Speed regulation control method and system of conveyor, storage medium and computer program product
By obtaining the traffic data and efficiency attributes in real time, combining the neural network model, optimizing the belt speed control of belt conveyors, the problem of unstable belt speed in traditional speed regulation methods is solved, and the operation efficiency and reliability of the conveyor are improved.
Patent Information
- Application Number
- CN202410994822.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-24
AI Technical Summary
The speed control logic of traditional belt conveyors is simple and relies on hypothetical parameters, which leads to unstable belt speed and frequent speed regulation, which reduces the reliability and energy-saving effect of the conveyor.
By obtaining the current transport volume data of the conveyor, combining the bearing area and efficiency attribute data, the target belt speed is updated in real time, and the neural network model is used for frequency conversion control, optimize belt speed adjustment, and avoid frequent speed regulation.
Accurate frequency conversion control of belt speed of belt conveyors is realized, which improves the operating efficiency and reliability of the conveyor and reduces energy consumption.
Smart Images

Figure CN118939018A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of conveyors, and in particular to a conveyor speed control method, a conveyor speed control system, a storage medium, a computer program product, and an electronic device. Background Art
[0002] At present, belt conveyors have been widely used in industries such as electricity, metallurgy, and ports, and there is a trend towards large-volume and long-distance transportation. Traditional conveyor control generally adopts a constant speed operation mode, that is, no matter how much or how little material is coming from the upstream, it always runs at a fixed speed, which leads to very serious energy waste. In some schemes, the speed of the conveyor is controlled by installing automatic speed control devices on some conveyors, but there are still certain defects; for example, the control logic is simple, the calculation process uses completely assumed parameters, and the theoretical calculation results are often out of touch with the actual situation; or, the speed is frequently adjusted during the actual control process, resulting in unstable belt speed and speed oscillation, which leads to reduced reliability and poor energy saving effects.
[0003] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention
[0004] The present disclosure provides a conveyor speed control method, a conveyor speed control system, a storage medium, a computer program product, and an electronic device, which can effectively overcome the defects existing in the prior art.
[0005] Other features and advantages of the present disclosure will become apparent from the following detailed description, or may be learned in part by the practice of the present disclosure.
[0006] According to a first aspect of the present disclosure, a speed control method for a conveyor is provided, the method comprising:
[0007] Obtaining first transport volume data corresponding to the current monitoring period of the conveyor;
[0008] Determine a first belt speed in combination with the carrying area of the conveyor and the first transport volume data;
[0009] According to the efficiency attribute data of the conveyor, a second belt speed is determined based on the first belt speed, and the target belt speed of the conveyor is updated according to the second belt speed; wherein the efficiency attribute data is used to represent the relationship between the operating power and the conveying efficiency of the conveyor.
[0010] In some exemplary embodiments, the method further comprises:
[0011] Get the target random number in the preset data interval;
[0012] A third belt speed is determined by combining the target random number with the second belt speed, and the target belt speed of the conveyor is updated according to the third belt speed.
[0013] In some exemplary embodiments, after obtaining the first transport volume data corresponding to the current monitoring period of the conveyor, the method further includes:
[0014] Collect current environmental parameters corresponding to the current monitoring period;
[0015] The first transport volume data and current environmental parameters are used as input parameters, and the input parameters are processed using a variable frequency control model to obtain a fourth belt speed, and the target belt speed of the conveyor is updated according to the fourth belt speed.
[0016] In some exemplary embodiments, the method further comprises:
[0017] Collect historical data corresponding to a preset number of monitoring cycles to construct sample data; wherein the sample data includes: environmental parameters, power parameters, operating speed parameters, and transport volume parameters; the operating speed parameters include the second belt speed or the third belt speed;
[0018] Initialize the neural network model and initialize the model hyperparameters;
[0019] The sample data is used to perform forward feedback training on the neural network model to obtain a variable frequency control model based on the neural network.
[0020] In some exemplary embodiments, after configuring the target belt speed of the conveyor, the method further includes:
[0021] Determining second transport volume data corresponding to the target belt speed;
[0022] When the second transport volume data and the first transport volume data belong to the same transport volume interval, the target belt speed of the conveyor is not updated; or
[0023] When the second transportation volume data and the first transportation volume data belong to different transportation volume intervals, the target belt speed of the conveyor is updated according to the maximum transportation volume of the transportation volume interval corresponding to the second transportation volume data.
[0024] In some exemplary embodiments, when the second traffic volume data and the first traffic volume data belong to different traffic volume intervals, the method further includes:
[0025] Determine a target delay parameter; wherein the target delay parameter includes: a basic delay and / or an additional delay;
[0026] After executing the duration of the target delay parameter, the target belt speed is executed.
[0027] In some exemplary embodiments, the method further comprises:
[0028] When the second traffic volume data is less than the first traffic volume data, configuring the target delay parameter to include a basic delay and an additional delay; or,
[0029] When the second traffic volume data is greater than the first traffic volume data, configuring the target delay parameter includes a basic delay.
[0030] In some exemplary embodiments, determining the additional delay in the target delay parameter includes:
[0031] Obtaining prior transport volume data corresponding to at least one prior monitoring period;
[0032] According to the traffic volume change trends of the previous traffic volume data and the first traffic volume data, the traffic volume change time corresponding to the traffic volume change trend is estimated, and the traffic volume change time is configured as the additional delay.
[0033] In some exemplary embodiments, estimating the traffic volume change time corresponding to the traffic volume change trend according to the traffic volume change trend of the previous traffic volume data and the first traffic volume data includes:
[0034] Collecting historical traffic volume data corresponding to each historical monitoring period and corresponding time information, and constructing sample data according to the historical traffic volume data and the corresponding time information;
[0035] Using the sample data to train a neural network-based time-delayed dead reckoning model;
[0036] The first traffic volume data and the previous traffic volume data corresponding to at least one previous monitoring period are configured as input data and input into the time-delayed extrapolation model to obtain the traffic volume change time output by the time-delayed extrapolation model.
[0037] In some exemplary embodiments, the method further comprises:
[0038] Perform data statistics based on the historical traffic volume data of each historical monitoring period, and determine the traffic volume probability distribution based on the data statistical results;
[0039] The traffic volume intervals are divided based on the traffic volume probability distribution.
[0040] According to a second aspect of the present disclosure, a conveyor speed control system is provided, comprising:
[0041] A transport volume detection module, used to obtain first transport volume data corresponding to a current monitoring period of the conveyor;
[0042] A belt speed calculation module, used to determine a first belt speed in combination with the carrying area of the conveyor and the first transport volume data;
[0043] A belt speed control module is used to determine a second belt speed based on the first belt speed according to the efficiency attribute data of the conveyor, and to update the target belt speed of the conveyor according to the second belt speed; wherein the efficiency attribute data is used to represent the relationship between the operating power and the conveying efficiency of the conveyor.
[0044] According to a third aspect of the present disclosure, there is provided a storage medium on which a computer program is stored, and when the computer program is executed by a processor, the above-mentioned conveyor speed control method is implemented.
[0045] According to a fourth aspect of the present disclosure, there is provided an electronic device, including:
[0046] Processor; and
[0047] A memory, configured to store executable instructions of the processor;
[0048] Wherein, the processor is configured to implement the above-mentioned navigation decoy signal processing method by executing the executable instructions.
[0049] According to a fifth aspect of the present disclosure, there is provided a computer program product on which a computer program is stored, and when the computer program is executed by a processor, the above-mentioned conveyor speed control method is implemented.
[0050] The conveyor speed control method provided by the embodiment of the present disclosure obtains the first transport volume data of the current monitoring period of the real-time wipe and calculates the corresponding first belt speed based on the first transport volume data. The first belt speed can be fine-tuned according to the efficiency attribute data of the conveyor itself, so as to output a more accurate belt speed in real time and realize accurate frequency control of the conveyor belt speed.
[0051] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] The accompanying drawings herein are incorporated into the specification and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the specification are used to explain the principles of the present disclosure. Obviously, the accompanying drawings described below are only some embodiments of the present disclosure, and for ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.
[0053] Figure 1 A schematic diagram schematically illustrates a speed control method for a conveyor in an exemplary embodiment of the present disclosure;
[0054] Figure 2 A schematic diagram schematically illustrates an architecture of a control system according to an exemplary embodiment of the present disclosure;
[0055] Figure 3 A schematic diagram schematically showing a change in energy consumption performance of a motor according to an exemplary embodiment of the present disclosure;
[0056] Figure 4 A schematic diagram schematically illustrates a method for regulating a second belt speed in an exemplary embodiment of the present disclosure;
[0057] Figure 5 A schematic diagram schematically illustrates a variable frequency control model control method in an exemplary embodiment of the present disclosure;
[0058] Figure 6 A schematic diagram schematically illustrates a method for calculating a target belt speed of a conveyor using a variable frequency control model in an exemplary embodiment of the present disclosure;
[0059] Figure 7 A schematic diagram schematically illustrates a traffic volume variation curve in an exemplary embodiment of the present disclosure;
[0060] Figure 8 A schematic diagram schematically illustrates a result of dividing a traffic volume interval in an exemplary embodiment of the present disclosure;
[0061] Fig. 9 A schematic diagram schematically shows the composition of a speed control system of a conveyor in an exemplary embodiment of the present disclosure;
[0062] Fig.10 The diagram schematically shows the components of an electronic device in an exemplary embodiment of the present disclosure. DETAILED DESCRIPTION
[0063] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and to fully convey the concepts of the example embodiments to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
[0064] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor devices and / or microcontroller devices.
[0065] In view of the shortcomings and deficiencies of the prior art, this exemplary embodiment provides a conveyor speed control method, which can be applied to real-time frequency conversion control of the running belt speed of the belt conveyor. Figure 1 As shown in , the speed control method may specifically include:
[0066] Step S11, obtaining first transport volume data corresponding to the current monitoring period of the conveyor;
[0067] Step S12, determining a first belt speed in combination with the carrying area of the conveyor and the first transport volume data;
[0068] Step S13, according to the efficiency attribute data of the conveyor, determine the second belt speed based on the first belt speed, and update the target belt speed of the conveyor according to the second belt speed; wherein the efficiency attribute data is used to represent the relationship between the operating power and the conveying efficiency of the conveyor.
[0069] The conveyor speed control method provided in this example implementation can be applied to belt or other forms of conveyors. By acquiring the first transport volume data of the current monitoring period of the conveyor in real time and combining it with the load-bearing area of the conveyor, its first belt speed can be determined; according to the efficiency attribute data of the conveyor, the second belt speed can be calculated according to the first belt speed, and the second belt speed can be configured as the target belt speed of the conveyor, so as to fine-tune the first belt speed according to the efficiency attribute data of the conveyor itself, so as to output a more accurate belt speed in real time and realize accurate frequency conversion control of the conveyor belt speed.
[0070] Below, each step of the conveyor speed control method in this example implementation will be described in more detail with reference to the accompanying drawings and embodiments.
[0071] Exemplary, reference Figure 2As shown, a material flow detection component 105 may be provided at the outlet of the material guide trough at the rear of the conveyor 101, for obtaining the material conveying volume of the conveyor in real time. For example, the material flow detection component may be a detection component based on laser radar and / or visual detection technology. The present disclosure does not specifically limit the form and detection method of the material flow detection component. The conveyor 105 may also be connected to a speed sensor 104 for real-time acquisition of the running belt speed of the conveyor. In addition, a temperature sensor 102 and a humidity sensor 103 may also be provided around the conveyor 101 for detecting the temperature and humidity of the surrounding environment of the conveyor belt. Each sensor and detection component may send the detection data to the control terminal 106 in real time by wire and / or wireless means; or, each sensor and detection component may send the current detection data to the master controller of the conveyor 101, and then send it to the control terminal 106 through the master controller. The control terminal may calculate according to the currently received data, output the belt speed information of the conveyor belt, and send the corresponding belt speed update instruction to the master controller of the conveyor belt, thereby realizing the variable frequency control of the conveyor belt speed. The control terminal 106 may be a laptop computer, a desktop computer, or a smart mobile terminal device such as a mobile phone or a tablet computer, or a background server with certain computing capabilities. Alternatively, in some exemplary embodiments, the control terminal 106 may be a control terminal that is integrated with the conveyor.
[0072] In step S11, the first transport volume data corresponding to the current monitoring period of the conveyor is obtained.
[0073] In this example implementation, Figure 2 The system architecture shown can be that the control terminal obtains the first transport volume data by receiving the real-time detection data of the material flow detection component 105. Among them, the material flow at the outlet of the material guide trough at the rear of the conveyor can be used as the first transport volume data. The above-mentioned current monitoring period can be one second, three seconds or five seconds, and the first transport volume data can be the real-time material flow of the conveyor, so that the current transport volume changes of the conveyor can be detected in real time and the frequency conversion control of the conveyor belt speed can be triggered. Alternatively, the above-mentioned monitoring period can also be 10 seconds, 15 seconds, 30 seconds or one minute.
[0074] In step S12, a first belt speed is determined in combination with the carrying area of the conveyor and the first transport volume data.
[0075] In this example implementation, the material flow rate Q of the conveyor = belt speed v × load area S. The load area S of the conveyor can be determined based on the width of the conveyor belt and the transportation length of the conveyor. Since the conveyor load area S is an invariant constant of the conveyor itself, based on the above formula, the minimum belt speed v that can obtain the current material transportation volume of the conveyor, that is, the first belt speed, can be calculated. The first belt speed can be configured as the lower limit of the corresponding running speed of the conveyor to meet the current real-time transportation volume Q.
[0076] In step S13, according to the efficiency attribute data of the conveyor, the second belt speed is determined based on the first belt speed, and the target belt speed of the conveyor is updated according to the second belt speed; wherein the efficiency attribute data is used to represent the relationship between the operating power and the conveying efficiency of the conveyor.
[0077] In this exemplary embodiment, the efficiency attribute data of the conveyor is used to represent the relationship between the operating power and the conveying efficiency of the conveyor. Figure 3 As shown, the relationship curve between the motor speed and efficiency of the conveyor can be used as the efficiency attribute data. Specifically, the relationship curve between the motor speed and efficiency of the conveyor can be obtained in advance. For example Figure 3 Schematic diagram of the conveyor motor working characteristics shown, where η is the efficiency curve.
[0078] Specifically, a belt speed parameter adjustment range can be pre-configured. For example, according to the actual conditions such as the type of material conveyed by the conveyor, the type of site, and the running length of the conveyor, the belt speed parameter adjustment range can be pre-configured to be 0 to 0.5 m / s.
[0079] For the first belt speed currently obtained, the operation of +0 to 0.5m / s can be performed. For example, according to the motor speed and efficiency curve, the speed increment of 0.1m / s is used to calculate the minimum speed of comprehensive energy consumption, that is, the second belt speed, and the second belt speed is configured as the target speed and output, and the conveyor belt speed is controlled with the second belt speed to realize the update and frequency conversion control of the conveyor belt speed. In this way, the belt speed frequency conversion control of the current detection cycle is completed.
[0080] Taking into account that the lowest running speed of the conveyor belt does not necessarily mean the lowest energy consumption, therefore, after obtaining the first belt speed, the power consumption attribute data of the conveyor belt is referred to to determine the second belt speed with the lowest energy consumption within a certain speed range of the first belt speed, so that the second belt speed with the lowest energy consumption can be determined more accurately.
[0081] In some exemplary embodiments, after completing a belt speed update in the current detection cycle, the next detection cycle may be entered after a fixed time interval t to reacquire the real-time transport volume data of the conveyor.
[0082] In this example implementation, reference Figure 4 As shown, after obtaining the second belt speed, the speed control method may further include:
[0083] Step S21, obtaining a target random number in a preset data interval;
[0084] Step S22, determining a third belt speed by combining the target random number and the second belt speed, and updating the target belt speed of the conveyor according to the third belt speed.
[0085] Exemplarily, a preset data interval for generating a random number i can be preconfigured; for example, the value range of the random number i can be configured to be 0 to 0.5. Specifically, after obtaining the second speed, or when calculating the second speed, a random number generation task can be triggered, and the terminal device executes the task and generates the current target random number in the preset data interval, adds the target random number i to the second speed, obtains the final third speed, and updates the third speed to the final target speed.
[0086] In this example implementation, data of each detection cycle can also be collected, and a variable frequency control model for calculating the belt speed can be trained. Figure 5 As shown, the above method may also include:
[0087] Step S31, collecting historical data corresponding to a preset number of monitoring cycles to construct sample data; wherein the sample data includes: environmental parameters, power parameters, operating speed parameters, and transport volume parameters; the operating speed parameters include the second belt speed or the third belt speed;
[0088] Step S32, initializing the neural network model and initializing the model hyperparameters;
[0089] Step S33, using the sample data to perform forward feedback training on the neural network model to obtain a variable frequency control model based on the neural network.
[0090] Specifically, historical data of a certain number of monitoring cycles can be collected in advance to form sample data. The historical data of each monitoring cycle can include environmental parameters, power parameters, operating speed parameters, and transport volume parameters; wherein the operating speed parameter can be the second belt speed or the third belt speed of the conveyor within the monitoring cycle. Considering that in different operating environments, there are changes in temperature and humidity that affect the operating power of the conveyor, the environmental parameters of temperature and humidity within the monitoring cycle can be used as sample data. For example, 500, 800, 1000 groups or other numbers of historical data collected can be used to construct samples. After completing the sample data construction, an initial model based on a convolutional neural network CNN can be constructed, the neural network model is initialized, and hyperparameters and loss functions are set. The temperature, humidity, motor power of the conveyor, and transport volume of the sample data can be input into the model to obtain the predicted transport speed output by the model, and the predicted transport speed is compared with the collected transport speed parameters, and the Loss between the predicted result and the true value is calculated, and then the hyperparameters of the model are updated by back propagation. When the number of iterations reaches the set value, the training ends, and a variable frequency control model based on a neural network can be obtained.
[0091] In this exemplary implementation, after obtaining the first transport volume data corresponding to the current monitoring period of the conveyor, the trained variable frequency control model can also be used to calculate the target belt speed of the conveyor. Figure 6 As shown, the method also includes:
[0092] Step S61, collecting current environmental parameters corresponding to the current monitoring period;
[0093] Step S62: taking the first transport volume data and current environmental parameters as input parameters, performing data processing on the input parameters using a variable frequency control model to obtain a fourth belt speed, and updating the target belt speed of the conveyor according to the fourth belt speed.
[0094] Specifically, in each monitoring cycle, the current environmental parameters corresponding to the environment where the conveyor is located can also be detected. Among them, the current environmental parameters can include current temperature data and humidity data. The first transport volume data, temperature data, humidity data, and the corresponding current belt speed can be used as input data, and the input data can be input into the trained variable frequency control model, and the fourth belt speed output by the model can be obtained, so that the fourth belt speed can be configured as the target belt speed to achieve the belt speed update of the conveyor, so that the variable frequency control of the conveyor belt speed based on the minimum operating speed can be achieved.
[0095] In this example implementation, after obtaining the target belt speed based on the second belt speed, the third belt speed, or the fourth belt speed, it is also possible to determine whether to update the target belt speed based on the traffic volume data. Figure 7As shown, after configuring the target belt speed of the conveyor, the method further includes:
[0096] Step S71, determining the second transport volume data corresponding to the target belt speed;
[0097] Step S72: when the second transport volume data and the first transport volume data belong to the same transport volume interval, the target transport speed of the conveyor is not updated; or
[0098] Step S73: When the second transportation volume data and the first transportation volume data belong to different transportation volume intervals, the target belt speed of the conveyor is updated according to the maximum transportation volume of the transportation volume interval corresponding to the second transportation volume data.
[0099] Specifically, after the target belt speed to be updated is calculated and determined based on the second belt speed, the third belt speed or the fourth belt speed, the second transport volume data can be calculated based on the current target belt speed in combination with the size and load-bearing area of the conveyor belt. The second transport volume data is compared with the first transport volume data to determine whether they are in the same transport volume area. If the second transport volume data and the first transport volume data belong to the same transport volume area, it means that although the transport volume has changed, the current transport volume change can be ignored, and there is no need to update the target transport speed of the conveyor; the speed of the conveyor can be maintained unchanged for the current transport volume, thereby realizing intelligent variable frequency control of the belt conveyor.
[0100] Alternatively, if the second volume data and the first volume data belong to the same volume interval, the maximum volume value of the volume interval where the second volume data is located can be used to recalculate the target belt speed and update the current conveyor speed.
[0101] For example, the first belt speed can be calculated using the maximum transport volume, and the corresponding second belt speed can be calculated based on the first belt speed, and the second belt speed can be used as the target belt speed. Alternatively, the third belt speed can be calculated based on the second belt speed, and the third belt speed can be used as the target belt speed. Alternatively, the maximum transport volume, temperature, humidity, and current belt speed can be input into a trained variable frequency control model, and the value output by the model can be used as the target belt speed.
[0102] By comparing and judging the second volume data corresponding to the target belt speed to be updated with the current first volume data, it is possible to make a judgment on whether to update the belt speed based on the change in the volume data, which can effectively avoid repeated, small-scale speed adjustment operations. When recalculating the target belt speed based on the maximum volume of the volume interval to which the second volume data belongs, the speed can be effectively estimated and expanded within a certain range to meet the situation of possible continuous increase in volume, thereby avoiding repeated speed adjustment operations. Reasonable variable frequency speed regulation is achieved.
[0103] For example, the above-mentioned traffic volume interval may be pre-configured by collecting statistics on traffic volume data of a historical monitoring period. Specifically, the above-mentioned method may further include:
[0104] Step S71, performing data statistics based on the historical traffic volume data of each historical monitoring period, and determining the traffic volume probability distribution based on the data statistical results;
[0105] Step S72, dividing the traffic volume intervals based on the traffic volume probability distribution.
[0106] Specifically, the volume data of the historical monitoring period can be collected in advance. For the monitoring period within a day, the volume of traffic per minute can be counted in units of minutes; the actual volume of traffic per hour can be calculated based on the traffic statistics per minute. Figure 7 As shown in the figure, with the actual traffic volume as the vertical axis and time as the horizontal axis, the traffic volume change curve for each hour in a day is B. For multiple days, the corresponding traffic volume change curves B1, B2, B3, ... can be counted. Curve B can be converted from the time domain to the frequency domain, for example, with 50 tons as a level, and converted into the probability of occurrence of each traffic volume, and then the relationship list is saved in units of days as A1, A2, A3, ...; for example Figure 4 The traffic volume interval division is shown.
[0107] When the cyclical factors of transportation are not considered, the sum of the newly added volume probability Ai and the existing volume probability A can be divided by the number of days to obtain the latest version of the volume probability data A updated every day. When the cyclical factors need to be considered, the volume probability A can be generated in monthly units. Its role is that if the production of the enterprise has obvious off-seasons and peak seasons throughout the year, the data A is summarized into 12 different volume probability change statistics by month, and different A data are used each month to improve the control accuracy.
[0108] In order to divide the traffic volume interval for automatic speed regulation, the traffic volume interval is divided according to the traffic volume probability data A, with the significant turning points of the probability curve as segmentation points. Among them, the significant turning point can be when the probability change amplitude is greater than the preset threshold, and this point is used as the segmentation point to divide the traffic volume interval. If there is no significant change in the traffic volume throughout the interval, it means that the probability of occurrence of various traffic volumes is basically the same. At this time, the traffic volume interval is set by the equal distribution method. For traffic volume sections with the lowest cumulative probability of occurrence less than 10%, they are merged into one section. For example, refer to Figure 8 If the volume does not vary by more than 20% in the entire interval, it means that the probability of occurrence of different volumes is basically the same. In this case, the equal distribution method is used to set 10 volume intervals.
[0109] In this example implementation, in order to avoid frequent speed regulation caused by accidental traffic volume fluctuations, a delay measurement of the variable frequency speed regulation action can also be set. Specifically, when the second traffic volume data and the first traffic volume data belong to different traffic volume intervals, the method further includes:
[0110] Determine a target delay parameter; wherein the target delay parameter includes: a basic delay and / or an additional delay; after executing the target delay parameter for a certain period of time, execute the target belt speed.
[0111] Exemplarily, the method further includes:
[0112] When the second traffic volume data is less than the first traffic volume data, configuring the target delay parameter to include a basic delay and an additional delay; or,
[0113] When the second traffic volume data is greater than the first traffic volume data, configuring the target delay parameter includes a basic delay.
[0114] Specifically, the target delay parameters may include a basic delay T1 and an additional delay T2. The basic delay is pre-configured based on the equipment performance attributes of the conveyor, the type of conveyed material, and the environment. For example, the basic delay is set to 3 to 5 seconds. The additional delay can be determined based on the estimated results of the volume change trend, and can be expressed as the time from the current volume state to the next volume state. If the previous monitoring cycle was a large volume, and the current small volume deceleration operation will be transferred to another volume interval, the target delay parameter is determined based on the basic delay T1 + additional delay T2, and the frequency conversion speed reduction measures are taken after the delay. If the previous monitoring cycle was a small volume, and the next step will be a large volume acceleration operation in another volume interval, the speed change will be performed only after the delay of the basic delay T1, so as to avoid overloading the conveyor due to failure to speed up immediately.
[0115] By configuring delayed measurement, frequent speed adjustments caused by accidental fluctuations in transport volume can be effectively avoided, and precise control of variable frequency speed regulation can be achieved.
[0116] In this example implementation, determining the additional delay in the target delay parameter includes: obtaining prior traffic volume data corresponding to at least one prior monitoring cycle; estimating the traffic volume change time corresponding to the traffic volume change trend based on the traffic volume change trend of the prior traffic volume data and the first traffic volume data, and configuring the traffic volume change time as the additional delay.
[0117] In this example implementation, estimating the traffic volume change time corresponding to the traffic volume change trend according to the traffic volume change trend of the previous traffic volume data and the first traffic volume data includes:
[0118] Step S81, collecting historical traffic volume data corresponding to each historical monitoring period and corresponding time information, and constructing sample data according to the historical traffic volume data and corresponding time information;
[0119] Step S82, using the sample data to train a neural network-based delay estimation model;
[0120] Step S83: configure the first traffic volume data and the previous traffic volume data corresponding to the at least one previous monitoring period as input data and input them into the delayed extrapolation model to obtain the traffic volume change time output by the delayed extrapolation model.
[0121] Specifically, a delay extrapolation model for calculating the additional delay can be pre-trained, and the change trend of the volume data can be learned according to the volume change data when the conveyor is running, so as to complete the training of the delay extrapolation model. For the first volume data of the current monitoring period, when determining to update the target belt speed, the first volume data and the historical volume data of one, two or more previous monitoring periods before the current monitoring period can be input into the model, and the delay extrapolation model is used to output the prediction result of the current volume trend development, and the time to jump from the current volume state to the first volume state is estimated as the additional delay. Among them, the current volume state can be the volume currently being transported by the conveyor, and the first volume state can be the volume to be transported identified in the current monitoring period, that is, the material transport volume of the conveyor to be transported obtained from the outlet of the material guide trough at the rear of the conveyor.
[0122] The speed control method of the conveyor provided by the embodiment of the present disclosure can collect the transportation volume data of the historical monitoring period through the material flow detection component, and calculate the daily transportation volume change curve according to the actual transportation volume from 0 to 24 o'clock every day. For example, the transportation volume of a certain day varies in the range of 0 to 2000 t / h. Then, the time domain of the transportation volume is converted to the frequency domain, and 50 tons is used as a statistical file to convert it into the probability of occurrence of each transportation volume, and then the relationship list is saved in units of days. The transportation volume probability is used as the data sample, and the transportation volume interval is divided by the significant turning point of the probability curve as the segmentation point. For the class areas with the lowest probability of occurrence less than 10% in total, these class areas are merged into a large speed area. If the transportation volume does not change by more than 20% in the entire interval, it means that the probability of occurrence of various different transportation volumes is basically the same. At this time, the equal distribution method is used to set 10 transportation volume intervals. For the current monitoring cycle, the current real-time transport volume is obtained by using the detection equipment as the first transport volume data; the corresponding lower limit of the operating speed that meets the real-time transport volume Q is calculated based on the first transport volume data, that is, the first belt speed; then the minimum speed of comprehensive energy consumption, that is, the second belt speed, can be calculated within the speed range of 0-0.5m / s according to the motor speed and efficiency curve. On the basis of the second belt speed, the random number generated by the system is added to obtain the final third belt speed as the final output target belt speed. The final target belt speed and the corresponding conveyor transport volume Q, motor power N, ambient temperature T, humidity W and other parameters can be recorded to construct sample data and train the variable frequency control model. After the cumulative training completes the predetermined number of iterations, the real-time transport volume Q, ambient temperature T, and ambient humidity W obtained in the current monitoring cycle can be input into the variable frequency control model, and the target belt speed predicted by the model is input. The second transport volume data is determined according to the target belt speed and compared with the first transport volume data. If they are in the same transport volume range, the belt speed is not updated. Alternatively, if they do not belong to the same traffic volume interval, the corresponding target belt speed v is calculated according to the maximum traffic volume of the traffic volume partition where the second traffic volume data is located. 环 , and after determining the delay, adjust the actual running speed of the conveyor to v 环 . This method uses a variable frequency speed regulation model based on a neural network to include multiple factors that may affect the operating efficiency into the calculation scope, realizing the comprehensive consideration of multi-dimensional factors. By designing a speed regulation control method for volume interval and delay calculation, the volume interval is set by changing the time domain and frequency domain of historical data. By judging the volume interval and calculating the delay time, the stability control of the variable frequency is realized, avoiding excessive oscillation caused by frequent speed regulation.
[0123] It should be noted that the above figures are only schematic illustrations of the processes included in the method according to an exemplary embodiment of the present invention, and are not intended to be limiting. It is easy to understand that the processes shown in the above figures do not indicate or limit the time sequence of these processes. In addition, it is also easy to understand that these processes can be performed synchronously or asynchronously, for example, in multiple modules.
[0124] For further reference, Fig. 9 As shown, in the embodiment of this example, a conveyor speed control system 90 is also provided, and the system includes: a transport volume detection module 901, a belt speed calculation module 902, and a belt speed control module 903. Among them,
[0125] The transport volume detection module 901 is used to obtain the first transport volume data corresponding to the current monitoring period of the conveyor;
[0126] A belt speed calculation module 902, for determining a first belt speed in combination with the carrying area of the conveyor and the first transport volume data;
[0127] The belt speed control module 903 is used to determine the second belt speed based on the first belt speed according to the efficiency attribute data of the conveyor, and update the target belt speed of the conveyor according to the second belt speed; wherein the efficiency attribute data is used to represent the relationship between the operating power and the conveying efficiency of the conveyor.
[0128] In some exemplary embodiments, the belt speed control module 903 can also be used to obtain a target random number in a preset data interval; determine a third belt speed by combining the target random number and the second belt speed, and update the target belt speed of the conveyor according to the third belt speed.
[0129] In some exemplary embodiments, the belt speed control module 903 can also be used to obtain the first transport volume data corresponding to the current monitoring period of the conveyor, and then collect the current environmental parameters corresponding to the current monitoring period; use the first transport volume data and the current environmental parameters as input parameters, and use the variable frequency control model to process the input parameters to obtain a fourth belt speed, and update the target belt speed of the conveyor according to the fourth belt speed.
[0130] In some exemplary embodiments, the system 90 further includes: a variable frequency control model training module, which is used to collect historical data corresponding to a preset number of monitoring cycles to construct sample data; wherein the sample data includes: environmental parameters, power parameters, operating speed parameters, and transport volume parameters; the operating speed parameters include the second belt speed or the third belt speed; initialize the neural network model and initialize the model hyperparameters; use the sample data to perform forward feedback training on the neural network model to obtain a variable frequency control model based on the neural network.
[0131] In some exemplary embodiments, the system 90 further includes: a transport volume interval judgment module, which is used to determine a second transport volume data corresponding to the target belt speed after configuring the target belt speed of the conveyor; when the second transport volume data and the first transport volume data belong to the same transport volume interval, the target belt speed of the conveyor is not updated; or when the second transport volume data and the first transport volume data belong to different transport volume intervals, the target belt speed of the conveyor is updated according to the maximum transport volume of the volume interval corresponding to the second transport volume data.
[0132] In some exemplary embodiments, the system 90 further includes: a delay calculation module, for determining a target delay parameter when the second traffic volume data and the first traffic volume data belong to different traffic volume intervals; wherein the target delay parameter includes: a basic delay and / or an additional delay; and after executing the target delay parameter for a certain period of time, executing the target belt speed.
[0133] In some exemplary embodiments, the delay calculation module can also be used to configure the target delay parameters to include basic delay and additional delay when the second traffic volume data is smaller than the first traffic volume data; or, when the second traffic volume data is larger than the first traffic volume data, configure the target delay parameters to include basic delay.
[0134] In some exemplary embodiments, the delay calculation module can also be used to determine the additional delay in the target delay parameter, obtain prior traffic volume data corresponding to at least one prior monitoring cycle; estimate the traffic volume change time corresponding to the traffic volume change trend based on the traffic volume change trend of the prior traffic volume data and the first traffic volume data, and configure the traffic volume change time as the additional delay.
[0135] In some exemplary embodiments, the system 90 further includes: a delayed extrapolation model processing module for collecting historical volume data corresponding to each historical monitoring period, and corresponding time information, and constructing sample data based on the historical volume data and the corresponding time information; using the sample data to train a neural network-based delayed extrapolation model; configuring the first volume data and the prior volume data corresponding to at least one prior monitoring period as input data and inputting them into the delayed extrapolation model to obtain the volume change time output by the delayed extrapolation model.
[0136] In some exemplary embodiments, the system 90 further includes: a traffic volume interval division module, which is used to perform data statistics based on historical traffic volume data of each historical monitoring period, and determine the traffic volume probability distribution based on the data statistical results; and divide the traffic volume interval based on the traffic volume probability distribution.
[0137] It should be noted that, although several modules or units of the device for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present disclosure, the features and functions of two or more modules or units described above can be embodied in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into multiple modules or units to be embodied.
[0138] Fig.10 A schematic diagram of an electronic device suitable for implementing an embodiment of the present invention is shown.
[0139] It should be noted that Fig.10 The electronic device 1000 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.
[0140] like Fig.10 As shown, the electronic device 1000 includes a central processing unit (CPU) 1001, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 1002 or the program loaded from the storage part 1008 to the random access memory (RAM) 1003. In the RAM 1003, various programs and data required for system operation are also stored. The CPU 1001, ROM 1002 and RAM 1003 are connected to each other through a bus 1004. An input / output (I / O) interface 1005 is also connected to the bus 1004.
[0141] The following components are connected to the I / O interface 1005: an input section 1006 including a keyboard, a mouse, etc.; an output section 1007 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 1008 including a hard disk, etc.; and a communication section 1009 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 1009 performs communication processing via a network such as the Internet. A drive 1010 is also connected to the I / O interface 1005 as needed. A removable medium 1011, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 1010 as needed, so that a computer program read therefrom is installed into the storage section 1008 as needed.
[0142] In particular, according to an embodiment of the present invention, the process described below with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present invention includes a computer program product, which includes a computer program carried on a storage medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication part 1009, and / or installed from a removable medium 1011. When the computer program is executed by a central processing unit (CPU) 1001, various functions defined in the system of the present application are executed.
[0143] Specifically, the electronic device may be a smart mobile electronic device such as a mobile phone, a tablet computer or a laptop computer, or may be a smart electronic device such as a desktop computer.
[0144] It should be noted that the storage medium shown in the embodiment of the present invention may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present invention, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by or in combination with an instruction execution system, device or device. In the present invention, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any storage medium other than computer-readable storage media, which may send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device. The program code contained on the storage medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.
[0145] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present invention. In this regard, each box in the flow chart or block diagram can represent a module, a program segment, or a part of a code, and the above-mentioned module, program segment, or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flow chart, and the combination of the boxes in the block diagram or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0146] The units involved in the embodiments of the present invention may be implemented by software or hardware, and the units described may also be arranged in a processor. The names of these units do not, in some cases, limit the units themselves.
[0147] It should be noted that, as another aspect, the present application also provides a storage medium, which can be included in an electronic device; or it can exist independently without being installed in the electronic device. The above storage medium carries one or more programs, and when the above one or more programs are executed by an electronic device, the electronic device implements the method described in the following embodiments. For example, the electronic device can implement the following Figure 1 The various steps of the conveyor speed control method are shown.
[0148] In one embodiment, the present application provides a computer program product, including a computer program, which implements the steps in the above-mentioned method embodiments when executed by a processor.
[0149] In addition, the above-mentioned figures are only schematic illustrations of the processes included in the method according to an exemplary embodiment of the present invention, and are not intended to be limiting. It is easy to understand that the processes shown in the above-mentioned figures do not indicate or limit the time sequence of these processes. In addition, it is also easy to understand that these processes can be performed synchronously or asynchronously, for example, in multiple modules.
[0150] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. This application is intended to cover any variations, uses, or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary technical means in the art that are not disclosed in the present disclosure. The specification and examples are to be considered as exemplary only, and the true scope and spirit of the present disclosure are indicated by the claims.
[0151] It should be understood that the present disclosure is not limited to the exact structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.
Claims
1. A conveyor speed control method, characterized in that: The method comprises: Obtaining first transport volume data corresponding to the current monitoring period of the conveyor; Determine a first belt speed in combination with the carrying area of the conveyor and the first transport volume data; According to the efficiency attribute data of the conveyor, a second belt speed is determined based on the first belt speed, and the target belt speed of the conveyor is updated according to the second belt speed; wherein the efficiency attribute data is used to represent the relationship between the operating power and the conveying efficiency of the conveyor.
2. The method according to claim 1, characterized in that The method further comprises: Get the target random number in the preset data interval; A third belt speed is determined by combining the target random number with the second belt speed, and the target belt speed of the conveyor is updated according to the third belt speed.
3. The method according to claim 1, characterized in that: After obtaining the first transport volume data corresponding to the current monitoring period of the conveyor, the method further includes: Collect current environmental parameters corresponding to the current monitoring period; The first transport volume data and current environmental parameters are used as input parameters, and the input parameters are processed using a variable frequency control model to obtain a fourth belt speed, and the target belt speed of the conveyor is updated according to the fourth belt speed.
4. The method according to claim 3, characterized in that The method further comprises: Collect historical data corresponding to a preset number of monitoring cycles to construct sample data; wherein the sample data includes: environmental parameters, power parameters, operating speed parameters, and transport volume parameters; the operating speed parameters include the second belt speed or the third belt speed; Initialize the neural network model and initialize the model hyperparameters; The sample data is used to perform forward feedback training on the neural network model to obtain a variable frequency control model based on the neural network.
5. The method according to claim 1, 2 or 3, characterized in that: After configuring the target belt speed of the conveyor, the method further includes: Determining second transport volume data corresponding to the target belt speed; When the second transport volume data and the first transport volume data belong to the same transport volume interval, the target belt speed of the conveyor is not updated; or When the second transportation volume data and the first transportation volume data belong to different transportation volume intervals, the target belt speed of the conveyor is updated according to the maximum transportation volume of the transportation volume interval corresponding to the second transportation volume data.
6. The method according to claim 5, characterized in that When the second traffic volume data and the first traffic volume data belong to different traffic volume intervals, the method further includes: Determine a target delay parameter; wherein the target delay parameter includes: a basic delay and / or an additional delay; After executing the duration of the target delay parameter, the target belt speed is executed.
7. The method according to claim 6, characterized in that The method further comprises: When the second traffic volume data is less than the first traffic volume data, configuring the target delay parameter to include a basic delay and an additional delay; or, When the second traffic volume data is greater than the first traffic volume data, configuring the target delay parameter includes a basic delay.
8. The method according to claim 6, characterized in that Determining the additional delay in the target delay parameter includes: Obtaining prior transport volume data corresponding to at least one prior monitoring period; According to the traffic volume change trends of the previous traffic volume data and the first traffic volume data, the traffic volume change time corresponding to the traffic volume change trend is estimated, and the traffic volume change time is configured as the additional delay.
9. The method according to claim 8, characterized in that The estimating the traffic volume change time corresponding to the traffic volume change trend according to the traffic volume change trend of the previous traffic volume data and the first traffic volume data includes: Collecting historical traffic volume data corresponding to each historical monitoring period and corresponding time information, and constructing sample data according to the historical traffic volume data and the corresponding time information; Using the sample data to train a neural network-based time-delayed dead reckoning model; The first traffic volume data and the previous traffic volume data corresponding to at least one previous monitoring period are configured as input data and input into the time-delayed extrapolation model to obtain the traffic volume change time output by the time-delayed extrapolation model.
10. The method according to claim 5, characterized in that The method further comprises: Perform data statistics based on the historical traffic volume data of each historical monitoring period, and determine the traffic volume probability distribution based on the data statistical results; The traffic volume intervals are divided based on the traffic volume probability distribution.
11. A conveyor speed control system, characterized in that: The method comprises: A transport volume detection module, used to obtain first transport volume data corresponding to a current monitoring period of the conveyor; A belt speed calculation module, used to determine a first belt speed in combination with the carrying area of the conveyor and the first transport volume data; A belt speed control module is used to determine a second belt speed based on the first belt speed according to the efficiency attribute data of the conveyor, and to update the target belt speed of the conveyor according to the second belt speed; wherein the efficiency attribute data is used to represent the relationship between the operating power and the conveying efficiency of the conveyor.
12. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the speed control method of a conveyor according to any one of claims 1 to 10 is implemented.
13. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the conveyor speed control method according to any one of claims 1 to 10 are implemented.
14. An electronic device, characterized in that: include: processor; as well as A memory, configured to store executable instructions of the processor; Wherein, the processor is configured to execute the speed control method of the conveyor according to any one of claims 1 to 10 by executing the executable instructions.
Citation Information
Patent Citations
Intelligent speed regulation belt conveyor tension cooperative control system and control method
CN110342209A
Belt speed control method, device and equipment for belt conveyor and storage medium
CN114275487A
Conveyor belt adaptive speed optimization method and system based on digital twinning technology
CN114435897A
Conveyor belt working condition detection method and system, electronic equipment and storage medium
CN118155113A
Energy-efficient control of a device for continuous material conveying
DE102019220430A1
