Combined drilling and workover wireless parameter recorder and underground monitoring system
Through the sound wave detection and real-time data acquisition of combined drilling and repair wireless parameter recorder, the problems of formation medium type evaluation and development task setting in drilling and repairing are solved, and efficient, safe and real-time monitoring of drilling and repairing are achieved, improving Development efficiency and security.
Patent Information
- Application Number
- CN202411028368.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-12
AI Technical Summary
During the drilling and repairing process, targeted development tasks and equipment operation quality assessment cannot be carried out according to the formation medium type, resulting in low development efficiency and reduced safety, and the inability to monitor and collect data in real time, affecting the reliability of pressure-controlled drilling. and timeliness.
Design a combined drilling and repairing wireless parameter recorder, which divides development periods and mining periods through sound wave detection and real-time data acquisition, sets tasks, evaluates and monitors, analyzes the sound wave transmission process in real time, adjusts equipment types, evaluates development efficiency and Safety, generate evaluation signals and risk signals, and ensure targeted and real-time downhole monitoring.
Improve the pertinence and rationality of drilling and repairing well development, ensure the efficient development, avoid safety accidents, enhance the pertinence and real-time nature of underground monitoring, improve resource mining efficiency, reduce cost waste, and ensure the safety of underground operations and quality.
Smart Images

Figure CN118933745A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of downhole monitoring, in particular to a combined wireless parameter recorder for drilling and repairing wells and a downhole monitoring system. Background Art
[0002] Well drilling and workover are important links in the process of oil and gas exploration and development, mainly including two aspects: drilling and workover. Drilling is the process of drilling a well underground with drilling equipment to obtain underground oil and gas resources. Various drilling equipment and techniques are required during the drilling process to ensure the efficiency and quality of drilling. Workover operations are maintenance and servicing measures taken to ensure the smooth use of oil wells.
[0003] The patent with the publication number CN117703355A discloses an intelligent decision-making method, equipment and readable storage medium for wellbore pressure control based on online monitoring, which belongs to the field of oil and gas exploration and development drilling, including identifying drilling conditions based on real-time engineering logging and pressure control data; establishing an annular multiphase flow model, calculating the wellbore pressure under the current drilling parameters, and inverting the wellhead backpressure pre-control value required to balance the formation pressure; according to the pressure control drilling operation specifications and industry standards, setting the pressure control limit values of different pressure control levels of pressure control drilling under different working conditions, correcting the wellhead backpressure pre-control value for different drilling conditions, obtaining the wellhead backpressure recommended value, and realizing the intelligent decision-making control of wellbore pressure control based on the wellhead backpressure recommended value. The present invention overcomes the defect that the existing pressure control system cannot accurately analyze and recommend control decisions based on engineering parameters and well condition changes in the absence of bottom hole pressure measurement data, and improves the reliability and timeliness of the wellhead backpressure control of pressure control drilling.
[0004] In the above-mentioned public technology, it is impossible to set targeted development tasks in combination with the actual formation media during drilling, repairing and exploitation; at the same time, it is impossible to evaluate the operating quality of development equipment according to the formation medium type, resulting in inefficient development. In addition, it is impossible to perform real-time data collection and monitoring during development, which reduces development safety.
[0005] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0006] The purpose of the present invention is to solve the above-mentioned problems and to provide a combined wireless parameter recorder for drilling and repairing wells and a downhole monitoring system.
[0007] The purpose of the present invention can be achieved by the following technical solutions:
[0008] A downhole monitoring system of a combined wireless parameter recorder for drilling and workover, comprising a server, the server being communicatively connected to a timer and a parameter monitoring unit, the timer dividing the drilling and workover operation period into a development period and a mining period, and the parameter monitoring unit collecting and analyzing data for the development period and the mining period;
[0009] The communication connections of the parameter monitoring unit are:
[0010] A task setting unit is used to perform acoustic wave detection in the early stage of well drilling and workover development and set development tasks based on the analysis of the acoustic wave detection process, set the real-time area to be drilled and workover development as the area to be opened, and use the center of the area to be opened as the signal source and the underground as the direction of acoustic wave transmission to transmit acoustic waves, and set the natural loss speed of the intensity during the acoustic wave transmission process as the loss threshold according to the acoustic wave characteristics;
[0011] The development assessment unit is used to conduct development assessment on the development of the area to be developed in combination with the formulated tasks, classify the equipment adjustment by type during the development process, collect the enhanced adjustment information and the reduced adjustment information, and conduct development assessment based on the information analysis;
[0012] The real-time monitoring unit is used to monitor the execution process of the development task in real time, mark the underground space that has been developed in the area to be opened as a real-time development well, collect operating temperature data and development pressure data, and infer whether the real-time monitoring is safe based on data analysis.
[0013] As a preferred embodiment of the present invention, the sound wave transmission process is analyzed, and the preset loss amount is calculated according to the corresponding loss speed at each time point, and the real-time loss amount according to the sound wave intensity is compared with the preset loss amount;
[0014] If the deviation between the real-time loss of sound wave intensity and the preset loss does not exceed the set deviation threshold, the underground area through which the sound wave passes during the current period is uniformly marked as a conforming medium area;
[0015] If the deviation between the real-time loss of sound wave intensity and the preset loss exceeds the set deviation threshold, and the real-time loss of sound wave intensity is higher than the preset loss, the current moment is marked as the moment of contact with the obstructing medium, and if it is consistent with the above loss data after the moment of contact with the obstructing medium, the underground area through which the sound wave passes in the current period is uniformly marked as the obstructing medium area;
[0016] If the deviation between the real-time loss of sound wave intensity and the preset loss exceeds the set deviation threshold, and the real-time loss of sound wave intensity is lower than the preset loss, the current moment will be marked as the moment of promoting medium contact, and if it is consistent with the above loss data after the moment of promoting medium contact, the underground area through which the sound wave passes during the current period will be uniformly marked as the promoting medium area.
[0017] As a preferred embodiment of the present invention, the various area types are sequentially arranged and development tasks are constructed according to the order of acoustic wave detection of underground areas, and analysis is performed according to real-time development tasks. If there is an obstruction medium area to be transformed into a conforming medium area or a promoting medium area, or a conforming medium area to be transformed into a promoting medium area in the development task, the current equipment adjustment is set to a strength reduction adjustment;
[0018] If the conforming media area or the promoting media area is transformed into the hindering media area, or the promoting media area is transformed into the conforming media area, the current device adjustment mark is enhanced and adjusted.
[0019] As a preferred embodiment of the present invention, the enhancement adjustment information and the reduction adjustment information are respectively the excess of the cumulative time consumed by the enhancement adjustment during the development process and the time consumed by the transformation of the area where the current drilling rig equipment is located, and the maximum overlapping time of the duration of the reduction adjustment during the development process and the actual development time of the corresponding reduction area;
[0020] If the enhancement adjustment information exceeds the time excess threshold, or the reduction adjustment information does not exceed the maximum overlap duration threshold, an evaluation inefficiency signal is generated and sent to the server;
[0021] If the enhanced adjustment information does not exceed the time excess threshold and the reduced adjustment information exceeds the maximum overlap duration threshold, an evaluation high efficiency signal is generated and sent to the server.
[0022] As a preferred embodiment of the present invention, the operating temperature data and the development pressure data are respectively the temperature numerical ratio of the drill bit temperature rise control amount corresponding to the enhanced adjustment moment after the adjacent execution of the enhanced adjustment and the reduced intensity adjustment during continuous exploitation in the real-time development well and the drill bit temperature peak increase amount corresponding to the reduced intensity adjustment moment, and the numerical fluctuation amount of the pressure ratio of any two groups of sub-areas in the balanced pressure ratio group during continuous development in the real-time development well and the corresponding floating amount numerical ratio of the pressure ratio mean fluctuation amount of the balanced pressure ratio group;
[0023] If the operating temperature data is not within the temperature numerical ratio threshold range, or the development pressure data is not within the floating quantity numerical ratio threshold range, a downhole development data risk signal is generated and the downhole development data risk signal is sent to the server; if the operating temperature data is within the temperature numerical ratio threshold range, and the development pressure data is within the floating quantity numerical ratio threshold range, a downhole development data safety signal is generated and the downhole development data safety signal is sent to the server.
[0024] As a preferred embodiment of the present invention, the parameter monitoring unit is communicatively connected with a mining decision unit and a mining monitoring unit; the mining monitoring unit performs mining monitoring on the real-time development shaft, collects shaft mining monitoring information, substitutes it into the formula to obtain the mining monitoring coefficient, generates a mining danger signal or a mining safety signal according to the comparison of the mining monitoring coefficient, and sends it to the server; after the server receives the mining safety signal, the mining decision unit performs data collection and analysis according to the mining path of the real-time development shaft.
[0025] As a preferred embodiment of the present invention, the shaft mining monitoring information includes the continuous increase span of the pressure difference between the shaft formation pressure and the shaft regional pressure during the real-time development shaft mining process, the temperature value difference between the environmental temperature growth span before and after the enhanced adjustment and the maximum temperature reduction value of the drilling fluid supply increase amount of the enhanced adjustment during the real-time development shaft mining process, and the resource flow peak update span per unit measurement time during the real-time development shaft mining process. The corresponding numerical ratio of the span deviation value between the resource flow increase output and the flow reduction output;
[0026] If the mining monitoring coefficient of the real-time development well exceeds the mining monitoring coefficient threshold, a mining danger signal is generated; if the mining monitoring coefficient of the real-time development well does not exceed the mining monitoring coefficient threshold, a mining safety signal is generated and sent to the server.
[0027] As a preferred embodiment of the present invention, the data collection and analysis process is as follows:
[0028] The porosity of unexploited formations in real-time development wells is collected through sonic logging technology. At the same time, the formation porosity of the currently developed path in the real-time development wells is combined for analysis, and the floating trend of formation porosity is obtained according to the locations of the exploited and unexploited formations.
[0029] The span of the numerical deviation corresponding to the promotion increase of ventilation and drainage operations in the mining stage of the current developed path in the real-time development well and the actual demand continues to increase.
[0030] As a preferred embodiment of the present invention, if the floating trend of the formation porosity shows a decreasing trend, or the numerical deviation between the promotion increase amount of the ventilation and drainage operation in the current developed path mining stage in the real-time development well and the actual demand amount continues to increase by more than the increase span threshold, a path adjustment signal is generated;
[0031] If the floating trend of the formation porosity shows an increasing trend, and the numerical deviation between the promotion increase of the ventilation and drainage operation in the current developed path mining stage in the real-time development well and the corresponding numerical deviation of the actual demand continues to increase and the span does not exceed the increase span threshold, a path unchanged signal is generated.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] 1. In the present invention, acoustic wave detection is performed in the early stage of drilling and workover development, and development tasks are set according to the analysis of the acoustic wave detection process, so as to improve the pertinence and rationality of drilling and workover development, ensure that the task execution prediction of drilling and workover in the early stage of development is in line with actual needs, and ensure the efficiency of drilling and workover development; infer whether the current development is reasonable through real-time wireless data acquisition and analysis, avoid the unreasonable operation efficiency of development equipment causing the decline of development quality, which is easy to cause the occurrence of drilling and workover safety accidents, and at the same time, evaluate the operation quality of development equipment to infer whether the drilling development quality in drilling and workover is qualified, so that the downhole monitoring of drilling and workover is more targeted, and the current parameter abnormality cause can be inferred in time when the downhole monitoring is abnormal, and the normal exploitation of drilling and workover can be guaranteed; the execution process of the development task is monitored in real time to infer whether the real-time monitoring data in the current drilling and workover development process is safe, avoid the abnormal parameters in the drilling and workover development process, resulting in increased construction risks of drilling and workover operations, which is not conducive to drilling and workover operations.
[0034] 2. In the present invention, mining monitoring is carried out on the real-time development shaft, and whether the current mining environment is safe is inferred based on the real-time mining environment data collection, monitoring and analysis, so as to avoid safety hazards in mining operations and increase the construction risks of underground operations. At the same time, under the premise of ensuring the safety of the mining environment, the resource mining efficiency can be improved, and the resource output of each development shaft can be ensured to be proportional to the construction cost; data collection and analysis are carried out according to the mining path of the real-time development shaft, and mining path decisions are made according to the data collection and analysis results to ensure that the resource mining path during the mining process is consistent with the regional resource location, thereby reducing unnecessary cost waste in the mining process and being able to guarantee resource output at all times during the mining stage. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.
[0036] Figure 1 It is an overall schematic diagram of the structure of the present invention;
[0037] Figure 2 is a system block diagram of Embodiment 2 of the present invention;
[0038] Figure 3 is a system block diagram of Embodiment 3 of the present invention;
[0039] Figure 4 This is a system block diagram of embodiment 4 of the present invention. DETAILED DESCRIPTION
[0040] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0042] Embodiment 1
[0043] See also Figure 1 As shown, a combined wireless parameter recorder for drilling and repairing wells includes an acoustic wave generator and a server, wherein the acoustic wave generator is mainly used to perform acoustic wave detection actions, specifically to emit acoustic waves for regional locations in drilling and repairing well development, and the server is used as a downhole monitoring system in the following embodiments,
[0044] Embodiment 2
[0045] This embodiment adds a device usage scenario based on the previous embodiment, specifically a downhole monitoring system of a combined drilling and repairing wireless parameter recorder, please refer to Figure 2 As shown, the server in the wireless parameter recorder is connected to a timer and a parameter monitoring unit in communication; wherein the timer is represented as a time measuring device, which performs time statistics at the start of drilling and well repair development and divides the time periods according to the real-time task execution, and the development period and exploitation period mentioned in the following embodiments correspond to the start of drilling and well repair development period, specifically the real-time wellhead development drilling construction, and the drilling and well repair exploitation period, specifically the real-time oil and gas and other resource exploitation period after the real-time wellhead completes the drilling; in addition, the timer is connected to the parameter monitoring unit in communication, and the parameter monitoring unit in this embodiment is a variety of types of sensors, which provide data acquisition support for the data monitoring and analysis of the following embodiments, so as to ensure that the accuracy can be adjusted according to the real-time data acquisition and analysis during the development period and the exploitation period, to ensure the downhole monitoring efficiency of drilling and well repair, and at the same time ensure that the wireless parameter recorder can efficiently cooperate with the drilling and well repair operation;
[0046] Embodiment 3
[0047] This embodiment carries out data collection and monitoring during the development period on the basis of the previous embodiment. Please refer to Figure 3 As shown, the parameter monitoring unit is communicatively connected with the task setting unit, the development and evaluation unit and the real-time monitoring unit, and the data streams of the data processing results of the task setting unit, the development and evaluation unit and the real-time monitoring unit are all transmitted to the server, and the server performs targeted warning after receiving the data;
[0048] The parameter monitoring unit generates a task setting signal and sends the task setting signal to the task setting unit. After receiving the task setting signal, the task setting unit performs acoustic detection in the early stage of drilling and workover development and sets the development task according to the analysis of the acoustic detection process, so as to improve the pertinence and rationality of drilling and workover development, ensure that the task execution prediction of drilling and workover in the early stage of development fits the actual needs, and ensure the efficiency of drilling and workover development;
[0049] The real-time area to be drilled and worked over is set as the area to be opened, and the sound wave transmission is carried out with the center of the area to be opened as the signal source and the underground as the direction of sound wave transmission. According to the characteristics of the sound wave, the natural loss rate of the intensity during the sound wave transmission process is set as the loss threshold, where the loss threshold is the loss rate of the same type of sound wave obtained from historical use and multiple experimental results;
[0050] The sound wave transmission process is analyzed, and the preset loss amount is calculated according to the corresponding loss speed at each time point, and the real-time loss amount of the sound wave intensity is compared with the preset loss amount. If the deviation value between the real-time loss amount of the sound wave intensity and the preset loss amount does not exceed the set deviation value threshold, the underground area through which the sound wave passes in the current period is uniformly marked as a conforming medium area; if the deviation value between the real-time loss amount of the sound wave intensity and the preset loss amount exceeds the set deviation value threshold, and the real-time loss amount of the sound wave intensity is higher than the preset loss amount, the current moment is marked as a blocking medium contact moment, and after the blocking medium contact moment, if the loss data is consistent with the above loss data, the underground area through which the sound wave passes in the current period is uniformly marked as a blocking medium area; if the deviation value between the real-time loss amount of the sound wave intensity and the preset loss amount exceeds the set deviation value threshold, and the real-time loss amount of the sound wave intensity is lower than the preset loss amount, the current moment is marked as a promoting medium contact moment, and after the promoting medium contact moment, if the loss data is consistent with the above loss data, the underground area through which the sound wave passes in the current period is uniformly marked as a promoting medium area;
[0051] According to the current sound wave transmission process, the farthest area of sound wave transmission is set as the detection decision point, and the underground area types and corresponding detection decision points of the location of the area to be opened are sent to the server. After receiving, the server stores them and formulates development tasks according to the area type, specifically, when developing the obstructing medium area, the type of equipment such as the drill bit in the current area is replaced, or the supply of drilling fluid required by the drill bit is adjusted;
[0052] At the same time, a development assessment signal is generated and sent to the development assessment unit. After receiving the development assessment signal, the development assessment unit conducts development assessment on the development of the area to be developed in combination with the formulated task, and infers whether the current development is reasonable through real-time wireless data acquisition and analysis, so as to avoid the unreasonable operation efficiency of the development equipment causing the decline of development quality, which is easy to cause the occurrence of drilling and workover safety accidents. At the same time, the evaluation of the operation quality of the development equipment can infer whether the drilling development quality in the drilling and workover is qualified, so that the downhole monitoring of the drilling and workover is more targeted, and the cause of the current parameter abnormality can be inferred in time when the downhole monitoring is abnormal, and the normal exploitation of the drilling and workover can be guaranteed;
[0053] According to the order of acoustic wave detection of underground areas, various area types are arranged in sequence and development tasks are constructed, and analyzed according to real-time development tasks. If there is an obstruction medium area transformed into a conforming medium area or a promoting medium area, or a conforming medium area transformed into a promoting medium area in the development task, the current equipment adjustment is set to a reduced intensity adjustment, which specifically means reducing the work intensity; on the contrary, if the conforming medium area or the promoting medium area is transformed into the obstructing medium area, or the promoting medium area is transformed into the conforming medium area, the current equipment adjustment mark is enhanced adjustment; in actual equipment adjustment, when the penetration of different acoustic waves of the same type is inconsistent, the corresponding equipment is adjusted before processing, and enhanced adjustment or reduced intensity adjustment means wear monitoring of development drill bits and other equipment, and when the wear is abnormal, enhanced adjustment means replacement of the drill bit or maintenance, on the contrary, reduced intensity adjustment means continuous monitoring and continued use;
[0054] The excess time between the cumulative time consumed by the enhanced adjustment in the development process and the time consumed by the transformation of the area where the current drilling rig equipment is located is obtained, and at the same time, the maximum overlap time between the duration of the intensity reduction adjustment in the development process and the actual development time of the corresponding intensity reduction area is obtained. The excess time between the cumulative time consumed by the enhanced adjustment in the development process and the time consumed by the transformation of the area where the current drilling rig equipment is located, and the maximum overlap time between the duration of the intensity reduction adjustment in the development process and the actual development time of the corresponding intensity reduction area are marked as enhanced adjustment information and intensity reduction adjustment information, respectively, and compared with the time excess threshold and the maximum overlap threshold, respectively:
[0055] If the excess of the cumulative time consumed by the enhancement adjustment during the development process and the time consumed by the transformation of the area where the current drilling rig equipment is located exceeds the time excess threshold, or the maximum overlap time of the duration of the reduction adjustment during the development process and the actual development time of the corresponding reduction area does not exceed the maximum overlap time threshold, then it is determined that the development task execution evaluation during the development process is inefficient, and an evaluation inefficiency signal is generated and sent to the server. After receiving the evaluation inefficiency signal, the server detects and maintains the development task execution process after the development of the current area to be opened, and continues the development task execution after completion;
[0056] If the excess of the cumulative time consumed by the enhancement adjustment during the development process and the time consumed by the transformation of the area where the current drilling rig equipment is located does not exceed the time excess threshold, and the maximum overlap time between the duration of the intensity reduction adjustment during the development process and the actual development time of the corresponding intensity reduction area exceeds the maximum overlap time threshold, then it is determined that the development task execution during the development process is highly evaluated, an evaluation efficiency signal is generated and sent to the server, and after the server receives the evaluation efficiency signal, it continuously monitors the execution of the current development task;
[0057] At the same time, a real-time monitoring signal is generated and sent to the real-time monitoring unit. After receiving the real-time monitoring signal, the real-time monitoring unit monitors the execution process of the development task in real time to infer whether the real-time monitoring data in the current drilling and workover development process is safe, so as to avoid abnormal parameters in the drilling and workover development process, which will increase the construction risk of the drilling and workover operation and be unfavorable to the drilling and workover operation;
[0058] The underground space that has been developed in real time in the area to be opened is marked as a real-time development well, and the temperature value ratio of the drill bit temperature rise control amount corresponding to the enhanced adjustment moment after the enhanced adjustment and the reduced intensity adjustment are executed adjacently during the continuous development of the real-time development well to the drill bit temperature peak increase amount corresponding to the reduced intensity adjustment moment is collected. At the same time, the temperature value ratio of the drill bit temperature rise control amount corresponding to the enhanced adjustment moment after the enhanced adjustment and the reduced intensity adjustment are executed adjacently during the continuous exploitation of the real-time development well to the drill bit temperature peak increase amount corresponding to the reduced intensity adjustment moment is marked as the operating temperature data;
[0059] The real-time development well is divided into several sub-areas of the same spatial size, and the pressure ratio of any two groups of sub-areas is set as the balanced pressure ratio group in the current wellbore stable state, and the numerical ratio of the corresponding floating amount of the numerical floating amount of the pressure ratio of any two groups of sub-areas in the balanced pressure ratio group when the real-time development well is continuously developed and the pressure ratio average floating amount of the balanced pressure ratio group is obtained, and the numerical ratio of the corresponding floating amount of the numerical floating amount of the pressure ratio of any two groups of sub-areas in the balanced pressure ratio group when the real-time development well is continuously developed and the pressure ratio average floating amount of the balanced pressure ratio group is marked as development pressure data;
[0060] The temperature numerical ratio of the drill bit temperature rise control amount corresponding to the enhanced adjustment moment and the drill bit temperature peak increase amount corresponding to the reduced intensity adjustment moment after the adjacent execution of enhanced adjustment and reduced intensity adjustment during continuous mining in real-time development wells, and the numerical fluctuation amount of the pressure ratio of any two groups in the balanced pressure ratio group during continuous development of the real-time development wells and the corresponding floating amount numerical ratio of the pressure ratio mean fluctuation amount of the balanced pressure ratio group are compared with the temperature numerical ratio threshold range and the floating amount numerical ratio threshold range respectively: This technical solution uses the threshold range as the comparison standard, and under the premise of not affecting the stability of the well wall, the range data is used to weaken the environmental influence on data such as temperature and pressure;
[0061] If the temperature value ratio of the drill bit temperature rise control amount corresponding to the enhanced adjustment moment and the drill bit temperature peak increase amount corresponding to the reduced intensity adjustment moment after the enhanced adjustment and the reduced intensity adjustment are executed adjacently during continuous exploitation in the real-time development well, or the floating amount of the pressure ratio of any two groups in the balanced pressure ratio group during continuous development and the floating amount corresponding to the average floating amount of the pressure ratio of the balanced pressure ratio group are not within the floating amount value ratio threshold range, then it is determined that the data collection and monitoring of the current area is abnormal, and a downhole development data risk signal is generated and sent to the server. After receiving the downhole development data risk signal, the server suspends the execution of the development task of the current underground area and evaluates the wellbore status of the real-time development well, and adjusts the pressure difference and pressure ratio fluctuation of the internal sub-areas at the same time;
[0062] If the temperature value ratio of the drill bit temperature rise control amount corresponding to the enhanced adjustment moment and the drill bit temperature peak increase amount corresponding to the reduced intensity adjustment moment after the enhanced adjustment and the reduced intensity adjustment are executed adjacently during continuous exploitation in the real-time development well, and the floating amount of the pressure ratio of any two groups in the balanced pressure ratio group during continuous development in the real-time development well and the floating amount corresponding to the floating amount of the pressure ratio mean floating amount of the balanced pressure ratio group are within the floating amount value ratio threshold range, then it is determined that the data collection and monitoring of the current area is normal, and a downhole development data safety signal is generated and sent to the server;
[0063] After the server receives the underground development data safety signal, it continues to execute the current development task and when the development area reaches the detection decision point, it performs acoustic detection at the deepest point of the current real-time development well. If the propagation intensity reduction in the area is lower than the set reduction threshold after the acoustic detection, the current position is set as the development termination point; otherwise, the regional medium type is divided according to the current acoustic detection, the development task is re-formulated and continued until the development termination point is reached. It should be noted that when the current real-time development well depth exceeds the depth threshold, the well direction is adjusted to avoid unnecessary cost waste caused by the current development path being unsuitable for resource exploitation. At the same time, too deep a depth also increases the risk of underground operations.
[0064] Embodiment 4
[0065] The previous embodiment uses a wireless parameter recorder to collect and analyze real-time data on the development of drilling and repairing wells, while this embodiment collects and analyzes data on the real-time mining process after the drilling and repairing wells are completed. It should be noted that this embodiment is also applicable to wireless parameter recorders for data collection. Please refer to Figure 4 As shown, the parameter monitoring unit is communicatively connected with the mining decision unit and the mining monitoring unit;
[0066] The parameter monitoring unit generates a mining monitoring signal and sends the mining monitoring signal to the mining monitoring unit. After receiving the mining monitoring signal, the mining monitoring unit conducts mining monitoring on the real-time development wells, collects monitoring and analysis based on the real-time mining environment data to infer whether the current mining environment is safe, avoids potential safety hazards in mining operations, increases the construction risk of underground operations, and at the same time, improves resource mining efficiency while ensuring the safety of the mining environment, ensuring that the resource output of each development well is proportional to the construction cost;
[0067] The span of the continuous increase of the pressure difference between the well formation pressure and the well regional pressure during the real-time development well production is obtained, and the span of the continuous increase of the pressure difference between the well formation pressure and the well regional pressure during the real-time development well production is marked as CK; the temperature value difference between the environmental temperature growth span before and after the enhanced adjustment and the maximum temperature reduction value of the enhanced adjustment drilling fluid supply increase during the real-time development well production is obtained, and the temperature value difference between the environmental temperature growth span before and after the enhanced adjustment and the maximum temperature reduction value of the enhanced adjustment drilling fluid supply increase during the real-time development well production is marked as WC;
[0068] Obtain the corresponding numerical ratio of the span deviation value between the resource flow peak value update span and the resource flow increase output and the flow decrease output within the unit measurement time in the real-time development well mining process, and mark the corresponding numerical ratio of the span deviation value between the resource flow peak value update span and the resource flow increase output and the flow decrease output within the unit measurement time in the real-time development well mining process as KB; where the resource is represented as oil or gas;
[0069] The above collected data are uniformly marked as shaft mining monitoring information, and substituted into the formula to obtain the mining monitoring coefficient C of the real-time development shaft. The specific formula is: Wherein, mg1, mg2 and mg3 are preset proportional coefficients, e is a natural constant, and β is an error correction factor with a value of 1.1;
[0070] Compare the mining monitoring coefficient C of the real-time development well with the mining monitoring coefficient threshold:
[0071] If the mining monitoring coefficient C of the real-time development well exceeds the mining monitoring coefficient threshold, the current real-time development well mining monitoring is judged to be abnormal, and a mining danger signal is generated and sent to the server. After receiving the mining danger signal, the server regulates the mining environment, controls the drill bit temperature, and ensures the pressure difference of the formation in the well. When it cannot be controlled, the construction is stopped and the occurrence of well accidents is reduced by means of pressure relief and other means.
[0072] If the mining monitoring coefficient C of the real-time development well does not exceed the mining monitoring coefficient threshold, it is determined that the current real-time development well mining monitoring is normal, and a mining safety signal is generated and sent to the server;
[0073] At the same time, a mining decision signal is generated and sent to the mining decision unit. After receiving the mining decision signal, the mining decision unit performs data collection and analysis according to the mining path of the real-time development well, and makes mining path decisions based on the data collection and analysis results to ensure that the resource mining path in the mining process is consistent with the regional resource location, thereby reducing unnecessary cost waste in the mining process and ensuring resource output at all times during the mining stage;
[0074] The porosity of the unexploited strata in the real-time development well is collected through the sonic logging technology. At the same time, the formation porosity of the current developed path in the real-time development well is combined for analysis. The floating trend of the formation porosity is obtained according to the location of the exploited and unexploited strata. At the same time, the value deviation between the promotion increase of the ventilation and drainage operation in the exploitation stage of the current developed path in the real-time development well and the actual demand is obtained. The promotion increase is expressed as the maximum ventilation volume and the maximum drainage volume that can be satisfied at the current formation position, and the real-time demand is expressed as the ventilation volume and drainage volume that need to be satisfied at the current underground city position; and they are analyzed:
[0075] If the floating trend of the formation porosity shows a decreasing trend, or the numerical deviation between the promotion increase of the ventilation and drainage operation in the current developed path mining stage in the real-time development well and the actual demand continues to increase and exceeds the increase span threshold, it is determined that the sustainability of the current mining path is low, and a path adjustment signal is generated and sent to the server. After receiving the path adjustment signal, the server performs resource detection on the current well and adjusts the development path according to the resource detection position;
[0076] If the floating trend of the formation porosity shows an increasing trend, and the value deviation between the promotion increase of the ventilation and drainage operation in the current developed path mining stage in the real-time development well and the actual demand value continues to increase and the span does not exceed the increase span threshold, then it is determined that the current mining path is highly sustainable, and a path unchanged signal is generated and sent to the server;
[0077] The above formulas are obtained by collecting a large amount of data and performing software simulation, and a formula close to the actual value is selected. The coefficients in the formula are set by technicians in this field according to actual conditions;
[0078] When the present invention is in use, the task setting unit performs sonic detection in the early stage of well drilling and workover development and sets development tasks based on the analysis of the sonic detection process; the development evaluation unit performs development evaluation on the development of the area to be developed in combination with the formulated tasks, divides the equipment adjustments into types during the development process, collects enhancement adjustment information and reduction adjustment information, and performs development evaluation based on information analysis; the real-time monitoring unit monitors the execution process of the development tasks in real time; the production monitoring unit performs production monitoring on the real-time development wells, and the production decision unit collects and analyzes data based on the production path of the real-time development wells.
[0079] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A downhole monitoring system of a combined wireless parameter recorder for drilling and repairing wells, comprising a server, characterized in that: The server is connected to a timer and a parameter monitoring unit. The timer divides the drilling and workover operation period into a development period and a production period. The parameter monitoring unit collects and analyzes data for the development period and the production period. The communication connections of the parameter monitoring unit are: A task setting unit is used to perform acoustic wave detection in the early stage of well drilling and workover development and set development tasks based on the analysis of the acoustic wave detection process, set the real-time area to be drilled and workover development as the area to be opened, and use the center of the area to be opened as the signal source and the underground as the direction of acoustic wave transmission to transmit acoustic waves, and set the natural loss speed of the intensity during the acoustic wave transmission process as the loss threshold according to the acoustic wave characteristics; The development assessment unit is used to conduct development assessment on the development of the area to be developed in combination with the formulated tasks, classify the equipment adjustment by type during the development process, collect the enhanced adjustment information and the reduced adjustment information, and conduct development assessment based on the information analysis; The real-time monitoring unit is used to monitor the execution process of the development task in real time, mark the underground space that has been developed in the area to be opened as a real-time development well, collect operating temperature data and development pressure data, and infer whether the real-time monitoring is safe based on data analysis.
2. The downhole monitoring system of the combined wireless parameter recorder for drilling and repairing according to claim 1 is characterized in that: Analyze the sound wave transmission process, calculate the preset loss amount according to the corresponding loss speed at each time point, and compare the real-time loss amount based on the sound wave intensity with the preset loss amount; If the deviation between the real-time loss of sound wave intensity and the preset loss does not exceed the set deviation threshold, the underground area through which the sound wave passes during the current period is uniformly marked as a conforming medium area; If the deviation between the real-time loss of sound wave intensity and the preset loss exceeds the set deviation threshold, and the real-time loss of sound wave intensity is higher than the preset loss, the current moment is marked as the moment of contact with the obstructing medium, and if it is consistent with the above loss data after the moment of contact with the obstructing medium, the underground area through which the sound wave passes in the current period is uniformly marked as the obstructing medium area; If the deviation between the real-time loss of sound wave intensity and the preset loss exceeds the set deviation threshold, and the real-time loss of sound wave intensity is lower than the preset loss, the current moment will be marked as the moment of promoting medium contact, and if it is consistent with the above loss data after the moment of promoting medium contact, the underground area through which the sound wave passes during the current period will be uniformly marked as the promoting medium area.
3. The downhole monitoring system of the combined wireless parameter recorder for drilling and repairing according to claim 2 is characterized in that: Arrange the various area types in order according to the order of acoustic wave detection of underground areas and construct development tasks, and analyze them according to real-time development tasks. If there is an obstruction in the development task that transforms the medium area into a conforming medium area or a promoting medium area, or a conforming medium area into a promoting medium area, the current equipment adjustment is set to a reduction adjustment; If the conforming media area or the promoting media area is transformed into the hindering media area, or the promoting media area is transformed into the conforming media area, the current device adjustment mark is enhanced and adjusted.
4. The downhole monitoring system of the combined wireless parameter recorder for drilling and repairing according to claim 3 is characterized in that: The enhanced adjustment information and the reduced intensity adjustment information are respectively the excess of the cumulative time of enhanced adjustment during the development process and the time of transformation of the area where the current drilling rig equipment is located, and the maximum overlap time of the duration of reduced intensity adjustment during the development process and the actual development time of the corresponding reduced intensity area; If the enhancement adjustment information exceeds the time excess threshold, or the reduction adjustment information does not exceed the maximum overlap duration threshold, an evaluation inefficiency signal is generated and sent to the server; If the enhanced adjustment information does not exceed the time excess threshold and the reduced adjustment information exceeds the maximum overlap duration threshold, an evaluation high efficiency signal is generated and sent to the server.
5. The downhole monitoring system of the combined wireless parameter recorder for drilling and repairing according to claim 4 is characterized in that: The operating temperature data and the development pressure data are respectively the temperature numerical ratio of the drill bit temperature rise control amount corresponding to the enhanced adjustment moment and the drill bit temperature peak rise amount corresponding to the reduced intensity adjustment moment after the enhanced adjustment and reduced intensity adjustment are executed adjacently during continuous exploitation in the real-time development well, and the numerical ratio of the floating amount of the pressure ratio of any two groups of sub-areas in the balanced pressure ratio group during continuous development in the real-time development well to the corresponding floating amount of the pressure ratio mean floating amount of the balanced pressure ratio group; If the operating temperature data is not within the temperature value ratio threshold range, or the development pressure data is not within the floating amount value ratio threshold range, a downhole development data risk signal is generated and sent to the server; If the operating temperature data is within the temperature value ratio threshold range, and the development pressure data is within the floating value ratio threshold range, a downhole development data safety signal is generated and sent to the server.
6. The downhole monitoring system of the combined wireless parameter recorder for drilling and repairing according to claim 2 is characterized in that: The parameter monitoring unit is communicatively connected with the mining decision unit and the mining monitoring unit; the mining monitoring unit monitors the mining of the real-time development shaft, collects the shaft mining monitoring information, substitutes it into the formula to obtain the mining monitoring coefficient, generates a mining danger signal or a mining safety signal according to the comparison of the mining monitoring coefficient, and sends it to the server. After the server receives the mining safety signal, the mining decision unit collects and analyzes data according to the mining path of the real-time development shaft.
7. A downhole monitoring system of a combined wireless parameter recorder for drilling and repairing according to claim 6, characterized in that: The shaft mining monitoring information includes the continuous increase span of the pressure difference between the shaft formation pressure and the shaft regional pressure during the real-time development shaft mining process, the temperature value difference between the environmental temperature growth span before and after the enhanced adjustment and the maximum temperature reduction value of the drilling fluid supply increase amount of the enhanced adjustment during the real-time development shaft mining process, and the corresponding numerical ratio of the resource flow peak update span per unit measurement time and the span deviation value between the resource flow increase output and the flow reduction output during the real-time development shaft mining process; If the mining monitoring coefficient of the real-time development well exceeds the mining monitoring coefficient threshold, a mining danger signal is generated; If the mining monitoring coefficient of the real-time development well does not exceed the mining monitoring coefficient threshold, a mining safety signal is generated and sent to the server.
8. The downhole monitoring system of the combined wireless parameter recorder for drilling and repairing according to claim 7 is characterized in that: The data collection and analysis process is as follows: The porosity of unexploited formations in real-time development wells is collected through sonic logging technology. At the same time, the formation porosity of the currently developed path in the real-time development wells is combined for analysis, and the floating trend of formation porosity is obtained according to the locations of the exploited and unexploited formations. The span of the numerical deviation corresponding to the promotion increase of ventilation and drainage operations in the mining stage of the current developed path in the real-time development well and the actual demand continues to increase.
9. The downhole monitoring system of the combined wireless parameter recorder for drilling and repairing according to claim 8 is characterized in that: If the floating trend of the formation porosity shows a decreasing trend, or if the numerical deviation between the promotion increase of the ventilation and drainage operation in the mining stage of the current developed path in the real-time development well and the corresponding numerical deviation of the actual demand continues to increase by more than the increase span threshold, a path adjustment signal is generated; If the floating trend of the formation porosity shows an increasing trend, and the numerical deviation between the promotion increase of the ventilation and drainage operation in the current developed path mining stage in the real-time development well and the corresponding numerical deviation of the actual demand continues to increase and the span does not exceed the increase span threshold, a path unchanged signal is generated.
10. A combined wireless parameter recorder for drilling and repairing wells, a downhole monitoring system using a combined wireless parameter recorder for drilling and repairing wells as claimed in any one of claims 1 to 9, characterized in that: Includes server and sound wave generator.