Shield synchronous grouting effect evaluation method in silty soil area

Through multi-dimensional parameter collection and real-time monitoring and optimization of grouting parameters, the shortcomings of grouting effect evaluation in shield construction in silt soil area are solved, accurate evaluation of grouting effect and improvement of construction efficiency are achieved, and the stability of tunnel structure is ensured. Sex and safety.

CN118933866APending Publication Date: 2024-11-12ZHONGTIAN CONSTR GROUP +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411055697.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the shield construction in silt soil area, the traditional synchronous grouting effect evaluation method has problems such as single indicators, incomplete data collection, lack of dynamic monitoring and insufficient basis for secondary grouting decisions, which makes it difficult to accurately evaluate and optimize the grouting effect, which affects the impact of Tunnel structure stability and safety.

Method used

The acquisition and comparison analysis method of multi-dimensional key parameters is adopted, including data acquisition and calculation of drilling core rate, cohesion, internal friction angle, residual strength and porosity of surrounding rocks before and after grouting, and real-time monitoring and adjustment of grouting Parameters, optimize the grouting effect through multiple detection and feedback, and provide scientific secondary grouting decisions.

Benefits of technology

Multi-dimensional and accurate evaluation of grouting effect was achieved, problems during grouting were discovered and solved in a timely manner, construction efficiency and quality were improved, long-term stability and safety of tunnel structures were ensured, and grouting process was optimized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933866A_ABST
    Figure CN118933866A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel construction, and provides a silty soil area shield synchronous grouting effect evaluation method which comprises the steps of data acquisition before and after grouting, shield tunneling synchronous grouting, calculation of evaluation index values of surrounding rock strength after preliminary grouting, calculation and judgment of surrounding rock strength values after grouting and the like, and grouting effect evaluation and adjustment are carried out. According to the method for evaluating the synchronous grouting effect of the shield in the silty soil area, by comprehensively collecting, comparing and analyzing key physical and mechanical parameters before and after grouting, multi-dimensional and accurate evaluation of the grouting effect is achieved, the limitation of a traditional single evaluation index is overcome, problems are found and solved in time, a scientific basis is provided for secondary grouting, and the method is suitable for popularization and application. The problem of stratum instability caused by insufficient or excessive grouting is effectively avoided, long-term stability and safety of a tunnel structure are ensured, the construction efficiency and quality are remarkably improved, and a solid technical guarantee is provided for shield tunnel construction in a silty soil area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular to a method for evaluating the synchronous grouting effect of a shield in a silt soil area. Background Art

[0002] When constructing tunnels in silty soil areas, the shield machine is the core equipment, and the synchronous grouting technology during its excavation process is particularly important. This type of geological conditions, due to its fine particles, strong permeability, and poor self-stability, brings many challenges to shield construction, especially in the evaluation and control of grouting effects.

[0003] The geological conditions in silt soil areas are complex and changeable, and the bonding force between soil particles is weak, which makes it easy to be disturbed and deformed during shield excavation. When the excavation diameter of the shield machine's cutterhead is larger than the outer diameter of the segment, the naturally formed gap between the segment and the surrounding rock becomes a problem that needs to be solved urgently. This gap will not only cause the displacement of the rock mass and the sinking of the surface, but may also cause stability problems of the tunnel structure, increasing safety hazards during construction.

[0004] In order to fill this gap and reduce surface settlement and tunnel deformation, synchronous grouting technology came into being. This technology achieves the purpose of filling the gap and stabilizing the stratum by injecting grout into the building gap between the pipe segment and the surrounding rock in real time during the excavation process. The timeliness, uniformity and sufficiency of synchronous grouting are directly related to the quality of grouting, which in turn affects the quality and safety of the entire tunnel construction.

[0005] However, when performing synchronous grouting in silty soil areas, a series of technical difficulties are often encountered. First of all, the control of grouting parameters is crucial, including grouting volume and grouting pressure. If the grouting pressure is too high, it may cause adverse consequences such as surface uplift and slurry breaking through the shield tail seal; if the grouting pressure is too low, it may lead to incomplete slurry filling and affect the grouting effect. Secondly, the selection and proportion of grouting materials are also key factors affecting the grouting effect. The durability, fluidity and other properties of the slurry need to match the geological conditions of the silty soil to ensure the long-term stability of the grouting effect.

[0006] In addition, the order and process of grouting are also links that cannot be ignored. Reasonable grouting order and process can ensure the uniform distribution of slurry between the pipe segment and the surrounding rock, and improve the efficiency and quality of grouting. However, in the actual construction process, due to improper operation or substandard technology, problems such as uneven grouting, pipe segment misalignment and floating often occur, which have an adverse effect on tunnel construction.

[0007] By constructing a set of reasonable, economical, efficient and safe construction methods and combining them with scientific grouting effect evaluation technology, we can ensure the safety and smooth progress of shield construction and provide strong guarantees for the construction of underground tunnels.

[0008] At present, although the evaluation method of shield synchronous grouting effect in silt soil areas has been developed, it still has some shortcomings and limitations. It is mainly reflected in the following aspects:

[0009] (1) Single evaluation index: Traditional evaluation methods often rely only on a single physical and mechanical parameter after grouting, such as the strength of the grouting body or the deformation of the formation, ignoring the comprehensive impact of the grouting process on multiple parameters of the surrounding rock. This single evaluation method is difficult to fully reflect the true situation of the grouting effect.

[0010] (2) Incomplete data collection: Some evaluation methods have deficiencies in data collection and fail to fully consider the overall changes in the surrounding rock state before and after grouting. For example, the monitoring of key parameters such as the core sampling rate, surrounding rock cohesion, and internal friction angle before and after grouting is not detailed enough, resulting in deviations in the evaluation results.

[0011] (3) Lack of dynamic monitoring: The grouting effect is not static, but fluctuates with time and changes in geological conditions. However, existing evaluation methods often lack dynamic monitoring of the grouting effect and are unable to promptly detect and deal with problems that arise during the grouting process.

[0012] (4) Insufficient basis for secondary grouting decision: When the grouting effect is not ideal, secondary grouting is needed to make up for the deficiency. However, the existing evaluation methods are insufficient in providing a basis for secondary grouting decision, often relying only on experience or subjective judgment, lacking scientificity and accuracy. Summary of the invention

[0013] In view of this, the present invention aims to propose a method for evaluating the effect of synchronous grouting of shield tunneling in silt soil areas, aiming to provide a comprehensive and accurate method for evaluating the effect of synchronous grouting of shield tunneling in silt soil areas, by collecting and comparing and analyzing multi-dimensional key parameters, to ensure the grouting effect, improve the stability and safety of the tunnel structure, optimize the construction process, and ensure the smooth progress of shield tunnel construction.

[0014] To achieve the above object, the technical solution of the present invention is achieved as follows:

[0015] A method for evaluating the effect of synchronous grouting of a shield in a silty soil area, comprising:

[0016] S1: Data collection before grouting, obtaining data information on surrounding rock drilling core ratio a1, surrounding rock specimen cohesion b1, internal friction angle c1, residual strength d1, and porosity e1 before grouting;

[0017] S2: During shield tunneling, preliminary grouting is carried out in combination with deformation monitoring data;

[0018] S3: Data collection after grouting, obtaining data information on the surrounding rock drilling core ratio a2, surrounding rock specimen cohesion b2, internal friction angle c2, residual strength d2, and porosity e2 after grouting;

[0019] S4: Based on the improvement rate K of drilling core before and after grouting i , Cohesion improvement rate b i , the increase rate of the internal friction angle of the surrounding rock c i , residual strength improvement rate d i , porosity reduction rate e i , calculate the evaluation index value of surrounding rock strength after initial grouting;

[0020] S5: If the evaluation index value of the surrounding rock strength after grouting in step S4 is greater than the preset evaluation index value K0, then the displacement value of the outer layer of the surrounding rock is detected after the preset grouting days N, and the displacement value of the outer layer of the surrounding rock is measured again for two consecutive days on the N+1 day and the N+2 day, and the displacement value change rate ΔΨ of the outer layer of the surrounding rock is calculated;

[0021] S6: If the displacement change rate of the surrounding rock outer layer ΔΨ is less than the preset change rate ΔΨ 预 , then calculate whether the surrounding rock strength value is within the surrounding rock strength range value, if so, end the construction effect evaluation, if not, perform secondary grouting and enter step S5.

[0022] Furthermore, in step S1, multiple boreholes are arranged on different cross-sections, the coring rate a = total length of complete core / total length of borehole × 100%, the cohesion b and the internal friction angle c are calculated based on the triaxial compression test of the sample, the residual strength d is the minimum stress value that the specimen can withstand after failure in the triaxial compression test, and the porosity = pore volume / total volume × 100%.

[0023] Furthermore, in step S2, the following steps are included:

[0024] S21: multiple grouting holes are set on the shield machine for synchronous grouting;

[0025] S22: Synchronous grouting is performed on each grouting hole by pressure injection, and a pressure divider and a display structure are set at the outlet of each grouting hole to monitor and control the grouting pressure and grouting amount in real time to ensure symmetrical and uniform pressure injection behind the segment;

[0026] S23: determining the grouting pressure based on the water and soil pressure at the current grouting position and the pressure loss of the shield machine grouting pipe;

[0027] S24: Calculate the grouting volume based on the excavation diameter, segment outer diameter and length during the shield tunneling process, and adjust the grouting rate based on the ground conditions to ensure that the building voids are fully filled;

[0028] S25: During the grouting process, the grouting parameters are adjusted in real time in combination with the tunnel deformation monitoring data to optimize the grouting effect.

[0029] Furthermore, in step S23, the following steps are included: a pressure sensor is set on the shield tail grouting pipe, and the grouting pressure is determined in combination with the water and soil pressure at the current grouting position and the pressure loss of the shield machine grouting pipe.

[0030] Furthermore, in step S25, the following steps are included:

[0031] S251: According to the feedback of grouting effect, timely adjust the slurry ratio to obtain the optimal slurry adapted to the formation conditions and improve the bonding strength and density of the formation;

[0032] S252: Combined with real-time deformation monitoring data, ensure that building gaps are filled in a timely and sufficient manner, and control ground deformation and segment displacement to a safe range.

[0033] Furthermore, in step S3, a test piece at the same depth and position as before grouting is selected, and data collection is performed in accordance with step S1.

[0034] Further, in step S4, based on the data collected after grouting, the improvement rate of drilling coring before and after grouting a is calculated. i =a2-a1, cohesion improvement rate b i = b2-b1, the increase rate of the internal friction angle of the surrounding rock c i =c2-c1, residual strength improvement rate d i =d2-d1, porosity reduction rate e i =e1-e2, the evaluation index value of surrounding rock strength after initial grouting K = k1a i +k2b i +k3c i +k4d i +k5e i , k1, k2, k3, k4, k5 are preset weight coefficients.

[0035] Furthermore, in step S5, the following steps are included:

[0036] S51: Perform grouting operations according to the construction plan, and after the grouting is preset N days, use high-precision measuring equipment to perform initial detection of the displacement value of the outer layer of the surrounding rock, and record the displacement value D1 at this time;

[0037] S52: On the N+1 day and the N+2 day, the displacement values ​​of the outer layer of the surrounding rock at the same position are detected again using the same measuring equipment and method, and recorded as D2 and D3 respectively;

[0038] S53: Based on the displacement values ​​D2 and D3 of two consecutive days, the change rate ΔΨ of the displacement value of the outer layer of the surrounding rock is calculated, ΔΨ=(D3-D2) / (D2-D1)*100%.

[0039] Furthermore, in step S5, the following steps are also included:

[0040] S50: Determine whether the evaluation index value of the surrounding rock strength after grouting in step S4 is greater than the preset evaluation index value K0. If so, enter S51; if not, perform secondary grouting and return to step S4.

[0041] Furthermore, in step S6, the following steps are included:

[0042] S61: Perform nondestructive testing on the surrounding rock after grouting and collect the physical and mechanical parameters of the surrounding rock;

[0043] S62: inputting the collected data into a preset calculation model, which converts the collected physical and mechanical parameters into the dynamic elastic modulus E and density ρ of the surrounding rock according to the principles of geomechanics;

[0044] S63: Based on the dynamic elastic modulus E and density ρ, the uniaxial compressive strength σ of the surrounding rock is calculated using the Mohr-Coulomb criterion formula or Hooke's law formula c ;

[0045] S64: The calculated uniaxial compressive strength σ c Compared with the preset intensity range value, if σ c Within the allowable strength range, the construction effect evaluation is terminated; if σ c If the strength is lower than the range, secondary grouting is required and step S5 is repeated until the surrounding rock strength reaches the standard.

[0046] Compared with the prior art, the method for evaluating the effect of synchronous grouting of shield in silty soil area described in the present invention has the following advantages:

[0047] (1) The method for evaluating the effect of synchronous grouting of shield tunneling in silty soil areas described in the present invention not only overcomes the limitations of the traditional single evaluation index by introducing comprehensive collection and comparative analysis of multiple key parameters, but also realizes a multi-dimensional and comprehensive evaluation of the grouting effect. It can timely and accurately discover problems existing in the grouting process, provide a scientific basis for secondary grouting, and effectively avoid safety hazards such as stratum instability and segment misalignment caused by insufficient or excessive grouting, promote the optimization of grouting construction technology, improve construction efficiency and quality, and provide a strong guarantee for the smooth construction of shield tunnels in silty soil areas.

[0048] (2) The method for evaluating the effect of synchronous grouting of shield tunneling in silt soil areas described in the present invention realizes a multi-dimensional and accurate evaluation of the grouting effect by comprehensively collecting and comparing the key physical and mechanical parameters before and after grouting. It not only improves the scientificity and accuracy of grouting construction, but also effectively avoids the problem of stratum instability caused by insufficient or excessive grouting, ensures the long-term stability and safety of the tunnel structure, significantly optimizes the grouting process, improves construction efficiency and quality, and provides solid technical support for the smooth construction of shield tunnels in silt soil areas, overcomes the limitations of traditional methods, and ensures the overall quality and safety of tunnel engineering. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0050] Figure 1 It is a logic block diagram of the method for evaluating the effect of synchronous grouting of a shield in a silty soil area according to an embodiment of the present invention;

[0051] Figure 2 It is a logic block diagram of the preliminary grouting in step S2 of the embodiment of the present invention;

[0052] Figure 3 This is a logic diagram of adjusting grouting parameters in step S25 of an embodiment of the present invention;

[0053] Figure 4 It is a logic block diagram for calculating the displacement change rate of the outer layer of the surrounding rock in step S5 of the embodiment of the present invention;

[0054] Figure 5 This is a logic block diagram for calculating the displacement change rate of the outer layer of the surrounding rock in the second step S5 of the embodiment of the present invention;

[0055] Figure 6 This is a logic block diagram for calculating the surrounding rock strength value and determining whether to end the construction effect evaluation in step S6 of an embodiment of the present invention. DETAILED DESCRIPTION

[0056] In order to make the technical means, objectives and effects of the present invention easy to understand, the embodiments of the present invention are described in detail below with reference to specific drawings.

[0057] It should be noted that all the terms used in the present invention for directional and positional indications, such as "up", "down", "left", "right", "front", "back", "vertical", "horizontal", "inside", "outside", "top", "low", "lateral", "longitudinal", "center", etc., are only used to explain the relative positional relationship and connection status between the components in a certain state (as shown in the accompanying drawings), and are only for the convenience of describing the present invention, rather than requiring the present invention to be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes, and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features.

[0058] In the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0059] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0060] like Figures 1 to 6 As shown, the present application discloses a method for evaluating the effect of synchronous grouting of shield in silty soil area, which is used to evaluate the grouting effect during synchronous grouting of shield, and includes:

[0061] S1: Data collection before grouting, obtaining data information on surrounding rock drilling core ratio a1, surrounding rock specimen cohesion b1, internal friction angle c1, residual strength d1, and porosity e1 before grouting;

[0062] S2: During shield tunneling, preliminary grouting is carried out in combination with deformation monitoring data;

[0063] S3: Data collection after grouting, obtaining data information on the surrounding rock drilling core ratio a2, surrounding rock specimen cohesion b2, internal friction angle c2, residual strength d2, and porosity e2 after grouting;

[0064] S4: Based on the improvement rate K of drilling core before and after grouting i , Cohesion improvement rate b i , the increase rate of the internal friction angle of the surrounding rock c i , residual strength improvement rate d i , porosity reduction rate e i , calculate the evaluation index value of surrounding rock strength after initial grouting;

[0065] S5: If the evaluation index value of the surrounding rock strength after grouting in step S4 is greater than the preset evaluation index value K0, then the displacement value of the outer layer of the surrounding rock is detected after the preset grouting days N, and the displacement value of the outer layer of the surrounding rock is measured again for two consecutive days on the N+1 day and the N+2 day, and the displacement value change rate ΔΨ of the outer layer of the surrounding rock is calculated;

[0066] S6: If the displacement change rate of the surrounding rock outer layer ΔΨ is less than the preset change rate ΔΨ 预 , then calculate whether the surrounding rock strength value is within the surrounding rock strength range value, if so, end the construction effect evaluation, if not, perform secondary grouting and enter step S5.

[0067] The method for evaluating the effect of synchronous grouting of shield in silty soil area disclosed in this application scientifically evaluates the grouting effect by comprehensively and systematically comparing the changes of multiple key parameters before and after grouting. First, before grouting, through detailed data collection, multiple physical and mechanical properties of the surrounding rock are obtained, such as drilling coring rate, cohesion, internal friction angle, residual strength, porosity, etc., as evaluation benchmarks; then, preliminary grouting is implemented during the shield excavation process, and dynamic adjustment is performed in combination with deformation monitoring data; after grouting is completed, data is collected again at the same position to compare and analyze the grouting effect; by calculating the improvement rate or change rate of each indicator before and after grouting, the degree of improvement of the surrounding rock strength by grouting is comprehensively evaluated; if the preliminary grouting effect meets the preset standard, the change of the displacement value of the outer layer of the surrounding rock is further monitored to confirm the long-term stability of the grouting effect; if the displacement value change rate is within the specified range and the surrounding rock strength remains within the safe range, the evaluation ends; otherwise, secondary grouting measures are taken and the evaluation process is repeated until a satisfactory effect is achieved.

[0068] The method for evaluating the effect of synchronous grouting of shield tunneling in silt soil areas disclosed in the present application not only overcomes the limitations of the traditional single evaluation index by introducing the comprehensive collection and comparative analysis of multiple key parameters, but also realizes a multi-dimensional and comprehensive evaluation of the grouting effect. It can timely and accurately discover the problems existing in the grouting process, provide a scientific basis for secondary grouting, and effectively avoid safety hazards such as stratum instability and segment misalignment caused by insufficient or excessive grouting, promote the optimization of the grouting construction process, improve the construction efficiency and quality, and provide a strong guarantee for the smooth construction of shield tunnels in silt soil areas.

[0069] In the example of the present application, in step S1, multiple drill holes are arranged on different cross-section arrangements, the coring rate a = (total length of complete core / total length of drill hole) × 100%, the cohesion b and the internal friction angle c are calculated based on the triaxial compression test of the sample, the residual strength d is the minimum stress value that the specimen can withstand after failure in the triaxial compression test, and the porosity = pore volume / total volume × 100%. As a specific example of the present application, according to the geological conditions, end face dimensions and grouting parameters of the underground tunnel work station, a plan for obtaining surrounding rock parameters before and after grouting is designed, and parameters such as the number of boreholes, diameter, height, depth, and length of the exploration area are determined. Diamond drill bits and double-layer core tubes are used to drill at predetermined drilling positions, and coring is performed continuously. The drilling length of each borehole and the length of the complete core taken out are recorded to obtain index information of the coring rate a, which reflects the integrity of the rock mass and the drilling quality before and after grouting; representative samples are selected from the taken out cores, processed into standard specimens, and indoor triaxial compression tests are carried out. Axial pressures under different confining pressures are applied by a triaxial compression testing machine, and the stress-strain curves of the specimens are recorded. The cohesion b and internal friction angle c of the specimens are calculated based on the test data using the Mohr-Coulomb criterion; in the triaxial compression test, when the specimen reaches the peak strength, it continues to be loaded until it is destroyed, and the residual stress after destruction is recorded. The residual strength d is the minimum stress value that the specimen can withstand after destruction; the porosity in the core is observed by drilling and coring, and the porosity g is estimated in combination with image analysis technology. In the example of this application, if a complete core sample has been obtained during the coring process, the porosity change before and after grouting can be estimated by measuring parameters such as density, volume and mass of the core combined with theoretical calculations or empirical formulas.

[0070] The above setting, through a carefully designed multi-drilling layout, combined with high-precision calculation or estimation of coring ratio a, cohesion b, internal friction angle c, residual strength d, and porosity e, not only deeply analyzes the impact of grouting on the mechanical properties of surrounding rock, but also ensures the comprehensiveness and accuracy of the evaluation results. Based on the indirect calculation of core physical parameters, it captures the changes in pore structure caused by grouting in multiple dimensions and levels, provides strong data support for evaluating grouting density, intuitively reveals the changes in rock integrity before and after grouting, and provides an important basis for engineering quality control.

[0071] As a preferred example of the present application, in step S2, the following steps are included:

[0072] S21: multiple grouting holes are set on the shield machine for synchronous grouting;

[0073] S22: Synchronous grouting is performed on each grouting hole by pressure injection, and a pressure divider and a display structure are set at the outlet of each grouting hole to monitor and control the grouting pressure and grouting amount in real time to ensure symmetrical and uniform pressure injection behind the segment;

[0074] S23: determining the grouting pressure based on the water and soil pressure at the current grouting position and the pressure loss of the shield machine grouting pipe;

[0075] S24: Calculate the grouting volume based on the excavation diameter, segment outer diameter and length during the shield tunneling process, and adjust the grouting rate based on the ground conditions to ensure that the building voids are fully filled;

[0076] S25: During the grouting process, the grouting parameters are adjusted in real time in combination with the tunnel deformation monitoring data to optimize the grouting effect.

[0077] In a specific example of the present application, in step S21, 6 grouting holes are evenly arranged in the circumferential direction around the tail of the shield machine, and each grouting hole is spaced 60 degrees apart to ensure that the grouting slurry can be evenly distributed to every corner behind the pipe segment. By evenly arranging multiple grouting holes on the shield machine, it can be ensured that the grouting operation can fully cover the space behind the pipe segment, thereby achieving uniform slurry filling and improving the stability and safety of the tunnel. The setting of multiple grouting holes also helps to reduce problems such as ground settlement or pipe segment damage caused by uneven local grouting. In step S22, a high-precision voltage divider and an LED display are installed at the outlet of each grouting hole to display the pressure and grouting amount of the current grouting hole in real time. The operator can adjust the grouting parameters in time according to the displayed data to ensure that the grouting process is stable and controllable. Grouting is carried out by pressure injection, and the grouting pressure and grouting amount are monitored in real time using the voltage divider and the display structure, which can effectively control the grouting process, ensure that the grouting pressure and grouting amount meet the design requirements, and thus improve the accuracy and reliability of grouting. In step S23, the water and soil pressure value at the current position is obtained using geological exploration data. Then, the pressure loss is calculated based on the length, diameter and material properties of the grouting pipeline. Finally, the water and soil pressure and the pressure loss are added to obtain the required grouting pressure value. For example, if the water and soil pressure is 0.3MPa and the pressure loss of the grouting pipeline is 0.1MPa, the grouting pressure should be set to 0.4MPa. The grouting pressure is determined based on the water and soil pressure at the current position and the pressure loss of the grouting pipeline to ensure that the slurry can overcome the formation resistance and effectively fill behind the pipe segment. Too high or too low grouting pressure may affect the grouting effect. In step S24, the theoretical void volume behind each ring of segments is calculated according to the excavation diameter (such as 6.3 meters) of the shield machine and the outer diameter (such as 6 meters) and length (such as 1.5 meters) of the segment. Then, according to the permeability and injectability of the stratum, the grouting rate is adjusted (such as the initial setting of 150%) to ensure that the grouting slurry can fully fill the void and have an appropriate diffusion range. As the construction proceeds, the grouting rate can be further fine-tuned according to the actual grouting effect and monitoring data. By accurately calculating the required grouting amount and adjusting the grouting rate according to the stratum conditions, it can be ensured that the building void is fully filled, while avoiding problems caused by excessive or insufficient grouting. In step S25, a high-precision laser displacement meter is set inside the tunnel to monitor the bottom plate floating and clearance convergence in real time. When the monitoring data shows that the tunnel deformation exceeds the allowable range, the grouting parameters are adjusted immediately. For example, if it is found that the bottom plate floats too much, the grouting amount can be appropriately increased or the grouting pressure can be reduced to reduce the floating speed. Through continuous feedback and adjustment, it is ensured that the grouting process is always kept in the best state. By real-time monitoring of tunnel deformation, such as bottom plate buoyancy and clearance convergence, grouting parameters, such as grouting pressure and grouting volume, can be adjusted in time to optimize the grouting effect and reduce ground subsidence and tunnel deformation.

[0078] The above settings significantly improved the quality and stability of tunnel construction by optimizing the shield synchronous grouting process, and ensured the long-term stability and safety of the tunnel structure.

[0079] As a preferred example of the present application, in step S23, the following steps are included: a pressure sensor is set on the shield tail grouting pipe, and the grouting pressure is determined in combination with the water and soil pressure at the current grouting position and the pressure loss of the shield machine grouting pipe. As a specific example of the present application, a high-precision pressure sensor is installed on the grouting pipe at the tail of the shield to ensure that the real-time pressure value during the grouting process can be accurately measured. The water and soil pressure data at the current grouting position are obtained by using geological survey data and groundwater monitoring equipment. According to the specific model of the shield machine and the layout of the grouting pipeline, the pressure loss of the grouting pipe during the slurry transportation process is obtained through experiments or calculations, including the pressure reduction caused by factors such as slurry flow resistance and pipeline friction resistance. Combined with the water and soil pressure at the current grouting position and the pressure loss of the grouting pipe, a reasonable grouting pressure setting value is calculated through a formula, wherein the grouting pressure setting value formula is: target grouting pressure = water and soil pressure + pressure loss + safety margin, wherein the safety margin is an additional pressure value set to ensure that the actual grouting pressure is not lower than the theoretical calculated value. During the grouting process, the grouting pressure is monitored in real time by a pressure sensor, and the output pressure of the grouting pump is dynamically adjusted according to the monitoring results to keep the actual grouting pressure within the set reasonable range.

[0080] This setting can ensure that the slurry is evenly distributed behind the tunnel wall by precisely controlling the grouting pressure, avoid local voids, improve the grouting density, enhance the overall stability of the tunnel structure, and avoid problems such as tunnel deformation and segment damage caused by improper pressure, thereby reducing construction risks, delays caused by rework, and improving construction efficiency.

[0081] As a preferred example of the present application, in step S25, the following steps are included:

[0082] S251: According to the feedback of grouting effect, timely adjust the slurry ratio to obtain the optimal slurry adapted to the formation conditions and improve the bonding strength and density of the formation;

[0083] S252: Combined with real-time deformation monitoring data, ensure that building gaps are filled in a timely and sufficient manner, and control ground deformation and segment displacement to a safe range.

[0084] As a specific example of the present application, during the construction process, the initial slurry ratio is first set (such as a water-cement ratio of 1:1, with an appropriate amount of accelerating setting agent added). As excavation and grouting proceed, feedback data such as grouting pressure and slurry diffusion range are collected. If it is found that the grouting pressure is abnormally increased or the slurry diffusion range is insufficient, it means that the current slurry ratio may not be suitable for the stratum. At this time, the slurry ratio is adjusted according to the feedback, such as reducing the water-cement ratio to 0.8:1 and increasing the amount of admixture to enhance the slurry performance. After adjustment, the grouting test is carried out again until the ideal grouting effect is obtained; during the tunnel excavation process, high-precision deformation monitoring points are arranged along the tunnel axis to monitor the displacement of the tunnel segments and the settlement of the ground in real time. According to the monitoring data, if it is found that the deformation of a certain section exceeds the safety range, the emergency grouting measures are immediately initiated. First, the required grouting amount is calculated according to the deformation; then, the pressure and flow of the grouting pump are adjusted, and the grouting amount is increased until the monitoring data shows that the deformation is effectively controlled. At the same time, pay attention to whether there is slurry overflow during the grouting process, and adjust the grouting strategy in time to ensure that the grouting is sufficient but not excessive to achieve the best filling effect. This setting dynamically adjusts the slurry ratio to make the slurry performance more in line with the characteristics of the formation, improves the bonding strength and density of the grouting, reduces the risk of grouting being not dense and empty, and at the same time, effectively controls ground settlement and tunnel segment deviation, ensuring the safety of the tunnel structure and surrounding environment.

[0085] In step S3, a specimen at the same depth and position as before grouting is selected, and data collection consistent with step S1 is performed. In a specific example of the present application, according to the designed surrounding rock parameter acquisition scheme before and after grouting, before grouting construction, a total station or GPS and other equipment are used to accurately locate the predetermined grouting position, and obvious marks are made on the ground, and the specific coordinates and depth of each grouting point are recorded. According to the grouting point mark, a drilling rig is used to drill and sample at a predetermined depth. When sampling, it should be ensured that the depth and position of the specimen are completely consistent with the design requirements of the grouting point, and the removed specimens are properly preserved and marked. In subsequent comparisons, the physical and mechanical properties of the specimens before and after grouting are tested, including density, strength, permeability and other indicators. Through comparative analysis, the grouting effect is evaluated, and the subsequent construction parameters are adjusted as needed. This design directly compares the geological data before and after grouting to accurately understand the impact of grouting on the surrounding soil, including reinforcement effect, filling density, etc., to provide a reliable basis for subsequent construction, and can scientifically and accurately evaluate the effect of shield tunnel grouting construction, providing strong support for subsequent construction.

[0086] As a preferred example of the present application, in step S4, based on the data collected after grouting, the improvement rate a of the core drilling before and after grouting is calculated. i =a2-a1, cohesion improvement rate b i = b2-b1, the increase rate of the internal friction angle of the surrounding rock c i=c2-c1, residual strength improvement rate d i =d2-d1, porosity reduction rate e i =e1-e2, the evaluation index value of surrounding rock strength after initial grouting K = k1a i +k2b i +k3c i +k4d i +k5e i , k1, k2, k3, k4, k5 are preset weight coefficients. In the specific example of this application, before and after grouting, the surrounding rock at the same position is drilled and cored, and the relevant indicators are tested. The core rate a, cohesion b and internal friction angle c, the increase rate of residual strength d and the decrease rate of porosity e after grouting are calculated according to the formula. According to engineering experience and actual needs, the weight coefficients k1, k2, k3, k4, k5 are preset. These coefficients reflect the importance of each indicator in the comprehensive evaluation index. The improvement rate of each indicator is multiplied by the corresponding weight coefficient and then summed up to obtain the comprehensive evaluation index value K=k1a of the surrounding rock strength after preliminary grouting. i +k2b i +k3c i +k4d i +k5e i . In the example of this application, a quantitative evaluation of the grouting effect is achieved by calculating the evaluation index value K of the surrounding rock strength after preliminary grouting. This index comprehensively considers the improvement of various properties of the surrounding rock by grouting, which not only improves the accuracy and scientificity of the evaluation, but also provides strong data support for the subsequent adjustment and optimization of construction parameters; at the same time, through the adjustment of the preset weight coefficient, the proportion of each indicator in the comprehensive evaluation index can be flexibly adjusted according to the specific needs of different projects and the characteristics of the surrounding rock, to ensure the pertinence and effectiveness of the evaluation results. This setting helps to further improve the safety and efficiency of shield tunnel construction and reduce construction costs.

[0087] As a preferred example of the present application, in step S5, the following steps are included:

[0088] S51: Perform grouting operations according to the construction plan, and after a preset N days of grouting (e.g., N=5 days), use high-precision measuring equipment to perform initial detection of the displacement value of the outer layer of the surrounding rock, and record the displacement value D1 at this time;

[0089] S52: On the N+1 day and the N+2 day, the displacement values ​​of the outer layer of the surrounding rock at the same position are detected again using the same measuring equipment and method, and recorded as D2 and D3 respectively;

[0090] S53: Based on the displacement values ​​D2 and D3 of two consecutive days, the change rate ΔΨ of the displacement value of the outer layer of the surrounding rock is calculated, ΔΨ=(D3-D2) / (D2-D1)*100%.

[0091] By detecting and calculating the displacement change rate ΔΨ of the outer layer of the surrounding rock, the stability change of the surrounding rock after grouting can be grasped in real time. If the ΔΨ value is small, it means that the surrounding rock is stable and the grouting effect meets the requirements; if the ΔΨ value is large, it means that the stability of the surrounding rock is affected and there may be potential safety hazards. This dynamic monitoring and evaluation method helps to discover and solve problems in a timely manner, ensuring the safety and quality of shield tunnel construction. At the same time, this method also provides important reference data for subsequent construction, which helps to optimize construction parameters and improve construction efficiency.

[0092] As a preferred example of the present application, in step S5, the following steps are also included:

[0093] S50: Determine whether the evaluation index value of the surrounding rock strength after grouting in step S4 is greater than the preset evaluation index value K0. If so, enter S51; if not, perform secondary grouting and return to step S4.

[0094] Taking a tunnel project in a silt-sand soil section of Nantong Metro as an example, the specific implementation steps are as follows:

[0095] Step 1: Grouting construction: Carry out grouting construction according to the preset grouting parameters, including grouting pressure, grouting volume, etc.;

[0096] Step 2: Data collection: After grouting is completed, the sensors deployed around the tunnel collect relevant data on the strength of the surrounding rock after grouting;

[0097] Step 3: Index calculation: Based on the collected data, calculate the evaluation index value of the surrounding rock strength after grouting.

[0098] Step 4: Judgment and evaluation: Compare the calculated evaluation index value with the preset evaluation index preset value K0. Assuming the preset value K0 is 80, the actual calculated index value is 85, indicating that the grouting effect is good and the next step of construction can be entered;

[0099] Secondary grouting and feedback: If the actual index value is less than K0, for example, 75, it means that the grouting effect is insufficient and secondary grouting is required. At this time, readjust the grouting parameters, perform secondary grouting, and repeat steps 2 to 4 until the evaluation index value is greater than K0.

[0100] By real-time monitoring and evaluating the surrounding rock strength after grouting, problems can be discovered and remedied in a timely manner, avoiding structural safety hazards caused by insufficient grouting. In addition, this closed-loop feedback mechanism can also improve construction efficiency, reduce time and cost waste due to rework, and ensure that each step of construction meets quality requirements, thereby improving the safety and stability of the entire shield tunnel project.

[0101] As a preferred example of the present application, in step S6, the following steps are included:

[0102] S61: Perform nondestructive testing on the surrounding rock after grouting and collect the physical and mechanical parameters of the surrounding rock;

[0103] S62: inputting the collected data into a preset calculation model, which converts the collected physical and mechanical parameters into the dynamic elastic modulus E and density ρ of the surrounding rock according to the principles of geomechanics;

[0104] S63: Based on the dynamic elastic modulus E and density ρ, the uniaxial compressive strength σ of the surrounding rock is calculated using the Mohr-Coulomb criterion formula or Hooke's law formula c ;

[0105] S64: The calculated uniaxial compressive strength σ c Compared with the preset intensity range value, if σ c If the value is within the allowable strength range, it indicates that the grouting effect is good and the surrounding rock strength meets the requirements; c If the strength is lower than the range, secondary grouting is required and step S5 is repeated until the surrounding rock strength reaches the standard.

[0106] In step S6, the main purpose is to evaluate the stability of the surrounding rock after grouting construction. By monitoring the displacement change rate ΔΨ of the outer layer of the surrounding rock and comparing it with the preset change rate threshold ΔΨ 预 By comparison, we can preliminarily judge whether the grouting effect has reached the expected result. 预 , indicating that the displacement of the surrounding rock tends to be stable. In order to ensure that the surrounding rock after grouting can bear the expected geological stress, it is necessary to further calculate the surrounding rock strength value to verify whether it is within the allowable strength range, so as to ensure the long-term stability and safety of the engineering structure. Specifically, when collecting the physical and mechanical parameters of the surrounding rock in step S61, the surrounding rock after grouting is non-destructively tested using equipment such as geological radar or acoustic wave detection, and the physical and mechanical parameters of the surrounding rock including wave velocity, amplitude and other information are collected.

[0107] The above settings can accurately evaluate the grouting effect and its impact on the stability of the surrounding rock. This dynamic evaluation and adjustment mechanism effectively ensures project quality and construction safety.

[0108] As a preferred example of the present application, when performing secondary grouting in step S5 or step S6, the specific location and range where secondary grouting is required are determined based on the ultrasonic detection results, the grouting pipe is installed at the location where secondary grouting is required, and it is ensured that the grouting pipe is tightly connected to the grouting hole. During the grouting process, the changes in deformation monitoring data are closely monitored, and the grouting pressure and grouting amount are adjusted in real time to ensure that the grouting is uniform and sufficient, thereby reducing formation deformation and achieving the purpose of stabilizing the tunnel structure.

[0109] The present application discloses a method for evaluating the effect of synchronous grouting of shield tunneling in silt soil areas. By comprehensively collecting and comparing and analyzing key physical and mechanical parameters before and after grouting, a multi-dimensional and accurate evaluation of the grouting effect is achieved. This not only improves the scientificity and accuracy of grouting construction, but also effectively avoids the problem of stratum instability caused by insufficient or excessive grouting, ensures the long-term stability and safety of the tunnel structure, significantly optimizes the grouting process, improves construction efficiency and quality, provides solid technical support for the smooth construction of shield tunnels in silt soil areas, overcomes the limitations of traditional methods, and ensures the overall quality and safety of tunnel projects.

[0110] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for evaluating the effect of synchronous grouting of shield in silt soil area, characterized in that: include: S1: Data collection before grouting, obtaining data information on surrounding rock drilling core ratio a1, surrounding rock specimen cohesion b1, internal friction angle c1, residual strength d1, and porosity e1 before grouting; S2: During shield tunneling, preliminary grouting is carried out in combination with deformation monitoring data; S3: Data collection after grouting, obtaining data information on the surrounding rock drilling core ratio a2, surrounding rock specimen cohesion b2, internal friction angle c2, residual strength d2, and porosity e2 after grouting; S4: Based on the improvement rate K of drilling core before and after grouting i , Cohesion improvement rate b i , the increase rate of the internal friction angle of the surrounding rock c i , residual strength improvement rate d i , porosity reduction rate e i , calculate the evaluation index value of surrounding rock strength after initial grouting; S5: If the evaluation index value of the surrounding rock strength after grouting in step S4 is greater than the preset evaluation index value K0, then the displacement value of the outer layer of the surrounding rock is detected after the preset grouting days N, and the displacement value of the outer layer of the surrounding rock is measured again for two consecutive days on the N+1 day and the N+2 day, and the displacement value change rate ΔΨ of the outer layer of the surrounding rock is calculated; S6: If the displacement change rate of the surrounding rock outer layer ΔΨ is less than the preset change rate ΔΨ 预 , then calculate whether the surrounding rock strength value is within the surrounding rock strength range value, if so, end the construction effect evaluation, if not, perform secondary grouting and enter step S5.

2. The method for evaluating the effect of synchronous grouting of shield in silty soil area according to claim 1, characterized in that: In step S1, multiple boreholes are arranged on different cross-sections, the coring rate a = total length of complete core / total length of borehole × 100%, the cohesion b and the internal friction angle c are calculated based on the triaxial compression test of the sample, the residual strength d is the minimum stress value that the specimen can withstand after failure in the triaxial compression test, and the porosity = pore volume / total volume × 100%.

3. The method for evaluating the effect of shield synchronous grouting in silty soil area according to claim 1 or 2, characterized in that: In step S2, the following steps are included: S21: multiple grouting holes are set on the shield machine for synchronous grouting; S22: Synchronous grouting is performed on each grouting hole by pressure injection, and a pressure divider and a display structure are set at the outlet of each grouting hole to monitor and control the grouting pressure and grouting amount in real time to ensure symmetrical and uniform pressure injection behind the segment; S23: determining the grouting pressure based on the water and soil pressure at the current grouting position and the pressure loss of the shield machine grouting pipe; S24: Calculate the grouting volume based on the excavation diameter, segment outer diameter and length during the shield tunneling process, and adjust the grouting rate based on the ground conditions to ensure that the building voids are fully filled; S25: During the grouting process, the grouting parameters are adjusted in real time in combination with the tunnel deformation monitoring data to optimize the grouting effect.

4. The method for evaluating the effect of synchronous grouting of shield in silty soil area according to claim 3, characterized in that: In step S23, the following steps are included: a pressure sensor is set on the shield tail grouting pipe, and the grouting pressure is determined in combination with the water and soil pressure at the current grouting position and the pressure loss of the shield machine grouting pipe.

5. The method for evaluating the effect of synchronous grouting of shield in silty soil area according to claim 3, characterized in that: In step S25, the following steps are included: S251: According to the feedback of grouting effect, timely adjust the slurry ratio to obtain the optimal slurry adapted to the formation conditions and improve the bonding strength and density of the formation; S252: Combined with real-time deformation monitoring data, ensure that building gaps are filled in a timely and sufficient manner, and control ground deformation and segment displacement to a safe range.

6. The method for evaluating the effect of synchronous grouting of shield in silty soil area according to claim 1, characterized in that: In step S3, a test piece at the same depth and position as before grouting is selected, and data collection is performed in accordance with step S1.

7. The method for evaluating the effect of synchronous grouting of shield in silty soil area according to claim 1, characterized in that: In step S4, based on the data collected after grouting, the improvement rate of drilling coring before and after grouting a is calculated. i =a2-a1, cohesion improvement rate b i = b2-b1, the increase rate of the internal friction angle of the surrounding rock c i =c2-c1, residual strength improvement rate d i =d2-d1, porosity reduction rate e i =e1-e2, the evaluation index value of surrounding rock strength after initial grouting K = k1a i +k2b i +k3c i +k4d i +k5e i , k1, k2, k3, k4, k5 are preset weight coefficients.

8. The method for evaluating the effect of synchronous grouting of shield in silty soil area according to claim 1, characterized in that: In step S5, the following steps are included: S51: Perform grouting operations according to the construction plan, and after the grouting is preset N days, use high-precision measuring equipment to perform initial detection of the displacement value of the outer layer of the surrounding rock, and record the displacement value D1 at this time; S52: On the N+1 day and the N+2 day, the displacement values ​​of the outer layer of the surrounding rock at the same position are detected again using the same measuring equipment and method, and recorded as D2 and D3 respectively; S53: Based on the displacement values ​​D2 and D3 of two consecutive days, the change rate ΔΨ of the displacement value of the outer layer of the surrounding rock is calculated, ΔΨ=(D3-D2) / (D2-D1)*100%.

9. The method for evaluating the effect of synchronous grouting of shield in silty soil area according to claim 8, characterized in that: In step S5, the following steps are also included: S50: Determine whether the evaluation index value of the surrounding rock strength after grouting in step S4 is greater than the preset evaluation index value K0. If so, enter S51; if not, perform secondary grouting and return to step S4.

10. The method for evaluating the effect of shield synchronous grouting in silty soil area according to claim 1, characterized in that: In step S6, the following steps are included: S61: Perform nondestructive testing on the surrounding rock after grouting and collect the physical and mechanical parameters of the surrounding rock; S62: inputting the collected data into a preset calculation model, which converts the collected physical and mechanical parameters into the dynamic elastic modulus E and density ρ of the surrounding rock according to the principles of geomechanics; S63: Based on the dynamic elastic modulus E and density ρ, the uniaxial compressive strength σ of the surrounding rock is calculated using the Mohr-Coulomb criterion formula or Hooke's law formula c ; S64: The calculated uniaxial compressive strength σ c Compared with the preset intensity range value, if σ c Within the allowable strength range, the construction effect evaluation is terminated; if σ c If the strength is lower than the range, secondary grouting is required and step S5 is repeated until the surrounding rock strength reaches the standard.

Citation Information

Cited By

  • Cooperative grouting treatment method for large-diameter shield tunnel in upper-soft lower-hard stratum

    CN119554064A

  • Intelligent grouting method for water-rich sandy gravel stratum shield tunnel construction and related equipment

    CN121615435A

  • Method for evaluating residual service performance and toughness of tunnel grouting reinforced surrounding rock

    CN121683284A