Method for evaluating architectural design project

By obtaining and calculating the amount, workload and difficulty parameters of the architectural design project, and calculating the cost-effectiveness scores combined with positive and negative indicators, the problems of inefficiency and lack of objectivity of the evaluation methods in the existing technology are solved, and the construction is achieved The rapid and accurate cost-effective evaluation of the design project improves the accuracy and economic benefits of the evaluation.

CN118941223AInactive Publication Date: 2024-11-12SHANGHAI XIANDAI ARCHITECTURE DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310513691.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-09
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing architectural design project evaluation methods are inefficient and lack objectivity, and usually only some factors are considered, making it difficult to conduct a comprehensive evaluation.

Method used

By obtaining the project amount, workload and difficulty parameters, calculating the parameter values ​​and average values, calculating the deviation, and calculating the cost-effectiveness score based on positive and negative indicators, the total cost-effectiveness score is obtained and classified into five levels. Consider the actual project requirements and special requirements.

Benefits of technology

It achieves a rapid and accurate cost-effective evaluation of architectural design projects, provides more objective, comprehensive and accurate evaluation results, helping enterprises optimize resource allocation and improve economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941223A_ABST
    Figure CN118941223A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of project evaluation in the architectural design industry, and discloses a method for evaluating architectural design projects, which comprises the following steps: S1, acquiring project amount parameters, workload parameters and project difficulty parameters; s2, respectively calculating a parameter value of a single item and a parameter average value of items of the same type; s3, calculating the deviation degree of a single item from the average value of items of the same type; s4, calculating the cost performance score of each parameter in combination with the positive index and the negative index; s5, adding the cost performance scores of all the parameters to obtain a total cost performance score; and step S6, dividing the cost performance scores of all the items into five grades according to a sequence of scores from low to high. According to the invention, the cost performance of the project can be rapidly and accurately evaluated, so that more effective project management can be carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of project evaluation in the architectural design industry, and in particular to a method for evaluating architectural design projects. Background Art

[0002] In the architectural design industry, in order to better control the cost of the project and increase the profit of the project, it is necessary to evaluate the cost performance of the project. In previous project management practices, most of the evaluations were done manually, which is inefficient and difficult to ensure the objectivity and accuracy of the evaluation. The existing evaluation methods usually only consider some factors, such as cost and construction period, and lack a comprehensive evaluation of the project. Therefore, a method for evaluating architectural design projects is needed. Summary of the invention

[0003] The purpose of the present invention is to overcome the existing defects and provide a method for evaluating architectural design projects, which can quickly and accurately evaluate the cost performance of the project so as to carry out more effective project management.

[0004] The technical solution to achieve the above purpose is:

[0005] A method for evaluating architectural design projects, comprising:

[0006] Step S1, obtaining project amount parameters, workload parameters and project difficulty parameters;

[0007] Step S2, respectively calculating the parameter value of a single item and the parameter average value of items of the same type;

[0008] Step S3, calculating the deviation of a single item from the average value of items of the same type;

[0009] Step S4, combining the positive index and the negative index to calculate the cost performance score of each parameter;

[0010] Step S5, adding the cost-performance scores of all parameters to obtain a total cost-performance score;

[0011] Step S6: The cost-performance scores of all projects are divided into five levels in order from low to high.

[0012] Preferably, in step S1, the amount parameters include the contract amount, confirmed revenue, total cost budget, actual cost and project inventory; the workload parameters include the project standard working hours and project duration; and the project difficulty parameters include the project personnel level, the number of delivered drawings and the drawing output ratio.

[0013] Preferably, in step S3, the deviation formula is (individual indicator value-indicator average value) / indicator average value.

[0014] Preferably, in step S4, the cost-effectiveness score formula is 5+deviation*10*[-1|+1], wherein 5 is the default score, the positive indicator score is +1, and the negative indicator score is -1.

[0015] Preferably, in step S4, the score range of the amount parameter, workload parameter and project difficulty parameter is 0-10 points, and the total score is 100 points. If the score of each parameter is less than 0, it is defaulted to 0, and if the score is greater than 10, it is defaulted to 10.

[0016] Preferably, in step S4, when calculating the cost-effectiveness scores of the project, the actual needs and special requirements of the project are further considered, including the difficulty and duration of the project.

[0017] Preferably, in step S6, the five levels are: the first level is 0%-20%, the second level is 20%-40%, the third level is 40%-60%, the fourth level is 60%-80%, and the fifth level is 80%-100%.

[0018] The beneficial effects of the present invention are as follows: the present invention introduces the concept of deviation, combines positive and negative indicators, calculates the evaluation score of each parameter, thereby realizing accurate evaluation and classification of project evaluation; comprehensively evaluates a single project through multiple parameters, while taking into account the cost-effectiveness differences of similar projects, making the evaluation results more objective and accurate, and being able to better help enterprises evaluate project evaluation, optimize resource allocation, and improve economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The present invention is a flowchart of a method for evaluating architectural design projects. DETAILED DESCRIPTION

[0020] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0021] The present invention will be further described below in conjunction with the accompanying drawings.

[0022] like Figure 1As shown in the figure, a method for evaluating architectural design projects uses 10 parameters to evaluate the cost performance of a single project through a comprehensive calculation method to better control project costs and increase profits, including:

[0023] Step S1, obtain the project amount parameter, workload parameter and project difficulty parameter; the amount parameter includes the contract amount, confirmed revenue, total cost budget, actual cost and project inventory, that is, 5 parameters; the workload parameter includes the project standard working hours and project duration, that is, 2 parameters; the project difficulty parameter includes the project personnel level, the number of delivered drawings and the drawing output ratio, that is, 3 parameters; a total of 10 parameters.

[0024] Step S2, respectively calculating the parameter value of a single item and the average parameter value of items of the same type.

[0025] Step S3, calculating the deviation of a single item from the average value of items of the same type; the deviation formula is (individual indicator value - average indicator value) / average indicator value.

[0026] Step S4, combining positive indicators and negative indicators, calculate the cost-effectiveness score of each parameter; the cost-effectiveness score formula is 5+deviation*10*[-1|+1], where 5 is the default score, the positive indicator score is +1, and the negative indicator score is -1. The higher the positive indicator deviation, the better, and the lower the negative indicator deviation, the better; the score range of the amount parameter, workload parameter and project difficulty parameter is 0-10 points, and the total score is 100 points. The scores that do not meet the score range are adjusted. If the score of each parameter is less than 0, it is defaulted to 0, and the score is greater than 10, it is defaulted to 10.

[0027] When calculating the cost-effectiveness scores of various architectural design projects, the actual needs and special requirements of the project, such as project difficulty, construction period, etc., are further considered to more accurately evaluate the cost-effectiveness of architectural design projects.

[0028] Step S5, adding the cost-performance scores of all parameters to obtain a total cost-performance score.

[0029] Step S6, divide the cost-effectiveness scores of all projects into five levels in order from low to high; the five levels are: the first level is 0%-20%, the second level is 20%-40%, the third level is 40%-60%, the fourth level is 60%-80%, and the fifth level is 80%-100%. The higher the level, the higher the project evaluation, that is, the higher the cost-effectiveness of the project.

[0030] The present invention realizes a comprehensive evaluation of the project cost performance, provides decision makers with more comprehensive and objective project evaluation results, and has the advantages of simple operation, objective results, and a wide range of applications.

[0031] The present invention can also comprehensively evaluate a single project through multiple parameters, while taking into account the differences in cost performance of projects of the same type, so that the evaluation results are more objective and accurate.

[0032] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some or all of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for evaluating architectural design projects, characterized in that: include: Step S1, obtaining project amount parameters, workload parameters and project difficulty parameters; Step S2, respectively calculating the parameter value of a single item and the parameter average value of items of the same type; Step S3, calculating the deviation of a single item from the average value of items of the same type; Step S4, combining the positive index and the negative index to calculate the cost performance score of each parameter; Step S5, adding the cost-performance scores of all parameters to obtain a total cost-performance score; Step S6: The cost-performance scores of all projects are divided into five levels in order from low to high.

2. A method for evaluating architectural design projects according to claim 1, characterized in that: In step S1, the amount parameters include the contract amount, confirmed revenue, total cost budget, actual cost and project inventory; the workload parameters include the project standard working hours and project duration; Project difficulty parameters include project personnel level, number of delivered drawings, and drawing output ratio.

3. A method for evaluating architectural design projects according to claim 1, characterized in that: In step S3, the deviation formula is (indicator individual value-indicator average value) / indicator average value.

4. A method for evaluating architectural design projects according to claim 1, characterized in that: In step S4, the cost-effectiveness score formula is 5+deviation*10*[-1|+1], where 5 is the default score, the positive indicator score is +1, and the negative indicator score is -1.

5. A method for evaluating architectural design projects according to claim 1, characterized in that: In step S4, the score range of the amount parameter, workload parameter and project difficulty parameter is 0-10 points, and the total score is 100 points. If the score of each parameter is less than 0, it is defaulted to 0, and if the score is greater than 10, it is defaulted to 10.

6. A method for evaluating architectural design projects according to claim 1, characterized in that: In step S4, when calculating the cost-effectiveness scores of the project, the actual needs and special requirements of the project are further considered, including the project difficulty and construction period.

7. A method for evaluating architectural design projects according to claim 1, characterized in that: In step S6, the five levels are: the first level is 0%-20%, the second level is 20%-40%, the third level is 40%-60%, the fourth level is 60%-80%, and the fifth level is 80%-100%.