Prevention and control system and prevention and control method for primary weighting of coal mine top coal caving working face

By blasting deep holes in the coal seam roof, destroying the 'masonry beam' structure, the problems of increasing the initial pressure step and increasing the dynamic pressure coefficient in coal mining are solved, and the pressure relief of the old top or key layer is achieved, and the Production safety prevents impact ground pressure and top-burst accidents.

CN118933778APending Publication Date: 2024-11-12HUATING COAL GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411067896.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During coal mining, when the top coal loading working surface is first pressed, the top plate fracture leads to an increase in the initial pressure step and the dynamic pressure coefficient increases, which easily leads to impact ground pressure and top-burning accidents, and lacks effective prevention and control measures.

Method used

By adopting the deep hole blasting method of coal seam top plate, the first blasting hole and the second blasting hole are arranged in the middle and upper part of the coal seam to the key layer, the 'masonry beam' structure is destroyed, and the step distance and dynamic pressure coefficient are reduced to achieve the Relieve pressure from the old top or key layer to prevent and control the first time of pressure.

Benefits of technology

It effectively reduces the initial pressure step distance and dynamic pressure coefficient, reduces the risk of roof crushing, improves production safety, and avoids impact ground pressure and top-burning accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933778A_ABST
    Figure CN118933778A_ABST
Patent Text Reader

Abstract

The invention provides a coal mine top coal caving working face initial weighting prevention system and prevention method, and relates to the technical field of coal mining, the system comprises a cutting hole, a first blast hole and a second blast hole, the cutting hole is located in a coal seam, and the coal seam is located below a key layer in the height direction of the cutting hole; the first blast hole and the second blast hole extend to the middle upper part of the key layer from the wall surface of the cutting hole to the key layer, and are respectively formed in the two sides of the cutting hole in the width direction of the cutting hole; the axis of the first blast hole and the axis of the second blast hole form an included angle with the horizontal plane where the top plate of the cutting hole is located. According to the method, the mode of deep hole blasting of the coal seam roof is adopted, the masonry beam structure can be destroyed, pressure relief is conducted on an upper roof or a key layer, the weighting step pitch and the dynamic pressure coefficient are reduced, and effective prevention and treatment of primary weighting of the top coal caving working face are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mining, and in particular to a system and method for preventing and controlling the initial pressure of a top coal caving working face in a coal mine. Background Art

[0002] The top coal caving working face advances outward from the cutting eye. When the roof rock beam cannot bear the weight of the suspended roof and breaks and collapses, the step length of the initial pressure will be twice that of the periodic pressure due to the influence of the "masonry beam" structure of the working face, making the pressure on the support and the coal wall of the working face more intense. The impact of the initial pressure on the working face generally lasts for 2-3 days, during which there may be severe spalling of the coal wall, cracks or slag falling in the roof, a significant increase in the amount and speed of roof subsidence, a rapid increase in the support load, and frequent mine earthquakes. Therefore, it is easy to induce impact ground pressure and roof falls.

[0003] In the relevant technology, the object that is directly maintained by means of supports during working face mining is the immediate roof. The quality of the immediate roof is related to production safety, and the integrity of the immediate roof is affected by the balance characteristics of the old roof. However, there is currently a lack of effective prevention and control measures for the old roof (or key layer). Summary of the invention

[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0005] To this end, an embodiment of one aspect of the present invention proposes a system for preventing and controlling the initial pressure on the top coal caving working face of a coal mine. The system for preventing and controlling the initial pressure on the top coal caving working face of a coal mine adopts a method of deep hole blasting on the coal seam roof, which can destroy the "masonry beam" structure to relieve pressure on the old roof or key layer, reduce the pressure step distance and dynamic pressure coefficient, and achieve effective prevention and control of the initial pressure on the top coal caving working face.

[0006] A system for preventing and controlling the initial pressure in a coal mine top coal caving working face according to an embodiment of the present invention comprises a cut hole, a first blasting hole, and a second blasting hole.

[0007] Wherein, the cutting eye is located in a coal seam, and the coal seam is located below a key layer along a height direction of the cutting eye;

[0008] Among them, the first blasting hole and the second blasting hole both extend from the wall of the cut eye toward the key layer and extend to the middle and upper part of the key layer, the first blasting hole and the second blasting hole are respectively arranged on both sides of the cut eye along the width direction of the cut eye, and the axis of the first blasting hole and the axis of the second blasting hole both form an angle with the horizontal plane where the top plate of the cut eye is located.

[0009] According to the system for preventing and controlling the initial pressure on the top coal caving working face of a coal mine according to the embodiment of the present invention, by arranging the first blasting hole and the second blasting hole between the middle and upper parts of the coal seam and the key layer, blasting deep into the coal seam roof can be achieved, so as to crack the "masonry beam" structure in advance and destroy the three-twisted arch balance of the old roof. At the same time, because the first blasting hole and the second blasting hole are arranged on both sides of the width direction of the cut eye, the roof of the cut eye can be isolated and protected from being broken, which is beneficial to safe production. Therefore, compared with the related art, the present invention adopts the method of deep hole blasting on the coal seam roof, which can destroy the "masonry beam" structure to relieve the pressure on the old roof or the key layer, reduce the pressure step distance and the dynamic pressure coefficient, and achieve effective prevention and control of the initial pressure on the top coal caving working face.

[0010] In some embodiments, the vertical distance from the lowest position of the key layer to the highest position of the coal seam is greater than or equal to 60m.

[0011] In some embodiments, the charge center of each of the first blast hole and the second blast hole is located at the critical layer.

[0012] In some embodiments, each of the orifice of the first blasting hole and the orifice of the second blasting hole is adjacent to a junction of a top plate and a side of the cut-out.

[0013] In some embodiments, the first blasting hole and the second blasting hole are arranged in mirror symmetry with respect to a central axis of the cut eye.

[0014] In some embodiments, there are a plurality of the first blasting holes and the second blasting holes in one-to-one correspondence, and all the first blasting holes and all the second blasting holes are arranged at intervals along the extension direction of the cut eye.

[0015] In some embodiments, the distance between any two adjacent first blasting holes is a1, and the distance between any two adjacent second blasting holes is a2, wherein a1=a2, and 20m≤a1≤30m.

[0016] In some embodiments, the initial pressure step is defined as L, the width of the cut eye is b, the length of the projection of the first blasting hole on the horizontal plane where the top plate of the cut eye is located is b1, the length of the projection of the second blasting hole on the horizontal plane where the top plate of the cut eye is located is b2, and the initial pressure step L satisfies: L≤b1+b+b2.

[0017] In some embodiments, the vertical distance from the bottom of the first blast hole to the horizontal plane where the top plate of the cut hole is located is defined as H1, and the angle between the axis of the first blast hole and the horizontal plane where the top plate of the cut hole is located is A.

[0018] The vertical distance from the bottom of the second blast hole to the horizontal plane where the top plate of the cut hole is located is H2, and the angle between the axis of the second blast hole and the horizontal plane where the top plate of the cut hole is located is B.

[0019] In some embodiments, the angle A between the axis of the first blasting hole and the horizontal plane where the top plate of the cut eye is located satisfies: 45°≤A≤80°; the angle B between the axis of the second blasting hole and the horizontal plane where the top plate of the cut eye is located satisfies: 45°≤B≤80°.

[0020] In some embodiments, the hole depth of the first blasting hole and the hole depth of the second blasting hole are both greater than 10 m.

[0021] In some embodiments, the hole depth of the first blasting hole is t1, the sealing length of the first blasting hole is l1, 0.3t1≤l1<t1, and l1≥5m, the hole depth of the second blasting hole is t2, the sealing length of the second blasting hole is l2, 0.3t2≤l2<t2, and l2≥5m.

[0022] In some embodiments, the diameter of the first blasting hole and the diameter of the second blasting hole are both greater than 94 mm.

[0023] A method for preventing and controlling the initial pressure of a coal mine top coal caving working face according to an embodiment of the present invention comprises the following steps:

[0024] Cutting holes in coal seam construction;

[0025] determining the location of a critical layer above the coal seam;

[0026] Calculating the drilling angle and depth of each of the first blast hole and the second blast hole according to the initial pressure step, the width of the cut hole, and the position of the key layer;

[0027] Constructing the first blasting hole and the second blasting hole from the wall surface of the cut hole toward the key layer, and extending the first blasting hole and the second blasting hole to the middle and upper part of the key layer;

[0028] The first blasting hole and the second blasting hole are charged and blasted.

[0029] The technical advantages of the method for preventing and controlling the initial pressure on the top coal caving working face of a coal mine according to an embodiment of the present invention are the same as the technical advantages of the system for preventing and controlling the initial pressure on the top coal caving working face of a coal mine described above, and will not be repeated here.

[0030] In some embodiments, the step of determining the position of the key layer above the coal seam is specifically to determine the position of the key layer based on the thickness detection data of the top coal at the cutting eye, combined with the thickness and lithological characteristics of the pseudo-roof, direct roof, and key rock layer above the coal seam in the drill column diagram adjacent to the cutting eye.

[0031] In some embodiments, the first blast hole and the second blast hole are arranged mirror-symmetrically with respect to the central axis of the cut hole, and the step of calculating the drilling angle and depth of each of the first blast hole and the second blast hole according to the initial pressure step, the width of the cut hole, and the position of the key layer comprises:

[0032] Using the formula Calculate the horizontal distance b′ between the first blast hole and the second blast hole, where L is the initial pressure step distance and b is the width of the cut hole;

[0033] According to the position of the key layer, determine the vertical distance H′ from the bottom of the first blast hole and the bottom of the second blast hole to the horizontal plane where the top plate of the cut hole is located;

[0034] By formula Calculating drilling angles θ of the first blasting hole and the second blasting hole;

[0035] Based on the drilling angle θ of the first blast hole and the second blast hole, and combined with the horizontal distance b′ between the first blast hole and the second blast hole, the formula The hole depths t' of the first blasting hole and the second blasting hole are calculated.

[0036] In some embodiments, in the step of constructing the first blasting hole and the second blasting hole from the wall of the cut eye toward the key layer, there are multiple first blasting holes and multiple second blasting holes, and the multiple first blasting holes and the multiple second blasting holes are arranged at intervals along the extension direction of the cut eye.

[0037] In some embodiments, the step of charging and blasting the first blasting hole and the second blasting hole comprises:

[0038] charging the first blasting hole and the second blasting hole in a radially uncoupled continuous charging manner;

[0039] sealing the first blasting hole and the second blasting hole with a sealing material;

[0040] According to the blasting safety factor, the number of the first blasting holes and the second blasting holes and the blasting method for each blasting are determined, and a corresponding number of the first blasting holes and the second blasting holes are detonated.

[0041] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 The diagram is a planar structural diagram of a system for preventing and controlling the initial pressure in a coal mine top coal caving working face according to an embodiment of the present invention.

[0043] Figure 2 yes Figure 1 Schematic diagram of the AA cross-section structure.

[0044] Figure 3 It is a flow chart of a method for preventing and controlling the initial pressure in a coal mine top coal caving working face according to an embodiment of the present invention.

[0045] Figure numerals: 1. Cutting eye, 2. First blasting hole, 3. Second blasting hole, 4. Coal seam, 41. Laotang side, 42. Coal body side of working face, 5. Key layer, 6. Transport tunnel, 7. Return air tunnel. DETAILED DESCRIPTION

[0046] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0047] like Figure 1 and Figure 2 As shown, a system for preventing and controlling the initial pressure in a coal mine top coal caving working face according to an embodiment of the present invention comprises a cutting hole 1, a first blasting hole 2 and a second blasting hole 3.

[0048] The cutting eye 1 is located in the coal seam 4 , and the coal seam 4 is located below the key layer 5 along the height direction of the cutting eye 1 .

[0049] Among them, the first blasting hole 2 and the second blasting hole 3 both extend from the wall of the cut eye 1 toward the key layer 5 and extend to the middle and upper part of the key layer 5. The first blasting hole 2 and the second blasting hole 3 are arranged on both sides of the cut eye 1 along the width direction of the cut eye 1. The axis of the first blasting hole 2 and the axis of the second blasting hole 3 both form an angle with the horizontal plane where the top plate of the cut eye 1 is located.

[0050] It can be understood that the system for preventing and controlling the initial pressure on the top coal caving working face of a coal mine according to the embodiment of the present invention can realize blasting deep into the roof of the coal seam 4 by arranging the first blasting hole 2 and the second blasting hole 3 between the middle and upper parts of the coal seam 4 and the key layer 5, so as to crack the "masonry beam" structure in advance and destroy the three-twisted arch balance of the old roof. At the same time, because the first blasting hole 2 and the second blasting hole 3 are arranged on both sides of the width direction of the cutting eye 1, the roof of the cutting eye 1 can be isolated to protect the roof of the cutting eye 1 from being broken, which is beneficial to safe production. Therefore, compared with the relevant technology, the present invention adopts the method of deep hole blasting on the roof of the coal seam 4, which can destroy the "masonry beam" structure to relieve the pressure on the old roof or the key layer 5, reduce the pressure step distance and the dynamic pressure coefficient, and realize effective prevention and control of the initial pressure on the top coal caving working face.

[0051] Specifically, the cut eye 1 connects the transport tunnel 6 and the return air tunnel 7, and is located at the working face of the coal seam 4, and forms an old pond side 41 and a working face coal body side 42 on both sides along its width direction. The top plate of the cut eye 1 is used to support the top coal of the coal seam 4. The height direction of the cut eye 1 can be the up-and-down direction in the figure. The extension direction of the cut eye 1 can be the front-and-back direction in the figure. The width direction of the cut eye 1 can be the left-and-right direction in the figure.

[0052] It should be noted that the main reason why the initial pressure has a greater impact than the periodic pressure is the influence of the "masonry beam" structure and the three-twisted arch balance formed by the old roof fracture. Because there are two structures, "beam" and "arch" in the old roof rock structure, the step length of the pressure part will increase. The larger the step length of the initial pressure on the old roof, the more intense the pressure on the working face will be, and the corresponding dynamic pressure coefficient (that is, the ratio of the load on the support during pressure to the normal load) will also be greater. Therefore, in order to achieve safe production, it is necessary to destroy the "masonry beam" structure.

[0053] In addition, above the coal seam 4, from bottom to top, are the pseudo roof, direct roof and old roof (or key layer 5), and the integrity of the direct roof is affected by the balance characteristics of the old roof. Therefore, the blasting holes (i.e., the first blasting hole 2 and the second blasting hole 3) that pass through the pseudo roof and the direct roof in sequence and extend to the old roof (or key layer 5) through the wall of the cutting eye 1 can be used to realize blasting pressure relief of the old roof (or key layer 5), so as to effectively prevent the initial pressure of the top coal caving working face and reduce the pressure step distance.

[0054] There are multiple layers of rock strata with different thicknesses and strengths directly above the roof, among which one or several thick hard rock strata play a major role in controlling the movement of the overburden strata in the mining area. The rock strata that control the movement of the overburden strata in the mining area or all the strata on the surface are called key strata 5. The fracture of key stratum 5 will cause the overall movement of all or a considerable part of the overburden strata.

[0055] like Figure 1 and Figure 2As shown, in some embodiments, the vertical distance from the lowest position of the key layer 5 to the highest position of the coal seam 4 is greater than or equal to 60m, that is, the key layer 5 is a hard rock layer extending toward the surface 60 meters above the coal seam 4.

[0056] It can be understood that by determining the starting position of the key layer 5 in the present invention as 60 meters above the coal seam 4, when blasting and unloading are carried out in the first blasting hole 2 and the second blasting hole 3, the key layer 5 can present a masonry beam-like breaking movement similar to that of layered mining, and effectively avoid the rapid sinking of the working face roof caused by long-step old roof fractures due to rock rotation instability, sliding instability, step sinking, etc., and easily induce impact ground pressure and roof collapse accidents.

[0057] It should be noted that, according to the vertical distance H between the key layer 5 and the coal seam 4, it can be divided into a low key layer 5 (H < 10m), a middle key layer 5 (10m ≤ H < 60m) and a high key layer 5 (60m ≤ H). In the actual mining process of the mine, the low key layer 5 generates a large dynamic load disturbance to the mining area, and the energy release of the low key layer 5 before it touches the gangue is more meaningful.

[0058] After mining the coal seam 4, the thickness and lithology of the coal seam 4 determine the distribution state of the "three zones" of the overburden, and the position of the key layer 5 in the "three zones" determines its fracture form and the structural form that can be formed after fracture. Compared with stratified mining, the thickness of the coal seam 4 mined at one time in the comprehensive top-caving of thick coal seam 4 is significantly increased, resulting in an increase in the height of the collapse zone. Under the same overburden conditions, the broken rocks after the direct roof collapse are generally far from filling the goaf. After the old roof and the low key layer 5 are broken, they cannot contact the collapsed rocks in the goaf due to the large rotation and sinking amount, and it is difficult to form a stable masonry beam structure. Therefore, the old roof and the low key layer 5 of the comprehensive top-caving mining are often broken in the form of a cantilever beam, dividing the collapse zone into regular hard rock fracture blocks in the upper part and disordered direct roof broken rocks in the lower part. The higher key layer 5 presents a masonry beam-like breaking movement similar to stratified mining due to the gradual decrease in rotation and sinking amount. Therefore, the key layer 5 for the initial pressure blasting prevention and control of the top coal working face is selected as the hardest layer within 60m.

[0059] like Figure 2 As shown, in some embodiments, the position of the charge center of gravity of each of the first blasting hole 2 and the second blasting hole 3 is located in the key layer 5, that is, when the first blasting hole 2 and the second blasting hole 3 are charged and blasted, the charge center of gravity needs to penetrate into the first blasting hole 2 and the second blasting hole 3 and extend to the hole section of the key layer 5.

[0060] It can be understood that, under the coordinated structural design in which both the first blasting hole 2 and the second blasting hole 3 extend to the middle and upper part of the key layer 5 and the center of gravity of the charges of both are made to penetrate into the key layer 5, the initial pressure step distance can be reduced, the violent activity of the roof caused by the periodic pressure can be alleviated, and the superposition of dynamic and static load stresses caused by coal mining disturbance can be avoided.

[0061] Specifically, the first blasting hole 2 and the second blasting hole 3 may both include a first section and a second section connected, wherein the first section is located in the coal seam 4 and the non-critical layer 5, and the second section is located in the critical layer 5. The charge length of the first blasting hole 2 and the second blasting hole 3 may both be the entire second section and at least a portion of the first section adjacent to the second section, which may be adjusted according to the hole depth of the first blasting hole 2 and the second blasting hole 3 and the effect of the early pressure relief blasting, but it is necessary to ensure that the position of the charge center of gravity is located in the critical layer 5.

[0062] like Figure 2 As shown, in some embodiments, each of the orifices of the first blasting hole 2 and the orifice of the second blasting hole 3 is adjacent to the junction of the top plate and the side of the cutting eye 1, that is, the orifices of the two are arranged near the shoulder socket of the cutting eye 1, which is convenient for the construction of both and can isolate the top plate to protect it from being broken.

[0063] like Figure 2 As shown, in some embodiments, the first blasting hole 2 and the second blasting hole 3 are arranged in mirror symmetry with respect to the central axis of the cut hole 1, so as to further simplify the method of determining the layout of the first blasting hole 2 and the second blasting hole 3 and reduce the construction difficulty.

[0064] like Figure 1 and Figure 2 As shown, in some embodiments, there are multiple first blasting holes 2 and second blasting holes 3 and they correspond one to one, and all first blasting holes 2 and all second blasting holes 3 are arranged at intervals along the extension direction of the cutting eye 1, so that the entire length of the cutting eye 1 can be blasted, reducing the initial pressure step distance of the coal mine top coal caving working face.

[0065] like Figure 1 and Figure 2 As shown, in some embodiments, the spacing between any two adjacent first blasting holes 2 is a1, and the spacing between any two adjacent second blasting holes 3 is a2, wherein a1=a2, and 20m≤a1≤30m. The specific spacing between any two adjacent first blasting holes 2 can comprehensively consider factors such as the superposition effect of stress waves and the structural characteristics of the energy-gathering tube (i.e., the blasting energy-gathering tube), and be adjusted according to the effect of the previous pressure relief blasting.

[0066] like Figure 2As shown, in some embodiments, the initial pressure step distance is defined as L, the width of the cut eye 1 is b, the length of the projection of the first blasting hole 2 on the horizontal plane where the top plate of the cut eye 1 is located is b1, that is, the horizontal distance of the first blasting hole 2 is b1, and the length of the projection of the second blasting hole 3 on the horizontal plane where the top plate of the cut eye 1 is located is b2, that is, the horizontal distance of the second blasting hole 3 is b2, and the initial pressure step distance L satisfies: L≤b1+b+b2, that is, the sum of the horizontal distance of the first blasting hole 2, the width of the cut eye 1 and the horizontal distance of the second blasting hole 3 (that is, the effective pressure relief length) should not be less than the initial pressure step distance.

[0067] It should be noted that the initial pressure step and pressure intensity of the old roof are related to the mechanical properties, thickness, and interlocking conditions of the old roof rock strata. The sum of the horizontal distance of the first blasting hole 2, the width of the cut hole 1, and the horizontal distance of the second blasting hole 3 should not be less than the initial pressure step. According to the statistics of measured data in relevant technologies, in the production working face, the initial pressure step of 10-30m accounts for about 54%, 30-55m accounts for about 37.5%, and the rest is greater than 55m. Therefore, if the mine is the first mining working face, the pressure relief length (i.e., the sum of the horizontal distance of the first blasting hole 2, the width of the cut hole 1, and the horizontal distance of the second blasting hole 3) is determined as 30m, and the pressure relief length at the working face behind the mine can be determined based on the previous pressure relief situation.

[0068] like Figure 2 As shown, in some embodiments, the vertical distance from the bottom of the first blast hole 2 to the horizontal plane where the top plate of the cut hole 1 is located is defined as H1, and the angle between the axis of the first blast hole 2 and the horizontal plane where the top plate of the cut hole 1 is located is A.

[0069] The vertical distance from the bottom of the second blast hole 3 to the horizontal plane where the top plate of the cut hole 1 is located is H2, and the angle between the axis of the second blast hole 3 and the horizontal plane where the top plate of the cut hole 1 is located is B.

[0070] like Figure 2 As shown, in some embodiments, the angle A between the axis of the first blasting hole 2 and the horizontal plane where the top plate of the cut eye 1 is located satisfies: 45°≤A≤80°; the angle B between the axis of the second blasting hole 3 and the horizontal plane where the top plate of the cut eye 1 is located satisfies: 45°≤B≤80°.

[0071] It should be noted that the specific parameters of the orientation of the two and the orientation of the cutting eye 1 can be comprehensively considered according to factors such as the thickness of the coal seam 4 at the working face, the rock properties of the roof of the coal seam 4, construction conditions and equipment, and adjusted according to the effect of the previous pressure relief blasting.

[0072] like Figure 2As shown, in some embodiments, the hole depth of the first blasting hole 2 and the hole depth of the second blasting hole 3 are both greater than 10m to ensure the stability and safety of the roof support during the installation of the working face.

[0073] like Figure 1 and Figure 2 As shown, in some embodiments, the hole depth of the first blasting hole 2 is t1, the sealing length of the first blasting hole 2 is l1, 0.3t1≤l1<t1, and l1≥5m, the hole depth of the second blasting hole 3 is t2, the sealing length of the second blasting hole 3 is l2, 0.3t2≤l2<t2, and l2≥5m, that is, the sealing lengths of the two should not be less than 1 / 3 of the depth of the blasting holes (that is, the first blasting hole 2 and the second blasting hole 3), and should not be less than 5m, so as to ensure safety and blasting effect.

[0074] It should be noted that a reasonable sealing length should ensure that the rock mass in the sealing section is loose and pre-cracked, while at the same time preventing the formation of a throwing blasting funnel. In addition, all remaining blast holes after charging are sealed with yellow sand and yellow mud as sealing materials. The sealing should be firm but not too tight, and the detonator leg wire should not be damaged.

[0075] like Figure 1 and Figure 2 As shown, in some embodiments, the aperture of the first blasting hole 2 and the aperture of the second blasting hole 3 are both greater than 94 mm, specifically considering factors such as the diameter of the cartridge and the installation of the focusing tube, or by back-calculating based on the blasting uncoupling coefficient of 1.5.

[0076] like Figures 1 to 3 As shown, a method for preventing and controlling the initial pressure of a coal mine top coal caving working face according to an embodiment of the present invention comprises the following steps:

[0077] Step S1, constructing a cut 1 in the coal seam 4;

[0078] Step S2, determining the position of the key layer 5 above the coal seam 4;

[0079] Step S3, calculating the drilling angle and depth of each of the first blast hole 2 and the second blast hole 3 according to the initial pressure step, the width of the cut hole 1, and the position of the key layer 5;

[0080] Step S4, constructing the first blasting hole 2 and the second blasting hole 3 from the wall surface of the cut hole 1 toward the key layer 5, and extending the first blasting hole 2 and the second blasting hole 3 to the middle and upper part of the key layer 5;

[0081] Step S5, charging and blasting the first blasting hole 2 and the second blasting hole 3.

[0082] The technical advantages of the method for preventing and controlling the initial pressure on the top coal caving working face of a coal mine according to an embodiment of the present invention are the same as the technical advantages of the system for preventing and controlling the initial pressure on the top coal caving working face of a coal mine described above, and will not be repeated here.

[0083] like Figures 1 to 3 As shown, in some embodiments, step S2 is specifically to determine the position of the key layer 5 based on the thickness detection data of the top coal at the cutting eye 1, and combined with the thickness and lithological characteristics of the pseudo-roof, direct roof, and key rock layer above the coal seam 4 in the drill column diagram adjacent to the cutting eye 1.

[0084] like Figures 1 to 3 As shown, in some embodiments, the first blasting hole 2 and the second blasting hole 3 are arranged in mirror symmetry with respect to the central axis of the cut hole 1, that is, the first blasting hole 2 and the second blasting hole 3 have the same structure in the working face of the coal seam 4 where the cut hole 1 is located, and both are arranged in mirror image with respect to the cut hole 1, and step S3 includes:

[0085] Step S31, using formula Calculate the horizontal distance b′ between the first blast hole 2 and the second blast hole 3, where L is the initial pressure step distance and b is the width of the cut hole 1;

[0086] Step S32, according to the position of the key layer 5, determine the vertical distance H' from the bottom of the first blasting hole 2 and the bottom of the second blasting hole 3 to the horizontal plane where the top plate of the cut hole 1 is located;

[0087] Step S33, by formula Calculate the drilling angle θ of the first blasting hole 2 and the second blasting hole 3;

[0088] Step S34, based on the drilling angle θ of the first blast hole 2 and the second blast hole 3, and combined with the horizontal distance b′ between the first blast hole 2 and the second blast hole 3, the formula The hole depths t′ of the first blasting hole 2 and the second blasting hole 3 are calculated.

[0089] It should be noted that, since the first blasting hole 2 and the second blasting hole 3 are arranged in a mirror image relative to the cut eye 1, b1=b2, H1=H2, A=B, and t1=t2 in the above embodiment, therefore, b′ is the above-mentioned b1 or b2, similarly, H′ is the above-mentioned vertical distance H1 or H2, θ is the above-mentioned angle A or B, and t′ is the above-mentioned t1 and t2.

[0090] like Figures 1 to 3 As shown, in some embodiments, in the step of constructing the first blasting hole 2 and the second blasting hole 3 from the wall of the cut eye 1 toward the key layer 5, there are multiple first blasting holes 2 and multiple second blasting holes 3, and the multiple first blasting holes 2 and the multiple second blasting holes 3 are arranged at intervals along the extension direction of the cut eye 1.

[0091] like Figures 1 to 3 As shown, in some embodiments, step S5 includes:

[0092] Step S51, charging the first blasting hole 2 and the second blasting hole 3 by adopting a radial uncoupled continuous charging method;

[0093] Step S52, sealing the first blasting hole 2 and the second blasting hole 3 with a sealing material;

[0094] Step S53, determining the number of first blasting holes 2 and second blasting holes 3 and the blasting method for each blasting according to the blasting safety factor, and detonating the corresponding number of first blasting holes 2 and second blasting holes 3.

[0095] Specifically, the charge decoupling coefficient of the first blasting hole 2 and the second blasting hole 3 is not greater than 1.5, the charge line density is not less than 2kg / m, and the charge amount of a single hole does not exceed 100kg. The number of detonators used in a single hole should not be less than 2, and the number of detonators used in a single explosive package should not be less than 2. The lead connection should be in parallel in the hole and in series between holes. The distance from the leading coal mining face in the blasting operation should not be less than 200m. The charge structure can adopt the existing technology in this field. In order to reduce the impact of blasting on the surrounding rock of the tunnel, a certain blasting safety factor is considered, and it is preliminarily determined that 2 or 3 holes are blasted each time, and 2 or 3 holes are blasted in series. In addition, based on the previous blasting, the number of blasting holes (i.e., the first blasting hole 2 or the second blasting hole 3) can be optimized and adjusted.

[0096] It should be noted that a reasonable charge structure can avoid explosion rejection and sympathetic detonation and improve the blasting effect. In deep hole blasting, explosion rejection or sympathetic detonation is caused by pipeline effect or difference in detonation time of adjacent blast holes. The use of radial uncoupled continuous charge and detonation index detonation can avoid this phenomenon.

[0097] In addition, when the construction depth of the first blasting hole 2 and the second blasting hole 3 is less than 1 / 2 of the design depth (i.e., t′), charging blasting is strictly prohibited, and charging blasting is carried out according to the original design parameters at a distance of 0.8m to 1m from the original drill hole; and when the construction depth of the first blasting hole 2 and the second blasting hole 3 is greater than 1 / 2 of the design depth and the depth of entering the rock is greater than 5m, the charging amount can be reduced accordingly according to the ratio of the construction depth to the design depth, charging blasting is carried out, and the non-charging length is ensured to be not less than 10m, and at the same time, an additional blasting hole is constructed in the middle of the two originally designed blasting holes (the first blasting hole 2 or the second blasting hole 3) for pressure relief blasting.

[0098] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0099] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0100] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0101] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0102] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0103] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A system for preventing and controlling the initial pressure of a coal mine top coal caving working face, characterized in that: include: A cutting eye, wherein the cutting eye is located in a coal seam, and the coal seam is located below a key layer along a height direction of the cutting eye; as well as A first blasting hole and a second blasting hole, the first blasting hole and the second blasting hole both extend from the wall of the cut eye toward the key layer and extend to the middle and upper part of the key layer, the first blasting hole and the second blasting hole are respectively arranged on both sides of the cut eye along the width direction of the cut eye, and the axis of the first blasting hole and the axis of the second blasting hole both form an angle with the horizontal plane where the top plate of the cut eye is located.

2. The system for preventing and controlling the initial pressure in the coal mine top coal caving working face according to claim 1 is characterized in that: The vertical distance from the lowest position of the key layer to the highest position of the coal seam is greater than or equal to 60m; And / or, the charge center of each of the first blasting hole and the second blasting hole is located at the critical layer.

3. The system for preventing and controlling the initial pressure in the coal mine top coal caving working face according to claim 1, characterized in that: Each of the orifice of the first blasting hole and the orifice of the second blasting hole is adjacent to the junction of the top plate and the side of the cut hole.

4. The system for preventing and controlling the initial pressure in the coal mine top coal caving working face according to claim 1, characterized in that: The first blasting hole and the second blasting hole are arranged in mirror symmetry with respect to the central axis of the cut eye.

5. The system for preventing and controlling the initial pressure in the coal mine top coal caving working face according to claim 1, characterized in that: There are multiple first blasting holes and multiple second blasting holes in one-to-one correspondence, and all the first blasting holes and all the second blasting holes are arranged at intervals along the extension direction of the cut eye.

6. The system for preventing and controlling the initial pressure of the top coal caving working face in a coal mine according to any one of claims 1 to 5, characterized in that: Define the initial pressure step distance as L, the width of the cut eye as b, the length of the projection of the first blasting hole on the horizontal plane where the top plate of the cut eye is located as b1, the length of the projection of the second blasting hole on the horizontal plane where the top plate of the cut eye is located as b2, and the initial pressure step distance L satisfies: L≤b1+b+b2.

7. The system for preventing and controlling the initial pressure in the coal mine top coal caving working face according to claim 6, characterized in that: The vertical distance from the bottom of the first blast hole to the horizontal plane where the top plate of the cut hole is located is defined as H1, and the angle between the axis of the first blast hole and the horizontal plane where the top plate of the cut hole is located is defined as A. The vertical distance from the bottom of the second blast hole to the horizontal plane where the top plate of the cut hole is located is H2, and the angle between the axis of the second blast hole and the horizontal plane where the top plate of the cut hole is located is B.

8. A method for preventing and controlling the initial pressure of a coal mine top coal caving working face, characterized in that: The following steps are involved: Cutting holes in coal seam construction; determining the location of a critical layer above the coal seam; Calculating the drilling angle and depth of each of the first blast hole and the second blast hole according to the initial pressure step, the width of the cut hole, and the position of the key layer; Constructing the first blasting hole and the second blasting hole from the wall surface of the cut hole toward the key layer, and extending the first blasting hole and the second blasting hole to the middle and upper part of the key layer; The first blasting hole and the second blasting hole are charged and blasted.

9. The method for preventing and controlling the initial pressure in the coal mine top coal caving working face according to claim 8, characterized in that: The first blast hole and the second blast hole are arranged mirror-symmetrically with respect to the central axis of the cut hole, and the step of calculating the drilling angle and depth of each of the first blast hole and the second blast hole according to the initial pressure step, the width of the cut hole, and the position of the key layer comprises: Using the formula Calculate the horizontal distance b′ between the first blast hole and the second blast hole, where L is the initial pressure step distance and b is the width of the cut hole; According to the position of the key layer, determine the vertical distance H′ from the bottom of the first blast hole and the bottom of the second blast hole to the horizontal plane where the top plate of the cut hole is located; By formula Calculating drilling angles θ of the first blasting hole and the second blasting hole; Based on the drilling angle θ of the first blast hole and the second blast hole, and combined with the horizontal distance b′ between the first blast hole and the second blast hole, the formula The hole depths t' of the first blasting hole and the second blasting hole are calculated.

10. The method for preventing and controlling the initial pressure of the top coal caving working face in a coal mine according to claim 8 or 9, characterized in that: In the step of constructing the first blasting hole and the second blasting hole from the wall of the cut toward the key layer, there are multiple first blasting holes and multiple second blasting holes, and the multiple first blasting holes and the multiple second blasting holes are arranged at intervals along the extension direction of the cut.