Underground pipeline excavation and installation robot and excavation and installation method thereof
By designing underground pipeline excavation and installation robots, the automation integration of pipeline construction is achieved, and the problems of traditional low efficiency and high cost are solved, construction efficiency and accuracy are improved, and it is suitable for installation of pipes of different sizes.
Patent Information
- Application Number
- CN202410968081.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-12
AI Technical Summary
The construction process of traditional underground pipelines is complicated and requires a lot of manpower, resulting in extended construction time, inefficient efficiency and increased costs.
Design an underground pipeline excavation and installation robot to realize the integration of pipeline excavation, earth storage, pipe storage, pipe glue coating, pipeline installation, earth backfill and soil surface flatness, through a variety of mechanical units (such as chain shovel units, Pipeline storage and transportation units, glue coating units, robotic arms, etc.) automate various processes to reduce manual participation.
It greatly reduces the amount of manpower, improves construction efficiency and installation accuracy, shortens construction time, reduces costs, and is suitable for automated installations of various pipe sizes.
Smart Images

Figure CN118935090A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering, and in particular to an underground pipeline excavation and installation robot, and also to an excavation and installation method of the underground pipeline excavation and installation robot. Background Art
[0002] Underground pipeline construction is an important part of urban infrastructure construction, and plays a vital role in urban water supply, gas supply, power supply, sewage treatment, etc. The traditional pipeline laying process is cumbersome and requires a lot of manpower to control each part. In addition, there is a time difference between the connection steps, which prolongs the construction time and reduces the construction efficiency. Summary of the invention
[0003] Based on the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is to provide an underground pipeline excavation and installation robot and an excavation and installation method thereof, so as to realize the integration of pipeline excavation, earth storage, pipe storage, pipe transportation, pipe gluing, pipeline installation, earth backfilling and soil surface leveling, and the use of manpower in each process is greatly reduced, thereby saving labor costs to a great extent.
[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical measures:
[0005] The underground pipeline excavation and installation robot of the present invention comprises: a trench excavation part, which is used to excavate a trench from the soil surface and lay the pipe in the excavated trench; a pipeline storage and transportation part, which is used to store the pipes that need to be painted and automatically feed the pipes into the device; a pipeline gluing part, which is used to glue the pipe ports of different sizes so that the pipes can be fixed with glue when they are subsequently connected; an intermediate chassis part, which is used to carry the installation of other mechanisms and crawlers; a pipeline installation part, which is used to directly connect the glued pipes; an earth backfilling part, which is used to store the soil excavated from the trench excavation part and fill the stored soil back into the excavated trench after the pipe is laid; and a soil surface flattening part, which is used to flatten the soil surface on the tunnel after the earth backfilling part is backfilled.
[0006] Preferably, the trenching section comprises a vehicle body, a chain shovel unit, an earthwork conveyor belt unit, and a track for the trenching section; wherein the vehicle body comprises a vehicle body hydraulic cylinder unit and an earthwork scraper, the vehicle body hydraulic cylinder unit comprises a chain shovel hydraulic cylinder unit and an earthwork scraper hydraulic cylinder unit, one end of the chain shovel hydraulic cylinder unit is connected to the vehicle body through an articulated seat so that one end of the chain shovel hydraulic cylinder unit can rotate around the articulated seat, and the movable end of the chain shovel hydraulic cylinder unit is connected to the chain shovel guard through an articulated seat so that the movable end of the chain shovel hydraulic cylinder unit can rotate around the articulated seat, so that The chain shovel hydraulic cylinder unit controls the direction of the chain shovel by telescoping the hydraulic cylinder, thereby adjusting the depth of the dug trench; one end of the earth scraper hydraulic cylinder unit is connected to the chain shovel guard through an articulated seat, so that one end of the earth scraper hydraulic cylinder unit can rotate around the articulated seat, and the movable end of the earth scraper hydraulic cylinder unit is connected to the earth scraper through the articulated seat, so that the earth scraper hydraulic cylinder unit can adjust the scraper height of the earth scraper; the earth scraper is connected to the vehicle body through the articulated seat so that the earth scraper can rotate around the articulated seat to adjust the scraper height of the earth scraper.
[0007] Furthermore, the chain shovel unit includes a chain shovel and a chain shovel guard, the rotating drum part of the chain shovel is fixed to the inner side of the chain shovel guard by bolts, and the motor that drives the chain shovel to rotate is fixed to the outer side of the corresponding position of the chain shovel guard by bolts so that the chain shovel can be driven to rotate when the motor rotates; one end of the chain shovel guard is fixed to the vehicle body by bolts, so that the chain shovel guard can rotate around the hinge seat, thereby adjusting the direction of the chain shovel and thus adjusting the depth of the excavated trench; the earthwork conveyor belt unit includes an earthwork conveyor belt a and an earthwork conveyor belt b with the same structure, the two sides of the earthwork conveyor belt a are fixed to the vehicle body by bolts, and the earthwork conveyor belt a is driven by the motor to rotate and transport, so that the earthwork conveyor belt a can transport the soil dug by the chain shovel from the bottom of the vehicle body to the upward soil transporting device a; the track of the trench excavation part is fixed to the chassis under the vehicle body by bolts so that the track of the trench excavation part can drive the trench excavation part forward.
[0008] Furthermore, the pipe storage and transportation part includes a pipe storage box unit and a pipe transportation unit; the pipe storage box unit includes a pipe storage box a and a pipe storage box b with the same structure; the pipe storage box a includes a push door, a pipe storage box, a translation track, an electric roller for the pipe storage box and an opening and closing door for the pipe storage box; the top of the push door is connected to the motor by bolts, the rotor end of the motor is connected to the gear, the gear is limited on the translation track, and the two sides of the push door are connected with a pulley group by bolts, and the slideway of the pulley group is on the inner side of the pipe storage box; the forward movement of the push door can push the pipe in the pipe storage box to move toward the pipe outlet, so that the pipe can go out from the outlet; the pipe storage box is fixed to the middle left chassis unit by bolts and can be used to store pipes, and the translation track The translation track is fixed to the upper part of the two side walls of the pipe storage box by bolts, and can cooperate with the motor and gears to drive the push door forward or backward; the electric roller of the pipe storage box is connected to the bottom of the inner wall of the pipe storage box through a bearing, and the pipe in the pipe storage box can be moved when the electric roller of the pipe storage box rolls, so that the pipe can come out from the opening and closing door of the pipe storage box; one end of the opening and closing door of the pipe storage box is connected to the electric push rod, and one end of the electric push rod is connected to the pipe storage box through a hinge seat. When the electric push rod is extended and retracted, it can drive the opening and closing door of the pipe storage box to release or block the pipe; the pipeline transportation unit includes a pipeline transportation belt unit, a pipeline push plate unit and a pipeline transmission elevator unit; the pipeline transportation belt unit includes a pipeline transportation belt a and a pipeline transportation belt having the same structure. b, the bottom of the pipe conveyor belt a is fixed to the middle left chassis unit by bolts. After the pipe comes out of the opening and closing door of the pipe storage box, the pipe conveyor belt a can transport the pipe forward so that the pipe reaches the end of the pipe conveyor belt a, and then cooperates with the pipe push plate a to push the pipe into the pipe conveying elevator a; the pipe push plate unit includes a pipe push plate a and a pipe push plate b with the same structure. The middle and upper part of the pipe push plate a is connected to the side fence of the pipe conveyor belt a through a hinge seat, so that the pipe push plate a can rotate around the hinge seat, and the top of the pipe push plate a is connected to the electric push rod, and the bottom end of the electric push rod is fixed to the middle left chassis unit so that the extension and retraction of the electric push rod can control the push plate of the pipe push plate a to push the pipe forward or stick to the side wall of the pipe conveyor belt a backward. Thereby, the pipe will not be blocked from moving forward, so that the pipe push plate a pushes the pipe into the pipe conveying elevator a when the pipe is transported to the end of the pipe conveying belt a; the pipe conveying elevator unit includes a pipe conveying elevator a and a pipe conveying elevator b with the same structure; the pipe conveying elevator a includes a winch, an elevator outer frame and an elevator lifting frame; the base of the winch is fixed to the top of the elevator outer frame by bolts, and the rope extended from the winch is connected to the top of the elevator lifting frame through a hook, so that the winch can control the up and down movement of the elevator lifting frame, and the elevator outer frame is fixed to the surface of the middle left chassis unit by bolts, and the elevator lifting frame is connected to the rope extended from the winch through a hook, and can rise or fall under the control of the winch to transport the pipe upward or downward.
[0009] Preferably, the pipe gluing part includes a front-end center positioning unit and a gluing part and a pipe conveying unit; the front-end center positioning unit includes a front-end center positioning device a and a front-end center positioning device b of the same structure; the front-end center positioning device a includes a lifting frame and an infrared locator, the lifting frame is fixed to the top of the middle left chassis unit by bolts, and the track inside the lifting frame allows the sliding lifter to move only in the up and down directions, playing the role of a guide rail; the infrared locator includes a sliding lifter, a front-end positioning electric push rod unit and a front-end positioning infrared transmitter, the middle of the sliding lifter is an electric push rod, and four movable pulleys are installed on both sides of the electric push rod, so that the sliding lifter can move along the track formed by the lifting frame The front-end positioning electric push rod unit includes a large electric push rod in the horizontal direction and four small electric push rods in the four directions of up, down, left and right. One end of the four small electric push rods is fixed to the top of the movable end of the large electric push rod by bolts. The tops of the four small electric push rods are fixed with pressure sensors by bolts. When the four small electric push rods are working, they can penetrate into the inside of the pipe. Then the four small electric push rods are extended so that the four pressure sensors on their tops can be squeezed to the inner wall of the pipe until the pressures of the four pressure sensors are the same. The front-end positioning infrared transmitter is fixed to the movable end of the large electric push rod in the electric push rod unit. After the positions of the four small electric push rods are fixed, the front-end positioning infrared transmitter can emit infrared rays in the horizontal direction. The infrared receiver at the end can receive the infrared ray, thereby transmitting the center position of the tube to the middle glue coating device a, so that the middle glue coating device a can adjust its height to match the center with the center of the tube; the glue coating part and the pipeline transportation unit include a front end angle conveyor belt unit, an intermediate glue coating unit and a rear end angle conveyor belt unit; the front end angle conveyor belt unit includes a front end angle conveyor belt a and a front end angle conveyor belt b with the same structure; the front end angle conveyor belt a includes an angle conveyor belt a and a front end angle conveyor belt motor unit, and the conveying roller can rotate under the drive of the front end angle conveyor belt motor unit, so that the tube can be conveyed forward by friction, and the roller of the front end angle conveyor belt motor unit is fixed to the front by bolts. The intermediate gluing unit comprises an intermediate gluing device a and an intermediate gluing device b of the same structure; the intermediate gluing device a comprises a primary fixing and conveying ring, a secondary gluing ring, and a tertiary gluing ring, and the primary fixing and conveying ring comprises a primary outer ring, a primary inner ring, a primary hydraulic cylinder unit, a pressure sensor unit, and a primary friction transmission slide rail unit; the primary outer ring is connected to the intermediate chassis lifting frame a by bolts, and can drive the primary fixing and conveying ring to rise and fall when the intermediate chassis lifting frame a rises and falls; the primary outer ring and the primary inner ring are connected by bolts and a primary hydraulic cylinder unit, and the primary outer ring and the primary inner ring are fixed together with the same center of the circle, and fixed to the top of the primary hydraulic cylinder unit by bolts;When the first-level hydraulic cylinder unit is extended, the pressure sensor unit can be squeezed onto the transmitted pipe. After the pressure reaches a certain value, the first-level hydraulic cylinder unit memorizes the current extended length, thereby providing the first-level fixing and transmission ring, the second-level glue coating ring and the third-level glue brushing ring with the pipe diameter information; the first-level friction transmission slide rail unit is fixed to the top of the first-level hydraulic cylinder unit by bolts, and the first-level hydraulic cylinder unit connected to the first-level friction transmission slide rail unit is extended to make the first-level friction transmission slide rail unit in close contact with the pipe, and the first-level friction transmission slide rail unit rotates its motor so that its roller drives the pipe downward by friction; the second-level glue coating ring includes a second The outer ring, the secondary inner ring, the secondary hydraulic cylinder unit and the glue gun unit; the secondary outer ring and the secondary inner ring have the same structure as the primary outer ring and the primary inner ring respectively; the glue gun unit is fixed to the top of the secondary hydraulic cylinder unit by bolts, and after the pressure sensor unit provides the diameter information of the pipe, it is extended to an appropriate length so that the top of the glue gun unit contacts the outer surface of the pipe and completes the glue coating; the three-stage glue brushing ring includes a three-stage outer ring, a three-stage inner ring, a three-stage hydraulic cylinder unit, a three-stage friction transmission slide rail unit, a glue brush unit, a large gear ring, a small gear ring unit and a three-stage motor unit. The three-stage hydraulic cylinder unit obtains the pipe diameter information provided by the pressure sensor unit. After that, it can be extended to an appropriate length. First, the rubber brush unit fixed on the three-stage hydraulic cylinder unit by bolts is extended until the rubber brush unit contacts the surface of the pipe; then the motor rotates to drive the small gear ring unit to rotate, and the small gear ring unit drives the large gear ring to rotate, so that the rubber brush unit rotates around the center of the pipe to carry out the work of brushing glue; after the glue brushing is completed, the hydraulic cylinder of the rubber brush unit fixed on the top is retracted, and then the three-stage hydraulic cylinder unit fixed with the three-stage friction transmission slide rail unit by bolts is extended, so that the three-stage friction transmission slide rail unit is in close contact with the outer surface of the pipe, and the roller of the three-stage friction transmission slide rail unit rotates, and the pipe is moved forward by friction. To the rear end angle conveyor belt a; the rear end angle conveyor belt unit includes rear end angle conveyor belt a and rear end angle conveyor belt b with the same structure; the rear end angle conveyor belt a includes rear end front conveyor belt, rear end rear conveyor belt and infrared gripper locator, the bottom of the bracket of the rear end front conveyor belt is fixed to the middle left chassis unit by bolts, and the roller in the rear end front conveyor belt can be rotated under the drive of its motor, and the pipe can be driven forward by friction; the infrared gripper locator is fixed to the bracket leg of the rear end front conveyor belt by bolts, and can be calibrated with the vertical infrared locator to position the upper mechanical arm hydraulic gripper. ;
[0010] Furthermore, the middle chassis part includes a middle left chassis unit and a middle right chassis unit with the same structure; the middle left chassis unit includes a chassis frame, a middle left chassis track and a middle left chassis tire unit, the middle left chassis track is fixed to the chassis frame by bolts and can drive the entire device to move forward, and the middle left chassis tire unit is fixed to the lower surface of the middle left chassis unit by bolts, playing a supporting role for the central soil transport pipe and the rear soil discharge device.
[0011] Preferably, the pipeline installation part includes an upper mechanical arm and a lower mechanical clamp; the upper mechanical arm includes an arm unit, an upper mechanical arm hydraulic cylinder unit, an upper mechanical arm hydraulic clamp, a horizontal infrared locator unit a, and a vertical infrared locator; the respective arms in the arm unit are connected to each other through an articulated seat and can rotate around the articulated seat; the respective hydraulic cylinders in the upper mechanical arm hydraulic cylinder unit are connected to the articulated seat blue of the respective arms in the arm unit in the form of an articulated seat so that the hydraulic cylinders in the upper mechanical arm hydraulic cylinder unit can rotate at the articulated seat connection, thereby controlling the arm unit and the upper mechanical arm hydraulic clamp to be connected through the articulated seat to the top arm of the arm unit and the hydraulic cylinder connected to the top arm in the upper mechanical arm hydraulic cylinder unit, thereby controlling the direction of the upper mechanical arm hydraulic clamp; the upper mechanical arm hydraulic clamp includes an upper mechanical arm small hydraulic cylinder unit and an upper mechanical arm clamp unit, and the upper mechanical arm The hydraulic cylinders in the small hydraulic cylinder unit are all connected to the clamps in the upper mechanical arm clamp unit through an articulated seat, so that the upper mechanical arm small hydraulic cylinder unit can control the clamping action of the upper mechanical arm clamp unit; the horizontal infrared locator unit a is fixed to the surface of the upper mechanical arm hydraulic clamp by bolts, and can emit horizontal infrared rays for positioning, and the vertical infrared locator is fixed to the other surface of the upper mechanical arm hydraulic clamp by bolts, and can emit infrared rays for positioning; the lower mechanical clamp includes a lower mechanical hydraulic cylinder unit, a lower mechanical hydraulic clamp, and a horizontal infrared locator unit b. The bottom end of the hydraulic cylinder in the lower mechanical hydraulic cylinder unit is fixed to the lower surface of the middle chassis part by bolts, and the top end of each hydraulic cylinder in the lower mechanical hydraulic cylinder unit is connected to the lower mechanical hydraulic clamp by bolts to control the lower mechanical hydraulic clamp to rise or fall; the lower mechanical hydraulic clamp includes a lower mechanical small hydraulic cylinder unit and a lower mechanical clamp unit.
[0012] Preferably, the earthwork backfilling part includes an upward earthmoving device unit, a middle earthmoving pipe, a rear earth discharge device and a middle earthmoving pipe fixing bracket; the upward earthmoving device unit includes an upward earthmoving device a and an upward earthmoving device b with the same structure; the upward earthmoving device a includes an earthmoving vehicle cover and an upward earthmoving conveyor belt, the earthmoving vehicle cover is connected to the vehicle body of the excavated ditch part through a connecting piece, after the earthmoving conveyor belt a transports the earth into the earthmoving vehicle cover, the upward earthmoving conveyor belt fixed to the inner side of the earthmoving vehicle cover by bolts can transport the earth in the upward direction to the middle earthmoving pipe; the front end of the middle earthmoving pipe is connected to the outlet of the upward earthmoving device a by bolts, so that the earth discharged by the upward earthmoving conveyor belt can enter the middle earthmoving pipe, and the middle earthmoving pipe is fixed to the pipe storage box a and the pipe storage box a by connecting pieces. In the middle of the storage box b, the lower surface of the middle earth transporting pipe is also connected to the middle chassis part by bolts through some columns, thereby supporting and fixing the middle earth transporting pipe; the rear earth discharge device includes an earth discharge box, an earth discharge roller and an earth discharge opening and closing plate. The earth discharge box is connected to the outlet of the middle earth transporting pipe by bolts, so that the earth in the middle earth transporting pipe can enter the earth discharge box, and the earth discharge roller is installed on the bottom surface of the inner part of the earth discharge box, and the earth in the earth discharge box can be discharged outward by rotating the roller. The earth discharge opening and closing plate is connected to the side of the earth discharge box through a hinge seat, and the earth discharge opening and closing plate is also connected to the side of the earth discharge box through a hydraulic cylinder so that the hydraulic cylinder can control the opening and closing state of the earth discharge opening and closing plate; the middle earth transporting pipe fixing bracket is connected to the middle earth transporting pipe by bolts at different positions, thereby supporting and fixing the middle earth transporting pipe.
[0013] Correspondingly, the present invention also provides an excavation and installation method of an underground pipeline excavation and installation robot, the steps of which are:
[0014] S1. An external device places the pipe to be laid into the pipe storage box unit along the direction of the electric roller of the pipe storage box for storage;
[0015] S2, the starting device moves forward, the chain shovel unit is turned on and the direction of the chain shovel is adjusted to adjust the depth of the trench to be dug, and then digging begins;
[0016] S3, the device starts to dig soil while moving forward, the earthwork conveyor unit is turned on, the excavated soil is transferred to the upward soil transport device unit through the earthwork conveyor unit, the upward soil transport conveyor is turned on, and the soil in the outer cover of the soil transport vehicle is discharged upward into the middle soil transport pipe, so that the soil is temporarily stored in the soil discharge box;
[0017] S4. After the device digs a trench of a certain length, the electric roller of the pipe storage box is opened to rotate the pipes in the pipe storage box, and the opening and closing door of the pipe storage box is opened to discharge a pipe in the pipe storage box to the pipeline conveyor unit. After the first pipe is discharged, the opening and closing door of the pipe storage box is immediately closed to prevent the pipe from being discharged outward;
[0018] S5, the pipe is transferred to the pipe transfer elevator unit through the pipe transport unit, and then rises to the front angle conveyor belt unit;
[0019] S6, the infrared locator extends forward, the front end positioning electric push rod unit is pushed deep into the pipe, and then the front end positioning electric push rod unit extends the push rod in four directions, up, down, left and right. After the push rod is fully extended, the front end positioning infrared transmitter emits infrared rays;
[0020] S7, adjusting the height of the front infrared receiver so that the infrared rays emitted by the front positioning infrared transmitter are transmitted to the front infrared receiver so that the center of the tube is aligned with the center of the circle;
[0021] S8, the large electric push rod in the front end positioning electric push rod unit continues to extend forward, so that the pipe enters the primary fixing and conveying ring;
[0022] S9, the first-stage hydraulic cylinder unit extends the hydraulic cylinder to make the pressure sensor unit closely contact with the pipe, thereby measuring the diameter information of the pipe;
[0023] S10, the first-level friction transmission slide rail unit extends the hydraulic cylinder connected to it according to the measured pipe diameter information, and then the pipe is sent into the second-level glue coating ring through the sliding friction force of the first-level friction transmission slide rail unit;
[0024] S11, the secondary hydraulic cylinder unit extends the hydraulic cylinder according to the obtained pipe diameter information so that the glue gun mouth of the glue gun unit is in close contact with the pipe and glue is applied, and then the secondary hydraulic cylinder unit is retracted;
[0025] S12, the first-level friction transmission slide rail unit continues to transport the pipe backward to the third-level glue brushing ring; the third-level hydraulic cylinder unit is extended according to the obtained pipe diameter information to make the glue brush of the glue brush unit closely contact with the pipe, and the glue coating work is completed;
[0026] S13, after the brushing work is completed, the three-stage hydraulic cylinder unit equipped with the glue brush is retracted, and then the first-stage friction transmission slide rail unit slightly conveys the pipe forward so that when the three-stage friction transmission slide rail unit contacts the pipe, it will not contact the applied glue, and then the hydraulic cylinder of the three-stage friction transmission slide rail unit is extended to make the conveying device closely contact with the pipe;
[0027] S14, the first-stage friction transmission slide rail unit and the third-stage friction transmission slide rail unit then convey the tube downwards, so that the tube slides to the rear-end angle conveyor belt a, and at this time, the upper robot arm is moved so that the vertical infrared locator and the infrared gripper locator are kept in a straight line in the vertical direction and the gripper is directed downwards, maintaining an open posture without hindering the tube from moving backwards;
[0028] S15, the rear angle conveyor belt unit starts the motor to continue to convey the tube downwards. At this time, the tube will hinder the infrared transmission between the vertical infrared locator and the infrared gripper locator until the tube just crosses the straight line where the two infrared transmitters are located. At this time, the two infrared transmitters can realize the two-way reception of infrared rays, thereby transmitting signals, so that the rear angle conveyor belt unit no longer conveys the tube backwards;
[0029] S16, at this time, the upper mechanical arm clamp unit is controlled to clamp the pipe downward and the mechanical arm is controlled to move the pipe to the lower mechanical clamp (520000) until the horizontal infrared locator unit a corresponds to the horizontal infrared locator unit b. After the position of the arm unit is determined, the arm unit no longer moves up and down and left and right;
[0030] S17. At this time, since the positions of the upper robot arm and the lower mechanical gripper are completely corresponding, the upper robot arm is moved to the lower mechanical gripper to transfer the tube to the lower mechanical gripper. When the horizontal infrared locator unit a of the upper robot arm and the horizontal infrared locator unit b of the lower mechanical gripper measure that the distance between them reaches a certain value, the middle and rear part of the tube has moved into the grasping range of the lower mechanical gripper. At this time, the lower mechanical gripper is clamped to complete the installation of the first tube.
[0031] S18. The overall steps for installing the rear pipe are the same as above, except that when the upper mechanical arm delivers the pipe to the lower mechanical gripper, the glue-coated part of the pipe gripped by the upper mechanical arm is inserted into the hole behind the pipe gripped by the lower mechanical gripper to achieve the butt joint of the two pipes;
[0032] S19. Since the upper mechanical arm pushes the clamped pipe toward the pipe clamped by the lower mechanical gripper when two pipes are butt-jointed, the gripper is always on the most recently installed pipe;
[0033] S20, in the trench section where the pipe is installed, the soil discharge opening and closing plate can be opened and the soil discharge roller can be turned on to discharge the soil in the soil discharge box into the trench where the pipe has been installed. Since the device is always in a forward state, the soil discharge position of the rear soil discharge device also moves forward with the device, and each trench where the pipe is installed can be filled with soil;
[0034] S21. Then the flattened part of the soil surface presses over the filled soil position and compacts the soil. At this point, the entire pipeline excavation and installation work is completed.
[0035] From the above, the underground pipeline excavation and installation robot and the excavation and installation method thereof of the present invention have the following beneficial effects:
[0036] 1. This device can basically realize the integration and automation of pipeline excavation, earth storage, pipe storage, pipe transportation, pipe gluing, pipeline installation, earth backfilling, and soil surface leveling. The use of manpower in each process is greatly reduced, thereby saving labor costs to a great extent.
[0037] 2. This device can be automatically adjusted according to the size of the pipe used. Therefore, as long as it is within the adjustment range of the machine, this device is suitable for pipes of various sizes. No manual control is required, and the various parts of this device can automatically adapt to pipes of different sizes.
[0038] 3. Since the installation procedures of this device are basically automated, the installation accuracy is greatly improved compared with manual installation, thereby greatly improving the quality of pipeline installation.
[0039] 4. Since the installation processes of this device are basically integrated, the installation processes are closely connected, thereby greatly reducing the time for pipeline installation.
[0040] 5. The device is set up as a structure where the left and right sides work together. When the pipe is coated with glue on one side, the coated pipe can be installed on the other side, which improves the efficiency of pipeline installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0042] Figure 1 This is a schematic diagram of the overall structure of the underground pipeline excavation and installation robot of the present invention;
[0043] Figure 2 It is a schematic structural diagram of the trenching part of the present invention;
[0044] Figure 3 It is a structural schematic diagram of a vehicle body of the present invention;
[0045] Figure 4 It is a structural schematic diagram of a vehicle body hydraulic cylinder unit of the present invention;
[0046] Figure 5 It is a structural schematic diagram of a chain shovel unit of the present invention;
[0047] Figure 6 It is a structural schematic diagram of the earthwork transfer belt unit of the present invention;
[0048] Figure 7 It is a schematic diagram of the structure of the pipeline storage and transportation part of the present invention;
[0049] Figure 8It is a structural schematic diagram of the pipeline storage box unit of the present invention;
[0050] Fig. 9 It is a structural schematic diagram of the pipeline storage box a of the present invention;
[0051] Fig.10 It is a schematic structural diagram of the pipeline transportation unit of the present invention;
[0052] Fig.11 It is a schematic structural diagram of the pipeline conveyor belt unit of the present invention;
[0053] Fig.12 It is a structural schematic diagram of the pipeline push plate unit of the present invention;
[0054] Fig.13 It is a structural schematic diagram of a pipeline transmission elevator unit of the present invention;
[0055] Fig.14 It is a structural schematic diagram of the pipeline conveying elevator a of the present invention;
[0056] Fig.15 It is a structural schematic diagram of the pipe glue coating part of the present invention;
[0057] Fig.16 It is a structural schematic diagram of the front-end center positioning unit of the present invention;
[0058] Fig.17 It is a structural schematic diagram of the front end center positioning device a of the present invention;
[0059] Fig.18 It is a structural schematic diagram of the infrared locator of the present invention;
[0060] Fig.19 It is a structural schematic diagram of the glue coating part and the pipeline conveying unit of the present invention;
[0061] Fig. 20 It is a schematic structural diagram of the front-end angle conveyor belt unit of the present invention;
[0062] Fig.21 It is a structural schematic diagram of the front-end angle conveyor belt a of the present invention;
[0063] Fig. 22 It is a structural schematic diagram of the intermediate glue coating unit of the present invention;
[0064] Fig.23 It is a structural schematic diagram of the intermediate glue coating device a of the present invention;
[0065] Fig.24 It is a structural schematic diagram of the primary fixing and conveying ring of the present invention;
[0066] Fig.25It is a structural schematic diagram of the secondary glue coating ring of the present invention;
[0067] Fig.26 This is one of the structural schematic diagrams of the three-stage glue brushing ring of the present invention;
[0068] Fig. 27 This is the second structural schematic diagram of the three-stage glue brushing ring of the present invention;
[0069] Fig.28 It is a structural schematic diagram of the rear end angle conveyor belt unit of the present invention;
[0070] Fig.29 It is a structural schematic diagram of the rear end angle conveyor belt a of the present invention;
[0071] Fig.30 It is a schematic structural diagram of the middle chassis part of the present invention;
[0072] Fig.31 It is a structural schematic diagram of the middle left chassis unit of the present invention;
[0073] Fig.32 It is a structural schematic diagram of the pipeline installation part of the present invention;
[0074] Fig.33 It is a structural schematic diagram of the upper mechanical arm of the present invention;
[0075] Fig.34 It is a structural schematic diagram of a horizontal infrared locator unit of the present invention;
[0076] Fig.35 It is a structural schematic diagram of the hydraulic clamp of the upper mechanical arm of the present invention;
[0077] Fig.36 It is a schematic structural diagram of the lower mechanical gripper of the present invention;
[0078] Fig.37 It is a structural schematic diagram of the lower mechanical hydraulic clamping jaw of the present invention;
[0079] Fig.38 It is a structural schematic diagram of the earth backfilling part of the present invention;
[0080] Fig.39 It is a structural schematic diagram of the upward soil transporting device unit of the present invention;
[0081] Fig.40 It is a structural schematic diagram of the upward soil transporting device a of the present invention;
[0082] Fig.41 It is a structural schematic diagram of the rear soil discharge device of the present invention;
[0083] Fig.42It is a structural schematic diagram of the soil surface flattening part of the present invention. Description of the drawings:
[0085] 100,000- trench excavation;
[0086] 110000-body;
[0087] 111000-Car body hydraulic cylinder unit;
[0088] 111100-chain shovel hydraulic cylinder unit, 111200-earth scraper hydraulic cylinder unit; 112000-earth scraper;
[0089] 120000-chain shovel unit;
[0090] 121000-chain shovel, 122000-chain shovel protective gear;
[0091] 130000 - Earth moving conveyor belt unit;
[0092] 131000-earth conveyor belt a, 132000-earth conveyor belt b;
[0093] 140000-partial crawler tracks for trenching;
[0094] 200,000-Pipeline storage and transportation section;
[0095] 210000-Pipeline storage box unit;
[0096] 211000-Pipeline storage box a;
[0097] 211100- push door;
[0098] 211200-pipe storage box;
[0099] 211300-Translation track;
[0100] 211400-Electric drum for storage box;
[0101] 211500-opening and closing door of storage box;
[0102] 212000-Pipeline storage box b;
[0103] 220000-Pipeline transport unit;
[0104] 221000-Pipeline conveyor belt unit;
[0105] 221100-Pipeline conveyor belt a, 221200-Pipeline conveyor belt b;
[0106] 222000-Pipe push plate unit;
[0107] 222100-Pipeline push plate a, 222200-Pipeline push plate b;
[0108] 223000-Pipeline conveyor elevator unit;
[0109] 223100-Pipeline conveyor elevator a;
[0110] 223110-Winches;
[0111] 223120- elevator frame;
[0112] 223130-Elevator lifting frame;
[0113] 223200-Pipeline conveyor elevator b;
[0114] 300000-pipe glue coating part;
[0115] 310000-front end center positioning unit;
[0116] 311000-front end center positioning device a;
[0117] 311100-lifting frame;
[0118] 311200-infrared locator;
[0119] 311210-Sliding lifter;
[0120] 311220-Front end positioning electric push rod unit;
[0121] 311230-front-end positioning infrared transmitter;
[0122] 312000-front end center positioning device b;
[0123] 320000-Glue coating part and pipeline transport unit;
[0124] 321000-front angle conveyor unit;
[0125] 321100-front angle conveyor belt a;
[0126] 321110-Angle conveyor belt a;
[0127] 321120-Front Angle Conveyor Motor Unit;
[0128] 321200-front angle conveyor belt b;
[0129] 322000-intermediate gluing unit;
[0130] 322100-intermediate glue coating device a;
[0131] 322110-First-level fixing and transmission ring;
[0132] 322111-First level outer ring;
[0133] 322112-First level inner ring;
[0134] 322113-First-stage hydraulic cylinder unit;
[0135] 322114-pressure sensor unit;
[0136] 322115-First-level friction drive slide unit;
[0137] 322120-Secondary rubberized ring;
[0138] 322121-Secondary Outer Ring;
[0139] 322122-Secondary inner ring;
[0140] 322123-Secondary hydraulic cylinder unit;
[0141] 322124-Glue gun unit;
[0142] 322130-three-stage brushing rubber ring;
[0143] 322131-third level outer ring;
[0144] 322132-third level inner ring;
[0145] 322133-three-stage hydraulic cylinder unit;
[0146] 322134-Three-stage friction drive slide unit;
[0147] 322135-Glue brush unit;
[0148] 322136-large tooth ring;
[0149] 322137-small gear ring unit;
[0150] 322138-Three-stage motor unit;
[0151] 322140-front infrared receiver;
[0152] 322200-intermediate glue coating device b;
[0153] 322300-Intermediate chassis lifting frame a;
[0154] 322400-intermediate chassis lifting frame b;
[0155] 323000-Rear end angle conveyor unit;
[0156] 323100-Rear end angle conveyor belt a;
[0157] 323110-rear end front conveyor belt;
[0158] 323120-rear conveyor belt;
[0159] 323130-Infrared gripper positioner;
[0160] 323200- rear angle conveyor belt b;
[0161] 400,000-middle chassis part;
[0162] 410000-center left chassis unit;
[0163] 411000-Chassis frame;
[0164] 412000-center left chassis track;
[0165] 413000-center left chassis tire unit;
[0166] 420000-center right chassis unit;
[0167] 500000-Pipeline installation part;
[0168] 510000-upper robot arm;
[0169] 511000-arm unit;
[0170] 512000-upper arm hydraulic cylinder unit;
[0171] 513000-Hydraulic gripper of upper arm;
[0172] 513100- small hydraulic cylinder unit of upper manipulator arm;
[0173] 513200-Upper arm clamp unit;
[0174] 514000-Horizontal infrared locator unit a;
[0175] 515000-vertical infrared locator;
[0176] 520000-lower mechanical gripper;
[0177] 521000-lower mechanical hydraulic cylinder unit;
[0178] 522000-lower mechanical hydraulic gripper;
[0179] 522100-lower mechanical small hydraulic cylinder unit;
[0180] 522200-lower mechanical clamp unit;
[0181] 523000-Horizontal infrared locator unit b;
[0182] 600,000-earth backfilling part;
[0183] 610000- upward earth moving device unit;
[0184] 611000- upward earth transport device a;
[0185] 611100 - Earth moving vehicle covers;
[0186] 611200- conveyor belt for transporting soil upward;
[0187] 612000- upward earth transport device b;
[0188] 620000-Central earth transport pipeline;
[0189] 630000-Rear earth discharge device;
[0190] 631000-soil dump box;
[0191] 632000-soil discharge roller;
[0192] 633000-Earth discharge opening and closing plate;
[0193] 640000-Fixed bracket for the middle earth-moving pipeline;
[0194] 700000-soil surface flattened part;
[0195] 710000-soil roller;
[0196] 720000-Connecting arm. DETAILED DESCRIPTION
[0197] Next, combine Figures 1 to 42 The present invention introduces in detail an underground pipeline excavation and installation robot and an excavation and installation method thereof.
[0198] Depend on Figure 1As shown, the underground pipeline excavation and installation robot of the present invention is generally divided into a trench excavation part 100000, a pipeline storage and transportation part 200000, a pipeline gluing part 300000, an intermediate chassis part 400000, a pipeline installation part 500000, an earth backfilling part 600000 and an earth surface flattening part 700000. Among them, the trench excavation part 100000 digs a trench on the soil surface so that the pipe can be laid in the excavated trench; the pipe storage and transportation part 200000 stores the pipes that need to be painted and can automatically deliver the pipes into the device; the pipe gluing part 300000 glues the pipe ports of different sizes so that the pipes can be fixed with glue when they are subsequently connected; the middle chassis part 400000 is used to carry the installation of other mechanisms and tracks; the pipe installation part 500000 can directly connect the glued pipes; the earth backfilling part 600000 stores the soil excavated by the trench excavation part 100000, and fills the stored soil back into the excavated trench after the pipe is laid; the soil surface flattening part 700000 is used to flatten the soil surface on the tunnel after the earth backfilling part 600000 backfills.
[0199] like Figure 2 As shown, the trench excavation part 100000 includes a vehicle body 110000, a chain shovel unit 120000, an earthwork conveyor belt unit 130000, and a trench excavation part crawler 140000. The logical relationship between the above components is described in detail below:
[0200] like Figure 3 to Figure 4As shown, the vehicle body 110000 includes a vehicle body hydraulic cylinder unit 111000 and an earth scraper 112000. The vehicle body hydraulic cylinder unit 111000 includes a chain shovel hydraulic cylinder unit 111100 and an earth scraper hydraulic cylinder unit 111200. One end of the chain shovel hydraulic cylinder unit 111100 is connected to the vehicle body 110000 through an articulated seat so that one end of the chain shovel hydraulic cylinder unit 111100 can rotate around the articulated seat, and the movable end of the chain shovel hydraulic cylinder unit 111100 is connected to the chain shovel guard 122000 through an articulated seat so that the movable end of the chain shovel hydraulic cylinder unit 111100 can rotate around the articulated seat, so that the chain shovel hydraulic cylinder unit 111100 controls the direction of the chain shovel 121000 through the telescopic hydraulic cylinder, thereby adjusting the depth of the trench dug. One end of the earth scraper hydraulic cylinder unit 111200 is connected to the chain shovel guard 122000 through an articulated seat, so that one end of the earth scraper hydraulic cylinder unit 111200 can rotate around the articulated seat, and the movable end of the earth scraper hydraulic cylinder unit 111200 is connected to the earth scraper 112000 through the articulated seat, so that the earth scraper hydraulic cylinder unit 111200 can adjust the scraper height of the earth scraper 112000. The earth scraper 112000 is connected to the vehicle body 110000 through the articulated seat so that the earth scraper 112000 can rotate around the articulated seat to adjust the scraper height of the earth scraper 112000.
[0201] like Figure 5 As shown, the chain shovel unit 120000 includes a chain shovel 121000 and a chain shovel protective gear 122000. The rotating drum portion of the chain shovel 121000 is fixed to the inner side of the chain shovel protective gear 122000 by bolts, and the motor driving the chain shovel 121000 to rotate is fixed to the outer side of the corresponding position of the chain shovel protective gear 122000 by bolts so that the chain shovel 121000 can be driven to rotate when the motor rotates. One end of the chain shovel protective gear 122000 is fixed to the vehicle body 110000 by bolts, so that the chain shovel protective gear 122000 can rotate around the hinge seat, thereby adjusting the direction of the chain shovel 121000 and thus adjusting the depth of the excavated trench.
[0202] like Figure 6As shown, the earthwork conveyor belt unit 130000 includes an earthwork conveyor belt a131000 and an earthwork conveyor belt b132000. The two earthwork conveyor belts are connected in the same way and have the same functions. Therefore, only the earthwork conveyor belt a131000 is described, and the earthwork conveyor belt b132000 is not described in detail. The two sides of the earthwork conveyor belt a131000 are fixed to the vehicle body 110000 by bolts, and the earthwork conveyor belt a131000 is driven by a motor to rotate and transport, so that the earthwork conveyor belt a131000 can transport the soil excavated by the chain shovel 121000 from the bottom of the vehicle body 110000 to the upward soil transporting device a611000. The trenching part crawler 140000 is fixed to the chassis below the vehicle body 110000 by bolts so that the trenching part crawler 140000 can drive the trenching part 100000 to move forward.
[0203] like Figure 7 As shown, the pipeline storage and transportation part 200000 includes a pipeline storage box unit 210000 and a pipeline transportation unit 220000. The logical relationship of the above components is described in detail below:
[0204] like Figure 8 As shown, the pipe storage box unit 210000 includes a pipe storage box a211000 and a pipe storage box b212000. Since the pipe storage box a211000 and the pipe storage box b212000 are symmetrical structures, the structures of the two are the same and the connection methods are the same, only the pipe storage box a211000 will be described, and the pipe storage box b212000 will not be described in detail.
[0205] like Fig. 9As shown, the pipe storage box a211000 includes a push door 211100, a pipe storage box 211200, a translation track 211300, a pipe storage box electric roller 211400 and a pipe storage box opening and closing door 211500. The top of the push door 211100 is connected to the motor through bolts, the rotor end of the motor is connected to the gear, the gear is limited on the translation track 211300, and the two sides of the push door 211100 are connected with a pulley block through bolts. The slideway of the pulley block is on the inner side of the pipe storage box 211200, so that the pulley block can only slide in the horizontal direction along the slideway, which mainly plays a role in limiting the moving direction of the push door 211100, so that the motor at the top is not affected by the dead weight of the push door 211100 when driving the gear to move. The advancement of the push door 211100 can push the pipe in the pipe storage box 211200 to move toward the pipe outlet, so that the pipe can go out from the outlet. The pipe storage box 211200 is fixed to the middle left chassis unit 410000 by bolts and can be used to store pipes. The translation rail 211300 is fixed to the upper side walls of the pipe storage box 211200 by bolts. The translation rail 211300 can cooperate with the motor and gear to drive the push door 211100 to move forward or backward. The pipe storage box electric roller 211400 is connected to the bottom of the inner wall of the pipe storage box 211200 through a bearing. When the pipe storage box electric roller 211400 rolls, the pipes in the pipe storage box 211200 can be moved, so that the pipes can come out from the pipe storage box opening and closing door 211500. One end of the pipe storage box opening and closing door 211500 is connected to an electric push rod, and one end of the electric push rod is connected to the pipe storage box 211200 through a hinge seat. When the electric push rod is extended and retracted, it can drive the opening and closing door 211500 of the pipe storage box to release or block the pipes.
[0206] like Fig.10 As shown, the pipe transport unit 220000 includes a pipe transport belt unit 221000 , a pipe push plate unit 222000 and a pipe conveying elevator unit 223000 .
[0207] like Fig.11 As shown, the pipeline conveyor belt unit 221000 includes a pipeline conveyor belt a221100 and a pipeline conveyor belt b221200. Since the two conveyor belts are symmetrical structures, have the same structure and the same connection method, only the pipeline conveyor belt a221100 will be described, and the pipeline conveyor belt b221200 will not be described in detail. The bottom of the pipeline conveyor belt a221100 is fixed to the middle left chassis unit 410000 by bolts. After the pipe comes out of the pipe storage box opening and closing door 211500, the pipeline conveyor belt a221100 can transport the pipe forward so that the pipe reaches the end of the pipeline conveyor belt a221100, and then cooperates with the pipeline push plate a222100 to push the pipe into the pipeline conveying elevator a223100.
[0208] like Fig.12 As shown, the pipeline push plate unit 222000 includes a pipeline push plate a222100 and a pipeline push plate b222200. Since the two push plates are symmetrical, have the same structure and the same connection method, only the pipeline push plate a222100 will be described, and the pipeline push plate b222200 will not be described in detail. The middle upper part of the pipeline push plate a222100 is connected to the side fence of the pipeline conveyor belt a221100 through a hinge seat, so that the pipeline push plate a222100 can rotate around the hinge seat. The top end of the pipe push plate a222100 is connected to the electric push rod, and the bottom end of the electric push rod is fixed on the middle left chassis unit 410000 so that the extension and retraction of the electric push rod can control the pipe push plate a222100 to push the pipe forward or stick to the side wall of the pipe conveyor belt a221100 backward so as not to block the advancement of the pipe, so that the pipe push plate a222100 can push the pipe into the pipe conveying elevator a223100 when the pipe is transported to the end of the pipe conveyor belt a221100.
[0209] like Fig.13 As shown, the pipeline conveying elevator unit 223000 includes a pipeline conveying elevator a223100 and a pipeline conveying elevator b223200. Since these two elevators are symmetrical structures with the same structure and the same connection method, only the pipeline conveying elevator a223100 is described, and the pipeline conveying elevator b223200 is not described in detail.
[0210] like Fig.14 As shown, the pipe conveying elevator a223100 includes a winch 223110, an elevator outer frame 223120 and an elevator lifting frame 223130. The base of the winch 223110 is fixed on the top of the elevator outer frame 223120 by bolts, and the rope extended from the winch 223110 is connected to the top of the elevator lifting frame 223130 through a hook, so that the winch 223110 can control the up and down movement of the elevator lifting frame 223130, the elevator outer frame 223120 is fixed on the surface of the middle left chassis unit 410000 by bolts, and the elevator lifting frame 223130 is connected to the rope extended from the winch 223110 through a hook, and can rise or fall under the control of the winch 223110 to transport the pipe upward or downward.
[0211] like Fig.15 As shown, the pipe glue coating part 300000 includes a front end center positioning unit 310000 and a glue coating part and a pipe conveying unit 320000. The logical relationship between the above components is described in detail below:
[0212] like Fig.16As shown, the front end center positioning unit 310000 includes a front end center positioning device a311000 and a front end center positioning device b312000. Since these two positioning devices are symmetrical structures, they have the same structure and the same connection method. Therefore, only the front end center positioning device a311000 is described, and the front end center positioning device b312000 is not repeated.
[0213] like Fig.17 As shown, the front center positioning device a311000 includes a lifting frame 311100 and an infrared locator 311200. The lifting frame 311100 is fixed to the middle left chassis unit 410000 by bolts. The internal track allows the sliding lifter 311210 to move only in the up and down directions, acting as a guide rail.
[0214] like Fig.18 As shown, the infrared locator 311200 includes a sliding lifter 311210, a front-end positioning electric push rod unit 311220 and a front-end positioning infrared transmitter 311230. The middle of the sliding lifter 311210 is an electric push rod, and four movable pulleys are installed on both sides of the electric push rod, so that the sliding lifter 311210 can slide up and down along the track formed by the lifting frame 311100. The front-end positioning electric push rod unit 311220 includes a large electric push rod in the horizontal direction and four small electric push rods in the four directions of up, down, left and right. One end of the four small electric push rods is fixed to the top of the movable end of the large electric push rod by bolts, and the top of the four small electric push rods is fixed with pressure sensors by bolts. When the four small electric push rods are working, they can penetrate into the inside of the pipe, and then the four small electric push rods are extended so that the four pressure sensors at their tops can be squeezed to the inner wall of the pipe until the pressure of the four pressure sensors is the same. The front-end positioning infrared transmitter 311230 is fixed on the movable end of the large electric push rod in the electric push rod unit. After the positions of the four small electric push rods are fixed, the front-end positioning infrared transmitter 311230 can emit infrared rays in the horizontal direction, and the front-end infrared receiver 322140 can receive the infrared rays, thereby transmitting the center position of the tube to the middle glue coating device a322100, so that the middle glue coating device a322100 can adjust its height to match the center with the center of the tube.
[0215] like Fig.19 As shown, the gluing part and the pipe conveying unit 320000 includes a front end angle conveyor belt unit 321000 , a middle gluing unit 322000 and a rear end angle conveyor belt unit 323000 .
[0216] like Fig. 20As shown, the front angle conveyor belt unit 321000 includes a front angle conveyor belt a321100 and a front angle conveyor belt b321200. Since the two conveyor belts are symmetrical structures, have the same structure and the same connection method, only the front angle conveyor belt a321100 is described, and the front angle conveyor belt b321200 is not repeated.
[0217] like Fig.21 As shown, the front angle conveyor a321100 includes an angle conveyor a321110 and a front angle conveyor motor unit 321120. The conveying roller can be rotated under the drive of the front angle conveyor motor unit 321120, so that the pipe can be conveyed forward by friction. The roller of the front angle conveyor motor unit 321120 is fixed to the brackets on both sides of the front angle conveyor a321100 by bolts.
[0218] like Fig. 22 As shown, the intermediate gluing unit 322000 includes an intermediate gluing device a322100 and an intermediate gluing device b322200. Since these two gluing devices are symmetrical structures with the same structure and the same connection method, only the intermediate gluing device a322100 is described, and the intermediate gluing device b322200 is not described in detail.
[0219] like Figure 22 to Figure 24As shown, the intermediate glue coating device a322100 includes a primary fixing and conveying ring 322110, a secondary glue coating ring 322120, and a tertiary glue brushing ring 322130. The primary fixing and conveying ring 322110 includes a primary outer ring 322111, a primary inner ring 322112, a primary hydraulic cylinder unit 322113, a pressure sensor unit 322114, and a primary friction transmission slide rail unit 322115. The primary outer ring 322111 is connected to the intermediate chassis lifting frame a322300 by bolts, and can drive the primary fixing and conveying ring 322110 to rise and fall when the intermediate chassis lifting frame a322300 rises and falls. The first-level outer ring 322111 and the first-level inner ring 322112 are connected by bolts and the first-level hydraulic cylinder unit 322113. The first-level outer ring 322111 and the first-level inner ring 322112 are fixed together concentrically and fixed to the top of the first-level hydraulic cylinder unit 322113 by bolts. When the first-level hydraulic cylinder unit 322113 is extended, the pressure sensor unit 322114 can be squeezed onto the pipe transmitted. After the pressure reaches a certain value, the first-level hydraulic cylinder unit 322113 memorizes the current extended length, thereby providing the first-level fixing and transmission ring 322110, the second-level glue coating ring 322120 and the third-level glue brushing ring 322130 with the diameter information of the pipe. The first-level friction transmission slide rail unit 322115 is fixed to the top of the first-level hydraulic cylinder unit 322113 by bolts, and the first-level hydraulic cylinder unit 322113 connected to the first-level friction transmission slide rail unit 322115 is extended to make the first-level friction transmission slide rail unit 322115 in close contact with the pipe, and the first-level friction transmission slide rail unit 322115 rotates its motor so that its roller drives the pipe downward by friction force.
[0220] like Fig.25 As shown, the secondary glue coating ring 322120 includes a secondary outer ring 322121, a secondary inner ring 322122, a secondary hydraulic cylinder unit 322123 and a glue coating gun unit 322124. The secondary outer ring 322121 and the secondary inner ring 322122 have the same structure, similar functions and similar connection methods as the primary outer ring 322111 and the primary inner ring 322112, respectively, so they are not described in detail. The glue coating gun unit 322124 is fixed to the top of the secondary hydraulic cylinder unit 322123 by bolts. After the pressure sensor unit 322114 provides the diameter information of the pipe, it is extended to an appropriate length so that the top of the glue coating gun unit 322124 contacts the outer surface of the pipe and completes the glue coating.
[0221] like Fig.26 and Fig. 27As shown, the three-stage brush rubber ring 322130 includes a three-stage outer ring 322131, a three-stage inner ring 322132, a three-stage hydraulic cylinder unit 322133, a three-stage friction transmission slide rail unit 322134, a rubber brush unit 322135, a large gear ring 322136, a small gear ring unit 322137 and a three-stage motor unit 322138. The three-stage outer ring 322131 and the three-stage inner ring 322132 are similar in structure, function and connection to the first-stage outer ring 322111 and the first-stage inner ring 322112, respectively, so they are not described in detail. After obtaining the pipe diameter information provided by the pressure sensor unit 322114, the three-stage hydraulic cylinder unit 322133 can be extended to an appropriate length, firstly extending the rubber brush unit 322135 fixed to the three-stage hydraulic cylinder unit 322133 by bolts until the rubber brush unit 322135 contacts the surface of the pipe. Then the motor rotates to drive the small gear ring unit 322137 to rotate, and the small gear ring unit 322137 in turn drives the large gear ring 322136 to rotate, so that the glue brush unit 322135 rotates around the center of the tube to carry out the glue brushing work. After the glue brushing is completed, the hydraulic cylinder of the glue brush unit 322135 fixed at the top is retracted, and then the three-stage hydraulic cylinder unit 322133 fixed with the three-stage friction transmission slide rail unit 322134 by bolts is extended, so that the three-stage friction transmission slide rail unit 322134 is in close contact with the outer surface of the tube, and the roller of the three-stage friction transmission slide rail unit 322134 rotates, and the tube is moved forward to the rear end angle conveyor belt a323100 by friction.
[0222] like Figure 28 to Figure 29 As shown, the rear angle conveyor belt unit 323000 includes a rear angle conveyor belt a323100 and a rear angle conveyor belt b323200. Since the two conveyor belts have the same structure, function and connection method, only the rear angle conveyor belt a323100 will be described, and the rear angle conveyor belt b323200 will not be described in detail. The rear angle conveyor belt a323100 includes a rear front conveyor belt 323110, a rear rear conveyor belt 323120 and an infrared gripper positioner 323130. The bottom of the bracket of the rear front conveyor belt 323110 is fixed to the middle left chassis unit 410000 by bolts. Driven by its motor, the roller in the rear front conveyor belt 323110 can rotate, and the friction force can drive the pipe to move forward. The connection method of the rear rear conveyor belt 323120 is similar to that of the rear front conveyor belt 323110, so it will not be described in detail. The infrared gripper locator 323130 is fixed to the bracket leg of the rear end front conveyor belt 323110 by bolts, and can be calibrated with the vertical infrared locator 311200 to position the upper robot arm hydraulic gripper 513000.
[0223] like Fig.30As shown, the middle chassis part 400000 includes a middle left chassis unit 410000 and a middle right chassis unit 420000. The logical relationship of the above components is described in detail below:
[0224] Since the middle left chassis unit 410000 and the middle right chassis unit 420000 are symmetrical structures with the same structure and the same connection method, only the middle left chassis unit 410000 will be described, and the middle right chassis unit 420000 will not be described in detail.
[0225] like Fig.31 As shown, the middle left chassis unit 410000 includes a chassis frame 411000, a middle left chassis track 412000 and a middle left chassis tire unit 413000. The middle left chassis track 412000 is fixed to the chassis frame 411000 by bolts and can drive the entire device to move forward. The middle left chassis tire unit 413000 is fixed to the lower surface of the middle left chassis unit 410000 by bolts, and plays a supporting role for the middle soil transport pipe 620000 and the rear soil discharge device 630000.
[0226] The pipe installation part 500000 includes an upper mechanical arm 510000 and a lower mechanical gripper 520000. The logical relationship between the above components is described in detail below:
[0227] like Figure 32-Figure 34 As shown, the upper robot arm 510000 includes an arm unit 511000, an upper robot arm hydraulic cylinder unit 512000, an upper robot arm hydraulic clamp 513000, a horizontal infrared locator unit a514000, and a vertical infrared locator 515000. The arms in the arm unit 511000 are connected to each other through an articulated seat and can rotate around the articulated seat. Each hydraulic cylinder in the upper robot arm hydraulic cylinder unit 512000 is connected to the articulated seat of each arm in the arm unit 511000 through an articulated seat, so that the hydraulic cylinder in the upper robot arm hydraulic cylinder unit 512000 can rotate at the articulated seat connection, thereby controlling the arm unit 511000 and the upper robot arm hydraulic clamp 513000 to be connected to the top arm of the arm unit 511000 and the hydraulic cylinder connected to the top arm in the upper robot arm hydraulic cylinder unit 512000 through the articulated seat, thereby controlling the direction of the upper robot arm hydraulic clamp 513000.
[0228] like Fig.35As shown, the upper mechanical arm hydraulic clamp 513000 includes an upper mechanical arm small hydraulic cylinder unit 513100 and an upper mechanical arm clamp unit 513200. The hydraulic cylinders in the upper mechanical arm small hydraulic cylinder unit 513100 are connected to the clamps in the upper mechanical arm clamp unit 513200 in the form of an articulated seat so that the upper mechanical arm small hydraulic cylinder unit 513100 can control the clamping action of the upper mechanical arm clamp unit 513200. The horizontal infrared locator unit a514000 is fixed to the surface of the upper mechanical arm hydraulic clamp 513000 by bolts, and can emit horizontal infrared rays for positioning. The vertical infrared locator 515000 is fixed to the other surface of the upper mechanical arm hydraulic clamp 513000 by bolts and can emit infrared rays for positioning.
[0229] like Fig.36 and Fig.37 As shown, the lower mechanical clamp 520000 includes a lower mechanical hydraulic cylinder unit 521000, a lower mechanical hydraulic clamp 522000, and a horizontal infrared locator unit b523000. The bottom end of the hydraulic cylinder in the lower mechanical hydraulic cylinder unit 521000 is fixed to the lower surface of the middle chassis part 400000 by bolts, and the top of each hydraulic cylinder in the lower mechanical hydraulic cylinder unit 521000 is connected to the lower mechanical hydraulic clamp 522000 by bolts to control the lower mechanical hydraulic clamp 522000 to rise or fall. The lower mechanical hydraulic clamp 522000 includes a lower mechanical small hydraulic cylinder unit 522100 and a lower mechanical clamp unit 522200. Since the lower mechanical hydraulic clamp 522000 and the upper mechanical arm hydraulic clamp 513000 have similar structures, similar functions, and similar connection methods, they will not be described in detail. The horizontal infrared locator unit b523000 has a similar structure, function and connection method to the horizontal infrared locator unit a514000, so they will not be described in detail.
[0230] like Fig.38 As shown, the earth backfill part 600000 includes an upward earth transport device unit 610000, a middle earth transport pipe 620000, a rear earth discharge device 630000 and a middle earth transport pipe fixing bracket 640000. The logical relationship of the above components is described in detail below:
[0231] like Fig.39 and Fig.40As shown, the upward earth-moving device unit 610000 includes an upward earth-moving device a611000 and an upward earth-moving device b612000. Since the two earth-moving devices have the same structure, the same function, and the same connection method, only the upward earth-moving device a611000 will be described, and the upward earth-moving device b612000 will not be described in detail. The upward earth-moving device a611000 includes an earth-moving vehicle cover 611100 and an upward earth-moving conveyor belt 611200. The earth-moving vehicle cover 611100 is connected to the vehicle body 110000 through a connecting piece. After the earth-moving conveyor belt a131000 transfers the earth into the earth-moving vehicle cover 611100, the upward earth-moving conveyor belt 611200 fixed to the inner side of the earth-moving vehicle cover 611100 by bolts can transfer the earth in the middle earth-moving pipeline 620000. The front end of the middle soil transport pipe 620000 is connected to the outlet of the upward soil transport device a611000 by bolts, so that the soil discharged from the upward soil transport conveyor belt 611200 can enter the middle soil transport pipe 620000. The middle soil transport pipe 620000 is fixed in the middle of the pipe storage box a211000 and the pipe storage box b212000 by connecting parts. The lower surface of the middle soil transport pipe 620000 is also connected to the middle chassis part 400000 by bolts through some columns, thereby supporting and fixing the middle soil transport pipe 620000.
[0232] like Fig.41 As shown, the rear soil discharge device 630000 includes a soil discharge box 631000, a soil discharge roller 632000 and a soil discharge opening and closing plate 633000. The soil discharge box 631000 is connected to the outlet of the middle soil transport pipe 620000 by bolts, so that the soil in the middle soil transport pipe 620000 can enter the soil discharge box 631000. The soil discharge roller 632000 is installed on the inner bottom surface of the soil discharge box 631000, and the soil in the soil discharge box 631000 can be discharged outward by rotating the roller. The soil discharge opening and closing plate 633000 is connected to the side of the soil discharge box 631000 through a hinge seat, and the soil discharge opening and closing plate 633000 is also connected to the side of the soil discharge box 631000 through a hydraulic cylinder so that the hydraulic cylinder can control the opening and closing state of the soil discharge opening and closing plate 633000. The middle earth transport pipe fixing bracket 640000 is connected to the middle earth transport pipe 620000 by bolts at different positions, so as to support and fix the middle earth transport pipe 620000.
[0233] like Fig.42 As shown, the soil surface flattening part 700000 includes a soil compacting roller 710000 and a connecting arm 720000. The logical relationship of the above components is described in detail below:
[0234] Both ends of the soil compacting roller 710000 are connected to the connecting arm rod 720000, and the connecting arm rod 720000 is connected to the middle chassis part 400000 through a hinge seat, so that when the device as a whole moves forward, the soil compacting roller 710000 can flatten the filled soil.
[0235] Accordingly, the excavation and installation method of the underground pipeline excavation and installation robot of the present invention is as follows:
[0236] S1. An external device places the pipe to be laid into the pipe storage box unit 210000 along the direction of the pipe storage box electric roller 211400 for storage.
[0237] S2. The starting device moves forward, the chain shovel unit 120000 is turned on and the direction of the chain shovel 121000 is adjusted to adjust the depth of the trench to be dug, and then digging begins.
[0238] S3. The device starts to dig soil while moving forward, and the earth conveyor belt unit 130000 is turned on. The excavated soil is transferred to the upward soil transport device unit 610000 through the earth conveyor belt unit 130000, and the upward soil transport conveyor belt 611200 is turned on to discharge the soil in the outer cover 611100 of the soil transport vehicle upward into the middle soil transport pipe 620000, so that the soil is temporarily stored in the soil discharge box 631000.
[0239] S4. After the device digs a trench of a certain length, open the electric roller 211400 of the pipe storage box to rotate the pipes in the pipe storage box 211200, open the opening and closing door 211500 of the pipe storage box to discharge a pipe in the pipe storage box 211200 to the pipeline conveyor belt unit 221000, and immediately close the opening and closing door 211500 of the pipe storage box after the first pipe is discharged to prevent the pipe from being discharged outward.
[0240] S5. The pipe is transferred to the pipe transfer elevator unit 223000 through the pipe transport unit 220000, and then rises to reach the front end angle conveyor belt unit 321000.
[0241] S6. The infrared locator 311200 extends forward to push the front-end positioning electric push rod unit 311220 deep into the pipe, and then the front-end positioning electric push rod unit 311220 extends the push rod in four directions of up, down, left and right. After the push rod is fully extended, the front-end positioning infrared transmitter 311230 emits infrared rays.
[0242] S7. Adjust the height of the front-end infrared receiver 322140 so that the infrared rays emitted by the front-end positioning infrared transmitter 311230 are transmitted to the front-end infrared receiver 322140, thereby making the center of the tube correspond to the center of the circle.
[0243] S8. The large electric push rod in the front end positioning electric push rod unit 311220 continues to extend forward, allowing the pipe to enter the primary fixing and conveying ring 322110.
[0244] S9. The first-stage hydraulic cylinder unit 322113 extends the hydraulic cylinder to bring the pressure sensor unit 322114 into close contact with the pipe, thereby determining the diameter information of the pipe.
[0245] S10, the first-level friction transmission slide rail unit 322115 extends the hydraulic cylinder connected to it according to the measured pipe diameter information, and then the pipe is sent into the second-level rubber coating ring 322120 through the sliding friction force of the first-level friction transmission slide rail unit 322115.
[0246] S11. The secondary hydraulic cylinder unit 322123 extends the hydraulic cylinder according to the obtained pipe diameter information so that the glue gun muzzle of the glue gun unit 322124 is in close contact with the pipe and glue is applied, and then the secondary hydraulic cylinder unit 322123 is retracted.
[0247] S12, the first-level friction transmission slide rail unit 322115 continues to transport the pipe backward to the third-level glue brush ring 322130. The third-level hydraulic cylinder unit 322133 is extended according to the obtained pipe diameter information to make the glue brush of the glue brush unit 322135 closely contact the pipe and complete the glue coating work.
[0248] S13. After the painting work is completed, the three-stage hydraulic cylinder unit 322133 equipped with the glue brush is retracted, and then the first-stage friction transmission slide unit 322115 transmits the pipe slightly forward so that when the three-stage friction transmission slide unit 322134 contacts the pipe, it will not contact the applied glue, and then the hydraulic cylinder of the three-stage friction transmission slide unit 322134 is extended to make the conveying device in close contact with the pipe.
[0249] S14. The first-level friction transmission slide rail unit 322115 and the third-level friction transmission slide rail unit 322134 then transfer the tube downwards, so that the tube slides to the rear end angle conveyor belt a323100. At this time, the upper robot arm 510000 is moved so that the vertical infrared locator 311200 and the infrared clamping jaw locator 323130 are kept in a straight line in the vertical direction and the clamping jaw is directed downwards, maintaining an open posture without hindering the tube from moving backwards.
[0250] S15. The rear end angle conveyor belt unit 323000 turns on the motor to continue conveying the tube downward. At this time, the tube will hinder the infrared transmission between the vertical infrared locator 311200 and the infrared gripper locator 323130 until the tube just crosses the straight line where the two infrared transmitters are located. At this time, the two infrared transmitters can realize two-way reception of infrared rays to transmit signals so that the rear end angle conveyor belt unit 323000 no longer conveys the tube backward.
[0251] S16. At this time, the upper robotic arm clamp unit 513200 clamps the pipe downward and controls the robotic arm to move the pipe to the lower mechanical clamp 520000 until the horizontal infrared locator unit a514000 corresponds to the horizontal infrared locator unit b523000. After determining the position of the arm unit 511000, the arm unit 511000 no longer moves up and down and left and right.
[0252] S17. At this time, since the positions of the upper robot arm 510000 and the lower mechanical gripper 520000 are completely corresponding, the upper robot arm 510000 is moved to the lower mechanical gripper 520000 to transfer the tube to the lower mechanical gripper 520000. When the horizontal infrared locator unit a514000 of the upper robot arm 510000 and the horizontal infrared locator unit b523000 of the lower mechanical gripper 520000 measure that the distance between them reaches a certain value, the middle and rear part of the tube has moved into the grasping range of the lower mechanical gripper 520000. At this time, the lower mechanical gripper 520000 is clamped to complete the installation of the first tube.
[0253] S18. The overall steps for installing the rear pipe are the same as above, except that when the upper robot arm 510000 delivers the pipe toward the lower mechanical gripper 520000, the glue-coated part of the pipe gripped by the upper robot arm 510000 is inserted into the hole behind the pipe gripped by the lower mechanical gripper 520000 to achieve docking of the two pipes.
[0254] S19. Since the upper mechanical arm 510000 pushes the clamped pipe toward the pipe clamped by the lower mechanical clamp 520000 when the two pipes are butt-joined, the clamp is always on the most recently installed pipe.
[0255] S20. In the ditch section where the pipe has been installed, the soil discharge opening and closing plate 633000 can be opened and the soil discharge roller 632000 can be turned on to discharge the soil in the soil discharge box 631000 into the ditch where the pipe has been installed. Since the device is always in a forward state, the soil discharge position of the rear soil discharge device 630000 also moves forward with the device, so that every ditch where the pipe is installed can be filled with soil.
[0256] S21. Then the soil surface flattening part 700000 presses over the filled soil position and compacts the soil. At this point, the entire pipeline excavation and installation work is completed.
[0257] The above description is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be understood by anyone familiar with the technology within the technical scope disclosed by the present invention should be included in the scope of the present invention.
Claims
1. An underground pipeline excavation and installation robot, characterized in that: include: The trench excavation part (100000) is used to excavate a trench from the soil surface and lay the pipe in the excavated trench; A pipe storage and transportation part (200000) is used to store pipes to be used for painting and automatically feed the pipes into the device; The pipe gluing part (300000) is used to glue the ends of pipes of different sizes so that the pipes can be fixed with glue when they are subsequently connected; The middle chassis part (400000) is used to carry other mechanisms and track installation; The pipe installation part (500000) is used to directly connect the glued pipes; The earth backfilling part (600000) is used to store the earth excavated from the trench excavation part (100000) and to backfill the stored earth into the trench after the pipes are laid; The soil surface flattening part (700000) is used to flatten the soil surface on the tunnel after the backfilling part (600000) is backfilled.
2. The underground pipeline excavation and installation robot according to claim 1, characterized in that: The trench excavation part (100000) comprises a vehicle body (110000), a chain shovel unit (120000), an earthwork conveyor belt unit (130000), and a trench excavation part crawler (140000); The vehicle body (110000) comprises a vehicle body hydraulic cylinder unit (111000) and an earthwork scraper (112000), wherein the vehicle body hydraulic cylinder unit (111000) comprises a chain shovel hydraulic cylinder unit (111100) and an earthwork scraper hydraulic cylinder unit (111200), wherein one end of the chain shovel hydraulic cylinder unit (111100) is connected to the vehicle body (110000) through an articulated seat so that one end of the chain shovel hydraulic cylinder unit (111100) can rotate around the articulated seat, and the movable end of the chain shovel hydraulic cylinder unit (111100) is connected to the chain shovel protective gear (122000) through an articulated seat so that the movable end of the chain shovel hydraulic cylinder unit (111100) can rotate around the articulated seat, so that the chain shovel hydraulic cylinder unit (111100) controls the direction of the chain shovel (121000) through a telescopic hydraulic cylinder, thereby adjusting the depth of the excavated trench; One end of the earth-moving scraper hydraulic cylinder unit (111200) is connected to the chain shovel guard (122000) via an articulated seat, so that one end of the earth-moving scraper hydraulic cylinder unit (111200) can rotate around the articulated seat, and the movable end of the earth-moving scraper hydraulic cylinder unit (111200) is connected to the earth-moving scraper (112000) via the articulated seat, so that the earth-moving scraper hydraulic cylinder unit (111200) can adjust the scraper height of the earth-moving scraper (112000); the earth-moving scraper (112000) is connected to the vehicle body (110000) via the articulated seat, so that the earth-moving scraper (112000) can rotate around the articulated seat, thereby adjusting the scraper height of the earth-moving scraper (112000).
3. The underground pipeline excavation and installation robot according to claim 2, characterized in that: The chain shovel unit (120000) comprises a chain shovel (121000) and a chain shovel protective gear (122000); the rotating drum portion of the chain shovel (121000) is fixed to the inner side of the chain shovel protective gear (122000) by bolts; the motor driving the chain shovel (121000) to rotate is fixed to the outer side of the corresponding position of the chain shovel protective gear (122000) by bolts, so that the chain shovel (121000) can be driven to rotate when the motor rotates; one end of the chain shovel protective gear (122000) is fixed to the vehicle body (110000) by bolts, so that the chain shovel protective gear (122000) can rotate around the hinge seat, thereby adjusting the direction of the chain shovel (121000) and thus adjusting the depth of the excavated trench; The earthwork conveyor belt unit (130000) comprises an earthwork conveyor belt a (131000) and an earthwork conveyor belt b (132000) of the same structure. Both sides of the earthwork conveyor belt a (131000) are fixed to the vehicle body (110000) by bolts. The earthwork conveyor belt a (131000) is driven by a motor to rotate and transport, so that the earthwork conveyor belt a (131000) can transport the soil excavated by the chain shovel (121000) from the bottom of the vehicle body (110000) to the upward soil transporting device a (611000); the trench excavation part crawler (140000) is fixed to the chassis below the vehicle body (110000) by bolts so that the trench excavation part crawler (140000) can drive the trench excavation part (100000) to move forward.
4. The underground pipeline excavation and installation robot according to claim 1, characterized in that: The pipeline storage and transportation part (200000) includes a pipeline storage box unit (210000) and a pipeline transportation unit (220000); The pipe storage box unit (210000) comprises a pipe storage box a (211000) and a pipe storage box b (212000) of the same structure; the pipe storage box a (211000) comprises a push-pull door (211100), a pipe storage box (211200), a translation track (211300), a pipe storage box electric roller (211400) and a pipe storage box opening and closing door (211500); the push-pull door (2111 00) is connected to the motor through bolts, the rotor end of the motor is connected to the gear, the gear is limited on the translation track (211300), the two sides of the push door (211100) are connected with a pulley group through bolts, and the slideway of the pulley group is on the inner side of the pipe storage box (211200); the forward movement of the push door (211100) can push the pipe in the pipe storage box (211200) to move toward the pipe outlet, so that the pipe can be discharged from the outlet; The pipe storage box (211200) is fixed to the middle left chassis unit (410000) by bolts and can be used to store pipes. The translation rail (211300) is fixed to the upper side walls of the pipe storage box (211200) by bolts. The translation rail (211300) can cooperate with the motor and gears to drive the push door (211100) forward or backward. The pipe storage box electric roller (211400) is connected to the bottom of the inner wall of the pipe storage box (211200) by bearings. When the electric roller (211400) of the pipe storage box rolls, the pipes in the pipe storage box (211200) can be moved, so that the pipes can come out from the pipe storage box opening and closing door (211500); one end of the pipe storage box opening and closing door (211500) is connected to the electric push rod, and one end of the electric push rod is connected to the pipe storage box (211200) through a hinge seat. When the electric push rod is extended or retracted, the pipe storage box opening and closing door (211500) can be driven to open and close, so that the pipes can be released or blocked; The pipeline transport unit (220000) comprises a pipeline conveyor belt unit (221000), a pipeline push plate unit (222000) and a pipeline conveying elevator unit (223000); the pipeline conveyor belt unit (221000) comprises a pipeline conveyor belt a (221100) and a pipeline conveyor belt b (221200) of the same structure, the bottom of the pipeline conveyor belt a (221100) is fixed to the middle left chassis unit (410000) by bolts, after the pipe comes out of the pipe storage box opening and closing door (211500), the pipeline conveyor belt a (221100) can transport the pipe forward, so that the pipe reaches the end of the pipeline conveyor belt a (221100), and then cooperates with the pipeline push plate a (222100) to push the pipe into the pipeline conveying elevator a (223100); The pipeline push plate unit (222000) comprises a pipeline push plate a (222100) and a pipeline push plate b (222200) of the same structure. The middle upper part of the pipeline push plate a (222100) is connected to the side fence of the pipeline conveyor belt a (221100) through a hinge seat, so that the pipeline push plate a (222100) can rotate around the hinge seat. The top end of the pipeline push plate a (222100) is connected to an electric push rod. The bottom end of the push rod is fixed on the middle left chassis unit (410000) so that the extension and retraction of the electric push rod can control the push plate of the pipeline push plate a (222100) to push the pipe forward or to stick to the side wall of the pipeline conveyor belt a (221100) backward so as not to block the advancement of the pipe, so that the pipeline push plate a (222100) pushes the pipe into the pipeline conveying elevator a (223100) when the pipe is transported to the end of the pipeline conveyor belt a (221100); The pipeline conveying elevator unit (223000) comprises a pipeline conveying elevator a (223100) and a pipeline conveying elevator b (223200) having the same structure; The pipeline conveying elevator a (223100) comprises a winch (223110), an elevator outer frame (223120) and an elevator lifting frame (223130); the base of the winch (223110) is fixed on the top of the elevator outer frame (223120) by bolts, and the rope extended from the winch (223110) is connected to the top of the elevator lifting frame (223130) through a hook, so that the winch (223110) can control the up and down movement of the elevator lifting frame (223130); the elevator outer frame (223120) is fixed on the surface of the middle left chassis unit (410000) by bolts, and the elevator lifting frame (223130) is connected to the rope extended from the winch (223110) through a hook, and can rise or fall under the control of the winch (223110) to transport the pipe upward or downward.
5. The underground pipeline excavation and installation robot according to claim 1, characterized in that: The pipe glue coating part (300000) comprises a front end center positioning unit (310000) and a glue coating part and pipe conveying unit (320000); The front end center positioning unit (310000) comprises a front end center positioning device a (311000) and a front end center positioning device b (312000) of the same structure; the front end center positioning device a (311000) comprises a lifting frame (311100) and an infrared locator (311200); the lifting frame (311100) is fixed to the top of the middle left chassis unit (410000) by bolts, and the internal track allows the sliding lifter (311210) to move only in the up and down directions, thus serving as a guide rail; The infrared locator (311200) includes a sliding lifter (311210), a front-end positioning electric push rod unit (311220) and a front-end positioning infrared transmitter (311230). The middle of the sliding lifter (311210) is an electric push rod, and four movable pulleys are installed on both sides of the electric push rod, so that the sliding lifter (311210) can slide up and down along the track formed by the lifting frame (311100); the front-end positioning electric push rod unit (311220) includes a large electric push rod in the horizontal direction and four small electric push rods in the four directions of up, down, left and right. One end of the four small electric push rods is fixed to the top of the movable end of the large electric push rod by bolts, and the tops of the four small electric push rods are fixed with pressure by bolts. Force sensor, when working, these four small electric push rods can go deep into the tube, and then the four small electric push rods extend so that the four pressure sensors at their tops can be squeezed to the inner wall of the tube until the pressures of the four pressure sensors are the same; the front-end positioning infrared transmitter (311230) is fixed to the movable end of the large electric push rod in the electric push rod unit, after the positions of the four small electric push rods are fixed, the front-end positioning infrared transmitter (311230) can emit infrared rays in the horizontal direction, and the front-end infrared receiver (322140) can receive the infrared rays, thereby transmitting the center position of the tube to the middle glue coating device a (322100), so that the middle glue coating device a (322100) can adjust its height to match the center with the center of the tube; The glue coating part and the pipeline transport unit (320000) include a front end angle conveyor belt unit (321000), a middle glue coating unit (322000) and a rear end angle conveyor belt unit (323000); The front end angle conveyor belt unit (321000) comprises a front end angle conveyor belt a (321100) and a front end angle conveyor belt b (321200) of the same structure; the front end angle conveyor belt a (321100) comprises an angle conveyor belt a (321110) and a front end angle conveyor belt motor unit (321120); the conveying roller can be rotated under the drive of the front end angle conveyor belt motor unit (321120), so that the pipe can be conveyed forward by friction; the roller of the front end angle conveyor belt motor unit (321120) is fixed to the brackets on both sides of the front end angle conveyor belt a (321100) by bolts; The intermediate glue coating unit (322000) comprises an intermediate glue coating device a (322100) and an intermediate glue coating device b (322200) of the same structure; the intermediate glue coating device a (322100) comprises a primary fixing and conveying ring (322110), a secondary glue coating ring (322120), and a tertiary glue brushing ring (322130); the primary fixing and conveying ring (322110) comprises a primary outer ring (322111), a primary inner ring (322112), and a primary hydraulic cylinder unit (32211 3), a pressure sensor unit (322114) and a first-level friction transmission slide rail unit (322115); the first-level outer ring (322111) is connected to the intermediate chassis lifting frame a (322300) by bolts, and when the intermediate chassis lifting frame a (322300) is lifted or lowered, it can drive the first-level fixing and transmission ring (322110) to lift or lower; the first-level outer ring (322111) and the first-level inner ring (322112) are connected by bolts and a first-level hydraulic cylinder unit (322113), and the first-level outer ring (322111) and the first-level inner ring (322112) are connected by bolts and a first-level hydraulic cylinder unit (322113). The ring (322111) is fixed together with the first-level inner ring (322112) cocentrically and fixed to the top of the first-level hydraulic cylinder unit (322113) by bolts; when the first-level hydraulic cylinder unit (322113) is extended, the pressure sensor unit (322114) can be squeezed onto the pipe transmitted. After the pressure reaches a certain value, the first-level hydraulic cylinder unit (322113) memorizes the current extended length, thereby providing the first-level fixing and transmission ring (322110), the second-level glue coating ring (322120) and The third-level rubber brush ring (322130) provides the diameter information of the pipe; the first-level friction transmission slide rail unit (322115) is fixed to the top of the first-level hydraulic cylinder unit (322113) by bolts, and the first-level hydraulic cylinder unit (322113) connected to the first-level friction transmission slide rail unit (322115) is extended to make the first-level friction transmission slide rail unit (322115) in close contact with the pipe, and the first-level friction transmission slide rail unit (322115) rotates its motor so that its roller drives the pipe downward by friction force; The secondary glue coating ring (322120) comprises a secondary outer ring (322121), a secondary inner ring (322122), a secondary hydraulic cylinder unit (322123) and a glue coating gun unit (322124); the secondary outer ring (322121) and the secondary inner ring (322122) are respectively the same in structure as the primary outer ring (322111) and the primary inner ring (322112); the glue coating gun unit (322124) is fixed to the top of the secondary hydraulic cylinder unit (322123) by bolts, and after the pressure sensor unit (322114) provides the diameter information of the pipe, it is extended to an appropriate length so that the top of the glue coating gun unit (322124) contacts the outer surface of the pipe and completes the glue coating; The three-stage brush rubber ring (322130) comprises a three-stage outer ring (322131), a three-stage inner ring (322132), a three-stage hydraulic cylinder unit (322133), a three-stage friction transmission slide rail unit (322134), a rubber brush unit (322135), a large gear ring (322136), a small gear ring unit (322137) and a three-stage motor unit (322138). After obtaining the pipe diameter information provided by the pressure sensor unit (322114), the three-stage hydraulic cylinder unit (322133) can be extended to an appropriate length, firstly extending the rubber brush unit (322135) fixed to the three-stage hydraulic cylinder unit (322133) by bolts until the rubber brush unit (322135) contacts the surface of the pipe; then The motor rotates to drive the small gear ring unit (322137) to rotate, and the small gear ring unit (322137) in turn drives the large gear ring (322136) to rotate, so that the glue brush unit (322135) rotates around the center of the tube to carry out the glue brushing work; after the glue brushing is completed, the hydraulic cylinder of the glue brush unit (322135) fixed at the top is retracted, and then the three-stage hydraulic cylinder unit (322133) fixed with the three-stage friction transmission slide rail unit (322134) by bolts is extended, so that the three-stage friction transmission slide rail unit (322134) is in close contact with the outer surface of the tube, and the roller of the three-stage friction transmission slide rail unit (322134) is rotated, and the tube is moved forward to the rear end angle conveyor belt a (323100) by relying on friction; The rear end angle conveyor belt unit (323000) comprises a rear end angle conveyor belt a (323100) and a rear end angle conveyor belt b (323200) of the same structure; the rear end angle conveyor belt a (323100) comprises a rear end front conveyor belt (323110), a rear end rear conveyor belt (323120) and an infrared gripper positioner (323130); the bottom of the bracket of the rear end front conveyor belt (323110) is fixed to the middle left chassis unit (410000) by bolts; under the drive of its motor, the roller in the rear end front conveyor belt (323110) can rotate, and the friction force can drive the pipe to move forward; The infrared gripper locator (323130) is fixed to the bracket leg of the rear front conveyor belt (323110) by bolts, and can be calibrated with the vertical infrared locator (311200) to position the upper robot arm hydraulic gripper (513000).
6. The underground pipeline excavation and installation robot according to claim 1, characterized in that: The middle chassis part (400000) comprises a middle left chassis unit (410000) and a middle right chassis unit (420000) having the same structure; The middle left chassis unit (410000) comprises a chassis frame (411000), a middle left chassis track (412000) and a middle left chassis tire unit (413000); the middle left chassis track (412000) is fixed to the chassis frame (411000) by bolts and can drive the entire device to move forward; the middle left chassis tire unit (413000) is fixed to the lower surface of the middle left chassis unit (410000) by bolts and plays a supporting role for the middle soil transport pipe (620000) and the rear soil discharge device (630000).
7. The underground pipeline excavation and installation robot according to claim 1, characterized in that: The pipeline installation part (500000) includes an upper mechanical arm (510000) and a lower mechanical clamp (520000); The upper robot arm (510000) comprises an arm unit (511000), an upper robot arm hydraulic cylinder unit (512000), an upper robot arm hydraulic clamp (513000), a horizontal infrared locator unit a (514000), and a vertical infrared locator (515000); the arms in the arm unit (511000) are connected to each other through an articulated seat and can rotate around the articulated seat; the hydraulic cylinders in the upper robot arm hydraulic cylinder unit (512000) are connected to each other through the articulated seat. The upper mechanical arm hydraulic clamp (513000) is connected to the upper mechanical arm hydraulic cylinder unit (512000) in a manner that the hydraulic cylinder can rotate at the joint of the joint, thereby controlling the upper mechanical arm hydraulic clamp (513000) to be connected to the uppermost arm of the arm unit (511000) and the hydraulic cylinder connected to the uppermost arm of the arm unit (511000) through the joint, thereby controlling the direction of the upper mechanical arm hydraulic clamp (513000); The upper mechanical arm hydraulic clamp (513000) comprises an upper mechanical arm small hydraulic cylinder unit (513100) and an upper mechanical arm clamp unit (513200), wherein the hydraulic cylinders in the upper mechanical arm small hydraulic cylinder unit (513100) are connected to the clamps in the upper mechanical arm clamp unit (513200) in the form of an articulated seat, so that the upper mechanical arm small hydraulic cylinder unit (513100) can control the clamping action of the upper mechanical arm clamp unit (513200); the horizontal infrared locator unit a (514000) is fixed to the surface of the upper mechanical arm hydraulic clamp (513000) by bolts, and can emit horizontal infrared rays for positioning; the vertical infrared locator (515000) is fixed to the other surface of the upper mechanical arm hydraulic clamp (513000) by bolts, and can emit infrared rays for positioning; The lower mechanical clamp (520000) includes a lower mechanical hydraulic cylinder unit (521000), a lower mechanical hydraulic clamp (522000), and a horizontal infrared locator unit b (523000). The bottom end of the hydraulic cylinder in the lower mechanical hydraulic cylinder unit (521000) is fixed to the lower surface of the middle chassis part (400000) by bolts, and the top end of each hydraulic cylinder in the lower mechanical hydraulic cylinder unit (521000) is connected to the lower mechanical hydraulic clamp (522000) by bolts to control the lower mechanical hydraulic clamp (522000) to rise or fall. The lower mechanical hydraulic clamp (522000) includes a lower mechanical small hydraulic cylinder unit (522100) and a lower mechanical clamp unit (522200).
8. The underground pipeline excavation and installation robot according to claim 1, characterized in that: The earth backfilling part (600000) includes an upward earth transporting device unit (610000), a middle earth transporting pipeline (620000), a rear earth discharge device (630000) and a middle earth transporting pipeline fixing bracket (640000); The upward earth-moving device unit (610000) comprises an upward earth-moving device a (611000) and an upward earth-moving device b (612000) of the same structure; the upward earth-moving device a (611000) comprises an earth-moving vehicle cover (611100) and an upward earth-moving conveyor belt (611200); the earth-moving vehicle cover (611100) is connected to the vehicle body (110000) of the trench excavation part (100000) via a connecting piece; after the earth-moving conveyor belt a (131000) conveys earth into the earth-moving vehicle cover (611100), the upward earth-moving conveyor belt (611200) fixed to the inner side of the earth-moving vehicle cover (611100) by bolts can transport the earth upward. The soil is transported upward to the middle soil transport pipe (620000); the front end of the middle soil transport pipe (620000) is connected to the outlet of the upward soil transport device a (611000) by bolts, so that the soil discharged from the upward soil transport conveyor belt (611200) can enter the middle soil transport pipe (620000); the middle soil transport pipe (620000) is fixed in the middle of the pipe storage box a (211000) and the pipe storage box b (212000) by connecting parts, and the lower surface of the middle soil transport pipe (620000) is also connected to the middle chassis part (400000) by bolts through some columns, so as to play a role in supporting and fixing the middle soil transport pipe (620000); The rear soil discharge device (630000) comprises a soil discharge box (631000), a soil discharge roller (632000) and a soil discharge opening and closing plate (633000). The soil discharge box (631000) is connected to the outlet of the middle soil transport pipe (620000) by bolts, so that the soil in the middle soil transport pipe (620000) can enter the soil discharge box (631000). The soil discharge roller (632000) is installed on the inner bottom surface of the soil discharge box (631000). The soil discharge box (631000) can be opened and closed by rotating the roller. The soil inside is discharged outwards, the soil discharge opening and closing plate (633000) is connected to the side of the soil discharge box (631000) through a hinged seat, and the soil discharge opening and closing plate (633000) is also connected to the side of the soil discharge box (631000) through a hydraulic cylinder so that the hydraulic cylinder can control the opening and closing state of the soil discharge opening and closing plate (633000); the middle soil transport pipe fixing bracket (640000) is connected to the middle soil transport pipe (620000) by bolts at different positions, so as to support and fix the middle soil transport pipe (620000).
9. An excavation and installation method for underground pipelines using the underground pipeline excavation and installation robot according to any one of claims 1 to 8, characterized in that: The steps are: S1. An external device places the pipe to be laid into the pipe storage box unit (210000) along the direction of the pipe storage box electric roller (211400) for storage; S2, the starting device moves forward, the chain shovel unit (120000) is turned on and the direction of the chain shovel (121000) is adjusted to adjust the depth of the trench to be dug, and then digging begins; S3, the device starts to dig soil while moving forward, the soil conveyor unit (130000) is turned on, the excavated soil is transferred to the upward soil transport device unit (610000) through the soil conveyor unit (130000), the upward soil transport conveyor (611200) is turned on, and the soil in the outer cover (611100) of the soil transport vehicle is discharged upward into the middle soil transport pipe (620000), so that the soil is temporarily stored in the soil discharge box (631000); S4. After the device digs a trench of a certain length, the electric roller (211400) of the pipe storage box is opened to rotate the pipes in the pipe storage box (211200), and the opening and closing door (211500) of the pipe storage box is opened to discharge a pipe in the pipe storage box (211200) to the pipeline conveyor belt unit (221000). After the first pipe is discharged, the opening and closing door (211500) of the pipe storage box is immediately closed to prevent the pipe from being discharged outward; S5. The pipe is transferred to the pipe transfer elevator unit (223000) through the pipe transport unit (220000), and then rises to the front angle conveyor belt unit (321000); S6, the infrared locator (311200) extends forward, the front end positioning electric push rod unit (311220) is deeply inserted into the pipe, and then the front end positioning electric push rod unit (311220) extends the push rod in four directions of upward, downward, left and right. After the push rod is fully extended, the front end positioning infrared transmitter (311230) emits infrared rays; S7, adjusting the height of the front infrared receiver (322140) so that the infrared rays emitted by the front positioning infrared transmitter (311230) are transmitted to the front infrared receiver (322140) so that the center of the tube is aligned with the center of the circle; S8, the large electric push rod in the front end positioning electric push rod unit (311220) continues to extend forward, so that the pipe enters the primary fixing and conveying ring (322110); S9, extending the hydraulic cylinder of the first hydraulic cylinder unit (322113) to make the pressure sensor unit (322114) in close contact with the pipe, thereby measuring the diameter information of the pipe; S10, the first-level friction transmission slide rail unit (322115) extends the hydraulic cylinder connected to it according to the measured pipe diameter information, and then the pipe is sent into the second-level glue coating ring (322120) through the sliding friction force of the first-level friction transmission slide rail unit (322115); S11, the secondary hydraulic cylinder unit (322123) extends the hydraulic cylinder according to the obtained pipe diameter information so that the glue gun mouth of the glue gun unit (322124) is in close contact with the pipe and glue is applied, and then the secondary hydraulic cylinder unit (322123) is retracted; S12, the first-level friction transmission slide rail unit (322115) continues to transport the pipe backward to the third-level glue brush ring (322130); the third-level hydraulic cylinder unit (322133) is extended according to the obtained pipe diameter information so that the glue brush of the glue brush unit (322135) is in close contact with the pipe, and the glue coating work is completed; S13, after the brushing work is completed, the three-stage hydraulic cylinder unit (322133) equipped with the glue brush is retracted, and then the first-stage friction transmission slide rail unit (322115) slightly conveys the pipe forward so that when the three-stage friction transmission slide rail unit (322134) contacts the pipe, it will not contact the applied glue, and then the hydraulic cylinder of the three-stage friction transmission slide rail unit (322134) is extended to make the conveying device closely contact with the pipe; S14, the first-stage friction transmission slide rail unit (322115) and the third-stage friction transmission slide rail unit (322134) then convey the tube downwards, causing the tube to slide to the rear end angle conveyor belt a (323100), and at this time, the upper robot arm (510000) is moved to keep the vertical infrared locator (311200) and the infrared gripper locator (323130) in a straight line in the vertical direction and to point the gripper downwards, maintaining an open posture while not hindering the tube from moving backwards; S15, the rear angle conveyor belt unit (323000) starts the motor to continue to convey the tube downwards, at which time the tube will hinder the infrared transmission between the vertical infrared locator (311200) and the infrared gripper locator (323130), until the tube just crosses the straight line where the two infrared transmitters are located, at which time the two infrared transmitters can realize two-way reception of infrared rays, thereby transmitting signals, so that the rear angle conveyor belt unit (323000) no longer conveys the tube backwards; S16, at this time, the upper mechanical arm clamp unit (513200) is ordered to clamp the pipe downward and control the mechanical arm to move the pipe to the lower mechanical clamp (520000) until the horizontal infrared locator unit a (514000) corresponds to the horizontal infrared locator unit b (523000), and after the position of the arm unit (511000) is determined, the arm unit (511000) no longer moves up and down and left and right; S17. At this time, since the positions of the upper robot arm (510000) and the lower mechanical gripper (520000) are completely corresponding, the upper robot arm (510000) is moved to the lower mechanical gripper (520000) to transfer the tube to the lower mechanical gripper (520000). When the horizontal infrared locator unit a (514000) of the upper robot arm (510000) and the horizontal infrared locator unit b (523000) of the lower mechanical gripper (520000) measure that the distance between them reaches a certain value, the middle and rear part of the tube has moved to the grasping range of the lower mechanical gripper (520000). At this time, the lower mechanical gripper (520000) is clamped to complete the installation of the first tube. S18. The overall steps for installing the following pipes are the same as above, except that when the upper mechanical arm (510000) delivers the pipe to the lower mechanical gripper (520000), the glue-coated part of the pipe gripped by the upper mechanical arm (510000) is inserted into the hole behind the pipe gripped by the lower mechanical gripper (520000) to achieve docking of the two pipes; S19. Since the upper mechanical arm (510000) pushes the clamped pipe toward the pipe clamped by the lower mechanical clamp (520000) when the two pipes are butt-jointed, the clamp is always on the most recently installed pipe; S20, in the trench section where the pipe has been installed, the soil discharge opening and closing plate (633000) is opened and the soil discharge roller (632000) is turned on to discharge the soil in the soil discharge box (631000) into the trench where the pipe has been installed. Since the device is always in a forward state, the soil discharge position of the rear soil discharge device (630000) also moves forward with the device, so that every trench where the pipe has been installed can be filled with soil; S21. Then the flattened part of the soil surface (700000) presses over the filled soil position and compacts the soil. At this point, the entire pipeline excavation and installation work is completed.
Citation Information
Cited By
Earthwork backfilling device and method for water conservancy construction
CN119711575A