Tunnel crossing fault supporting structure and construction method
By using a combined structure of external and internal supporting arc plates and hollow grouting anchors in tunnel projects, combined with self-locking components and adhesive technology, the deformation and uneven stress of surrounding rocks in high ground stress are solved, and the problem of significant improvement of the problem of weak surrounding rocks is significantly improved. The support effect and structural stability of tunnel crossing faults are achieved.
Patent Information
- Application Number
- CN202411247968.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-12
AI Technical Summary
In tunnel projects in high-intensity areas, traditional support structures are difficult to effectively cope with the problems of continuous deformation and uneven stress of surrounding rocks in high ground stress, resulting in insufficient reliability and safety of tunnel structures.
The outer support arc plate and the inner support arc plate are combined with hollow grouting anchors to form the basic structure through the outer layer of concrete, waterproof layer and inner layer, and the deformation layer is filled by grouting concrete, using self-locking components and adhesive The glue realizes the initial and secondary support of the support structure, and the hollow grouting anchor rod penetrates the outer and inner support plates to reinforce the surrounding rock.
It effectively solved the problem of continuous deformation and uneven stress in the crushing zone of the highland stress fault, improved the support effect of tunnel crossing faults, and enhanced the stability and safety of the structure.
Smart Images

Figure CN118933895A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel engineering, and in particular to a tunnel crossing fault support structure and a construction method. Background Art
[0002] The movement of the tunnel follows the stratum. When an earthquake occurs, the tunnel and the stratum move together as a whole. Therefore, many people think that the tunnel is less damaged by the earthquake. However, with the continuous improvement of earthquake damage data, people gradually realize that tunnels can also be greatly damaged in earthquakes, especially tunnels in high-intensity areas. The tectonic movement in the southwestern mountainous area is intense, and active fault zones are widely distributed. The surrounding rock conditions of tunnels in active fault zones are poor.
[0003] For tunnels with high ground stress and weak surrounding rock, large deformation is one of the common engineering disasters. The traditional approach is to increase the strength and rigidity of the initial support structure of the tunnel and set up sleeve arches. The main support methods are to add two or more initial support structures to the tunnel, increase the strength of the secondary lining of the tunnel, and expand the excavation to a circular section with better stress performance. However, the above operation procedures are cumbersome and the progress is slow. The secondary lining of the tunnel is under great stress, and the reliability, safety and durability of the tunnel structure cannot be guaranteed. Summary of the invention
[0004] The object of the present invention is to provide a tunnel crossing fault support structure and a construction method to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a tunnel crossing fault support structure and construction method, comprising an outer supporting arc plate and a filling deformation layer, wherein the outer side of the filling deformation layer is provided with an outer layer of concrete, the outer side of the outer layer of concrete is provided with a first waterproof layer, the inner side of the filling deformation layer is provided with an inner layer of concrete, the inner side of the inner layer of concrete is provided with a second waterproof layer, the inner side of the second waterproof layer is provided with an inner supporting arc plate, a basic tunnel framework is formed between the outer layer of concrete, the first waterproof layer, the inner layer of concrete and the second waterproof layer, hollow grouting anchor rods are inserted into the outer supporting arc plate and the inner supporting arc plate, one end of the hollow grouting anchor rods passes through the outer supporting arc plate, the basic tunnel framework and the inner supporting arc plate, a locking component that is easy to operate is provided on the hollow grouting anchor rod, and self-locking components that are easy to adjust are provided between the outer supporting arc plates and between the inner supporting arc plates and the inner supporting arc plates.
[0006] Preferably, a plurality of inner supporting circular arc plates are provided, and the plurality of inner supporting circular arc plates are distributed in a circle along the inner side of the basic framework of the tunnel; a plurality of outer supporting circular arc plates are provided, and the plurality of outer supporting circular arc plates are distributed in a circle along the outer side of the basic framework of the tunnel.
[0007] Preferably, both sides of the outer supporting arc plate and the inner supporting arc plate are in the form of protruding block structures, and two adjacent protruding block structures are staggered and fitted.
[0008] Preferably, the locking assembly includes a first adjusting nut, the first adjusting nut is sleeved on the hollow grouting anchor rod, a sleeve is sleeved on the hollow grouting anchor rod, a connecting rod is provided on one side of the sleeve, and a sealing plug is provided on one side of the connecting rod.
[0009] Preferably, a grouting port is provided on the outer supporting arc plate, the opening of the grouting port leads to the filling deformation layer, the sealing plug is inserted into the grouting port, the bottom of the first adjusting nut is sleeved with a second adjusting nut, and the second adjusting nut is connected to the first adjusting nut by internal and external threads.
[0010] Preferably, the self-locking component includes an insert block, two insert blocks are protrudingly arranged on the protruding block structure of the outer supporting circular arc plate and the inner supporting circular arc plate, a groove is opened on one side of the insert block, a mounting block is arranged at the opening of the groove, and a slot is opened on one side of the protruding block structure of the outer supporting circular arc plate and the inner supporting circular arc plate.
[0011] Preferably, a limiting block is slidably inserted on the mounting block, the limiting block is a "T"-shaped block structure, and one side of the end is an inclined surface structure, a supporting spring is arranged between the limiting block and the groove, a limiting groove is opened on one side of the slot, and the end of the limiting block is arranged correspondingly to the limiting groove.
[0012] Preferably, a receiving groove is provided on one side of the end of the limit block, a pin is provided on the receiving groove, an abutment block is movably sleeved on the pin, a torsion spring is sleeved on the pin, one end of the torsion spring is fixed on the pin, and the other end is fixed on the abutment block.
[0013] A construction method for a tunnel passing through a fault support structure, the construction method comprising the following steps:
[0014] S1: The fault detection equipment is used to monitor the position of the tunnel crossing the fault. After the fault is determined, the basic structure of the tunnel is drilled by the drilling equipment until the hole is drilled to the filled deformation layer and penetrates through;
[0015] S2: The outer supporting arc plate is attached to the inner side of the basic framework of the tunnel by gluing, and then the protruding block structure of another outer supporting arc plate is staggered and attached to the protruding block structure of the outer supporting arc plate. At this time, the plug-in block is inserted into the slot, and an elastic plug-in structure is formed between the support spring and the limit block, so that the end of the limit block is inserted into the limit groove, thereby realizing the self-locking connection between the outer supporting arc plates and the outer supporting arc plates;
[0016] S3: Then, the inner supporting arc plate is attached to the inner side of the basic framework of the tunnel by gluing, and then the protruding block structure of another inner supporting arc plate is staggered and attached to the protruding block structure of the inner supporting arc plate. At this time, the plug-in block is plugged into the slot, and an elastic plug-in structure is formed between the support spring and the limit block, so that the end of the limit block is plugged into the limit groove, thereby realizing the self-locking connection between the inner supporting arc plates and the inner supporting arc plates;
[0017] S4: Two hollow grouting anchor rods are screwed through the outer supporting arc plate, the tunnel basic structure and the inner supporting arc plate, and then the grouting concrete is injected into the filling deformation layer through the grouting port to make up for the defect of the tunnel crossing the fault, and then the sealing plug is inserted into the grouting port to seal the grouting port, and the sleeve is sleeved on the hollow grouting anchor rod;
[0018] S5: By screwing the first adjusting nut and the second adjusting nut up and down, the outer supporting arc plate and the inner supporting arc plate are tightened and fit on the basic structure of the tunnel, so as to further realize the support treatment of the tunnel crossing the fault.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. The present invention forms a basic tunnel framework between a concrete outer layer, a first waterproof layer, a concrete inner layer and a second waterproof layer, realizes an initial support structure between an outer support circular arc plate and an inner support circular arc plate, and further forms a secondary support structure by inserting hollow grouting anchor rods and injecting grouting concrete into the filling deformation layer, which can effectively solve the problems of continuous deformation and uneven stress of surrounding rocks in the later stage of high ground stress fault fracture zone.
[0021] 2. The present invention adheres the outer supporting circular arc plate and the inner supporting circular arc plate to the inner side of the basic framework of the tunnel by gluing, and the protruding block structures are staggered and fitted, and an elastic plug-in structure is formed between the supporting spring and the limit block, so that the end of the limit block is plugged into the limit groove, thereby realizing self-locking connection between the inner supporting circular arc plates and the outer supporting circular arc plates, and forming an initial support structure.
[0022] 3. The present invention injects grouting concrete into the filling deformation layer through the grouting port, thereby compensating for the defect of the tunnel crossing the fault, and then inserts the sealing plug into the grouting port to achieve the sealing of the grouting port. At the same time, the sleeve is sleeved on the hollow grouting anchor rod to further achieve the support treatment of the tunnel crossing the fault. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a structural schematic diagram of the tunnel crossing fault support structure of the present invention.
[0024] Figure 2 It is a schematic diagram of the structure inside the basic framework of the tunnel of the present invention.
[0025] Figure 3 It is a schematic structural diagram of the support frame for tunnel crossing a fault according to the present invention.
[0026] Figure 4 It is a schematic diagram of the explosion between the first adjusting nut and the outer supporting arc plate of the present invention.
[0027] Figure 5 It is a schematic diagram of the structure of the slot of the present invention.
[0028] Figure 6 It is a structural schematic diagram of the self-locking component of the present invention.
[0029] Figure 7 For the present invention Figure 6 Schematic diagram of the structure enlarged at point A in the middle.
[0030] Figure 8 It is a structural schematic diagram of the abutment assembly of the present invention.
[0031] Fig. 9 For the present invention Figure 8 Schematic diagram of the enlarged structure at point B.
[0032] Fig.10 It is a structural schematic diagram of the hollow grouting anchor rod of the present invention.
[0033] In the figure: outer supporting arc plate 1; slot 11; limit slot 12; concrete outer layer 2; filling deformation layer 3; concrete inner layer 4; inner supporting arc plate 5; hollow grouting anchor rod 6; first adjusting nut 61; sleeve 62; connecting rod 63; sealing plug 64; second adjusting nut 65; grouting port 7; insert block 8; groove 81; mounting block 82; limit block 83; receiving slot 831; pin shaft 832; torsion spring 833; abutment block 834; support spring 84. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] See also Figures 1 to 10The present invention provides a technical solution: a tunnel crossing fault support structure and construction method, comprising an outer supporting arc plate 1 and a filling deformation layer 3, the outer side of the filling deformation layer 3 is grout-filled with a concrete outer layer 2, the outer side of the concrete outer layer 2 is filled with a first waterproof layer, the inner side of the filling deformation layer 3 is filled with a concrete inner layer 4, the inner side of the concrete inner layer 4 is filled with a second waterproof layer, the inner side of the second waterproof layer is bonded with an inner supporting arc plate 5, and the basic framework of the tunnel is formed between the concrete outer layer 2, the first waterproof layer, the concrete inner layer 4 and the second waterproof layer.
[0036] A plurality of inner supporting arc plates 5 are provided, and the plurality of inner supporting arc plates 5 are distributed in a circle along the inner side of the basic framework of the tunnel. A plurality of outer supporting arc plates 1 are provided, and the plurality of outer supporting arc plates 1 are distributed in a circle along the outer side of the basic framework of the tunnel. Hollow grouting anchor rods 6 are inserted into the outer supporting arc plates 1 and the inner supporting arc plates 5, and one end of the hollow grouting anchor rods 6 passes through the outer supporting arc plates 1, the basic framework of the tunnel and the inner supporting arc plates 5.
[0037] Both sides of the outer supporting arc plate 1 and the inner supporting arc plate 5 are in the form of protruding block structures, and two adjacent protruding block structures are staggered and fitted together. The hollow grouting anchor rod 6 is provided with a locking assembly that is easy to operate, and the locking assembly includes a first adjusting nut 61, and the first adjusting nut 61 is sleeved on the hollow grouting anchor rod 6, and a sleeve 62 is sleeved on the hollow grouting anchor rod 6, and one side of the sleeve 62 is fixedly connected to a connecting rod 63, and one side of the connecting rod 63 is fixedly connected to a sealing plug 64.
[0038] The screw structure of the hollow grouting anchor rod 6 together with the concrete inner layer 4 and the second waterproof layer forms the basic framework of the tunnel. The hollow grouting anchor rod 6 can also be used to deeply reinforce the surrounding rock around the tunnel, improve the stability of the broken rock mass itself, and finally form a composite tunnel surrounding rock reinforcement structure.
[0039] A grouting port 7 is provided on the outer supporting arc plate 1, and the opening of the grouting port 7 leads to the filling deformation layer 3. The sealing plug 64 is inserted into the grouting port 7. The bottom of the first adjusting nut 61 is sleeved with a second adjusting nut 65, and the second adjusting nut 65 is connected to the first adjusting nut 61 by internal and external threads.
[0040] A self-locking component that is easy to adjust is arranged between the outer supporting arc plates 1 and the inner supporting arc plates 5. The self-locking component includes an insert block 8. The two insert blocks 8 are protrudingly arranged on the protruding block structure of the outer supporting arc plate 1 and the inner supporting arc plate 5. A groove 81 is opened on one side of the insert block 8. A mounting block 82 is fixed at the opening of the groove 81 by bolts. A limiting block 83 is slidably inserted on the mounting block 82. The limiting block 83 is a "T"-shaped block structure, and one side of the end is an inclined surface structure. A support spring 84 is fixedly connected between the limiting block 83 and the groove 81.
[0041] A receiving groove 831 is provided on one side of the end of the limit block 83, and a pin shaft 832 is fixedly inserted on the receiving groove 831, and an abutment block 834 is movably sleeved on the pin shaft 832. A torsion spring 833 is sleeved on the pin shaft 832, and one end of the torsion spring 833 is fixed on the pin shaft 832, and the other end is fixed on the abutment block 834. A slot 11 is provided on one side of the protruding block structure of the outer supporting arc plate 1 and the inner supporting arc plate 5, and a limiting slot 12 is provided on one side of the slot 11. The end of the limit block 83 is correspondingly arranged with the limiting slot 12, and the insertion block 8 is correspondingly arranged with the slot 11.
[0042] An elastic abutment structure is formed between the torsion spring 833 and the abutment block 834, so that the end of the abutment block 834 abuts against the limiting groove 12, thereby compensating for the gap between the limiting groove 12 and the limiting block 83, which is beneficial to the buffering and vibration reduction effect.
[0043] A construction method for a tunnel passing through a fault support structure, the construction method comprising the following steps:
[0044] S1: The fault detection device is used to monitor the position where the tunnel crosses the fault. After the position is determined, the basic structure of the tunnel is drilled by the drilling equipment until the hole is drilled to the filled deformation layer 3 and penetrates through;
[0045] S2: The outer supporting arc plate 1 is attached to the inner side of the basic framework of the tunnel by gluing, and then the protruding block structure of another outer supporting arc plate 1 is staggered and attached to the protruding block structure of the outer supporting arc plate 1. At this time, the plug block 8 is plugged into the slot 11, and an elastic plug-in structure is formed between the support spring 84 and the limit block 83, so that the end of the limit block 83 is plugged into the limit groove 12, so as to realize the self-locking connection between the outer supporting arc plate 1 and the outer supporting arc plate 1;
[0046] S3: Then, the inner supporting arc plate 5 is attached to the inner side of the basic framework of the tunnel by gluing, and then the protruding block structure of another inner supporting arc plate 5 is staggered and attached to the protruding block structure of the inner supporting arc plate 5. At this time, the plug-in block 8 is plugged into the slot 11, and an elastic plug-in structure is formed between the support spring 84 and the limit block 83, so that the end of the limit block 83 is plugged into the limit groove 12, so as to realize the self-locking connection between the inner supporting arc plate 5 and the inner supporting arc plate 5;
[0047] S4: two hollow grouting anchor rods 6 are screwed through the outer supporting arc plate 1, the tunnel basic structure and the inner supporting arc plate 5, and then the grouting concrete is injected into the filling deformation layer 3 through the grouting port 7 to make up for the defect of the tunnel passing through the fault, and then the sealing plug 64 is inserted into the grouting port 7 to achieve the sealing of the grouting port 7, and the sleeve 62 is sleeved on the hollow grouting anchor rod 6;
[0048] S5: By screwing the first adjusting nut 61 and the second adjusting nut 65 up and down, the outer supporting arc plate 1 and the inner supporting arc plate 5 are respectively tightened and fitted on the basic structure of the tunnel, thereby further achieving support processing for the tunnel crossing the fault.
[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tunnel crossing fault support structure and construction method, comprising an outer support arc plate (1) and a filling deformation layer (3), characterized in that: The outer side of the filling deformation layer (3) is provided with a concrete outer layer (2), the outer side of the concrete outer layer (2) is provided with a first waterproof layer, the inner side of the filling deformation layer (3) is provided with a concrete inner layer (4), the inner side of the concrete inner layer (4) is provided with a second waterproof layer, the inner side of the second waterproof layer is provided with an inner supporting arc plate (5), a basic tunnel structure is formed between the concrete outer layer (2), the first waterproof layer, the concrete inner layer (4) and the second waterproof layer, a hollow grouting anchor rod (6) is inserted into the outer supporting arc plate (1) and the inner supporting arc plate (5), one end of the hollow grouting anchor rod (6) passes through the outer supporting arc plate (1), the basic tunnel structure and the inner supporting arc plate (5), a locking component that is easy to operate is provided on the hollow grouting anchor rod (6), and a self-locking component that is easy to adjust is provided between the outer supporting arc plates (1) and between the inner supporting arc plates (5).
2. A tunnel crossing fault support structure and construction method according to claim 1, characterized in that: The inner supporting circular arc plates (5) are provided in plurality, and the plurality of inner supporting circular arc plates (5) are distributed in a circle along the inner side of the tunnel basic framework; the outer supporting circular arc plates (1) are provided in plurality, and the plurality of outer supporting circular arc plates (1) are distributed in a circle along the outer side of the tunnel basic framework.
3. A tunnel crossing fault support structure and construction method according to claim 1, characterized in that: Both sides of the outer supporting arc plate (1) and the inner supporting arc plate (5) are in the form of protruding block structures, and two adjacent protruding block structures are arranged in a staggered manner.
4. A tunnel crossing fault support structure and construction method according to claim 1, characterized in that: The locking assembly comprises a first adjusting nut (61), the first adjusting nut (61) is sleeved on the hollow grouting anchor rod (6), a sleeve (62) is sleeved on the hollow grouting anchor rod (6), a connecting rod (63) is arranged on one side of the sleeve (62), and a sealing plug (64) is arranged on one side of the connecting rod (63).
5. A tunnel crossing fault support structure and construction method according to claim 4, characterized in that: The outer supporting arc plate (1) is provided with a grouting port (7), the opening of the grouting port (7) leads to the filling deformation layer (3), a sealing plug (64) is inserted into the grouting port (7), a second adjusting nut (65) is sleeved on the bottom of the first adjusting nut (61), and the second adjusting nut (65) is connected to the first adjusting nut (61) by internal and external threads.
6. A tunnel crossing fault support structure and construction method according to claim 1, characterized in that: The self-locking assembly comprises an insert block (8), wherein the two insert blocks (8) are protrudingly arranged on the protruding block structure of the outer supporting circular arc plate (1) and the inner supporting circular arc plate (5), a groove (81) is provided on one side of the insert block (8), a mounting block (82) is provided at the opening of the groove (81), and a slot (11) is provided on one side of the protruding block structure of the outer supporting circular arc plate (1) and the inner supporting circular arc plate (5).
7. A tunnel crossing fault support structure and construction method according to claim 6, characterized in that: A limiting block (83) is slidably inserted on the mounting block (82); the limiting block (83) is in a T-shaped block structure, and one side of the end is in an inclined surface structure; a support spring (84) is arranged between the limiting block (83) and the groove (81); a limiting groove (12) is provided on one side of the slot (11); and the end of the limiting block (83) and the limiting groove (12) are arranged correspondingly.
8. A tunnel crossing fault support structure and construction method according to claim 7, characterized in that: A receiving groove (831) is provided on one side of the end of the limit block (83), a pin shaft (832) is provided on the receiving groove (831), an abutment block (834) is movably sleeved on the pin shaft (832), a torsion spring (833) is sleeved on the pin shaft (832), one end of the torsion spring (833) is fixed on the pin shaft (832), and the other end is fixed on the abutment block (834).
9. A construction method for a tunnel crossing a fault support structure according to any one of claims 1 to 8, characterized in that: The construction method comprises the following steps: S1: The position where the tunnel crosses the fault is monitored by means of a fault detection device, and after the position is determined, a hole is drilled into the basic structure of the tunnel by means of a drilling device until the hole reaches the filled deformed layer (3) and penetrates through the tunnel; S2: The outer supporting arc plate (1) is attached to the inner side of the tunnel basic framework by gluing, and then the protruding block structure of another outer supporting arc plate (1) is alternately attached to the protruding block structure of the outer supporting arc plate (1), at which time the plug block (8) is plugged into the slot (11), and an elastic plug-in structure is formed between the support spring (84) and the limit block (83), so that the end of the limit block (83) is plugged into the limit groove (12), thereby realizing a self-locking connection between the outer supporting arc plates (1) and the outer supporting arc plates (1); S3: The inner supporting arc plate (5) is then attached to the inner side of the tunnel basic framework by gluing, and the protruding block structure of another inner supporting arc plate (5) is alternately attached to the protruding block structure of the inner supporting arc plate (5). At this time, the insert block (8) is inserted into the slot (11), and an elastic plug-in structure is formed between the support spring (84) and the limit block (83), so that the end of the limit block (83) is inserted into the limit groove (12), thereby realizing a self-locking connection between the inner supporting arc plates (5) and the inner supporting arc plates (5); S4: two hollow grouting anchor rods (6) are inserted through the outer supporting arc plate (1), the tunnel basic frame and the inner supporting arc plate (5) and screwed together, and then grouting concrete is injected into the filling deformation layer (3) through the grouting port (7) to make up for the defect of the tunnel passing through the fault, and then the sealing plug (64) is inserted into the grouting port (7) to achieve the sealing of the grouting port (7), and at the same time, the sleeve (62) is sleeved on the hollow grouting anchor rod (6); S5: By screwing the first adjusting nut (61) and the second adjusting nut (65) up and down, the outer supporting arc plate (1) and the inner supporting arc plate (5) are respectively tightened and fitted on the basic structure of the tunnel, thereby further achieving support processing for the tunnel crossing the fault.