year was analyzed. The top three engineering transformation parameters with the highest positive correlation were selected as the key engineering transformation parameters. The results showed that the three engineering transformation parameters with the strongest positive correlation were fracture density, liquid injection intensity and sand addition intensity.

[0192] (2) Comprehensive calculation of single well EUR: Based on big data analysis, the economically effective recoverable reserves (EUR) of a single well under different fracture density, liquid inflow intensity, and sand addition intensity conditions are calculated respectively, and a relationship chart between the three parameters and the economically effective recoverable reserves (EUR) of a single well is established, such as Fig. 9 , Fig.10 and Fig.11 shown.

[0193] (3) Economic indicator sensitivity analysis: Based on the relationship between fracture density, fluid inflow intensity, sand addition intensity and economically effective recoverable reserves of a single well obtained in step (2), economic recommendation charts for fracture density, fluid inflow intensity and sand addition intensity were established with technical and economic optimization as the core. The area corresponding to the technical and economic balance point of each parameter was selected as the economic optimal range. The optimization results were fracture density of 9 to 11 per 100 m, fluid inflow intensity of 20 to 25 m 3 / m, sand adding strength 3.5~4.0t / m, such as Fig.12 , Fig.13 and Fig.14 shown.

[0194] 4. Propose an optimized design method for fracturing to increase production and reduce costs in shale oil reservoirs: Based on the optimization results of the production increase concept, main process, and engineering parameters, a targeted optimized design method for fracturing to increase production and reduce costs in shale oil reservoirs in the target block is proposed.

[0195] (1) Stereoscopic well layout combined with horizontal section sweet spot optimization: adopt large well cluster multi-layer stereoscopic well layout, such as Fig.15 As shown in Figure 1, the rock mechanical parameters are calculated based on the logging interpretation data of the entire horizontal well section, and a segmented grading evaluation standard that considers both the reservoir quality (RQ) and engineering quality (CQ) of the horizontal well is established, as shown in Table 1. According to the comprehensive evaluation results: when the reservoir quality is I and the engineering quality is A, it indicates good comprehensive quality, when the reservoir quality is III or the engineering quality is C, it indicates poor comprehensive quality, and the rest indicates medium comprehensive quality, the horizontal sweet spot of the target well is selected. The shale oil reservoir is utilized on a large scale through three-dimensional horizontal well drilling and large-scale segmented multi-cluster volume fracturing transformation.

[0196] Table 1 Evaluation criteria for reservoir segmentation and classification of shale oil horizontal wells in target blocks

[0197]

[0198] Note: Φe——effective porosity, %; So——oil saturation, %; σh——minimum horizontal principal stress, MPa; BI——brittleness index, %.

[0199] (2) Propose an optimized design method for fracturing to increase production and reduce costs in the target block: Based on the optimization results of the three aspects of comprehensive development and production increase concept, main process technology, and key economic parameters, the block is optimized to use a large well cluster multi-layer three-dimensional well layout to improve the reservoir utilization, use a fully soluble metal ball seat to perform long horizontal well subdivision cutting volume fracturing, and cooperate with temporary plugging measures to improve the effectiveness of fracturing in densely cut multi-cluster fractures. Among them, the preferred range of transformation parameters for the target block is: 8 to 12 clusters per segment, 6 to 10 m fracture spacing, and 900 to 1500 m of liquid flow per segment. 3 , crack density 9 to 11 / 100m, liquid penetration strength 20 to 25m 3 / m, sand addition intensity 3.5-4.0t / m; the preferred range of perforation parameters in the target block is: single cluster hole number 2-9 holes / cluster, single hole flow rate 0.3-0.4m 3 / min; the preferred range of temporary plugging parameters in the target block is: single-stage temporary plugging agent dosage is 25-45kg, single-stage temporary plugging is 1-2 levels; the preferred range of well blocking time in the target block is: well blocking for 40-60 days. Finally, according to the horizontal segment reservoir segmentation and grading evaluation standard that takes into account both reservoir quality (RQ) and engineering quality (CQ), the horizontal segment sweet spot is selected, and the optimized design parameters are used for reservoir transformation. The mine big data shows that after the fracturing optimization design, the initial production of the block increased from 9.6t / d to 18t / d, the annual cumulative oil production increased from 2380t to 4931t, and the predicted ultimate recoverable reserves (EUR) of a single well increased from 1.8×10 4 t increased to 2.6×10 4t, the cost of single well fracturing dropped from 20 million yuan in the early stage to 15 million yuan, and the full cost per barrel of oil dropped from 60 US dollars to 40 US dollars, with an overall economic benefit of nearly 260 million yuan.

[0200] In the absence of conflicts, technicians in this field can combine the relevant technical features in the above examples according to actual conditions to achieve corresponding technical effects. The specific combinations are not described here one by one.

[0201] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0202] In addition, the descriptions of "first", "second", etc. in the present invention are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features.

[0203] The above are only preferred embodiments of the present invention. The present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features disclosed herein. Any simple modification, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A fracturing optimization design method for increasing production and reducing costs in shale oil reservoirs. Features: The following steps are included: Step 1: Combine high-density subdivision cutting and cracking, replenish formation energy with clear water before fracturing, and use nano-oil displacement variable viscosity slippery water fracturing fluid as an oil displacement agent to accelerate the infiltration and replacement, optimize the fracture spacing, the amount of liquid entering the ground in a single section, and the time range of well blocking; Step 2: Use fully soluble metal ball seats to perform volumetric fracturing of long horizontal wells, use flow-limiting perforation to distribute slits and temporary plugging to shift to soft clustering, and optimize the parameters of horizontal well perforation cluster number, single cluster hole number, single hole flow rate, plugging agent dosage, and temporary plugging level; Step 3: Combine the statistical regression of mine big data, comprehensive calculation of single well EUR and sensitivity analysis of economic indicators to establish an economic evaluation system for key engineering transformation parameters and determine the economic optimal range of each key engineering transformation parameter; Step 4: Use a large well cluster multi-layer system to set up three-dimensional wells, establish a horizontal reservoir segmentation and grading evaluation standard, select the horizontal sweet spot of each horizontal well according to the reservoir segmentation and grading evaluation results, and carry out large-scale segmented multi-cluster volume fracturing stimulation respectively; Step 5: Based on the results obtained from steps 1 to 5, conduct targeted shale oil reservoir fracturing optimization design to increase production and reduce costs in the target block.

2. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 1, Features: The specific method of obtaining the crack spacing range by high-density subdivision cutting and slitting in step 1 is as follows: Step 1: By inputting reservoir boundary conditions, ground stress, elastic modulus, Poisson's ratio, permeability, porosity, fracturing fluid viscosity, filtration coefficient, construction displacement, pumping time, and fracture location parameters into the three-dimensional finite element analysis software 3D-FEM, a multi-cluster fracture expansion map of horizontal wells in shale oil reservoirs with different fracture spacings is obtained. The fracture spacing that forms the complex fracture network with the largest contact area with the reservoir is selected through the fracture expansion map; Step 2: Calculate the effective seepage distance of the matrix using the following one-dimensional linear seepage pressure distribution equation (1) for low permeability reservoirs, and select the fracture spacing that minimizes the seepage distance of the fluid in the matrix; Where: P——formation pressure, MPa; Pe——original formation pressure, MPa; Pw——bottom hole pressure, MPa; Pc——casing pressure, MPa; G——starting pressure gradient, MPa / m; s——skin factor, the pollution factor caused by the change of permeability in the near-wellbore area; x——the distance from the bottom of the horizontal wellbore, m; L——horizontal well length, m; Step 3: Use Mangrove fracturing software to establish a multi-cluster fracturing complex fracture network model, simulate the relationship between different fracture spacing and production when the horizontal section length is certain, and select the fracture spacing with the largest cumulative production; Step 4: Use the intersection of the crack spacing in steps 1 to 3 as the crack spacing range for high-density subdivision cutting and slitting.

3. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 1, Features: The specific method for supplementing the formation energy with pre-pressure water in step 1 to obtain the range of liquid volume entering the ground in a single stage is as follows: Step 1: Obtain and analyze microseismic monitoring results, establish a relationship chart between the amount of liquid entering the ground in a single section and the length of the fracture zone, and select the amount of liquid entering the ground in a single section that meets the fracture creation requirements under the corresponding well spacing conditions according to the principle of full fracture coverage; Step 2: Based on the single-stage liquid volume obtained in the first step, the relationship between the liquid volume and the formation pressure in reservoir engineering (2) is used to calculate the single-stage liquid volume required to increase the formation pressure coefficient to a preset value under the corresponding well spacing conditions, and the increment of the single-stage liquid volume that can supplement the formation energy is selected; ΔV=C t ·V·ΔP (2) Where: V——fracture transformation volume-in-ground fluid volume, m 3 ; Ct——comprehensive compression coefficient, MPa -1 ; ΔV——the amount of liquid to be added, m 3 ; ΔP——Increased formation pressure, MPa. Step 3: Superimpose the single-stage liquid volume entered into the ground obtained in the first step and the increment of the single-stage liquid volume entered into the ground obtained in the second step, that is, obtain the liquid volume entered into the ground for replenishing formation energy with clear water before pressure.

4. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 1, Features: The specific method for accelerating the imbibition displacement of the oil displacement agent in step 1 to obtain the time range of the well being blocked is as follows: Step 1: Use nuclear magnetic resonance and imaging systems to conduct static imbibition experiments on horizontal well cores, establish imbibition velocity and time relationship charts, imbibition recovery rate and time relationship charts, and select the well-clogging time when the imbibition effect reaches equilibrium; Step 2: Use the mathematical analysis software Matlab to simulate the imbibition process of the fracturing fluid in the matrix, establish a graph of the relationship between the well blocking time and the invasion distance, and select the well blocking time when the fracturing fluid invasion distance reaches a balance; Step 3: Take the intersection of the well-clogging time obtained in the first and second steps as the well-clogging time range for accelerating the oil-water replacement efficiency by using nano-oil-displacing variable-viscosity slippery water fracturing fluid.

5. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 1, Features: The specific method of the flow-limiting perforation dense seam in step 2 adopts the following steps: Step 1: Obtain the operation displacement, number of perforations, diameter of perforations, friction parameters of perforations and near-wellbore areas, and input the parameters into Fracpro PT fracturing software to calculate perforation friction; Step 2: Draw the calculation chart of hole friction resistance under different displacement and hole number; Step 3: According to the range of inter-cluster stress difference, use current limiting to overcome the inter-cluster stress difference and select the number of single-segment clusters, the number of single-cluster holes and the single-hole flow value.

6. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 1, Features: The specific method of temporary blocking and soft clustering in step 2 is as follows: Step 1: Obtain the mine temporary plugging construction data and temporary plugging steering physical model test data; Step 2: Based on the data obtained in the first step, establish a distribution chart of the amount of temporary plugging agent added and the temporary plugging pressure increase value; Step 3: Based on the distribution chart of temporary plugging agent addition amount and temporary plugging pressure rise value obtained in step 2, the average plugging agent dosage corresponding to the temporary plugging pressure rise value ≥ 10MPa is used as the single-stage temporary plugging agent addition amount; Step 4: Use numerical simulation software Meyer to simulate the fracture morphology after temporary plugging and fracturing at different levels under different cluster numbers, and select the single-stage temporary plugging level.

7. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 1, Features: The detailed process of establishing the economic evaluation system of key engineering transformation parameters by combining the statistical regression of mine big data, comprehensive calculation of single well EUR and sensitivity analysis of economic indicators in step 3 is as follows: Step 1: Collect the number of sections, number of clusters, fracture density, amount of liquid entering the ground, amount of sand added, liquid inflow intensity, sand addition intensity, displacement and production data of the engineering transformation parameters of shale oil horizontal wells in the mine, and establish the relationship chart between each engineering transformation parameter and the cumulative oil production of the 100-meter horizontal section in half a year, analyze the positive correlation between each engineering transformation parameter and the cumulative oil production of the 100-meter horizontal section in half a year, and select the top three engineering transformation parameters with positive correlation as the key engineering transformation parameters; Step 2: Based on the key engineering transformation parameters obtained in the first step, the economically effective recoverable reserves of a single well under different key engineering transformation parameters are calculated, and a relationship chart between each key engineering transformation parameter and the economically effective recoverable reserves of a single well is established; Step 3: Based on the relationship between the key engineering transformation parameters and the economically effective recoverable reserves of a single well obtained in the second step, establish an economic recommendation chart for different key engineering transformation parameters, and select the area corresponding to the technical and economic balance point of each parameter, which is the interval range for economic maximization of each parameter.

8. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 1, Features: In step 4, the horizontal reservoir segmentation and classification evaluation criteria are established, and the specific method for selecting the horizontal segment sweet spot is as follows: Step 1: Obtain logging interpretation data for the entire horizontal well section, including depth, vertical depth, acoustic time difference, density, gamma, shale content, effective porosity, and oil saturation; Step 2: Input the parameters obtained in the first step into Fracpro PT fracturing software to calculate rock mechanics parameters and obtain the minimum horizontal principal stress and brittleness index parameters; Step 3: Based on the reservoir quality parameters effective porosity and oil saturation in the first step and the engineering quality parameters minimum horizontal principal stress and brittleness index in the second step, establish the evaluation standard for horizontal reservoir segmentation and classification; Step 4: Select the horizontal sweet spot of the target well according to the horizontal reservoir segmentation and classification evaluation criteria.

9. A shale oil reservoir production increase and cost reduction fracturing optimization design method as claimed in claim 8, Features: The horizontal reservoir segmentation and grading evaluation standard is to divide the reservoir quality into three levels of I, II, and III, and the engineering quality into three levels of A, B, and C according to the effective porosity, oil saturation, minimum horizontal principal stress and brittleness index. When the reservoir quality is I and the engineering quality is A, it indicates that the overall quality is good; when the reservoir quality is III or the engineering quality is C, it indicates that the overall quality is poor; the rest indicates that the overall quality is medium.

Citation Information

Patent Citations

  • Optimized design method for hydraulic fracturing of dense oil and gas reservoirs based on compressibility evaluation

    CN111287720A

  • Horizontal well close cutting fracturing crack propagation prediction and design parameter optimization method

    CN113389534A

  • Oil field fracturing transformation method

    CN106246150A

  • Dense reservoir long horizontal well limit clustering perforation fracturing method

    CN110984943A

  • Overall fracturing optimization design method for large well group of tight oil horizontal well

    CN112963132A

Cited By

  • Optimal selection method of continental facies shale volume fracturing process technology

    CN119393108A

  • Tight oil geological engineering integrated well selection method and device, equipment and medium

    CN121436384A