Production detection method and system for automatic cluster operation equipment
By constructing production operation plans and evaluation models that take into account operation time and accuracy, and by real-time monitoring and optimization of automated cluster operation equipment, the problem of equipment flexibility in the face of changes in production demand is solved, and efficient and flexible production management and quality control are achieved.
Patent Information
- Application Number
- CN202410996301.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-24
AI Technical Summary
Existing automated cluster operation equipment is unable to quickly adapt to increased production speed or adjust operations to improve yield when faced with irregular changes in production demand, lacking flexibility and adaptability.
A production operation plan that considers operation time and accuracy is constructed, and real-time detection and optimization are performed through a production evaluation model. Multiple production operation plans are generated, and the influence of time and accuracy evaluation parameters is adjusted by weighting factors. Equipment performance is monitored in real time and operation time and accuracy are optimized.
It improves the flexibility and adaptability of the production process, enabling it to respond quickly to market changes, optimize resource allocation, improve production efficiency and product quality, and ensure that the production process meets the expected efficiency and quality standards.
Smart Images

Figure CN118938828A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of production operation detection, and in particular to a production detection method and system for automated cluster operation equipment. Background Art
[0002] In modern manufacturing, in order to improve production efficiency and ensure product quality, more and more companies are turning to automated cluster operation equipment, which uses precise mechanical systems and intelligent control to collaboratively complete complex production tasks, such as production, processing, assembly, packaging, and testing. With the development of technology, single automated equipment can no longer meet the rapidly changing market needs, so cluster operation has become an important trend. Multiple devices in a cluster are interconnected through a network, which can share information, optimize task allocation, and coordinate actions, thereby achieving higher production efficiency and lower operating costs.
[0003] However, the ever-changing production needs require automated cluster operation equipment to be highly adaptable and flexible. Existing automation systems often find it difficult to quickly adapt to the increase in production speed or adjust operations to improve yields while maintaining a certain production speed in the face of irregular changes in production needs. These adjustments involve complex parameter optimization and coordination between equipment, resulting in existing automation equipment systems often lacking sufficient flexibility to respond to these changes in real time.
[0004] Therefore, a production detection method and system for automated cluster operation equipment are proposed to solve the above-mentioned problems. Summary of the invention
[0005] The present invention aims to provide a production detection method and system for automated cluster operation equipment to solve or improve at least one of the above-mentioned technical problems.
[0006] In view of this, a first aspect of the present invention is to provide a production detection method for automated cluster operation equipment.
[0007] A second aspect of the present invention is to provide a system.
[0008] The first aspect of the present invention provides a production detection method for automated cluster operation equipment, comprising the following steps: constructing a production operation plan that takes into account the operation time and operation accuracy of the operation equipment, and a production evaluation model that evaluates the production operation plan; obtaining the performance parameters of each of the operation equipment, and generating multiple production operation plans based on the performance parameters and the currently set production expectations, and inputting each of the production operation plans into the production evaluation model to obtain corresponding evaluation indicators; real-time detection of the operation time of multiple operation equipment on the same production line, as well as the operation accuracy at the current operation time, and collectively serving as a detection set; optimizing all the production operation plans based on the evaluation indicators, and outputting the production operation plan with the highest evaluation indicator before each optimization; taking the highest evaluation indicator and the detection set as the detection results and optimizing the operation time or operation accuracy of the operation equipment.
[0009] In any of the above technical solutions, the production evaluation model is constructed through the following steps: respectively configuring a time evaluation parameter and a precision evaluation parameter on the independent variable of the production evaluation model, and configuring a comprehensive index parameter on the dependent variable of the production evaluation model; configuring a first weight factor adjusted according to the production expectation on the time evaluation parameter, and configuring a second weight factor adjusted according to the production expectation on the precision evaluation parameter; judging whether there is an influence relationship between the production evaluation model and the time evaluation parameter on the current production expectation, and configuring the influence mode of the precision evaluation parameter and the time evaluation parameter on the comprehensive index parameter according to the result of the judgment.
[0010] In any of the above technical solutions, the first weight factor is used to characterize the efficiency expectation set in the production expectation, and the second weight factor is used to characterize the economic expectation set in the production expectation.
[0011] In any of the above technical solutions, the production evaluation model is the following formula: Wherein, E is the comprehensive index parameter; S is the time evaluation parameter; P is the accuracy evaluation parameter; Used to characterize the influence mode. When there is no influence relationship, Characterized as a plus sign, when there is an impact relationship Represented as a multiplication sign; the α1 and α2 together constitute the first weight factor; the β1 and β2 together constitute the second weight factor.
[0012] In any of the above technical solutions, when there is no influence relationship, the α2 is assigned a value of 1 and the first weight factor is adjusted through the α1, and the β2 is assigned a value of 1 and the second weight factor is adjusted through the β1; when there is an influence relationship, the α1 is assigned a value of 1 and the first weight factor is adjusted through the α2, and the β1 is assigned a value of 1 and the second weight factor is adjusted through the β2.
[0013] In any of the above technical solutions, the step of generating multiple production operation plans based on the performance parameters and the currently set production expectations specifically includes: determining the constraint type set in the current production expectations; configuring the calculation method of the time evaluation parameters and the accuracy evaluation parameters according to the constraint type; defining the operation time range of the operation equipment in the performance parameters through the production expectations; and generating multiple production operation plans within the operation time range.
[0014] In any of the above technical solutions, the time evaluation parameter is calculated by the following formula: S -1 = or The accuracy evaluation parameter is calculated by the following formula: or Among them, the S -1 and the S -2 is a calculation formula configured according to the constraint type for the time evaluation parameter; the P -1 and the P -2 is a calculation formula configured according to the constraint type for the accuracy evaluation parameter; the T a is the operation time; a is the operation accuracy; A={A1,A2,…,A a} is the serial number of the operating equipment, and a is a positive integer.
[0015] In any of the above technical solutions, the step of optimizing all the production operation plans according to the evaluation index specifically includes: sorting all the production operation plans generated at the current moment according to the evaluation index, and filtering the production operation plans according to the constraint type; using the operation time of each operation equipment in the production operation plan as an update factor, and exchanging the update factors between the production operation plans to generate a new production operation plan; calibrating the operation accuracy of all the production operation plans at the current moment through the detection set of the previous moment.
[0016] The second aspect of the present invention provides a system for implementing the production inspection method described in any of the above-mentioned technical solutions, including: a solution generation module, used to construct multiple production operation solutions according to the performance parameters of the operating equipment and the production expectations; an evaluation and optimization module, which evaluates all the production operation solutions through the production evaluation model and obtains the corresponding evaluation indicators; and selects and optimizes the production operation solutions according to the evaluation indicators; a real-time monitoring module, used to monitor all operating equipment on the production line and obtain the operation time and the operation accuracy.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] By adapting the currently set production expectations, multiple production operation plans are automatically generated. This process uses algorithms to adjust in real time according to changing production needs to ensure that the best production plan can always be obtained. This not only increases the flexibility of the production process, but also enables rapid response to market changes, optimize resource allocation, and improve production efficiency.
[0019] By precisely controlling the operation time, the production equipment can be adjusted in detail, achieving comprehensive control over the actual operation on the production line. This is achieved by periodically adjusting and optimizing the operating parameters of the equipment to ensure that each production link can achieve the expected efficiency and quality standards, thereby gradually improving the overall production performance in the continuous production cycle.
[0020] Considering the importance of real-time detection data, the integrated data monitoring system collects data from the production process and applies this data to the estimation and prediction of the production model. After each production is completed, the model is calibrated according to the actual detection data to ensure the accuracy and reliability of the model prediction, thus making the production decision more scientific and precise.
[0021] Additional aspects and advantages of embodiments according to the present invention will become apparent in the following description or may be learned through practice of embodiments according to the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0023] Figure 1 is a flow chart of the method steps of the present invention;
[0024] Figure 2 It is a schematic diagram of a cluster of operating equipment on a production line of the present invention;
[0025] Figure 3 It is a system logic block diagram of the present invention;
[0026] Figure 4 The figure is a schematic diagram of the structure of an electronic device of the present invention. DETAILED DESCRIPTION
[0027] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0028] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0029] See also Figure 1-Figure 4 , the following describes a production detection method and system for automated cluster operation equipment according to some embodiments of the present invention.
[0030] The embodiment of the first aspect of the present invention provides a production detection method for automated cluster operation equipment. In some embodiments of the present invention, such as Figure 1 and Figure 2 As shown, the method includes:
[0031] S101, constructing a production operation plan that takes into account the operation time and operation accuracy of the operation equipment, and a production evaluation model that evaluates the production operation plan.
[0032] Here, in this step, the first task is to build a detailed production operation plan that takes into account the operation time and operation accuracy of each device in the cluster. Operation time refers to the length of time required for each device to complete its designated task, while operation accuracy focuses on the accuracy and ability of the device to meet quality standards when completing the task. The purpose of this plan is to ensure the efficient operation of the entire production line, while also ensuring that the product quality meets the established standards.
[0033] As can be seen from the above, in order to evaluate whether the constructed production operation plan is effective, this step also constructs a production evaluation model. This model is based on mathematical and statistical principles and can comprehensively evaluate the time and accuracy parameters set in the operation plan. Through the model, the results under different production configurations can be predicted, such as the expected production speed, the possible product quality level, and the efficiency of resource utilization. The evaluation model usually includes algorithms and calculation programs that can process large amounts of data and provide optimization suggestions to help decision makers make adjustments to improve production efficiency and product quality.
[0034] In addition, the evaluation model also supports iterative improvement, and can continuously adjust and optimize the original production operation plan based on the feedback data from actual production. The dynamic adjustment mechanism ensures that the production system can flexibly respond to various challenges and changes that may arise in the production process.
[0035] Specifically, the operating accuracy refers to the processing production yield rate of the operating equipment.
[0036] As can be seen from the above, the core function of expressing operating accuracy through yield rate is to provide a quantitative standard to evaluate the production effect and quality control capability of each device on the production line. The higher the yield rate, the less waste and defective products produced by the equipment, and the higher the production efficiency and product quality; it helps management monitor and control production quality, ensure that products meet the quality requirements of the industry and the market, reduce additional costs caused by waste and rework, and indicate equipment that may need to be repaired or adjusted to improve its operating accuracy.
[0037] Sensors and quality inspection equipment are installed at each key node on the production line to capture the quality status of each product in real time. These devices may include visual inspection systems, dimensional measuring instruments or other automatic inspection equipment; all collected data will be transmitted to the central processing system. Here, the data is analyzed to determine the number of qualified and unqualified products in each batch of products, and the yield rate is calculated by dividing the number of qualified products by the total number of products; based on the results of the yield rate, the production system can be adjusted automatically or manually by the operator. For example, if a decrease in the yield rate is detected, the system may prompt to check the calibration status of a specific device or check the quality of the raw materials used. In addition, this data can also be used for long-term production trend analysis to help identify potential problems in the production process and formulate improvement measures; continuous monitoring of the yield rate and combined with other production parameters such as equipment speed and operating conditions can implement comprehensive process optimization. This includes adjusting machine parameters, improving workflows, or updating production strategies to improve the efficiency and quality of the overall production line.
[0038] Specifically, the production evaluation model is constructed through the following steps:
[0039] The time evaluation parameters and the accuracy evaluation parameters are respectively configured on the independent variables of the production evaluation model, and the comprehensive indicator parameters are configured on the dependent variables of the production evaluation model.
[0040] A first weighting factor adjusted according to production expectations is configured on the time evaluation parameter, and a second weighting factor adjusted according to production expectations is configured on the accuracy evaluation parameter.
[0041] Determine whether the production evaluation model and time evaluation parameters have an impact on the current production expectations, and configure the impact of accuracy evaluation parameters and time evaluation parameters on the comprehensive index parameters based on the judgment results.
[0042] For the above specific description, the time evaluation parameter usually involves the time required for the production equipment to complete the task. Shorter operation time often means efficient production speed. The accuracy evaluation parameter involves the accuracy of product quality in the production process, especially the yield rate, that is, the proportion of qualified products in the total production volume; the first weight factor is an adjustment factor that adjusts the influence of the time evaluation parameter according to the specific expectations of production (such as speed priority or cost priority), and the second weight factor is an adjustment factor that is used to adjust the influence of the accuracy evaluation parameter according to the specific needs of production; the comprehensive indicator parameter is the output of the model, which represents the overall evaluation of the production process, and is usually a weighted combination of time and accuracy parameters.
[0043] In summary, according to the specific expectations of production, weight factors will be set and adjusted. For example, if the current production goal is to complete orders as quickly as possible, the weight of time evaluation will increase; if the focus is on ensuring product quality, the weight of accuracy evaluation will be higher; during the production process, the model will detect the actual performance of time and accuracy parameters in real time and compare them with the preset expectations. If it is detected that the relationship between time and expectation has changed (for example, the production speed has decreased due to aging or improper maintenance of equipment), the model will re-evaluate the impact of this change on the comprehensive index and adjust the weight of the parameter; the comprehensive index is calculated by weighted average, and the weight reflects the priority of different production goals. This indicator is used to evaluate production efficiency and help managers make decisions to adjust or optimize production processes; in this way, the production evaluation model not only provides a quantitative tool for measuring production performance, but also can flexibly adapt to changes in production goals and optimize the production process in real time, thereby ensuring that production activities can more effectively meet the needs of the market and enterprises. The application of this model helps enterprises improve production efficiency, reduce costs, and improve product quality.
[0044] In any of the above embodiments, the first weight factor is used to characterize the efficiency expectation set in the production expectation, and the second weight factor is used to characterize the economic expectation set in the production expectation.
[0045] In this embodiment, in the production evaluation model, the first weight factor and the second weight factor are set to ensure that the model can be flexibly adjusted according to different requirements and goals of the production process. The two weight factors each undertake the task of reflecting specific expectations in the production process: the first weight factor focuses on efficiency expectations, while the second weight factor focuses on economic expectations.
[0046] The first weight factor (efficiency expectation): It is used to adjust the influence of the time evaluation parameter in the production evaluation model. It represents the emphasis on efficiency in the production process, that is, the priority of production speed and task completion rate. In a production environment that prioritizes efficiency, this weight factor is high, indicating that completing production tasks quickly is the primary goal, which is particularly important in high-demand seasons or emergency order processing.
[0047] The second weight factor (economic expectation): adjusts the importance of the accuracy evaluation parameters in the production evaluation model. It reflects the focus on production costs and resource utilization efficiency, including material costs, energy consumption, and minimizing scrap rates. In cost-sensitive or resource-constrained production environments, this weight is higher, emphasizing economy and cost-effectiveness, with the goal of maximizing output per unit of input.
[0048] During the planning and operation phases of the production process, the two weight factors are dynamically adjusted according to current market demand, cost conditions, and production capacity. For example, if raw material prices rise, the second weight factor may need to be increased to place more emphasis on cost efficiency. The adjustment of the weight factors is usually completed by decision support tools in the production management system or through manual input, based on real-time data and long-term production strategies; the production evaluation model uses the adjusted weight factors, combined with the actual collected operation time and accuracy data, to calculate the comprehensive index parameters. This comprehensive index helps management understand the current performance of production efficiency and economy, and serves as the basis for improving the production process. The results of the comprehensive index will be fed back to the production line manager for adjusting operations, such as changing the production rhythm, adjusting quality control standards, or reallocating resources.
[0049] In any of the above embodiments, the production evaluation model is the following formula:
[0050]
[0051] Among them, E is the comprehensive index parameter; S is the time evaluation parameter; P is the accuracy evaluation parameter; Used to characterize the mode of influence when there is no influence relationship Characterized as a plus sign when there is an influence relationship Represented as a multiplication sign; α1 and α2 together constitute the first weight factor; β1 and β2 together constitute the second weight factor.
[0052] In this embodiment, the time evaluation weights (α1 and α2), α1 adjusts the baseline influence of parameter S, and α2 is an exponent that adjusts the strengthening or weakening effect on the parameter. This means that the influence of S is not just linear, but can be adjusted to a more complex nonlinear relationship through α2; precision evaluation weights (β1 and β2): Similarly, β1 adjusts the baseline influence of parameter P, and β2, as an exponent, provides the nonlinear ability to adjust the influence of precision; when time and precision are independent of each other in the production process, the addition operation is used, indicating that the contribution of time and precision to the overall performance is separate, that is, When there is a significant interaction effect, a multiplicative operation is used, indicating that time and precision are causal or mutually reinforcing to some extent, that is, This situation may occur in production tasks that require very high precision and are time-sensitive. Through this flexible model design, the evaluation model can be adjusted according to actual production conditions and specific needs, so that it can accurately reflect the actual situation and optimization needs of the production process. The dynamic adjustment ability of this model makes production management more efficient and helps decision makers improve production efficiency while maintaining production quality.
[0053] The formula provides a highly flexible and comprehensive way to evaluate the production process, which is suitable for a variety of production environments. Through the adjustable weights α1 and α2, β1 and β2, enterprises can customize the evaluation criteria according to specific needs and effectively balance production speed and product quality. In addition, by selecting addition or multiplication operators, the formula can adaptively express the interaction between time and accuracy, and more realistically reflect the actual production situation. This evaluation method not only supports immediate production decision adjustments, but also provides a data-driven decision support tool through long-term data analysis production planning, which helps to achieve continuous improvement of the production process, improve efficiency, reduce costs, and enhance the market competitiveness of products.
[0054] In any of the above embodiments, when there is no influence relationship, α2 is assigned a value of 1 and the first weight factor is adjusted by α1, and β2 is assigned a value of 1 and the second weight factor is adjusted by β1.
[0055] When there is an influence relationship, α1 is assigned a value of 1 and the first weight factor is adjusted by α2, and β1 is assigned a value of 1 and the second weight factor is adjusted by β2.
[0056] In this embodiment, when there is no influence relationship: In this case, the time evaluation parameter S and the precision evaluation parameter P are regarded as independent factors, that is, their contribution to the production comprehensive index E is calculated separately without cross-influence. β2 and α2 are assigned a value of 1, which means that the influence of S and P is direct without any nonlinear adjustment or amplification; by adjusting α1 and β1, the contribution of time efficiency and precision to the comprehensive evaluation index E can be directly controlled. Because α2 = 1 and β2 = 1, the model is simplified to E = α1S + β1P, which is a linear model in which the contribution of time and precision is directly added, allowing managers to directly observe and evaluate the contribution of each factor to the overall goal, facilitating rapid adjustments without considering the interaction between factors.
[0057] When there is an influence relationship: In this configuration, time evaluation S and accuracy evaluation P are regarded as interdependent factors, and their interactive effects on the production comprehensive index E are mutually reinforcing or offsetting.
[0058] α1 and β1 are assigned 1, which means that the basic weights are equal, and the nonlinear effects of S and P are adjusted by α2 and β2. Because α1 = 1 and β1 = 1, the model is transformed into This is a nonlinear product model that emphasizes the interaction between time and precision. This setting enables the model to provide deeper analysis when considering how the two can enhance or inhibit each other. For example, if the production speed S is increased but the precision P is sacrificed, the settings of α2 and β2 will determine how this trade-off affects the overall performance E.
[0059] Through such a configuration, the production evaluation model can not only more accurately reflect the actual relationship between time and precision under different production conditions, but also flexibly adjust the evaluation criteria according to specific production needs, thereby optimizing production efficiency while ensuring product quality, providing strong adaptability and decision-making support for production management, enabling it to effectively cope with complex and changing production environments.
[0060] Furthermore, the production evaluation model also stores the operation accuracy of each operation equipment at different operation times.
[0061] As can be seen above, the model not only records the operating time of each device, but also the corresponding operating accuracy. This allows the evaluation model to comprehensively analyze the performance of the equipment, including the two key indicators of speed and quality, and to clearly understand how product quality may be affected while speeding up production, or at which operating speeds the equipment can maintain or achieve the optimal operating accuracy. By analyzing data on different operating times and corresponding operating accuracies, the evaluation model helps decision makers find the best production balance point. For example, when producing a high-precision product, the model can recommend the most suitable operating speed to ensure that quality standards are met while maximizing efficiency.
[0062] S102, obtaining the performance parameters of each operating equipment, and generating multiple production operation plans according to the performance parameters and the currently set production expectations, and inputting each production operation plan into the production evaluation model to obtain the corresponding evaluation index.
[0063] Here, the main function of this step is to collect and analyze the performance parameters of each operating device in the automation cluster. These parameters may include but are not limited to the operating speed, accuracy, failure rate, maintenance history, energy consumption, etc. of the equipment. Based on this data, combined with the current production goals and expectations (such as output goals, quality requirements, etc.), the system will automatically generate multiple potential production operation plans. Each plan attempts to configure equipment parameters and production processes in different ways to achieve or optimize production goals.
[0064] As can be seen above, the system first obtains real-time equipment performance data through an integrated sensor network or device interface. This data is sent to the central processing system, where advanced algorithms analyze these parameters and calculate multiple possible production plans based on production goals. This plan generation is based on a preset algorithm model, such as an optimization algorithm, heuristic algorithm, or machine learning model, which aims to explore the production effects under different parameter combinations.
[0065] Once these production plans are generated, the next step is to input them into the production evaluation model that has been built in S101. The model will evaluate each plan and generate corresponding evaluation indicators. These evaluation indicators may include expected production efficiency, cost-effectiveness analysis, quality control indicators, resource consumption estimates, etc. During the model evaluation process, a variety of data analysis techniques will be used, including statistical analysis, performance prediction, and possible failure analysis.
[0066] Through these evaluation indicators, production managers can intuitively see the advantages and potential risks of each solution, so as to make informed decisions. After selecting the best production solution, it will be implemented in the production line. This process not only enhances the flexibility and adaptability of production, but also continuously improves the overall efficiency and stability of the production system through continuous data feedback and model iteration.
[0067] Specifically, the steps of generating multiple production operation plans according to the performance parameters and the currently set production expectations include:
[0068] Determine the type of constraints set in the current production expectations.
[0069] Configure the calculation method of time evaluation parameters and accuracy evaluation parameters according to the constraint type.
[0070] The operating time range of the operating equipment is defined in the performance parameters based on production expectations.
[0071] Generate multiple production operation plans within the operation time range.
[0072] For the above specific description, judging the constraint type set in the current production expectation is to judge the main constraint types that need to be considered in the production process according to the production goals and requirements, such as time optimization, cost minimization, quality maximization, etc. This step helps to determine the parameters and restrictions that should be given priority in the subsequent solution generation; the calculation method of configuring the time evaluation parameters and precision evaluation parameters according to the constraint type is to select the appropriate calculation method and formula to calculate the time and precision parameters according to the determined constraint type. For example, if time efficiency is prioritized, the calculation of time parameters may pay more attention to speed, ensuring that the calculation of each production parameter can accurately reflect the current production needs and constraints, thereby improving the practicality and effectiveness of the production plan; defining the operating time range of the operating equipment in the performance parameters through production expectations is to set a specific operating time range within an acceptable performance parameter range based on equipment performance and production goals. This step helps determine the fastest and slowest possible operating times for each device, providing actual operating boundaries for plan generation; generating multiple production operation plans within the operating time range is to generate a variety of different production operation plans based on the set operating time range and evaluation parameters using algorithms and models, and provide multiple plans for selection, so that managers can choose the best or most suitable plan based on actual production conditions and effect predictions.
[0073] In summary, by collecting and analyzing data about equipment performance and production needs, the system can automatically identify and adapt to different production constraints and goals; use optimization algorithms (such as linear programming, genetic algorithms, etc.) to deal with complex constraints and multi-objective problems, and generate a series of production plans that are both time-efficient and meet quality standards; by simulating the execution results of different plans, predict the performance of each plan in actual production, thereby making the decision-making process more scientific and accurate.
[0074] Specifically, the performance parameters are the adjustable range of the operating speed of the operating equipment during production and processing. Minimum operating speed: refers to the lowest speed at which the equipment can operate safely and effectively, which is usually set to ensure product quality or meet specific process requirements. The maximum operating speed refers to the highest speed that the equipment can reach while ensuring safety and meeting production standards. Within a lower operating speed range, the equipment can usually maintain a higher yield rate, because the slower speed allows the equipment to process or assemble products more accurately, reducing errors or defects caused by rapid operation. As the operating speed increases, the equipment may not be able to maintain the same operating accuracy, so the error rate increases, resulting in a decrease in yield. This phenomenon is especially common in precision manufacturing or production lines that require delicate operations. Through historical data analysis and experimental testing, the maximum operating speed of different equipment while maintaining a high-quality yield rate can be determined, and this maximum operating speed is the dividing threshold between operating accuracy and operating time that can have an impact or have no impact.
[0075] In any of the above embodiments, the time evaluation parameter is calculated by the following formula:
[0076] or
[0077] The accuracy evaluation parameters are calculated using the following formula:
[0078] or
[0079] Among them, S -1 and S -2 P is the calculation formula for the time evaluation parameter configured according to the constraint type; -1 and P -2 T is the calculation formula configured for the accuracy evaluation parameter according to the constraint type; a Y is the operation time; a is the operation accuracy; A={A1,A2,…,A a} is the number of the operating equipment, and a is a positive integer.
[0080] In this embodiment, the time evaluation parameter S is used to measure the time efficiency of each operation in the production process. -1 and S -2 , can be used to evaluate time performance based on specific production constraints (such as shortest completion time or optimal time utilization); select the appropriate formula S according to the constraint type -1 and S -2 For example, if the constraint is to minimize the total job time, S -1 ; If you want to optimize the time allocation of a single operation, you can use S -2 The formula will be based on the actual operation time Ta The time evaluation parameter is calculated by a predetermined mathematical relationship (such as linear, exponential or other functional relationship) based on the set production target. The precision evaluation parameter P is used to evaluate the quality control and yield rate in the production process. This parameter reflects the accuracy and quality level of the production activities; select P -1 or P -2 formula, depending on the quality target or specific quality constraints of production; using the operating accuracy Y a and related production data, and the accuracy evaluation parameters are derived through preset calculation formulas (which may involve calculation of error rate or statistical analysis of pass rate).
[0081] By comprehensively considering the evaluation parameters of time and accuracy, the production process can be comprehensively evaluated and optimized. For example, under the premise of meeting certain quality standards, the production time can be shortened as much as possible; equipment number A = A1, A2, ..., A a}, each device has a unique number, which helps to track and distinguish the performance of different devices during data analysis and performance evaluation; through this method, companies can improve production efficiency while ensuring product quality and better meet market demand and production goals.
[0082] Specifically, the formula S -1 The objective function is to minimize the maximum time. The goal is to find a solution that makes the longest single operation time of all the operation equipment as short as possible. Formula S -2 To minimize the objective function of average time, the goal is to find a solution that minimizes the average operating time of all operating equipment.
[0083] Formula P -1 The objective function of maximizing the minimum yield rate is to find a solution that makes the yield rate of the single operating equipment with the lowest yield rate among all operating equipment as large as possible; Formula P -2 The objective function of maximizing the average yield rate is to find a solution that maximizes the average yield rate of all operating equipment.
[0084] And the formula is selected based on the current operating equipment and production expectations.
[0085] S103, real-time detection of the operation time of multiple operation equipment on the same production line, as well as the operation accuracy under the current operation time, and use them together as a detection set.
[0086] Here, this step aims to continuously monitor and evaluate the actual operation of each operating equipment on the production line, especially focusing on the equipment's operating time and operating accuracy. Operating time refers to the actual time required for the equipment to complete a specific task, while operating accuracy measures the ability of the equipment to meet the predetermined quality standards when completing the task. These two indicators are crucial for evaluating overall production efficiency and product quality. By detecting these parameters in real time and analyzing them as a whole data set, it is possible to more accurately understand the dynamic changes in the production process and their impact on production results.
[0087] As mentioned above, the system collects operation time and operation accuracy data by installing sensors on each device. These sensors can provide high-precision real-time data, such as the exact time when the equipment starts and ends the task, as well as the quality control test results during the production process.
[0088] The collected data is sent to a central data processing system where software applications organize the data into detection sets and then analyze it in real time using data analysis and processing algorithms. The analysis process may include comparing actual data with expected data in the production operation plan to identify any significant deviations. In addition, advanced analytical techniques such as statistical analysis, trend prediction and anomaly detection are also used to identify potential performance degradation or production efficiency issues.
[0089] Through real-time monitoring and data analysis, the production management system can adjust production parameters or intervene in time to correct deviations or optimize the production process. For example, if it is detected that the operating accuracy of a certain device is below standard, the system can immediately notify the maintenance team to investigate and repair it. Similarly, if the operation time is too long, it may be necessary to re-evaluate the equipment configuration or production process. Step S103 not only improves the transparency and monitoring capabilities of the production line, but also enhances the control of the production process, ensuring that production activities can continue to operate in the optimal state, thereby achieving the goal of improving production efficiency and product quality.
[0090] S104, optimize all production operation plans according to the evaluation index, and output the production operation plan with the highest evaluation index before each optimization; use the highest evaluation index and detection set as the detection result and optimize the operation time or operation accuracy of the operation equipment.
[0091] Here, this step is a key link in the production detection method of automated cluster operation equipment. The main purpose is to optimize the production operation plan based on the evaluation indicators obtained from the previous steps. By analyzing the evaluation indicators generated by the evaluation model, the system can identify and recommend the production plan with the best performance. In addition, the system will also use real-time detection data (detection set) to further optimize the operation time and operation accuracy of the equipment to ensure that the production process is not only efficient but also high-quality.
[0092] As can be seen from the above, the system first sorts all possible production operation plans according to their evaluation indicators. These evaluation indicators include but are not limited to production efficiency, product quality, cost-effectiveness, etc. The plan with the highest evaluation index is considered to be the best plan under the current conditions; before the start of each optimization cycle, the system automatically outputs the plan with the highest current evaluation to provide decision-making basis for production managers.
[0093] After outputting the optimal solution, the system continues to optimize the equipment performance using the real-time monitoring of the operation time and operation accuracy data (i.e., the detection set) from step S103; during the optimization process, the algorithm analyzes these real-time data to identify any factors that may lead to reduced production efficiency or substandard product quality. Based on these analysis results, the system can adjust the equipment's operating parameters, such as adjusting the operating speed, improving the operating procedures, or reconfiguring the equipment layout.
[0094] Optimization is not a one-time activity, but a continuous process. The system will re-evaluate the production plan regularly or as needed to ensure that the production process continues to meet or exceed the expected performance standards; through this dynamic feedback mechanism, the production system can continuously adapt to new production needs and environmental changes, thereby achieving long-term optimization and improvement.
[0095] Specifically, the steps to optimize all production operation plans according to the evaluation indicators include:
[0096] All production operation plans generated at the current moment are sorted according to the evaluation index, and the production operation plans are filtered according to the constraint type.
[0097] The operation time of each operating equipment in the production operation plan is used as an update factor, and the factors are updated interactively between the production operation plans to generate a new production operation plan.
[0098] The operation accuracy of all production operation plans at the current moment is calibrated through the detection set of the previous moment.
[0099] For the above specific description, sorting and screening production operation plans is to sort all generated production operation plans according to preset evaluation indicators (such as time efficiency, production cost, product quality, etc.). These evaluation indicators are usually analyzed from previous production data and reflect the comprehensive performance of each plan; first, the system calculates the evaluation indicator score of each production plan. Then, sort according to the score to determine which plans perform best. In addition, according to the specific constraints of the current production (such as minimizing costs, maximizing output, etc.), the plans that meet these constraints are screened for further consideration. Interactively updating the operation time is to regard the operation time of each operation equipment in the selected production plan as an adjustable update factor. By exchanging these update factors between different plans, a new production operation plan is generated, which may be more optimized. This step involves dynamically adjusting and optimizing the operation time to adapt to production needs and resource allocation. For example, if a certain equipment is less efficient in one plan, you can try to apply its operation time configuration in another plan to see if it can improve efficiency. This method relies on algorithm simulation and prediction technology to ensure that time adjustment can bring about overall performance improvement. Calibration of operation accuracy is to calibrate the operation accuracy of all production operation plans at the current moment using the inspection data set from the previous moment. This ensures the reliability and accuracy of each plan in quality control, and calibrates the expected operation accuracy of each plan based on the data collected in actual production (such as error rate, pass rate, etc.). This calibration process may involve statistical analysis and machine learning techniques to learn from historical data and predict future performance. In this way, production strategies can be adjusted in a timely manner to cope with quality fluctuations or changes in the production environment.
[0100] In summary, a continuous optimization cycle is formed, which continuously improves the efficiency of the production process and the quality of output through data analysis and technology application. In this way, production management can not only respond to rapidly changing market demands, but also continuously improve production efficiency and product quality.
[0101] Specifically, the steps to optimize the operating time or operating accuracy of operating equipment are:
[0102] Under the same impact mode, compare the operation time of the operation equipment with the operation time of the output production operation plan. If the operation time of the production operation plan is shorter, update the power or operation speed of the operation equipment to achieve the required operation time.
[0103] The operation time of the operating equipment on the production line is updated according to the comparison results.
[0104] For the above specific description, the system compares the current actual operation time of the operating equipment with the operation time set in the production operation plan. The purpose of this step is to identify opportunities to shorten the operation time and improve efficiency; for example, if the actual operation time of a machine is longer than the scheduled time in the production plan, the system will identify this difference; when it is found that the operation time in the production operation plan is shorter than the actual time, the system will guide the adjustment of the operating equipment to achieve the operation time in the plan. This may involve adjusting the power setting or operating speed of the machine. This adjustment ensures that the equipment operates in the best state to achieve the predetermined production goals and reduce energy consumption and material waste.
[0105] In summary, the sensors and data acquisition systems installed on the production line monitor the operation time in real time and compare it with the target operation time in the database. The real-time data monitoring technology and big data analysis are used to quickly identify the deviation of the operation time; according to the data analysis results, the settings of the operation equipment (such as power, speed) are automatically or manually adjusted. This adjustment is based on a pre-set algorithm, which can ensure the accuracy and efficiency of equipment adjustment. It relies on control systems and machine learning algorithms. These systems can automatically adjust equipment parameters based on historical data and predictive models to optimize the production process; after the adjustment, the system continues to monitor the changed operation time to verify the effectiveness of the adjustment. If the adjustments made fail to achieve the desired effect, the system may make further adjustments or propose alternatives. In this process, a continuous feedback loop is the key, which relies on sensor feedback and real-time data processing to continuously optimize operations.
[0106] The present invention provides a production detection method for automated cluster operation equipment. By constructing a production operation scheme that takes into account the operation time and operation accuracy of the operation equipment and establishing a corresponding evaluation model, the present invention can optimize the production process at the scheme design stage, ensure that each step is operated under the best conditions allowed by the equipment performance, and improve the overall production efficiency and product quality; by generating multiple production operation schemes and evaluating each scheme using a production evaluation model, the most suitable production scheme can be selected, so that efficient and high-quality production can be maintained under different production conditions; real-time monitoring of the operation time and accuracy of multiple devices on the production line, and using these data as a detection set, it is helpful to quickly discover and solve problems in production, reduce downtime, and improve production continuity and product consistency; by continuously optimizing the production operation scheme according to the evaluation index, and outputting the scheme with the highest evaluation index before each optimization, the present invention allows the production process to maintain dynamic adjustment to ensure that it always runs in the best way. In addition, by optimizing the operation time and accuracy of the equipment, efficiency can be further improved and resource waste can be reduced.
[0107] The second aspect of the present invention provides a system for implementing the production detection method described in any of the above embodiments. In some embodiments of the present invention, Figure 3 As shown, the production detection system 2 includes:
[0108] The plan generation module 201 is used to construct a plurality of the production operation plans according to the performance parameters of the operation equipment and the production expectations.
[0109] The evaluation and optimization module 202 evaluates all the production operation plans through the production evaluation model and obtains the corresponding evaluation indicators; and selects and optimizes the production operation plans according to the evaluation indicators.
[0110] The real-time monitoring module 203 is used to monitor all operating equipment on the production line and obtain the operating time and the operating accuracy.
[0111] The present invention provides a system that customizes and generates suitable production operation plans based on specific equipment performance parameters and production goals (production expectations). This high degree of customization ensures that each plan can maximize the performance advantages of the equipment while meeting the specific needs of production, thereby improving overall production efficiency and product quality; by carefully evaluating all generated production operation plans, it is ensured that each plan can achieve optimal performance in actual applications. This process not only relies on the initial plan evaluation, but also includes continuous performance tracking and iterative optimization to ensure that the production process adapts to environmental changes or equipment performance changes at any time; it can accurately monitor the operating status of all operating equipment on the production line, including operating time and accuracy. The acquisition of this real-time data helps to adjust production parameters in a timely manner, prevent equipment failures, reduce downtime, and ensure production quality.
[0112] Embodiments of the third aspect of the present invention provide electronic equipment. In some embodiments of the present invention, such as Figure 4 As shown, an electronic device is provided, which includes: electronic devices such as desktop computers, notebooks, handheld computers, and cloud servers. The electronic device 3 may include but is not limited to a processor 301 and a memory 302. Those skilled in the art will understand that Figure 4 The electronic device 3 is merely an example and does not limit the electronic device 3 , and may include more or less components than those shown in the figure, or different components.
[0113] The processor 301 can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.
[0114] The memory 302 may be an internal storage unit of the electronic device 3, for example, a hard disk or memory of the electronic device 3. The memory 302 may also be an external storage device of the electronic device 3, for example, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 3. The memory 302 may also include both an internal storage unit of the electronic device 3 and an external storage device. The memory 302 is used to store computer programs and other programs and data required by the electronic device.
[0115] The embodiment of the fourth aspect of the present invention proposes a computer-readable storage medium. In some embodiments of the present invention, a computer-readable storage medium is provided, and when the computer-readable storage medium is executed by the processor 301, the steps of the above method are implemented. Therefore, the computer-readable storage medium provided by the fourth aspect of the present invention has all the technical effects of the above steps, which will not be repeated here.
[0116] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0117] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this disclosure.
[0118] In the embodiments provided in the present disclosure, it should be understood that the disclosed devices / electronic devices and methods can be implemented in other ways. For example, the device / electronic device embodiments described above are merely schematic. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation. Multiple units or components may be combined or integrated into another system, or some features may be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed may be through some interfaces, indirect coupling or communication connection of devices or units, which may be electrical, mechanical or other forms.
[0119] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present disclosure implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. The computer program may include computer program code, and the computer program code may be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, the computer-readable medium does not include electric carrier signals and telecommunication signals.
[0120] The above embodiments are only used to illustrate the technical solutions of the present disclosure, rather than to limit them. Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present disclosure, and should all be included in the protection scope of the present disclosure.
Claims
1. A production detection method for automated cluster operation equipment, characterized in that: The steps include: Constructing a production operation plan that takes into account the operation time and operation accuracy of the operation equipment, and a production evaluation model that evaluates the production operation plan; Acquire the performance parameters of each of the operating equipment, and generate a plurality of the production operation plans according to the performance parameters and the currently set production expectations, and input each of the production operation plans into the production evaluation model to obtain corresponding evaluation indicators; Real-time detection of the operation time of multiple operation devices on the same production line, as well as the operation accuracy at the current operation time, and the two are taken together as a detection set; Optimize all the production operation plans according to the evaluation index, and output the production operation plan with the highest evaluation index before each optimization; The highest evaluation index and the detection set are used as the detection results and the operation time or operation accuracy of the operation equipment is optimized.
2. The production detection method according to claim 1, characterized in that: The production evaluation model is constructed by the following steps: respectively configuring a time evaluation parameter and a precision evaluation parameter on the independent variables of the production evaluation model, and configuring a comprehensive indicator parameter on the dependent variable of the production evaluation model; configuring a first weighting factor adjusted according to the production expectation on the time evaluation parameter, and configuring a second weighting factor adjusted according to the production expectation on the accuracy evaluation parameter; Determine whether the production evaluation model and the time evaluation parameter have an influence relationship on the current production expectation, and configure the influence mode of the accuracy evaluation parameter and the time evaluation parameter on the comprehensive index parameter according to the result of the determination.
3. The production detection method according to claim 2, characterized in that: The first weight factor is used to characterize the efficiency expectation set in the production expectation, and the second weight factor is used to characterize the economic expectation set in the production expectation.
4. The production detection method according to claim 2, characterized in that: The production evaluation model is the following formula: Wherein, E is the comprehensive index parameter; S is the time evaluation parameter; P is the accuracy evaluation parameter; Used to characterize the influence mode. When there is no influence relationship, Characterized as a plus sign, when there is an impact relationship Represented as a multiplication sign; the α1 and α2 together constitute the first weight factor; the β1 and β2 together constitute the second weight factor.
5. The production detection method according to claim 4, characterized in that: When there is no influence relationship, the α2 is assigned a value of 1 and the first weight factor is adjusted by the α1, and the β2 is assigned a value of 1 and the second weight factor is adjusted by the β1; When there is an influence relationship, the α1 is assigned a value of 1 and the first weight factor is adjusted by the α2, and the β1 is assigned a value of 1 and the second weight factor is adjusted by the β2.
6. The production detection method according to claim 4, characterized in that: The step of generating a plurality of production operation plans according to the performance parameters and the currently set production expectations specifically includes: Determine the type of constraints set in the current production expectations; Configure the calculation method of the time evaluation parameter and the accuracy evaluation parameter according to the constraint type; Defining the operating time range of the operating equipment in the performance parameters according to the production expectation; A plurality of the production operation plans are generated within the operation time range.
7. The production detection method according to claim 6, characterized in that: The time evaluation parameter is calculated by the following formula: or The accuracy evaluation parameter is calculated by the following formula: or Among them, the S -1 and the S -2 is a calculation formula configured according to the constraint type for the time evaluation parameter; the P -1 and the P -2 is a calculation formula configured according to the constraint type for the accuracy evaluation parameter; the T a is the operation time; a is the operation accuracy; A={A1,A2,...,A a } is the serial number of the operating equipment, and a is a positive integer.
8. The production detection method according to claim 6, characterized in that: The step of optimizing all the production operation plans according to the evaluation index specifically includes: Sort all the production operation plans generated at the current moment according to the evaluation index, and filter the production operation plans according to the constraint type; Taking the operation time of each of the operation equipment in the production operation plan as an update factor, and exchanging the update factors between the production operation plans to generate a new production operation plan; The operation accuracy of all the production operation plans at the current moment is calibrated by using the detection set at the previous moment.
9. The production detection method according to claim 8, characterized in that: The steps of optimizing the operation time or operation accuracy of the operation equipment are as follows: Under the same influencing mode, comparing the operation time of the operation equipment with the operation time of the output production operation plan; The operation time of the operating equipment on the production line is updated according to the comparison result.
10. A system for implementing the production detection method according to any one of claims 1 to 9, characterized in that: include: A scheme generating module, used for constructing a plurality of the production operation schemes according to the performance parameters of the operation equipment and the production expectations; An evaluation and optimization module, which evaluates all the production operation plans through the production evaluation model and obtains the corresponding evaluation indicators; and selecting and optimizing the production operation plan according to the evaluation index; The real-time monitoring module is used to monitor all operating equipment on the production line and obtain the operating time and the operating accuracy.
Citation Information
Patent Citations
Integrated control method and device of production operations of heating furnace and hot rolling of iron and steel enterprise
CN101791631A
A processing scheme optimal selection method in a cloud manufacturing environment
CN106228298A
Grain processing scheme optimization method, device and equipment and storage medium
CN110210684A
Industrial internet platform evaluation method and system based on production data management
CN113962558A
Production line construction method and system based on comprehensive performance evaluation
CN116127695A
