Structure interlayer bonding strength drawing detector with pavement backfilling function

By designing an automatic backfill structural bond strength pulling detector, the problem of hole exposure is solved by using gravity and nylon strip cleaning components, the integrity of the road structure and backfill efficiency are improved, and manual backfill amount and impurities are reduced. Influence.

CN118937080AInactive Publication Date: 2024-11-12MINGDE COLLEGE OF GUIZHOU UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411181781.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the detection of the bond strength between the existing pavement structures, the holes left after the inspection are easily exposed to the external environment, resulting in the penetration of rainwater, dust and other substances, resulting in softening and reducing the strength of the road base, and a lot of manual manual is required. Backfill.

Method used

A structural interlayer bond strength pulling detector with pavement backfill was designed, using mortar barrels and backfill components to automatically fill holes through the action of gravity, and the backfill quality and efficiency were ensured through nylon strip cleaning and agitation components.

Benefits of technology

Timely filling of holes is achieved, the penetration of rainwater and dust is avoided, the amount of manual backfill is reduced, and the integrity of road structure and the consistency of backfill is ensured, and impurity interference and cement mortar curing is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118937080A_ABST
    Figure CN118937080A_ABST
Patent Text Reader

Abstract

The invention discloses a structural interlayer bonding strength drawing detector with a pavement backfilling function, and relates to the technical field of pavement detection, the structural interlayer bonding strength drawing detector comprises a trolley, a pavement interlayer strength detector and a drawing head, the pavement interlayer strength detector is slidably connected to the top surface of the trolley, the drawing head is mounted at the bottom of the pavement interlayer strength detector, and the trolley is connected with the drawing head. A backfilling assembly is arranged on the trolley and comprises a mortar barrel, the mortar barrel is fixedly connected to the upper surface of the trolley, and the bottom of the mortar barrel fixedly communicates with a fixed cavity block; cement mortar located at the top of a second sealing plate and in a cavity of a movable cavity block falls into a hole under the action of gravity, and then the hole is backfilled with the cement mortar, so that the hole formed due to detection is filled in time, rainwater and dust can be prevented from entering the hole exposed to the outside, and the detection efficiency is improved. And the structural integrity of the road structural layer under the hole is ensured, and meanwhile, the workload of manual backfilling can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of road surface detection, and in particular to a pull-out detector for bonding strength between structural layers of road backfill. Background Art

[0002] The pavement structure interlayer bond strength pull-out tester is an important device specially used to evaluate the bond strength between the various structural layers of the pavement. It is mainly used in the process of road construction and maintenance to test whether the bond between the structural layers of the newly paved road meets the design requirements and relevant standards. For example, between the asphalt surface layer and the base layer, the pull-out test is used to determine whether the bond strength is sufficient to ensure the integrity and durability of the pavement.

[0003] The existing pull-out test process for the bonding strength between pavement structure layers is to first use a cutting device to cut a section on the pavement, and then use an adhesive to fix the pavement and the pulling head. Therefore, the pull-out test will leave a hole in the ground after the test is completed. Since the pull-out test needs to test multiple points on the same road section to achieve comprehensive test results of the overall strength of the road, the holes left by the previous test are exposed to the external environment during the subsequent test time. If they are not filled in time, rainwater, dust, and accumulated water will penetrate into deeper structural layers along the holes, causing the road base to soften and reduce its strength.

[0004] Therefore, a pull-out tester for the bonding strength between structural layers of road backfill is proposed. Summary of the invention

[0005] The object of the present invention is to provide a pull-out tester for the bonding strength between structural layers of road backfill to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a pull-out tester for the bonding strength between structural layers of road backfill, comprising a trolley, a road interlayer strength tester, and a pulling head, wherein the road interlayer strength tester is slidably connected to the top surface of the trolley, the pulling head is installed at the bottom of the road interlayer strength tester, a backfilling assembly is arranged on the trolley, and the backfilling assembly comprises a mortar bucket, the mortar bucket is fixedly connected to the upper surface of the trolley, the bottom of the mortar bucket is fixedly connected to a fixed cavity block, and the lower surface of the fixed cavity block is slidably connected to A first sealing plate, two first springs are symmetrically fixedly connected between the first sealing plate and the outer wall of the fixed cavity block, a linkage rod is fixedly connected to the side of the pavement interlayer strength tester close to the mortar barrel, the bottom end of the linkage rod is fixedly connected to the mobile cavity block, the lower surface of the mobile cavity block is slidably connected to the second sealing plate, two second springs are symmetrically fixedly connected between the second sealing plate and the outer wall of the mobile cavity block, two force blocks are symmetrically fixedly connected to the side of the second sealing plate away from the second spring, and two force blocks are symmetrically fixedly connected to the lower surface of the trolley.

[0007] Furthermore, the fixed cavity block is located on the lower surface of the trolley, the first sealing plate is located on the moving path of the movable cavity block, and the bottom end of the linkage rod passes through the trolley.

[0008] Furthermore, a circular groove connected to the fixed cavity block is provided on the movable cavity block, the two force-applying blocks are respectively located on the moving paths of the force-bearing blocks on the same side, a cover plate is clamped on the top of the mortar barrel, and a scraper plate is fixedly connected to the lower surface of the linkage rod.

[0009] Further, the pulling head penetrates the trolley.

[0010] Furthermore, it also includes a cleaning component, which is arranged at the bottom of the trolley, and the cleaning component includes a cross bar, which is fixedly connected to the linkage rod, and the end of the cross bar away from the linkage rod is fixedly connected to the vertical rod, the top of the vertical rod is fixedly connected to the curved rod, and the top of the curved rod is rotatably connected to a gear, the lower surface of the trolley is fixedly connected to a rack, the side of the gear away from the curved rod is fixedly connected to a pulley, the bottom end of the vertical rod is rotatably connected to a rotating shaft, a plurality of nylon strips are evenly and fixedly connected to the surface of the rotating shaft, and a belt is transmission-connected between the pulley and the rotating shaft.

[0011] Furthermore, the rack and the gear are meshed with each other.

[0012] Furthermore, it also includes a stirring assembly, which is arranged at the bottom of the mortar barrel, and the stirring assembly includes two telescopic tubes, the two telescopic tubes are symmetrically fixedly connected in the fixed cavity block cavity, the telescopic ends of the two telescopic tubes are commonly fixedly connected to a push plate, the first sealing plate is symmetrically fixedly connected to two push rods on one side away from the pulling head, and the two push rods are each fixedly connected to a steel wire rope on one side close to the push plate.

[0013] Furthermore, the top of the push plate extends into the mortar barrel cavity, and the ends of the two steel wire ropes away from the push rod are fixedly connected to the inner wall of the telescopic end of the telescopic tube on the same side.

[0014] Compared with the prior art, the present invention has the following beneficial effects: The cement mortar in the cavity of the movable cavity block located at the top of the second cover plate falls into the hole under the action of gravity, and then the hole is backfilled with cement mortar, so as to timely fill the hole opened for inspection, and prevent rainwater and dust from entering the hole exposed to the outside, thereby ensuring the structural integrity of the road structure layer under the hole, and reducing the workload of manual backfilling; The cement mortar in the mortar barrel cavity falls on the top of the second sealing plate and the movable cavity block cavity under the action of gravity. In this process, the cement mortar in the movable cavity block cavity can be automatically replenished. At the same time, since the volume of the movable cavity block cavity is fixed, the volume of cement mortar replenished each time is the same, which can avoid inconsistent backfilling volume and cause potholes on the road surface. The nylon strip is extended into the hole to sweep the impurities in the hole toward the pulling head, so as to avoid the impurities and dust splashing caused by cleaning to disturb the workers, and to prevent the impurities from splashing into the cement mortar when the movable cavity block moves and the second sealing plate is removed, so as to ensure that the impurities on the ground will not affect the cement mortar and the backfilling work of the hole; During the two movements of sealing and opening the bottom of the fixed cavity block by the first sealing plate, the push plate and the first sealing plate move in the same direction, and in the process of the push plate moving, the cement mortar in the mortar barrel cavity can be pushed to flow, thereby preventing the cement mortar from solidifying due to long-term standing in an environment with high outdoor temperature, and providing guarantee for the smooth operation of the backfill assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional schematic diagram of the overall device of the present invention; Figure 2 It is a bottom view schematic diagram of the overall device of the present invention; Figure 3 For the present invention Figure 2 The enlarged schematic diagram at A in the middle; Figure 4 This is a schematic diagram of the position of the backfill assembly of the present invention; Figure 5 For the present invention Figure 4 The enlarged schematic diagram of point B in the middle; Figure 6 This is a schematic diagram of the location of the cleaning component of the present invention; Figure 7 For the present invention Figure 6 The enlarged schematic diagram at C in the middle; Figure 8 It is an exploded schematic diagram of the structures of the movable cavity block, the second sealing plate, the second spring, the force bearing block, etc. of the present invention; Fig. 9 It is an exploded schematic diagram of the structure of the fixed cavity block, the first sealing plate, the first spring, etc. of the present invention; Fig.10 For the present invention Fig. 9 Enlarged schematic diagram at point D in the middle.

[0016] In the figure: 11, trolley; 12, pavement interlayer strength tester; 13, pulling head; 21. mortar bucket; 22. fixed cavity block; 23. first closing plate; 24. first spring; 25. linkage rod; 26. movable cavity block; 27. second closing plate; 28. second spring; 29. ​​force bearing block; 210. force applying block; 211. cover plate; 212. scraper plate; 31. horizontal bar; 32. vertical bar; 33. curved bar; 34. gear; 35. rack; 36. pulley; 37. rotating shaft; 38. nylon strip; 39. belt; 41. Telescopic tube; 42. Push plate; 43. Push rod; 44. Wire rope. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] Embodiments provided by the present invention: Example 1: Please refer to Figures 1 to 3 A structural interlayer bonding strength pulling tester with pavement backfill includes a trolley 11, a pavement interlayer strength tester 12, and a pulling head 13. The pavement interlayer strength tester 12 is slidably connected to the top surface of the trolley 11, and the pulling head 13 is installed at the bottom of the pavement interlayer strength tester 12. The pulling head 13 passes through the bottom of the trolley 11.

[0019] It should be noted that the pavement interlayer strength detector 12 is connected to the trolley 11 via an electric slide rail, and the staff can control the pavement interlayer strength detector 12 to slide on the trolley 11 through a controller.

[0020] See also Figures 1 to 9 As shown, the backfill assembly is arranged on the trolley 11, and the backfill assembly includes a mortar bucket 21, which is fixedly connected to the upper surface of the trolley 11, and the bottom of the mortar bucket 21 is fixedly connected to a fixed cavity block 22, and the fixed cavity block 22 is located on the lower surface of the trolley 11. The lower surface of the fixed cavity block 22 is slidably connected to a first sealing plate 23, and two first springs 24 are symmetrically fixedly connected between the first sealing plate 23 and the outer wall of the fixed cavity block 22. The pavement interlayer strength detector 12 is close to the mortar bucket 2 A linkage rod 25 is fixedly connected to one side of the trolley 11, and the bottom end of the linkage rod 25 passes through the bottom of the trolley 11. A movable cavity block 26 is fixedly connected to the bottom end of the linkage rod 25. The first sealing plate 23 is located on the moving path of the movable cavity block 26. The lower surface of the movable cavity block 26 is slidably connected to the second sealing plate 27. The movable cavity block 26 is provided with a circular groove connected to the fixed cavity block 22. Two second springs 28 are symmetrically fixedly connected between the second sealing plate 27 and the outer wall of the movable cavity block 26. Two force blocks 29 are symmetrically fixedly connected to the side of the second sealing plate 27 away from the second spring 28. Two force blocks 210 are symmetrically fixedly connected to the lower surface of the trolley 11. The two force blocks 210 are respectively located on the moving path of the force blocks 29 on the same side. A cover plate 211 is clamped on the top of the mortar barrel 21, and a scraper plate 212 is fixedly connected to the lower surface of the linkage rod 25.

[0021] Among them: Figure 2 For position reference: in the initial state, the pulling head 13 is located in the middle of the trolley 11. When the pavement interlayer strength tester 12 slides to the leftmost end on the trolley 11, the movable cavity block 26 is located in the middle of the trolley 11, that is, the movable cavity block 26 coincides with the position of the previous pulling head 13, and at this time the first sealing plate 23 is in conflict with the movable cavity block 26, and the first spring 24 is in a stretched state. At the same time, in the initial state, the lower surface of the scraper plate 212 is in contact with the ground.

[0022] When the above-mentioned backfill assembly is used, the staff first cuts the test ground on the road, and cooperates with the trolley 11 to move the pavement interlayer strength tester 12 to the pulling head 13 to fit the test ground, and then fix the test ground and the pulling head 13 together with an adhesive. At this time, the staff drives the pavement interlayer strength tester 12, so that the pavement interlayer strength tester 12 drives the pulling head 13 to lift, and applies an upward pulling force to the test ground during the lifting process until the test ground is separated from the road. At this time, the staff records the test data of the pavement interlayer strength tester 12. At this time, a gap in the test ground is exposed on the ground, hereinafter referred to as a hole.

[0023] At this time, the staff drives the electric slide rail to slide the pavement interlayer strength detector 12 to the leftmost end of the trolley 11. Figure 1 and Figure 2 At the left end of the movable cavity block 26, during the sliding process of the pavement interlayer strength tester 12, the movable cavity block 26 is driven to move synchronously through the linkage rod 25. During this process, the movable cavity block 26 no longer conflicts with the first sealing plate 23, so that the first spring 24 elastically contracts, so that the first sealing plate 23 slides toward the linkage rod 25 at the bottom of the fixed cavity block 22 until the first sealing plate 23 seals the bottom of the fixed cavity block 22, so that the bottom of the mortar barrel 21 is also blocked. As the movable cavity block 26 moves, the two force blocks 210 will conflict with the force blocks 29, so that the second sealing plate 27 is no longer synchronous with the movable cavity block 26. The second spring 28 elastically stretches, so that the bottom of the movable cavity block 26 is no longer blocked by the second sealing plate 27. When the movable cavity block 26 moves to the center of the trolley 11, that is, directly above the hole, the cement mortar originally located on the top of the second sealing plate 27 and in the cavity of the movable cavity block 26 falls into the hole under the action of gravity, and the hole is backfilled with cement mortar. The hole is no longer in contact with the external environment, which can prevent the holes exposed to the outside world from being affected by rain and dust, thereby ensuring the structural integrity of the road structure layer under the hole and reducing the workload of manual backfilling.

[0024] In the process of the bottom of the movable cavity block 26 being completely exposed, since the cement mortar itself has a certain flow resistance, a large amount of cement mortar will not flow out as soon as the movable cavity block 26 and the second sealing plate 27 are misaligned, thereby preventing the cement mortar from being poured out ineffectively.

[0025] In the above process, the scraping plate 212 follows the linkage rod 25 and moves to the side of the hole close to the drawing head 13 .

[0026] After backfilling is completed, the staff drives the pavement interlayer strength tester 12 to drive the pulling head 13 to slide in the opposite direction until the pulling head 13 is located in the middle of the trolley 11 again. At this time, the linkage rod 25 drives the movable cavity block 26 to move in the opposite direction. In this process, when the movable cavity block 26 passes over the force block 210, under the elastic contraction of the second spring 28, the second sealing plate 27 blocks the bottom of the movable cavity block 26. When the movable cavity block 26 contacts the first sealing plate 23, the movable cavity block 26 pushes the first sealing plate 23 away from the pulling head 13, and the first spring 28 24 is elastically stretched, at this time, the movable cavity block 26 and the fixed cavity block 22 are fitted with each other, the fixed cavity block 22 is connected with the movable cavity block 26 and the inside of the mortar barrel 21, and the cement mortar in the cavity of the mortar barrel 21 falls on the top of the second sealing plate 27 and the cavity of the movable cavity block 26 under the action of gravity. In this process, the cement mortar in the cavity of the movable cavity block 26 can be automatically replenished. At the same time, since the volume of the cavity of the movable cavity block 26 is constant, the volume of the cement mortar replenished each time is the same, which can avoid inconsistent backfilling volume and cause potholes on the road surface.

[0027] In the above process, the scraper plate 212 moves and resets following the linkage rod 25, and in the process of the scraper plate 212 moving, the mortar overflowing outside the hole will be scraped flat, ensuring the backfilling effect and flatness of the hole.

[0028] When the cement mortar in the cavity of the mortar barrel 21 needs to be supplemented, the staff can open the cover plate 211 to add cement mortar into the cavity of the mortar barrel 21 .

[0029] Example 2: Please refer to Figure 1 , Figure 4 and Figure 6 , Figure 7 As shown, when the pulling head 13 is pulled out of the detection ground, the detection ground is destructively separated from the original ground, and many fine impurities such as cement blocks, asphalt particles, etc. will be generated. These impurities will affect the adhesion between the backfilled cement mortar and the ground, and thus a cleaning component is set.

[0030] A cleaning assembly is arranged at the bottom of the trolley 11, and the cleaning assembly includes a cross bar 31, which is fixedly connected to the linkage rod 25, and the end of the cross bar 31 away from the linkage rod 25 is fixedly connected to a vertical rod 32, and the top of the vertical rod 32 is fixedly connected to a curved rod 33, and the top of the curved rod 33 is rotatably connected to a gear 34, and the lower surface of the trolley 11 is fixedly connected to a rack 35, and the rack 35 and the gear 34 are meshed with each other. The side of the gear 34 away from the curved rod 33 is fixedly connected to a pulley 36, and the bottom end of the vertical rod 32 is rotatably connected to a rotating shaft 37, and a plurality of nylon strips 38 are evenly and fixedly connected to the surface of the rotating shaft 37, and a belt 39 is connected between the pulley 36 and the rotating shaft 37.

[0031] Wherein: in the initial state, the nylon strip 38 contacts the ground and is deformed.

[0032] When the cleaning assembly is running, the linkage rod 25 is moving and the moving cavity block 26 is not backfilling the hole with cement mortar. When the linkage rod 25 moves toward the pulling head 13, the linkage rod 25 drives the horizontal rod 31 and the vertical rod 32 to move synchronously, so that the gear 34 moves toward the pulling head 13 on the rack 35, and then the gear 34 meshes and rotates with the rack 35. Figure 7 As shown, it should be noted that at this time, the rotation of the gear 34 is clockwise, that is, it rotates in the direction of the pulling head 13, and then the gear 34 drives the pulley 36 to rotate synchronously, and the pulley 36 drives the rotating shaft 37 to rotate synchronously clockwise through the belt 39, and then the nylon strip 38 follows the rotating shaft 37 to rotate synchronously clockwise, and then at this time the nylon strip 38 moves toward the pulling head 13, and is in a state of conflict with the ground and rotating clockwise. The rotation of the nylon strip 38 sweeps the impurities on the ground toward the pulling head 13. When the nylon strip 38 moves to the hole position, due to the nylon strip 38 8 Previously, it was in a state of resistance deformation, and then the nylon strip 38 can extend into the hole to sweep the impurities inside the hole toward the pulling head 13. The purpose of sweeping toward the pulling head 13 is that when the staff pushes the trolley 11, they are on the side of the trolley 11 close to the mortar barrel 21, so as to avoid the impurities and dust splashing caused by cleaning to disturb the staff, and to avoid the impurities splashing into the cement mortar when the movable cavity block 26 moves and the second sealing plate 27 is removed, so as to ensure that the ground impurities will not affect the cement mortar and the backfilling work of the hole.

[0033] Example 3: Please refer to Figure 4 and Figure 5 ,as well as Fig. 9 , Fig.10 As shown, during the use of the above-mentioned backfill component, since the use environment is outdoors, when high temperature occurs outdoors, the cement mortar in the cavity of the mortar barrel 21 is prone to solidification, and the solidified cement mortar is not easy to flow, which will affect the backfill component's backfilling operation on the hole, and thus a stirring component is set.

[0034] The stirring assembly is arranged at the bottom of the mortar barrel 21, and the stirring assembly includes two telescopic tubes 41, and the two telescopic tubes 41 are symmetrically fixedly connected in the cavity of the fixed cavity block 22, and the telescopic ends of the two telescopic tubes 41 are commonly fixedly connected with a push plate 42, and the top of the push plate 42 extends into the cavity of the mortar barrel 21, and the first sealing plate 23 is symmetrically fixedly connected with two push rods 43 on the side away from the pulling head 13, and the two push rods 43 are respectively fixedly connected with a steel wire rope 44 on one side close to the push plate 42, and the ends of the two steel wire ropes 44 away from the push rods 43 are fixedly connected to the inner wall of the telescopic end of the telescopic tube 41 on the same side.

[0035] Among them: the push rod 43 is located in the ring of the first spring 24, and the setting of the wire rope 44 is to avoid the push rod 43 from being directly connected to the telescopic tube 41. Since the size of the inner ring surface of the fixed cavity block 22 is smaller than the size of its outer frame rectangle, if the push rod 43 is directly connected to the telescopic tube 41, when the telescopic tube 41 is fully extended, the first sealing plate 23 will not be able to completely seal the bottom of the fixed cavity block 22. The setting of the wire rope 44 provides the push rod 43 with a function similar to "flexible" length adjustment, thereby ensuring the sealing function of the first sealing plate 23 and the full extension and contraction of the telescopic tube 41.

[0036] It should be noted that the length of the push rod 43 is sufficient for the telescopic end of the telescopic tube 41 to fully extend, and will not affect the sealing of the bottom surface of the fixed cavity block 22 by the first sealing plate 23 .

[0037] During the two movement processes of the first sealing plate 23 sealing and opening the bottom of the fixed cavity block 22, when the first sealing plate 23 seals the bottom of the fixed cavity block 22, the first sealing plate 23 slides toward the telescopic tube 41, and drives the push rod 43 to move synchronously toward the telescopic tube 41. During this process, the wire rope 44 is no longer tightened. When the push rod 43 hits the inner wall of the telescopic end of the telescopic tube 41, as the push rod 43 moves, the output end of the telescopic tube 41 extends, and drives the push plate 42 to move in the cavity of the mortar barrel 21.

[0038] When the first sealing plate 23 moves in the reverse direction and no longer blocks the bottom of the fixed cavity block 22, the first sealing plate 23 moves in the direction away from the telescopic tube 41. First, the push rod 43 withdraws from the cavity of the telescopic tube 41. During this process, the wire rope 44 gradually straightens, pulling the telescopic end of the telescopic tube 41 toward the push rod 43, and causing the push plate 42 to move in the reverse direction in the cavity of the mortar barrel 21.

[0039] During the two movements of the first sealing plate 23 sealing and opening the bottom of the fixed cavity block 22, the push plate 42 moves in the same direction as the first sealing plate 23, and during the movement of the push plate 42, it can push the cement mortar in the cavity of the mortar barrel 21 to flow, thereby preventing the cement mortar from solidifying due to long-term standing in an environment with high outdoor temperature, and providing a guarantee for the smooth operation of the backfill assembly.

[0040] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0041] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pull-out tester for the bonding strength between structural layers of a road backfill, comprising a trolley (11), a road interlayer strength tester (12), and a pull-out head (13), wherein the road interlayer strength tester (12) is slidably connected to the top surface of the trolley (11), and the pull-out head (13) is installed at the bottom of the road interlayer strength tester (12), characterized in that: The trolley (11) is provided with a backfilling assembly, the backfilling assembly comprising a mortar bucket (21), the mortar bucket (21) being fixedly connected to the upper surface of the trolley (11), the bottom of the mortar bucket (21) being fixedly connected to a fixed cavity block (22), the lower surface of the fixed cavity block (22) being slidably connected to a first sealing plate (23), two first springs (24) being symmetrically fixedly connected between the first sealing plate (23) and the outer wall of the fixed cavity block (22), and the pavement interlayer strength detector (12) being close to the mortar bucket (21) on one side thereof. A linkage rod (25) is fixedly connected, the bottom end of the linkage rod (25) is fixedly connected to a movable cavity block (26), the lower surface of the movable cavity block (26) is slidably connected to a second sealing plate (27), two second springs (28) are symmetrically fixedly connected between the second sealing plate (27) and the outer side wall of the movable cavity block (26), two force blocks (29) are symmetrically fixedly connected to the side of the second sealing plate (27) away from the second spring (28), and two force blocks (210) are symmetrically fixedly connected to the lower surface of the trolley (11).

2. The pull-out tester for bonding strength between structural layers of road backfill according to claim 1, characterized in that: The fixed cavity block (22) is located on the lower surface of the trolley (11), the first sealing plate (23) is located on the moving path of the movable cavity block (26), and the bottom end of the linkage rod (25) passes through the trolley (11).

3. The pull-out tester for bonding strength between structural layers of road backfill according to claim 1, characterized in that: The movable cavity block (26) is provided with a circular groove which is in communication with the fixed cavity block (22); the two force-applying blocks (210) are respectively located on the moving paths of the force-bearing blocks (29) on the same side; a cover plate (211) is clamped on the top of the mortar barrel (21); and a scraping plate (212) is fixedly connected to the lower surface of the linkage rod (25).

4. The pull-out tester for bonding strength between structural layers of road backfill according to claim 1, characterized in that: The pulling head (13) penetrates the trolley (11).

5. The pull-out tester for bonding strength between structural layers of road backfill according to claim 1, characterized in that: The invention also comprises a cleaning assembly, which is arranged at the bottom of the trolley (11). The cleaning assembly comprises a cross bar (31), the cross bar (31) is fixedly connected to the linkage rod (25), one end of the cross bar (31) away from the linkage rod (25) is fixedly connected to a vertical rod (32), the top of the vertical rod (32) is fixedly connected to a curved rod (33), the top of the curved rod (33) is rotatably connected to a gear (34), the lower surface of the trolley (11) is fixedly connected to a rack (35), the side of the gear (34) away from the curved rod (33) is fixedly connected to a pulley (36), the bottom end of the vertical rod (32) is rotatably connected to a rotating shaft (37), a plurality of nylon strips (38) are evenly fixedly connected to the surface of the rotating shaft (37), and a belt (39) is transmission-connected between the pulley (36) and the rotating shaft (37).

6. The pull-out tester for bonding strength between structural layers of road backfill according to claim 5, characterized in that: The rack (35) and the gear (34) mesh with each other.

7. The pull-out tester for bonding strength between structural layers of road backfill according to claim 1, characterized in that: The invention also comprises a stirring assembly, which is arranged at the bottom of the mortar barrel (21), and comprises two telescopic tubes (41), the two telescopic tubes (41) are symmetrically fixedly connected in the cavity of the fixed cavity block (22), the telescopic ends of the two telescopic tubes (41) are commonly fixedly connected to a push plate (42), the first sealing plate (23) is symmetrically fixedly connected to one side away from the drawing head (13) with two push rods (43), and the two push rods (43) are each fixedly connected to one side close to the push plate (42) with a steel wire rope (44).

8. The pull-out tester for bonding strength between structural layers of road backfill according to claim 7, characterized in that: The top of the push plate (42) extends into the cavity of the mortar barrel (21), and the ends of the two steel wires (44) away from the push rod (43) are fixedly connected to the inner wall of the telescopic end of the telescopic tube (41) on the same side.