Ventilation device for underground engineering construction
By designing ventilation devices with fixed nodes and mobile bodies in underground projects, the problems of poor ventilation and dust diffusion in underground space are solved, fixed-point ventilation and air filtration are achieved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202411269417.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-12
AI Technical Summary
In underground projects, due to poor ventilation in underground spaces, it is difficult to achieve the effect of blowing in a single direction, and dust diffusion affects construction progress and safety. The existing technology cannot effectively solve the ventilation problems under bending branches and shading.
A ventilation device including a fixed node, a connecting rail and a moving body is designed. Through the reciprocating movement of the moving body and the cooperation of the fixed node, fixed point ventilation is realized, and air filtering is carried out through the cooperation of the upper ventilation module and the lower ventilation module to improve ventilation. Effect and construction safety.
It improves the ventilation effect of underground projects, reduces dust diffusion, improves construction efficiency and safety, and realizes fixed-point ventilation and air filtration.
Smart Images

Figure CN118933965A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering, and in particular to a ventilation device for underground engineering construction. Background Art
[0002] Underground engineering refers to projects that are developed and constructed deep beneath the ground, such as underground tunnels, underground parking lots, etc.
[0003] Because underground projects are carried out underground, they usually need to be excavated. The excavated underground space is generally poorly ventilated, and people who stay there for a long time are prone to problems such as hypoxia. Therefore, underground projects generally need to be ventilated. Existing underground project ventilation is generally achieved by placing large fans at the entrance of the underground space, blowing air into the underground space through the large fans, thereby driving air circulation inside the underground space. However, this technology has certain shortcomings when used. When there are several curved branches or a large number of obstructions in the underground space, blowing air in a single direction cannot achieve the expected effect. Setting several vents in the underground space will disperse the air volume, affecting the ventilation effect. At the same time, a large amount of dust will appear during excavation or construction in the underground space. The dust will be diffused under the influence of the air blown into the underground space by the fan. This situation not only reduces the construction progress of the underground project, but also poses certain safety hazards. Summary of the invention
[0004] The purpose of the present invention is to solve the problems in the background technology and to propose a ventilation device for underground engineering construction.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a ventilation device for underground engineering construction, comprising a fixed node, a connecting rail and a mobile body, the fixed node is fixedly installed on the top of the inner wall of the underground project by bolts, the fixed node is a rectangular structure, and an installation groove is opened at the bottom of the fixed node, the connecting rail is fixedly installed on the top of the inner wall of the underground project by bolts and passes through the installation groove, a number of connecting rails are provided and fixed in series with each other, a number of fixed nodes are provided and are intermittently distributed along the laying direction of the number of connecting rails, two ventilation pipes are fixedly installed on both sides of the fixed node by flanges, and the mobile body is slidably connected to the connecting rails.
[0006] In the above-mentioned ventilation device for underground engineering construction, two symmetrically arranged ventilation chambers are opened in the fixed node, and channel No. 1 is opened at both ends of the ventilation chamber respectively. The end of channel No. 1 away from the ventilation chamber passes through the fixed node and is connected with the corresponding ventilation pipe. An electric cylinder No. 1 is fixedly installed on the inner wall of the ventilation chamber, and channel No. 2 is opened at the bottom of the ventilation chamber, and a sealing plug No. 1 is inserted in channel No. 2. The telescopic end of the electric cylinder No. 1 is fixedly connected to the top of the sealing plug No. 1.
[0007] In the above-mentioned ventilation device for underground engineering construction, the inner diameter of the ventilation bin is larger than the inner diameter of the No. 1 channel, and a No. 1 slide groove is provided on both sides of the inner wall of the ventilation bin. An extrusion frame is arranged in the ventilation bin, and an inclined surface is provided at one end of the extrusion frame. The two sides of the extrusion frame are respectively slidably connected with the No. 1 slide groove through the bracket, and a No. 2 sealing plug with a cylindrical structure is fixedly installed at the end of the extrusion frame away from the inclined surface, and the No. 1 sealing plug is in contact with the inclined surface opened on the extrusion frame.
[0008] In the above-mentioned ventilation device for underground engineering construction, two symmetrically arranged No. 3 channels are opened in the mobile body, and both ends of No. 3 channel pass through the mobile body. The opening position of No. 3 channel corresponds to the opening position of No. 2 channel. A lifting pipe is inserted in No. 3 channel, and a lifting groove is opened on the inner wall of No. 3 channel. A connecting block is fixedly installed on the outer wall of the lifting pipe, and the connecting block is inserted in the lifting groove. A No. 2 electric cylinder is fixedly installed in the lifting groove, and the telescopic end of the No. 2 electric cylinder is fixedly connected to the connecting block.
[0009] In the above-mentioned ventilation device for underground engineering construction, a sealing cover plate is fixedly installed on the top of the lifting pipe, and an air inlet is opened on the side wall of the lifting pipe and below the cover plate.
[0010] In the above-mentioned ventilation device for underground engineering construction, two symmetrically arranged connecting pipes are fixedly installed at the bottom of the mobile body, and the two connecting pipes are respectively connected to two No. 3 channels, and an upper ventilation module is fixedly installed at the bottom of the two connecting pipes. The upper ventilation module is a disc-shaped structure, and the outer edge of the upper ventilation module is a downwardly curved structure. A number of fan-shaped air outlet channels are opened in the upper ventilation module, and one end of the air outlet channel passes through the upper ventilation module. A transition bin with a circular ring structure is opened in the upper ventilation module, and a number of air outlet channels are respectively connected to the transition bin, and the bottom of the connecting pipe is connected to the transition bin.
[0011] In the above-mentioned ventilation device for underground engineering construction, an auxiliary pipe is fixedly installed at the bottom of the upper ventilation module, the auxiliary pipe is connected to the transition bin, the bottom of the auxiliary pipe is threadedly connected to an extension pipe, and a lower ventilation module is arranged below the extension pipe. The lower ventilation module is a disc-shaped structure, and the outer edge of the lower ventilation module is an upwardly curved structure. An air inlet duct is fixedly installed on the top of the lower ventilation module, and the top of the air inlet duct is threadedly connected to the bottom of the extension pipe. A motor compartment is provided in the lower ventilation module, and an exhaust module is fixedly installed in the motor compartment, and the motor compartment is connected to the air inlet duct. A filter compartment is provided in the lower ventilation module and below the motor compartment, and an exhaust port with a circular structure is provided on the outer wall of the lower ventilation module, the exhaust port is connected to the filter compartment, and the filter compartment is connected to the motor compartment, and a filter net with a circular structure is fixedly installed in the filter compartment.
[0012] In the above-mentioned ventilation device for underground engineering construction, a spring bead is fixedly installed on the top of the sealing cover plate, a connecting groove is opened at the bottom of the No. 2 sealing plug, and a sensor unit is fixedly installed on the inner wall of the connecting groove and in the spring bead.
[0013] Compared with the existing technology, the advantages of the ventilation device for underground engineering construction are: the present invention designs a mobile main body, through the reciprocating movement of the mobile main body, in cooperation with the fixed node, the wind in the ventilation duct can be discharged from the position where the fixed node is located, thereby realizing fixed-point ventilation of the underground space and improving the ventilation effect of the underground project. At the same time, with the mutual cooperation of the upper ventilation module and the lower ventilation module, ventilation can be carried out at the designated position while filtering the dust in the air, avoiding safety hazards to construction personnel and improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the three-dimensional structure of the fixed node, the connecting track and the mobile body in the present invention.
[0015] Figure 2 It is a three-dimensional structural schematic diagram of the upper ventilation module and the lower ventilation module in the present invention.
[0016] Figure 3 It is a schematic diagram of the planar structure of the fixed nodes, connecting tracks and the mobile body in the present invention.
[0017] Figure 4 It is a schematic diagram of the cross-sectional structure of the fixed node and the mobile body in the present invention.
[0018] Figure 5 The present invention Figure 4 Schematic diagram of the local enlarged structure at point A in the middle.
[0019] Figure 6 The present invention Figure 4 Schematic diagram of the local enlarged structure at point B in the middle.
[0020] Figure 7 The present invention Figure 4 Schematic diagram of the local enlarged structure at point C in the middle.
[0021] Figure 8 It is a schematic cross-sectional structural diagram of the ventilation bin in the present invention.
[0022] In the figure: 1. fixed node; 2. connecting track; 3. moving body; 101. installation groove; 102. ventilation compartment; 103. channel No. 1; 104. electric cylinder No. 1; 105. channel No. 2; 106. sealing plug No. 1; 107. slide slot No. 1; 108. extrusion rack; 109. sealing plug No. 2; 301. channel No. 3; 302. lifting pipe; 303. lifting groove; 304. connecting block; 305. electric cylinder No. 2; 306. sealing cover plate; 307. connecting pipe; 4. upper ventilation module; 401. air outlet channel; 402. transition compartment; 403. auxiliary pipe; 404. extension pipe; 5. lower ventilation module; 501. air inlet pipe; 502. motor compartment; 503. filter compartment; 504. exhaust port; 308. spring bead; 110. connecting groove. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0024] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0025] Reference Figure 1-Figure 8 A ventilation device for underground engineering construction includes a fixed node 1, a connecting track 2 and a mobile body 3. The fixed node 1 is fixedly installed on the top of the inner wall of the underground project by bolts. The fixed node 1 is a rectangular structure. An installation groove 101 is opened at the bottom of the fixed node 1. The connecting track 2 is fixedly installed on the top of the inner wall of the underground project by bolts and penetrates the installation groove 101. A plurality of connecting tracks 2 are provided and fixed in series with each other. A plurality of fixed nodes 1 are provided and are intermittently distributed along the laying direction of the plurality of connecting tracks 2. Two ventilation pipes are fixedly installed on both sides of the fixed node 1 by flanges. The mobile body 3 is slidably connected to the connecting track 2. A plurality of fixed nodes 1 are provided and are distributed along the connecting track 2 at the top of the inner wall of the underground project. The mobile body 3 moves through the connecting track 2. The underground space can be ventilated by cooperating with the mobile body 3 through the plurality of fixed nodes 1. When the mobile body 3 moves to a designated position and contacts the fixed node 1 at the corresponding position, the wind in the ventilation pipe can be discharged from the designated position. The ventilation pipe is used for an external fan to supply air in a directional manner.
[0026] Two symmetrically arranged ventilation bins 102 are provided in the fixed node 1, and channel No. 103 is provided at both ends of the ventilation bin 102 respectively. One end of channel No. 103 away from the ventilation bin 102 passes through the fixed node 1 and is connected to the corresponding ventilation pipe. An electric cylinder No. 104 is fixedly installed on the inner wall of the ventilation bin 102, and a channel No. 2 105 is provided at the bottom of the ventilation bin 102. A sealing plug No. 106 is inserted in the channel No. 2 105. The telescopic end of the electric cylinder No. 104 is fixedly connected to the top of the sealing plug No. 106. The ventilation bin 102 cooperates with the channel No. 103 to connect the ventilation pipe, so that the wind in the ventilation pipe can be smoothly and continuously transported through several fixed nodes 1. When it is necessary to supply air to the specified position through the mobile body 3, the electric cylinder No. 104 is operated to contract, driving the sealing plug No. 106 to rise and separate from the channel No. 2 105. At this time, the channel No. 2 105 will be in an open state, and the wind in the ventilation bin 102 can smoothly enter the mobile body 3 and be discharged.
[0027] The inner diameter of the ventilation bin 102 is larger than the inner diameter of the No. 1 channel 103. Both sides of the inner wall of the ventilation bin 102 are provided with a No. 1 slide groove 107. An extrusion frame 108 is arranged in the ventilation bin 102. An inclined surface is provided at one end of the extrusion frame 108. Both sides of the extrusion frame 108 are slidably connected with the No. 1 slide groove 107 through brackets respectively. A No. 2 sealing plug 109 of a cylindrical structure is fixedly installed at one end of the extrusion frame 108 away from the inclined surface. The No. 1 sealing plug 106 is in contact with the inclined surface provided on the extrusion frame 108. When the No. 1 sealing plug 106 rises, it will squeeze the extrusion frame 108 through the inclined surface provided on the extrusion frame 108. The extrusion frame 108 is squeezed to push the No. 2 Sealing plug No. 109 is inserted into channel No. 103 in a specified direction. Since the wind in the ventilation duct is blown in a specified direction, the insertion direction of sealing plug No. 2 109 is consistent with the blowing direction. Therefore, when channel No. 1 103 in a specified direction is sealed, the wind blown from another channel No. 1 103 will accumulate in the ventilation bin 102 and be blown out through channel No. 2 105, which can increase the wind pressure. A spring is fixedly installed in slide groove No. 1 107, and the spring is connected to the bracket. When sealing plug No. 1 106 descends and resets, the extrusion frame 108 will automatically reset under the elastic force of the spring, and the sealed channel No. 1 103 will be opened. At this time, the wind in the ventilation duct continues to be smoothly transported.
[0028] Two symmetrically arranged No. 3 channels 301 are opened in the mobile body 3, and both ends of No. 3 channel 301 pass through the mobile body 3. The opening position of No. 3 channel 301 corresponds to the opening position of No. 2 channel 105. A lifting tube 302 is inserted in No. 3 channel 301, and a lifting groove 303 is opened on the inner wall of No. 3 channel 301. A connecting block 304 is fixedly installed on the outer wall of the lifting tube 302, and the connecting block 304 is inserted in the lifting groove 303. A No. 2 electric cylinder 305 is fixedly installed in the lifting groove 303, and the telescopic end of the No. 2 electric cylinder 305 is fixedly connected to the connecting block 304. No. 3 channel 301 is used to guide the wind blown out through No. 2 channel 105. When No. 3 channel 301 is aligned with No. 2 channel 105, the telescopic end of the No. 2 electric cylinder 305 is operated to extend and push the lifting tube 302 to rise and extend into the No. 2 channel 105.
[0029] A sealing cover plate 306 is fixedly installed on the top of the lifting tube 302, and an air inlet is opened on the side wall of the lifting tube 302 and below the cover plate. The sealing cover plate 306 is used to seal the top of the lifting tube 302 and the third channel 301 when the lifting tube 302 is reset, so as to prevent debris from falling into the lifting tube 302 and the third channel 301 when the mobile body 3 moves.
[0030] Two symmetrically arranged connecting pipes 307 are fixedly installed at the bottom of the mobile body 3, and the two connecting pipes 307 are respectively connected to the two No. 3 channels 301. An upper ventilation module 4 is fixedly installed at the bottom of the two connecting pipes 307. The upper ventilation module 4 is a disc-shaped structure, and the outer edge of the upper ventilation module 4 is a downwardly curved structure. A plurality of fan-shaped air outlet channels 401 are provided in the upper ventilation module 4. One end of the air outlet channel 401 passes through the upper ventilation module 4. A transition chamber 402 with a circular ring structure is provided in the upper ventilation module 4. If The dry air outlet channel 401 is respectively connected with the transition bin 402, and the bottom of the connecting pipe 307 is connected with the transition bin 402. After the wind passes through the No. 3 channel 301, it will enter the transition bin 402 and be blown out through the air outlet channel 401. Through a number of arc-shaped air outlet channels 401, the blown wind can be diffused, thereby improving the ventilation effect. At the same time, it avoids excessive air volume and causing large dust. Moreover, since the upper ventilation module 4 is located at a high place in the underground space, it can further avoid blowing the dust on the ground of the underground space.
[0031] An auxiliary pipe 403 is fixedly installed at the bottom of the upper ventilation module 4, and the auxiliary pipe 403 is connected to the transition bin 402. An extension pipe 404 is threadedly connected to the bottom of the auxiliary pipe 403. A lower ventilation module 5 is arranged below the extension pipe 404. The lower ventilation module 5 is a disc-shaped structure, and the outer edge of the lower ventilation module 5 is an upwardly curved structure. An air inlet duct 501 is fixedly installed on the top of the lower ventilation module 5, and the top of the air inlet duct 501 is threadedly connected to the bottom of the extension pipe 404. A motor bin 502 is provided in the lower ventilation module 5, and an exhaust module is fixedly installed in the motor bin 502, and the motor bin 502 is connected to the air inlet duct 501. A filter bin 503 is provided in the lower ventilation module 5 and below the motor bin 502. An exhaust port 504 with a circular ring structure is provided on the outer wall of the lower ventilation module 5. 4 is connected with the filter bin 503, the filter bin 503 is connected with the motor bin 502, a filter screen with an annular structure is fixedly installed in the filter bin 503, the auxiliary pipe 403 is used to connect the extension pipe 404 or the lower ventilation module 5, a plurality of extension pipes 404 are provided, and the extension pipes 404 can be added or reduced at will according to the height of the underground space, or all the extension pipes 404 can be removed, and the air inlet pipe 501 on the lower ventilation module 5 is directly threadedly connected with the auxiliary pipe 403. When in use, the exhaust module generates suction force, and the air in the underground space is drawn into the filter bin 503 from the exhaust port 504 for filtration. The filtered air passes through the air inlet pipe 501, the extension pipe 404 and the auxiliary pipe 403 and enters the transition bin 402 again and is blown out through the air outlet channel 401, which can further improve the ventilation effect.
[0032] A spring bead 308 is fixedly installed on the top of the sealing cover plate 306, and a connecting groove 110 is opened at the bottom of the No. 2 sealing plug 109. Sensor units are fixedly installed on the inner wall of the connecting groove 110 and in the spring bead 308. When the connecting groove 110 and the sensor unit in the spring bead 308 are in contact, the mobile body 3 can be automatically positioned. At the same time, the No. 1 electric cylinder 104 and the No. 2 electric cylinder 305 are started to achieve fixed-point ventilation.
[0033] It is further explained that the above-mentioned fixed connection should be understood in a broad sense unless otherwise clearly specified and limited. For example, it can be welding, gluing, or one-piece molding, etc., which are conventional means well known to those skilled in the art.
[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A ventilation device for underground engineering construction, comprising a fixed node (1), a connecting track (2) and a mobile body (3), Features: The fixed node (1) is fixedly installed on the top of the inner wall of the underground project by bolts. The fixed node (1) is of rectangular structure. A mounting groove (101) is provided at the bottom of the fixed node (1). The connecting rail (2) is fixedly installed on the top of the inner wall of the underground project by bolts and passes through the mounting groove (101). A plurality of connecting rails (2) are provided and fixed in series with each other. A plurality of fixed nodes (1) are provided and are intermittently distributed along the laying direction of the plurality of connecting rails (2). Two ventilation pipes are fixedly installed on both sides of the fixed node (1) by flanges. The mobile body (3) is slidably connected to the connecting rail (2).
2. A ventilation device for underground engineering construction according to claim 1, Features: Two symmetrically arranged ventilation chambers (102) are provided in the fixed node (1), and a No. 1 channel (103) is provided at both ends of the ventilation chamber (102). One end of the No. 1 channel (103) away from the ventilation chamber (102) passes through the fixed node (1) and is connected to a corresponding ventilation pipe. A No. 1 electric cylinder (104) is fixedly installed on the inner wall of the ventilation chamber (102), and a No. 2 channel (105) is provided at the bottom of the ventilation chamber (102). A No. 1 sealing plug (106) is inserted into the No. 2 channel (105), and a telescopic end of the No. 1 electric cylinder (104) is fixedly connected to the top of the No. 1 sealing plug (106).
3. A ventilation device for underground engineering construction according to claim 2, Features: The inner diameter of the ventilation bin (102) is larger than the inner diameter of the No. 1 channel (103), and No. 1 slide grooves (107) are provided on both sides of the inner wall of the ventilation bin (102). An extrusion frame (108) is provided in the ventilation bin (102), and an inclined surface is provided at one end of the extrusion frame (108). Both sides of the extrusion frame (108) are slidably connected to the No. 1 slide groove (107) through brackets, and a No. 2 sealing plug (109) of a cylindrical structure is fixedly installed at one end of the extrusion frame (108) away from the inclined surface, and the No. 1 sealing plug (106) is in contact with the inclined surface provided on the extrusion frame (108).
4. A ventilation device for underground engineering construction according to claim 3, Features: The mobile body (3) is provided with two symmetrically arranged No. 3 channels (301), both ends of the No. 3 channels (301) pass through the mobile body (3), the opening position of the No. 3 channels (301) corresponds to the opening position of the No. 2 channels (105), a lifting tube (302) is inserted in the No. 3 channels (301), a lifting groove (303) is provided on the inner wall of the No. 3 channels (301), a connecting block (304) is fixedly installed on the outer wall of the lifting tube (302), the connecting block (304) is inserted in the lifting groove (303), a No. 2 electric cylinder (305) is fixedly installed in the lifting groove (303), and the telescopic end of the No. 2 electric cylinder (305) is fixedly connected to the connecting block (304).
5. A ventilation device for underground engineering construction according to claim 4, Features: A sealing cover plate (306) is fixedly mounted on the top of the lifting tube (302), and an air inlet is provided on the side wall of the lifting tube (302) and below the cover plate.
6. A ventilation device for underground engineering construction according to claim 4, Features: Two symmetrically arranged connecting pipes (307) are fixedly installed below the mobile body (3), and the two connecting pipes (307) are respectively connected to the two No. 3 channels (301). An upper ventilation module (4) is fixedly installed at the bottom of the two connecting pipes (307). The upper ventilation module (4) is in a disc-shaped structure, and the outer edge of the upper ventilation module (4) is in a downwardly curved structure. A plurality of fan-shaped air outlet channels (401) are provided in the upper ventilation module (4), and one end of the air outlet channel (401) passes through the upper ventilation module (4). A transition chamber (402) in a circular ring structure is provided in the upper ventilation module (4), and the plurality of air outlet channels (401) are respectively connected to the transition chamber (402), and the bottom of the connecting pipe (307) is connected to the transition chamber (402).
7. A ventilation device for underground engineering construction according to claim 6, Features: An auxiliary pipe (403) is fixedly installed at the bottom of the upper ventilation module (4), and the auxiliary pipe (403) is connected to the transition chamber (402). The bottom of the auxiliary pipe (403) is threadedly connected to an extension pipe (404). A lower ventilation module (5) is arranged below the extension pipe (404). The lower ventilation module (5) is in a disc-shaped structure, and the outer edge of the lower ventilation module (5) is in an upwardly curved structure. An air inlet pipe (501) is fixedly installed at the top of the lower ventilation module (5), and the top of the air inlet pipe (501) is threadedly connected to the bottom of the extension pipe (404). A motor compartment (502) is provided in the ventilation module (5), an exhaust module is fixedly installed in the motor compartment (502), the motor compartment (502) is connected to the air inlet duct (501), a filter compartment (503) is provided in the lower ventilation module (5) and below the motor compartment (502), an exhaust port (504) with a circular ring structure is provided on the outer wall of the lower ventilation module (5), the exhaust port (504) is connected to the filter compartment (503), the filter compartment (503) is connected to the motor compartment (502), and a filter net with a circular ring structure is fixedly installed in the filter compartment (503).
8. A ventilation device for underground engineering construction according to claim 5, Features: A spring bead (308) is fixedly mounted on the top of the sealing cover plate (306), a connecting groove (110) is provided at the bottom of the No. 2 sealing plug (109), and a sensor unit is fixedly mounted on the inner wall of the connecting groove (110) and in the spring bead (308).
