Water treatment machine and control valve for water treatment machine
Through innovative control valve design, the problems of high manufacturing costs, high failure rates and insufficient water flow in existing water treatment systems are solved, and efficient water treatment and sewage management are achieved, reducing manufacturing costs and space occupied.
Patent Information
- Application Number
- CN202410579288.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2024-03-19
- Filing Date
- 2024-05-10
- Publication Date
- 2024-11-12
AI Technical Summary
The design of the control valve of the existing water treatment system leads to high manufacturing costs, large space occupancy, high failure rate, and insufficient water flow, which affects the treatment efficiency.
Adopting an innovative control valve design, multiple openings and fluid openings are formed through a jet, valve body and valve core, and the relative movement of the plane valve plate is used to realize series control and reverse/forward flushing of the water treatment device. Prevent sewage pollution and improve water treatment efficiency.
It reduces manufacturing costs and space occupancy, improves the treatment efficiency and failure rate of the water treatment system, and ensures the stability of water flow and wastewater management.
Smart Images

Figure CN118935030A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a water treatment machine, and in particular to a water treatment machine capable of performing multi-stage treatment on raw water (eg, tap water) to obtain treated water with expected water quality. The present invention further relates to a control valve for the water treatment machine. Background Art
[0002] In modern industrial production, many industries require water with high cleanliness or low hardness. However, many water sources, whether surface water sources or groundwater sources, do not meet the standards for industrial water in terms of cleanliness and hardness. In order to obtain water with the expected water quality, the water from the water source (or raw water) needs to be treated. To treat raw water, generally, the raw water from the water source is first coarsely filtered to filter out larger particulate pollutants to obtain coarsely filtered water, and then the coarsely filtered water is further filtered using materials such as activated carbon to obtain cleaner purified water. Finally, the purified water is softened (or ultrafiltration or RO membrane filtration) to obtain softened water (or purified water with extremely high purity). Finally, the raw water is treated in multiple stages (two or more stages) to obtain treated water with the expected water quality. For example, people use water filtration equipment (filter materials are quartz sand, activated carbon or PP cotton filter materials, etc.) and water ultrafiltration equipment (filter materials are generally ultrafiltration membrane fibers) to filter and ultrafilter raw water in turn; or use water filtration equipment, water ultrafiltration equipment and RO membrane water purification equipment to filter, ultrafilter and RO membrane treat raw water in turn; or use pre-filter, water filtration equipment and water softener to coarsely filter, filter and soften raw water in turn.
[0003] In addition, with the improvement of people's living standards and the increasing attention to health, people have higher and higher requirements for the quality of domestic water. However, the treatment of water taken back from the water source by the water plant is relatively extensive, which is not enough to remove all impurities, such as particulate pollutants (flocculent gel, silt, and even bacteria, etc.), which are increasingly difficult to meet people's needs. In addition, the aging of the tap water supply network will also bring new pollution to the tap water. Therefore, in order to further purify the tap water and improve its cleanliness, people also need a variety of water treatment methods to treat the tap water.
[0004] However, many existing water treatment systems or water treatment equipment for multi-stage treatment of raw water include multiple water treatment devices and multiple control valves that control the flow of water inside the corresponding water treatment devices, and each control valve controls the water treatment function, flushing function and regeneration function of the corresponding water treatment device. The multiple control valves of the water treatment system lead to high manufacturing costs and large space occupation. At the same time, since the control valve is a relatively complex device, the multiple control valves cause the failure rate of the entire water treatment system to be high. The Chinese invention patent with application number CN201910378852.7 discloses a water treatment system, which includes two water treatment devices and a flat valve for controlling the water treatment device to treat water, which can control the two water treatment devices to purify and soften water in series. However, the planar valve 10 of the water treatment system provided by the patent has a low utilization rate of the control surfaces of its fixed valve plate 12 and the movable valve plate 13. The channel of the fixed valve plate 12 of the planar valve 10 is divided into two circles (except the central part), wherein the first channel 101, the second channel 102, the third channel 103, the fourth channel 104, the fifth channel 105 and the sixth channel 106 are arranged in the inner circle, and the clean water channel 1030 and the soft water channel 1028 are arranged in the outer circle. Correspondingly, the channel of the movable valve plate 13 of the planar valve 10 is also divided into two circles, wherein the seventh channel 107 and the tenth channel 1010 are arranged in the inner circle, and the eighth channel 108 and the ninth channel 109 are arranged in the inner circle and the outer circle. In particular, when the water treatment system provided by the patent is in the purification-softening working position, the first channel 107 of the movable valve plate 13 is arranged in the inner circle. The seventh channel 107 and the first channel 101 of the fixed valve plate 12 are the main water inlet channels, and only the inner circle area can be used as the water inlet channel. The ninth channel 109 is connected with the second channel 102 and the third channel 103 respectively, and plays the role of connecting the purification device and the softening device. Only the inner circle area of the ninth channel 109 plays a conducting role. The eighth channel 108 is connected with the fourth channel 104 and the soft water channel 1028 respectively, and plays the role of conducting and supplying softened water, which is to divert the water from the inner circle channel to the outer circle channel. Therefore, the two-circle design of the channels of the fixed valve plate 12 and the movable valve plate 13 of the flat valve 10 provided by the patent makes the total area of the flow control surface of the fixed valve plate and the movable valve plate too low, which greatly affects the water flow rate when the water treatment machine purifies and softens the raw water. In order to meet the water flow requirements through the multifunctional purification-softening valve, the volume of the multifunctional purification-softening valve has to be increased, resulting in a larger size and inconvenience in use. The larger size requires a thicker valve body wall thickness to ensure the stability of the valve body under water pressure, which directly leads to an increase in production costs. In addition, regardless of whether the movable valve plate of the multifunctional purification-softening valve is made of metal material or ceramic material, if its size is too large, it will lead to a lower yield rate when it is manufactured. In particular, when the movable valve plate of the multifunctional purification-softening valve is made of ceramic material, the larger its size, the easier it is to crack, and the service life is also significantly reduced.Finally, the control valve of the water treatment machine disclosed in the invention patent adopts a traditional double valve plate structure, and at least one diversion blind hole needs to be set on the movable valve plate to provide treated water so as to change the flow direction of the water. For example, the softened water flows upward from the fourth channel 104 of the fixed valve plate 12, passes through the eighth channel 108 (diversion blind hole) of the movable valve plate 13, and then flows downward into the soft water channel 1028 of the fixed valve plate 12, and then flows out from the soft water port 1128 for water supply. It can be understood that when the water flows in the diversion blind hole (the eighth channel 108 of the movable valve plate 13), the flow direction changes 360 degrees, which will cause the water flow to encounter greater resistance and cause a great loss of kinetic energy of the water flow, so that the flow rate of the water flow is significantly reduced. Summary of the invention
[0005] The main advantage of the present invention is to provide a water treatment machine, wherein the control valve of the water treatment machine of the present invention has an innovative design so that when the water treatment machine of the present invention is in a water treatment state, the two water treatment devices of the water treatment machine of the present invention can be controlled to be connected in series to perform secondary treatment on the raw water and obtain treated water of the expected water quality; and when the water treatment machine of the present invention is in a flushing state, the raw water is controlled to perform reverse or forward flushing on the filter material or softening resin of the corresponding water treatment device separately and individually, and the sewage generated by the reverse flushing or forward flushing is controlled to flow out separately to prevent the sewage from contaminating other water treatment devices. Accordingly, the water treatment machine of the present invention and the control valve used for the water treatment machine both have a brand-new and unique spatial structure, which is an innovative design unique to the world, thereby creatively solving the difficult problem of using a single control valve to perform reverse or forward flushing on two water treatment devices used in series separately and individually.
[0006] Another advantage of the present invention is that it provides a control valve for a water treatment machine, wherein the control valve for a water treatment machine of the present invention is configured to control two water treatment devices of the water treatment machine of the present invention to be connected in series, so that raw water flows through the two water treatment devices of the water treatment machine of the present invention in sequence and undergoes secondary treatment on the raw water; and controls the raw water to reversely or forwardly flush the filter material or softening resin of the corresponding water treatment device, and controls the sewage generated by the reverse flushing or forward flushing to flow out respectively, so as to prevent the sewage from contaminating other water treatment devices.
[0007] Another advantage of the present invention is that it provides a control valve for a water treatment machine, wherein the control valve for a water treatment machine of the present invention is configured to control the regeneration solution to regenerate the softening resin in the second water treatment device of the water treatment machine of the present invention (if the second water treatment device is a water softening device), and when controlling the regeneration solution to regenerate the softening resin in the second water treatment device of the water treatment machine of the present invention, it does not affect the first water treatment device of the water treatment machine of the present invention.
[0008] Other objects and features of the present invention will be fully apparent from the following detailed description.
[0009] According to one aspect of the present invention, a control valve for a water treatment machine of the present invention that can achieve the aforementioned objects and other objects and advantages includes:
[0010] an ejector;
[0011] a valve body; and
[0012] A valve core, wherein the valve body forms a valve cavity, a first opening, a second opening, a third opening, a fourth opening, a first fluid opening, a second fluid opening, a sewage opening and a first jet opening, wherein the valve core is arranged in the valve cavity, wherein the second fluid opening of the valve body is suitable for being connected to a raw water source, wherein the ejector has an ejection port suitable for being connected to the first jet opening and a salt absorption port connected to the ejection port, wherein the control valve for the water treatment machine is a plane valve, the valve core comprises a first fixed valve plate, a movable valve plate and a second fixed valve plate, wherein the first fixed valve plate has a first fluid control surface, the movable valve plate has a second fluid control surface and a third fluid control surface, and the second fixed valve plate has a fourth fluid control surface, wherein the first fixed valve plate, the movable valve plate and the second The fixed valve plates are all arranged in the valve cavity, wherein the second fluid control surface and the third fluid control surface of the movable valve plate are respectively formed on opposite sides of the movable valve plate, wherein the second fluid control surface of the movable valve plate is arranged on the first fluid control surface of the first fixed valve plate, and the fourth fluid control surface of the second fixed valve plate is arranged on the third fluid control surface of the movable valve plate, and the movable valve plate is arranged to be able to rotate relative to the first fixed valve plate and the second fixed valve plate, wherein when the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the water treatment working position, the valve core of the planar valve forms a first water treatment flow channel respectively connected to the second fluid opening and the first opening, a second water treatment flow channel respectively connected to the second opening and the third opening, and a third water treatment flow channel respectively connected to the fourth opening and the first fluid opening.
[0013] Further objects and advantages of the present invention will be fully apparent from an understanding of the following description and the accompanying drawings.
[0014] These and other objects, features and advantages of the present invention will be more fully understood from the following detailed description and accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a front view of the water treatment machine according to the first embodiment of the present invention.
[0016] Figure 2It is an assembly diagram of the water treatment machine according to the first embodiment of the present invention.
[0017] Figure 3A It is a cross-sectional view of the first water treatment device of the water treatment machine according to the first embodiment and the second embodiment of the present invention, which shows the direction of water flow from the first water inlet to the first water outlet when the first water treatment device is used for water treatment or forward flushing.
[0018] Figure 3B It is a cross-sectional view of the first water treatment device of the water treatment machine according to the first embodiment and the second embodiment of the present invention, which shows the direction of water flow from the first water outlet to the first water inlet when the first water treatment device is reversely flushed.
[0019] Figure 3C It is a cross-sectional view of the second water treatment device of the water treatment machine according to the first embodiment and the second embodiment of the present invention, which shows the direction of water flow from the second water inlet to the second water outlet when the second water treatment device is used for water treatment, forward flushing or used as a softening filter element for downstream salt absorption and regeneration.
[0020] Figure 3D It is a cross-sectional view of the second water treatment device of the water treatment machine according to the first embodiment and the second embodiment of the present invention, which shows the direction of water flow from the second water outlet to the second water inlet when the second water treatment device is backwashed or used as a softening filter element for countercurrent salt absorption regeneration.
[0021] Figure 3E It is a cross-sectional view of the water treatment machine according to the first embodiment of the present invention.
[0022] Figure 4 It is a three-dimensional view of the control valve of the water treatment machine according to the first embodiment of the present invention.
[0023] Figure 5 It is an assembly diagram of the control valve of the water treatment machine according to the first embodiment of the present invention.
[0024] Fig. 6A It is a stereoscopic view of the first valve body portion of the valve body of the control valve of the water treatment machine according to the first embodiment of the present invention, wherein the view shows the valve cavity of the valve body, the first opening, the fourth opening, the first jet opening and the second jet opening of the first valve body portion.
[0025] Figure 6B It is another stereoscopic view of the first valve body portion of the control valve of the water treatment machine according to the first embodiment of the present invention, wherein the view shows the valve cavity of the valve body, the first opening, the second opening, the third opening and the fourth opening of the first valve body portion.
[0026] Figure 6C 1 is another stereoscopic view of the first valve body of the control valve of the water treatment machine according to the first embodiment of the present invention.
[0027] Fig.6D It is a cross-sectional view of the first valve body portion of the control valve of the water treatment machine according to the first embodiment of the present invention. The control valve is a planar valve, wherein the figure shows that the first channel of the planar valve is connected to the first opening, the second channel is connected to the second opening, the third channel is connected to the third opening, and the fourth channel is connected to the fourth opening.
[0028] Fig. 6E It is another cross-sectional view of the first valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the first jet channel of the planar valve is connected to the first jet opening, and the second jet channel is connected to the second jet opening.
[0029] Fig. 6F It is a cross-sectional view of the first valve body and the ejector of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0030] Figure 6G It is a stereoscopic view of the second valve body portion of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the view shows the first fluid opening and the sewage opening of the second valve body portion, and the second fluid opening is arranged in the second valve body portion of the valve body.
[0031] Figure 6H It is another stereoscopic view of the second valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the view shows the first fluid opening and the sewage opening of the second valve body, and the second fluid opening is arranged in the second valve body of the valve body.
[0032] Fig.6I It is another stereoscopic view of the second valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0033] Figure 6J 1 is a cross-sectional view of the second valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the second fluid opening is connected to the valve cavity.
[0034] Figure 6K It is another cross-sectional view of the second valve body portion of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the fifth channel of the planar valve is connected to the first fluid opening, the second fluid opening is connected to the valve cavity, and the ninth channel is connected to the sewage opening.
[0035] Figure 6LIt is a stereoscopic view of the first valve body portion and the first fixed valve plate of the valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the first fixed valve plate is arranged in the valve cavity of the planar valve.
[0036] Figure 6M It is a stereoscopic view of the first valve body portion, the first fixed valve plate and the movable valve plate of the valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the movable valve plate is arranged in the valve cavity of the planar valve.
[0037] Figure 6N It is a stereoscopic view of the second valve body portion and the second fixed valve plate of the valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the second fixed valve plate is disposed in the valve cavity of the planar valve.
[0038] Fig.6O 1 is a cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the ninth channel of the planar valve is connected to the sewage discharge opening.
[0039] Figure 6P 1 is a cross-sectional view of the valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the valve body includes the first valve body portion and the second valve body portion.
[0040] Figure 6Q 1 is another cross-sectional view of the valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the valve body includes the first valve body portion and the second valve body portion.
[0041] Figure 6R 1 is another cross-sectional view of the valve body of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the valve body includes the first valve body portion and the second valve body portion.
[0042] Fig. 7A It is a three-dimensional view of the first fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0043] Figure 7B It is a three-dimensional view of the movable valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0044] Figure 7C It is a three-dimensional view of the second fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0045] Fig.7D It is a top view of the first fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0046] Fig. 7EIt is another stereoscopic view of the first fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0047] Figure 7F It is a top view of the movable valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0048] Figure 7G It is a bottom view of the movable valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0049] Figure 7H It is a top view of the second fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0050] Fig.7I It is another stereoscopic view of the second fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention.
[0051] Fig. 8A It is a structural schematic diagram of the first fixed valve plate of the plane valve of the water treatment machine according to the first embodiment of the present invention.
[0052] Figure 8B It is a structural schematic diagram of the movable valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the dotted lines in the figure indicate the conducting blind hole and the sixth channel of the movable valve plate.
[0053] Figure 8C It is a structural schematic diagram of the second fixed valve plate of the plane valve of the water treatment machine according to the first embodiment of the present invention.
[0054] Fig.9A It is a schematic diagram of equally divided first fluid control surface of the first fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the diagram shows the specific equally divided positions of the first fluid control surface of the first fixed valve plate at which the various channels are arranged.
[0055] Fig. 9B It is a schematic diagram of equally divided second fluid control surface of the movable valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the diagram shows the specific equally divided positions of the second fluid control surface of the movable valve plate where each channel is arranged.
[0056] Fig. 9C It is a schematic diagram of equally divided third fluid control surface of the movable valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows the specific equally divided positions of each channel arranged on the third fluid control surface of the movable valve plate.
[0057] Fig.9DIt is a schematic diagram of equally divided fourth fluid control surface of the second fixed valve plate of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows the specific equally divided positions of each channel arranged on the fourth fluid control surface of the second fixed valve plate.
[0058] Fig. 10A It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its water treatment working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0059] Fig. 10B It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its water treatment working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0060] Fig. 10C It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its first backwash working position, wherein the oblique line shaded part in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0061] Fig. 10D It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its first backwash working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0062] Fig. 10E It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its second backwash working position, wherein the oblique line shaded part in the figure shows the mutually connected channel between the movable valve plate and the first fixed valve plate of the planar valve.
[0063] Fig.10FIt is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its second backwash working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0064] Figure 10G It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its regeneration working position, wherein the oblique line shaded part in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0065] Fig. 10H It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its regeneration working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0066] Fig.10I It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its first positive flushing working position, wherein the oblique line shaded part in the figure shows the mutually connected channel between the movable valve plate of the planar valve and the first fixed valve plate.
[0067] Fig.10J It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its first positive flushing working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0068] Figure 10K It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its second positive flushing working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0069] Fig.10LIt is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its second positive flushing working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0070] Figure 10M It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the first embodiment of the present invention is in its water replenishment working position, wherein the oblique line shaded part in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0071] Fig.10N It is a schematic diagram of the connection between the channel of the movable valve plate of the plane valve and the channel of the second fixed valve plate when the plane valve of the water treatment machine according to the first embodiment of the present invention is in its water replenishment working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the plane valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the plane valve and the channel of the second fixed valve plate are not connected.
[0072] Fig.11A It is a cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the water treatment working position.
[0073] Fig. 11B It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the water treatment working position.
[0074] Fig.12 It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the first backwashing working position.
[0075] Fig.13 It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the second backwashing working position.
[0076] Fig.14A It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the regeneration working position.
[0077] Fig. 14B It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the regeneration working position.
[0078] Fig.15 It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the first positive flushing working position.
[0079] Fig.16 It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the second positive flushing working position.
[0080] Fig.17 It is another cross-sectional view of the planar valve of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve shown in the figure is in the water replenishment working position.
[0081] Fig.18A It is a structural schematic diagram of a water treatment machine according to the first embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the water treatment working position, the water treatment machine is controlled to be in its water treatment working state, and the arrow in the figure points to the direction of water flow.
[0082] Fig.18B This is another structural schematic diagram of the water treatment machine according to the first embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the first backwash working position, the water treatment machine is controlled to be in its first backwash working state, and the arrow in the figure points to the direction of water flow.
[0083] Fig. 18C This is another structural schematic diagram of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve of the water treatment machine shown in the figure is in the second backwash working position, the water treatment machine is controlled to be in its second backwash working state, and the arrow in the figure points to the direction of water flow.
[0084] Fig.18D This is another structural schematic diagram of the water treatment machine according to the first embodiment of the present invention, wherein the planar valve of the water treatment machine shown in the figure is in the regeneration working position, the water treatment machine is controlled to be in its regeneration working state, and the arrow in the figure points to the direction of water flow.
[0085] Fig.18E It is another structural schematic diagram of the water treatment machine according to the first embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the first positive flushing working position, the water treatment machine is controlled to be in its first positive flushing working state, and the arrow in the figure points to the direction of water flow.
[0086] Fig.18FIt is another structural schematic diagram of the water treatment machine according to the first embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the second positive flushing working position, the water treatment machine is controlled to be in its second positive flushing working state, and the arrow in the figure points to the direction of water flow.
[0087] Figure 18G This is another structural schematic diagram of the water treatment machine according to the first embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the water replenishment working position, the water treatment machine is controlled to be in its water replenishment working state, and the arrow in the figure points to the direction of water flow.
[0088] Fig.19A It is a three-dimensional view of an optional implementation of the control valve of the water treatment machine according to the first embodiment of the present invention, wherein the view shows that the second fluid opening is arranged on the first valve body portion of the valve body.
[0089] Fig.19B 4 is a cross-sectional view of the optional implementation of the control valve of the water treatment machine according to the first embodiment of the present invention, wherein the figure shows that the second fluid opening is arranged in the first valve body portion of the valve body.
[0090] Fig. 20 It is a front view of the water treatment machine according to the second embodiment of the present invention.
[0091] Fig.21 It is an assembly diagram of a water treatment machine according to the second embodiment of the present invention.
[0092] Fig. 22 It is a cross-sectional view of a water treatment machine according to the second embodiment of the present invention.
[0093] Fig.23 It is a perspective view of a control valve of a water treatment machine according to the second embodiment of the present invention.
[0094] Fig.24 1 is an assembly diagram of the control valve of the water treatment machine according to the second embodiment of the present invention.
[0095] Fig.25A It is a three-dimensional view of the first valve body portion of the valve body of the control valve of the water treatment machine according to the second embodiment of the present invention, wherein the view shows the valve cavity of the valve body, the first opening, the second opening, the third opening, the first jet opening and the second jet opening of the first valve body portion.
[0096] Fig.25B It is another stereoscopic view of the first valve body portion of the control valve of the water treatment machine according to the second embodiment of the present invention, wherein the view shows the valve cavity of the valve body, the first opening, the second opening, the third opening, and the fourth opening of the first valve body portion.
[0097] Fig.25C 1 is another stereoscopic view of the first valve body of the control valve of the water treatment machine according to the second embodiment of the present invention.
[0098] Fig.25D It is a cross-sectional view of the first valve body portion of the control valve of the water treatment machine according to the second embodiment of the present invention. The control valve is a planar valve, wherein the figure shows that the first channel of the planar valve is connected to the first opening, the second channel is connected to the second opening, the third channel is connected to the third opening, and the fourth channel is connected to the fourth opening.
[0099] Fig.25E It is another cross-sectional view of the first valve body portion of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the first jet channel of the planar valve is connected to the first jet opening, and the second jet channel is connected to the second jet opening.
[0100] Fig.25F It is a cross-sectional view of the first valve body and the ejector of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0101] Figure 25G It is a stereoscopic view of the second valve body portion of the valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the view shows the sewage discharge opening of the second valve body portion, and the second fluid opening is arranged in the second valve body portion of the valve body.
[0102] Fig.25H It is another stereoscopic view of the second valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the view shows the first fluid opening and the sewage opening of the second valve body, and the second fluid opening is arranged in the second valve body of the valve body.
[0103] Fig.25I 1 is another stereoscopic view of the second valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0104] Fig.25J 4 is a cross-sectional view of the second valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the second fluid opening is connected to the valve cavity.
[0105] Figure 25K It is another cross-sectional view of the second valve body portion of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the fifth channel of the planar valve is connected to the first fluid opening, the second fluid opening is connected to the valve cavity, and the ninth channel is connected to the sewage opening.
[0106] Figure 25LIt is a stereoscopic view of the first valve body portion and the first fixed valve plate of the valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the first fixed valve plate is disposed in the valve cavity of the planar valve.
[0107] Figure 25M It is a stereoscopic view of the first valve body portion, the first fixed valve plate and the movable valve plate of the valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the movable valve plate is arranged in the valve cavity of the planar valve.
[0108] Fig.25N It is a stereoscopic view of the second valve body portion and the second fixed valve plate of the valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the second fixed valve plate is disposed in the valve cavity of the planar valve.
[0109] Fig.25O 2 is a cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the ninth channel of the planar valve is connected to the sewage discharge opening.
[0110] Figure 25P 1 is a cross-sectional view of the valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the valve body includes the first valve body portion and the second valve body portion.
[0111] Figure 25Q 1 is another cross-sectional view of the valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the valve body includes the first valve body portion and the second valve body portion.
[0112] Figure 25R 1 is another cross-sectional view of the valve body of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the valve body includes the first valve body portion and the second valve body portion.
[0113] Fig.26A It is a three-dimensional view of the first fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0114] Fig.26B It is a three-dimensional view of the movable valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0115] Fig.26C It is a three-dimensional view of the second fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0116] Fig.26D It is a top view of the first fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0117] Fig.26EIt is another stereoscopic view of the first fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0118] Fig.26F It is a top view of the movable valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0119] Figure 26G It is a bottom view of the movable valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0120] Fig.26H It is a top view of the second fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0121] Fig.26I It is another stereoscopic view of the second fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0122] Fig.27A It is a structural schematic diagram of the first fixed valve plate of the plane valve of the water treatment machine according to the second embodiment of the present invention.
[0123] Fig.27B 1 is a schematic structural diagram of the movable valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the dotted lines in the figure indicate the conducting blind hole and the sixth channel of the movable valve plate.
[0124] Fig.27C It is a structural schematic diagram of the second fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention.
[0125] Fig.28A It is a schematic diagram of equally divided first fluid control surface of the first fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the diagram shows the specific equally divided positions of the first fluid control surface of the first fixed valve plate at which the various channels are arranged.
[0126] Fig.28B It is a schematic diagram of equally divided second fluid control surface of the movable valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the diagram shows the specific equally divided positions of the second fluid control surface of the movable valve plate where each channel is arranged.
[0127] Fig.28C It is a schematic diagram of equally divided third fluid control surface of the movable valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows the specific equally divided positions of each channel arranged on the third fluid control surface of the movable valve plate.
[0128] Fig.28DIt is a schematic diagram of equally divided fourth fluid control surface of the second fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows the specific equally divided positions of each channel arranged on the fourth fluid control surface of the second fixed valve plate.
[0129] Fig.29A It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its water treatment working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0130] Fig.29B This is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its water treatment working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0131] Fig.29C This is a schematic diagram of the connection between the channel of the movable valve plate and the channel of the first fixed valve plate of the planar valve of the water treatment machine according to the second embodiment of the present invention when the planar valve is in its first backwash working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0132] Fig.29D It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its first backwash working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0133] Fig.29E It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its second backwash working position, wherein the oblique line shaded part in the figure shows the mutually connected channel between the movable valve plate and the first fixed valve plate of the planar valve.
[0134] Fig.29FIt is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its second backwash working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0135] Figure 29G This is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its regeneration working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0136] Fig.29H It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its regeneration working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0137] Fig.29I It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its first positive flushing working position, wherein the oblique line shaded part in the figure shows the mutually connected channel between the movable valve plate of the planar valve and the first fixed valve plate.
[0138] Fig.29J It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its first positive flushing working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0139] Figure 29K It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its second positive flushing working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0140] Figure 29LIt is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its second positive flushing working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the planar valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the planar valve and the channel of the second fixed valve plate are not connected.
[0141] Fig.29M It is a schematic diagram of the connection between the channel of the movable valve plate of the planar valve and the channel of the first fixed valve plate when the planar valve of the water treatment machine according to the second embodiment of the present invention is in its water replenishment working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels between the movable valve plate and the first fixed valve plate of the planar valve.
[0142] Fig.29N It is a schematic diagram of the connection between the channel of the movable valve plate of the plane valve and the channel of the second fixed valve plate when the plane valve of the water treatment machine according to the second embodiment of the present invention is in its water replenishment working position, wherein the oblique line shaded portion in the figure shows the mutually connected channels of the movable valve plate and the second fixed valve plate of the plane valve, and the grid shaded portion in the figure shows that the channel of the movable valve plate of the plane valve and the channel of the second fixed valve plate are not connected.
[0143] Fig. 30A It is a cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the water treatment working position.
[0144] Fig. 30B It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the water treatment working position.
[0145] Fig.31 It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the first backwashing working position.
[0146] Fig.32 It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the second backwashing working position.
[0147] Fig.33A It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the regeneration working position.
[0148] Fig.33B It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the regeneration working position.
[0149] Fig.34 It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the first positive flushing working position.
[0150] Fig.35 It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the second positive flushing working position.
[0151] Fig.36 It is another cross-sectional view of the planar valve of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve shown in the figure is in the water replenishment working position.
[0152] Fig.37A It is a structural schematic diagram of a water treatment machine according to the second embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the water treatment working position, the water treatment machine is controlled to be in its water treatment working state, and the arrow in the figure points to the direction of water flow.
[0153] Fig.37B This is another structural schematic diagram of the water treatment machine according to the second embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the first backwash working position, the water treatment machine is controlled to be in its first backwash working state, and the arrow in the figure points to the direction of water flow.
[0154] Fig.37C This is another structural schematic diagram of the water treatment machine according to the second embodiment of the present invention, wherein the planar valve of the water treatment machine shown in the figure is in the second backwash working position, the water treatment machine is controlled to be in its second backwash working state, and the arrow in the figure points to the direction of water flow.
[0155] Fig.37D It is another structural schematic diagram of the water treatment machine according to the second embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the regeneration working position, the water treatment machine is controlled to be in its regeneration working state, and the arrow in the figure points to the direction of water flow.
[0156] Fig.37E It is another structural schematic diagram of the water treatment machine according to the second embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the first positive flushing working position, the water treatment machine is controlled to be in its first positive flushing working state, and the arrow in the figure points to the direction of water flow.
[0157] Fig.37FThis is another structural schematic diagram of the water treatment machine according to the second embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the second positive flushing working position, the water treatment machine is controlled to be in its second positive flushing working state, and the arrow in the figure points to the direction of water flow.
[0158] Figure 37G This is another structural schematic diagram of the water treatment machine according to the second embodiment of the present invention, wherein the plane valve of the water treatment machine shown in the figure is in the water replenishment working position, the water treatment machine is controlled to be in its water replenishment working state, and the arrow in the figure points to the direction of water flow.
[0159] Fig.38A It is a three-dimensional view of an optional implementation of the control valve of the water treatment machine according to the second embodiment of the present invention, wherein the view shows that the second fluid opening is arranged on the first valve body portion of the valve body.
[0160] Fig.38B 4 is a cross-sectional view of the optional implementation of the control valve of the water treatment machine according to the second embodiment of the present invention, wherein the figure shows that the second fluid opening is arranged in the first valve body portion of the valve body. DETAILED DESCRIPTION
[0161] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the present invention defined in the following description can be applied to other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the present invention.
[0162] It should be understood by those skilled in the art that, in the disclosure of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore the above terms cannot be understood as limiting the present invention. It is understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" cannot be understood as limiting the quantity.
[0163] Reference to the attached drawings of the specification Figures 1 to 3E, a water treatment machine according to a first embodiment of the present invention is illustrated, wherein the water treatment machine of the present invention comprises a control valve 1, a first water treatment device 51 and a second water treatment device 52, wherein the first water treatment device 51 has a first water inlet 511 and a first water outlet 512, so that water can flow in through the first water inlet 511 of the first water treatment device 51 and flow out through the first water outlet 512 or can flow in through the first water outlet 512 of the first water treatment device 51 and flow out through the first water inlet 511; the second water treatment device 52 has a A second water inlet 521 and a second water outlet 522 are provided so that water can flow in through the second water inlet 521 of the second water treatment device 52 and flow out through the second water outlet 522 or can flow in through the second water outlet 522 of the second water treatment device 52 and flow out through the second water inlet 521. The control valve 1 is configured to control the flow of water, such as controlling the water flow to be provided to the first water treatment device 51 and / or the second water treatment device 52, controlling the flow of water in the first water treatment device 51 and the second water treatment device 52, and controlling the provision of treated water. It can be understood that the control valve 1 of the water treatment machine of the present invention is suitable for being connected to a water source. For example, the control valve 1 of the water treatment machine of the present invention can be connected to a tap water pipe. In other words, the control valve 1 controls raw water (e.g., tap water) to be provided to the first water treatment device 51 and / or the second water treatment device 52.
[0164] As shown in the attached picture Figure 3A and Figure 3BAs shown, exemplarily, the first water treatment device 51 of the water treatment machine according to the first embodiment of the present invention includes a first outer shell 513, a first central tube 514 and a first water treatment material 515, the first outer shell 513 has a first end 5131 and a first shell body 5132 extending from the first end 5131, the first central tube 514 has a first tube upper end 5141 and a first tube lower end 5142, the first water inlet 511 is formed between the first end 5131 and the first tube upper end 5141, the first tube upper end 5141 forms the first water outlet 512, the first water treatment material 515 is arranged between the first outer shell 513 and the first central tube 514, wherein the first central tube 514 is arranged so that the primary treated water generated after the raw water is treated by the first water treatment material 515 can be collected by the first central tube 514. It can be understood that the first water treatment material 515 of the first water treatment device 51 of the water treatment machine of the first embodiment of the present invention can be a filter material, such as activated carbon, PP cotton or quartz sand. It can be understood that the first water treatment material 515 of the first water treatment device 51 of the water treatment machine of the first embodiment of the present invention can be a dispersed distribution filter material, or it can be a molded filter material obtained by various molding techniques. The first water treatment material 515 of the first water treatment device 51 of the water treatment machine of the first embodiment of the present invention may also be a softening material, such as a softening resin. Those skilled in the art can understand that the first water treatment device 51 of the water treatment machine of the present invention can also be any other water treatment device with a water inlet and a water outlet.
[0165] As shown in the attached picture Figure 3C and Figure 3DAs shown, exemplarily, the second water treatment device 52 of the water treatment machine according to the first embodiment of the present invention includes a second outer shell 523, a second central tube 524 and a second water treatment material 525, the second outer shell 523 has a second end 5231 and a second shell body 5232 extending from the second end 5231, the second central tube 524 has a second tube upper end 5241 and a second tube lower end 5242 extending downward from the second tube upper end 5241, the second water inlet 521 is formed between the second end 5231 of the second outer shell 523 and the second tube upper end 5241, the second tube upper end 5241 forms the second water outlet 522, the second water treatment material 525 is arranged between the second outer shell 523 and the second central tube 524, wherein the second central tube 524 is arranged so that the secondary treated water generated after the primary treated water flowing in from the second water inlet 521 is treated by the second water treatment material 525 can be collected by the second central tube 524. Preferably, the second water treatment material 525 of the second water treatment device 52 of the water treatment machine of the first embodiment of the present invention is a softening material, such as a softening resin. It is understood that the second water treatment material 525 of the second water treatment device 52 of the water treatment machine of the first embodiment of the present invention may also be a filter material, such as activated carbon, PP cotton or quartz sand. It is understood that the second water treatment material 525 of the second water treatment device 52 of the water treatment machine of the first embodiment of the present invention may be a dispersed distribution filter material, or a molded filter material obtained by various molding techniques. Those skilled in the art may understand that the second water treatment device 52 of the water treatment machine of the present invention may also be any other water treatment device having a water inlet and a water outlet.
[0166] As shown in the attached picture Figure 3A As shown, when the first water treatment device 51 of the water treatment machine according to the first embodiment of the present invention is used for water treatment (for example, filtering) or the first water treatment device 51 is forward flushed (positive flushing), water flows into the first water treatment device 51 from the first water inlet 511, and then flows through the first end 5131, the first water treatment material 515, the first tube lower end 5142, the first central tube 514 and the first tube upper end 5141 in sequence and flows out from the first water outlet 512; as shown in the accompanying drawings Figure 3B As shown, when the first water treatment device 51 of the water treatment machine according to the first embodiment of the present invention is backwashed (backwashed), water flows into the first water treatment device 51 from the first water outlet 512, and then flows through the first tube upper end 5141, the first center tube 514, the first tube lower end 5142, the first water treatment material 515 and the first end 5131 in sequence and flows out from the first water inlet 511.
[0167] As shown in the attached picture Figure 3CAs shown, when the second water treatment device 52 of the water treatment machine according to the first embodiment of the present invention is used as a purification filter element to purify water or the second water treatment device 52 is forward flushed (positive flushing), water flows into the second water treatment device 52 from the second water inlet 521, and then flows through the second end 5231, the second water treatment material 525, the second tube lower end 5242, the second center tube 524 and the second tube upper end 5241 in sequence and flows out from the second water outlet 522; as shown in the accompanying drawings Figure 3D As shown, when the second water treatment device 52 of the water treatment machine according to the first embodiment of the present invention is backwashed (backwashed) as a purification filter element (or softening filter element), water flows into the second water treatment device 52 from the second water outlet 522, and then flows through the second tube upper end 5241, the second center tube 524, the second tube lower end 5242, the second water treatment material 525 and the second end 5231 in sequence and flows out from the second water inlet 521. As shown in the accompanying drawings Figure 3C As shown, when the second water treatment device 52 of the water treatment machine according to the first embodiment of the present invention is used as a softening filter element to soften water, the second water treatment device 52 is forward flushed (positive flushing) or the second water treatment device 52 is regenerated by downstream salt absorption, water or regeneration solution flows into the second water treatment device 52 from the second water inlet 521, and then flows through the second end 5231, the second water treatment material 525, the second tube lower end 5242, the second center tube 524 and the second tube upper end 5241 in sequence and flows out from the second water outlet 522.
[0168] As shown in the attached picture Figures 2 to 6R As shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention comprises a valve body 10 and a valve core 12, wherein the valve body 10 forms a valve cavity 110, a first opening 1101, a second opening 1102, a third opening 1103, a fourth opening 1104, a first fluid opening 1105, a second fluid opening 1106 and a sewage discharge opening 1109, wherein the valve core 12 is arranged in the valve cavity 110, wherein the first opening 1101 of the valve body 10 is The valve body 10 is adapted to be connected to the first water inlet 511 of the first water treatment device 51, the second opening 1102 is adapted to be connected to the first water outlet 512 of the first water treatment device 51, the third opening 1103 is adapted to be connected to the second water inlet 521 of the second water treatment device 52, the fourth opening 1104 is adapted to be connected to the second water outlet 522 of the second water treatment device 52, and the second fluid opening 1106 of the valve body 10 is adapted to be connected to a raw water source (e.g., tap water).
[0169] As shown in the attached picture Figures 1 to 6FAs shown, preferably, the second water treatment device 52 of the water treatment machine according to the first embodiment of the present invention is a water softening device, the control valve 1 further has an ejector 18, and the valve body 10 of the control valve 1 further forms a first ejection opening 11011, wherein the ejector 18 has an ejection port 182 suitable for communicating with the first ejection opening 11011. Figures 1 to 6F As shown, the valve body 10 of the control valve 1 further forms a second jet opening 11012, and the ejector 18 further has an ejection port 183 suitable for communicating with the second jet opening 11012 and a salt absorption port 181 respectively connected with the ejection port 182 and the ejection port 183, so that when water flow, such as raw water flow, flows from the ejection port 182 of the ejector 18 to the ejection port 183 of the ejector 18, negative pressure occurs at the salt absorption port 181 of the ejector 18, so that the regeneration solution can flow from the salt absorption port 181 of the ejector 18 to the ejection port 183 of the ejector 18.
[0170] As shown in the attached picture Figure 1 , Figure 2 and Figure 5 As shown, the water treatment machine according to the first embodiment of the present invention further includes a salt absorption pipe 184 and a regeneration solution tank 31, wherein one end of the salt absorption pipe 184 is connected to the salt absorption port 181, and the other end of the salt absorption pipe 184 is connected to the regeneration solution tank 31, so that the salt solution can be provided to the salt absorption port 181 through the salt absorption pipe 184 or the water flow can flow from the salt absorption port 181 and flow through the salt absorption pipe 184 to the regeneration solution tank 31 to replenish the regeneration solution tank 31. It can be understood that the regeneration solution is generally a salt solution.
[0171] As shown in the attached picture Figures 4 to 8CAs shown, more specifically, the control valve 1 of the water treatment machine according to the first embodiment of the present invention is a plane valve, wherein the valve core 12 of the plane valve 1 further includes a first fixed valve plate 121, a movable valve plate 122 and a second fixed valve plate 123, wherein the first fixed valve plate 121 has a first fluid control surface 1210, the movable valve plate 122 has a second fluid control surface 1220 and a third fluid control surface 1223, and the second fixed valve plate 123 has a fourth fluid control surface 1230, wherein the first fixed valve plate 121, the movable valve plate 122 and the second fixed valve plate 123 are all arranged in the valve cavity 110, wherein the second fluid control surface 1220 and the third fluid control surface 1223 of the movable valve plate 122 are respectively formed on the opposite sides of the movable valve plate 122, wherein the second fluid control surface 1220 of the movable valve plate 122 is arranged on the first fluid control surface 1210 of the first fixed valve plate 121, the fourth fluid control surface 1230 of the second fixed valve plate 123 is arranged on the third fluid control surface 1223 of the movable valve plate 122, and the movable valve plate 122 is arranged to be able to rotate relative to the first fixed valve plate 121 and the second fixed valve plate 123. Correspondingly, the first fixed valve disc 121 is disposed between the valve body 10 and the movable valve disc 122, the second fixed valve disc 123 is disposed between the valve body 10 and the movable valve disc 122, and the first fixed valve disc 121 is disposed to remain relatively still with respect to the valve body 10, and the second fixed valve disc 123 is disposed to remain relatively still with respect to the valve body 10. Preferably, the second fluid opening 1106 is communicated with the valve cavity 110 of the valve body 10.
[0172] As shown in the attached picture Figures 4 to 6R , Fig.19A and Fig.19B As shown, the valve body 10 of the control valve 1 of the water treatment machine according to the first embodiment of the present invention comprises a first valve body portion 11 and a second valve body portion 13, wherein the valve chamber 110 is formed between the first valve body portion 11 and the second valve body portion 13, the first opening 1101, the second opening 1102, the third opening 1103, the fourth opening 1104, the first jet opening 11011 and the second jet opening 11012 are formed in the first valve body portion 11, the first fluid opening 1105 and the sewage opening 1109 are formed in the second valve body portion 13, and the second fluid opening 1106 is selectively provided in the first valve body portion 11 or the second valve body portion 13 of the valve body 10. In other words, the second fluid opening 1106 can be provided in the first valve body portion 11 of the valve body 10, or in the second valve body portion 13 of the valve body 10.
[0173] As shown in the attached picture Fig.11A , Fig. 11B and Fig.18AAs shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention has a water treatment working position, wherein when the control valve 1 of the water treatment machine of the present invention is in the water treatment working position, the valve core 12 of the control valve 1 forms a first water treatment flow channel 7001, a second water treatment flow channel 7002 and a third water treatment flow channel 7003, wherein the first water treatment flow channel 7001 is respectively connected to the second fluid opening 1106 and the first opening 1101, the second water treatment flow channel 7002 is respectively connected to the second opening 1102 and the third opening 1103, and the third water treatment flow channel 7003 is respectively connected to the fourth opening 1104 and the first fluid opening 1105. Accordingly, when the control valve 1 of the water treatment machine of the present invention is in the water treatment working position, the raw water flows in from the second fluid opening 1106 of the valve body 10 of the control valve 1 under the action of water pressure, flows to the first opening 1101 of the first valve body 11 through the first water treatment flow channel 7001, and further flows into the first water treatment device 51 from the first water inlet 511 under the action of water pressure, and the primary treated water obtained after being treated by the first water treatment device 51 flows out from the first water outlet 512 and further The water flows into the second opening 1102 of the first valve body 11, then flows into the third opening 1103 of the first valve body 11 through the second water treatment channel 7002, and further flows into the second water treatment device 52 from the second water inlet 521. The secondary treated water treated by the second water treatment device 52 flows out from the second water outlet 522, and under the action of water pressure, further flows into the fourth opening 1104, and then flows to the first fluid opening 1105 through the third water treatment channel 7003 and is provided. Correspondingly, when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the water treatment working position, the water flows in sequence through the second fluid opening 1106 of the valve body 10, the first water treatment channel 7001, the first opening 1101 of the first valve body part 11, the first water inlet 511 of the first water treatment device 51, the first water outlet 512 of the first water treatment device 51, the second opening 1102 of the first valve body part 11, the second water treatment channel 7002, the third opening 1103 of the first valve body part 11, the second water inlet 521 of the second water treatment device 52, the second water outlet 522 of the second water treatment device 52, the fourth opening 1104 of the first valve body part 11, the third water treatment channel 7003 and the first fluid opening 1105, so that the control valve 1 of the water treatment machine of the present invention can control the two water treatment devices of the water treatment machine of the present invention to be connected in series. It can be understood that when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the water treatment working position, the water treatment machine of the present invention is controlled to be in its water treatment working state.
[0174] As shown in the attached picture Fig.12and Fig.18B As shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention has a first backwash working position, wherein when the control valve 1 of the water treatment machine of the present invention is in the first backwash working position, the valve core 12 of the control valve 1 forms a first backwash flow channel 7101 and a second backwash flow channel 7102, wherein the first backwash flow channel 7101 is respectively connected to the second fluid opening 1106 and the second opening 1102, and the second backwash flow channel 7102 is respectively connected to the sewage opening 1109 and the first opening 1101. Accordingly, when the control valve 1 of the water treatment machine of the present invention is in the first backwashing working position, raw water flows in from the second fluid opening 1106 of the valve body 10 of the control valve 1 under the action of water pressure, flows to the second opening 1102 through the first backwashing channel 7101, and further flows into the first water treatment device 51 from the first water outlet 512. The sewage generated after backwashing the first water treatment device 51 flows out from the first water inlet 511, and then is discharged through the first opening 1101, the second backwashing channel 7102 and the sewage discharge opening 1109. Preferably, the control valve 1 of the water treatment machine according to the first embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106 of the valve body 10 of the control valve 1 to the third opening 1103, the fourth opening 1104, the first jet opening 11011 and the second jet opening 11012 when the control valve 1 is controlled to be in the first backwashing working position. More preferably, when the control valve 1 of the water treatment machine of the present invention is controlled to be in the first backwashing working position, the flow of water in the third opening 1103 and the fourth opening 1104 is blocked, so that the flow of water in the second water treatment device 52 is blocked. More specifically, when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the first backwashing working position, the water flow cannot flow from the third opening 1103 or the fourth opening 1104 of the first valve body 11 to the second water treatment device 52, thereby ensuring that the raw water can and can only backwash the first water treatment device 51. It can be understood that when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the first backwashing working position, the water treatment machine of the present invention is controlled to be in its first backwashing working state to backwash the first water treatment device 51 of the water treatment machine of the present invention.
[0175] As shown in the attached picture Fig.13 and Fig. 18CAs shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention has a second backwash working position, wherein when the control valve 1 of the water treatment machine of the present invention is in the second backwash working position, the valve core 12 of the control valve 1 forms a third backwash channel 7103 and a fourth backwash channel 7104, wherein the third backwash channel 7103 is respectively connected to the second fluid opening 1106 and the fourth opening 1104, and the fourth backwash channel 7104 is respectively connected to the sewage opening 1109 and the third opening 1103. Accordingly, when the control valve 1 of the water treatment machine of the present invention is in the second backwashing working position, raw water flows in from the second fluid opening 1106 of the valve body 10 of the control valve 1 under the action of water pressure, flows to the fourth opening 1104 through the third backwashing channel 7103, and further flows into the second water treatment device 52 from the second water outlet 522. The sewage generated after backwashing the second water treatment device 52 flows out from the second water inlet 521, and then is discharged through the third opening 1103, the fourth backwashing channel 7104 and the sewage discharge opening 1109. Preferably, the control valve 1 of the water treatment machine according to the first embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106 of the valve body 10 of the control valve 1 to the first opening 1101, the second opening 1102, the first jet opening 11011 and the second jet opening 11012 when the control valve 1 is controlled to be in the second backwashing working position. More preferably, when the control valve 1 of the water treatment machine of the present invention is controlled to be in the second backwashing working position, the flow of water in the first opening 1101 and the second opening 1102 is blocked, so that the flow of water in the first water treatment device 51 is blocked. More specifically, when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the second backwashing working position, the water flow cannot flow from the first opening 1101 or the second opening 1102 of the first valve body 11 to the first water treatment device 51, thereby ensuring that the raw water can and can only backwash the second water treatment device 52. It can be understood that when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the second backwashing working position, the water treatment machine of the present invention is controlled to be in its second backwashing working state to backwash the second water treatment device 52 of the water treatment machine of the present invention.
[0176] It can be understood that backwashing in this article refers to the situation where when water flows through the water treatment device of the water treatment machine of the present invention (the first water treatment device 51 or the second water treatment device 52) to flush the water treatment device of the water treatment machine of the present invention, the flow direction of the water flowing through the water treatment device of the water treatment machine of the present invention is opposite to the flow direction of the raw water flowing through the water treatment device of the water treatment machine of the present invention when the water treatment device of the water treatment machine of the present invention treats the raw water.
[0177] As shown in the attached picture Fig.14A , Fig. 14B and Fig.18DAs shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention has a regeneration working position, wherein when the control valve 1 of the water treatment machine of the present invention is in the regeneration working position, the valve core 12 of the control valve 1 forms a first regeneration flow channel 7301, a second regeneration flow channel 7302 and a third regeneration flow channel 7303, wherein the first regeneration flow channel 7301 is respectively connected to the second fluid opening 1106 and the first jet opening 11011 of the valve body 10, the second regeneration flow channel 7302 is respectively connected to the second jet opening 11012 and the third opening 1103, and the third regeneration flow channel 7303 is respectively connected to the sewage opening 1109 and the fourth opening 1104. Accordingly, when the control valve 1 of the water treatment machine of the present invention is in the regeneration working position, the raw water flows in from the second fluid opening 1106 of the valve body 10 of the control valve 1 under the action of water pressure, flows through the first regeneration flow channel 7301 to the first jet opening 11011 of the first valve body 11, and then flows into the ejection port 182 of the ejector 18, passes through the ejection port 18, and is mixed with the salt solution (such as sodium chloride solution) from the salt absorption port 181 to form a regeneration solution. The regeneration solution passes through the ejection port 182 of the ejector 18. 3 flows into the second jet opening 11012 of the first valve body 11, and then flows into the third opening 1103 of the first valve body 11 through the second regeneration flow channel 7302. The regeneration solution flows into the second water treatment device 52 from the second water inlet 521, and regenerates the second water treatment material 525 downstream, such as softening the resin. The waste water generated after regeneration flows out from the second water outlet 522, and then flows out through the fourth opening 1104 of the first valve body 11, the third regeneration flow channel 7303 and the sewage opening 1109 in sequence. Preferably, the control valve 1 of the water treatment machine according to the first embodiment of the present invention is configured to prevent the regeneration solution from flowing to the first opening 1101 and the second opening 1102, and prevent the raw water from flowing from the second fluid opening 1106 of the valve body 10 of the control valve 1 to the first opening 1101 and the second opening 1102 when the control valve 1 is controlled to be in the regeneration working position. More preferably, when the control valve 1 of the water treatment machine of the present invention is controlled to be in the regeneration working position, the flow of water in the first opening 1101 and the second opening 1102 is blocked, so that the flow of water in the first water treatment device 51 is blocked. More specifically, when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the regeneration working position, water cannot flow from the first opening 1101 or the second opening 1102 of the first valve body 11 to the first water treatment device 51, thereby ensuring that the regeneration solution can and can only flow to the second water treatment device 52.The downstream regeneration herein means that when the regeneration working position is reached, the flow direction of the regeneration solution in the second water treatment device 52 is the same as the flow direction of the water flow in the second water treatment device 52 when the control valve 1 is in the water treatment working position. It can be understood that when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the regeneration working position, the water treatment machine of the present invention is controlled to be in its regeneration working state.
[0178] As shown in the attached picture Fig.15 and Fig.18E As shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention has a first positive flushing working position, wherein when the control valve 1 of the water treatment machine of the present invention is in the first positive flushing working position, the valve core 12 of the control valve 1 forms a first positive flushing flow channel 7201 and a second positive flushing flow channel 7202, wherein the first positive flushing flow channel 7201 is respectively connected to the second fluid opening 1106 and the first opening 1101, and the second positive flushing flow channel 7202 is respectively connected to the sewage opening 1109 and the second opening 1102. Accordingly, when the control valve 1 of the water treatment machine of the present invention is in the first positive flushing working position, raw water flows in from the second fluid opening 1106 of the valve body 10 of the control valve 1 under the action of water pressure, flows to the first opening 1101 through the first positive flushing channel 7201, and further flows into the first water treatment device 51 from the first water inlet 511. The sewage after positive flushing the first water treatment device 51 flows out from the first water outlet 512, and then is discharged through the second opening 1102, the second positive flushing channel 7202 and the sewage discharge opening 1109. Preferably, the control valve 1 of the water treatment machine according to the first embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106 of the valve body 10 of the control valve 1 to the third opening 1103, the fourth opening 1104, the first jet opening 11011 and the second jet opening 11012 when the control valve 1 is controlled to be in the first positive flushing working position. More preferably, when the control valve 1 of the water treatment machine of the present invention is controlled to be in the first positive flushing working position, the flow of water in the third opening 1103 and the fourth opening 1104 is blocked, so that the flow of water in the second water treatment device 52 is blocked. More specifically, when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the first positive flushing working position, the water flow cannot flow from the third opening 1103 or the fourth opening 1104 of the first valve body 11 to the second water treatment device 52, thereby ensuring that the raw water can and can only positively flush the first water treatment device 51. It can be understood that when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the first positive flushing working position, the water treatment machine of the present invention is controlled to be in its first positive flushing working state to positively flush the first water treatment device 51 of the water treatment machine of the present invention.
[0179] As shown in the attached picture Fig.16 and Fig.18F As shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention has a second positive flushing working position, wherein when the control valve 1 of the water treatment machine of the present invention is in the second positive flushing working position, the valve core 12 of the control valve 1 forms a third positive flushing flow channel 7203 and a fourth positive flushing flow channel 7204, wherein the third positive flushing flow channel 7203 is respectively connected to the second fluid opening 1106 and the third opening 1103, and the fourth positive flushing flow channel 7204 is respectively connected to the sewage opening 1109 and the fourth opening 1104. Accordingly, when the control valve 1 of the water treatment machine of the present invention is in the second positive flushing working position, raw water flows in from the second fluid opening 1106 of the valve body 10 of the control valve 1 under the action of water pressure, flows to the third opening 1103 through the third positive flushing flow channel 7203, and further flows into the second water treatment device 52 from the second water inlet 521. The sewage after positive flushing the second water treatment device 52 flows out from the second water outlet 522, and then is discharged through the fourth opening 1104, the fourth positive flushing flow channel 7204 and the sewage discharge opening 1109. Preferably, the control valve 1 of the water treatment machine according to the first embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106 of the valve body 10 of the control valve 1 to the first opening 1101, the second opening 1102, the first jet opening 11011 and the second jet opening 11012 when the control valve 1 is controlled to be in the second positive flushing working position. More preferably, when the control valve 1 of the water treatment machine of the present invention is controlled to be in the second positive flushing working position, the flow of water in the first opening 1101 and the second opening 1102 is blocked, so that the flow of water in the first water treatment device 51 is blocked. More specifically, when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the second positive flushing working position, the water flow cannot flow from the first opening 1101 or the second opening 1102 of the first valve body 11 to the first water treatment device 51, thereby ensuring that the raw water can and can only positively flush the second water treatment device 52. It can be understood that when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the second positive flushing working position, the water treatment machine of the present invention is controlled to be in its second positive flushing working state to positively flush the second water treatment device 52 of the water treatment machine of the present invention.
[0180] It can be understood that the positive flushing in this article refers to the flow direction of the water treatment device (the first water treatment device 51 or the second water treatment device 52) of the water treatment machine of the present invention when the water flow flushes the water treatment device of the water treatment machine of the present invention, and the flow direction of the raw water flowing through the water treatment device of the water treatment machine of the present invention when the water treatment device of the water treatment machine of the present invention treats the raw water is the same. Generally, the time for the water treatment device of the water treatment machine of the present invention to be positively flushed by water flow is after the backwashing, so as to flush away the wastewater generated by the backwashing remaining in the water treatment device of the water treatment machine of the present invention. In addition, if the filter material (or softening material) of the water treatment device of the water treatment machine of the present invention is a granular filter material, the positive flushing can also play a role in compacting the filter material (or softening material) so that it has a better water treatment effect.
[0181] As shown in the attached picture FIG. 11A to FIG. 16 and FIG. 18A to FIG. 18F As shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention, more specifically, the control valve 1 of a single water treatment machine of the present invention, is configured to control the first water treatment device 51 and the second water treatment device 52 of the water treatment machine of the present invention to be connected in series and to perform secondary treatment on the raw water, and to control the raw water to respectively and individually perform backwashing and forward flushing on the first water treatment device 51 and the second water treatment device 52 of the water treatment machine of the present invention and to control the raw water to perform regeneration treatment on the second water treatment device 52.
[0182] As shown in the attached picture Fig.17 and Figure 18GAs shown, the control valve 1 of the water treatment machine according to the first embodiment of the present invention further has a water replenishment working position, wherein when the control valve 1 is in the water replenishment working position, the valve core 12 of the control valve 1 forms a water replenishment flow channel 7401, wherein the water replenishment flow channel 7401 is respectively connected with the second fluid opening 1106 and the second jet opening 11012. Correspondingly, when the control valve 1 is in the water replenishment working position, the raw water flows in from the second fluid opening 1106 of the valve body 10 of the control valve 1 under the action of water pressure, flows to the second jet opening 11012 of the first valve body part 11 through the water replenishment flow channel 7401, and then flows into the regeneration solution tank 31 through the injection port 183 of the ejector 18, the salt absorption port 181 and the salt absorption pipe 184 in sequence for water replenishment. Preferably, the control valve 1 of the water treatment machine according to the first embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106 of the valve body 10 of the control valve 1 to the first opening 1101, the second opening 1102, the third opening 1103, the fourth opening 1104 and the first jet opening 11011 when the control valve 1 is controlled to be in the water replenishment working position. More preferably, when the control valve 1 of the water treatment machine of the present invention is controlled to be in the water replenishment working position, the flow of water in the first opening 1101, the second opening 1102, the third opening 1103 and the fourth opening 1104 is prevented, so that the flow of water in the first water treatment device 51 and the second water treatment device 52 is prevented. More specifically, when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the water replenishment working position, water cannot flow from the first opening 1101 or the second opening 1102 of the first valve body 11 to the first water treatment device 51, and water cannot flow from the third opening 1103 or the fourth opening 1104 of the first valve body 11 to the second water treatment device 52. It can be understood that when the control valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the water replenishment working position, the water treatment machine of the present invention is controlled to be in its water replenishment working state.
[0183] As shown in the attached picture Figures 5 to 8CAs shown, the plane valve 1 of the water treatment machine according to the first embodiment of the present invention comprises a first channel 101, a second channel 102, a third channel 103, a fourth channel 104, a fifth channel 105, a sixth channel 106, a seventh channel 107, an eighth channel 108, a ninth channel 109, a first jet channel 1011 and a second jet channel 1012, wherein the first channel 101, the second channel 102, the third channel 103, the fourth channel 104, the first jet channel 1011 and the second jet channel 1012 are respectively arranged on the first fixed valve plate 121 and extend from the first fluid control surface 1210 of the first fixed valve plate 121; the sixth channel 106, the seventh channel 107 and the eighth channel 108 are respectively arranged on the movable valve plate 122, wherein the sixth channel 106 and the seventh channel 107 extend from the second fluid control surface 122 of the movable valve plate 122 0, the eighth channel 108 extends from the second fluid control surface 1220 of the movable valve plate 122 to the third fluid control surface 1223; the fifth channel 105 and the ninth channel 109 are respectively provided on the second fixed valve plate 123 and respectively extend from the fourth fluid control surface 1230 of the second fixed valve plate 123, wherein the first channel 101 is connected to the first opening 1101, the second channel 102 is connected to the second opening 1102, and the third channel 103 The seventh channel 107 is connected to the third opening 1103, the fourth channel 104 is connected to the fourth opening 1104, the fifth channel 105 is connected to the first fluid opening 1105, the sixth channel 106 is connected to the second fluid opening 1106, the ninth channel 109 is connected to the sewage opening 1109, the first jet channel 1011 is connected to the first jet opening 11011, and the second jet channel 1012 is connected to the second jet opening 11012. Preferably, the seventh channel 107 is a conducting blind hole. Preferably, the eighth channel 108 is a conducting through hole. Preferably, the sixth channel 106 is connected to the valve cavity 110 and further connected to the second fluid opening 1106 through the valve cavity 110.
[0184] As shown in the attached picture Fig. 10A , Fig. 10B , Fig.11A , Fig. 11B and Fig.18AAs shown, according to the first embodiment of the present invention, the movable valve plate 122 of the plane valve 1 of the water treatment machine can rotate relative to the first fixed valve plate 121 and the second fixed valve plate 123 so that the plane valve 1 has a water treatment working position. When the plane valve 1 of the water treatment machine of the present invention is in the water treatment working position, the sixth channel 106 of the plane valve 1 is connected with the first channel 101, thereby forming the first water treatment flow channel 7001 respectively connected with the second fluid opening 1106 and the first opening 1101, the seventh channel 107 is respectively connected with the second channel 102 and the third channel 103, thereby forming the second water treatment flow channel 7002 respectively connected with the second opening 1102 and the third opening 1103, and the eighth channel 108 is respectively connected with the fourth channel 104 and the fifth channel 105, thereby forming the third water treatment flow channel 7003 respectively connected with the fourth opening 1104 and the first fluid opening 1105. In other words, when the plane valve 1 of the water treatment machine of the present invention is in the water treatment working position, the water flow, under the action of water pressure, sequentially flows through the second fluid opening 1106 of the plane valve 1, the sixth channel 106, the first channel 101, the first opening 1101, the first water inlet 511 of the first water treatment device 51, the first water outlet 512 of the first water treatment device 51, the second opening 1102 of the plane valve 1, the second channel 102, the seventh channel 107, the third channel 103, the third opening 1103, the second water inlet 521 of the second water treatment device 52, the second water outlet 522 of the second water treatment device 52, the fourth opening 1104 of the plane valve 1, the fourth channel 104, the eighth channel 108, the fifth channel 105 and the first fluid opening 1105. As shown in the accompanying drawings 7A to 7I , Fig. 10A , Fig. 10B and Fig.18A As shown, exemplarily, when the planar valve 1 of the water treatment machine of the present invention is in the water treatment working position, the first jet channel 1011 and the second jet channel 1012 of the planar valve 1 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the ninth channel 109 is blocked by the third fluid control surface 1223 of the movable valve plate 122.
[0185] It is worth noting that when the plane valve 1 of the water treatment machine of the present invention is in the water treatment working position, the seventh channel 107 is connected to the second channel 102 and the third channel 103 respectively, that is, when the plane valve 1 is in the water treatment working position, the second opening 1102 and the third opening 1103 are connected through the second water treatment flow channel 7002. Since the second opening 1102 is connected to the first water outlet 512 of the first water treatment device 51, and the third opening 1103 is connected to the second water inlet 521 of the second water treatment device 52, at this time, the The first water outlet 512 of the first water treatment device 51 and the second water inlet 521 of the second water treatment device 52 form a series structure, so that when the plane valve 1 is in the water treatment working position, the first water treatment device 51 and the second water treatment device 52 form a two-stage series structure, and the first water treatment material 515 of the first water treatment device 51 and the second water treatment material 525 of the second water treatment device 52 will sequentially treat the raw water entering the second fluid opening 1106 of the plane valve 1, and the treated water flows out from the first fluid opening 1105 and is provided. It can be understood that the two-stage series structure can better perform deep treatment on raw water. In particular, the first water treatment material 515 of the first water treatment device 51 and the second water treatment material 525 of the second water treatment device 52 can be set to different materials, for example, the first water treatment material 515 can be set to granular activated carbon as an adsorption material, and the second water treatment material 525 can be set to softening resin for softening treatment.
[0186] As shown in the attached picture Fig.11A , Fig. 11B and Fig.18AAs shown, exemplarily, when the flat valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the water treatment working position, the raw water from the flat valve 1 flows into the valve cavity 110 from the second fluid opening 1106 of the valve body 10 under the action of water pressure, and then flows into the first opening 1101 through the sixth channel 106 and the first channel 101, and then flows into the first water treatment device 51 from the first water inlet 511 of the first water treatment device 51. Under the action of water pressure, after being treated (for example, purified) by the first water treatment material 515, the generated primary treated water is collected by the first central tube 514 and flows out from the first water outlet 512 of the first water treatment device 51. Under the action of water pressure, the primary treated water The water further flows through the second opening 1102, the second channel 102, the seventh channel 107, the third channel 103, and the third opening 1103 of the planar valve 1 to the second water inlet 521 of the second water treatment device 52 and into the second water treatment device 52, and then under the action of water pressure, is treated (for example, softened) by the second water treatment material 525, and the generated secondary treated water is collected by the second central pipe 524 and flows out from the second water outlet 522 of the second water treatment device 52, and then under the action of water pressure, is further provided through the fourth opening 1104, the fourth channel 104, the eighth channel 108, the fifth channel 105 and the first fluid opening 1105 of the planar valve 1.
[0187] As shown in the attached picture Fig. 10C , Fig. 10D , Fig.12 and Fig.18B As shown, the plane valve 1 of the water treatment machine according to the first embodiment of the present invention further has a first backwashing working position. When the plane valve 1 of the water treatment machine of the present invention is in the first backwashing working position, the sixth channel 106 of the plane valve 1 is connected with the second channel 102, thereby forming the first backwashing flow channel 7101 connected with the second fluid opening 1106 and the second opening 1102 respectively, and the eighth channel 108 is connected with the ninth channel 109 and the first channel 101 respectively, thereby forming the second backwashing flow channel 7102 connected with the sewage opening 1109 and the first opening 1101 respectively. As shown in the accompanying drawings 7A to 7I , Fig. 10C , Fig. 10D and Fig.18BAs shown, when the planar valve 1 of the water treatment machine of the present invention is in the first backwash working position, the seventh channel 107 of the planar valve 1 is respectively connected to the first channel 101 and the fourth channel 104, the third channel 103, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. Therefore, when the plane valve 1 is in the first backwashing working position, although the seventh channel 107 of the plane valve 1 is connected to the first channel 101 and the fourth channel 104 respectively, the seventh channel 107 is a conducting blind hole, and the third channel 103, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, so that the raw water can only flow into the sixth channel 106 from the second fluid opening 1106 of the plane valve 1, and The wastewater further flows through the second channel 102 and the second opening 1102 to the first water outlet 512 of the first water treatment device 51 and flows into the first water treatment device 51. The wastewater generated by reverse flushing the first water treatment device 51 flows from the first water inlet 511 of the first water treatment device 51 to the first opening 1101 of the plane valve 1, and is further discharged through the first channel 101, the eighth channel 108, the ninth channel 109 and the sewage opening 1109 of the plane valve 1 under the action of water pressure. In other words, although the seventh channel 107 is connected to the first channel 101 and the fourth channel 104 respectively, the seventh channel 107 is a conducting blind hole, and the third channel 103 is blocked by the second fluid control surface 1220 of the movable valve plate 122, so the water does not flow through the flow channel formed by them. Correspondingly, when the planar valve 1 is in the first backwash working position, the third channel 103 of the planar valve 1 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the third opening 1103 of the planar valve 1, so that the flow of water from the second water inlet 521 of the second water treatment device 52 to the third opening 1103 is blocked, and the flow of water from the fourth opening 1104 to the second water outlet 522 of the second water treatment device 52 is blocked, so that no water flows in the fourth opening 1104, thereby preventing the flow of water in the second water treatment device 52. In other words, although the seventh channel 107 is connected to the first channel 101 and the fourth channel 104 respectively, so that the first opening 1101 and the fourth opening 1104 are connected, the movable valve plate 122 hinders the water flow to the third channel 103, so that the flow of water in the second water treatment device 52 is blocked, thereby ensuring that only the first water treatment device 51 is reverse flushed.
[0188] It is worth noting that when the plane valve 1 is in the first backwashing working position, the third channel 103 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the third opening 1103, so that no water flows in the fourth opening 1104, and no water flows in the second water treatment device 52, so as to ensure that only the first water treatment device 51 is backwashed, thereby increasing the intensity of the water flow of the raw water backwashing the first water treatment device 51, and preventing the generated sewage from flowing to the second water treatment device 52. Therefore, when the plane valve 1 is in the first backwashing working position, the first water treatment device 51 of the water treatment machine of the present invention is backwashed separately.
[0189] As shown in the attached picture Fig.12 and Fig.18B As shown, exemplarily, when the plane valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the first backwash working position, the raw water from the plane valve 1 flows into the first water treatment device 51 from the first water outlet 512 of the first water treatment device 51 under the action of water pressure, and then flows from the first central pipe 514 to the first water treatment material 515 and backwashes the first water treatment material 515 under the action of water pressure, and the generated sewage flows out from the first water inlet 511 of the first water treatment device 51, and under the action of water pressure, flows to the first opening 1101 of the plane valve 1, and then flows to the sewage opening 1109 through the second backwash channel 7102 and is discharged.
[0190] As shown in the attached picture Fig. 10E , Fig.10F , Fig.13 and Fig. 18C As shown, the plane valve 1 of the water treatment machine according to the first embodiment of the present invention further has a second backwashing working position. When the plane valve 1 of the water treatment machine of the present invention is in the second backwashing working position, the sixth channel 106 of the plane valve 1 is connected with the fourth channel 104, thereby forming the third backwashing flow channel 7103 connected with the second fluid opening 1106 and the fourth opening 1104 respectively, and the eighth channel 108 is connected with the ninth channel 109 and the third channel 103 respectively, thereby forming the fourth backwashing flow channel 7104 connected with the sewage opening 1109 and the third opening 1103 respectively. As shown in the accompanying drawings 7A to 7I , Fig. 10E , Fig.10F and Fig. 18CAs shown, when the plane valve 1 of the water treatment machine of the present invention is in the second backwashing working position, the seventh channel 107 of the plane valve 1 is connected to the first channel 101 and the first jet channel 1011 respectively, the second channel 102 and the second jet channel 1012 are blocked by the second fluid control surface 1220 of the movable valve plate 122 respectively, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. As shown in the accompanying drawings 7A to 7I , Fig. 10E , Fig.10F and Fig. 18C Specifically, when the plane valve 1 is in the second backwashing working position, although the seventh channel 107 is connected to the first channel 101 and the first jet channel 1011 respectively, since the seventh channel 107 is a conducting blind hole, and the second channel 102 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the raw water can only flow into the sixth channel 106 from the second fluid opening 1106 of the plane valve 1, and further through the The fourth channel 104 and the fourth opening 1104 flow toward the second water outlet 522 of the second water treatment device 52 and flow into the second water treatment device 52, and the waste water generated by backwashing the second water treatment device 52 flows from the second water inlet 521 of the second water treatment device 52 to the third opening 1103 of the plane valve 1, and is further discharged through the third channel 103, the eighth channel 108, the ninth channel 109 and the sewage discharge opening 1109 of the plane valve 1 under the action of water pressure. In other words, although the seventh channel 107 of the plane valve 1 is connected with the first channel 101 and the first jet channel 1011 respectively, the seventh channel 107 is a conducting blind hole, and the second channel 102 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, so the water does not flow through the flow channel formed by them. Therefore, when the plane valve 1 is in the second backwashing working position, the second channel 102 of the plane valve 1 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the second opening 1102 of the plane valve 1; and because the water does not flow through the flow channel formed by the seventh channel 107 being connected to the first channel 101 and the first jet channel 1011, respectively, no water flows in the first opening 1101, and therefore, the flow of water in the first water treatment device 51 is prevented. In other words, although the seventh channel 107 is connected to the first channel 101 and the first jet channel 1011, respectively, the flow of water in the first water treatment device 51 is prevented because the movable valve plate 122 blocks the raw water from flowing to the second channel 102, thereby ensuring that only the second water treatment device 52 is backwashed.
[0191] It is worth noting that when the plane valve 1 is in the second backwashing working position, the second channel 102 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the second opening 1102. Although the seventh channel 107 of the plane valve 1 is respectively connected to the first channel 101 and the first jet channel 1011, the water does not flow through the flow channel formed by them, so that no water flows in the first opening 1101, so that the first water treatment device 51 is isolated from the water flow to ensure that only the second water treatment device 52 is backwashed, thereby increasing the intensity of the water flow of the raw water backwashing the second water treatment device 52, and preventing the generated sewage from flowing to the first water treatment device 51. Therefore, when the plane valve 1 is in the second backwashing working position, the second water treatment device 52 of the water treatment machine of the present invention is backwashed separately.
[0192] As shown in the attached picture Fig.13 and Fig. 18C As shown, exemplarily, when the plane valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the second backwash working position, the raw water from the plane valve 1 flows into the second water treatment device 52 from the second water outlet 522 of the second water treatment device 52 under the action of water pressure, and then flows from the second center pipe 524 to the second water treatment material 525 and backwashes the second water treatment material 525 under the action of water pressure, and the generated sewage flows out from the second water inlet 521 of the second water treatment device 52, and under the action of water pressure, flows to the third opening 1103 of the first valve body part 11 of the plane valve 1, and then flows to the sewage opening 1109 through the fourth backwash channel 7104 and is discharged.
[0193] As shown in the attached picture Figure 10G , Fig. 10H , Fig.14A , Fig. 14B and Fig.18D As shown, the plane valve 1 of the water treatment machine according to the first embodiment of the present invention further has a regeneration working position. When the plane valve 1 is in the regeneration working position, the sixth channel 106 of the plane valve 1 is connected with the first jet channel 1011, thereby forming the first regeneration flow channel 7301 respectively connected with the second fluid opening 1106 and the first jet opening 11011, the seventh channel 107 is respectively connected with the second jet channel 1012 and the third channel 103, thereby forming the second regeneration flow channel 7302 respectively connected with the second jet opening 11012 and the third opening 1103, and the eighth channel 108 is respectively connected with the ninth channel 109 and the fourth channel 104, thereby forming the third regeneration flow channel 7303 respectively connected with the sewage opening 1109 and the fourth opening 1104. As shown in the accompanying drawings 7A to 7I , Figure 10G , Fig. 10H and Fig.18D As shown, when the planar valve 1 is in the regeneration working position, the first channel 101 and the second channel 102 of the planar valve 1 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. Therefore, when the plane valve 1 of the water treatment machine of the present invention is in the regeneration working position, the raw water flows in from the second fluid opening 1106 of the valve body 10 of the plane valve 1 under the action of water pressure, flows through the first regeneration flow channel 7301 (the sixth channel 106 and the first jet channel 1011) to the first jet opening 11011 of the first valve body part 11, and then flows into the ejection port 182 of the ejector 18, passes through the ejector 18 jet, and is mixed with the salt solution (such as sodium chloride solution) from the salt absorption port 181 to form a regeneration solution, and the regeneration solution flows into the second jet opening of the first valve body part 11 through the ejection port 183 of the ejector 18. 11012, then flows into the third opening 1103 of the first valve body 11 through the second regeneration flow channel 7302 (the second jet channel 1012, the seventh channel 107 and the third channel 103), and the regeneration solution flows into the second water treatment device 52 from the second water inlet 521, regenerates the second water treatment material 525 downstream, such as softening the resin, and the waste water generated after regeneration flows out from the second water outlet 522, and then flows out through the fourth opening 1104 of the first valve body 11, the third regeneration flow channel 7303 (the fourth channel 104, the eighth channel 108 and the ninth channel 109) and the sewage opening 1109 in sequence. As shown in the attached figure 7A to 7I , Figure 10G , Fig. 10H and Fig.18DAs shown, specifically, when the plane valve 1 is in the regeneration working position, the first channel 101 and the second channel 102 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, so that the raw water can only flow into the sixth channel 106 from the second fluid opening 1106 of the plane valve 1, and further sequentially through the first jet channel 1011, the first jet opening 11011, the ejector 18, the second jet opening 11012, the second jet channel 1012, the seventh channel 107, the third channel 108, the seventh channel 109, the seventh channel 111, the seventh channel 112, the seventh channel 113, the seventh channel 114, the seventh channel 115, the seventh channel 116, the seventh channel 117, the seventh channel 118, the seventh channel 119, the seventh channel 120, the seventh channel 121, the seventh channel 123, the seventh channel 124, the seventh channel 125, the seventh channel 126, the seventh channel 127, the seventh channel 128, the seventh channel 129, the seventh channel 130, the seventh channel 131, the seventh channel 132, the seventh channel 133, the seventh channel 134, the seventh channel 135, the seventh channel 136, the seventh channel 137, the seventh channel 138, the seventh channel 139, the seventh channel 140, the seventh channel 141, the seventh channel 1 The waste water flows from the second water outlet 522 of the second water treatment device 52 to the fourth opening 1104 of the plane valve 1, and is further discharged through the fourth channel 104, the eighth channel 108, the ninth channel 109 and the sewage opening 1109 of the plane valve 1 under the action of water pressure. Correspondingly, when the planar valve 1 is in the regeneration working position, the first channel 101 and the second channel 102 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the first opening 1101 and the second opening 1102 of the planar valve 1, so that the flow of water from the first opening 1101 to the first water inlet 511 of the first water treatment device 51 is blocked, the flow of water from the second opening 1102 to the first water outlet 512 of the first water treatment device 51 is blocked, and the flow of water in the first water treatment device 51 is blocked, thereby ensuring that only the second water treatment device 52 is regenerated downstream.
[0194] It is worth noting that when the planar valve 1 is in the regeneration working position, the first channel 101 and the second channel 102 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, so that the first opening 1101 and the second opening 1102 are both blocked by the movable valve plate 122, so that the first water treatment device 51 is isolated from the water flow to ensure that only the second water treatment device 52 is regenerated downstream, thereby increasing the intensity of the water flow of the regeneration solution for downstream regeneration of the second water treatment device 52 and preventing the generated sewage from flowing to the first water treatment device 51. In particular, it is necessary to prevent the regeneration salt solution (or sewage wastewater after the regeneration resin, because the sewage wastewater has a higher salt content) from entering the first water treatment device 51, because in actual use, the first water treatment device 51 is often other adsorbent filter materials such as activated carbon, and the regeneration salt solution will contaminate the activated carbon and other filter materials, thereby weakening the purification capacity of the first water treatment device 51. This is also a major reason why the multi-stage purification and softening water treatment equipment cannot simply use the activated carbon water treatment device and the softening resin water treatment device directly in series. Therefore, when the plane valve 1 is in the regeneration working position, the second water treatment device 52 of the water treatment machine of the present invention is regenerated separately downstream.
[0195] As shown in the attached picture Fig.14A , Fig. 14B and Fig.18D As shown, exemplarily, when the plane valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the regeneration working position, the raw water from the plane valve 1 is mixed with the salt solution from the ejector 18 under the action of water pressure to form a regeneration solution, which flows into the second water treatment device 52 from the second water inlet 521 of the second water treatment device 52, and then under the action of water pressure, the second water treatment material 525 is regenerated downstream, and the generated sewage is collected by the second central pipe 524, and flows out from the second water outlet 522 of the second water treatment device 52, and under the action of water pressure, flows to the fourth opening 1104 of the plane valve 1, and then flows to the sewage opening 1109 through the third regeneration flow channel 7303 and is discharged.
[0196] As shown in the attached picture Fig.10I , Fig.10J , Fig.15 and Fig.18EAs shown, the plane valve 1 of the water treatment machine according to the first embodiment of the present invention further has a first positive flushing working position. When the plane valve 1 of the water treatment machine of the present invention is in the first positive flushing working position, the sixth channel 106 of the plane valve 1 is connected with the first channel 101, thereby forming the first positive flushing flow channel 7201 respectively connected with the second fluid opening 1106 and the first opening 1101, and the eighth channel 108 is respectively connected with the ninth channel 109 and the second channel 102, thereby forming the second positive flushing flow channel 7202 respectively connected with the sewage opening 1109 and the second opening 1102. As shown in the accompanying drawings 7A to 7I , Fig.10I , Fig.10J and Fig.18E As shown, when the plane valve 1 of the water treatment machine of the present invention is in the first positive flushing working position, the seventh channel 107 of the plane valve 1 is connected to the third channel 103 and the second jet channel 1012 respectively, the fourth channel 104 and the first jet channel 1011 are blocked by the second fluid control surface 1220 of the movable valve plate 122 respectively, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. As shown in the accompanying drawings 7A to 7I , Fig.10I , Fig.10J and Fig.18EAs shown, when the plane valve 1 is in the first positive flushing working position, although the seventh channel 107 of the plane valve 1 is connected to the third channel 103 and the second jet channel 1012 respectively, the seventh channel 107 is a conducting blind hole, and the fourth channel 104 and the first jet channel 1011 are blocked by the second fluid control surface 1220 of the movable valve plate 122 respectively, so that the raw water can only flow into the sixth channel 106 from the second fluid opening 1106 of the plane valve 1, and further through the The first channel 101 and the first opening 1101 flow toward the first water inlet 511 of the first water treatment device 51 and flow into the first water treatment device 51, and the waste water generated by positively flushing the first water treatment device 51 flows from the first water outlet 512 of the first water treatment device 51 to the second opening 1102 of the plane valve 1, and is further discharged through the second channel 102, the eighth channel 108, the ninth channel 109 and the sewage discharge opening 1109 of the plane valve 1 under the action of water pressure. In other words, although the seventh channel 107 of the plane valve 1 is connected with the third channel 103 and the second jet channel 1012 respectively, because the seventh channel 107 is a conducting blind hole, and the fourth channel 104 and the first jet channel 1011 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the water flow does not flow through the flow channel formed by them. Accordingly, when the plane valve 1 is in the first positive flushing working position, the fourth channel 104 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the fourth opening 1104 of the plane valve 1, and preventing water from flowing from the fourth opening 1104 to the second water outlet 522 of the second water treatment device 52; and because water does not flow through the flow channel formed by the seventh channel 107 being connected to the third channel 103 and the second jet channel 1012, respectively, no water flows in the third opening 1103, and therefore, the flow of water in the second water treatment device 52 is prevented. In other words, although the seventh channel 107 is connected to the third channel 103 and the second jet channel 1012, respectively, the movable valve plate 122 blocks the raw water from flowing to the fourth channel 104, so that the flow of water in the second water treatment device 52 is prevented, thereby ensuring that only the first water treatment device 51 is reversely flushed.
[0197] It is worth noting that when the plane valve 1 is in the first positive flushing working position, the fourth channel 104 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the fourth opening 1104. Although the seventh channel 107 of the plane valve 1 is respectively connected to the third channel 103 and the second jet channel 1012, the water does not flow through the flow channel formed by them, so that no water flows in the third opening 1103, so that the second water treatment device 52 is isolated from the water flow to ensure that only the first water treatment device 51 is positively flushed, thereby increasing the intensity of the water flow of the raw water for positively flushing the first water treatment device 51, and preventing the generated sewage from flowing to the second water treatment device 52. Therefore, when the plane valve 1 is in the first positive flushing working position, the first water treatment device 51 of the water treatment machine of the present invention is positively flushed alone.
[0198] As shown in the attached picture Fig.15 and Fig.18E As shown, exemplarily, when the plane valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the first positive flushing working position, the raw water from the plane valve 1 flows into the first water treatment device 51 from the first water inlet 511 of the first water treatment device 51 under the action of water pressure, and then positively flushes the first water treatment material 515 under the action of water pressure, and the generated sewage is collected by the first central pipe 514, and flows out from the first water outlet 512 of the first water treatment device 51, and flows to the second opening 1102 of the plane valve 1 under the action of water pressure, and then flows to the sewage opening 1109 through the second positive flushing channel 7202 and is discharged.
[0199] As shown in the attached picture Figure 10K , Fig.10L , Fig.16 and Fig.18F As shown, the plane valve 1 of the water treatment machine according to the first embodiment of the present invention further has a second positive flushing working position. When the plane valve 1 of the water treatment machine of the present invention is in the second positive flushing working position, the sixth channel 106 of the plane valve 1 is connected with the third channel 103, thereby forming the third positive flushing flow channel 7203 connected with the second fluid opening 1106 and the third opening 1103 respectively, and the eighth channel 108 is connected with the ninth channel 109 and the fourth channel 104 respectively, thereby forming the fourth positive flushing flow channel 7204 connected with the sewage opening 1109 and the fourth opening 1104 respectively. As shown in the accompanying drawings 7A to 7I , Figure 10K , Fig.10L and Fig.18FAs shown, when the plane valve 1 of the water treatment machine of the present invention is in the second positive flushing working position, the seventh channel 107 of the plane valve 1 is connected to the second channel 102 and the fourth channel 104 respectively, the first channel 101, the first jet channel 1011 and the second jet channel 1012 are blocked by the second fluid control surface 1220 of the movable valve plate 122 respectively, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. As shown in the accompanying drawings 7A to 7I , Figure 10K , Fig.10L and Fig.18F As shown, specifically, when the plane valve 1 is in the second positive flushing working position, although the seventh channel 107 of the plane valve 1 is connected to the second channel 102 and the fourth channel 104 respectively, the seventh channel 107 is a conducting blind hole, and the first channel 101, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, so that the raw water can only flow into the sixth channel 101 from the second fluid opening 1106 of the plane valve 1. 6, and further flows to the second water inlet 521 of the second water treatment device 52 and flows into the second water treatment device 52 through the third channel 103 and the third opening 1103, and the waste water generated by positively flushing the second water treatment device 52 flows from the second water outlet 522 of the second water treatment device 52 to the fourth opening 1104 of the plane valve 1, and is further discharged through the fourth channel 104, the eighth channel 108, the ninth channel 109 and the sewage opening 1109 of the plane valve 1 under the action of water pressure. In other words, although the seventh channel 107 is connected to the second channel 102 and the fourth channel 104 respectively, since the seventh channel 107 is a conducting blind hole and the first channel 101 is blocked by the second fluid control surface 1220 of the movable valve plate 122, the water flow does not flow through the flow channel formed by them. Accordingly, when the plane valve 1 is in the second positive flushing working position, the first channel 101 of the plane valve 1 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the first opening 1101 of the plane valve 1, so that the flow of water from the first water inlet 511 of the first water treatment device 51 to the first opening 1101 is prevented, so that no water flows in the second opening 1102, and thus the flow of water in the first water treatment device 51 is prevented. In other words, the seventh channel 107 is connected to the second channel 102 and the fourth channel 104 respectively, but because the movable valve plate 122 hinders the flow of water to the first channel 101, the flow of water in the first water treatment device 51 is prevented, thereby ensuring that only the second water treatment device 52 is positively flushed.
[0200] It is worth noting that when the plane valve 1 is in the second positive flushing working position, the first channel 101 is blocked by the second fluid control surface 1220 of the movable valve plate 122, thereby preventing water from flowing through the first opening 1101, so that no water flows in the second opening 1102, and no water flows in the first water treatment device 51, so as to ensure that only the second water treatment device 52 is positively flushed, thereby increasing the intensity of the water flow of the raw water for positively flushing the second water treatment device 52, and preventing the generated sewage from flowing to the first water treatment device 51. Therefore, when the plane valve 1 is in the second positive flushing working position, the second water treatment device 52 of the water treatment machine of the present invention is positively flushed alone.
[0201] As shown in the attached picture Fig.16 and Fig.18F As shown, exemplarily, when the plane valve 1 of the water treatment machine according to the first embodiment of the present invention is controlled to be in the second positive flushing working position, the raw water from the plane valve 1 flows into the second water treatment device 52 from the second water inlet 521 of the second water treatment device 52 under the action of water pressure, and then positively flushes the second water treatment material 525 under the action of water pressure, and the generated sewage is collected by the second central pipe 524, and flows out from the second water outlet 522 of the second water treatment device 52, and flows to the fourth opening 1104 of the plane valve 1 under the action of water pressure, and then flows to the sewage opening 1109 through the fourth positive flushing channel 7204 and is discharged.
[0202] As shown in the attached picture Figure 10M , Fig.10N , Fig.17 and Figure 18G As shown, the plane valve 1 of the water treatment machine according to the first embodiment of the present invention further has a water replenishment working position. When the plane valve 1 is in the water replenishment working position, the sixth channel 106 is connected to the second jet channel 1012, thereby forming the water replenishment flow channel 7401 connected to the second fluid opening 1106 and the second jet opening 11012 respectively. 7A to 7I , Figure 10M , Fig.10N and Figure 18GAs shown, when the planar valve 1 is in the water replenishing working position, the seventh channel 107 of the planar valve 1 is connected with the fourth channel 104, the eighth channel 108 is respectively connected with the ninth channel 109 and the first channel 101, the second channel 102, the third channel 103 and the first jet channel 1011 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. Therefore, when the plane valve 1 of the water treatment machine of the present invention is in the water replenishment working position, the raw water flows in from the second fluid opening 1106 of the valve body 10 of the plane valve 1 under the action of water pressure, flows into the second jet opening 11012 through the sixth channel 106 and the second jet channel 1012, and then flows into the regeneration solution tank 31 through the injection port 183 of the ejector 18, the salt absorption port 181 and the salt absorption pipe 184 in sequence for water replenishment. Although the seventh channel 107 is connected with the fourth channel 104, the seventh channel 107 is a conductive blind hole, so that the fourth channel 104 is blocked by the movable valve plate 122. Although the eighth channel 108 is respectively connected with the ninth channel 109 and the first channel 101, the eighth channel 108 is a conductive through hole, and the second channel 102 is blocked by the second fluid control surface 1220 of the movable valve plate 122, so that the ninth channel 109, the eighth channel 108, the first channel 101, the first opening 1101, the first water treatment device 51, the second opening 1102, and the second channel 102 form a flow channel isolated from the raw water, so that the water flow cannot flow through the first opening 1101, the second opening 1102, the third opening 1103 and the fourth opening 1104. In other words, although the seventh channel 107 is connected to the fourth channel 104, and the eighth channel 108 is connected to the ninth channel 109 and the first channel 101 respectively, a flow channel allowing water to flow through cannot be formed.
[0203] It is worth noting that the traditional plane valve adopts a valve core structure with a single movable valve plate and a single fixed valve plate, and its movable valve plate often requires a water supply conducting blind hole (except for the conducting blind hole for conducting the second opening and the third opening) to guide the water flow to the water outlet. When the water flows in the water supply diversion blind hole, the flow direction changes 360 degrees, which will cause the water flow to encounter greater resistance and cause a great loss of kinetic energy of the water flow, so that the flow rate of the water flow is significantly reduced. The plane valve 1 of the water treatment machine of the present invention adopts a three-valve plate structure. The water flow to the water outlet flows upward from the lower valve plate (the first fixed valve plate 121), and the water outlet is on the upper valve plate (the second fixed valve plate 123). The change in the flow direction of the water flow is small (roughly), and the resistance encountered by the water flow in the process of changing the flow direction is also small, and the loss of water flow is also significantly reduced. Furthermore, the channel for controlling the flow direction of water flow arranged on the fixed valve plate of the existing planar valve with a single fixed valve plate can only be arranged on a single fixed valve plate. In order to realize the corresponding functions of the planar valve, the channel of the fixed valve plate is divided into two circles (except for the central part), and the soft water channel (water outlet channel) is often arranged in the outer circle. Correspondingly, the channel of the movable valve plate is also arranged in two circles, resulting in that the effective flow channel area accounts for too low a total flow control surface area of the entire fixed valve plate and the movable valve plate. In order to ensure the flow rate of water, the diameter of the fixed valve plate and the movable valve plate of the planar valve is large and the volume of the entire planar valve is large. The larger the diameter of the planar valve, the more difficult it is to ensure the stability of the movable valve plate when it rotates. In order to ensure the stability of the entire planar valve, the cross-sectional area of the planar valve becomes larger, and the valve body needs a thicker wall thickness. Since the diameter of the movable valve plate becomes larger accordingly, the thickness of the movable valve plate also needs to be increased accordingly, which not only increases the manufacturing cost of the planar valve, but also makes the entire planar valve more bulky and difficult to operate. The first channel 101, the second channel 102, the third channel 103, the fourth channel 104, the fifth channel 105, the ninth channel 109, the first jet channel 1011 and the second jet channel 1012 of the plane valve 1 of the water treatment machine of the present invention are respectively arranged on the first fixed valve plate 121 and the second fixed valve plate 123, and are arranged in a single circle. The sixth channel 106, the seventh channel 107 and the eighth channel 108 are respectively arranged on the movable valve plate 122, and are also arranged in a single circle, thereby allowing the space occupied by each channel arranged on the fixed valve plate and the movable valve plate to be enlarged and increasing the water flow rate.In other words, the first channel 101, the second channel 102, the third channel 103, the fourth channel 104, the fifth channel 105, the ninth channel 109, the first jet channel 1011 and the second jet channel 1012 of the planar valve 1 of the water treatment machine of the present invention are respectively arranged in a single circle on the first fixed valve plate 121 and the second fixed valve plate 123, and the sixth channel 106, the seventh channel 107 and the eighth channel 108 are respectively arranged in a single circle on the movable valve plate 122, which can significantly reduce the diameter of the fixed and movable valve plates (or the inner diameter of the valve cavity), the thickness of the movable valve plate and the wall thickness of the valve body of the planar valve, thereby reducing the manufacturing cost of the planar valve and making the entire planar valve structure lighter and easier to operate.
[0204] As shown in the attached picture FIG. 6C to FIG. 10NAs shown, the first channel 101 of the plane valve 1 of the water treatment machine according to the first embodiment of the present invention has a first communication portion 10101 and a second communication portion 10102, wherein the first communication portion 10101 of the first channel 101 is connected to the first opening 1101, and the second communication portion 10102 of the first channel 101 is connected to the first opening 1101. Preferably, the first channel 101 of the plane valve 1 further has a third communication portion 10103 extending between the first communication portion 10101 and the second communication portion 10102, the first communication portion 10101 of the first channel 101 is connected to the first opening 1101, and the second communication portion 10102 of the first channel 101 is connected to the first communication portion 10101 through the third communication portion 10103. That is to say, the first communication portion 10101 of the first channel 101 and the second communication portion 10102 of the first channel 101 are both connected to the third communication portion 10103, so that the second communication portion 10102 of the first channel 101 is connected to the first opening 1101 through the third communication portion 10103 and the first communication portion 10101. Preferably, the first jet channel 1011 of the planar valve 1 is arranged outside the third communication portion 10103. The third channel 103 of the planar valve 1 has a first conduction portion 10301 and a second conduction portion 10302, wherein the first conduction portion 10301 of the third channel 103 is connected to the third opening 1103, and the second conduction portion 10302 of the third channel 103 is connected to the third opening 1103. Preferably, the third channel 103 of the planar valve 1 further has a third conducting portion 10303 extending between the first conducting portion 10301 and the second conducting portion 10302, the first conducting portion 10301 of the third channel 103 is connected to the third opening 1103, and the second conducting portion 10302 of the third channel 103 is connected to the first conducting portion 10301 through the third conducting portion 10303. In other words, the first conducting portion 10301 of the third channel 103 and the second conducting portion 10302 of the third channel 103 are both connected to the third conducting portion 10303, so that the second conducting portion 10302 of the third channel 103 is connected to the third opening 1103 through the third conducting portion 10303 and the first conducting portion 10301. Preferably, the second jet channel 1012 of the planar valve 1 is arranged on the outside of the third conducting portion 10303 .When the plane valve 1 is in the water treatment working position, the sixth channel 106 of the plane valve 1 is connected with the first connecting portion 10101 of the first channel 101, the seventh channel 107 is respectively connected with the first conducting portions 10301 of the second channel 102 and the third channel 103, the eighth channel 108 is respectively connected with the fourth channel 104 and the fifth channel 105, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the second connecting portion 10102, the third connecting portion 10103 of the first channel 101, the second conducting portion 10302 and the third conducting portion 10303 of the third channel 103 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the ninth channel 109 is blocked by the third fluid control surface 1223 of the movable valve plate 122. When the planar valve 1 is in the first backwash working position, the sixth channel 106 of the planar valve 1 is connected with the second channel 102, the eighth channel 108 is respectively connected with the ninth channel 109 and the first connecting portion 10101 of the first channel 101, the seventh channel 107 is respectively connected with the second connecting portion 10102 of the first channel 101 and the fourth channel 104, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the third connecting portion 10103 of the first channel 101, the first conducting portion 10301, the second conducting portion 10302 and the third conducting portion 10303 of the third channel 103 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. When the planar valve 1 is in the second backwashing working position, the sixth channel 106 of the planar valve 1 is connected with the fourth channel 104, the eighth channel 108 is respectively connected with the ninth channel 109 and the second conducting portion 10302 of the third channel 103, the seventh channel 107 is respectively connected with the second communicating portion 10102 of the first channel 101 and the first jet channel 1011, the second channel 102 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the first communicating portion 10101 of the first channel 101, the third communicating portion 10103, the first conducting portion 10301 and the third conducting portion 10303 of the third channel 103 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122.When the planar valve 1 is in the regeneration working position, the sixth channel 106 is connected with the first jet channel 1011, the seventh channel 107 is respectively connected with the second jet channel 1012 and the first conducting portion 10301 of the third channel 103, the eighth channel 108 is respectively connected with the ninth channel 109 and the fourth channel 104, the second channel 102 is blocked by the second fluid control surface 1220 of the movable valve plate 122, the first connecting portion 10101 of the first channel 101, the second connecting portion 10102, the third connecting portion 10103, the second conducting portion 10302 and the third conducting portion 10303 of the third channel 103 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. When the planar valve 1 is in the first positive flushing working position, the sixth channel 106 of the planar valve 1 is connected with the second connecting portion 10102 of the first channel 101, the eighth channel 108 is respectively connected with the ninth channel 109 and the second channel 102, the seventh channel 107 is respectively connected with the second conducting portion 10302 of the third channel 103 and the second jet channel 1012, the fourth channel 104 and the first jet channel 1011 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the first connecting portion 10101 of the first channel 101, the third connecting portion 10103, the first conducting portion 10301 and the third conducting portion 10303 of the third channel 103 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. When the planar valve 1 is in the second positive flushing working position, the sixth channel 106 of the planar valve 1 is connected with the second conducting portion 10302 of the third channel 103, the eighth channel 108 is respectively connected with the ninth channel 109 and the fourth channel 104, the seventh channel 107 is respectively connected with the second channel 102 and the fourth channel 104, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the first connecting portion 10101, the second connecting portion 10102, the third connecting portion 10103, the first conducting portion 10301 and the third conducting portion 10303 of the first channel 101 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122.When the plane valve 1 is in the water replenishment working position, the sixth channel 106 is connected with the second jet channel 1012, the seventh channel 107 is connected with the fourth channel 104, the eighth channel 108 is connected with the second connecting portion 10102 of the ninth channel 109 and the first channel 101 respectively, the second channel 102 and the first jet channel 1011 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, the first connecting portion 10101 of the first channel 101, the third connecting portion 10103, the first conducting portion 10301, the second conducting portion 10302 and the third conducting portion 10303 of the third channel 103 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122. Preferably, the third communication portion 10103 of the first channel 101 is disposed on the first fluid control surface 1210 of the first fixed valve disc 121 of the plane valve 1. Optionally, the third communication portion 10103 of the first channel 101 is disposed inside the first fixed valve disc 121 of the plane valve 1. Optionally, the third communication portion 10103 of the first channel 101 is disposed inside the first valve body portion 11 of the plane valve 1. Preferably, the third conduction portion 10303 of the third channel 103 is disposed on the first fluid control surface 1210 of the first fixed valve disc 121 of the plane valve 1. Optionally, the third conduction portion 10303 of the third channel 103 is disposed inside the first fixed valve disc 121 of the plane valve 1. Optionally, the third conduction portion 10303 of the third channel 103 is disposed inside the first valve body portion 11 of the plane valve 1.
[0205] As shown in the attached picture 7A to 9DAs shown, the first fluid control surface 1210 of the first fixed valve plate 121 of the plane valve 1 of the water treatment machine according to the first embodiment of the present invention forms a central portion 12101, an edge portion 12102 extending outward from the central portion 12101, the first connecting portion 10101 of the first channel 101 of the plane valve 1, the second conducting portion 10302 of the third channel 103, the second jet channel 1012, the first conducting portion 10301 of the third channel 103, the second channel 102, the fourth channel 104, the first The second connecting portion 10102 and the first jet channel 1011 of a channel 101 are arranged clockwise in this order on the edge portion 12102 of the first fluid control surface 1210 of the first fixed valve plate 121, the sixth channel 106, the seventh channel 107 and the eighth channel 108 of the planar valve 1 are arranged clockwise in this order on the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 and the ninth channel 109 of the planar valve 1 are arranged on the fourth fluid control surface 1230 of the second fixed valve plate 123. Optionally, the first connecting portion 10101 of the first channel 101 of the planar valve 1, the second conducting portion 10302 of the third channel 103, the second jet channel 1012, the first conducting portion 10301 of the third channel 103, the second channel 102, the fourth channel 104, the second connecting portion 10102 of the first channel 101 and the first jet channel 1011 are arranged counterclockwise in this order on the edge portion 12102 of the first fluid control surface 1210 of the first fixed valve plate 121, and the sixth channel 106, the seventh channel 107 and the eighth channel 108 of the planar valve 1 are arranged counterclockwise in this order on the second fluid control surface 1220 of the movable valve plate 122. Preferably, the first channel 101, the third channel 103, the second jet channel 1012, the second channel 102, the fourth channel 104 and the first jet channel 1011 are separately arranged on the first fluid control surface 1210 of the first fixed valve plate 121; the sixth channel 106, the seventh channel 107 and the eighth channel 108 of the plane valve 1 are separately arranged on the second fluid control surface 1220 of the movable valve plate 122; the fifth channel 105 and the ninth channel 109 of the plane valve 1 are separately arranged on the fourth fluid control surface 1230 of the second fixed valve plate 123. Preferably, the third connecting portion 10103 of the first channel 101 and the third conducting portion 10303 of the third channel 103 are arranged at the central portion 12101 of the first fluid control surface 1210 of the first fixed valve plate 121.
[0206] As shown in the attached picture 7A to 9DAs shown, the first fluid control surface 1210 of the first fixed valve plate 121 of the plane valve 1 of the water treatment machine according to the first embodiment of the present invention has the central portion 12101 and the edge portion 12102 shown by the dotted line in the figure, wherein the central portion 12101 and the edge portion 12102 are arranged at the top end portion 1214 of the first fixed valve plate 121, and the edge portion 12102 of the first fluid control surface 1210 (or the portion outside the central portion 12101) is equally divided into a first portion 1201, a second portion 1202, a third portion 1203, a fourth portion 1204, a fifth portion 1205, a sixth portion 1206, a seventh portion 1207, an eighth portion 1208, a ninth portion 1209 and a tenth portion 12010; the second fluid control surface 1220 of the movable valve plate 122 of the planar valve 1 has a lower end central area 12201 shown by a dashed line in the figure and a lower end edge area 12202 extending outward from the lower end central area 12201, wherein the lower end central area 12201 and the lower end edge area 12202 are arranged at the lower end portion 1221 of the movable valve plate 122, and the lower end edge area 12202 of the second fluid control surface 1220 (the portion outside the lower end central area 12201) is equally divided into a first lower end area 2001, a second lower end area 2002, and a third lower end area 2003 shown by a dashed line. a lower end region 2003, a fourth lower end region 2004, a fifth lower end region 2005, a sixth lower end region 2006, a seventh lower end region 2007, an eighth lower end region 2008, a ninth lower end region 2009 and a tenth lower end region 20010; the third fluid control surface 1223 of the movable valve plate 122 of the plane valve 1 has an upper end center region 12231 shown by a dotted line in the figure and an upper end edge region 12232 extending outward from the upper end center region 12231, wherein the upper end center region 12231 and the upper end edge region 12232 are arranged at the upper end portion 1222 of the movable valve plate 122, and the upper end of the third fluid control surface 1223 The edge region 12232 (the portion outside the upper center region 12231) is equally divided into a first upper region 3001, a second upper region 3002, a third upper region 3003, a fourth upper region 3004, a fifth upper region 3005, a sixth upper region 3006, a seventh upper region 3007, an eighth upper region 3008, a ninth upper region 3009 and a tenth upper region 30010 as indicated by dotted lines; wherein the first lower region 2001 is opposite to the first upper region 3001, the second lower region 2002 is opposite to the second upper region 3002, the third lower region 2003 is opposite to the third upper region 3003,The fourth lower end region 2004 faces the fourth upper end region 3004, the fifth lower end region 2005 faces the fifth upper end region 3005, the sixth lower end region 2006 faces the sixth upper end region 3006, the seventh lower end region 2007 faces the seventh upper end region 3007, the eighth lower end region 2008 faces the eighth upper end region 3008, the ninth lower end region 2009 faces the ninth upper end region 3009, and the tenth lower end region 20010 faces the tenth upper end region 30010; the fourth fluid control surface 1230 of the second fixed valve plate 123 of the planar valve 1 has a central partition 12301 shown by a dotted line in the figure and a central partition 12301 extending outward from the central partition 12301. The first channel 101 extends from the first fixed valve plate 121 to the first fluid control surface 1230, wherein the center partition 12301 and the edge partition 12302 are arranged at the bottom end 1231 of the second fixed valve plate 123, and the edge partition 12302 (the part outside the center partition 12301) of the fourth fluid control surface 1230 is equally divided into a first partition 4001, a second partition 4002, a third partition 4003, a fourth partition 4004, a fifth partition 4005, a sixth partition 4006, a seventh partition 4007, an eighth partition 4008, a ninth partition 4009 and a tenth partition 40010 as shown by dotted lines; wherein the first channel 101 extends from the first fixed valve plate 121 to the first fluid control surface 1230, ... The first portion 1201 and the ninth portion 1209 of the fluid control surface 1210 extend downward, the third channel 103 extends downward from the second portion 1202 and the fourth portion 1204 of the first fluid control surface 1210 of the first fixed valve plate 121, the second jet channel 1012 extends downward from the third portion 1203 of the first fluid control surface 1210 of the first fixed valve plate 121, the second channel 102 extends downward from the fifth portion 1205 of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth channel 104 extends downward from the sixth portion 1206, the seventh portion 1207 and the eighth portion 1208 of the first fluid control surface 1210 of the first fixed valve plate 121 208 extends downward, the first jet channel 1011 extends downward from the tenth portion 12010 of the first fluid control surface 1210 of the first fixed valve plate 121, the sixth channel 106 extends upward and outward from the first lower end area 2001 of the second fluid control surface 1220 of the movable valve plate 122, the seventh channel 107 extends upward from the fourth lower end area 2004 and the fifth lower end area 2005 of the second fluid control surface 1220 of the movable valve plate 122, the eighth channel 108 extends from the seventh lower end area 2007 of the second fluid control surface 1220 of the movable valve plate 122 to the seventh upper end area 3007 of the third fluid control surface 1223 of the movable valve plate 122,The fifth channel 105 extends upward from the seventh partition 4007 of the fourth fluid control surface 1230 of the second fixed valve plate 123, and the ninth channel 109 extends upward from the first partition 4001, the second partition 4002, the third partition 4003, the fourth partition 4004, the fifth partition 4005, the sixth partition 4006, the eighth partition 4008, the ninth partition 4009 and the tenth partition 40010 of the fourth fluid control surface 1230 of the second fixed valve plate 123. More specifically, the first connecting portion 10101 of the first channel 101 extends downward from the first part 1201 of the first fluid control surface 1210 of the first fixed valve plate 121, the second connecting portion 10102 of the first channel 101 extends downward from the ninth part 1209 of the first fluid control surface 1210 of the first fixed valve plate 121, the first conducting portion 10301 of the third channel 103 extends downward from the fourth part 1204 of the first fluid control surface 1210 of the first fixed valve plate 121, and the second conducting portion 10302 of the third channel 103 extends downward from the second part 1202 of the first fluid control surface 1210 of the first fixed valve plate 121. Preferably, the third connecting portion 10103 of the first channel 101 and the third conducting portion 10303 of the third channel 103 extend downward from the central portion 12101 of the first fluid control surface 1210 of the first fixed valve plate 121 respectively.
[0207] As shown in the attached picture 7A to 9DAs shown, preferably, the edge portion 12102 of the first fluid control surface 1210 of the first fixed valve plate 121 of the plane valve 1 is divided clockwise into the first part 1201, the second part 1202, the third part 1203, the fourth part 1204, the fifth part 1205, the sixth part 1206, the seventh part 1207, the eighth part 1208, the ninth part 1209 and the tenth part 12010, the plane valve 1 The lower edge area 12202 of the second fluid control surface 1220 of the movable valve plate 122 is divided clockwise into the first lower end area 2001, the second lower end area 2002, the third lower end area 2003, the fourth lower end area 2004, the fifth lower end area 2005, the sixth lower end area 2006, the seventh lower end area 2007, the eighth lower end area 2008, the ninth lower end area 2009 and the tenth lower end area 200 10, the upper edge area 12232 of the third fluid control surface 1223 of the movable valve plate 122 of the plane valve 1 is divided clockwise into the first upper end area 3001, the second upper end area 3002, the third upper end area 3003, the fourth upper end area 3004, the fifth upper end area 3005, the sixth upper end area 3006, the seventh upper end area 3007, the eighth upper end area 3008, the ninth upper end area 3009 and the In the tenth upper end area 30010, the edge partition 12302 of the fourth fluid control surface 1230 of the second fixed valve plate 123 of the planar valve 1 is divided equally into the first partition 4001, the second partition 4002, the third partition 4003, the fourth partition 4004, the fifth partition 4005, the sixth partition 4006, the seventh partition 4007, the eighth partition 4008, the ninth partition 4009 and the tenth partition 40010 in a clockwise direction.Optionally, the edge portion 12102 of the first fluid control surface 1210 is counterclockwise divided into the first portion 1201, the second portion 1202, the third portion 1203, the fourth portion 1204, the fifth portion 1205, the sixth portion 1206, the seventh portion 1207, the eighth portion 1208, the ninth portion 1209 and the tenth portion 12010, and the second fluid of the movable valve plate 122 of the plane valve 1 The lower edge region 12202 of the control surface 1220 is divided counterclockwise into the first lower region 2001, the second lower region 2002, the third lower region 2003, the fourth lower region 2004, the fifth lower region 2005, the sixth lower region 2006, the seventh lower region 2007, the eighth lower region 2008, the ninth lower region 2009 and the tenth lower region 20010. The upper edge area 12232 of the third fluid control surface 1223 of the movable valve plate 122 is divided counterclockwise into the first upper end area 3001, the second upper end area 3002, the third upper end area 3003, the fourth upper end area 3004, the fifth upper end area 3005, the sixth upper end area 3006, the seventh upper end area 3007, the eighth upper end area 3008, the ninth upper end area 3009 and the tenth upper end area In the domain 30010, the edge partition 12302 of the fourth fluid control surface 1230 of the second fixed valve disc 123 of the plane valve 1 is counterclockwise divided into the first partition 4001, the second partition 4002, the third partition 4003, the fourth partition 4004, the fifth partition 4005, the sixth partition 4006, the seventh partition 4007, the eighth partition 4008, the ninth partition 4009 and the tenth partition 40010. In other words, the first fluid control surface 1210 of the first fixed valve disc 121 of the plane valve 1 forms ten equal parts, the second fluid control surface 1220 of the movable valve disc 122 of the plane valve 1 forms ten equal parts, the third fluid control surface 1223 of the movable valve disc 122 of the plane valve 1 forms ten equal parts, and the fourth fluid control surface 1230 of the second fixed valve disc 123 of the plane valve 1 forms ten equal parts.It can be understood that the second fixed valve plate 123 of the plane valve 1 remains stationary relative to the first fixed valve plate 121, and the first partition 4001 of the fourth fluid control surface 1230 of the second fixed valve plate 123 is directly opposite to the first part 1201 of the first fluid control surface 1210 of the first fixed valve plate 121; the second partition 4002 of the fourth fluid control surface 1230 of the second fixed valve plate 123 is directly opposite to the second part 1202 of the first fluid control surface 1210 of the first fixed valve plate 121; the second fixed valve plate 1 The third partition 4003 of the fourth fluid control surface 1230 of the second fixed valve plate 123 is opposite to the third part 1203 of the first fluid control surface 1210 of the first fixed valve plate 121; the fourth partition 4004 of the fourth fluid control surface 1230 of the second fixed valve plate 123 is opposite to the fourth part 1204 of the first fluid control surface 1210 of the first fixed valve plate 121; the fifth partition 4005 of the fourth fluid control surface 1230 of the second fixed valve plate 123 is opposite to the first fluid control surface 1210 of the first fixed valve plate 121. The fifth part 1205 of the control surface 1210 of the second fixed valve disc 123; the sixth partition 4006 of the fourth fluid control surface 1230 of the second fixed valve disc 123 is opposite to the sixth part 1206 of the first fluid control surface 1210 of the first fixed valve disc 121; the seventh partition 4007 of the fourth fluid control surface 1230 of the second fixed valve disc 123 is opposite to the seventh part 1207 of the first fluid control surface 1210 of the first fixed valve disc 121; the eighth partition 4008 of the fourth fluid control surface 1230 of the second fixed valve disc 123 is opposite to the seventh part 1208 of the first fluid control surface 1210 of the first fixed valve disc 121; Partition 4008 is facing the eighth part 1208 of the first fluid control surface 1210 of the first fixed valve plate 121; the ninth partition 4009 of the fourth fluid control surface 1230 of the second fixed valve plate 123 is facing the ninth part 1209 of the first fluid control surface 1210 of the first fixed valve plate 121; the tenth partition 40010 of the fourth fluid control surface 1230 of the second fixed valve plate 123 is facing the tenth part 12010 of the first fluid control surface 1210 of the first fixed valve plate 121.
[0208] As shown in the attached picture 7A to 9D , Fig. 10A , Fig. 10B and Fig.18AAs shown, when the movable valve plate 122 of the plane valve 1 is rotated to the point where the first equal part (the first lower end area 2001) of the second fluid control surface 1220 of the movable valve plate 122 is aligned with the first equal part (the first part 1201) of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth equal part and the fifth equal part (the fourth lower end area 2004 and the fifth lower end area 2005) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 are aligned with the fourth equal part and the fifth equal part (the fourth part 1201) of the first fluid control surface 1210 of the first fixed valve plate 121 respectively. 4 and the fifth part 1205), the seventh equal part (the seventh lower end area 2007) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 and the seventh equal part (the seventh upper end area 3007) of the third fluid control surface 1223 are respectively aligned with the seventh equal part (the seventh part 1207) of the first fluid control surface 1210 of the first fixed valve plate 121 and the seventh equal part (the seventh partition 4007) of the fourth fluid control surface 1230 of the second fixed valve plate 123, so that the sixth channel 106 of the plane valve 1 is connected to the first channel 101, and the seventh channel 107 is divided The eighth channel 108 is respectively connected to the fourth channel 104 and the fifth channel 105, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the ninth channel 109 is blocked by the third fluid control surface 1223 of the movable valve plate 122, so as to allow raw water to flow in from the second fluid opening 1106 of the valve body 10, flow to the first opening 1101 through the sixth channel 106 and the first channel 101, and further flow into the first water treatment system from the first water inlet 511. The primary treated water after being treated by the first water treatment device 51 flows out from the first water outlet 512 and flows into the second opening 1102, then flows into the third opening 1103 through the second channel 102, the seventh channel 107, and the third channel 103, and further flows into the second water treatment device 52 from the second water inlet 521. The secondary treated water after being treated by the second water treatment device 52 flows out from the second water outlet 522 and flows into the fourth opening 1104, then flows out through the fourth channel 104, the eighth channel 108, the fifth channel 105, and the first fluid opening 1105 and is provided to the user. Accordingly, the water treatment machine is in the water treatment working state at this time.
[0209] As shown in the attached picture 7A to 9D , Fig. 10C , Fig. 10D and Fig.18BAs shown, when the movable valve plate 122 of the plane valve 1 is rotated to the point where the first equal part (the first lower end area 2001) of the second fluid control surface 1220 of the movable valve plate 122 is facing the fifth equal part (the fifth part 1205) of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth equal part and the fifth equal part (the fourth lower end area 2004 and the fifth lower end area 2005) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 are facing the first fluid control surface 1210 of the first fixed valve plate 121 respectively. The eighth and ninth equal parts (the eighth part 1208 and the ninth part 1209) of the body control surface 1210, the seventh equal part (the seventh lower end area 2007) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 and the seventh equal part (the seventh upper end area 3007) of the third fluid control surface 1223 are respectively opposite to the first equal part (the first part 1201) of the first fluid control surface 1210 of the first fixed valve plate 121 and the fourth fluid control surface 1230 of the second fixed valve plate 123. The first equal division (the first partition 4001) of the planar valve 1 makes the sixth channel 106 of the planar valve 1 communicate with the second channel 102, the eighth channel 108 is respectively communicated with the ninth channel 109 and the first channel 101, the seventh channel 107 is respectively communicated with the first channel 101 and the fourth channel 104, the third channel 103, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the movable valve plate The third fluid control surface 1223 of the valve body 122 is blocked to allow raw water to flow in from the second fluid opening 1106 of the valve body 10, flow to the second opening 1102 through the sixth channel 106 and the second channel 102, and further flow into the first water treatment device 51 from the first water outlet 512. The sewage generated after backwashing the first water treatment device 51 flows out from the first water inlet 511, and then is discharged through the first opening 1101, the first channel 101, the eighth channel 108, the ninth channel 109 and the sewage discharge opening 1109. Accordingly, the water treatment machine is in the first backwashing working state at this time.
[0210] As shown in the attached picture 7A to 9D , Fig. 10E , Fig.10F and Fig. 18CAs shown, when the movable valve plate 122 of the plane valve 1 is rotated to the point where the first equal part (the first lower end area 2001) of the second fluid control surface 1220 of the movable valve plate 122 is aligned with the sixth equal part (the sixth part 1206) of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth equal part and the fifth equal part (the fourth lower end area 2004 and the fifth lower end area 2005) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 are aligned with the first lower end area 2006 of the first fixed valve plate 121 respectively. The ninth and tenth equal parts (the ninth part 1209 and the tenth part 12010) of the first fluid control surface 1210, the seventh equal part (the seventh lower end area 2007) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 and the seventh equal part (the seventh upper end area 3007) of the third fluid control surface 1223 are respectively aligned with the second equal part (the second part 1202) of the first fluid control surface 1210 of the first fixed valve plate 121 and the fourth fluid control surface 1223 of the second fixed valve plate 123. The second equal division (the second partition 4002) of the plane valve 1230 makes the sixth channel 106 of the plane valve 1 communicate with the fourth channel 104, the eighth channel 108 is respectively communicated with the ninth channel 109 and the third channel 103, the seventh channel 107 is respectively communicated with the first channel 101 and the first jet channel 1011, the second channel 102 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the movable valve plate 12 2 is blocked to allow raw water to flow in from the second fluid opening 1106 of the valve body 10, flow to the fourth opening 1104 through the sixth channel 106 and the fourth channel 104, and further flow into the second water treatment device 52 from the second water outlet 522. The sewage generated after backwashing the second water treatment device 52 flows out from the second water inlet 521, and then is discharged through the third opening 1103, the third channel 103, the eighth channel 108, the ninth channel 109 and the sewage discharge opening 1109. Accordingly, the water treatment machine is in the second backwashing working state at this time.
[0211] As shown in the attached picture 7A to 9D , Figure 10G , Fig. 10H and Fig.18DAs shown, when the movable valve plate 122 of the plane valve 1 is rotated to the point where the first equal part (the first lower end area 2001) of the second fluid control surface 1220 of the movable valve plate 122 is aligned with the tenth equal part (the tenth part 12010) of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth equal part and the fifth equal part (the fourth lower end area 2004 and the fifth lower end area 2005) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 are aligned with the third equal part and the fourth equal part (the third part 1203 and the fourth part 1204) of the first fluid control surface 1210 of the first fixed valve plate 121, respectively. 4), the seventh equal part (the seventh lower end area 2007) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 and the seventh equal part (the seventh upper end area 3007) of the third fluid control surface 1223 are respectively aligned with the sixth equal part (the sixth part 1206) of the first fluid control surface 1210 of the first fixed valve plate 121 and the sixth equal part (the sixth partition 4006) of the fourth fluid control surface 1230 of the second fixed valve plate 123, so that the sixth channel 106 of the plane valve 1 is connected to the first jet channel 1011, and the seventh channel 107 is respectively connected to the second jet channel 1012 and the third channel The first channel 101 and the second channel 102 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122, so as to allow raw water to flow in from the second fluid opening 1106 of the valve body 10, flow into the first jet opening 11011 through the sixth channel 106 and the first jet channel 1011, and then flow into the ejection port 182 of the ejector 18, pass through the ejector 18 jet, mix with the salt solution (such as sodium chloride) from the salt intake port 181, and then flow into the ejection port 182 of the ejector 18. The regeneration solution is formed after the regeneration solution is removed from the second water inlet 521 through the injection port 183 of the ejector 18, and then flows into the second water inlet 521 through the second jet channel 1012, the seventh channel 107, the third channel 103 and the third opening 1103, and regenerates the water treatment material or mechanism of the second water treatment device 52, such as softening resin, and the waste water generated after regeneration flows out from the second water outlet 522, and then is discharged through the fourth opening 1104, the fourth channel 104, the eighth channel 108, the ninth channel 109 and the sewage opening 1109 of the first valve body 11 in sequence. Accordingly, the water treatment machine is in the regeneration working state at this time.
[0212] As shown in the attached picture 7A to 9D , Fig.10I , Fig.10J and Fig.18E As shown, when the movable valve plate 122 of the plane valve 1 is rotated to the point where the first equal part (the first lower end area 2001) of the second fluid control surface 1220 of the movable valve plate 122 is aligned with the ninth equal part (the ninth part 1209) of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth equal part and the fifth equal part (the fourth lower end area 2004 and the fifth lower end area 2005) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 are aligned with the first lower end area 2006 of the first fixed valve plate 121. The second and third equal parts (the second part 1202 and the third part 1203) of the first fluid control surface 1210, the seventh equal part (the seventh lower end area 2007) of the second fluid control surface 1220 of the movable valve plate 122 of the planar valve 1 and the seventh equal part (the seventh upper end area 3007) of the third fluid control surface 1223 are respectively aligned with the fifth equal part (the fifth part 1205) of the first fluid control surface 1210 of the first fixed valve plate 121 and the fourth fluid control surface 1223 of the second fixed valve plate 123. The fifth equal division (the fifth partition 4005) of the planar valve 1230 is formed so that the sixth channel 106 of the planar valve 1 is connected to the first channel 101, the eighth channel 108 is respectively connected to the ninth channel 109 and the second channel 102, the seventh channel 107 is respectively connected to the third channel 103 and the second jet channel 1012, the fourth channel 104 and the first jet channel 1011 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the movable valve plate 1 The third fluid control surface 1223 of the valve body 10 is blocked to allow raw water to flow in from the second fluid opening 1106 of the valve body 10, flow to the first opening 1101 through the sixth channel 106 and the first channel 101, and further flow into the first water treatment device 51 from the first water inlet 511. The sewage after positive flushing of the first water treatment device 51 flows out from the first water outlet 512, and then is discharged through the second opening 1102, the second channel 102, the eighth channel 108, the ninth channel 109 and the sewage discharge opening 1109. Accordingly, the water treatment machine is in the first positive flushing working state at this time.
[0213] As shown in the attached picture 7A to 9D , Figure 10K , Fig.10L and Fig.18FAs shown, when the movable valve plate 122 of the plane valve 1 is rotated to the point where the first equal part (the first lower end area 2001) of the second fluid control surface 1220 of the movable valve plate 122 is aligned with the second equal part (the second part 1202) of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth and fifth equal parts (the fourth lower end area 2004 and the fifth lower end area 2005) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 are aligned with the first fluid control surface 1210 of the first fixed valve plate 121, respectively. The fifth and sixth equal parts (the fifth part 1205 and the sixth part 1206) of the fluid control surface 1210, the seventh equal part (the seventh lower end area 2007) of the second fluid control surface 1220 of the movable valve plate 122 of the planar valve 1 and the seventh equal part (the seventh upper end area 3007) of the third fluid control surface 1223 are respectively opposite to the eighth equal part (the eighth part 1208) of the first fluid control surface 1210 of the first fixed valve plate 121 and the fourth fluid control surface 123 of the second fixed valve plate 123. 0 is divided into the eighth equal part (the eighth partition 4008), so that the sixth channel 106 of the plane valve 1 is connected to the third channel 103, the eighth channel 108 is respectively connected to the ninth channel 109 and the fourth channel 104, the seventh channel 107 is respectively connected to the second channel 102 and the fourth channel 104, the first channel 101, the first jet channel 1011 and the second jet channel 1012 are respectively blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the movable valve The third fluid control surface 1223 of the plate 122 is blocked to allow raw water to flow in from the second fluid opening 1106 of the valve body 10, flow to the third opening 1103 through the sixth channel 106 and the third channel 103, and further flow into the second water treatment device 52 from the second water inlet 521. The sewage after positively flushing the second water treatment device 52 flows out from the second water outlet 522, and then is discharged through the fourth opening 1104, the fourth channel 104, the eighth channel 108, the ninth channel 109 and the sewage discharge opening 1109. Accordingly, the water treatment machine is in the second positive flushing working state at this time.
[0214] As shown in the attached picture 7A to 9D , Figure 10M , Fig.10N and Figure 18GAs shown, when the movable valve plate 122 of the plane valve 1 is rotated to the point where the first equal part (the first lower end area 2001) of the second fluid control surface 1220 of the movable valve plate 122 is facing the third equal part (the third part 1203) of the first fluid control surface 1210 of the first fixed valve plate 121, the fourth equal part and the fifth equal part (the fourth lower end area 2004 and the fifth lower end area 2005) of the second fluid control surface 1220 of the movable valve plate 122 of the plane valve 1 are respectively The sixth and seventh portions (the sixth portion 1206 and the seventh portion 1207) of the first fluid control surface 1210 of the first fixed valve disc 121, the seventh portion (the seventh lower end region 2007) of the second fluid control surface 1220 of the movable valve disc 122 of the planar valve 1 and the seventh portion (the seventh upper end region 3007) of the third fluid control surface 1223 are respectively aligned with the ninth portion ( The ninth part 1209) and the ninth equal part (the ninth partition 4009) of the fourth fluid control surface 1230 of the second fixed valve plate 123, so that the sixth channel 106 of the plane valve 1 is connected to the second jet channel 1012, the seventh channel 107 is connected to the fourth channel 104, the eighth channel 108 is connected to the ninth channel 109 and the first channel 101 respectively, and the second channel 102, the third channel 103 and the first jet channel 1011 are respectively connected. The fifth channel 105 is blocked by the second fluid control surface 1220 of the movable valve plate 122, and the fifth channel 105 is blocked by the third fluid control surface 1223 of the movable valve plate 122, so as to allow raw water to flow in from the second fluid opening 1106 of the valve body 10, flow into the second jet opening 11012 through the sixth channel 106 and the second jet channel 1012, and then flow into the regeneration solution tank 31 through the injection port 183, the salt absorption port 181 and the salt absorption pipe 184 of the ejector 18 in sequence for water replenishment. Accordingly, the water treatment machine is in the water replenishment working state at this time.
[0215] It can be understood that when the second fluid control surface 1220 and the third fluid control surface 1223 of the movable valve plate 122 are respectively arranged on the first fluid control surface 1210 of the first fixed valve plate 121 and the fourth fluid control surface 1230 of the second fixed valve plate 123, the lower end center area 12201 of the second fluid control surface 1220 of the movable valve plate 122 is aligned with the center part 12101 of the first fluid control surface 1210 of the first fixed valve plate 121, and the lower end center area 12201 of the second fluid control surface 1220 of the movable valve plate 122 is aligned with the center part 12101 of the first fluid control surface 1210 of the first fixed valve plate 121. The end edge area 12202 is opposite to the edge portion 12102 of the first fluid control surface 1210 of the first fixed valve plate 121, the upper center area 12231 of the third fluid control surface 1223 of the movable valve plate 122 is opposite to the center partition 12301 of the fourth fluid control surface 1230 of the second fixed valve plate 123, and the upper edge area 12232 of the third fluid control surface 1223 of the movable valve plate 122 is opposite to the edge partition 12302 of the fourth fluid control surface 1230 of the second fixed valve plate 123.
[0216] Optionally, the first fluid control surface 1210 of the first fixed valve plate 121 of the plane valve 1, the fourth fluid control surface 1230 of the second fixed valve plate 123, the second fluid control surface 1220 of the movable valve plate 122 and the third fluid control surface 1223 are all circular, and the first connecting portion 10101 of the first channel 101 of the plane valve 1, the second conducting portion 10302 of the third channel 103, the second jet channel 1012, the first conducting portion 10301 of the third channel 103, the second channel 102, the fourth channel 104, the first channel 101 The two connecting parts 10102 and the first jet channel 1011 are both radially arranged on the first fluid control surface 1210 of the first fixed valve plate 121, the sixth channel 106 and the seventh channel 107 of the planar valve 1 are both radially arranged on the second fluid control surface 1220 of the movable valve plate 122, the eighth channel 108 of the planar valve 1 is radially arranged on the second fluid control surface 1220 and the third fluid control surface 1223 of the movable valve plate 122, and the fifth channel 105 and the ninth channel 109 of the planar valve 1 are both radially arranged on the fourth fluid control surface 1230 of the second fixed valve plate 123.
[0217] Preferably, the first channel 101 of the plane valve 1 extends downward and outward from the first fluid control surface 1210 of the first fixed valve plate 121, the third channel 103 extends downward and outward from the first fluid control surface 1210 of the first fixed valve plate 121, the second jet channel 1012 extends downward and outward from the first fluid control surface 1210 of the first fixed valve plate 121, and the second channel 102 extends downward and outward from the first fluid control surface 1210 of the first fixed valve plate 121. The fourth channel 104 extends downward and outward from the first fluid control surface 1210 of the first fixed valve plate 121, the first jet channel 1011 extends downward and outward from the first fluid control surface 1210 of the first fixed valve plate 121, the fifth channel 105 of the planar valve 1 extends upward and outward from the fourth fluid control surface 1230 of the second fixed valve plate 123, and the ninth channel 109 extends upward and outward from the fourth fluid control surface 1230 of the second fixed valve plate 123.
[0218] As shown in the attached picture FIG. 6A to FIG. 6R As shown, the first valve body portion 11 of the planar valve 1 has a first inner wall 111, and the second valve body portion 13 has a second inner wall 131, wherein the first fixed valve plate 121 is suitable for being arranged in the valve cavity 110 with the first fluid control surface 1210 facing upward, the movable valve plate 122 is suitable for being arranged in the valve cavity 110 with the second fluid control surface 1220 facing downward (the third fluid control surface 1223 facing upward), and the second fixed valve plate 123 is suitable for being arranged in the valve cavity 110 with the fourth fluid control surface 1230 facing downward, wherein the valve cavity 110 is always connected to the sixth channel 106. It is worth noting that the first fixed valve plate 121 of the planar valve 1 can be detachably set on the first inner wall 111 of the first valve body portion 11, or it can be integrally formed with the first inner wall 111 of the first valve body portion 11 of the planar valve 1; the second fixed valve plate 123 of the planar valve 1 can be detachably set on the second inner wall 131 of the second valve body portion 13, or it can be integrally formed with the second inner wall 131 of the second valve body portion 13 of the planar valve 1. Those skilled in the art can understand that when the first fixed valve disc 121 is detachably disposed in the first valve body 11, a fixing mechanism is used between the first fixed valve disc 121 and the first valve body 11 to keep the first fixed valve disc 121 and the first valve body 11 synchronized; when the second fixed valve disc 123 is detachably disposed in the second valve body 13, another fixing mechanism is used between the second fixed valve disc 123 and the second valve body 13 to keep the second fixed valve disc 123 and the second valve body 13 synchronized. For example, as shown in the accompanying drawings FIG. 6A to FIG. 6RAs shown, the first fixed valve disc 121 has a first brake member 1213 protruding outward from the edge of the first fixed valve disc 121, and the first inner wall 111 of the first valve body 11 has a first brake portion 1110, wherein the first brake member 1213 of the first fixed valve disc 121 is configured to be able to engage with the first brake portion 1110 of the first inner wall 111 of the first valve body 11, so as to ensure that the first fixed valve disc 121 and the first valve body 11 are synchronized (or do not rotate relative to each other) and ensure that each channel arranged on the first fixed valve disc 121 is connected to the corresponding opening arranged on the first valve body 11 The second fixed valve disc 123 has a second stopper 1233 protruding outward from the edge of the second fixed valve disc 123, and the second inner wall 131 of the second valve body 13 has a second stopper 1310, wherein the second stopper 1233 of the second fixed valve disc 123 is configured to be able to engage with the second stopper 1310 of the second inner wall 131 of the second valve body 13, so as to ensure that the second fixed valve disc 123 and the second valve body 13 are synchronized (or do not rotate relative to each other) and ensure that each channel provided in the second fixed valve disc 123 is connected with the corresponding opening provided in the second valve body 13. It can be understood that when the first fixed valve disc 121 is detachably provided in the first valve body 11, the first fixed valve disc 121 can be manufactured separately, and when the second fixed valve disc 123 is detachably provided in the second valve body 13, the second fixed valve disc 123 can be manufactured separately. In other words, at this time, the first fixed valve plate 121 and the second fixed valve plate 123 can be made of wear-resistant materials, thereby improving the service life of the first fixed valve plate 121 and the second fixed valve plate 123 (or the entire plane valve). Preferably, the first fluid control surface 1210 of the first fixed valve plate 121 and the fourth fluid control surface 1230 of the second fixed valve plate 123 are smoothed to reduce their roughness.
[0219] As shown in the attached picture Figure 5 and Fig.6O As shown, the planar valve 1 further includes a driving element 17 extending upward from the movable valve disc 122 through the second fixed valve disc 123, wherein the driving element 17 is configured to drive the movable valve disc 122 of the planar valve 1 to rotate relative to the first fixed valve disc 121 and the second fixed valve disc 123. It can be understood that the driving element 17 can be any element or component that can drive the movable valve disc 122 to rotate relative to the first fixed valve disc 121 and the second fixed valve disc 123. For example, the driving element 17 can be a valve stem, a driving gear, or a driving gear set.
[0220] As shown in the attached picture FIG. 6C to FIG. 6R and FIG. 11A to FIG. 17As shown, the diameter of the movable valve plate 122 of the planar valve 1 is set to be slightly smaller than the diameter of the valve cavity 110 of the valve body 10, so that the sixth channel 106 of the planar valve 1 can remain connected to the valve cavity 110 of the valve body 10.
[0221] Reference to the attached drawings of the specification Figure 3A To Figure 3F and Figure 20 to Figure 22 , a water treatment machine according to a second embodiment of the present invention is illustrated, wherein the water treatment machine of the present invention includes a control valve 1B, a first water treatment device 51 and a second water treatment device 52, wherein the first water treatment device 51 has a first water inlet 511 and a first water outlet 512, so that water can flow in through the first water inlet 511 of the first water treatment device 51 and flow out through the first water outlet 512 or can flow in through the first water outlet 512 of the first water treatment device 51 and flow out through the first water inlet 511; the second water treatment device 52 has a A second water inlet 521 and a second water outlet 522 are provided so that water can flow in through the second water inlet 521 of the second water treatment device 52 and flow out through the second water outlet 522 or can flow in through the second water outlet 522 of the second water treatment device 52 and flow out through the second water inlet 521. The control valve 1B is configured to control the flow of water, such as controlling the water flow to be provided to the first water treatment device 51 and / or the second water treatment device 52, controlling the flow of water in the first water treatment device 51 and the second water treatment device 52, and controlling the provision of treated water. It can be understood that the control valve 1B of the water treatment machine of the present invention is suitable for being connected to a water source. For example, the control valve 1B of the water treatment machine of the present invention can be connected to a tap water pipe. In other words, the control valve 1B controls raw water (e.g., tap water) to be provided to the first water treatment device 51 and / or the second water treatment device 52.
[0222] As shown in the attached picture Figure 3A and Figure 3BAs shown, exemplarily, the first water treatment device 51 of the water treatment machine according to the second embodiment of the present invention includes a first outer shell 513, a first central tube 514 and a first water treatment material 515, the first outer shell 513 has a first end 5131 and a first shell body 5132 extending from the first end 5131, the first central tube 514 has a first tube upper end 5141 and a first tube lower end 5142, the first water inlet 511 is formed between the first end 5131 and the first tube upper end 5141, the first tube upper end 5141 forms the first water outlet 512, the first water treatment material 515 is arranged between the first outer shell 513 and the first central tube 514, wherein the first central tube 514 is arranged so that the primary treated water generated after the raw water is treated by the first water treatment material 515 can be collected by the first central tube 514. It can be understood that the first water treatment material 515 of the first water treatment device 51 of the water treatment machine of the second embodiment of the present invention can be a filter material, such as activated carbon, PP cotton or quartz sand. It can be understood that the first water treatment material 515 of the first water treatment device 51 of the water treatment machine of the second embodiment of the present invention can be a dispersed distribution filter material, or a molded filter material obtained by various molding techniques. The first water treatment material 515 of the first water treatment device 51 of the water treatment machine of the second embodiment of the present invention may also be a softening material, such as a softening resin.
[0223] As shown in the attached picture Figure 3C and Figure 3DAs shown, exemplarily, the second water treatment device 52 of the water treatment machine according to the second embodiment of the present invention includes a second outer shell 523, a second central tube 524 and a second water treatment material 525, the second outer shell 523 has a second end 5231 and a second shell body 5232 extending from the second end 5231, the second central tube 524 has a second tube upper end 5241 and a second tube lower end 5242 extending downward from the second tube upper end 5241, the second water inlet 521 is formed between the second end 5231 of the second outer shell 523 and the second tube upper end 5241, the second tube upper end 5241 forms the second water outlet 522, the second water treatment material 525 is arranged between the second outer shell 523 and the second central tube 524, wherein the second central tube 524 is arranged so that the secondary treated water generated after the primary treated water flowing in from the second water inlet 521 is treated by the second water treatment material 525 can be collected by the second central tube 524. Preferably, the second water treatment material 525 of the second water treatment device 52 of the water treatment machine of the second embodiment of the present invention is a softening material, such as a softening resin. It is understood that the second water treatment material 525 of the second water treatment device 52 of the water treatment machine of the second embodiment of the present invention may also be a filter material, such as activated carbon, PP cotton or quartz sand. It is understood that the second water treatment material 525 of the second water treatment device 52 of the water treatment machine of the second embodiment of the present invention may be a dispersed filter material, or a molded filter material obtained by various molding techniques. As shown in the accompanying drawings Figure 3A As shown, when the first water treatment device 51 of the water treatment machine according to the second embodiment of the present invention is used for water treatment or the first water treatment device 51 is forward flushed (positive flushing), water flows into the first water treatment device 51 from the first water inlet 511, and then flows through the first end 5131, the first water treatment material 515, the first tube lower end 5142, the first center tube 514 and the first tube upper end 5141 in sequence and flows out from the first water outlet 512; as shown in the accompanying drawings Figure 3B As shown, when the first water treatment device 51 of the water treatment machine according to the second embodiment of the present invention is backwashed (backwashed), water flows into the first water treatment device 51 from the first water outlet 512, and then flows through the first tube upper end 5141, the first center tube 514, the first tube lower end 5142, the first water treatment material 515 and the first end 5131 in sequence and flows out from the first water inlet 511.
[0224] As shown in the attached picture Figure 3CAs shown, when the second water treatment device 52 of the water treatment machine according to the second embodiment of the present invention is used as a purification filter element (or softening filter element) to purify water (or soften water) or the second water treatment device 52 is forward flushed (positive flushed), water flows into the second water treatment device 52 from the second water inlet 521, and then flows through the second end 5231, the second water treatment material 525, the second tube lower end 5242, the second center tube 524 and the second tube upper end 5241 in sequence and flows out from the second water outlet 522; as shown in the accompanying drawings Figure 3D As shown, when the second water treatment device 52 of the water treatment machine according to the second embodiment of the present invention is backwashed (backwashed) as a purification filter element (or softening filter element), water flows into the second water treatment device 52 from the second water outlet 522, and then flows through the second tube upper end 5241, the second center tube 524, the second tube lower end 5242, the second water treatment material 525 and the second end 5231 in sequence and flows out from the second water inlet 521. As shown in the accompanying drawings Figure 3D As shown, when the second water treatment device 52 of the water treatment machine according to the second embodiment of the present invention is used as a softening filter element to be regenerated by countercurrent salt absorption, the regeneration solution flows into the second water treatment device 52 from the second water outlet 522, and then flows through the second tube upper end 5241, the second center tube 524, the second tube lower end 5242, the second water treatment material 525 and the second end 5231 in sequence and flows out from the second water inlet 521.
[0225] As shown in the attached picture Figure 20 to Figure 25R As shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention includes a valve body 10B and a valve core 12B, wherein the valve body 10B forms a valve cavity 110B, a first opening 1101B, a second opening 1102B, a third opening 1103B, a fourth opening 1104B, a first fluid opening 1105B, a second fluid opening 1106B and a sewage discharge opening 1109B, wherein the valve core 12B is arranged in the valve cavity 110B, wherein the first opening 1101B of the valve body 10B The opening 1101B is suitable for being connected to the first water inlet 511 of the first water treatment device 51, the second opening 1102B is suitable for being connected to the first water outlet 512 of the first water treatment device 51, the third opening 1103B is suitable for being connected to the second water inlet 521 of the second water treatment device 52, the fourth opening 1104B is suitable for being connected to the second water outlet 522 of the second water treatment device 52, and the second fluid opening 1106B of the valve body 10B is suitable for being connected to a raw water source (for example, tap water).
[0226] As shown in the attached picture Figures 20 to 25FAs shown, preferably, the second water treatment device 52 of the water treatment machine according to the second embodiment of the present invention is a water softening device, the control valve 1B further has an ejector 18B, and the valve body 10B of the control valve 1B further forms a first ejection opening 11011B, wherein the ejector 18B has an ejection port 182B suitable for communicating with the first ejection opening 11011B. Figures 20 to 25F As shown, the valve body 10B of the control valve 1B further forms a second jet opening 11012B, and the ejector 18B further has an ejection port 183B suitable for being connected to the second jet opening 11012B and a salt absorption port 181B respectively connected to the ejection port 182B and the ejection port 183B, so that when water flow, such as raw water flow, flows from the ejection port 182B of the ejector 18B to the ejection port 183B of the ejector 18B, negative pressure occurs at the salt absorption port 181B of the ejector 18B, so that the regeneration solution can flow from the salt absorption port 181B of the ejector 18B to the ejection port 183B of the ejector 18B.
[0227] As shown in the attached picture Fig. 20 , Fig.21 and Fig.24 As shown, the water treatment machine according to the second embodiment of the present invention further includes a salt absorption pipe 184 and a regeneration solution tank 31, wherein one end of the salt absorption pipe 184 is connected to the salt absorption port 181B, and the other end of the salt absorption pipe 184 is connected to the regeneration solution tank 31, so that the salt solution can be provided to the salt absorption port 181B through the salt absorption pipe 184 or the water flow can flow from the salt absorption port 181B and flow through the salt absorption pipe 184 to the regeneration solution tank 31 to replenish the regeneration solution tank 31. It can be understood that the regeneration solution is generally a salt solution.
[0228] As shown in the attached picture Figures 23 to 27CAs shown, more specifically, the control valve 1B of the water treatment machine according to the second embodiment of the present invention is a plane valve, wherein the valve core 12B of the plane valve 1B further includes a first fixed valve plate 121B, a movable valve plate 122B and a second fixed valve plate 123B, wherein the first fixed valve plate 121B has a first fluid control surface 1210B, the movable valve plate 122B has a second fluid control surface 1220B and a third fluid control surface 1223B, and the second fixed valve plate 123B has a fourth fluid control surface 1230B, wherein the first fixed valve plate 121B, the movable valve plate 122B and the second fixed valve plate 1 23B are all arranged in the valve cavity 110B, wherein the second fluid control surface 1220B and the third fluid control surface 1223B of the movable valve plate 122B are respectively formed on the opposite sides of the movable valve plate 122B, wherein the second fluid control surface 1220B of the movable valve plate 122B is arranged on the first fluid control surface 1210B of the first fixed valve plate 121B, the fourth fluid control surface 1230B of the second fixed valve plate 123B is arranged on the third fluid control surface 1223B of the movable valve plate 122B, and the movable valve plate 122B is arranged to be able to rotate relative to the first fixed valve plate 121B and the second fixed valve plate 123B. Correspondingly, the first fixed valve disc 121B is disposed between the valve body 10B and the movable valve disc 122B, the second fixed valve disc 123B is disposed between the valve body 10B and the movable valve disc 122B, and the first fixed valve disc 121B is disposed to remain relatively still with the valve body 10B, and the second fixed valve disc 123B is disposed to remain relatively still with the valve body 10B. Preferably, the second fluid opening 1106B is communicated with the valve cavity 110B of the valve body 10B.
[0229] As shown in the attached picture Figure 23 to Figure 25R , Fig.38A and Fig.38B As shown, the valve body 10B of the control valve 1B of the water treatment machine according to the second embodiment of the present invention includes a first valve body portion 11B and a second valve body portion 13B, wherein the valve chamber 110B is formed between the first valve body portion 11B and the second valve body portion 13B, the first opening 1101B, the second opening 1102B, the third opening 1103B, the fourth opening 1104B, the first jet opening 11011B and the second jet opening 11012B are formed in the first valve body portion 11B, the first fluid opening 1105B and the sewage opening 1109B are formed in the second valve body portion 13B, and the second fluid opening 1106B is selectively arranged in the first valve body portion 11B or the second valve body portion 13B of the valve body 10B. In other words, the second fluid opening 1106B may be disposed in the first valve body portion 11B of the valve body 10B, or may be disposed in the second valve body portion 13B of the valve body 10B.
[0230] As shown in the attached picture Fig. 30A , Fig. 30B and Fig.37AAs shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention has a water treatment working position, wherein when the control valve 1B of the water treatment machine of the present invention is in the water treatment working position, the valve core 12B of the control valve 1B forms a first water treatment flow channel 7001B, a second water treatment flow channel 7002B and a third water treatment flow channel 7003B, wherein the first water treatment flow channel 7001B is respectively connected to the second fluid opening 1106B and the first opening 1101B, the second water treatment flow channel 7002B is respectively connected to the second opening 1102B and the third opening 1103B, and the third water treatment flow channel 7003B is respectively connected to the fourth opening 1104B and the first fluid opening 1105B. Accordingly, when the control valve 1B of the water treatment machine of the present invention is in the water treatment working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the control valve 1B under the action of water pressure, flows to the first opening 1101B of the first valve body 11B through the first water treatment flow channel 7001B, and further flows into the first water treatment device 51 from the first water inlet 511 under the action of water pressure, and the primary treated water obtained after being treated by the first water treatment device 51 flows out from the first water outlet 512 and further The water flows into the second opening 1102B of the first valve body 11B, then flows into the third opening 1103B of the first valve body 11B through the second water treatment channel 7002B, and further flows into the second water treatment device 52 from the second water inlet 521. The secondary treated water treated by the second water treatment device 52 flows out from the second water outlet 522, and under the action of water pressure, further flows into the fourth opening 1104B, and then flows to the first fluid opening 1105B through the third water treatment channel 7003B and is provided. Correspondingly, when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the water treatment working position, the water flows sequentially through the second fluid opening 1106B of the valve body 10B, the first water treatment flow channel 7001B, the first opening 1101B of the first valve body portion 11B, the first water inlet 511 of the first water treatment device 51, the first water outlet 512 of the first water treatment device 51, the second opening 1102B of the first valve body portion 11B, The second water treatment channel 7002B, the third opening 1103B of the first valve body 11B, the second water inlet 521 of the second water treatment device 52, the second water outlet 522 of the second water treatment device 52, the fourth opening 1104B of the first valve body 11B, the third water treatment channel 7003B and the first fluid opening 1105B, so that the control valve 1B of the water treatment machine of the present invention can control the two water treatment devices of the water treatment machine of the present invention in series.It can be understood that when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the water treatment working position, the water treatment machine of the present invention is controlled to be in its water treatment working state.
[0231] As shown in the attached picture Fig.31 and Fig.37B As shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention has a first backwash working position, wherein when the control valve 1B of the water treatment machine of the present invention is in the first backwash working position, the valve core 12B of the control valve 1B forms a first backwash flow channel 7101B and a second backwash flow channel 7102B, wherein the first backwash flow channel 7101B is respectively connected to the second fluid opening 1106B and the second opening 1102B, and the second backwash flow channel 7102B is respectively connected to the sewage opening 1109B and the first opening 1101B. Correspondingly, when the control valve 1B of the water treatment machine of the present invention is in the first backwash working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the control valve 1B under the action of water pressure, flows to the second opening 1102B through the first backwash channel 7101B, and further flows into the first water treatment device 51 from the first water outlet 512. The sewage generated after backwashing the first water treatment device 51 flows out from the first water inlet 511, and is then discharged through the first opening 1101B, the second backwash channel 7102B and the sewage opening 1109B. Preferably, the control valve 1B of the water treatment machine according to the second embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106B of the valve body 10B of the control valve 1B to the third opening 1103B, the fourth opening 1104B, the first jet opening 11011B and the second jet opening 11012B when the control valve 1B is controlled to be in the first backwashing working position. More preferably, when the control valve 1B of the water treatment machine of the present invention is controlled to be in the first backwashing working position, the flow of water in the third opening 1103B and the fourth opening 1104B is prevented, thereby preventing the flow of water in the second water treatment device 52. More specifically, when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the first backwashing working position, water cannot flow from the third opening 1103B or the fourth opening 1104B of the first valve body 11B to the second water treatment device 52, thereby ensuring that the raw water can and can only backwash the first water treatment device 51. It can be understood that when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the first backwashing working position, the water treatment machine of the present invention is controlled to be in its first backwashing working state to backwash the first water treatment device 51 of the water treatment machine of the present invention.
[0232] As shown in the attached picture Fig.32 and Fig.37C As shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention has a second backwash working position, wherein when the control valve 1B of the water treatment machine of the present invention is in the second backwash working position, the valve core 12B of the control valve 1B forms a third backwash flow channel 7103B and a fourth backwash flow channel 7104B, wherein the third backwash flow channel 7103B is respectively connected to the second fluid opening 1106B and the fourth opening 1104B, and the fourth backwash flow channel 7104B is respectively connected to the sewage opening 1109B and the third opening 1103B. Correspondingly, when the control valve 1B of the water treatment machine of the present invention is in the second backwash working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the control valve 1B under the action of water pressure, flows to the fourth opening 1104B through the third backwash channel 7103B, and further flows into the second water treatment device 52 from the second water outlet 522. The sewage generated after backwashing the second water treatment device 52 flows out from the second water inlet 521, and is then discharged through the third opening 1103B, the fourth backwash channel 7104B and the sewage opening 1109B. Preferably, the control valve 1B of the water treatment machine according to the second embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106B of the valve body 10B of the control valve 1B to the first opening 1101B, the second opening 1102B, the first jet opening 11011B and the second jet opening 11012B when the control valve 1B is controlled to be in the second backwashing working position. More preferably, when the control valve 1B of the water treatment machine of the present invention is controlled to be in the second backwashing working position, the flow of water in the first opening 1101B and the second opening 1102B is prevented, thereby preventing the flow of water in the first water treatment device 51. More specifically, when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the second backwashing working position, water cannot flow from the first opening 1101B or the second opening 1102B of the first valve body 11B to the first water treatment device 51, thereby ensuring that the raw water can and can only backwash the second water treatment device 52. It can be understood that when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the second backwashing working position, the water treatment machine of the present invention is controlled to be in its second backwashing working state to backwash the second water treatment device 52 of the water treatment machine of the present invention.
[0233] It can be understood that backwashing in this article refers to the situation where when water flows through the water treatment device of the water treatment machine of the present invention (the first water treatment device 51 or the second water treatment device 52) to flush the water treatment device of the water treatment machine of the present invention, the flow direction of the water flowing through the water treatment device of the water treatment machine of the present invention is opposite to the flow direction of the raw water flowing through the water treatment device of the water treatment machine of the present invention when the water treatment device of the water treatment machine of the present invention treats the raw water.
[0234] As shown in the attached picture Fig.33A , Fig.33B and Fig.37DAs shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention has a regeneration working position, wherein when the control valve 1B of the water treatment machine of the present invention is in the regeneration working position, the valve core 12B of the control valve 1B forms a first regeneration flow channel 7301B, a second regeneration flow channel 7302B and a third regeneration flow channel 7303B, wherein the first regeneration flow channel 7301B is respectively connected to the second fluid opening 1106B and the first jet opening 11011B of the valve body 10B, the second regeneration flow channel 7302B is respectively connected to the second jet opening 11012B and the fourth opening 1104B, and the third regeneration flow channel 7303B is respectively connected to the sewage opening 1109B and the third opening 1103B. Accordingly, when the control valve 1B of the water treatment machine of the present invention is in the regeneration working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the control valve 1B under the action of water pressure, flows through the first regeneration flow channel 7301B to the first jet opening 11011B of the first valve body 11B, and then flows into the jet port 182B of the ejector 18B, passes through the ejector 18B jet, and is mixed with the salt solution (such as sodium chloride solution) from the salt absorption port 181B to form a regeneration solution, and the regeneration solution passes through the jet port 182B of the ejector 18B. 83B flows into the second jet opening 11012B of the first valve body 11B, and then flows into the fourth opening 1104B of the first valve body 11B through the second regeneration channel 7302B. The regeneration solution flows into the second water treatment device 52 from the second water outlet 522, and countercurrently regenerates the second water treatment material 525. After the resin is softened, the waste water generated after regeneration flows out from the second water inlet 521, and then flows out through the third opening 1103B of the first valve body 11B, the third regeneration channel 7303B and the sewage opening 1109B in sequence. Preferably, the control valve 1B of the water treatment machine according to the second embodiment of the present invention is configured to prevent the regeneration solution from flowing to the first opening 1101B and the second opening 1102B, and prevent the raw water from flowing from the second fluid opening 1106B of the valve body 10B of the control valve 1B to the first opening 1101B and the second opening 1102B when the control valve 1B is controlled to be in the regeneration working position. More preferably, when the control valve 1B of the water treatment machine of the present invention is controlled to be in the regeneration working position, the flow of water in the first opening 1101B and the second opening 1102B is prevented, thereby preventing the flow of water in the first water treatment device 51. More specifically, when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the regeneration working position, water cannot flow from the first opening 1101B or the second opening 1102B of the first valve body 11B to the first water treatment device 51, thereby ensuring that the regeneration solution can and can only flow to the second water treatment device 52.The countercurrent regeneration herein means that when the regeneration working position is reached, the flow direction of the regeneration solution in the second water treatment device 52 is opposite to the flow direction of the water flow in the second water treatment device 52 when the control valve 1B is in the water treatment working position. It can be understood that when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the regeneration working position, the water treatment machine of the present invention is controlled to be in its regeneration working state.
[0235] As shown in the attached picture Fig.34 and Fig.37EAs shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention has a first positive flushing working position, wherein when the control valve 1B of the water treatment machine of the present invention is in the first positive flushing working position, the valve core 12B of the control valve 1B forms a first positive flushing flow channel 7201B and a second positive flushing flow channel 7202B, wherein the first positive flushing flow channel 7201B is respectively connected to the second fluid opening 1106B and the first opening 1101B, and the second positive flushing flow channel 7202B is respectively connected to the sewage opening 1109B and the second opening 1102B. Correspondingly, when the control valve 1B of the water treatment machine of the present invention is in the first positive flushing working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the control valve 1B under the action of water pressure, flows to the first opening 1101B through the first positive flushing channel 7201B, and further flows into the first water treatment device 51 from the first water inlet 511. The sewage after positive flushing the first water treatment device 51 flows out from the first water outlet 512, and is then discharged through the second opening 1102B, the second positive flushing channel 7202B and the sewage opening 1109B. Preferably, the control valve 1B of the water treatment machine according to the second embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106B of the valve body 10B of the control valve 1B to the third opening 1103B, the fourth opening 1104B, the first jet opening 11011B and the second jet opening 11012B when the control valve 1B is controlled to be in the first positive flushing working position. More preferably, when the control valve 1B of the water treatment machine of the present invention is controlled to be in the first positive flushing working position, the flow of water in the third opening 1103B and the fourth opening 1104B is prevented, thereby preventing the flow of water in the second water treatment device 52. More specifically, when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the first positive flushing working position, water cannot flow from the third opening 1103B or the fourth opening 1104B of the first valve body 11B to the second water treatment device 52, thereby ensuring that the raw water can and can only positively flush the first water treatment device 51. It can be understood that when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the first positive flushing working position, the water treatment machine of the present invention is controlled to be in its first positive flushing working state to positively flush the first water treatment device 51 of the water treatment machine of the present invention.
[0236] As shown in the attached picture Fig.35 and Fig.37FAs shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention has a second positive flushing working position, wherein when the control valve 1B of the water treatment machine of the present invention is in the second positive flushing working position, the valve core 12B of the control valve 1B forms a third positive flushing flow channel 7203B and a fourth positive flushing flow channel 7204B, wherein the third positive flushing flow channel 7203B is respectively connected to the second fluid opening 1106B and the third opening 1103B, and the fourth positive flushing flow channel 7204B is respectively connected to the sewage opening 1109B and the fourth opening 1104B. Correspondingly, when the control valve 1B of the water treatment machine of the present invention is in the second positive flushing working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the control valve 1B under the action of water pressure, flows to the third opening 1103B through the third positive flushing channel 7203B, and further flows into the second water treatment device 52 from the second water inlet 521. The sewage after positive flushing the second water treatment device 52 flows out from the second water outlet 522, and is then discharged through the fourth opening 1104B, the fourth positive flushing channel 7204B and the sewage opening 1109B. Preferably, the control valve 1B of the water treatment machine according to the second embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106B of the valve body 10B of the control valve 1B to the first opening 1101B, the second opening 1102B, the first jet opening 11011B and the second jet opening 11012B when the control valve 1B is controlled to be in the second positive flushing working position. More preferably, when the control valve 1B of the water treatment machine of the present invention is controlled to be in the second positive flushing working position, the flow of water in the first opening 1101B and the second opening 1102B is prevented, thereby preventing the flow of water in the first water treatment device 51. More specifically, when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the second positive flushing working position, water cannot flow from the first opening 1101B or the second opening 1102B of the first valve body 11B to the first water treatment device 51, thereby ensuring that the raw water can and can only positively flush the second water treatment device 52. It can be understood that when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the second positive flushing working state, the water treatment machine of the present invention is controlled to be in its second positive flushing working state to positively flush the second water treatment device 52 of the water treatment machine of the present invention.
[0237] It can be understood that the positive flushing in this article refers to the flow direction of the water treatment device (the first water treatment device 51 or the second water treatment device 52) of the water treatment machine of the present invention when the water flow flushes the water treatment device of the water treatment machine of the present invention, and the flow direction of the raw water flowing through the water treatment device of the water treatment machine of the present invention when the water treatment device of the water treatment machine of the present invention treats the raw water is the same. Generally, the time for the water treatment device of the water treatment machine of the present invention to be positively flushed by water flow is after the backwashing, so as to flush away the wastewater generated by the backwashing remaining in the water treatment device of the water treatment machine of the present invention. In addition, if the filter material (or softening material) of the water treatment device of the water treatment machine of the present invention is a granular filter material, the positive flushing can also play a role in compacting the filter material (or softening material) so that it has a better water treatment effect.
[0238] As shown in the attached picture FIG. 30A to FIG. 35 and FIG. 37A to FIG. 37F As shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention, more specifically, the control valve 1B of a single water treatment machine of the present invention, is configured to control the first water treatment device 51 and the second water treatment device 52 of the water treatment machine of the present invention to be connected in series and to perform secondary treatment on the raw water, and to control the raw water to respectively and individually perform backwashing and forward flushing on the first water treatment device 51 and the second water treatment device 52 of the water treatment machine of the present invention and to control the raw water to perform regeneration treatment on the second water treatment device 52.
[0239] As shown in the attached picture Fig.36 and Figure 37GAs shown, the control valve 1B of the water treatment machine according to the second embodiment of the present invention further has a water replenishment working position, wherein when the control valve 1B is in the water replenishment working position, the valve core 12B of the control valve 1B forms a water replenishment flow channel 7401B, wherein the water replenishment flow channel 7401B is respectively connected with the second fluid opening 1106B and the second jet opening 11012B. Correspondingly, when the control valve 1B is in the water replenishment working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the control valve 1B under the action of water pressure, flows through the water replenishment flow channel 7401B to the second jet opening 11012B of the first valve body part 11B, and then flows into the regeneration solution tank 31 through the injection port 183B of the ejector 18B, the salt absorption port 181B and the salt absorption pipe 184 in sequence for water replenishment. Preferably, the control valve 1B of the water treatment machine according to the second embodiment of the present invention is configured to prevent raw water from flowing from the second fluid opening 1106B of the valve body 10B of the control valve 1B to the first opening 1101B, the second opening 1102B, the third opening 1103B, the fourth opening 1104B and the first jet opening 11011B when the control valve 1B is controlled to be in the water replenishment working position. More preferably, when the control valve 1B of the water treatment machine of the present invention is controlled to be in the water replenishment working position, the flow of water in the first opening 1101B, the second opening 1102B, the third opening 1103B and the fourth opening 1104B is prevented, so that the flow of water in the first water treatment device 51 and the second water treatment device 52 is prevented. More specifically, when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the water replenishment working position, water cannot flow from the first opening 1101B or the second opening 1102B of the first valve body 11B to the first water treatment device 51, and water cannot flow from the third opening 1103B or the fourth opening 1104B of the first valve body 11B to the second water treatment device 52. It can be understood that when the control valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the water replenishment working position, the water treatment machine of the present invention is controlled to be in its water replenishment working state.
[0240] As shown in the attached picture Figures 24 to 27CAs shown, the plane valve 1B of the water treatment machine according to the second embodiment of the present invention has a first channel 101B, a second channel 102B, a third channel 103B, a fourth channel 104B, a fifth channel 105B, a sixth channel 106B, a seventh channel 107B, an eighth channel 108B, a ninth channel 109B, a first jet channel 1011B and a second jet channel 1012B, wherein the first channel 101B, the second channel 102B, The third channel 103B, the fourth channel 104B, the first jet channel 1011B and the second jet channel 1012B are respectively arranged on the first fixed valve plate 121B and extend from the first fluid control surface 1210B of the first fixed valve plate 121B; the sixth channel 106B, the seventh channel 107B and the eighth channel 108B are respectively arranged on the movable valve plate 122B, wherein the sixth channel 106B and the seventh channel 107B extend from the second fluid control surface 1220B of the movable valve plate 122B. 0B, the eighth channel 108B extends from the second fluid control surface 1220B of the movable valve plate 122B to the third fluid control surface 1223B; the fifth channel 105B and the ninth channel 109B are respectively provided on the second fixed valve plate 123B and respectively extend from the fourth fluid control surface 1230B of the second fixed valve plate 123B, wherein the first channel 101B is connected to the first opening 1101B, the second channel 102B is connected to the second opening 1102B, and the third channel 103 B is connected to the third opening 1103B, the fourth channel 104B is connected to the fourth opening 1104B, the fifth channel 105B is connected to the first fluid opening 1105B, the sixth channel 106B is connected to the second fluid opening 1106B, the ninth channel 109B is connected to the sewage opening 1109B, the first jet channel 1011B is connected to the first jet opening 11011B, and the second jet channel 1012B is connected to the second jet opening 11012B. Preferably, the seventh channel 107B is a conductive blind hole. Preferably, the eighth channel 108B is a conductive through hole. Preferably, the sixth channel 106B is connected to the valve cavity 110B and further connected to the second fluid opening 1106B through the valve cavity 110B.
[0241] As shown in the attached picture Fig.29A , Fig.29B , Fig. 30A , Fig. 30B and Fig.37AAs shown, according to the second embodiment of the present invention, the movable valve plate 122B of the plane valve 1B of the water treatment machine can rotate relative to the first fixed valve plate 121B and the second fixed valve plate 123B so that the plane valve 1B has a water treatment working position. When the plane valve 1B of the water treatment machine of the present invention is in the water treatment working position, the sixth channel 106B of the plane valve 1B is connected to the first channel 101B, thereby forming the first channel 106B connected to the second fluid opening 1106B and the first opening 1101B respectively. The water treatment channel 7001B, the seventh channel 107B is respectively connected to the second channel 102B and the third channel 103B, thereby forming the second water treatment channel 7002B respectively connected to the second opening 1102B and the third opening 1103B, and the eighth channel 108B is respectively connected to the fourth channel 104B and the fifth channel 105B, thereby forming the third water treatment channel 7003B respectively connected to the fourth opening 1104B and the first fluid opening 1105B. In other words, when the plane valve 1B of the water treatment machine of the present invention is in the water treatment working position, the water flow, under the action of water pressure, sequentially flows through the second fluid opening 1106B of the plane valve 1B, the sixth channel 106B, the first channel 101B, the first opening 1101B, the first water inlet 511 of the first water treatment device 51, the first water outlet 512 of the first water treatment device 51, the second opening 1102B of the plane valve 1B, the second channel 102B, the seventh channel 107B, the third channel 103B, the third opening 1103B, the second water inlet 521 of the second water treatment device 52, the second water outlet 522 of the second water treatment device 52, the fourth opening 1104B of the plane valve 1B, the fourth channel 104B, the eighth channel 108B, the fifth channel 105B and the first fluid opening 1105B. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Fig.29A , Fig.29B and Fig.37A As shown, exemplarily, when the planar valve 1B of the water treatment machine of the present invention is in the water treatment working position, the first jet channel 1011B and the second jet channel 1012B of the planar valve 1B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, and the ninth channel 109B is blocked by the third fluid control surface 1223B of the movable valve plate 122B.
[0242] It is worth noting that when the plane valve 1B of the water treatment machine of the present invention is in the water treatment working position, the seventh channel 107B is connected to the second channel 102B and the third channel 103B respectively, that is, when the plane valve 1B is in the water treatment working position, the second opening 1102B and the third opening 1103B are connected through the second water treatment flow channel 7002B. Since the second opening 1102B is connected to the first water outlet 512 of the first water treatment device 51, and the third opening 1103B is connected to the second water inlet 521 of the second water treatment device 52, this When the first water outlet 512 of the first water treatment device 51 and the second water inlet 521 of the second water treatment device 52 form a series structure, so that when the plane valve 1B is in the water treatment working position, the first water treatment device 51 and the second water treatment device 52 form a two-stage series structure, and the first water treatment material 515 of the first water treatment device 51 and the second water treatment material 525 of the second water treatment device 52 will sequentially treat the raw water entering the second fluid opening 1106B of the plane valve 1B, and the treated water flows out from the first fluid opening 1105B and is provided. It can be understood that the two-stage series structure can better perform deep treatment on raw water. In particular, the first water treatment material 515 of the first water treatment device 51 and the second water treatment material 525 of the second water treatment device 52 can be set to different materials. For example, the first water treatment material 515 can be set to granular activated carbon as the adsorption material, and the second water treatment material 525 can be set to softening resin for softening treatment.
[0243] As shown in the attached picture Fig. 30A , Fig. 30B and Fig.37AAs shown, exemplarily, when the plane valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the water treatment working position, the raw water from the plane valve 1B flows into the valve cavity 110B from the second fluid opening 1106B of the valve body 10B under the action of water pressure, and then flows into the first opening 1101B through the sixth channel 106B and the first channel 101B, and then flows into the first water treatment device 51 from the first water inlet 511 of the first water treatment device 51. Under the action of water pressure, after being treated (for example, purified) by the first water treatment material 515, the generated primary treated water is collected by the first central tube 514 and flows out from the first water outlet 512 of the first water treatment device 51. Under the action of water pressure, the primary treated water inlet 511 of the first water treatment device 51 is discharged. The secondary treated water flows through the second opening 1102B, the second channel 102B, the seventh channel 107B, the third channel 103B, and the third opening 1103B of the plane valve 1B to the second water inlet 521 of the second water treatment device 52 and into the second water treatment device 52, and then is treated (for example, softened) by the second water treatment material 525 under the action of water pressure. The generated secondary treated water is collected by the second central pipe 524 and flows out from the second water outlet 522 of the second water treatment device 52, and then is further provided through the fourth opening 1104B, the fourth channel 104B, the eighth channel 108B, the fifth channel 105B and the first fluid opening 1105B of the plane valve 1B under the action of water pressure.
[0244] As shown in the attached picture Fig.29C , Fig.29D , Fig.31 and Fig.37B As shown, the plane valve 1B of the water treatment machine according to the second embodiment of the present invention further has a first backwashing working position. When the plane valve 1B of the water treatment machine of the present invention is in the first backwashing working position, the sixth channel 106B of the plane valve 1B is connected with the second channel 102B, thereby forming the first backwashing flow channel 7101B connected with the second fluid opening 1106B and the second opening 1102B respectively, and the eighth channel 108B is connected with the ninth channel 109B and the first channel 101B respectively, thereby forming the second backwashing flow channel 7102B connected with the sewage opening 1109B and the first opening 1101B respectively. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Fig.29C , Fig.29D and Fig.37BAs shown, when the plane valve 1B of the water treatment machine of the present invention is in the first backwash working position, the seventh channel 107B of the plane valve 1B is respectively connected with the second channel 102B and the fourth channel 104B, the third channel 103B, the first jet channel 1011B and the second jet channel 1012B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, and the fifth channel 105B is blocked by the third fluid control surface 1223B of the movable valve plate 122B. Therefore, when the plane valve 1B is in the first backwashing working position, although the seventh channel 107B of the plane valve 1B is connected to the second channel 102B and the fourth channel 104B respectively, the seventh channel 107B is a conducting blind hole, and the third channel 103B, the first jet channel 1011B and the second jet channel 1012B are blocked by the second fluid control surface 1220B of the movable valve plate 122B, so that the raw water can only flow into the sixth channel 106B from the second fluid opening 1106B of the plane valve 1B. B, and further flows through the second channel 102B and the second opening 1102B to the first water outlet 512 of the first water treatment device 51 and flows into the first water treatment device 51, and the waste water generated by reverse flushing the first water treatment device 51 flows from the first water inlet 511 of the first water treatment device 51 to the first opening 1101B of the plane valve 1B, and is further discharged through the first channel 101B, the eighth channel 108B, the ninth channel 109B and the sewage discharge opening 1109B of the plane valve 1B under the action of water pressure. In other words, although the seventh channel 107B is connected to the second channel 102B and the fourth channel 104B respectively, the seventh channel 107B is a conducting blind hole, and the third channel 103B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, so the water does not flow through the flow channel formed by them. Correspondingly, when the planar valve 1B is in the first backwash working position, the third channel 103B of the planar valve 1B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the third opening 1103B of the planar valve 1B, so that the flow of water from the second water inlet 521 of the second water treatment device 52 to the third opening 1103B is blocked, and the flow of water from the fourth opening 1104B to the second water outlet 522 of the second water treatment device 52 is blocked, so that no water flows in the fourth opening 1104B, and therefore, no water flows in the second water treatment device 52. In other words, although the seventh channel 107B is connected to the second channel 102B and the fourth channel 104B respectively, the flow of water in the second water treatment device 52 is blocked because the movable valve plate 122B hinders the water flow to the third channel 103B, thereby ensuring that only the first water treatment device 51 is reverse flushed.
[0245] It is worth noting that when the plane valve 1B is in the first backwashing working position, the third channel 103B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the third opening 1103B, so that no water flows in the fourth opening 1104B, and thus no water flows in the second water treatment device 52, to ensure that only the first water treatment device 51 is backwashed, thereby increasing the intensity of the water flow of the raw water backwashing the first water treatment device 51, and preventing the generated sewage from flowing to the second water treatment device 52. Therefore, when the plane valve 1B is in the first backwashing working position, the first water treatment device 51 of the water treatment machine of the present invention is backwashed alone.
[0246] As shown in the attached picture Fig.31 and Fig.37B As shown, exemplarily, when the plane valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the first backwash working position, the raw water from the plane valve 1B flows into the first water treatment device 51 from the first water outlet 512 of the first water treatment device 51 under the action of water pressure, and then flows from the first central pipe 514 to the first water treatment material 515 and backwashes the first water treatment material 515 under the action of water pressure, and the generated sewage flows out from the first water inlet 511 of the first water treatment device 51, and under the action of water pressure, flows to the first opening 1101B of the plane valve 1B, and then flows to the sewage opening 1109B through the second backwash channel 7102B and is discharged.
[0247] As shown in the attached picture Fig.29E , Fig.29F , Fig.32 and Fig.37C As shown, the plane valve 1B of the water treatment machine according to the second embodiment of the present invention further has a second backwashing working position. When the plane valve 1B of the water treatment machine of the present invention is in the second backwashing working position, the sixth channel 106B of the plane valve 1B is connected with the fourth channel 104B, thereby forming the third backwashing flow channel 7103B respectively connected with the second fluid opening 1106B and the fourth opening 1104B, and the eighth channel 108B is respectively connected with the ninth channel 109B and the third channel 103B, thereby forming the fourth backwashing flow channel 7104B respectively connected with the sewage opening 1109B and the third opening 1103B. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Fig.29E , Fig.29F and Fig.37CAs shown, when the plane valve 1B of the water treatment machine of the present invention is in the second backwashing working position, the seventh channel 107B of the plane valve 1B is connected to the first channel 101B and the second jet channel 1012B respectively, the second channel 102B and the first jet channel 1011B are blocked by the second fluid control surface 1220B of the movable valve plate 122B respectively, and the fifth channel 105B is blocked by the third fluid control surface 1223B of the movable valve plate 122B. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Fig.29E , Fig.29F and Fig.37CSpecifically, when the plane valve 1B is in the second backwashing working position, although the seventh channel 107B is connected to the first channel 101B and the second jet channel 1012B respectively, since the seventh channel 107B is a conducting blind hole, and the second channel 102B and the first jet channel 1011B are blocked by the second fluid control surface 1220B of the movable valve plate 122B respectively, the raw water can only flow into the sixth channel 106B from the second fluid opening 1106B of the plane valve 1B, and further The wastewater flows to the second water outlet 522 of the second water treatment device 52 and flows into the second water treatment device 52 through the fourth channel 104B and the fourth opening 1104B. The wastewater generated by backwashing the second water treatment device 52 flows from the second water inlet 521 of the second water treatment device 52 to the third opening 1103B of the plane valve 1B, and is further discharged through the third channel 103B, the eighth channel 108B, the ninth channel 109B and the sewage opening 1109B of the plane valve 1B under the action of water pressure. In other words, although the seventh channel 107B of the planar valve 1B is respectively connected to the first channel 101B and the second jet channel 1012B, since the seventh channel 107B is a conductive blind hole, and the second channel 102B and the first jet channel 1011B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, the water does not flow through the flow channel formed by them. Correspondingly, when the planar valve 1B is in the second backwash working position, the second channel 102B of the planar valve 1B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the second opening 1102B of the planar valve 1B, so that the flow of water from the second opening 1102B to the first water outlet 512 of the first water treatment device 51 is blocked; and because the water does not flow through the flow channel formed by the seventh channel 107B respectively connected to the first channel 101B and the second jet channel 1012B, no water flows in the first opening 1101B, thereby preventing the flow of water in the first water treatment device 51. In other words, although the seventh channel 107B is respectively connected to the first channel 101B and the second jet channel 1012B, the flow of water in the first water treatment device 51 is blocked because the movable valve plate 122B hinders the raw water from flowing to the second channel 102B, thereby ensuring that only the second water treatment device 52 is reverse flushed.
[0248] It is worth noting that when the plane valve 1B is in the second backwashing working position, the second channel 102B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the second opening 1102B. Although the seventh channel 107B is respectively connected to the first channel 101B and the second jet channel 1012B, the water does not flow through the flow channel formed by them, so that no water flows in the first opening 1101B, so that the first water treatment device 51 is isolated from the water flow to ensure that only the second water treatment device 52 is backwashed, thereby increasing the intensity of the water flow of the raw water backwashing the second water treatment device 52, and preventing the generated sewage from flowing to the first water treatment device 51. Therefore, when the plane valve 1B is in the second backwashing working position, the second water treatment device 52 of the water treatment machine of the present invention is backwashed separately.
[0249] As shown in the attached picture Fig.32 and Fig.37C As shown, exemplarily, when the plane valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the second backwash working position, the raw water from the plane valve 1B flows into the second water treatment device 52 from the second water outlet 522 of the second water treatment device 52 under the action of water pressure, and then flows from the second center pipe 524 to the second water treatment material 525 and backwashes the second water treatment material 525 under the action of water pressure, and the generated sewage flows out from the second water inlet 521 of the second water treatment device 52, and under the action of water pressure, flows to the third opening 1103B of the first valve body part 11B of the plane valve 1B, and then flows to the sewage opening 1109B through the fourth backwash channel 7104B and is discharged.
[0250] As shown in the attached picture Figure 29G , Fig.29H , Fig.33A , Fig.33B and Fig.37DAs shown, the plane valve 1B of the water treatment machine according to the second embodiment of the present invention further has a regeneration working position. When the plane valve 1B is in the regeneration working position, the sixth channel 106B is connected to the first jet channel 1011B, thereby forming the first regeneration flow channel 7301B connected to the second fluid opening 1106B and the first jet opening 11011B respectively, the seventh channel 107B is connected to the second jet channel 1012B and the fourth channel 104B respectively, thereby forming the second regeneration flow channel 7302B connected to the second jet opening 11012B and the fourth opening 1104B respectively, and the eighth channel 108B is connected to the ninth channel 109B and the third channel 103B respectively, thereby forming the third regeneration flow channel 7303B connected to the sewage opening 1109B and the third opening 1103B respectively. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Figure 29G , Fig.29H and Fig.37D As shown, when the planar valve 1B is in the regeneration working position, the first channel 101B and the second channel 102B of the planar valve 1B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, and the fifth channel 105B is blocked by the third fluid control surface 1223B of the movable valve plate 122B. Therefore, when the plane valve 1B of the water treatment machine of the present invention is in the regeneration working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the plane valve 1B under the action of water pressure, flows through the first regeneration flow channel 7301B (the sixth channel 106B and the first jet channel 1011B) to the first jet opening 11011B of the first valve body 11B, and then flows into the ejection port 182B of the ejector 18B, passes through the ejector 18B jet, mixes with the salt solution (such as sodium chloride solution) from the salt absorption port 181B to form a regeneration solution, and the regeneration solution flows into the second jet opening 1106B of the first valve body 11B through the ejection port 183B of the ejector 18B. The regeneration solution flows into the second water treatment device 52 from the second water outlet 522, and regenerates the second water treatment material 525 in reverse flow, such as softening the resin. The waste water generated after regeneration flows out from the second water inlet 521, and then flows out through the third opening 1103B of the first valve body 11B, the third regeneration flow channel 7303B (the third channel 103B, the eighth channel 108B and the ninth channel 109B) and the sewage outlet 1109B in sequence. As shown in the attached figure FIG. 26A to FIG. 26I , Figure 29G , Fig.29H and Fig.37DAs shown, specifically, when the plane valve 1B is in the regeneration working position, the first channel 101B and the second channel 102B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, so that the raw water can only flow into the sixth channel 106B from the second fluid opening 1106B of the plane valve 1B, and further sequentially through the first jet channel 1011B, the first jet opening 11011B, the ejector 18B, the second jet opening 11012B, the second jet channel 1012B, the seventh channel 107B, the first jet opening 11011B, the ejector 18B, the second jet opening 11012B, the second jet channel 1012B, the seventh channel 107B, the first jet opening 11012B, the ejector 18B, the second jet opening 11012B, the second jet channel 107 ... The four channels 104B and the fourth opening 1104B flow toward the second water outlet 522 of the second water treatment device 52 and flow into the second water treatment device 52, countercurrently regenerating the softening material (for example, softening resin) of the second water treatment device 52, and the generated wastewater flows from the second water inlet 521 of the second water treatment device 52 to the third opening 1103B of the plane valve 1B, and is further discharged through the third channel 103B, the eighth channel 108B, the ninth channel 109B and the sewage opening 1109B of the plane valve 1B under the action of water pressure. Correspondingly, when the planar valve 1B is in the regeneration working position, the first channel 101B and the second channel 102B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the first opening 1101B and the second opening 1102B of the planar valve 1B, so that the flow of water from the first opening 1101B to the first water inlet 511 of the first water treatment device 51 is blocked, the flow of water from the second opening 1102B to the first water outlet 512 of the first water treatment device 51 is blocked, and the flow of water in the first water treatment device 51 is blocked, thereby ensuring that only the second water treatment device 52 is regenerated in reverse flow.
[0251] It is worth noting that when the planar valve 1B is in the regeneration working position, the first channel 101B and the second channel 102B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, so that the first opening 1101B and the second opening 1102B are both blocked by the movable valve plate 122B, so that the first water treatment device 51 is isolated from the water flow to ensure that only the second water treatment device 52 is reversely regenerated, thereby increasing the intensity of the water flow of the regeneration solution for reversely regenerating the second water treatment device 52, and preventing the generated sewage from flowing to the first water treatment device 51. In particular, it is necessary to prevent the regeneration salt solution (or sewage wastewater after the regeneration resin, because the sewage wastewater has a higher salt content) from entering the first water treatment device 51, because in actual use, the first water treatment device 51 is often other adsorbent filter materials such as activated carbon, and the regeneration salt solution will contaminate the activated carbon and other filter materials, thereby weakening the purification capacity of the first water treatment device 51. This is also a major reason why the multi-stage purification and softening water treatment equipment cannot simply use the activated carbon water treatment device and the softening resin water treatment device directly in series. Therefore, when the plane valve 1B is in the regeneration working position, the second water treatment device 52 of the water treatment machine of the present invention is regenerated separately in reverse flow.
[0252] As shown in the attached picture Fig.33A , Fig.33B and Fig.37D As shown, exemplarily, when the plane valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the regeneration working position, the raw water from the plane valve 1B is mixed with the salt solution from the ejector 18B under the action of water pressure to form a regeneration solution, which flows into the second water treatment device 52 from the second water outlet 522 of the second water treatment device 52, and then, under the action of water pressure, the second water treatment material 525 is regenerated in countercurrent, and the generated sewage flows out from the second water inlet 521 of the second water treatment device 52, and under the action of water pressure, flows to the third opening 1103B of the plane valve 1B, and then flows to the sewage opening 1109B through the third regeneration flow channel 7303B and is discharged.
[0253] As shown in the attached picture Fig.29I , Fig.29J , Fig.34 and Fig.37EAs shown, the plane valve 1B of the water treatment machine according to the second embodiment of the present invention further has a first positive flushing working position. When the plane valve 1B of the water treatment machine of the present invention is in the first positive flushing working position, the sixth channel 106B of the plane valve 1B is connected with the first channel 101B, thereby forming the first positive flushing flow channel 7201B connected with the second fluid opening 1106B and the first opening 1101B respectively, and the eighth channel 108B is connected with the ninth channel 109B and the second channel 102B respectively, thereby forming the second positive flushing flow channel 7202B connected with the sewage opening 1109B and the second opening 1102B respectively. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Fig.29I , Fig.29J and Fig.37E As shown, when the plane valve 1B of the water treatment machine of the present invention is in the first positive flushing working position, the seventh channel 107B is connected to the second channel 102B and the fourth channel 104B respectively, the third channel 103B, the first jet channel 1011B and the second jet channel 1012B of the plane valve 1B are blocked by the second fluid control surface 1220B of the movable valve plate 122B respectively, and the fifth channel 105B is blocked by the third fluid control surface 1223B of the movable valve plate 122B. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Fig.29I , Fig.29J and Fig.37EAs shown in FIG. 1 , when the plane valve 1B is in the first positive flushing working position, although the seventh channel 107B of the plane valve 1B is connected to the second channel 102B and the fourth channel 104B respectively, since the seventh channel 107B is a conducting blind hole, and the third channel 103B, the first jet channel 1011B and the second jet channel 1012B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, the raw water can only flow into the sixth channel 103B from the second fluid opening 1106B of the plane valve 1B. 6B, and further flows through the first channel 101B and the first opening 1101B to the first water inlet 511 of the first water treatment device 51 and flows into the first water treatment device 51, and the waste water generated by positively flushing the first water treatment device 51 flows from the first water outlet 512 of the first water treatment device 51 to the second opening 1102B of the plane valve 1B, and is further discharged through the second channel 102B, the eighth channel 108B, the ninth channel 109B and the sewage discharge opening 1109B of the plane valve 1B under the action of water pressure. In other words, although the seventh channel 107B of the plane valve 1B is connected to the second channel 102B and the fourth channel 104B respectively, since the seventh channel 107B is a conducting blind hole and the third channel 103B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, the water flow does not flow through the flow channel formed by them. Correspondingly, when the planar valve 1B is in the first positive flushing working position, the third channel 103B of the planar valve 1B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the third opening 1103B of the planar valve 1B, so that the flow of water from the second water inlet 521 of the second water treatment device 52 to the third opening 1103B is blocked, and the flow of water from the fourth opening 1104B to the second water outlet 522 of the second water treatment device 52 is blocked, so that no water flows in the fourth opening 1104B, and therefore, the flow of water in the second water treatment device 52 is blocked. In other words, although the seventh channel 107B is connected to the second channel 102B and the fourth channel 104B respectively, the flow of water in the second water treatment device 52 is blocked because the movable valve plate 122B hinders the water flow to the third channel 103B, thereby ensuring that only the first water treatment device 51 is reverse flushed.
[0254] It is worth noting that when the plane valve 1B is in the first positive flushing working position, the third channel 103B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the third opening 1103B, so that no water flows in the fourth opening 1104B, and no water flows in the second water treatment device 52, so as to ensure that only the first water treatment device 51 is positively flushed, thereby increasing the strength of the water flow of the raw water for positively flushing the first water treatment device 51, and preventing the generated sewage from flowing to the second water treatment device 52. Therefore, when the plane valve 1B is in the first positive flushing working position, the first water treatment device 51 of the water treatment machine of the present invention is positively flushed alone.
[0255] As shown in the attached picture Fig.34 and Fig.37E As shown, exemplarily, when the plane valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the first positive flushing working position, the raw water from the plane valve 1B flows into the first water treatment device 51 from the first water inlet 511 of the first water treatment device 51 under the action of water pressure, and then positively flushes the first water treatment material 515 under the action of water pressure, and the generated sewage is collected by the first central pipe 514, and flows out from the first water outlet 512 of the first water treatment device 51, and flows to the second opening 1102B of the plane valve 1B under the action of water pressure, and then flows to the sewage opening 1109B through the second positive flushing channel 7202B and is discharged.
[0256] As shown in the attached picture Figure 29K , Figure 29L , Fig.35 and Fig.37F As shown, the plane valve 1B of the water treatment machine according to the second embodiment of the present invention further has a second positive flushing working position. When the plane valve 1B of the water treatment machine of the present invention is in the second positive flushing working position, the sixth channel 106B of the plane valve 1B is connected with the third channel 103B, thereby forming the third positive flushing flow channel 7203B respectively connected with the second fluid opening 1106B and the third opening 1103B, and the eighth channel 108B is respectively connected with the ninth channel 109B and the fourth channel 104B, thereby forming the fourth positive flushing flow channel 7204B respectively connected with the sewage opening 1109B and the fourth opening 1104B. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Figure 29K , Figure 29L and Fig.37FAs shown, when the plane valve 1B of the water treatment machine of the present invention is in the second positive flushing working position, the seventh channel 107B of the plane valve 1B is connected to the first channel 101B and the first jet channel 1011B respectively, the second channel 102B and the second jet channel 1012B are blocked by the second fluid control surface 1220B of the movable valve plate 122B respectively, and the fifth channel 105B is blocked by the third fluid control surface 1223B of the movable valve plate 122B. As shown in the accompanying drawings FIG. 26A to FIG. 26I , Figure 29K , Figure 29L and Fig.37FAs shown, specifically, when the plane valve 1B is in the second positive flushing working position, although the seventh channel 107B of the plane valve 1B is connected with the first channel 101B and the first jet channel 1011B respectively, since the seventh channel 107B is a conducting blind hole, and the second channel 102B and the second jet channel 1012B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, the raw water can only flow into the sixth channel 106B from the second fluid opening 1106B of the plane valve 1B, The wastewater generated by the forward flushing of the second water treatment device 52 flows from the second water outlet 522 of the second water treatment device 52 to the fourth opening 1104B of the plane valve 1B, and is further discharged through the fourth channel 104B, the eighth channel 108B, the ninth channel 109B and the sewage discharge opening 1109B of the plane valve 1B under the action of water pressure. In other words, although the seventh channel 107B is connected to the first channel 101B and the first jet channel 1011B respectively, since the seventh channel 107B is a conducting blind hole, and the second channel 102B and the second jet channel 1012B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, the water does not flow through the flow channel formed by them. Correspondingly, when the planar valve 1B is in the second positive flushing working position, the second channel 102B of the planar valve 1B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the second opening 1102B of the planar valve 1B, so that the flow of water from the second opening 1102B to the first water outlet 512 of the first water treatment device 51 is blocked; and because the water does not flow through the flow channel formed by the seventh channel 107B which is respectively connected to the first channel 101B and the first jet channel 1011B, no water flows in the first opening 1101B, thereby preventing the flow of water in the first water treatment device 51. In other words, the seventh channel 107 is respectively connected to the first channel 101B and the first jet channel 1011B, but because the movable valve plate 122 blocks the raw water from flowing to the second channel 102B, the flow of water in the first water treatment device 51 is blocked, thereby ensuring that only the second water treatment device 52 is flushed forward.
[0257] It is worth noting that when the plane valve 1B is in the second positive flushing working position, the second channel 102B is blocked by the second fluid control surface 1220B of the movable valve plate 122B, thereby preventing water from flowing through the second opening 1102B. Although the seventh channel 107B is respectively connected to the first channel 101B and the first jet channel 1011B, the water does not flow through the flow channel formed by them, so that no water flows in the first opening 1101B, so that the first water treatment device 51 is isolated from the water flow to ensure that only the second water treatment device 52 is positively flushed, thereby increasing the intensity of the water flow of the raw water for positively flushing the second water treatment device 52, and preventing the generated sewage from flowing to the first water treatment device 51. Therefore, when the plane valve 1B is in the second positive flushing working position, the second water treatment device 52 of the water treatment machine of the present invention is positively flushed alone.
[0258] As shown in the attached picture Fig.35 and Fig.37F As shown, exemplarily, when the plane valve 1B of the water treatment machine according to the second embodiment of the present invention is controlled to be in the second positive flushing working position, the raw water from the plane valve 1B flows into the second water treatment device 52 from the second water inlet 521 of the second water treatment device 52 under the action of water pressure, and then positively flushes the second water treatment material 525 under the action of water pressure, and the generated sewage is collected by the second central pipe 524, and flows out from the second water outlet 522 of the second water treatment device 52, and flows to the fourth opening 1104B of the plane valve 1B under the action of water pressure, and then flows to the sewage opening 1109B through the fourth positive flushing channel 7204B and is discharged.
[0259] As shown in the attached picture Fig.29M , Fig.29N , Fig.36 and Figure 37G As shown, the plane valve 1B of the water treatment machine according to the second embodiment of the present invention further has a water replenishment working position. When the plane valve 1B is in the water replenishment working position, the sixth channel 106B is connected to the second jet channel 1012B, thereby forming the water replenishment channel 7401B connected to the second fluid opening 1106B and the second jet opening 11012B respectively. FIG. 26A to FIG. 26I , Fig.29M , Fig.29N and Figure 37GAs shown, when the plane valve 1B is in the water replenishment working position, the seventh channel 107B of the plane valve 1B is connected with the third channel 103B, one end of the eighth channel 108B is connected with the first jet channel 1011B, and the other end of the eighth channel 108B is blocked by the fourth fluid control surface 1230B of the second fixed valve plate 123B, the first channel 101B, the second channel 102B and the fourth channel 104B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, and the fifth channel 105B is blocked by the third fluid control surface 1223B of the movable valve plate 122B. Therefore, when the plane valve 1B of the water treatment machine of the present invention is in the water replenishment working position, the raw water flows in from the second fluid opening 1106B of the valve body 10B of the plane valve 1B under the action of water pressure, flows into the second jet opening 11012B through the sixth channel 106B and the second jet channel 1012B, and then flows into the regeneration solution tank 31 through the injection port 183B of the ejector 18B, the salt absorption port 181B and the salt absorption pipe 184 in sequence for water replenishment. Although the seventh channel 107B is connected to the third channel 103B, the seventh channel 107B is a conducting blind hole, so that the third channel 103B is blocked by the movable valve plate 122B. Although one end of the eighth channel 108B is connected to the first jet channel 1011B and the eighth channel 108B is a conducting through hole, the other end of the eighth channel 108B is blocked by the fourth fluid control surface 1230B of the second fixed valve plate 123B, so that the eighth channel 108B is connected to the first jet channel 1011B. The flow channel formed by the connection of the jet channel 1011B is blocked by the fourth fluid control surface 1230B of the second fixed valve plate 123B, and because the first channel 101B, the second channel 102B and the fourth channel 104B are respectively blocked by the second fluid control surface 1220B of the movable valve plate 122B, the water flow cannot flow through the first opening 1101B, the second opening 1102B, the third opening 1103B, the fourth opening 1104B and the first jet opening 11011B. In other words, although the seventh channel 107B is connected to the third channel 103B and the eighth channel 108B is connected to the first jet channel 1011B, a flow channel allowing water to flow cannot be formed.
[0260] It is worth notin...
Claims
1. A control valve for a water treatment machine, characterized in that: include: an ejector; a valve body; and A valve core, wherein the valve body forms a valve cavity, a first opening, a second opening, a third opening, a fourth opening, a first fluid opening, a second fluid opening, a sewage opening and a first jet opening, wherein the valve core is arranged in the valve cavity, wherein the second fluid opening of the valve body is suitable for being connected to a raw water source, wherein the ejector has an ejection port suitable for being connected to the first jet opening and a salt absorption port connected to the ejection port, wherein the control valve for the water treatment machine is a plane valve, the valve core comprises a first fixed valve plate, a movable valve plate and a second fixed valve plate, wherein the first fixed valve plate has a first fluid control surface, the movable valve plate has a second fluid control surface and a third fluid control surface, and the second fixed valve plate has a fourth fluid control surface, wherein the first fixed valve plate, the movable valve plate and the second The fixed valve plates are all arranged in the valve cavity, wherein the second fluid control surface and the third fluid control surface of the movable valve plate are respectively formed on opposite sides of the movable valve plate, wherein the second fluid control surface of the movable valve plate is arranged on the first fluid control surface of the first fixed valve plate, and the fourth fluid control surface of the second fixed valve plate is arranged on the third fluid control surface of the movable valve plate, and the movable valve plate is arranged to be able to rotate relative to the first fixed valve plate and the second fixed valve plate, wherein when the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the water treatment working position, the valve core of the planar valve forms a first water treatment flow channel respectively connected to the second fluid opening and the first opening, a second water treatment flow channel respectively connected to the second opening and the third opening, and a third water treatment flow channel respectively connected to the fourth opening and the first fluid opening.
2. The control valve for a water treatment machine according to claim 1, characterized in that: The valve body further forms a second jet opening, and the ejector further has an ejection port adapted to communicate with the second jet opening of the valve body, wherein the salt absorption port is respectively communicated with the ejection port and the ejection port.
3. The control valve for a water treatment machine according to claim 2, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the first backwash working position, the valve core of the planar valve forms a first backwash flow channel respectively connected to the second fluid opening and the second opening, and a second backwash flow channel respectively connected to the sewage opening and the first opening.
4. The control valve for a water treatment machine according to claim 3, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the second backwash working position, the valve core of the planar valve forms a third backwash channel respectively connected to the second fluid opening and the fourth opening, and a fourth backwash channel respectively connected to the sewage opening and the third opening.
5. The control valve for a water treatment machine according to claim 4, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the first positive flushing working position, the valve core of the planar valve forms a first positive flushing channel respectively connected to the second fluid opening and the first opening, and a second positive flushing channel respectively connected to the sewage opening and the second opening.
6. The control valve for a water treatment machine according to claim 5, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the second positive flushing working position, the valve core of the planar valve forms a third positive flushing channel respectively connected to the second fluid opening and the third opening, and a fourth positive flushing channel respectively connected to the sewage opening and the fourth opening.
7. The control valve for a water treatment machine according to claim 4, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the regeneration working position, the valve core of the planar valve forms a first regeneration flow channel respectively connected to the second fluid opening and the first jet opening of the valve body, a second regeneration flow channel respectively connected to the second jet opening and the third opening, and a third regeneration flow channel respectively connected to the sewage opening and the fourth opening.
8. The control valve for a water treatment machine according to claim 4, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in the regeneration working position, the valve core of the planar valve forms a first regeneration flow channel respectively connected to the second fluid opening and the first jet opening of the valve body, a second regeneration flow channel respectively connected to the second jet opening and the fourth opening, and a third regeneration flow channel respectively connected to the sewage opening and the third opening.
9. The control valve for a water treatment machine according to claim 7 or 8, characterized in that: When the movable valve disc rotates relative to the first fixed valve disc and the second fixed valve disc so that the planar valve is in the water replenishment working position, the valve core of the planar valve forms a water replenishment channel respectively connected to the second fluid opening and the second jet opening.
10. The control valve for a water treatment machine according to claim 2, characterized in that: The plane valve comprises a first channel, a second channel, a third channel, a fourth channel, a fifth channel, a sixth channel, a seventh channel, an eighth channel, a ninth channel, a first jet channel and a second jet channel, wherein the first channel, the second channel, the third channel, the fourth channel, the first jet channel and the second jet channel are respectively arranged on the first fixed valve plate and respectively extend from the first fluid control surface of the first fixed valve plate; The sixth channel, the seventh channel and the eighth channel are respectively arranged on the movable valve plate, wherein the sixth channel and the seventh channel extend from the second fluid control surface of the movable valve plate respectively, and the eighth channel extends from the second fluid control surface of the movable valve plate to the third fluid control surface; the fifth channel and the ninth channel are respectively arranged on the second fixed valve plate and extend from the fourth fluid control surface of the second fixed valve plate respectively, wherein the first channel is connected to the first opening, the second channel is connected to the second opening, the third channel is connected to the third opening, the fourth channel is connected to the fourth opening, the fifth channel is connected to the first fluid opening, the sixth channel is connected to the second fluid opening, and the ninth channel is connected to the fourth opening. The channel is connected to the sewage opening, the first jet channel is connected to the first jet opening, and the second jet channel is connected to the second jet opening, wherein when the planar valve is in the water treatment working position, the sixth channel of the planar valve is connected to the first channel, thereby forming the first water treatment flow channel respectively connected to the second fluid opening and the first opening, the seventh channel is respectively connected to the second channel and the third channel, thereby forming the second water treatment flow channel respectively connected to the second opening and the third opening, and the eighth channel is respectively connected to the fourth channel and the fifth channel, thereby forming the third water treatment flow channel respectively connected to the fourth opening and the first fluid opening.
11. The control valve for a water treatment machine according to claim 10, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in a first backwash working position, the sixth channel of the planar valve is connected with the second channel, thereby forming a first backwash flow channel respectively connected to the second fluid opening and the second opening, and the eighth channel is respectively connected with the ninth channel and the first channel, thereby forming a second backwash flow channel respectively connected to the sewage opening and the first opening.
12. The control valve for a water treatment machine according to claim 11, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in a second backwash working position, the sixth channel of the planar valve is connected with the fourth channel, thereby forming a third backwash flow channel respectively connected to the second fluid opening and the fourth opening, and the eighth channel is respectively connected with the ninth channel and the third channel, thereby forming a fourth backwash flow channel respectively connected to the sewage opening and the third opening.
13. The control valve for a water treatment machine according to claim 12, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in a first positive flushing working position, the sixth channel of the planar valve is connected with the first channel, thereby forming a first positive flushing channel respectively connected to the second fluid opening and the first opening, and the eighth channel is respectively connected with the ninth channel and the second channel, thereby forming a second positive flushing channel respectively connected to the sewage opening and the second opening.
14. The control valve for a water treatment machine according to claim 13, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in a second positive flushing working position, the sixth channel of the planar valve is connected with the third channel, thereby forming a third positive flushing channel respectively connected to the second fluid opening and the third opening, and the eighth channel is respectively connected with the ninth channel and the fourth channel, thereby forming a fourth positive flushing channel respectively connected to the sewage opening and the fourth opening.
15. The control valve for a water treatment machine according to claim 12, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in a regeneration working position, the sixth channel of the planar valve is connected with the first jet channel, thereby forming a first regeneration flow channel respectively connected to the second fluid opening and the first jet opening, the seventh channel is respectively connected with the second jet channel and the third channel, thereby forming a second regeneration flow channel respectively connected to the second jet opening and the third opening, and the eighth channel is respectively connected with the ninth channel and the fourth channel, thereby forming a third regeneration flow channel respectively connected to the sewage opening and the fourth opening.
16. The control valve for a water treatment machine according to claim 15, characterized in that: When the movable valve plate rotates relative to the first fixed valve plate and the second fixed valve plate, so that the planar valve is in a water replenishment working position, the sixth channel of the planar valve is connected with the second jet channel, thereby forming a water replenishment flow channel respectively connected with the second fluid opening and the second jet opening.
17. The control valve for a water treatment machine according to claim 10, characterized in that: When the planar valve is in the water treatment working position, the first jet channel and the second jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate, and the ninth channel is blocked by the third fluid control surface of the movable valve plate.
18. The control valve for a water treatment machine according to claim 12, characterized in that: When the planar valve is in the first backwash working position, the third channel, the first jet channel and the second jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate; when the planar valve is in the second backwash working position, the second channel and the second jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate.
19. The control valve for a water treatment machine according to claim 14, characterized in that: When the planar valve is in the first positive flushing working position, the fourth channel and the first jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate; when the planar valve is in the second positive flushing working position, the first channel, the first jet channel and the second jet channel are respectively blocked by the second fluid control surface of the movable valve plate.
20. The control valve for a water treatment machine according to claim 16, characterized in that: When the planar valve is in the regeneration working position, the first channel and the second channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate; when the planar valve is in the water replenishment working position, the second channel, the third channel and the first jet channel are respectively blocked by the second fluid control surface of the movable valve plate.
21. The control valve for a water treatment machine according to any one of claims 10 to 20, characterized in that: The first channel of the planar valve has a first connecting portion and a second connecting portion, wherein the first connecting portion of the first channel and the second connecting portion of the first channel are both connected to the first opening; the third channel of the planar valve has a first conducting portion and a second conducting portion, wherein the first conducting portion of the third channel and the second conducting portion of the third channel are both connected to the third opening.
22. The control valve for a water treatment machine according to claim 21, characterized in that: The first fluid control surface of the first fixed valve plate of the plane valve forms a central portion and an edge portion extending outward from the central portion, the first connecting portion of the first channel of the plane valve, the second conducting portion of the third channel, the second jet channel, the first conducting portion of the third channel, the second channel, the fourth channel, the second connecting portion of the first channel and the first jet channel are arranged clockwise in this order on the edge portion of the first fluid control surface of the first fixed valve plate, and the sixth channel, the seventh channel and the eighth channel of the plane valve are arranged clockwise in this order on the The second fluid control surface of the movable valve plate, the fifth channel and the ninth channel of the plane valve are arranged on the fourth fluid control surface of the second fixed valve plate, the first channel, the third channel, the second jet channel, the second channel, the fourth channel and the first jet channel are separated and arranged on the first fluid control surface of the first fixed valve plate; the sixth channel, the seventh channel and the eighth channel of the plane valve are separated and arranged on the second fluid control surface of the movable valve plate; the fifth channel and the ninth channel of the plane valve are separated and arranged on the fourth fluid control surface of the second fixed valve plate.
23. The control valve for a water treatment machine according to claim 21, characterized in that: The first fluid control surface of the first fixed valve plate of the plane valve forms a central portion and an edge portion extending outward from the central portion, the first connecting portion of the first channel of the plane valve, the second conducting portion of the third channel, the second jet channel, the first conducting portion of the third channel, the second channel, the fourth channel, the second connecting portion of the first channel and the first jet channel are arranged counterclockwise in this order on the edge portion of the first fluid control surface of the first fixed valve plate, and the sixth channel, the seventh channel and the eighth channel of the plane valve are arranged counterclockwise in this order on the The second fluid control surface of the movable valve plate, the fifth channel and the ninth channel of the plane valve are arranged on the fourth fluid control surface of the second fixed valve plate, the first channel, the third channel, the second jet channel, the second channel, the fourth channel and the first jet channel are separated and arranged on the first fluid control surface of the first fixed valve plate; the sixth channel, the seventh channel and the eighth channel of the plane valve are separated and arranged on the second fluid control surface of the movable valve plate; the fifth channel and the ninth channel of the plane valve are separated and arranged on the fourth fluid control surface of the second fixed valve plate.
24. The control valve for a water treatment machine according to claim 12, characterized in that: When the planar valve is in a regeneration working position, the sixth channel of the planar valve is connected with the first jet channel to form a first regeneration channel respectively connected with the second fluid opening and the first jet opening, the seventh channel is respectively connected with the second jet channel and the fourth channel to form a second regeneration channel respectively connected with the second jet opening and the fourth opening, the eighth channel is respectively connected with the ninth channel and the third channel to form a third regeneration channel respectively connected with the sewage opening and the third opening.
25. The control valve for a water treatment machine according to claim 24, characterized in that: When the planar valve is in a water replenishment working position, the sixth channel of the planar valve is connected to the second jet channel, thereby forming a water replenishment channel respectively connected to the second fluid opening and the second jet opening.
26. The control valve for a water treatment machine according to claim 12, characterized in that: When the planar valve is in the first backwash working position, the third channel, the first jet channel and the second jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate; when the planar valve is in the second backwash working position, the second channel and the first jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate.
27. The control valve for a water treatment machine according to claim 14, characterized in that: When the planar valve is in the first positive flushing working position, the third channel, the first jet channel and the second jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate; when the planar valve is in the second positive flushing working position, the second channel and the second jet channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate.
28. The control valve for a water treatment machine according to claim 25, characterized in that: When the planar valve is in the regeneration working position, the first channel and the second channel of the planar valve are respectively blocked by the second fluid control surface of the movable valve plate; when the planar valve is in the water replenishment working position, the first channel, the second channel and the fourth channel are respectively blocked by the second fluid control surface of the movable valve plate.
29. The control valve for a water treatment machine according to any one of claims 24 to 28, characterized in that: The second channel of the planar valve has a first connecting portion and a second connecting portion, wherein the first connecting portion of the second channel and the second connecting portion of the second channel are both connected to the second opening; the fourth channel of the planar valve has a first conducting portion and a second conducting portion, wherein the first conducting portion of the fourth channel and the second conducting portion of the fourth channel are both connected to the fourth opening.
30. The control valve for a water treatment machine according to claim 29, characterized in that: The first fluid control surface of the first fixed valve plate of the plane valve forms a central portion and an edge portion extending outward from the central portion. The first channel, the first jet channel, the first conducting portion of the fourth channel, the second connecting portion of the second channel, the third channel, the first connecting portion of the second channel, the second conducting portion of the fourth channel and the second jet channel of the plane valve are arranged clockwise in this order on the edge portion of the first fluid control surface of the first fixed valve plate. The sixth channel, the eighth channel and the seventh channel of the plane valve are arranged clockwise in this order on the movable valve plate. The second fluid control surface of the valve plate, the fifth channel and the ninth channel of the plane valve are arranged on the fourth fluid control surface of the second fixed valve plate, wherein the first channel, the first jet channel, the fourth channel, the second channel, the third channel and the second jet channel are arranged separately on the first fluid control surface of the first fixed valve plate; the sixth channel, the eighth channel and the seventh channel of the plane valve are arranged separately on the second fluid control surface of the movable valve plate; the fifth channel and the ninth channel of the plane valve are arranged separately on the fourth fluid control surface of the second fixed valve plate.
31. The control valve for a water treatment machine according to claim 29, characterized in that: The first fluid control surface of the first fixed valve plate of the plane valve forms a central portion and an edge portion extending outward from the central portion. The first channel, the first jet channel, the first conducting portion of the fourth channel, the second connecting portion of the second channel, the third channel, the first connecting portion of the second channel, the second conducting portion of the fourth channel and the second jet channel of the plane valve are arranged counterclockwise in this order on the edge portion of the first fluid control surface of the first fixed valve plate. The sixth channel, the eighth channel and the seventh channel of the plane valve are arranged counterclockwise in this order on the movable valve plate. The second fluid control surface of the valve plate, the fifth channel and the ninth channel of the plane valve are arranged on the fourth fluid control surface of the second fixed valve plate, wherein the first channel, the first jet channel, the fourth channel, the second channel, the third channel and the second jet channel are arranged separately on the first fluid control surface of the first fixed valve plate; the sixth channel, the eighth channel and the seventh channel of the plane valve are arranged separately on the second fluid control surface of the movable valve plate; the fifth channel and the ninth channel of the plane valve are arranged separately on the fourth fluid control surface of the second fixed valve plate.
32. The control valve for a water treatment machine according to any one of claims 2-8, 10-20 and 24-28, characterized in that: The valve body includes a first valve body portion and a second valve body portion, wherein the valve cavity is formed between the first valve body portion and the second valve body portion, the first opening, the second opening, the third opening, the fourth opening, the first jet opening and the second jet opening are formed in the first valve body portion, the first fluid opening and the sewage opening are formed in the second valve body portion, and the second fluid opening is selectively arranged in the first valve body portion or the second valve body portion of the valve body.
33. A water treatment machine, characterized in that: include: A control valve according to any one of claims 1 to 32; a first water treatment unit; and A second water treatment device, wherein the first water treatment device has a first water inlet and a first water outlet, and the second water treatment device has a second water inlet and a second water outlet, wherein the first opening of the valve body is suitable for being connected to the first water inlet of the first water treatment device, the second opening is suitable for being connected to the first water outlet of the first water treatment device, the third opening is suitable for being connected to the second water inlet of the second water treatment device, and the fourth opening is suitable for being connected to the second water outlet of the second water treatment device.
34. The water treatment machine according to claim 33, characterized in that: The first water treatment device includes a first shell, a first central tube and a first water treatment material, the first shell having a first end and a first shell body extending from the first end, the first central tube having a first tube upper end and a first tube lower end, the first water inlet is formed between the first end and the first tube upper end, the first tube upper end forms the first water outlet, and the first water treatment material is arranged between the first shell and the first central tube; the second water treatment device includes a second shell, a second central tube and a second water treatment material, the second shell having a second end and a second shell body extending from the second end, the second central tube having a second tube upper end and a second tube lower end extending downward from the second tube upper end, the second water inlet is formed between the second end of the second shell and the second tube upper end, the second tube upper end forms the second water outlet, and the second water treatment material is arranged between the second shell and the second central tube.
