Alternating gas sampling and unloading device and method

By using an alternating gas sampling and transfer device and method, efficient and constant-temperature storage and release of gases are achieved, solving the need for rapid detection and analysis of gases at multiple points and ensuring the accuracy of analysis results and the safety of the equipment.

CN118937019APending Publication Date: 2024-11-12PANZHIHUA IRON & STEEL RES INST OF PANGANG GROUP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411070971.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing technologies cannot meet the needs of high-frequency, multi-point gas collection and analysis, especially the rapid detection and analysis of the flame center and burnout zone during combustion. Furthermore, gas composition may change over time, and traditional sampling and storage methods cannot guarantee a constant gas temperature, affecting the accuracy of the analysis results.

Method used

Design an alternating gas sampling and storage device that utilizes the alternating movement of the heating working fluid circulation and the sealing piston to achieve alternating gas collection, isothermal storage and release in different chambers. By controlling the opening and closing of the gas pump and switch, multi-point rapid gas collection and analysis can be achieved.

Benefits of technology

It achieves efficient, constant-temperature storage and release of gases, meeting the needs of stable online or offline analysis and comparison of gases at multiple points. It avoids the damage to analytical equipment caused by excessive temperature due to traditional electric heating methods, ensuring the accuracy of analytical results and the safety of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118937019A_ABST
    Figure CN118937019A_ABST
Patent Text Reader

Abstract

The invention discloses an alternate gas sampling and transferring device in the technical field of gas collection, which comprises a box body, the box body comprises an inner layer and an outer layer, a filling gap is arranged between the inner layer and the outer layer, the filling gap is filled with a heating working medium, the outer layer is provided with a working medium inlet and a working medium outlet, and the working medium inlet and the working medium outlet are communicated with each other. A heating working medium enters the filling gap from the working medium inlet and is discharged from the working medium outlet after being circulated in the whole filling gap; an inner cavity is formed in the inner layer, a sealing piston is arranged on the inner wall of the inner cavity in a sliding mode, and the sealing piston divides the inner cavity into a first cavity and a second cavity; different gases in the first cavity and the second cavity are alternately collected, stored, transferred and analyzed, large-capacity collection, constant-temperature storage and release of the different gases are achieved, and the requirement for multi-point gas online or offline stable analysis and comparison with the high aging requirement is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of gas collection, and in particular to an alternating gas sampling and transfer device and method. Background Art

[0002] Industrial production flue gas emission monitoring or laboratory research on combustion characteristics, etc., will frequently involve accurate analysis and detection of gas components. Affected by the hydrogen content of the fuel itself and the water content in the combustion-supporting air, the gas or flue gas analyzed contains a certain amount of water vapor. For full-component gas analysis or analysis of components containing water vapor, it is necessary to ensure that the gas temperature is above the water condensation temperature to ensure that there is no condensed water, and at the same time ensure that the gas temperature is relatively constant to ensure that the results of the gas component analysis are accurate. This requires that the storage environment of the gas after gas collection needs sufficient heating and constant temperature protection.

[0003] In actual gas analysis and testing, from the perspective of cost and savings, there is usually only one gas analysis device, and it is very cumbersome to switch pipelines or move equipment back and forth for multi-point analysis. Therefore, for rapid detection and analysis that may involve two or more points, such as research on the combustion process, it at least involves smoke detection and analysis in the center of the flame and the burnout zone, in order to accurately analyze and study the combustion process. Or there may be a situation where the gas being analyzed changes over time, and the gas composition may change significantly. The analyzed gas needs to be collected and stored in a short period of time to monitor the gas at different time points, and the sampling and transfer methods in the prior art cannot meet the above requirements. Summary of the invention

[0004] In order to overcome the shortcomings, the technical problems to be solved by the present invention include two aspects: one is how to improve the technical problems that gas collection and heating can only be performed online when equipped with gas analysis equipment, that is, simultaneous collection and analysis have high time requirements, the numerical values ​​of the analysis results may fluctuate greatly, and sampling at multiple gas collection points is inconvenient; the second is how to ensure that the rapidly collected gas can be stored at a constant temperature for subsequent multiple offline analyses.

[0005] The technical solution adopted by the present invention to solve its technical problem is:

[0006] An alternating gas sampling and transfer device comprises a box body, the box body comprises an inner layer and an outer layer, a filling gap is provided between the inner layer and the outer layer, the filling gap is filled with a heating working medium, the outer layer is provided with a working medium inlet and a working medium outlet, the heating working medium enters the filling gap from the working medium inlet and is discharged from the working medium outlet after circulating in the entire filling gap; an inner cavity is formed inside the inner layer, a sealing piston is slidingly provided on the inner wall of the inner cavity, the sealing piston divides the inner cavity into a first cavity and a second cavity; the first cavity is connected to a first air inlet pipe and a first air outlet pipe at one end away from the sealing piston, the first air inlet pipe is connected to a first air pump, and the first air outlet is connected to a first air pump. An air outlet A and an air outlet B are respectively provided on the side of the air pipe away from the above-mentioned outer layer, and the above-mentioned air outlet A is provided with a switch A, and the above-mentioned air outlet B is provided with a switch B; the above-mentioned second cavity is connected to the end away from the above-mentioned sealing piston with a second air inlet pipe and a second air outlet pipe, and the above-mentioned second air inlet pipe and the above-mentioned second air outlet pipe are not connected to the above-mentioned filling gap; the above-mentioned second air inlet pipe is connected to a second air pump, and the above-mentioned second air outlet pipe is respectively provided with an air outlet C and an air outlet D on the side away from the above-mentioned outer layer, and the above-mentioned air outlet C is provided with a switch C, and the above-mentioned air outlet D is provided with a switch D; during operation, the pressure difference generated in the above-mentioned first cavity and the above-mentioned second cavity acts on the above-mentioned sealing piston and drives the above-mentioned sealing piston to move.

[0007] Furthermore, the inner layer and the outer layer are both rectangular, and the first air inlet pipe and the second air inlet pipe are symmetrically arranged based on the midpoint of the length direction of the outer layer, the air outlet A and the air outlet C are symmetrically arranged based on the midpoint of the length direction of the outer layer, and the air outlet B and the air outlet D are symmetrically arranged based on the midpoint of the length direction of the outer layer; the sealing piston is a rectangular piston and is perpendicular to the length direction of the inner layer.

[0008] Furthermore, the filling gap is provided with a partition, and the partition is arranged between the working fluid inlet and the working fluid outlet.

[0009] Furthermore, the first air outlet pipe and the second air outlet pipe are respectively provided with a first temperature sensor and a second temperature sensor.

[0010] Furthermore, the inner layer is made of high thermal conductivity alloy or carbon steel.

[0011] Furthermore, the outer wall of the outer layer is provided with a heat-insulating layer and a transparent area for displaying the position of the sealing piston is provided in the extension direction.

[0012] Furthermore, a third temperature sensor is provided at the working fluid inlet.

[0013] Furthermore, it also includes a controller, which is used to automatically control the opening and closing of the first vacuum pump, the second vacuum pump, the switch A, the switch B, the switch C and the switch D.

[0014] The present invention also proposes an alternating gas sampling and transfer method, characterized in that it includes a first state and a second state, the first state is gas collection, constant temperature storage and gas delivery analysis of two gases or two different gas extraction points, the second state is direct analysis of a single gas, an end of the first cavity close to the first air inlet pipe is set as a first end, when the sealing piston is located at the first end, the volume of the first cavity is zero, and an end of the second cavity close to the second air inlet pipe is set as a second end, when the sealing piston is located at the second end, the volume of the second cavity is zero;

[0015] The first state includes the following steps:

[0016] S11: injecting a heating medium at 100° C. to 380° C. from the medium inlet, so that the heating medium circulates in the filling gap and is discharged from the medium outlet;

[0017] S12: Turn on switch B and switch D, turn off switch A and switch C, start the second air pump, fill gas B into the second cavity, move the sealing piston to the first end, and complete the first inflation process; at this time, turn off the second air pump and turn on the first air pump, fill gas A into the first cavity, move the sealing piston to the second end, and complete the second inflation process. Repeat the first inflation process and the second inflation process multiple times, and finally move the sealing piston to the second end or the first end;

[0018] S13: After completing the first inflation process and the second inflation process, if the sealing piston moves to the second end, close switch A, switch C and switch D, open switch B and start the second air pump, the sealing piston moves toward the first air inlet pipe, and gas B is filled into the second cavity. When the sealing piston moves to the first end, close the second air pump to complete the collection and storage of gas B. After the gas B completes the constant temperature heat exchange, close switch B, open switch C, start the first air pump, and move the sealing piston toward the second end to pump the gas B in the second cavity into the analysis device B through the gas outlet C. After completing the collection and analysis of gas B, the sealing piston moves to the second end, close switch C and the first air pump. At this time, the first cavity is filled with gas A. After the gas A completes the constant temperature heat exchange, open switch A and the second air pump, and move the sealing piston toward the first end to pump the gas A in the first cavity into the analysis device A through the gas outlet A. After completing the collection and analysis of gas A, the sealing piston moves to the first end, close switch A and the second air pump, and completes an alternating collection and analysis cycle.

[0019] If the sealing piston moves to the first end, close switch A, switch B and switch C, open switch D and start the first air pump, the sealing piston moves toward the second end, and gas A is filled into the first cavity. When the sealing piston moves to the second end, close the first air pump and switch D, complete the collection and storage of gas A, and after gas A completes constant temperature heat exchange, open switch A and the second air pump, move the sealing piston toward the first end, and pump the gas A in the first cavity into the analysis device A through the gas outlet A. After the collection and analysis of gas A is completed, the sealing piston moves to the first end, close switch A and the second air pump, complete the collection and storage of gas B. After gas B completes constant temperature heat exchange, close switch B, open switch C, start the first air pump, move the sealing piston toward the second end, and pump the gas B in the second cavity into the analysis device B through the gas outlet C. After the collection and analysis of gas B is completed, the sealing piston moves to the second end, close switch C and the first air pump, and complete an alternating collection and analysis cycle;

[0020] The second state includes the following steps:

[0021] S21: injecting a heating medium at a temperature of 100° C. to 380° C. from the medium inlet, so that the heating medium circulates in the filling gap and is discharged from the medium outlet;

[0022] S22: Close switch A, switch C and switch D, open switch B, start the second vacuum pump, when the sealing piston moves close to the first end, the sealing piston and the first end have a constant temperature gap, then close switch B and the second vacuum pump, open switch A and the first vacuum pump, the gas C pumped in by the first vacuum pump is injected from the gas outlet A into the analysis equipment C through the constant temperature gap to realize the online gas collection and analysis process.

[0023] Furthermore, the constant temperature gap in step S22 is 0.8 cm-1.5 cm.

[0024] The beneficial effects of the present invention are:

[0025] By controlling the opening and closing of the first vacuum pump, the second vacuum pump, switch A, switch B, switch C and switch D, the sealing piston can be moved in the inner cavity, and the volume change between the first cavity and the second cavity can be adjusted, so that different gases in the first cavity and the second cavity are alternately collected, stored, transported and analyzed, thereby realizing large-capacity collection, constant temperature storage and release of different gases, and meeting the needs of stable online or offline analysis and comparison of multiple points of gas with high timeliness requirements; and the setting of the filling gap and the heating medium can realize the needs of multiple gas delivery analysis and verification of the collected gas under exactly the same conditions, and can also avoid damage to the analysis equipment caused by the traditional electric heating method due to the inability to cool down the collected gas due to the high temperature. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structure of the present invention;

[0027] Marked in the figure are, 1-box, 2-transparent area, 3-sealing piston, 4-filling gap, 5-first air inlet pipe, 6-controller, 7-second air inlet pipe, 8-second air outlet pipe, 9-working fluid outlet, 10-working fluid inlet, 11-first air outlet pipe, 12-third temperature sensor, 13-switch B, 14-switch A, 15-first air pump, 16-second air pump, 17-switch C, 18-switch D, 19-second temperature sensor, 20-first temperature sensor, 21-partition, 22-first cavity, 23-second cavity. DETAILED DESCRIPTION

[0028] The present invention is further described below in conjunction with the accompanying drawings.

[0029] like Figure 1 As shown, the embodiment of the present application proposes an alternating gas sampling and transfer device, characterized in that it includes a box body 1, the box body 1 includes an inner layer and an outer layer, a filling gap 4 is provided between the inner layer and the outer layer, the filling gap 4 is filled with a heating working medium, the outer layer is provided with a working medium inlet 10 and a working medium outlet 9, the heating working medium enters the filling gap 4 from the working medium inlet 10 and is discharged from the working medium outlet 9 after circulating in the entire filling gap 4; an inner cavity is formed inside the inner layer, a sealing piston 3 is slidingly provided on the inner wall of the inner cavity, the sealing piston 3 divides the inner cavity into a first cavity 22 and a second cavity 23; the first cavity 22 is connected to a first air inlet pipe 5 and a first air outlet pipe 11 at one end away from the sealing piston 3, and the first air inlet pipe 5 is connected to a first air pump 15. An air outlet A and an air outlet B are respectively provided on a side of the first air outlet pipe 11 away from the outer layer, and a switch A14 is provided on the air outlet A, and a switch B13 is provided on the air outlet B; a second air inlet pipe 7 and a second air outlet pipe 8 are respectively connected to an end of the second cavity 23 away from the sealing piston 3, and the second air inlet pipe 7 and the second air outlet pipe 8 are not connected to the filling gap 4; the second air inlet pipe 7 is connected to a second air pump 16, and an air outlet C and an air outlet D are respectively provided on a side of the second air outlet pipe 8 away from the outer layer, and a switch C17 is provided on the air outlet C, and a switch D18 is provided on the air outlet D; when working, the pressure difference generated in the first cavity 22 and the second cavity 23 acts on the sealing piston 3 and drives the sealing piston 3 to move.

[0030] Specifically, the interlayer formed by the inner layer and the outer layer, that is, the filling gap 4 is completely isolated from the inner cavity, and the heating medium circulating in the filling gap 4 can be heat-conducted to the inside of the inner cavity through the inner layer to achieve a heating constant temperature effect. The first vacuum pump 15 and the second vacuum pump 16 are both extraction devices for extracting the smoke to be detected, and the air outlet A and the air outlet C are both outlets connected to the analysis equipment, and the air outlet B and the air outlet D are both external exhaust ports. In addition, in another implementation method of the present embodiment, the first air outlet pipe 11 and the second air outlet pipe 8 may not be set, and the air outlet A, the air outlet C, the air outlet B and the air outlet D are directly set at the corresponding positions and connected to the corresponding pipelines and equipment.

[0031] In the specific working process, the sealing plug can be moved under the action of pressure difference by filling gas A into the first cavity 22 and filling gas B into the second cavity 23. In this process, the storage and transportation of gas can be realized by controlling the corresponding switches, and the heating working fluid provides a constant temperature environment during the process.

[0032] First of all, it should be stated that by controlling the opening and closing of the first vacuum pump 15, the second vacuum pump 16, the switch A14, the switch B13, the switch C17 and the switch D18, the sealing piston 3 can be moved in the inner cavity, and the volume change between the first cavity 22 and the second cavity 23 can be adjusted, so that different gases in the first cavity 22 and the second cavity 23 are alternately collected, stored and transported for analysis, and large-capacity collection, constant temperature storage and release of different gases are achieved, meeting the needs of online or offline stable analysis and comparison of multiple points of gas with high timeliness requirements; and the setting of the filling gap 4 and the heating medium can realize the needs of multiple gas delivery analysis and verification of the collected gas under exactly the same conditions, and can also avoid the damage to the analysis equipment caused by the traditional electric heating method due to the inability to cool down the collected gas due to the high temperature. The above switches A14, switch B13, switch C17 and switch D18 all use electromagnetic control valves, which can ensure sufficient sensitivity and sealing.

[0033] Specifically, the inner layer and the outer layer are both in the shape of a rectangular parallelepiped, and the first air inlet pipe 5 and the second air inlet pipe 7 are symmetrically arranged based on the midpoint of the length direction of the outer layer, the air outlet A and the air outlet C are symmetrically arranged based on the midpoint of the length direction of the outer layer, and the air outlet B and the air outlet D are symmetrically arranged based on the midpoint of the length direction of the outer layer; the sealing piston 3 is a rectangular piston and is perpendicular to the length direction of the inner layer; that is, the box body 1 as a whole is divided into two ends, and the two ends are respectively provided with stacked air inlets and air outlets, and the sealing piston 3 is movable in the inner cavity, and the whole structure is simple, easy to process and install, and reduces costs.

[0034] Moreover, the filling gap 4 is provided with a partition 21, and the partition 21 is arranged between the working fluid inlet 10 and the working fluid outlet 9, so as to ensure that the heating working fluid enters the filling gap 4 from the working fluid inlet 10 and is discharged from the working fluid outlet 9 only after completing one cycle, thereby ensuring the uniformity and high efficiency of heating and heat exchange.

[0035] In the actual detection process, different detection temperatures need to be set for different gases. In order to ensure the accuracy of the detection, the first gas outlet pipe 11 and the second gas outlet pipe 8 are respectively provided with a first temperature sensor 20 and a second temperature sensor 19, which can ensure the accuracy of the gas temperature entering the analysis equipment.

[0036] In order to enhance the heating and constant temperature effect of the entire device, the inner layer is made of high thermal conductivity alloy or carbon steel to ensure sufficient thermal conductivity efficiency and promote the heating medium to exchange heat through the inner layer and the gas in the inner cavity, and the outer layer is made of low thermal conductivity alloy to enhance the thermal insulation effect. An external thermal insulation layer may also be provided to ensure that the heat of the heating medium will not be lost to the outside in large quantities, and dust filter cotton, filter element or flow meter and other structures are provided on the inner wall of each pipeline to ensure the purity of the detected gas. A third temperature sensor 12 is provided at the working medium inlet 10 to ensure that the input heating medium is within the temperature range, and in order to reduce costs, no temperature sensor is required at the working medium outlet 9, and no temperature monitoring of the heating medium after the heat exchange cycle is required.

[0037] Furthermore, in order to accurately control the moving position of the sealing piston 3, the outer wall of the outer layer is provided with a heat-insulating layer and a transparent area 2 for displaying the position of the sealing piston 3 is provided in the extension direction.

[0038] In addition, the present embodiment also includes a controller 6, and the controller 6 is used to automatically control the opening and closing of the first vacuum pump 15, the second vacuum pump 16, the switch A14, the switch B13, the switch C17 and the switch D18. That is to say, by setting the corresponding program for the controller 6, it is ensured that the vacuum pumps and the switches are opened and closed in an orderly manner, and the gas collection and transportation analysis processes are alternately realized. In addition, the controller 6 can sense the signal of the temperature sensor, and control whether to interrupt the gas collection and transfer process according to whether the temperature is lower than the threshold value, so as to ensure the constant temperature state of the gas to be analyzed.

[0039] This embodiment also proposes an alternating gas sampling and transfer method, including a first state and a second state. The first state is gas collection, constant temperature storage and gas delivery analysis of two gases or two different gas extraction points, and the second state is direct analysis of a single gas. The end of the first cavity 22 close to the first air inlet pipe 5 is set as the first end. When the sealing piston 3 is located at the first end, the volume of the first cavity 22 is zero. The end of the second cavity 23 close to the second air inlet pipe 7 is set as the second end. When the sealing piston 3 is located at the second end, the volume of the second cavity 23 is zero.

[0040] The first state includes the following steps:

[0041] S11: injecting a heating medium at a temperature of 100° C. to 380° C. from the medium inlet 10, so that the heating medium circulates in the filling gap 4 and is discharged from the medium outlet 9;

[0042] S12: Turn on switch B13 and switch D18, turn off switch A14 and switch C17, turn on the second air pump 16, fill gas B into the second cavity 23, move the sealing piston 3 to the first end, and complete the first inflation process; at this time, turn off the second air pump 16 and turn on the first air pump 15, fill gas A into the first cavity 22, move the sealing piston 3 to the second end, and complete the second inflation process. Repeat the first inflation process and the second inflation process multiple times, and finally move the sealing piston 3 to the second end or the first end;

[0043] S13: After completing the first and second inflation processes, if the sealing piston 3 moves to the second end, close the switches A14, C17 and D18, open the switch B13 and start the second air pump 16, the sealing piston 3 moves toward the first air inlet pipe 5, and the gas B is filled into the second cavity 23. When the sealing piston 3 moves to the first end, close the second air pump 16 to complete the collection and storage of the gas B. After the gas B completes the constant temperature heat exchange, close the switch B13, open the switch C17, start the first air pump 15, and the sealing piston 3 moves toward the second end to fill the second cavity 23. The gas B in 23 is pumped into the analysis device B through the gas outlet C. After the collection and analysis of gas B is completed, the sealing piston 3 moves to the second end, and the switch C17 and the first air pump 15 are turned off. At this time, the first cavity 22 is filled with gas A. After the gas A completes the constant temperature heat exchange, the switch A14 and the second air pump 16 are turned on, and the sealing piston 3 moves toward the first end, and the gas A in the first cavity 22 is pumped into the analysis device A through the gas outlet A. After the collection and analysis of gas A is completed, the sealing piston 3 moves to the first end, and the switch A14 and the second air pump 16 are turned off to complete an alternating collection and analysis cycle. In this cycle, the transfer analysis of gas B is performed first, and then the transfer analysis of gas A is performed. During the process, the offline analysis of the two gases can be achieved without pipeline switching and equipment replacement.

[0044] If the sealing piston 3 moves to the first end, the switch A14, the switch B13 and the switch C17 are closed, the switch D18 is opened and the first vacuum pump 15 is started, the sealing piston 3 moves toward the second end, and the gas A is filled into the first cavity 22. When the sealing piston 3 moves to the second end, the first vacuum pump 15 and the switch D18 are closed to complete the collection and storage of the gas A. After the gas A completes the constant temperature heat exchange, the switch A14 and the second vacuum pump 16 are opened, the sealing piston 3 moves toward the first end, and the gas A in the first cavity 22 is pumped into the analysis device A through the gas outlet A. After the collection and analysis of the gas A is completed , the sealing piston 3 moves to the first end, closes the switch A14 and the second vacuum pump 16, completes the collection and storage of gas B, after the gas B completes the constant temperature heat exchange, closes the switch B13, opens the switch C17, starts the first vacuum pump 15, and moves the sealing piston 3 toward the second end, and injects the gas B in the second cavity 23 into the analysis device B through the gas outlet C. After the collection and analysis of gas B is completed, the sealing piston 3 moves to the second end, closes the switch C17 and the first vacuum pump 15, and completes an alternating collection and analysis cycle; in this cycle, the transfer and storage analysis of gas A is performed first, and then the transfer and storage analysis of gas B is performed.

[0045] In the first state, in a preferred embodiment, the external volume of the box body 1 is 50cm×30cm×30cm, and the outer layer is heat-insulated. After completing the connection between the gas extraction pipe and the gas source point and the connection between the gas outlet and the analysis equipment, the working fluid inlet 10 is connected to 120°C pressurized water and discharged from the working fluid outlet 9. Only switch B13 and switch D18 are turned on, and other switches are closed. The second vacuum pump 16 is turned on to push the sealing piston 3 to the first end, and then the second vacuum pump 16 is stopped and the first vacuum pump 15 is turned on alternately. After 5 times of back and forth, the sealing piston 3 finally stops at the first end to complete the preheating of the device and the pipeline; at this time, the temperature value of the first temperature sensor 20 is 118.6°C, and the temperature value of the second temperature sensor 19 is 117.1°C; when collecting gas, switch B13 is closed, and the first vacuum pump 1 is started. 5 Collect gas A and fill it into the first cavity 22. When the sealing piston 3 reaches the second end, the filling of gas A is completed. After 2.5 minutes, the temperature of gas A is 119.2℃, which fully meets the temperature requirements of gas analysis. When delivering gas, close switch D18, open switch A14, start the second vacuum pump 16 to collect gas B and fill it into the second cavity 23, and at the same time push the sealing piston 3 to move toward the first end to squeeze gas A into the gas analysis equipment. After a set of analysis data is completed, pause the second vacuum pump 16, wait for 10 seconds and then start to continue to deliver gas. Repeatedly start and pause until the sealing piston 3 reaches the first end. Statistics show that 9 gas delivery analysis requirements can be achieved. The temperature of gas A is maintained within the range of 119.2℃±0.5 during the entire delivery process, which meets the gas analysis temperature requirements. After the temperature of gas B in the second cavity 23 reaches the standard, fill the first cavity 22 with gas A, and the sealing piston 3 moves toward the second end to squeeze gas B into the gas analysis equipment for alternating gas transfer analysis.

[0046] The second state includes the following steps:

[0047] S21: injecting a heating medium at a temperature of 100° C. to 380° C. from the medium inlet 10, so that the heating medium circulates in the filling gap 4 and is discharged from the medium outlet 9;

[0048] S22: Close switch A14, switch C17 and switch D18, open switch B13, start the second vacuum pump 16, when the sealing piston 3 moves close to the first end, the sealing piston 3 and the first end have a constant temperature gap, and the constant temperature gap is 0.8cm-1.5cm. At this time, close switch B13 and the second vacuum pump 16, open switch A14 and the first vacuum pump 15, and the gas C drawn in by the first vacuum pump 15 is injected into the analysis equipment C from the gas outlet A through the constant temperature gap to realize the online gas collection and analysis process.

[0049] In the second state, a preferred embodiment is: the external volume of the box body 1 is 30cm×20cm×25cm. After the connection between the gas extraction pipe and the gas source point is completed, the working fluid inlet 10 is connected to 200°C pressurized water and discharged from the working fluid outlet 9, only the switch B13 and the switch D18 are turned on, and the other switches are turned off. The second vacuum pump 16 is turned on to pump air to push the sealing piston 3 to the first end, and then the second vacuum pump 16 is stopped and the first vacuum pump 15 is turned on for reverse operation. After 4 times of back and forth, the sealing piston 3 finally stops at a position 0.8cm away from the first end, and then the switch D18 is turned off. At this time, the temperature value of the first temperature sensor 20 is 198.2°C. When preparing for online gas collection and online gas delivery, turn on the gas outlet control switch A14 and turn off the switch B13, and the gas can be delivered to the analysis equipment online. During the entire gas delivery process, the temperature of gas A is maintained within the range of 198.2°C±0.6°C, meeting the online analysis temperature requirements of the gas.

[0050] In summary, the present invention proposes an alternating gas sampling and transfer device and method, which can realize large-capacity collection, constant temperature storage and release of multiple points or different gases to be analyzed by using the principle of gas pressure balance, and meet the needs of online alternating analysis of multiple points of gas or multiple stable analysis and comparative research offline. Furthermore, due to the use of program-controlled large-capacity heating constant temperature box dump and high specific heat heating working fluid to stabilize the temperature, it can meet the needs of multiple gas delivery analysis within the set range of the collected gas temperature, and can also avoid the damage to the analysis equipment caused by the traditional electric heating method due to the inability to cool down the collected gas temperature due to excessively high temperature, better supporting the accuracy requirements and technological progress in the field of gas analysis.

Claims

1. An alternating gas sampling and transfer device, characterized in that: The invention comprises a box body (1), wherein the box body (1) comprises an inner layer and an outer layer, a filling gap (4) is provided between the inner layer and the outer layer, the filling gap (4) is filled with a heating medium, the outer layer is provided with a medium inlet (10) and a medium outlet (9), the heating medium enters the filling gap (4) from the medium inlet (10), circulates in the entire filling gap (4), and is discharged from the medium outlet (9); an inner cavity is formed inside the inner layer, a sealing piston (3) is slidably provided on the inner wall of the inner cavity, the sealing piston (3) divides the inner cavity into a first cavity (22) and a second cavity (23); the first cavity (22) is connected to a first air inlet pipe (5) and a first air outlet pipe (11) at one end away from the sealing piston (3), and the first air inlet pipe (5) is connected to a first air pump (15), The first air outlet pipe (11) is provided with an air outlet A and an air outlet B, the air outlet A is provided with a switch A (14), and the air outlet B is provided with a switch B (13); the second cavity (23) is connected to a second air inlet pipe (7) and a second air outlet pipe (8) at one end away from the sealing piston (3), and the second air inlet pipe (7) and the second air outlet pipe (8) are not connected to the filling gap (4); the second air inlet pipe (7) is connected to a second air pump (16), and the second air outlet pipe (8) is provided with an air outlet C and an air outlet D, the air outlet C is provided with a switch C (17), and the air outlet D is provided with a switch D (18); when working, the pressure difference generated in the first cavity (22) and the second cavity (23) acts on the sealing piston (3) and drives the sealing piston (3) to move.

2. The alternating gas sampling and transfer device according to claim 1, characterized in that: The inner layer and the outer layer are both in the shape of a rectangular parallelepiped, and the first air inlet pipe (5) and the second air inlet pipe (7) are symmetrically arranged based on the midpoint of the length direction of the outer layer, the air outlet A and the air outlet C are symmetrically arranged based on the midpoint of the length direction of the outer layer, and the air outlet B and the air outlet D are symmetrically arranged based on the midpoint of the length direction of the outer layer; the sealing piston (3) is a rectangular piston and is perpendicular to the length direction of the inner layer.

3. The alternating gas sampling and transfer device according to claim 1, characterized in that: The filling gap (4) is provided with a partition (21), and the partition (21) is arranged between the working medium inlet (10) and the working medium outlet (9).

4. The alternating gas sampling and transfer device according to claim 1, characterized in that: The first air outlet pipe (11) and the second air outlet pipe (8) are respectively provided with a first temperature sensor (20) and a second temperature sensor (19).

5. The alternating gas sampling and transferring device according to claim 1, characterized in that: The inner layer is made of high thermal conductivity alloy or carbon steel.

6. The alternating gas sampling and transferring device according to claim 1, characterized in that: The outer wall of the outer layer is provided with a heat-insulating layer and a transparent area (2) for displaying the position of the sealing piston (3) is provided in the extension direction.

7. The alternating gas sampling and transferring device according to claim 1, characterized in that: A third temperature sensor (12) is provided at the working medium inlet (10).

8. An alternating gas sampling and transferring device according to any one of claims 1 to 7, characterized in that: The invention also comprises a controller (6), wherein the controller (6) is used to automatically control the opening and closing of the first vacuum pump (15), the second vacuum pump (16), the switch A (14), the switch B (13), the switch C (17) and the switch D (18).

9. An alternating gas sampling and transfer method, characterized in that: The invention comprises a first state and a second state, wherein the first state is gas collection, constant temperature storage and gas delivery analysis of two gases or gases from two different gas extraction points, and the second state is direct analysis of a single gas, wherein an end of the first cavity (22) close to the first gas inlet pipe (5) is set as a first end, and when the sealing piston (3) is located at the first end, the volume of the first cavity (22) is zero, and an end of the second cavity (23) close to the second gas inlet pipe (7) is set as a second end, and when the sealing piston (3) is located at the second end, the volume of the second cavity (23) is zero; The first state includes the following steps: S11: injecting a heating medium at a temperature of 100° C. to 380° C. from the medium inlet (10), so that the heating medium circulates in the filling gap (4) and is discharged from the medium outlet (9); S12: Turn on switch B (13) and switch D (18), turn off switch A (14) and switch C (17), start the second air pump (16), fill the second cavity (23) with gas B, move the sealing piston (3) to the first end, and complete the first inflation process; then turn off the second air pump (16) and turn on the first air pump (15), fill the first cavity (22) with gas A, move the sealing piston (3) to the second end, and complete the second inflation process; repeat the first inflation process and the second inflation process multiple times, and finally move the sealing piston (3) to the second end or the first end; S13: After the first inflation process and the second inflation process are completed, if the sealing piston (3) moves to the second end, the switches A (14), C (17) and D (18) are closed, the switch B (13) is opened and the second air pump (16) is started, the sealing piston (3) moves toward the first air inlet pipe (5), and the gas B is filled into the second cavity (23). When the sealing piston (3) moves to the first end, the second air pump (16) is closed to complete the collection and storage of the gas B. After the gas B completes the constant temperature heat exchange, the switch B (13) is closed, the switch C (17) is opened, the first air pump (15) is started, the sealing piston (3) moves toward the second end, and the gas B is filled into the second cavity (23). The gas B in the second cavity (23) is pumped into the analysis device B through the gas outlet C. After the collection and analysis of the gas B is completed, the sealing piston (3) moves to the second end, and the switch C (17) and the first air pump (15) are closed. At this time, the first cavity (22) is filled with the gas A. After the gas A completes the constant temperature heat exchange, the switch A (14) and the second air pump (16) are opened, and the sealing piston (3) moves toward the first end to pump the gas A in the first cavity (22) into the analysis device A through the gas outlet A. After the collection and analysis of the gas A is completed, the sealing piston (3) moves to the first end, and the switch A (14) and the second air pump (16) are closed, completing an alternating collection and analysis cycle; When the sealing piston (3) moves to the first end, the switch A (14), the switch B (13) and the switch C (17) are closed, the switch D (18) is opened and then the first air pump (15) is started, the sealing piston (3) moves toward the second end, and the gas A is filled into the first cavity (22). When the sealing piston (3) moves to the second end, the first air pump (15) and the switch D (18) are closed to complete the collection and storage of the gas A. After the gas A completes the constant temperature heat exchange, the switch A (14) and the second air pump (16) are opened, the sealing piston (3) moves toward the first end, and the gas A in the first cavity (22) is discharged through the gas outlet A. After the gas A is collected and analyzed, the sealing piston (3) moves to the first end, the switch A (14) and the second air pump (16) are closed, and the collection and storage of the gas B are completed. After the gas B completes the constant temperature heat exchange, the switch B (13) is closed, the switch C (17) is opened, the first air pump (15) is started, and the sealing piston (3) moves toward the second end, and the gas B in the second cavity (23) is pumped into the analysis device B through the gas outlet C. After the gas B is collected and analyzed, the sealing piston (3) moves to the second end, the switch C (17) and the first air pump (15) are closed, and an alternating collection and analysis cycle is completed; The second state includes the following steps: S21: injecting a heating medium at a temperature of 100° C. to 380° C. from the medium inlet (10), so that the heating medium circulates in the filling gap (4) and is discharged from the medium outlet (9); S22: Close switch A (14), switch C (17) and switch D (18), open switch B (13), start the second vacuum pump (16), when the sealing piston (3) moves close to the first end, the sealing piston (3) and the first end have a constant temperature gap, then close switch B (13) and the second vacuum pump (16), open switch A (14) and the first vacuum pump (15), the gas C pumped into the first vacuum pump (15) is injected from the gas outlet A into the analysis device C through the constant temperature gap to realize the online gas collection and analysis process.

10. The alternating gas sampling and transferring method according to claim 9, characterized in that: The constant temperature gap in step S22 is 0.8 cm-1.5 cm.

Citation Information

Cited By

  • Gas detection system and suction type sampling device