Integrated underground gas storage structure and construction method thereof

By adopting centrifugal divergent cave layout and steel component reinforcement structure in the underground gas storage, the problem of excessive stone excavation and backfill concrete in the construction of tunnel gas storage is solved, and more compact and efficient storage is achieved Gas storage design reduces construction costs and safety hazards.

CN118934042APending Publication Date: 2024-11-12SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411301217.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

After the installation scale of the existing compressed air underground gas storage project increases, the number of tunnel-type cavities or the lengthening of the hole lines, the excavation volume of stone and the backfilling concrete are too large, causing problems such as increased construction difficulty and cost.

Method used

Adopting an integrated underground gas storage structure, by excavating multiple cavernous chambers in the rock mass and setting up main channels and branch channels with the installation site as the center. The cavernous chambers are arranged in a centrifugal divergence structure along the axis direction to reduce unnecessary excavation. and install steel components and concrete linings in the cave room to reinforce the structure, optimize stress distribution and reduce material use.

Benefits of technology

It reduces the excavation volume and backfill concrete volume, reduces material costs and construction difficulty, improves construction efficiency and safety, reduces maintenance costs, and adapts to complex geological environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934042A_ABST
    Figure CN118934042A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of underground structure engineering, and discloses an integrated underground gas storage structure and a construction method thereof. According to the integrated underground gas storage structure, unnecessary excavation areas can be reduced by forming a centrifugal diffusion integration mode, the excavation amount is further reduced, meanwhile, due to the fact that the gas storage structure of the structure is more compact and efficient, the amount of concrete needing to be backfilled can be reduced, the material cost is reduced, and the energy consumption is reduced. The construction difficulty is reduced, the construction period is shortened, so that the construction cost is reduced, in addition, by adopting a centrifugal integration strategy, an operator can quickly move to the required cavern from the installation site, the situation that in a conventional scheme, the operator moves to one cavern from the installation site and then gradually moves to the required cavern is avoided, and the construction efficiency is improved. The traveling distance of operators is greatly shortened, the overhaul efficiency is improved, the maintenance cost is reduced, and potential safety hazards possibly caused by a long-distance channel are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of underground structure engineering, and in particular to an integrated underground gas storage structure and a construction method thereof. Background Art

[0002] Compressed air energy storage is one of the most promising physical energy storage technologies that can be promoted on a large scale besides pumped storage. It can effectively convert surplus electrical energy into the potential energy of air, and use compressed air to drive the expander to generate electricity during peak electricity consumption. It has the characteristics of large scale, low cost, long life, and environmental friendliness. Its large-scale application is of great significance for balancing the load of the power grid.

[0003] Current compressed air underground storage projects generally connect the ground and underground storage via vertical shafts. The storages are connected via connecting tunnels. The underground storage is sealed with sealing steel plates, and the space between the sealing steel plates and the rock wall is filled with lining concrete.

[0004] However, as the installed capacity of compressed air energy storage power stations gradually increases, the demand for storage capacity of underground gas storage facilities gradually increases, which increases the number of tunnel-type caverns or lengthens the tunnel lines of tunnel-type caverns. Connecting tunnels are needed to connect two adjacent caverns, resulting in excessive stone excavation and backfill concrete volumes. Summary of the invention

[0005] In view of this, the present invention provides an integrated underground gas storage structure and a construction method thereof to solve the problem of excessive amount of stone excavation and backfill concrete.

[0006] In the first aspect, the present invention provides an integrated underground gas storage structure, including a plurality of caverns excavated in a rock mass, specifically, the integrated underground gas storage structure includes an installation site and a cavern. The installation site is provided with a main channel and a plurality of branch channels, and any branch channel is connected to the main channel; the cavern is provided with a plurality of, and the axial direction of any of the caverns points to the installation site, and one of the ends of any of the caverns arranged along its axial direction is arranged close to the installation site, and the other end of any of the caverns arranged along its axial direction extends in a direction away from the installation site, so that the plurality of caverns are arranged in a centrifugal divergent structure around the installation site, and the gas storage chamber in the cavern is connected to the main channel through the branch channel.

[0007] Beneficial effect: By arranging one of the ends of each cavern along its axial direction close to the installation site, and extending the other end of the cavern along its axial direction in a direction away from the installation site, so that multiple caverns are arranged around the installation site, forming a centrifugal divergent integration method, it is possible to reduce unnecessary excavation areas, thereby reducing the amount of excavation. At the same time, since the gas storage structure of this structure is more compact and efficient, it can reduce the amount of concrete backfill required, reduce material costs, reduce construction difficulty and shorten the construction period, thereby reducing construction costs. In addition, by adopting a centrifugal integration strategy, operators can quickly move from the installation site to the required cavern without having to move from the installation site to a cavern first, and then gradually move to the required cavern as in conventional solutions. This greatly reduces the travel distance of operators, improves maintenance efficiency, reduces maintenance costs, and reduces safety hazards that may arise from long-distance passages.

[0008] In an optional embodiment, any cavern includes a steel component and a concrete lining, wherein the steel component is located inside the rock mass, and a distance is left between the steel component and the inner wall of the rock mass to form a casting chamber, an air storage chamber is formed inside the steel component, the air storage chamber is connected to the branch channel, and the concrete lining is located in the casting chamber.

[0009] Beneficial effects: By setting the steel components of the cavern inside the rock mass to provide support for the cavern as a whole, and by filling the casting chamber formed by the steel components and the inner wall of the rock mass with concrete lining, the cavern can be further reinforced, which can enhance the cavern's ability to withstand external factors such as ground stress and water pressure. At the same time, through the combined action of steel components and concrete lining, the stress distribution state of the cavern can be optimized, reducing the risk of damage caused by stress concentration.

[0010] In an optional embodiment, the steel component is formed by splicing a plurality of steel plates, and both ends of the steel component arranged along the axial direction thereof are hemispherical.

[0011] Beneficial effects: By arranging the steel member to be composed of multiple steel plates spliced ​​together, when subjected to external pressure or load, each steel plate can bear a part of the stress, which can effectively disperse the stress, thereby reducing the local stress concentration and improving the strength of the overall structure; and by arranging the two ends of the steel member along its axial direction in a hemispherical shape, it helps to reduce the stress concentration at the ends. At the same time, since the hemispherical surface is relatively smooth, it is not easy to accumulate moisture and impurities, reducing the impact on the subsequent pouring of concrete masonry. In addition, due to the splicing form, it can be adjusted and optimized according to the actual shape and size of the cavern, avoiding geological environments that are not conducive to construction, so as to better adapt to complex geological environments.

[0012] In an optional embodiment, the end of the steel member close to the installation site along its axial direction is located inside the installation site, and the outer walls of the ends of the multiple caverns close to the installation site, the inner wall of the installation site, the outer wall of the main channel and the outer wall of the branch channel enclose a casting chamber for filling concrete.

[0013] Beneficial effects: A casting chamber is formed by enclosing the outer walls of the ends of multiple chambers close to the installation site, the inner walls of the installation site, the outer walls of the main channel and the outer walls of the branch channels, and concrete is filled in the casting chamber to achieve a tight connection between the steel component and the installation site, the main channel and the branch channels, and ensure that the overall structure of the steel component and the installation site is more stable under high pressure. At the same time, by arranging the hemispherical end in the installation site, the pressure from the air storage chamber and the external force of the concrete on the end of the steel component can be effectively dispersed and transmitted, reducing the stress concentration phenomenon.

[0014] In an optional embodiment, the integrated underground gas storage structure further includes a vertical shaft, which is excavated in the rock mass between two adjacent caverns, and a distance is left between the vertical shaft and any side wall of the installation site.

[0015] Beneficial effects: By setting the vertical shaft between adjacent caverns and leaving a gap between the vertical shaft and each side wall of the installation site, the vertical shaft is located outside the installation site, and the hoisting and welding operations of the steel plate are separated, so that the hoisting and welding operations can be carried out at the same time, reducing the waiting time, helping to shorten the overall construction period, and avoiding idleness and waste of human resources; secondly, the vertical shaft can only meet the hoisting requirements of the pipe segments and steel blocks of each channel. Compared with the existing solution that welds the steel plates into pipe rings above the ground and then needs to be enlarged to meet the hoisting requirements of the pipe rings, the gas storage structure of this structure can adopt a smaller diameter vertical shaft, and reduce the ultimate bearing capacity of its derrick, thereby reducing costs; at the same time, by welding steel blocks in the cavern, it can be avoided that the existing pipe rings formed by welding steel blocks above the ground are easily deformed by external influences during the hoisting process, and it is difficult to ensure the docking quality between adjacent pipe rings; in addition, by carrying out hoisting and welding operations in relatively independent spaces, the risks brought by cross-operation are reduced.

[0016] In an optional embodiment, the integrated underground gas storage structure also includes a working corridor, which is excavated in the rock mass between two adjacent caverns, and one end of the working corridor extends to one of the side walls of the installation site, and the other end of the working corridor extends in a direction away from the installation site and is connected to the vertical shaft.

[0017] Beneficial effects: By setting the working corridor in the rock mass between two adjacent caverns, the rock space between the two adjacent caverns can be fully utilized, avoiding unnecessary excavation and backfilling, reducing the construction cost of the excavation process and reducing the impact of the excavation process on the environment. At the same time, through the working corridor, construction materials can be conveniently transported from the installation site to each cavern, reducing the transportation distance and time; at the same time, by setting the working corridor away from the installation site, it can provide convenient conditions for subsequent expansion and renovation, reducing construction costs and reducing construction difficulty.

[0018] In an optional embodiment, the integrated underground gas storage structure also includes a pedestrian passage, which is located in the working corridor, one end of the pedestrian passage arranged along the axial direction is connected to the main passage, and the other end of the pedestrian passage arranged along the axial direction extends to the bottom of the shaft.

[0019] Beneficial effects: By setting up a pedestrian passage in the working corridor and connecting the vertical shaft with the main passage through the pedestrian passage, workers can quickly reach their destination regardless of whether they enter the gas storage from the ground or move between different caverns, which reduces the workers' walking time and physical exertion and optimizes the construction process.

[0020] In an optional embodiment, the transverse section of the installation field is polygonal.

[0021] Beneficial effects: By setting the transverse profile of the installation site to a polygonal shape, the underground space can be utilized to the maximum extent. Compared with the traditional rectangular or circular settings, it can adapt to complex geological environments, reduce unnecessary excavation and backfilling, reduce construction costs and reduce environmental impacts; at the same time, the polygonal installation site can add more caverns in a limited space, thereby increasing the storage capacity of the gas storage facility; in addition, the polygonal installation site can be excavated and supported in sections as needed during the construction process, reducing the difficulty and risk of construction, and providing more working surfaces and channels for the construction team, thereby improving construction efficiency.

[0022] In a second aspect, the present invention further provides a construction method for an integrated underground gas storage structure, which is applied to the integrated underground gas storage structure in the first aspect, and the construction method comprises: step S1: excavating a vertical shaft, an operation corridor, an installation site and a plurality of caverns in sequence; step S2: installing steel components in the caverns, and pouring concrete lining between the steel components and the rock mass; step S3: pouring concrete in a pouring chamber enclosed by the outer wall of the end of the steel component close to the installation site, the inner wall of the installation site, the outer wall of the main channel and the outer wall of the branch channel.

[0023] Beneficial effects: Since the construction method of the integrated underground gas storage structure is applied to the integrated underground gas storage structure, it has the same effects as the integrated underground gas storage structure, and will not be repeated here.

[0024] In an optional implementation, during the excavation process in step S1, step S4 is simultaneously performed: a support structure is provided according to the type of surrounding rock.

[0025] Beneficial effects: By adding support structures during the excavation process, the rock mass exposed after excavation can be effectively supported to prevent collapse, avoid damage to surrounding pipelines, and reduce potential safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions in the specific implementation modes of the present invention, the drawings required for use in the description of the specific implementation modes will be briefly introduced below. Obviously, the drawings described below are some implementation modes of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 A top cross-sectional view of an integrated underground gas storage structure provided by an embodiment of the present invention;

[0028] Figure 2 A front cross-sectional view of the integrated underground gas storage structure provided by an embodiment of the present invention at the position of the shaft;

[0029] Figure 3 for Figure 2 A partial enlarged schematic diagram of B in the middle;

[0030] Figure 4 A cross-sectional view of the integrated underground gas storage structure provided by an embodiment of the present invention made along the axial direction of the cavern at the cavern;

[0031] Description of reference numerals:

[0032] 1. Installation site; 11. Main channel; 12. Branch channel; 13. Concrete;

[0033] 2. Cavern; 21. Steel structure; 22. Concrete lining; 23. Gas storage chamber;

[0034] 3. Vertical shaft;

[0035] 4. Operation corridor;

[0036] 5. Pedestrian passage;

[0037] 6. Water collection well;

[0038] 7. Inlet and outlet pipes;

[0039] 8. Pipe support seat;

[0040] A. Rock mass. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0042] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0043] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0045] Combine the following Figures 1 to 4 , describing an embodiment of the present invention.

[0046] According to an embodiment of the present invention, in a first aspect, an integrated underground gas storage structure is provided, comprising a plurality of caverns 2 excavated in a rock mass A.

[0047] Specifically, the integrated underground gas storage structure includes an installation site 1 and a cavern 2. The installation site 1 is provided with a main channel 11 and multiple branch channels 12, and any branch channel 12 is connected to the main channel 11; there are multiple caverns 2, and the axial direction of any cavern 2 points to the installation site 1, and one end of any cavern 2 arranged along its axial direction is arranged close to the installation site 1, and the other end of any cavern 2 arranged along its axial direction extends in a direction away from the installation site 1, so that the multiple caverns 2 are arranged in a centrifugal divergent structure around the installation site 1, and the gas storage chamber 23 in the cavern 2 is connected to the main channel 11 through the branch channel 12.

[0048] By utilizing the technical solution of the present embodiment, one of the ends of each cavern 2 arranged along its axial direction is arranged close to the installation site 1, and the other end of the cavern 2 arranged along its axial direction is extended in a direction away from the installation site 1, so that multiple caverns 2 are arranged around the installation site 1 to form a centrifugal divergent integration method, which can reduce unnecessary excavation areas and thus reduce the amount of excavation. At the same time, since the gas storage structure of the present structure is more compact and efficient, the amount of concrete 13 required for backfilling can be reduced, the material cost can be reduced, the construction difficulty can be alleviated, and the construction period can be shortened, thereby reducing the construction cost. In addition, by adopting a centrifugal integration strategy, the operating personnel can quickly move from the installation site 1 to the required cavern 2, without having to move from the installation site 1 to a cavern 2 first, and then gradually move to the required cavern 2 as in the conventional scheme. This greatly reduces the travel distance of the operating personnel, improves the maintenance efficiency, reduces the maintenance cost, and reduces the potential safety hazards caused by long-distance passages.

[0049] It can be explained that in this embodiment, during the excavation of the installation site 1 and the cavern 2, support devices need to be installed in a timely manner to effectively support the rock mass A exposed after excavation, prevent collapse, avoid damage to surrounding pipelines, and reduce potential safety hazards.

[0050] The structure of the cavern 2 in this embodiment is described in detail below.

[0051] In this embodiment, if Figures 1 to 4 As shown, any cavern 2 includes a steel component 21 and a concrete lining 22. The steel component 21 is located inside the rock mass A, and a distance is left between the steel component 21 and the inner wall of the rock mass A to form a casting chamber. An air storage chamber 23 is formed inside the steel component 21, and the air storage chamber 23 is connected to the branch channel 12. The concrete lining 22 is located in the casting chamber.

[0052] By utilizing the technical solution of this embodiment, the steel structure 21 of the cavern 2 is arranged inside the rock mass A to provide support for the cavern 2 as a whole, and the concrete lining 22 is filled in the casting chamber formed by the steel structure 21 and the inner wall of the rock mass A, so that the cavern 2 can be further reinforced, and the cavern 2 can be more resistant to external factors such as ground stress and water pressure. At the same time, through the joint action of the steel structure 21 and the concrete lining 22, the stress distribution state of the cavern 2 can be optimized, reducing the risk of damage caused by stress concentration.

[0053] In some embodiments, Figures 1 to 4 As shown, the steel member 21 is configured by welding a plurality of steel plates together in the cavern 2. In an embodiment not shown, the steel member 21 is configured by being disassembled and connected in the cavern 2, such as by connecting and fixing each plurality of steel plates with bolts, rivets or other connecting members.

[0054] In this embodiment, if Figures 1 to 4 As shown, the steel component 21 is formed by welding a plurality of steel plates together, and the two ends of the steel component 21 arranged along the axial direction thereof are both hemispherical.

[0055] By utilizing the technical solution of this embodiment, by configuring the steel member 21 to be composed of multiple steel plates spliced ​​together, each steel plate can bear a portion of the stress when subjected to external pressure or load, which can effectively disperse the stress, thereby reducing local stress concentration and improving the strength of the overall structure; and by configuring the two ends of the steel member 21 along its axial direction to be hemispherical, it helps to reduce stress concentration at the ends. At the same time, since the hemispherical surface is relatively smooth, it is not easy to accumulate moisture and impurities, thereby reducing the impact on the subsequent pouring of concrete 13. In addition, since the splicing form is adopted, it can be adjusted and optimized according to the actual shape and size of the cavern 2 to avoid geological environments that are not conducive to construction, so as to better adapt to complex geological environments.

[0056] It can be explained that, in the present application, the installation sequence of the steel components 21 is not specifically limited.

[0057] As one of the implementation methods, the hemispherical end is installed away from the installation site 1 first, and then gradually installed near the installation site 1. At the same time, after each section is installed, a concrete lining 22 is poured between the steel plate and the rock mass A to serve as a medium for pressure conduction between the steel plate and the rock mass A.

[0058] Furthermore, the rock mass A region where the hemispherical end is located away from the installation site 1 is expanded and excavated into a cubic structure. This arrangement facilitates the construction of the hemispherical end, and concrete 13 is backfilled between the rock mass A and the hemispherical end.

[0059] It should be noted that when installing to the hemispherical end near the installation site 1, it is necessary to open a through hole in the hemispherical end area to achieve communication with the branch channel 12, and weld the end to the branch channel 12, and the remaining steel plates are sealed after welding to ensure that the high-pressure gas in the gas storage and release process passes through the through hole.

[0060] In addition, it should be noted that the branch channels 12 of each cavern 2 near the end of the installation site 1 are all concentrated centripetally and are connected to the main channel 11 .

[0061] In this embodiment, if Figures 1 to 4 As shown, the steel member 21 is located inside the installation site 1 along its axial direction at its end close to the installation site 1, and the outer walls of the ends of the multiple caverns 2 close to the installation site 1, the inner wall of the installation site 1, the outer wall of the main channel 11 and the outer wall of the branch channel 12 enclose a casting chamber, which is used to fill concrete 13.

[0062] By utilizing the technical solution of this embodiment, a casting chamber is formed by enclosing the outer walls of the ends of the multiple caverns 2 close to the installation site 1, the inner walls of the installation site 1, the outer walls of the main channel 11 and the outer walls of the branch channels 12, and filling the casting chamber with concrete 13, so that a tight connection is achieved between the steel member 21 and the installation site 1, the main channel 11 and the branch channels 12, and it is ensured that the overall structure of the steel member 21 and the installation site 1 is more stable under high pressure. At the same time, by arranging the hemispherical end in the installation site 1, the pressure from the air storage chamber 23 and the external force of the concrete 13 acting on the end of the steel member 21 can be effectively dispersed and transmitted, thereby reducing the phenomenon of stress concentration.

[0063] In addition, it should be noted that the structure between the two ends of the steel member 21 is columnar, such as a cylinder or a prism.

[0064] In this embodiment, if Figures 1 to 4 As shown, the integrated underground gas storage structure further includes a vertical shaft 3 , which is excavated in the rock mass A between two adjacent caverns 2 , and a distance is left between the vertical shaft 3 and any side wall of the installation site 1 .

[0065] By using the technical solution of this embodiment, by setting the vertical shaft 3 between adjacent caverns 2 and leaving a gap between the vertical shaft 3 and each side wall of the installation site 1, the vertical shaft 3 is located outside the installation site 1, the welding operation of the steel plate is completed in the installation site 1, and the lifting operation of the steel plate is completed in the vertical shaft 3, which is convenient for separating the lifting operation and welding operation of the steel plate, so that the lifting operation and welding operation can be carried out at the same time, reducing the waiting time, helping to shorten the overall construction period, and avoiding idleness and waste of human resources; secondly, the vertical shaft 3 can only meet the needs of the pipe segments of each channel and the steel blocks of the steel components 21. Compared with the existing solution of welding steel plates into pipe rings above the ground and then enlarging them to meet the lifting requirements of the pipe rings, the gas storage structure of this structure can adopt a smaller diameter shaft 3 and reduce the ultimate bearing capacity of its derrick, thereby reducing costs; at the same time, by welding steel blocks in the cavern 2, it can be avoided that the existing pipe rings formed by welding steel blocks above the ground are easily deformed by external influences during the lifting process, which makes it difficult to ensure the docking quality between adjacent pipe rings; in addition, by carrying out the lifting operation and welding operation in relatively independent spaces, the risks brought by cross-operation are reduced.

[0066] It can be explained that in the present application, after the vertical shaft 3 is excavated, a support cylinder is installed, and a concrete lining is poured from top to bottom between the support cylinder and the inner wall of the rock mass A where the vertical shaft 3 is located, and excavation blasting is carried out with a delay, and the distance between the concrete lining 22 and the excavation surface is adjusted according to the excavation and blasting conditions to ensure that the concrete lining 22 is stable after the steel bars are placed inside.

[0067] Furthermore, a derrick is installed directly above the shaft 3 for subsequent lifting of the steel plate.

[0068] In this embodiment, if Figures 1 to 4 As shown, the integrated underground gas storage structure also includes an operating corridor 4, which is excavated in the rock mass A between two adjacent caverns 2, and one end of the operating corridor 4 extends to one of the side walls of the installation site 1, and the other end of the operating corridor 4 extends in a direction away from the installation site 1 and is connected to the vertical shaft 3.

[0069] By utilizing the technical solution of this embodiment, by setting the working corridor 4 in the rock mass A between two adjacent caverns 2, the space of the rock mass A between the two adjacent caverns 2 can be fully utilized, thereby avoiding unnecessary excavation and backfilling, reducing the construction cost of the excavation process, and reducing the impact of the excavation process on the environment. At the same time, through the working corridor 4, construction materials can be conveniently transported from the installation site 1 to each cavern 2, reducing the transportation distance and time; at the same time, by setting the working corridor 4 away from the installation site 1, convenient conditions can be provided for subsequent expansion and renovation, reducing construction costs and reducing construction difficulty.

[0070] It can be explained that, in the present application, backfill concrete 13 is filled between the outer wall of the working corridor 4 , the outer wall of the shaft 3 and the outer wall of the installation site 1 to bear the external force applied by the pedestrian passage 5 in the radial direction.

[0071] In this embodiment, if Figures 1 to 4 As shown, the integrated underground gas storage structure also includes a pedestrian passage 5, which is located in the working corridor 4. One end of the pedestrian passage 5 arranged along its axial direction is connected to the main passage 11, and the other end of the pedestrian passage 5 arranged along its axial direction extends to the bottom of the shaft 3.

[0072] By utilizing the technical solution of this embodiment, by arranging the pedestrian passage 5 in the working corridor 4 and connecting the vertical shaft 3 with the main passage 11 through the pedestrian passage 5, the workers can quickly reach their destination regardless of whether they enter the gas storage from the ground or move between different caverns 2, thereby reducing the walking time and physical exertion of the workers and optimizing the construction process.

[0073] In the integrated underground gas storage structure provided in the above embodiment, a sealed door is installed at the end of the pedestrian passage 5 away from the main passage 11, which serves as an entrance for human workers to enter the pedestrian passage 5 during maintenance.

[0074] In this embodiment, if Figures 1 to 4 As shown, the transverse section of the installation site 1 is polygonal.

[0075] By utilizing the technical solution of this embodiment, by setting the transverse section of the installation site 1 to a polygonal shape, the underground space can be utilized to the maximum extent. Compared with the traditional rectangular or circular settings, it can adapt to complex geological environments, reduce unnecessary excavation and backfilling, reduce construction costs and reduce the impact on the environment; at the same time, the polygonal installation site 1 can add more caverns 2 in a limited space, thereby increasing the storage capacity of the gas storage reservoir; in addition, the polygonal installation site 1 can be excavated and supported in sections as needed during the construction process, reducing the difficulty and risk of construction, and providing more working surfaces and channels for the construction team, thereby improving construction efficiency.

[0076] It can be explained that, in this embodiment, the specific structure of the installation site 1 is not specifically limited, and it only needs to be able to accommodate the arrangement of multiple caverns 2.

[0077] As one of the embodiments, the transverse section of the installation site 1 is a regular polygon, preferably, as Figure 1 At this time, there is at least one edge between the multiple caverns 2. This arrangement can ensure that there is a certain thickness of rock mass A between two adjacent caverns 2, which is convenient for providing sufficient strength to facilitate subsequent expansion and reconstruction.

[0078] Furthermore, the central axis of each cavern 2 is arranged perpendicular to the edge of the corresponding installation site 1 .

[0079] It can be explained that, in this embodiment, during the excavation of the installation site 1, the top of the installation site 1 is expanded according to the construction and installation requirements, and serves as a site for welding between steel plates during the construction.

[0080] like Figures 1 to 4 As shown, the integrated underground gas storage structure also includes a water collection well 6, which is arranged below the end of the working corridor 4 away from the installation site 1. In this arrangement, groundwater or rainwater around each cavern 2 is collected through the water collection pipe to prevent it from affecting the safety of the cavern 2, and in emergency situations such as leakage or fire, the accumulated water at the accident site is quickly discharged to reduce the impact of the accident on the environment around the cavern 2.

[0081] like Figures 1 to 4 As shown, the integrated underground gas storage structure also includes an inlet and outlet gas pipeline 7. At this time, the inlet and outlet gas pipeline 7 is vertically arranged in the vertical shaft 3 through a pipeline support, the bottom of the inlet and outlet gas pipeline 7 passes through the top of the horizontally arranged crosswalk, and the top of the inlet and outlet gas pipeline 7 extends to the ground.

[0082] like Figures 1 to 4 As shown, the integrated underground gas storage structure also includes a pipeline support seat 8, which is installed below the pedestrian passage 5 in the area of ​​the shaft 3 to facilitate supporting the end of the pedestrian passage 5 and the inlet and outlet gas pipes 7 and to inhibit the pedestrian passage 5 from sliding along its axial direction.

[0083] In the integrated underground gas storage structure provided in the above embodiment, when the cavern 2 is inflated, high-pressure gas enters the pedestrian passage 5 from the ground system through the inlet and outlet pipes 7, and then enters the desired cavern 2 through the main channel 11 and the branch channel 12. That is, in the gas storage stage, the inlet and outlet pipes 7, the pedestrian passage 5, the main channel 11, the branch channel 12 and the cavern 2 all store high-pressure gas.

[0084] According to an embodiment of the present invention, on the other hand, a construction method of an integrated underground gas storage structure is provided, which is applied to the integrated underground gas storage structure in the first aspect.

[0085] The construction method of the integrated underground gas storage structure includes: step S1: excavating a vertical shaft 3, an operation corridor 4, an installation site 1 and multiple caverns 2 in sequence; step S2: installing a steel component 21 in the cavern 2, and pouring a concrete lining 22 between the steel component 21 and the rock mass A; step S3: pouring concrete 13 in a pouring chamber enclosed by the outer wall of the end of the steel component 21 close to the installation site 1, the inner wall of the installation site 1, the outer wall of the main channel 11 and the outer wall of the branch channel 12.

[0086] By utilizing the technical solution of this embodiment, by sequentially excavating shafts, working corridors, installation sites, and multiple caverns, the safety risks caused by simultaneous operations on multiple working surfaces can be avoided. That is, the excavation of each stage is carried out after the completion of the previous stage, which reduces cross-operation and mutual interference and improves construction safety. Secondly, it helps to gradually reveal geological conditions during the excavation process and adjust the construction plan according to actual conditions. This gradual and in-depth approach helps to timely discover and deal with potential geological problems, such as soft strata, groundwater, etc., thereby avoiding safety accidents during the construction process. By installing steel components in the rock mass and pouring concrete linings, a solid supporting structure can be formed to enhance the stability and bearing capacity of the cavern. At the same time, the concrete lining can also prevent deformation and damage of the rock mass and protect the integrity of the cavern structure. In addition, by completing the excavation of the installation site and pouring concrete, a solid foundation can be provided for the installation of subsequent equipment, ensuring smooth operation and long-term use of the equipment.

[0087] Specifically, step S1 includes: step S101: excavating the vertical shaft 3; step S102: after the excavation of the vertical shaft 3 is completed, excavating the working corridor 4 at the bottom of the vertical shaft 3, and making the extension direction of the working corridor 4 horizontal; step S103: excavating the collection well 6 and the installation site 1 away from the working corridor 4 at the two ends of the working corridor 4 in the horizontal direction; step S104: excavating a cavern 2 at an edge of the installation site 1 in a direction perpendicular to the edge; step S105: repeating step S104 until the excavation of all caverns 2 is completed.

[0088] It can be explained that step S103 can be performed synchronously with step S104 and step S105.

[0089] In addition, it can be explained that after completing step S102 and before performing step S103, step S106 should also be included: installing the pipeline support and guiding the inlet and outlet pipes 7 to the ground.

[0090] It should be noted that, during the excavation of the cavern 2 , it is necessary to expand a square area at the end of the cavern 2 away from the installation site 1 to facilitate the subsequent installation of the hemispherical end of the steel member 21 .

[0091] After completing step S1, step S2 is performed, during which the steel components 21 are installed in sections and the concrete lining 22 is poured simultaneously.

[0092] Specifically, step S2 includes: step S201: completing the installation work of the hemispherical end of the steel component 21 away from the installation site 1; step S202: pouring the concrete lining 22 between the outer wall of the end of the steel component 21 away from the installation site 1 and the inner wall of the rock mass A; step S203: gradually welding the steel plates in the direction close to the installation site 1, and gradually pouring the concrete lining 22; step S204: installing the other hemispherical end of the steel component 21 in the installation site 1.

[0093] It can be explained that after each section of steel plate is installed, the steel plate of this section is used as a template, and a concrete lining 22 is poured in the gap between the steel plate and the rock mass A, and steel bars are buried.

[0094] It can be explained that during the excavation process of step S1, step S4 is simultaneously performed: the support structure is set according to the type of surrounding rock.

[0095] By utilizing the technical solution of this embodiment and adding a support structure during the excavation process, the rock mass A exposed after excavation can be effectively supported to prevent collapse, avoid damage to surrounding pipelines, and reduce potential safety hazards.

[0096] It can be explained that, during the excavation of the installation site 1 in step S1, the top of the installation site 1 needs to be expanded upward to achieve elevation as a site for welding and installation operations of various steel plates, that is, to meet construction and installation requirements and ensure construction quality.

[0097] Furthermore, in the process of excavating the caverns 2 in step S1, the axial direction of each cavern 2 is directed toward the installation site 1, preferably, the axial direction of each cavern 2 is perpendicular to the edge of the installation site 1, and two adjacent caverns 2 are arranged at intervals so that there is a certain thickness of rock mass A between the two adjacent caverns 2, so as to provide sufficient strength for subsequent expansion and renovation.

[0098] It can be explained that before performing step S3 , step S5 should also be performed: installing the main channel 11 and the branch channel 12 .

[0099] Furthermore, the method should also include step S6: installing the pedestrian passage 5 and the air inlet and outlet pipes 7, and connecting and welding the lower end of the air inlet and outlet pipes 7 to the upper end of the pedestrian passage 5.

[0100] It should be noted that the above step S6 may occur after step S3.

[0101] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the embodiments. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. The obvious changes or modifications derived therefrom are still within the scope of protection of the present invention.

Claims

1. An integrated underground gas storage structure, comprising a plurality of caverns (2) excavated in a rock mass (A), It is characterized in that The integrated underground gas storage structure comprises: An installation site (1), wherein a main channel (11) and a plurality of branch channels (12) are provided in the installation site (1), and any branch channel (12) is connected to the main channel (11); A cavity (2), wherein a plurality of the cavity (2) are provided, the axial direction of any of the cavity (2) points to the installation site (1), one end of any of the cavity (2) arranged along its axial direction is arranged close to the installation site (1), and the other end of any of the cavity (2) arranged along its axial direction extends in a direction away from the installation site (1), so that the plurality of cavity (2) are arranged around the installation site (1) in a centrifugal divergent structure, and the air storage chamber (23) in the cavity (2) is connected to the main channel (11) through the branch channel (12).

2. The integrated underground gas storage structure according to claim 1, It is characterized in that Any cavern (2) comprises a steel component (21) and a concrete lining (22), wherein the steel component (21) is located inside the rock mass (A), and a distance is left between the steel component (21) and the inner wall of the rock mass (A) to form a casting chamber, an air storage chamber (23) is formed inside the steel component (21), and the air storage chamber (23) is connected to the branch channel (12), and the concrete lining (22) is located in the casting chamber.

3. The integrated underground gas storage structure according to claim 2, It is characterized in that The steel component (21) is formed by splicing a plurality of steel plates, and both ends of the steel component (21) arranged along its axial direction are hemispherical.

4. The integrated underground gas storage structure according to claim 3, It is characterized in that The end of the steel member (21) close to the installation site (1) along its axial direction is located inside the installation site (1), and the outer walls of the ends of the plurality of caverns (2) close to the installation site (1), the inner wall of the installation site (1), the outer wall of the main channel (11) and the outer wall of the branch channel (12) enclose a casting chamber, and the casting chamber is used to fill concrete (13).

5. The integrated underground gas storage structure according to any one of claims 1 to 4, It is characterized in that Also includes: A vertical shaft (3), wherein the vertical shaft (3) is excavated in the rock mass (A) between two adjacent caverns (2), and a distance is left between the vertical shaft (3) and any side wall of the installation site (1).

6. The integrated underground gas storage structure according to claim 5, It is characterized in that Also includes: A working corridor (4), wherein the working corridor (4) is excavated in the rock mass (A) between two adjacent caverns (2), and one end of the working corridor (4) extends to one of the side walls of the installation site (1), and the other end of the working corridor (4) extends in a direction away from the installation site (1) and is connected to the vertical shaft (3).

7. The integrated underground gas storage structure according to claim 6, It is characterized in that Also includes: A pedestrian passage (5), the pedestrian passage (5) is located in the working corridor (4), one end of the pedestrian passage (5) arranged along its axial direction is connected to the main passage (11), and the other end of the pedestrian passage (5) arranged along its axial direction extends to the bottom of the shaft (3).

8. The integrated underground gas storage structure according to any one of claims 1 to 4, It is characterized in that The transverse section of the installation site (1) is polygonal.

9. A construction method for an integrated underground gas storage structure, applied to the integrated underground gas storage structure according to any one of claims 1 to 8, It is characterized in that The construction method includes: Step S1: excavating a vertical shaft (3), an operation corridor (4), an installation site (1) and a plurality of caverns (2) in sequence; Step S2: installing a steel member (21) in the cavern (2), and pouring a concrete lining (22) between the steel member (21) and the rock mass (A); Step S3: pouring concrete (13) in a pouring chamber enclosed by the outer wall of the end of the steel component (21) close to the installation site (1), the inner wall of the installation site (1), the outer wall of the main channel (11) and the outer wall of the branch channel (12).

10. The construction method of the integrated underground gas storage structure according to claim 9, It is characterized in that During the excavation process of step S1, step S4 is carried out simultaneously: supporting structures are set up according to the type of surrounding rock.