Preheating control method and device, water heater and storage medium

By detecting the temperature difference between the circulating preheating state of the water heater and the water point, we can determine whether the hot water reaches the target temperature, and turn off the circulating preheating when the user uses it, we can solve the problem of long preheating time and waste of water resources in the prior art. The problem has improved the efficiency and user experience of water heaters.

CN118935740APending Publication Date: 2024-11-12GREE ELECTRIC APPLIANCE INC OF ZHUHAI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411351573.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

When the existing water heater is turned on, the preheating control time is too long and the water resources are wasted, affecting the user experience.

Method used

By checking whether the water heater is turned on, and determining whether the hot water reaches the target water point based on the current water temperature and target temperature of the target water point, sending a reminder message and turning off the circulation preheating function when the user starts to use hot water to reduce pre-preparation The waste of heat time and water resources.

Benefits of technology

It realizes faster and more efficient preheating control, reduces the time and water resources spent during the circulating preheating process, and improves the user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118935740A_ABST
    Figure CN118935740A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of preheating control, and discloses a preheating control method and device, a water heater and a storage medium, the preheating control method and device are applied to the water heater, the water heater has a circulating preheating function, and the method comprises the steps that whether the circulating preheating function of the water heater is started or not is detected; when the circulating preheating function of the water heater is started, the current water temperature and the target temperature of the target water consumption point are obtained, and the target temperature is generated in response to the temperature setting operation of a user on the target water consumption point; judging whether the hot water reaches a target water consumption point based on the current water temperature and the target temperature; if the hot water reaches the target water using point, reminding information is sent out to remind the user that the hot water can be used after circulating preheating is completed, and when it is detected that the user starts to use the hot water, an ending signal is generated to control the water heater to close the circulating preheating function. Circulating preheating can be stopped when the hot water reaches the target water consumption point, time and water resources consumed by circulating preheating can be shortened, and then the use experience of a user is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of preheating control, and in particular to a preheating control method, device, water heater and storage medium. Background Art

[0002] At present, water heaters on the market, such as gas water heaters, generally have a circulation preheating function. Specifically, when the gas water heater turns on the circulation preheating function, the gas water heater starts the internal water pump, so that the water in the hot water pipe flows back to the gas water heater through the return pipe or the tap water pipe to form a circulation loop; after the gas water heater detects a water flow signal, it turns on the combustion heating, and the water in the entire circulation loop can be heated to the preset target temperature in a certain period of time; when the user uses water for bathing, hot water will be available when the shower is turned on, and cold water will not flow out first, that is, "zero" cold water. Equipment with zero cold water function is called zero cold water water heater.

[0003] Currently, the condition for shutting down the circulation preheating function is that the water inlet temperature of the gas water heater reaches the preset target temperature. However, this will cause the entire circulation loop to be filled with hot water, and the user's waiting time for water demand will be too long, resulting in a waste of resources and affecting the user experience.

[0004] In summary, when the existing water heater turns on the circulation preheating function, it is easy to cause a waste of preheating control time and water resources, which seriously affects the user experience. Summary of the invention

[0005] In view of this, the present invention provides a preheating control method, device, water heater and storage medium to solve the problems of existing water heaters that the preheating control takes too long and has poor effect, easily causing water resource waste of the water heater and failing to meet user needs.

[0006] In a first aspect, the present invention provides a preheating control method, which is applied to a water heater, wherein the water heater has a cyclic preheating function, and the method comprises:

[0007] Detect whether the circulation preheating function of the hot water appliance is turned on;

[0008] When the circulation preheating function of the water heater is turned on, the current water temperature and the target temperature of the target water use point are obtained, and the target temperature is generated in response to the temperature setting operation of the target water use point by the user;

[0009] Determine whether hot water has reached the target water point based on the current water temperature and the target temperature;

[0010] If the hot water reaches the target water use point, a reminder message is sent to remind the user that the circulation preheating is complete and the hot water can be used. When it is detected that the user starts to use the hot water, an end signal is generated to control the water heater to turn off the circulation preheating function.

[0011] The preheating control method provided by the present invention determines whether the hot water has reached the target water use point by comparing the current water temperature and the target temperature of the target water use point. When the hot water reaches the target water use point, a reminder message is issued and it is detected that the user starts to use the hot water, thereby realizing the circulation preheating function of the water heater when the hot water reaches the target water use point, which can greatly reduce the time and water resources consumed in the circulation preheating control process and help to improve the user experience.

[0012] In an optional implementation, judging whether hot water reaches a target water use point based on the current water temperature and the target temperature includes:

[0013] Subtract the current water temperature from the target temperature to obtain a first temperature difference;

[0014] Determine whether the first temperature difference is less than a preset temperature difference threshold;

[0015] If the temperature difference is less than the preset temperature difference threshold, it is determined that the hot water has reached the target water use point.

[0016] The present invention determines whether hot water has reached the target water use point by the relationship between the first temperature difference between the current water temperature and the target temperature and the preset temperature difference threshold, and determines that the hot water has reached the target water use point when the first temperature difference is less than the preset temperature difference threshold, which can ensure the accuracy of the judgment result and thereby improve the accuracy and efficiency of preheating control.

[0017] In an optional implementation, the preheating control method further includes:

[0018] If the temperature difference is not less than the preset temperature difference threshold, the process returns to the step of obtaining the current water temperature and the target temperature of the target water use point.

[0019] When the first temperature difference is not less than a preset temperature difference threshold, the present invention determines that the hot water has not reached the target water use point. By designing a step of returning to obtain the current water temperature and the target temperature of the target water use point, the continued operation of the circulation preheating function is ensured until the hot water reaches the target water use point, which can further reduce the waste of preheating resources and preheating time.

[0020] In an optional embodiment, before judging whether the hot water reaches the target water use point based on the current water temperature and the target temperature, the preheating control method further includes:

[0021] Get the water temperature at the water outlet of the hot water appliance;

[0022] Subtract the water temperature at the water outlet from the target temperature to obtain a second temperature difference;

[0023] Determine whether the second temperature difference is less than a preset temperature difference threshold;

[0024] If the second temperature difference is less than the preset temperature difference threshold, a hot water outflow signal is generated and sent to the target water use point. The hot water outflow signal is used to indicate that hot water flows out of the hot water appliance.

[0025] The present invention determines whether hot water flows out of the hot water appliance by the relationship between the water temperature at the water outlet of the hot water appliance and a second temperature difference of the target temperature generated in response to the temperature setting operation of the target water use point by the user and a preset temperature difference threshold, and determines that hot water flows out of the hot water appliance when the second temperature difference is less than the preset temperature difference threshold, thereby ensuring the normal operation of the circulation preheating function.

[0026] In an optional implementation, before issuing the reminder message, the preheating control method further includes:

[0027] The current water flow rate and the current usage time of the target water use point are obtained, wherein the current usage time refers to the time from the target water use point receiving the hot water outflow signal until the hot water reaches the target water use point, and the current water flow rate refers to the water flow rate of the hot water reaching the target water use point; when the current water flow rate satisfies a preset relationship, a reminder message is issued, and the preset relationship is composed of the current usage time, the first preset data and the second preset data, wherein the first preset data refers to the historical water flow rate of the hot water reaching the target water use point recorded during the historical operation of the water heater turning on the circulation preheating function, and the second preset data refers to the historical usage time from the issuance of the reminder message to the user starting to use the hot water, recorded during the historical operation of the water heater turning on the circulation preheating function.

[0028] The present invention determines the optimal time for sending the reminder message through the historical water flow rate of hot water reaching the target water use point recorded during the historical operation of the water heater starting the circulation preheating function, the historical usage time from the issuance of the reminder message to the user starting to use the hot water, the time taken for the hot water to reach the target water use point recorded from the time the hot water outflow signal in the current circulation preheating process reaches the target water use point, and the water flow rate of the hot water reaching the target water use point. This allows the hot water in the preheating process to just reach the target water use point when the user starts to use hot water, which can not only keep the water flow in the hot water pipe flowing continuously, but also avoid the situation where the temperature is too high during the use of the hot water, which affects the user experience.

[0029] In an optional implementation, the preheating control method further includes:

[0030] If the second temperature difference is not less than the preset temperature difference threshold, the process returns to the step of obtaining the water temperature of the water outlet of the water heater.

[0031] The present invention determines that no hot water flows out of the water heater when the second temperature difference is not less than a preset temperature difference threshold value, and designs a step of returning to obtain the water temperature of the water outlet of the water heater to ensure the normal operation of the circulation preheating function until hot water exists in the hot water pipeline, thereby reducing the waste of resources and time in the preheating control process to a certain extent.

[0032] In an optional implementation, detecting whether the circulating preheating function of the water heater is turned on includes:

[0033] In response to a user's key operation on the water heater, or when it is detected that the hot water flow rate in the hot water pipe of the water heater is not zero within a first preset time period and is zero within a second preset time period, a circulation preheating start signal is generated accordingly, and based on the circulation preheating start signal, it is determined that the water heater starts the circulation preheating function.

[0034] The present invention determines whether to generate a circulation preheating start signal by detecting the user's key operation on the water heater or the change in the hot water flow rate of the hot water pipeline of the water heater, and determines to start the circulation preheating function of the water heater when the circulation preheating start signal is generated, so that the activation of the circulation preheating function is flexible, which can meet the user's subjective setting, and at the same time, it can automatically determine whether to start the circulation preheating function according to the state change of the water heater itself, which has the significant advantages of accurate, flexible and effective function detection.

[0035] In a second aspect, the present invention provides a preheating control device, which is applied to a water heater, and the water heater has a circulation preheating function, and the device comprises:

[0036] A detection module, used to detect whether the circulation preheating function of the hot water appliance is turned on;

[0037] An acquisition module, used to acquire the current water temperature and the target temperature of the target water use point when the circulation preheating function of the water heater is turned on, wherein the target temperature is generated in response to the temperature setting operation of the target water use point by the user;

[0038] A judgment module, used to judge whether the hot water reaches the target water point based on the current water temperature and the target temperature;

[0039] The control module is used to send out a reminder message to remind the user that the circulation preheating is completed and the hot water can be used if the hot water reaches the target water use point, and to generate an end signal to control the water heater to turn off the circulation preheating function when it is detected that the user starts to use the hot water.

[0040] The preheating control device provided by the present invention determines the time when hot water reaches the target water use point by comparing the current water temperature and the target temperature of the target water use point and issues a reminder message to remind the user that the hot water can be used after the circulation preheating is completed. When it is detected that the user starts to use the hot water, an end signal is generated to control the water heater to turn off the circulation preheating function, so that the circulation preheating is stopped when the hot water reaches the target water use point, which helps to reduce the time and water resources consumed by the preheating control and meets the user's usage needs.

[0041] In a third aspect, the present invention provides a water heater, comprising a controller, the controller comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, computer instructions are stored in the memory, and the processor executes the preheating control method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.

[0042] In an optional embodiment, the water heater is any one of a gas water heater, an electric water heater and a wall-mounted boiler.

[0043] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the preheating control method of the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0045] Figure 1 is a flow chart of a preheating control method according to an embodiment of the present invention;

[0046] Figure 2 is a flow chart of another preheating control method according to an embodiment of the present invention;

[0047] Figure 3 It is a flow chart of preheating control;

[0048] Figure 4 is another schematic flow diagram of preheating control;

[0049] Figure 5 is a structural block diagram of a preheating control device according to an embodiment of the present invention;

[0050] Figure 6 Schematic diagram of the structure of the preheating controller according to an embodiment of the present invention. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0052] According to an embodiment of the present invention, a preheating control method embodiment is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0053] In this embodiment, a preheating control method is provided, which is applied to a water heater, wherein the water heater has a circulating preheating function. Figure 1 is a flow chart of a preheating control method according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0054] Step S101, detecting whether the circulation preheating function of the water heater is turned on.

[0055] It should be noted that the specific type of the water heater and the detection method of whether the circulating preheating function is turned on in this embodiment are not limited here, and can be adaptively adjusted based on actual needs. For example, if the water heater is a gas water heater, the function button or indicator light set on the control panel of the gas water heater can be used to determine whether the circulating preheating function is turned on, which is only an exemplary description.

[0056] Step S102, when the circulation preheating function of the water heater is turned on, the current water temperature and the target temperature of the target water use point are obtained, and the target temperature is generated in response to the user's temperature setting operation on the target water use point.

[0057] In this embodiment, the target water use point refers to water-using equipment or water-using products, and its specific type is adaptively set based on actual needs, such as faucets, shower heads, etc.; the specific method of obtaining the current water temperature of the target water use point is not limited here, such as installing a temperature sensor on the faucet to obtain the corresponding water temperature; the specific value of the target temperature is not limited here, and it is adaptively set based on user needs and the parameter range that can be set for actual water-using products. For example, if the settable temperature range specified in the product manual of a certain model of water heater is between 40°C and 70°C, then the target temperature can be set to 50°C in combination with user needs, which is only an exemplary description.

[0058] Step S103, judging whether the hot water reaches the target water use point based on the current water temperature and the target temperature.

[0059] In actual applications, the circulation preheating function includes two modes: full pipe preheating and half pipe preheating. For hot water appliances such as water heaters, when the circulation preheating stops, the external water pipe of the water heater between the water outlet of the water heater and the water inlet of the water heater needs to be filled with the target hot water, or the hot water pipe from the water outlet of the water heater to the water point farthest from the water heater is filled with the target hot water, which will lead to time-consuming preheating and waste of water resources. In this embodiment, the circulation preheating function is completed only by judging whether the hot water reaches the target water point, so that the circulation preheating is stopped when the target hot water reaches the target water point, that is, the hot water pipe between the water outlet of the water heater and the target water point is filled with the target hot water, which can greatly reduce the waste of preheating resources and preheating time.

[0060] Step S104, if the hot water reaches the target water usage point, a reminder message is issued to remind the user that the circulation preheating is completed and the hot water can be used. When it is detected that the user starts to use the hot water, an end signal is generated to control the water heater to turn off the circulation preheating function.

[0061] In this embodiment, the specific content of the reminder information and the end signal is not limited here, and is adaptively adjusted based on actual needs. For example, the reminder information is a voice message, an indicator light, a buzzer sound, etc., which is only used as an exemplary description.

[0062] The preheating control method of the embodiment of the present invention determines whether the hot water has reached the target water use point by comparing the current water temperature and the target temperature of the target water use point. When the hot water reaches the target water use point, a reminder message is issued and it is detected that the user starts to use the hot water. This realizes the circulation preheating function of the hot water appliance when the hot water reaches the target water use point, which can greatly reduce the time and water resources consumed in the circulation preheating control process and help to improve the user experience.

[0063] In this embodiment, a preheating control method is provided, which is applied to a water heater, wherein the water heater has a circulating preheating function. Figure 2 is a flow chart of another preheating control method according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:

[0064] Step S201, detecting whether the circulation preheating function of the water heater is turned on.

[0065] It should be noted that a water heater with a circulation preheating function generally determines whether to start the circulation preheating function by detecting whether there is a circulation preheating signal. The function trigger generation method is set according to the type of water heater. For example, the all-day circulation preheating method requires the water heater to maintain the circulation preheating state for 24 hours. This is only an exemplary description. In this embodiment, the activation of the circulation preheating function is based on the target water point with water demand to adaptively realize preheating control. Therefore, the function trigger generation method of this embodiment is suitable for a single circulation preheating method or an intermittent circulation preheating method.

[0066] Specifically, the above step S201 includes:

[0067] Step S2021, in response to the user's key operation on the water heater, or detecting that the hot water flow rate of the hot water pipe of the water heater is not zero within the first preset time period and is zero within the second preset time period, a circulation preheating start signal is generated accordingly, and based on the circulation preheating start signal, it is determined that the water heater starts the circulation preheating function.

[0068] It should be noted that, in this embodiment, the specific values ​​of the first preset time period and the second preset time period are not limited here, and are adaptively adjusted based on actual needs.

[0069] In a specific embodiment, the function trigger generation method includes a single cycle preheating method and a step-by-step cycle preheating method, wherein the single cycle preheating method refers to a method in which the water heater immediately performs cycle preheating after the user clicks a specific function button on the water heater control panel; the step-by-step cycle preheating method refers to a method in which, in the step-by-step cycle preheating mode, different triggering methods exist depending on the control program, such as the water heater detects a water flow signal in the hot water pipe for 2 consecutive seconds in standby mode, and the water flow signal disappears within 5 seconds, which is only an exemplary description.

[0070] In the embodiment of the present invention, whether to generate a circulation preheating start signal is determined by detecting the user's button operation on the water heater or the change in the hot water flow rate of the hot water pipeline of the water heater, and the water heater is determined to start the circulation preheating function when the circulation preheating start signal is generated, so that the activation of the circulation preheating function is flexible, which can meet the user's subjective setting, and at the same time, it can automatically determine whether to start the circulation preheating function according to the state change of the water heater itself, which has the significant advantages of accurate, flexible and effective function detection.

[0071] Step S202: When the water heater starts the circulation preheating function, the current water temperature and the target temperature of the target water point are obtained. The target temperature is generated in response to the user's temperature setting operation on the target water point. Figure 1 Step S102 of the illustrated embodiment will not be described in detail here.

[0072] Step S203, judging whether the hot water reaches the target water use point based on the current water temperature and the target temperature.

[0073] Specifically, the above step S203 includes:

[0074] Step S2031, subtract the current water temperature from the target temperature to obtain a first temperature difference.

[0075] Step S2032, determining whether the first temperature difference is less than a preset temperature difference threshold.

[0076] In this embodiment, the specific value of the preset temperature difference threshold is not limited here and is adaptively set based on actual needs.

[0077] Step S2033: if the temperature difference is less than the preset temperature difference threshold, it is determined that the hot water reaches the target water use point.

[0078] Step S2034: If the temperature difference is not less than the preset temperature difference threshold, the process returns to the step of obtaining the current water temperature and the target temperature of the target water use point.

[0079] In the embodiment of the present invention, whether the hot water has reached the target water use point is determined by the relationship between the first temperature difference between the current water temperature and the target temperature and the preset temperature difference threshold. When the first temperature difference is less than the preset temperature difference threshold, it is determined that the hot water has reached the target water use point. When the first temperature difference is not less than the preset temperature difference threshold, it is determined that the hot water has not reached the target water use point. A corresponding design is used to return to the steps of obtaining the current water temperature and the target temperature of the target water use point to ensure the continued operation of the circulating preheating function until the hot water reaches the target water use point. This not only further reduces the waste of preheating resources and preheating time, but also ensures the accuracy of the determination result, thereby improving the accuracy and efficiency of the preheating control.

[0080] It should be noted that when the hot water appliance is operating the circulation preheating function normally, hot water will be available in the hot water pipeline. Whether there is hot water at the water outlet of the hot water appliance is determined by detecting whether there is a hot water outflow signal. Therefore, before judging whether the hot water reaches the target water point based on the current water temperature and the target temperature, the preheating control method of this embodiment also includes:

[0081] Step a1, obtaining the water temperature at the water outlet of the water heater.

[0082] In this embodiment, the specific method for obtaining the water temperature at the water outlet is not limited here, and is obtained based on conventional detection means in the field.

[0083] Step a2, subtracting the water temperature at the water outlet from the target temperature to obtain a second temperature difference.

[0084] Step a3, determining whether the second temperature difference is less than a preset temperature difference threshold.

[0085] It should be noted that the specific content of the preset temperature difference threshold in this embodiment is described above and will not be repeated here.

[0086] Step a4: if the second temperature difference is less than the preset temperature difference threshold, a hot water outflow signal is generated and sent to the target water use point. The hot water outflow signal is used to indicate that hot water flows out of the hot water appliance.

[0087] Step a5: if the second temperature difference is not less than the preset temperature difference threshold, return to the step of obtaining the water temperature of the water outlet of the water heater.

[0088] In the embodiment of the present invention, whether hot water has flowed out of the hot water appliance is determined by the relationship between the water temperature at the water outlet of the hot water appliance and a second temperature difference of the target temperature generated in response to the temperature setting operation of the user on the target water use point, and a preset temperature difference threshold. When the second temperature difference is less than the preset temperature difference threshold, it is determined that hot water has flowed out of the hot water appliance. When the second temperature difference is not less than the preset temperature difference threshold, it is determined that hot water has not flowed out of the hot water appliance. The step of returning to obtain the water temperature at the water outlet of the hot water appliance is designed to ensure the normal operation of the circulation preheating function until hot water is present in the hot water pipeline, thereby reducing the waste of resources and time in the preheating control process to a certain extent.

[0089] Step S204, if the hot water reaches the target water usage point, a reminder message is issued to remind the user that the circulation preheating is completed and the hot water can be used, and when it is detected that the user starts to use the hot water, an end signal is generated to control the water heater to turn off the circulation preheating function.

[0090] In actual applications, in hot water appliances, such as electric water heaters, a reminder message is issued when the preheated hot water reaches the target water use point. During the time from the issuance of the reminder message to the user starting to use the hot water, the water in the hot water pipe does not flow, which will cause the water in the water tank of the current electric water heater body to be heated, and further cause the user to use hot water at a temperature that is too high, seriously affecting the user experience. Therefore, in this embodiment, not only is it possible to send a reminder message when the hot water reaches the target water use point, but the issuance time of the reminder message can also be optimized according to historical record data to achieve the early issuance of the reminder message, so that the target hot water just reaches the target water use point when the user starts to use hot water, and the water flow in the hot water pipe can be kept flowing, avoiding the situation where the water temperature is too high during use, and further saving the time and water resources for cyclic preheating. In summary, before sending a reminder message, the preheating control method of this embodiment also includes:

[0091] Step b1, obtain the current water flow and current usage time of the target water use point, where the current usage time refers to the time from the target water use point receiving the hot water outflow signal until the hot water reaches the target water use point, and the current water flow is the water flow rate of the hot water reaching the target water use point.

[0092] It should be noted that the specific method for obtaining the current water flow rate and the current usage time in this embodiment is not limited here, and can be obtained according to conventional data acquisition means in the art. For example, by installing a flow meter and a timer at the target water point to obtain the corresponding data, which is only an exemplary description.

[0093] Step b2, when the current water flow rate satisfies a preset relationship, a reminder message is issued, the preset relationship formula is composed of the current usage time, the first preset data and the second preset data, wherein the first preset data refers to the historical water flow rate of hot water reaching the target water use point recorded during the historical operation of the water heater turning on the circulation preheating function, and the second preset data refers to the historical usage time from the issuance of the reminder message to the user starting to use hot water, recorded during the historical operation of the water heater turning on the circulation preheating function.

[0094] It should be noted that the specific method for obtaining the historical water flow and historical usage time in this embodiment is not limited here. It can be obtained based on the record of the last time the circulation preheating function of the water heater was started; it can also be obtained based on the records of all historical times when the circulation preheating function of the water heater was started.

[0095] In the embodiment of the present invention, the optimal time for sending the reminder message is determined by the historical water flow rate of hot water reaching the target water use point recorded during the historical operation of the water heater starting the circulation preheating function, the historical usage time from the issuance of the reminder message to the user starting to use the hot water, the time taken for the hot water to reach the target water use point recorded from the time the hot water outflow signal in the current circulation preheating process arrives at the target water use point, and the water flow rate of the hot water reaching the target water use point. This allows the hot water in the preheating process to just reach the target water use point when the user starts to use hot water, which can not only keep the water flow in the hot water pipe flowing continuously, but also avoid the situation where the temperature is too high during the use of the hot water, which affects the user experience.

[0096] It should be noted that the conventional circulation pipeline includes: a return pipeline, a one-way valve is set near the water inlet of the water heater, the return pipeline and the cold water pipeline are connected, so that the hot water flows back from the water outlet of the water heater through the hot water pipeline, the return pipeline, and the one-way valve to the water inlet of the water heater; there is no return pipeline, a one-way valve is set at the water point farthest from the water heater, the hot water pipeline and the cold water pipeline are connected, so that the hot water flows back from the water outlet of the water heater through the hot water pipeline, the one-way valve, and the cold water pipeline to the water inlet of the water heater. In this embodiment, a plurality of water points (i.e., faucets) for using hot water are added to the circulation pipeline of the circulation preheating function of the water heater, and each faucet is connected to the hot water pipeline, the cold water pipeline, and the return pipeline to the water heater body. In addition, a temperature sensor is set in the hot water pipeline at the water use location to detect the water flow temperature; a water flow sensor detects the water flow signal; a one-way valve connects the hot water pipeline and the return pipeline (or cold water pipeline); the control device receives the temperature sensor and water flow sensor signals, controls the opening and closing of the one-way valve, and communicates with the main controller of the water heater body. Through the above hardware structure, the length of the pipeline connecting each water use location and the water inlet and outlet of the water heater (that is, the hot water pipeline and return pipeline / cold water pipeline of each water use location) can be recorded respectively, and the cycle preheating can be operated for different lengths accordingly to reduce the waste of preheating resources and preheating time.

[0097] In a specific embodiment, the water heater is a gas water heater (also called a water heater), which has a circulation preheating function; the target water use point is a faucet, wherein the water heater and the faucet are both equipped with corresponding control devices, including a water heater main controller and a water outlet control device. Figure 3 is a flow chart of preheating control, see Figure 3 , the specific control process includes:

[0098] Step 1: The water control device detects a circulation preheating signal.

[0099] In this embodiment, the water use point control device (i.e., the controller corresponding to the faucet) obtains the set water temperature of the water use point set by the user once it detects the circulation preheating signal.

[0100] Step 2: The water-using control device sends a start-up circulation preheating signal and sets the water temperature to the water heater main controller, and opens the one-way valve at the water-using point to connect the hot water pipe and the cold water pipe / return pipe.

[0101] Step 3: The water heater main controller starts running the circulation preheating program.

[0102] In this embodiment, the cyclic preheating program is a preheating function operation program built into the water heater when it leaves the factory, and its specific content is adaptively adjusted based on actual product requirements.

[0103] Step 4: The water-use point control device detects that the difference between the hot water temperature at the water-use point and the set water temperature is less than the preset temperature difference, and determines that the target hot water has reached the water-use point.

[0104] In this embodiment, the hot water temperature at the water-using location refers to the current water temperature in the hot water pipe at the water-using location.

[0105] Step 5: The water-use point control device sends a reminder message that hot water has arrived at the water-use point to remind the user that the circulation preheating is complete.

[0106] In this embodiment, the completion of the cycle preheating indicates that the user can use hot water.

[0107] Step 6: When the water use control device detects that the user starts to use hot water, it controls the one-way valve to close and sends a circulation preheating end signal to the water heater main controller, and the water heater main controller stops running the circulation preheating program.

[0108] In this embodiment, the time of sending the reminder information is optimized based on the historical record data of the water heater. Figure 4 This is another flow chart of preheating control. Figure 4 , the control process also includes:

[0109] Step 1: After the water heater main controller starts the circulation preheating program, when the water heater main controller detects that the difference between the water temperature at the water heater outlet and the set water temperature is within a preset range, it sends a target hot water outflow signal to the water use control device.

[0110] Step 2, the water use location control device records the water flow rate flowing through the water use location from the time when the target hot water outflow signal is received to the time when the target hot water reaches the water use location, as the water volume L0 in the hot water pipe between the water heater outlet and the water use location.

[0111] Step 3: The water use control device records the time T0 from when the reminder message is sent to when the user starts to use hot water.

[0112] Step 4, when the circulation preheating function is started again, the water use point control device monitors the water flow rate L flowing through the water use point after receiving the hot water outflow signal sent by the water heater main controller.

[0113] Step 5: When L≥L0×T / (T0+T), a reminder message is sent to remind the user.

[0114] It should be noted that L≥L0×T / (T0+T) is the preset relationship of this embodiment, where T is the time elapsed from the time when the water-use control device detects the hot water outflow signal sent by the water heater main controller during the current cycle preheating; T0 is the value recorded and corrected during the previous preheating process. The water flow rate of this cycle preheating is calculated by L / T, and then the time t required for the target hot water to flow to the water-use point is calculated based on L / T and L0-L, and when t≤T0, a reminder message is issued to remind the user. Substituting the corresponding data into the above inequality, it is simplified to obtain L≥L0×T / (T0+T).

[0115] In this embodiment, the water use control device can continuously update and correct the values ​​of L0 and T0 according to multiple records of L0 and T0.

[0116] In summary, the preheating control method of the embodiment of the present invention is mainly used when the water heater runs the cyclic preheating function. A control device is set at the water use point to detect the water temperature in the hot water pipe at the water use point. When the difference between the hot water temperature at the water use point and the set water temperature reaches the preset temperature value, the cyclic preheating is judged to be completed and a reminder message is sent to the user; and based on the water volume L0 in the hot water pipe between the water outlet of the water heater and the water use point obtained in the previous cyclic preheating process, the time T0 from sending the reminder message to the user starting to use the hot water, and the target hot water flow rate L and time T flowing out of the water outlet of the water heater obtained in the current preheating cycle, the reminder message is sent in advance to further save the time and water resources for cyclic preheating.

[0117] In this embodiment, a preheating control device is also provided, which is used to implement the above embodiments and preferred implementations, and the descriptions that have been made will not be repeated. As the term "module" is used below, it can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware is also possible and conceivable.

[0118] The present invention provides a preheating control device, which is applied to a water heater, wherein the water heater has a circulation preheating function, such as Figure 5 As shown, the device comprises:

[0119] The detection module 501 is used to detect whether the circulation preheating function of the water heater is turned on.

[0120] The acquisition module 502 is used to acquire the current water temperature and the target temperature of the target water use point when the circulation preheating function of the water heater is turned on. The target temperature is generated in response to the user's temperature setting operation on the target water use point.

[0121] The judgment module 503 is used to judge whether the hot water reaches the target water use point based on the current water temperature and the target temperature.

[0122] The control module 504 is used to send a reminder message to remind the user that the circulation preheating is completed and the hot water can be used if the hot water reaches the target water use point, and generate an end signal to control the water heater to turn off the circulation preheating function when it is detected that the user starts to use the hot water.

[0123] In some optional embodiments, the detection module 501 includes: a detection submodule, which is used to respond to the user's key operation on the water heater, or detect that the hot water flow rate of the hot water pipeline of the water heater is not zero within a first preset time period and is zero within a second preset time period, and accordingly generate a circulation preheating start signal, and determine whether the water heater starts the circulation preheating function based on the circulation preheating start signal.

[0124] In some optional embodiments, the judgment module 503 includes: a first judgment submodule, a second judgment submodule, a third judgment submodule and a fourth judgment submodule; wherein the first judgment submodule is used to subtract the current water temperature from the target temperature to obtain a first temperature difference; the second judgment submodule is used to determine whether the first temperature difference is less than a preset temperature difference threshold; the third judgment submodule is used to determine that the hot water has reached the target water use point if the temperature difference is less than the preset temperature difference threshold; the fourth judgment submodule is used to return to the step of obtaining the current water temperature and the target temperature of the target water use point if the temperature difference is not less than the preset temperature difference threshold.

[0125] In some optional embodiments, the judgment module 503 also includes: a first judgment submodule, a second judgment submodule, a third judgment submodule, a fourth judgment submodule and a fifth judgment submodule; wherein the first judgment submodule is used to obtain the water temperature of the water outlet of the water heater; the second judgment submodule is used to subtract the water temperature of the water outlet from the target temperature to obtain a second temperature difference; the third judgment submodule is used to determine whether the second temperature difference is less than a preset temperature difference threshold; the fourth judgment submodule is used to generate a hot water outflow signal and send it to the target water use point if the second temperature difference is less than the preset temperature difference threshold, and the hot water outflow signal is used to characterize the outflow of hot water from the water heater; the fifth judgment submodule is used to return to the step of obtaining the water temperature of the water outlet of the water heater if the second temperature difference is not less than the preset temperature difference threshold.

[0126] In some optional embodiments, the control module 504 includes: a first control submodule and a second control submodule; wherein the first control submodule is used to obtain the current water flow and current usage time of the target water use point, wherein the current usage time refers to the time from the target water use point receiving the hot water outflow signal until the hot water reaches the target water use point, and the current water flow is the water flow rate of the hot water reaching the target water use point; the second control submodule is used to issue a reminder message when the current water flow satisfies a preset relationship, and the preset relationship is composed of the current usage time, the first preset data and the second preset data, wherein the first preset data refers to the historical water flow of the hot water reaching the target water use point recorded during the historical operation of the water heater turning on the circulation preheating function, and the second preset data refers to the historical usage time from the issuance of the reminder message to the user starting to use hot water recorded during the historical operation of the water heater turning on the circulation preheating function.

[0127] The further functional description of each of the above modules is the same as that of the above corresponding embodiments and will not be repeated here.

[0128] The preheating control device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0129] The preheating control device of the embodiment of the present invention can stop circulating preheating when the hot water reaches the target water use point, which helps to reduce the time and water resources consumed by preheating control and meets the user's usage needs.

[0130] The present invention also provides a water heater, which includes a controller. Figure 6 , Figure 6 is a schematic diagram of the structure of the controller provided in an optional embodiment of the present invention, such as Figure 6As shown, the controller includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. The various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process instructions executed in the controller, including instructions stored in or on the memory to display graphical information of the GUI on an external input / output device (such as a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple controllers can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 10 is taken as an example.

[0131] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0132] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.

[0133] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required by at least one function; the data storage area may store data created according to the use of the controller, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the controller via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0134] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0135] The controller also includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means. Figure 5The example of connecting through bus is taken in the following.

[0136] The input device 30 can receive input digital or character information, and generate signal input related to the user settings and function control of the thermal power unit operation control unit, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator rod, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device may be a touch screen.

[0137] In this embodiment, the water heater is a smart home product, that is, a household appliance that provides hot water, including a gas water heater, an electric water heater, a wall-mounted boiler, etc., which is only used as an example and can be adaptively adjusted according to actual needs. Specifically, the above-mentioned preheating control method of this embodiment is integrated into the water heater, so that this type of water heater can be equipped with a very stable and reliable preheating control effect, and can determine the corresponding cycle preheating time according to the water demand of different water points, reduce the waste of preheating resources, meet the demand for efficient use, and improve the user experience to a certain extent.

[0138] A computer-readable storage medium is also provided in an embodiment of the present invention. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium and downloaded through a network, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor main control chip or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor or hardware, the method shown in the above embodiment is implemented.

[0139] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A preheating control method, applied to a water heater, wherein the water heater has a circulating preheating function, characterized in that: The method comprises: Detect whether the circulation preheating function of the hot water appliance is turned on; When the circulation preheating function of the water heater is turned on, the current water temperature and the target temperature of the target water use point are obtained, and the target temperature is generated in response to the temperature setting operation of the target water use point by the user; Determining whether the hot water reaches the target water use point based on the current water temperature and the target temperature; If the hot water reaches the target water use point, a reminder message is sent to remind the user that the circulation preheating is completed and the hot water can be used. When it is detected that the user starts to use the hot water, an end signal is generated to control the water heater to turn off the circulation preheating function.

2. The preheating control method according to claim 1, characterized in that: The step of judging whether the hot water reaches the target water use point based on the current water temperature and the target temperature includes: Subtracting the current water temperature from the target temperature to obtain a first temperature difference; Determining whether the first temperature difference is less than a preset temperature difference threshold; If the temperature difference is less than the preset temperature difference threshold, it is determined that the hot water reaches the target water use point.

3. The preheating control method according to claim 2, characterized in that: The method further comprises: If the temperature difference is not less than the preset temperature difference threshold, the process returns to the step of obtaining the current water temperature and the target temperature of the target water use point.

4. The preheating control method according to claim 1, characterized in that: Before judging whether the hot water reaches the target water use point based on the current water temperature and the target temperature, the method further includes: Get the water temperature at the water outlet of the hot water appliance; Subtracting the water outlet water temperature from the target temperature to obtain a second temperature difference; Determining whether the second temperature difference is less than a preset temperature difference threshold; If the second temperature difference is less than a preset temperature difference threshold, a hot water outflow signal is generated and sent to the target water use point, wherein the hot water outflow signal is used to indicate that hot water flows out of the hot water appliance.

5. The preheating control method according to claim 4, characterized in that: Before sending the reminder message, the method further includes: The current water flow rate and the current usage time of the target water use point are obtained, wherein the current usage time refers to the time from the target water use point receiving the hot water outflow signal until the hot water reaches the target water use point, and the current water flow rate is the water flow rate of the hot water reaching the target water use point; when the current water flow rate satisfies a preset relationship, a reminder message is issued, and the preset relationship is composed of the current usage time received by the target water use point, first preset data and second preset data, wherein the first preset data refers to the historical water flow rate of the hot water reaching the target water use point recorded during the historical operation of the water heater turning on the circulation preheating function, and the second preset data refers to the historical usage time from the issuance of the reminder message to the user starting to use the hot water, recorded during the historical operation of the water heater turning on the circulation preheating function.

6. The preheating control method according to claim 4, characterized in that: The method further comprises: If the second temperature difference is not less than the preset temperature difference threshold, the process returns to the step of obtaining the water temperature of the water outlet of the water heater.

7. The preheating control method according to claim 1, characterized in that: The method of detecting whether the hot water appliance has started the circulation preheating function includes: In response to a user's key operation on the water heater, or detecting that the hot water flow rate in the hot water pipeline of the water heater is not zero within a first preset time period and is zero within a second preset time period, a circulation preheating start signal is generated accordingly, and based on the circulation preheating start signal, it is determined that the water heater starts the circulation preheating function.

8. A preheating control device, applied to a water heater, wherein the water heater has a circulation preheating function, characterized in that: The device comprises: A detection module, used to detect whether the circulation preheating function of the hot water appliance is turned on; An acquisition module, configured to acquire the current water temperature and the target temperature of the target water use point when the circulation preheating function of the water heater is turned on, wherein the target temperature is generated in response to the temperature setting operation of the target water use point by the user; A judgment module, used for judging whether the hot water reaches the target water use point based on the current water temperature and the target temperature; The control module is used to send out a reminder message to remind the user that the circulation preheating is completed and the hot water can be used if the hot water reaches the target water use point, and to generate an end signal to control the water heater to turn off the circulation preheating function when it is detected that the user starts to use the hot water.

9. A water heater, characterized in that: The water heater includes a controller, which includes: a memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the preheating control method according to any one of claims 1 to 7 by executing the computer instructions.

10. The water heater according to claim 9, characterized in that: The water heater is any one of a gas water heater, an electric water heater and a wall-mounted boiler.

11. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the preheating control method according to any one of claims 1 to 7.