Nondestructive testing order sending method based on nuclear power station in-service inspection system
By using the welding management system to push the weld non-destructive testing commission for the in-service inspection system of the nuclear power plant, the non-destructive testing task is automatically processed, and the problems of manual repeated entry and low efficiency are solved, efficient non-destructive testing management and full-process recording are achieved, saving Development costs.
Patent Information
- Application Number
- CN202410905954.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-12
AI Technical Summary
The existing nuclear power system needs to manually fill in non-destructive testing information under the on-service inspection system, resulting in duplication of information entry and welding work orders, affecting efficiency, prone to errors, and failing to form a full process record of welding work, making it difficult to track and manage.
Through the welding management system, weld non-destructive testing entrustment form is pushed to the on-service inspection system, and the existing on-service non-destructive testing system is used to automatically approve, distribute and record non-destructive testing tasks to form a non-destructive testing report, avoid manual repeated filling, and realize the entire process Record.
It saves system development costs, improves work efficiency, avoids manual errors, and facilitates tracking and management of post-test detection projects.
Smart Images

Figure CN118940991A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of nuclear power weld management, and in particular relates to a non-destructive testing dispatching method based on an in-service inspection system of a nuclear power plant. Background Art
[0002] The existing nuclear power system requires manual filling of non-destructive testing information and forming a commission form under the in-service inspection system. This part of the information entry work is duplicated with the information entry work of the welding work order, which affects work efficiency, is prone to errors, and cannot form a full process record of the welding work, which is not convenient for the subsequent tracking and management of the inspection projects. Summary of the invention
[0003] The purpose of the present invention is to provide a non-destructive testing dispatching method based on an in-service inspection system of a nuclear power plant, which can save system development costs, improve work efficiency, avoid manual errors, and facilitate tracking and management.
[0004] The technical solution of the present invention is as follows: A non-destructive testing dispatching method based on an in-service inspection system of a nuclear power plant comprises the following steps:
[0005] S1: Push the weld nondestructive testing order to the in-service inspection system through the welding management system;
[0006] S2: After receiving the weld nondestructive testing order, the in-service inspection system initiates the weld nondestructive testing order approval based on the order;
[0007] S3: After the approval is completed, the weld non-destructive testing tasks are assigned and executed;
[0008] S4: Record the nondestructive testing results and form a nondestructive testing report;
[0009] S5: The in-service inspection system sends the nondestructive testing results and nondestructive testing reports to the welding management system;
[0010] S6: The welding management system summarizes the completion data.
[0011] In step S1, the welding management system first submits a welding application, prepares a welding list, and prepares a welding process document, and then forms a weld non-destructive testing order based on the welding list and welding process document.
[0012] In step S1, the weld nondestructive testing order is compiled according to the data requirements in the in-service inspection system.
[0013] In step S1, after receiving the weld nondestructive testing order, the in-service inspection system initiates the weld nondestructive testing order approval, task distribution and execution, records the nondestructive testing results, and generates a nondestructive testing report based on the order.
[0014] The beneficial effects of the present invention are as follows: the non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant of the present invention pushes the weld non-destructive testing entrustment order to the in-service inspection system through the welding management system, making full use of the existing in-service non-destructive testing system and saving the development cost of the welding management system; after the in-service inspection system receives the weld non-destructive testing entrustment order, it initiates the weld non-destructive testing entrustment order approval, task dispatch and execution, records the non-destructive testing results, and forms a non-destructive testing report based on the entrustment order, and the whole process does not require manual repeated filling and entry, thereby greatly improving work efficiency and avoiding the problem of easy errors in manual filling; and a full process record of the welding work can be formed in the welding management system, which is convenient for the tracking and management of the inspection items in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a flow chart of the non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant provided by the present invention. DETAILED DESCRIPTION
[0016] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0017] The nondestructive testing dispatching method based on the in-service inspection system of a nuclear power plant provided by the present invention initiates the nondestructive testing dispatching through the welding management system and makes full use of the existing in-service nondestructive testing system; the in-service nondestructive testing system can directly retrieve the information required to be entered from the welding management system without the need for manual repeated filling and entry; a full process record of the welding work can be formed, which is convenient for the follow-up management of the inspection items in the later stage.
[0018] like Figure 1 As shown, the non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant includes the following steps:
[0019] S1: Push the weld nondestructive testing order to the in-service inspection system through the welding management system;
[0020] In step S1, the welding management system first submits the welding application, prepares the welding list, and prepares the welding process documents, and then forms a weld non-destructive testing order based on the welding list and welding process documents. The weld non-destructive testing order is prepared according to the data requirements in the in-service inspection system. After the in-service inspection system receives the weld non-destructive testing order, it initiates the weld non-destructive testing order approval, task distribution and execution, records the non-destructive testing results, and forms a non-destructive testing report based on the order. The whole process does not require manual repeated filling and entry, thereby greatly improving work efficiency and avoiding the problem of manual filling and error proneness.
[0021] S2: After receiving the weld nondestructive testing order, the in-service inspection system initiates the weld nondestructive testing order approval based on the order;
[0022] S3: After the approval is completed, the weld non-destructive testing tasks are assigned and executed;
[0023] S4: Record the nondestructive testing results and form a nondestructive testing report;
[0024] S5: The in-service inspection system sends the nondestructive testing results and nondestructive testing reports to the welding management system;
[0025] S6: The welding management system summarizes the completion data.
[0026] The weld non-destructive testing entrustment form is prepared according to the data requirements in the in-service inspection system.
[0027] The non-destructive testing dispatching method based on the in-service inspection system of the nuclear power plant pushes the weld non-destructive testing order to the in-service inspection system through the welding management system, making full use of the existing in-service non-destructive testing system and saving the development cost of the welding management system; after the in-service inspection system receives the weld non-destructive testing order, it initiates the weld non-destructive testing order approval, task dispatch and execution, records the non-destructive testing results, and forms a non-destructive testing report based on the order. The whole process does not require repeated manual filling and entry, thereby greatly improving work efficiency and avoiding the problem of manual filling that is prone to errors; and a full process record of the welding work can be formed in the welding management system, which is convenient for the follow-up management of the inspection items in the later stage.
[0028] In this embodiment, preferably, in step S1, the welding management system first sequentially submits a welding application, prepares a welding list, and prepares a welding process document, and then forms a weld nondestructive testing order based on the welding list and the welding process document.
[0029] In this embodiment, preferably, the weld nondestructive testing commission is compiled according to the data requirements of the in-service inspection system, so as to meet and adapt to the existing in-service nondestructive testing system without adjusting and modifying the existing in-service nondestructive testing system.
[0030] The nondestructive testing dispatching method based on the in-service inspection system of a nuclear power plant of the present invention pushes the weld nondestructive testing commissioning order to the in-service inspection system through the welding management system, making full use of the existing in-service nondestructive testing system and saving the development cost of the welding management system; and a full process record of the welding work can be formed in the welding management system, which is convenient for the tracking and management of the inspection items in the later stage.
Claims
1. Nondestructive testing dispatching method based on the in-service inspection system of nuclear power plants, It is characterized in that The following steps are involved: S1: Push the weld nondestructive testing order to the in-service inspection system through the welding management system; S2: After receiving the weld nondestructive testing order, the in-service inspection system initiates the weld nondestructive testing order approval based on the order; S3: After the approval is completed, the weld non-destructive testing tasks are assigned and executed; S4: Record the nondestructive testing results and form a nondestructive testing report; S5: The in-service inspection system sends the nondestructive testing results and nondestructive testing reports to the welding management system; S6: The welding management system summarizes the completion data.
2. The non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant according to claim 1, Features: In step S1, the welding management system first submits a welding application, prepares a welding list, and prepares a welding process document, and then forms a weld non-destructive testing order based on the welding list and welding process document.
3. The non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant according to claim 2, Features: In step S1, the weld nondestructive testing order is compiled according to the data requirements in the in-service inspection system.
4. The non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant as claimed in claim 3, Features: In step S1, after receiving the weld non-destructive testing order, the in-service inspection system initiates the weld non-destructive testing order approval based on the order.
5. The non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant as claimed in claim 3, Features: In step S1, after receiving the weld nondestructive testing order, the in-service inspection system initiates task dispatch and execution based on the order.
6. The non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant according to claim 3, Features: In step S1, after receiving the weld nondestructive testing order, the in-service inspection system initiates recording of the nondestructive testing results based on the order.
7. The non-destructive testing dispatching method based on the in-service inspection system of a nuclear power plant according to claim 3, Features: In step S1, after receiving the weld nondestructive testing order, the in-service inspection system generates a nondestructive testing report based on the order.
