Earth pressure shield tunneling machine and deslagging method

By designing a detachable mud discharge device and pressure holding system in the soil pressure shield machine, combined with real-time formation information detection and mud-water circulation technology, the construction difficulties of the soil pressure shield machine in the water-rich formation are solved, and the construction is improved Adaptability and efficiency.

CN118933822AInactive Publication Date: 2024-11-12CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD

Patent Information

Application Number
CN202411332016.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

It is difficult to construct smoothly when the soil pressure shield machine encounters water-rich formations during construction, and it is difficult to switch out slag mode between complex formations, affecting construction efficiency and safety.

Method used

A soil pressure shield machine is designed, including a detachable mud discharge device and a pressure holding system, which can switch between slag and mud water slag discharge modes, adjust the slag discharge mode by real-time detection of formation information, and in water-rich slag The mud separation and dilution technology are used to realize mud water circulation and slag extraction.

Benefits of technology

Improve the adaptability of the soil-pressed shield machine to complex formations, ensure smooth construction in the water-rich formation, reduce construction load and cost, and realize mud and water circulation and slag extraction, solving the problem of traditional soil-pressed shield in the water-rich formation. construction problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933822A_ABST
    Figure CN118933822A_ABST
Patent Text Reader

Abstract

The invention discloses an earth pressure shield tunneling machine and a deslagging method. The earth pressure shield tunneling machine comprises a shield body, a cutter head, a spiral conveyor, a belt conveyor and a slurry discharging device. And the cutter head is rotatably arranged on the shield body. And an excavation bin is formed between the cutterhead and the inner wall of the shield body. A slag inlet of the spiral conveyor extends into the excavation bin, and a slag outlet of the spiral conveyor extends out of the outer side of the shield body. And the belt conveyor is arranged on the lower side of the slag outlet of the spiral conveyor. The slurry discharging device is detachably connected to the slag outlet of the spiral conveyor so that the earth pressure shield tunneling machine can be switched between a muck discharging mode and a muddy water discharging mode. And in the muddy water deslagging mode, the mud discharging device is configured to be connected with the spiral conveyor, and mud in the excavation bin is conveyed by the spiral conveyor to be discharged into the mud discharging device from the slag outlet and discharged. According to the earth pressure shield tunneling machine, mud water and soil residues can be removed under the water-rich stratum working condition, and the adaptability of the earth pressure shield tunneling machine to complex stratums is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnel construction equipment, and in particular to an earth pressure shield machine and a slag discharging method. Background Art

[0002] In tunnel shield construction, the selection of shield machines needs to be comprehensively considered based on multiple aspects of information such as stratum information, construction route, and construction requirements. At present, earth pressure shields and slurry shields are common shield types. Earth pressure shields are mainly suitable for soft soil layers with low water pressure and less water volume, but earth pressure shields have difficulty in excavating water-rich sand layers with high water pressure, large rocks, and high permeability. At this time, slurry shields are generally required.

[0003] However, for some tunnels, the strata they pass through are relatively complex. They may need to pass through soft soil layers suitable for earth pressure shield construction, as well as water-rich strata suitable for slurry shield construction. Moreover, in many cases, only a portion of the strata being passed through is suitable for slurry shield construction, while most of them are still suitable for earth pressure shield construction. Therefore, how to ensure that earth pressure shield construction can be carried out smoothly when encountering water-rich strata during construction is a technical problem that needs to be solved urgently.

[0004] It should be noted that the statements in this background technology section only provide background technology related to the present invention and do not necessarily constitute prior art. Summary of the invention

[0005] The invention provides an earth pressure shield machine and a slag discharging method to improve the adaptability of the earth pressure shield machine to complex strata.

[0006] A first aspect of the present invention provides an earth pressure shield machine, comprising:

[0007] shield;

[0008] A cutter disc is rotatably arranged on the shield body, and an excavation chamber is formed between the cutter disc and the inner wall of the shield body;

[0009] Screw conveyor, the slag inlet of the screw conveyor extends into the excavation chamber, and the slag outlet of the screw conveyor extends out of the outer side of the shield;

[0010] A belt conveyor is arranged at the lower side of the slag outlet of the screw conveyor; and

[0011] The mud discharge device is detachably connected to the slag outlet of the screw conveyor so that the earth pressure shield machine can be switched between the slag discharge mode and the mud and water slag discharge mode. In the slag discharge mode, the mud discharge device is configured to be detached from the screw conveyor, and the slag in the excavation bin is discharged from the slag outlet to the belt conveyor under the transportation of the screw conveyor; in the mud and water slag discharge mode, the mud discharge device is configured to be connected to the screw conveyor, and the mud in the excavation bin is discharged from the slag outlet into the mud discharge device and discharged under the transportation of the screw conveyor.

[0012] In some embodiments, the mud discharge device includes a dilution box, a slag pump and a slurry discharge pipe. The dilution box is fluidly connected to the slag outlet of the screw conveyor to dilute the slag to form mud. The slag pump is used to pump the mud into the slurry discharge pipe, and the slurry discharge pipe discharges the mud.

[0013] In some embodiments, a crusher is provided in the dilution box to break up rocks in the mud.

[0014] In some embodiments, the earth pressure shield machine also includes a mud separation station and a slurry inlet pipe. The mud separation station is connected to the slurry discharge pipe to separate the debris from the mud discharged from the slurry discharge pipe. The two ends of the slurry inlet pipe are respectively connected to the mud separation station and the dilution box to return the slurry after the debris is separated to the dilution box.

[0015] In some embodiments, the density of the slurry delivered by the slurry inlet pipe is configured to be adjusted according to a target density of the slurry discharged by the slurry discharge pipe.

[0016] In some embodiments, the target density of the slurry discharged from the slurry discharge pipe is 1.1-1.3 t / m 3 The density of the slurry transported by the slurry inlet pipe is 1-1.1t / m 3 .

[0017] In some embodiments, the earth pressure shield machine also includes a modifier delivery pipeline. In the soil slag discharge mode, the modifier delivery pipeline is configured to deliver water and / or foam to the excavation chamber; in the mud and water slag discharge mode, the modifier delivery pipeline is configured to connect to the mud and water separation station to deliver slurry into the excavation chamber.

[0018] In some embodiments, the slurry discharge pipe is configured to extend rearwardly along the axial direction of the shield so that the pressure of the slurry is reduced during transportation to avoid gushing.

[0019] In some embodiments, the earth pressure shield machine further includes a slag discharge gate disposed at the slag discharge port, and the opening of the slag discharge gate can be adjusted according to the pressure of the excavation chamber.

[0020] In some embodiments, the earth pressure shield machine also includes a pressure maintaining system, which includes a pressure maintaining pipe and a bentonite tank. The pressure maintaining pipe is connected to the excavation chamber. The pressure maintaining system is configured to transport the bentonite in the bentonite tank to the excavation chamber through the pressure maintaining pipe to increase the pressure in the excavation chamber when the pressure in the excavation chamber is less than a set value.

[0021] In some embodiments, the earth pressure shield machine also includes a pressure detection device for detecting the pressure of the excavation chamber in real time and a controller for controlling the excavation speed of the shield body along the excavation direction. When the pressure detection device detects that the pressure in the excavation chamber is greater than a set value, the controller is configured to slow down the excavation speed of the shield body.

[0022] A second aspect of the present invention provides a slag discharging method based on the above-mentioned earth pressure shield machine, comprising the following steps:

[0023] Real-time detection of excavation stratum information along the excavation path; and

[0024] The slag discharge mode of the earth pressure shield machine is switched according to the information of the excavation stratum, and the slag discharge mode includes a slag soil slag discharge mode and a mud and water slag discharge mode: when the excavation stratum is a soft soil stratum, the mud discharge device is removed to put the earth pressure shield machine in the slag soil slag discharge mode, and the slag in the excavation bin is discharged from the slag discharge port to the belt conveyor under the transportation of the screw conveyor; when the excavation stratum is a water-rich stratum, the mud discharge device is connected to the screw conveyor, and the screw conveyor is controlled to work so that the mud in the excavation bin is discharged from the slag discharge port into the mud discharge device and discharged under the transportation of the screw conveyor.

[0025] In some embodiments, in the muddy water mucking mode, when the pressure in the excavation chamber is greater than a set value, the excavation speed of the shield is slowed down.

[0026] Based on the technical solution provided by the present invention, the earth pressure shield machine includes a shield body, a cutter disc, a screw conveyor, a belt conveyor and a mud discharge device. Among them, the cutter disc is rotatably arranged on the shield body. And an excavation chamber is formed between the cutter disc and the inner wall of the shield body. The slag inlet of the screw conveyor extends into the excavation chamber, and the slag outlet of the screw conveyor extends out of the outer side of the shield body. The belt conveyor is arranged at the lower side of the slag outlet of the screw conveyor. The mud discharge device is detachably connected to the slag outlet of the screw conveyor so that the earth pressure shield machine can switch between the slag discharge mode of slag soil and the slag discharge mode of mud and water. In the slag discharge mode, the mud discharge device is configured to be detached from the screw conveyor, and the slag in the excavation chamber is discharged from the slag outlet to the belt conveyor under the conveyance of the screw conveyor. In the mud and water slag discharge mode, the mud discharge device is configured to be connected to the screw conveyor, and the mud in the excavation chamber is discharged from the slag outlet to the mud discharge device and discharged under the conveyance of the screw conveyor. The earth pressure shield machine of the embodiment of the present invention is provided with a detachably connected mud discharge device at the slag outlet of the screw conveyor. In this way, in the slag discharge mode, the mud discharge device can be removed, and the screw conveyor and the belt conveyor can be used to discharge the slag of the slag; in the mud and water slag discharge mode, the mud discharge device is connected to the screw conveyor, and the screw conveyor and the mud discharge device are used to discharge the mud together. In this way, the earth pressure shield machine of the embodiment of the present invention can discharge mud, water and soil slag in water-rich formation conditions, thereby improving the adaptability of the earth pressure shield machine to complex formations.

[0027] Further features and advantages of the present invention will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0029] Figure 1 It is a schematic diagram of the main structure of the earth pressure shield machine according to an embodiment of the present invention.

[0030] Figure 2 for Figure 1 Schematic diagram of the partial structure of the earth pressure shield machine shown.

[0031] Figure 3 for Figure 1 Schematic diagram of mud and water circulation of earth pressure shield machine shown. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] Unless otherwise specifically stated, the relative arrangement, numerical expressions and numerical values ​​of the parts and steps set forth in these embodiments do not limit the scope of the present invention. Meanwhile, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to actual proportional relationships. The technology, methods and equipment known to those of ordinary skill in the relevant art may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be considered as a part of the specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may have different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, and therefore, once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.

[0034] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" may include both "above" and "below". The device may also be positioned in other different ways, and the spatially relative descriptions used here are interpreted accordingly.

[0035] like Figures 1 to 3 As shown, some embodiments of the present invention provide an earth pressure shield machine, including a shield body 3, a cutter disc 1, a screw conveyor 4, a belt conveyor and a mud discharge device. Among them, the cutter disc 1 is rotatably arranged on the shield body 3. And an excavation chamber 2 is formed between the cutter disc 1 and the inner wall of the shield body 3. The slag inlet of the screw conveyor 4 extends into the excavation chamber 2, and the slag outlet of the screw conveyor 4 extends outward from the shield body 3. The belt conveyor is arranged on the lower side of the slag outlet of the screw conveyor 4. The mud discharge device is detachably connected to the slag outlet of the screw conveyor 4 so that the earth pressure shield machine can be switched between a slag discharge mode and a mud and water slag discharge mode. In the slag discharge mode, the mud discharge device is configured to be detached from the screw conveyor, and the slag in the excavation chamber 2 is discharged from the slag outlet to the belt conveyor under the transportation of the screw conveyor 4. In the mud and water slag discharge mode, the mud discharge device is configured to be connected to the screw conveyor, and the mud in the excavation chamber 2 is discharged from the slag discharge port into the mud discharge device and discharged under the conveyance of the screw conveyor 4.

[0036] The earth pressure shield machine of the embodiment of the present invention is provided with a detachably connected mud discharge device at the slag outlet of the screw conveyor, so that in the slag discharge mode, the mud discharge device can be removed, and then the slag of the slag can be realized by using the screw conveyor and the belt conveyor; in the mud and water slag discharge mode, the mud discharge device is connected to the screw conveyor, and the mud is discharged together by using the screw conveyor and the mud discharge device, so that the earth pressure shield machine of the embodiment of the present invention can realize mud, water and soil slag in water-rich formation conditions, and improves the adaptability of the earth pressure shield machine to complex formations. In addition, the mud discharge device of the earth pressure shield machine of the embodiment of the present invention is detachable, so in most soft soil formations, the earth pressure shield machine does not need to bear the weight of the mud discharge device during the excavation process, thereby reducing the load. Moreover, in this way, two slag discharge modes can be realized while maintaining the original structure of the earth pressure shield machine, so the cost is relatively low.

[0037] In some embodiments, the mud discharge device includes a dilution box 6, a slag pump 7 and a slurry discharge pipe 11. The dilution box 6 is fluidly connected to the slag outlet of the screw conveyor 4 to dilute the slag to form mud. The slag pump 7 is used to pump the mud into the slurry discharge pipe 11. The slurry discharge pipe 11 is configured to extend backward along the axial direction of the shield body 3 so that the pressure of the mud is reduced during the transportation process to avoid gushing.

[0038] The mud discharge device of this embodiment first dilutes the slag in the mud in the dilution box 6, so that the mud can be discharged smoothly. The slag discharge pump 7 is used to pump the diluted mud into the mud discharge pipe 11 located at a higher position, and the mud inlet pipe 11 extends in the axial direction so that the pressure of the slurry is reduced during the outward discharge process to avoid gushing.

[0039] In order to prevent the stones in the discharged mud from clogging the mud discharge pipe, in some embodiments, a crusher is provided in the dilution box 6 to crush the stones in the mud.

[0040] In some embodiments, the earth pressure shield machine further includes a mud separation station 17 and a slurry inlet pipe 10. The mud separation station 17 is connected to the slurry discharge pipe 11 to separate the slag from the mud discharged from the slurry discharge pipe 11, and the two ends of the slurry inlet pipe 10 are respectively connected to the mud separation station 17 and the dilution tank 6 to return the slurry after the slag is separated to the dilution tank 6. In this embodiment, the slurry after the mud and water separation is injected back into the dilution tank by the slurry inlet pipe 10 to dilute the slurry in the dilution tank, so that the density of the mud in the dilution tank can be reduced to prevent the stratification problem caused by too high concentration, thereby improving the smoothness of mud discharge.

[0041] As described in the previous paragraph, in order to prevent the density of the mud from being too high to be discharged, a slurry inlet pipe is provided to return the separated slurry to the dilution tank, so the concentration of the slurry returned to the dilution tank needs to be controlled. In some embodiments, the density of the slurry transported by the slurry inlet pipe 10 is configured to be adjusted according to the target density of the slurry discharged by the slurry discharge pipe 11.

[0042] In some embodiments, the density of the slurry delivered by the slurry inlet pipe 10 is less than the target density of the slurry discharged by the slurry discharge pipe 11. Specifically, the target density of the slurry discharged by the slurry discharge pipe 11 is 1.1-1.3 t / m 3 The density of the slurry delivered by the slurry inlet pipe 10 is 1-1.1 t / m 3 .

[0043] In some embodiments, the earth pressure shield machine also includes a modifier delivery pipeline. In the slag discharge mode, the modifier delivery pipeline is configured to deliver water and / or foam to the excavation chamber. In the mud and water discharge mode, the modifier delivery pipeline is configured to be connected to the mud and water separation station to deliver slurry to the excavation chamber. The earth pressure shield machine of this embodiment uses the existing structural modifier delivery pipeline to transport the slurry separated by the mud and water separation station back to the excavation chamber to improve the slag in the excavation chamber, thereby promoting the discharge of mud in the excavation chamber.

[0044] In the muddy water slag discharge mode, the pressure in the excavation chamber will increase a lot. In order to avoid abnormalities caused by excessive pressure fluctuations, in some embodiments, the earth pressure shield machine also includes a slag discharge gate 5 arranged at the slag discharge port. The opening of the slag discharge gate 5 is adjustable according to the pressure of the excavation chamber.

[0045] Specifically, when the pressure fluctuation of the excavation chamber is large, the opening of the slag gate 5 can be controlled to be small; when the pressure of the excavation chamber is stable, that is, the fluctuation is small, the opening of the slag gate 5 can be controlled to be large. In other words, the opening of the slag gate 5 of this embodiment is adjusted according to the magnitude of the pressure change of the excavation chamber.

[0046] In some embodiments, the earth pressure shield machine further includes a pressure maintaining system 9. The pressure maintaining system 9 includes a pressure maintaining pipe and a bentonite tank. The pressure maintaining pipe is connected to the excavation chamber 2, and the pressure maintaining system 9 is configured to transport the bentonite in the bentonite tank to the excavation chamber through the pressure maintaining pipe when the pressure in the excavation chamber is less than a set value to increase the pressure in the excavation chamber. When the pressure in the excavation chamber 2 is less than a set value, the pressure maintaining system 9 automatically replenishes bentonite in the excavation chamber 2 so that the pressure in the excavation chamber 2 is maintained at the set value, thereby avoiding problems such as face collapse.

[0047] The function of the pressure-maintaining system 9 is to prevent the pressure in the excavation chamber 2 from decreasing. In the case where the pressure in the excavation chamber 2 exceeds a set value, in some embodiments, the earth pressure shield machine further includes a pressure detection device for detecting the pressure in the excavation chamber in real time and a controller for controlling the excavation speed of the shield body along the excavation direction. When the pressure detection device detects that the pressure in the excavation chamber is greater than the set value, the controller is configured to slow down the excavation speed of the shield body.

[0048] That is to say, when the pressure in the excavation chamber exceeds the set value, the excavation speed of the shield can be slowed down to reduce the pressure in the excavation chamber.

[0049] Another embodiment of the present invention further provides a slag discharging method for an earth pressure shield machine based on the above embodiment, comprising the following steps:

[0050] Real-time detection of excavation stratum information along the excavation path; and

[0051] The slag discharge mode of the earth pressure shield machine is switched according to the information of the excavation stratum, and the slag discharge mode includes a slag soil slag discharge mode and a mud and water slag discharge mode: when the excavation stratum is a soft soil stratum, the mud discharge device is removed to put the earth pressure shield machine in the slag soil slag discharge mode, and the slag in the excavation chamber 2 is discharged from the slag discharge port to the belt conveyor under the transportation of the screw conveyor 4; when the excavation stratum is a water-rich stratum, the mud discharge device is connected to the screw conveyor, and the screw conveyor 4 is controlled to work so that the mud in the excavation chamber 2 is discharged from the slag discharge port to the mud discharge device and discharged under the transportation of the screw conveyor 4.

[0052] The earth pressure shield machine of this embodiment can realize mud and water circulation slag discharge, solving the problem of mud and water circulation slag discharge of the earth pressure shield. Moreover, the slag discharge method of this embodiment can predict the information of the stratum to be excavated in advance by real-time detection of the information of the excavation stratum on the excavation path. For example, if the stratum information is predicted in advance as a water-rich stratum, advance preparations can be made, and the mud discharge device can be connected to the screw conveyor at the location of the water-rich stratum.

[0053] Specifically, the real-time detection of the information of the excavation stratum on the excavation path includes using a pressure detection device to detect the pressure of the stratum and then determine the stratum information. Specifically, the current stratum information can be comprehensively determined based on the geological detection report and the actual excavated slag. Or in other embodiments, an advanced geological detection device is set on the shield machine to detect the current stratum information.

[0054] In some embodiments, in the muddy and water slag removal mode, when the pressure of the excavation chamber is greater than a set value, the excavation speed of the shield body 3 is slowed down.

[0055] According to the following Figures 1 to 3 The structure and slag discharging method of an earth pressure shield machine according to a specific embodiment of the present invention are described in detail.

[0056] like Figure 1 and Figure 2 As shown, the earth pressure shield machine of this embodiment includes a cutter head 1, an excavation chamber 2, a shield body 3, a screw conveyor 4, a slag gate 5, a dilution box 6, a slag pump 7, a pressure maintaining system 9, a slurry inlet pipe 10, a slurry discharge pipe 11, a first bentonite tank 12, a second bentonite tank 13, a foam delivery pipeline 14, a water delivery pipeline 15 and a mud-water separation station 17.

[0057] The shield body 3 includes a soil bin wall disposed on the inner side of the front end in the excavation direction, the cutter disc 1 is rotatably disposed on the soil bin wall, and a driving device for driving the cutter disc 1 to rotate is also disposed at the rear end of the soil bin wall. An excavation bin 2 is formed between the soil bin wall, the cutter disc 1 and the front end of the shield body 3.

[0058] The slag inlet of the screw conveyor 4 extends into the excavation chamber 2, so that the slag excavated by the cutter head 1 can directly enter the screw conveyor 4 through the slag inlet under the high-speed rotation of the screw conveyor 4 for slag discharge. The screw conveyor 4 is arranged as a whole inclined, and in the extending direction from the slag inlet to the slag discharge, the screw conveyor 4 is inclined upward. The slag inlet is arranged on the end face of the screw conveyor 4, such as Figure 1 and Figure 2 As shown, the slag outlet is arranged on the side wall of the screw conveyor 4. In this way, the belt conveyor is arranged below the slag outlet and can directly receive the slag discharged from the slag outlet and transport it to the outside of the tunnel.

[0059] like Figure 1 and Figure 2 As shown, a slag discharge gate 5 is provided at the slag discharge port of the screw conveyor 4 of this embodiment. The slag discharge gate 5 can control the opening and closing of the slag discharge port and the size of the opening.

[0060] The earth pressure shield machine of this embodiment has two slag discharge modes, namely, slag discharge mode and mud slag discharge mode. In the slag discharge mode, the slag discharge port of the screw conveyor 4 is not connected to the dilution box 6, so that the discharged slag directly falls on the belt conveyor and is discharged outside the tunnel; in the mud slag discharge mode, the slag discharge port of the screw conveyor 4 is connected to the dilution box 6 so that the mud enters the dilution box 6 for dilution. Specifically, the slag discharge mode of the earth pressure shield machine of this embodiment is switched according to the formation information encountered during the excavation process. For soft soil formations, the slag discharge mode is adopted, and for water-rich formations, the mud and water discharge mode is adopted.

[0061] It should also be noted here that the earth pressure shield machine of this embodiment is called an earth pressure shield machine because most of the strata in its excavation path are still soft soil strata, and only a small part may encounter water-rich strata. So this is also the improvement of this embodiment. By making low-cost structural improvements to the earth pressure shield machine, the original earth pressure shield machine can be able to cope with the mud and water slag discharge in water-rich strata, thereby reducing costs. Therefore, the earth pressure shield machine of this embodiment achieves the above purpose by providing a mud discharge device that is detachably connected to the screw conveyor 4. During most of the excavation process of the earth pressure shield machine, the mud discharge device is not connected to the screw conveyor 4, so that the earth pressure shield machine can operate in the original slag discharge mode, and at this time the earth pressure shield machine does not need to carry the mud discharge device during the excavation process, so the operating load of the earth pressure shield machine can be reduced.

[0062] like Figure 1 and Figure 2 As shown, the rear end of the dilution box 6 is connected to the slag pump 7, and the slag pump 7 is connected to the slurry discharge pipe 11. A crusher is arranged in the dilution box 6 to crush the stones in the slurry to prevent the stones from getting stuck in the slurry discharge pipe 11 and causing the pipe to be blocked. The slurry discharge pipe 11 discharges the slurry in the dilution box 6.

[0063] Mud is a mixture of slag, muddy water, stones, etc. Therefore, after the mud enters the dilution box 6, it may be stratified due to gravity, that is, heavier slag, stones, etc. will settle to the bottom, and muddy water, etc. will float on the upper layer. In this case, most of the mud entering the slurry discharge pipe 11 will be the muddy water floating on the upper layer, while the slag, stones, etc. may be retained in the dilution box 6 and affect the normal slag discharge.

[0064] In order to solve the above problems, Figure 3 As shown, the mud discharged from the slurry discharge pipe 11 passes through the mud separation station 17 to separate part of the slag in the mud, and the slurry formed after the slag separation returns to the dilution box 6 through the slurry inlet pipe 10 to dilute the slag in the dilution box 6 to complete the mud circulation. That is, in order to avoid the above stratification problem, the present embodiment uses the slurry inlet pipe 10 to inject the slurry after the mud and water separation back into the dilution box to dilute the slag in the dilution box, so that the density of the mud in the dilution box can be reduced to prevent the stratification problem caused by being too thick.

[0065] Furthermore, the pressure of the slurry output from the slurry inlet pipe 10 can be increased so that the slurry is sprayed into the dilution box, thereby allowing the slag and the slurry to be fully dissolved together to avoid sedimentation problems.

[0066] Specifically, Figure 2 As shown, the earth pressure shield machine of this embodiment includes an inclined connecting pipe 62, the upper end of which is connected to the slag outlet, and the lower end of which is connected to the dilution box 6. The output end of the slurry inlet pipe 10 of this embodiment is arranged at a position close to the upper end of the connecting pipe 62, so that the slurry is directly mixed with the slurry discharged from the output end of the slurry inlet pipe 10 after being discharged from the slag outlet, so that the slurry is mixed before entering the dilution box 6, avoiding precipitation in the dilution box.

[0067] When the earth pressure shield machine encounters a water-rich stratum, due to the high pressure in the excavation chamber, if the slag is directly discharged from the slag outlet of the screw conveyor 6, it will gush and splash into the tunnel, causing pollution or even damage to various components. The earth pressure shield machine of this embodiment connects a dilution box at the slag outlet to collect the slurry, avoiding pollution and damage caused by disorderly spraying. Figure 2 As shown, in this embodiment, the slurry discharge pipe 11 is extended very long in the axial direction so that the pressure of the slurry is gradually reduced during the discharge process in the slurry discharge pipe 11 until it is reduced to substantially the same as the atmospheric pressure, and then the slurry is discharged to the outside, thereby avoiding the gushing problem.

[0068] like Figure 3As shown, the earth pressure shield machine of this embodiment uses the slurry inlet pipe 10 to return the slurry after the separation of mud and water to the dilution box 6 to improve the slag in the dilution box 6. The earth pressure shield machine of this embodiment also uses the foam conveying pipeline 14 and the water conveying pipeline 15 of the earth pressure shield machine to convey the slurry to the excavation chamber 2 to improve the slag in the excavation chamber 2 to facilitate the discharge of the slurry.

[0069] like Figure 3 As shown, the mud discharged from the mud-water separation station 16 is mixed with bentonite through the second bentonite tank 13 and transported to the excavation chamber 2 through the foam delivery pipeline 14 and the water delivery pipeline 15. The second bentonite tank 13 here is used to inject appropriate bentonite into the mud to adjust the concentration of the slurry discharged back into the excavation chamber 2.

[0070] The mud-water separation station 17 of this embodiment includes a multi-stage separation station, for example, it may include a first-stage separation station 171 and a second-stage separation station 172. Of course, it may also include more stages of separation stations, which will not be described in detail here.

[0071] like Figure 3 As shown, the earth pressure shield machine of this embodiment also includes a pressure maintaining system 9, which is connected to the first bentonite tank 12 to allow bentonite to enter the pressure maintaining system 9, and when the pressure in the excavation chamber 2 is less than a set value, the bentonite is automatically added to the excavation chamber 2 to keep the pressure in the excavation chamber 2 at the set value, thereby avoiding problems such as face collapse.

[0072] Furthermore, the pressure-maintaining system 9 of this embodiment is also connected to the slurry inlet pipe 10 to inject the slurry into the excavation chamber by means of pressure compensation.

[0073] The density of the excavated soil after improvement is 1.6-1.8t / m 3 The density of the slag in the dilution box after dilution is 1.1-1.3 t / m 3 The density of the slurry after separation in the mud-water separation station is 1.0-1.1t / m 3 , realizing mud and water circulation and slag discharge.

[0074] The earth pressure shield machine of this embodiment can control the ratio of slurry inlet and slurry outlet by arranging a slurry inlet flowmeter on the slurry inlet pipe 10 and a slurry outlet flowmeter on the slurry outlet pipe 11. The density of the slurry inlet can be controlled by the amount of bentonite injected into the slurry. The density of the slurry outlet can be controlled by controlling the slurry inlet flow rate and the slurry outlet flow rate.

[0075] It can be seen that the earth pressure shield machine of this embodiment can realize mud and water circulation slag discharge. The mud and water circulation system is used to control the mud ratio of slurry inlet and slag discharge, and the weekend pressure maintenance system is used to realize the pressure control of the excavation chamber. At the same time, the foam delivery pipeline and water delivery pipeline of the earth pressure shield are used to realize the improvement of the slag in the excavation chamber. The earth pressure shield machine of this embodiment can realize mud and water circulation slag discharge, solving the problem of mud and water circulation slag discharge of the earth pressure shield.

[0076] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. An earth pressure shield machine, characterized in that: include: shield(3); A cutter disc (1) is rotatably arranged on the shield body (3), and an excavation chamber (2) is formed between the cutter disc (1) and the inner wall of the shield body (3); A screw conveyor (4), wherein a slag inlet of the screw conveyor (4) extends into the excavation chamber (2), and a slag outlet of the screw conveyor (4) extends outward from the shield body (3); A belt conveyor, arranged at the lower side of the slag outlet of the screw conveyor (4); and A mud discharge device is detachably connected to the slag outlet of the screw conveyor (4) so ​​that the earth pressure shield machine can be switched between a slag discharge mode and a mud and water slag discharge mode. In the slag discharge mode, the mud discharge device is configured to be detached from the screw conveyor, and the slag in the excavation chamber (2) is discharged from the slag outlet to the belt conveyor under the transportation of the screw conveyor (4); in the mud and water slag discharge mode, the mud discharge device is configured to be connected to the screw conveyor, and the mud in the excavation chamber (2) is discharged from the slag outlet to the mud discharge device under the transportation of the screw conveyor (4) and discharged.

2. The earth pressure shield machine according to claim 1, characterized in that: The mud discharge device comprises a dilution box (6), a slag discharge pump (7) and a slurry discharge pipe (11); the dilution box (6) is fluidly connected to the slag discharge port of the screw conveyor (4) to dilute the slag to form mud; the slag discharge pump (7) is used to pump the mud into the slurry discharge pipe (11); and the slurry discharge pipe (10) discharges the mud.

3. The earth pressure shield machine according to claim 2, characterized in that: A crusher is arranged in the dilution box (6) to crush the stones in the mud.

4. The earth pressure shield machine according to claim 2, characterized in that: The earth pressure shield machine also includes a mud separation station (17) and a slurry inlet pipe (10). The mud separation station (17) is connected to the slurry discharge pipe (11) to separate the slag from the mud discharged from the slurry discharge pipe (11). The two ends of the slurry inlet pipe (10) are respectively connected to the mud separation station (17) and the dilution tank (6) to return the slurry after the slurry is separated to the dilution tank (6).

5. The earth pressure shield machine according to claim 4, characterized in that: The density of the slurry delivered by the slurry inlet pipe (10) is configured to be adjusted according to the target density of the slurry discharged by the slurry discharge pipe (11).

6. The earth pressure shield machine according to claim 5, characterized in that: The target density of the slurry discharged from the slurry discharge pipe (11) is 1.1-1.3 t / m 3 The density of the slurry transported by the slurry inlet pipe (10) is 1-1.1 t / m 3 .

7. The earth pressure shield machine according to claim 4, characterized in that: The earth pressure shield machine also includes a modifier delivery pipeline. In the slag discharge mode, the modifier delivery pipeline is configured to deliver water and / or foam to the excavation chamber; in the mud and water discharge mode, the modifier delivery pipeline is configured to connect with the mud and water separation station to deliver slurry into the excavation chamber.

8. The earth pressure shield machine according to claim 2, characterized in that: The slurry discharge pipe (11) is configured to extend backward along the axial direction of the shield body (3) so that the pressure of the slurry is reduced during transportation to avoid gushing.

9. The earth pressure shield machine according to claim 1, characterized in that: The earth pressure shield machine further comprises a slag discharge gate (5) arranged at the slag discharge port, and the opening degree of the slag discharge gate (5) is adjustable according to the pressure of the excavation chamber.

10. The earth pressure shield machine according to claim 1, characterized in that: The earth pressure shield machine also includes a pressure maintaining system, the pressure maintaining system (9) includes a pressure maintaining pipe and a bentonite tank, the pressure maintaining pipe is connected to the excavation chamber, and the pressure maintaining system (9) is configured to transport the bentonite in the bentonite tank to the excavation chamber through the pressure maintaining pipe when the pressure in the excavation chamber is less than a set value to increase the pressure in the excavation chamber.

11. The earth pressure shield machine according to claim 10, characterized in that: The earth pressure shield machine also includes a pressure detection device for detecting the pressure of the excavation chamber in real time and a controller for controlling the excavation speed of the shield body along the excavation direction. When the pressure detection device detects that the pressure in the excavation chamber is greater than a set value, the controller is configured to slow down the excavation speed of the shield body.

12. A slag discharge method for an earth pressure shield machine according to any one of claims 1 to 11, characterized in that: The steps include: Real-time detection of excavation stratum information along the excavation path; and The slag discharge mode of the earth pressure shield machine is switched according to information of the excavation stratum, and the slag discharge mode includes a slag discharge mode and a mud and water slag discharge mode: when the excavation stratum is a soft soil stratum, the mud discharge device is removed so that the earth pressure shield machine is in the slag discharge mode, and the slag in the excavation chamber (2) is discharged from the slag discharge port to the belt conveyor under the transportation of the screw conveyor (4); when the excavation stratum is a water-rich stratum, the mud discharge device is connected to the screw conveyor, and the screw conveyor (4) is controlled to work so that the mud in the excavation chamber (2) is discharged from the slag discharge port to the mud discharge device and discharged under the transportation of the screw conveyor (4).

13. The slag discharging method according to claim 12, characterized in that: In the muddy water slag removal mode, when the pressure of the excavation chamber is greater than a set value, the excavation speed of the shield body (3) is slowed down.

Citation Information

Patent Citations

  • Deslagging system of shield tunneling machine and shield tunneling machine with deslagging system

    CN107989629A

  • Shield tunneling machine and construction method thereof

    CN111550255A

  • Device and method for shield tunneling speed coupling control

    CN114278311A

  • Dual-mode shield tunneling machine in-tunnel pressure-stabilizing and mode-changing construction system and method

    CN115929341A

  • Shield tunneling machine and grouting system thereof

    CN215213513U

Cited By