Wind power mobile inspection method and system, computer equipment and storage medium

By installing intelligent electronic locks in a wind farm and automatically issuing key information, the problem of key management difficulties of patrol personnel is solved, the inspection efficiency and accuracy are improved, and abnormal situations are recorded, and the inspection efficiency in the existing technology is solved Not high problem.

CN118942170APending Publication Date: 2024-11-12XIAN TPRI POWER PLANT INFORMATION TECHNOLOGY CO LTD +1
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411193720.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing mobile wind power inspection methods are inefficient. Inspection personnel need to frequently look for keys, which are prone to losing or forgetting to bring keys, resulting in low patrol efficiency and accuracy.

Method used

Install smart electronic locks in a wind farm, and automatically issue smart electronic lock key information based on inspection tasks and personnel identities through the control processing module. Inspection personnel can open the lock without carrying the key. The abnormal situation of the smart electronic lock is recorded and stored in the database .

Benefits of technology

Improve inspection efficiency and accuracy, reduce key management problems, and timely record and analyze abnormal situations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118942170A_ABST
    Figure CN118942170A_ABST
Patent Text Reader

Abstract

The invention provides a wind power mobile inspection method and system, computer equipment and a storage medium, and belongs to the technical field of wind power mobile inspection. The method comprises the following steps: installing an intelligent electronic lock in a target area, wherein the intelligent electronic lock is connected to an internal network of a wind power plant; after the inspection task is generated, receiving the inspection task and key information of the intelligent electronic lock; and opening the intelligent electronic lock for inspection according to the received inspection task and the key information of the intelligent electronic lock. The target area is a key area where the wind power plant relates to personal safety, equipment maintenance and forbidding of unauthorized entry. Compared with the prior art, the problem of low inspection efficiency in the prior art is effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of wind power mobile inspection, and in particular relates to a wind power mobile inspection method, system, computer equipment and storage medium. Background Art

[0002] As a new type of clean energy generation, wind farms have widely distributed equipment and complex environments, and usually require regular inspection and maintenance of the equipment.

[0003] Traditional inspection methods usually require inspectors to manually record and fill out paper record forms, which is not only prone to omissions and errors, but also inconvenient for data management and analysis, leading to low efficiency and inadequate monitoring. In order to improve inspection efficiency and monitoring accuracy, it is necessary to study more intelligent and convenient inspection solutions.

[0004] With the continuous development of information technology, mobile inspection methods based on smart electronic locks have gradually become a new option.

[0005] However, wind turbines, transformers and fences in wind farms are currently all controlled by locks, and the corresponding keys need to be carried to unlock them, which increases the workload of operation and maintenance personnel. In addition, during the mobile inspection, operation and maintenance personnel may frequently look for keys, destroy locks after losing keys, or forget to bring keys, which greatly reduces the efficiency of inspections.

[0006] In summary, the existing wind power mobile inspection methods have the problem of low inspection efficiency. Summary of the invention

[0007] The object of the present invention is to provide a wind power mobile inspection method, system, computer equipment and storage medium, which are used to solve the problem of low inspection efficiency in the prior art.

[0008] In order to achieve the above object, the present invention adopts the following technical solution:

[0009] In a first aspect, the present invention provides a wind power mobile inspection method, the inspection method comprising the following steps:

[0010] 1) Installing smart electronic locks in the target area, wherein the smart electronic locks are connected to the internal network of the wind farm;

[0011] 2) After the inspection task is generated, receive the inspection task and smart electronic lock key information;

[0012] 3) According to the inspection task and smart electronic lock key information received in step 2), the smart electronic lock is opened for inspection.

[0013] A further improvement of the present invention is that in step 2), after the inspection task is generated, the control processing module automatically sends the inspection task and the smart electronic lock key information to the inspection personnel according to the location of the smart electronic lock installed in the target area in step 1) and the identity of the inspection personnel, and the inspection personnel receive the inspection task and the smart electronic lock key information.

[0014] A further improvement of the present invention is that the target area is a key area of ​​the wind farm involving personal safety, equipment maintenance and where unauthorized entry is prohibited.

[0015] A further improvement of the present invention is that in step 3), if an abnormal situation occurs during the opening of the smart electronic lock, the control processing module records the abnormal information.

[0016] A further improvement of the present invention is that each operation of the intelligent electronic lock generates a record which is stored in a database.

[0017] A further improvement of the present invention is that the database is a MySQL database or a massive database.

[0018] A further improvement of the present invention is that the intelligent electronic lock is equipped with a mechanical key.

[0019] In a second aspect, the present invention provides a wind power mobile inspection system, including an intelligent electronic lock installation and network connection module, an inspection task receiving module and an inspection module;

[0020] The smart electronic lock installation and network connection module is used to install a smart electronic lock in the target area, and the smart electronic lock is connected to the internal network of the wind farm;

[0021] The inspection task receiving module is used to receive the inspection task and the smart electronic lock key information after the inspection task is generated;

[0022] The inspection module is used to open the smart electronic lock for inspection according to the inspection task and smart electronic lock key information received by the inspection task receiving module.

[0023] In a third aspect, the present invention provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned mobile wind power inspection method when executing the computer program.

[0024] In a fourth aspect, the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the wind power mobile inspection method introduced above is implemented.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] The present invention is an improved invention. Compared with the existing mobile wind power inspection method, the mobile wind power inspection method proposed by the present invention receives the inspection task and the key information of the smart electronic lock after the inspection task is generated. According to the received inspection task and the key information of the smart electronic lock, the smart electronic lock is opened for inspection. It can be seen that the present invention does not need to carry keys with you during the inspection process. The smart electronic lock can be opened according to the received inspection task and the key information of the smart electronic lock, thereby avoiding the problem of frequently searching for keys, destroying the lock after the key is lost, and forgetting to bring the key, thereby improving the inspection efficiency and accuracy. Compared with the prior art, the present invention effectively solves the problem of low inspection efficiency in the prior art.

[0027] Furthermore, the present invention also discloses that if an abnormal situation occurs during the process of opening the smart electronic lock, the control processing module records the abnormal information. It can be seen that when an abnormal situation occurs during the process of opening the smart electronic lock, the operation and maintenance personnel can analyze and handle it in time. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a flow chart of the wind power mobile inspection method of the present invention. DETAILED DESCRIPTION

[0029] In order to further understand the content of the present invention, the present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the embodiments are only for explaining the present invention and are not intended to limit it.

[0030] The wind power mobile inspection method proposed by the present invention receives the inspection task and the key information of the smart electronic lock after the inspection task is generated, and opens the smart electronic lock for inspection according to the received inspection task and the key information of the smart electronic lock. Compared with the prior art, the present invention effectively solves the problem of low inspection efficiency in the prior art.

[0031] Embodiment of the wind power mobile inspection method:

[0032] The flow chart of the wind power mobile inspection method of the present invention is as follows Figure 1 As shown, the technical solution of the present invention is specifically described as follows:

[0033] S1. Install smart electronic locks in the target area and connect them to the internal network of the wind farm.

[0034] First, install smart electronic locks in the target area and connect them to the internal network of the wind farm. The target area is the key area of ​​the wind farm that involves personal safety, equipment maintenance, and prohibited unauthorized entry (such as wind turbines, transformers, and fences). Smart electronic locks are equipped with mechanical keys for backup. Smart electronic locks are not only waterproof and anti-theft, but can also be monitored remotely.

[0035] S2. After the inspection task is generated, the inspection task and the smart electronic lock key information are received.

[0036] In this step, the control processing module (such as the software system background server set up on the wind farm computer terminal) first generates an inspection task according to a pre-set time rule. The software system background server set up on the wind farm computer terminal refers to the code program that implements the software system set up on the wind farm computer terminal.

[0037] The pre-set time rules include daily rules, monthly rules and weekly rules. Daily rules refer to the task schedules that need to be performed every day, monthly rules refer to the task schedules that need to be performed every month, and weekly rules refer to the task schedules that need to be performed every week. Inspection tasks include the information of the equipment (such as compressors, impellers, bearings, housings, ducts, fans and motors) that the inspectors need to perform the inspection work.

[0038] Specifically, after the inspection task is generated in this step, the control processing module (for example, the software system set up on the wind farm computer terminal) automatically sends the inspection task and the smart electronic lock key information to the inspection personnel according to the location of the smart electronic lock installed in the target area in step S1 and the identity of the inspection personnel, and the inspection personnel receive the inspection task and the smart electronic lock key information (specifically, the terminal device held by the inspection personnel receives the inspection task and the smart electronic lock key information, and the terminal device held by the inspection personnel is a smart phone or a tablet computer). The software system set up on the wind farm computer terminal is used to communicate with the terminal device held by the inspection personnel and view pages.

[0039] This step requires ensuring that the terminal device held by the inspection personnel and the internal network of the wind farm are in a communication connection state.

[0040] S3. According to the inspection task and smart electronic lock key information received in step S2, open the smart electronic lock for inspection.

[0041] Specifically, in this step, the inspection personnel go to the location where the smart electronic lock is installed in the wind farm according to the inspection task and the smart electronic lock key information received in step S2, and open the smart electronic lock for inspection.

[0042] In this step, if an abnormal situation occurs during the opening of the smart electronic lock, the control processing module (such as the software system background server set up on the computer side of the wind farm) records the abnormal information for analysis and processing by the operation and maintenance personnel.

[0043] The wind power mobile inspection method proposed by the present invention also includes the inspection personnel inputting the inspection results into the terminal device held by the inspection personnel, and uploading the inspection results to the software system background server set on the wind farm computer. After the inspection task is completed, the inspection personnel close the intelligent electronic lock, and the software system background server set on the wind farm computer processes and analyzes the inspection data to generate an inspection report and statistical analysis results.

[0044] In this embodiment, each operation of the smart electronic lock generates a record and stores it in the database for management personnel to conduct statistics and viewing. In this embodiment, the database is a MySQL database or a massive database (such as a VastBase database). VastBase is one of the mainstream domestic databases. It is an enterprise-level relational database developed based on Huawei's openGauss kernel. It not only has a large number of data types, rich and complete SQL syntax, powerful query optimizer, concurrency control means and storage optimization means, but also has high concurrency and high-performance computing capabilities. It can also ensure the stability and persistence of stored data, thereby ensuring the smooth operation of the storage data business.

[0045] Implementation example of wind power mobile inspection system:

[0046] The wind power mobile inspection system includes an intelligent electronic lock installation and network connection module, an inspection task receiving module and an inspection module.

[0047] The smart electronic lock installation and network connection module is used to install the smart electronic lock in the target area, and the smart electronic lock is connected to the internal network of the wind farm.

[0048] The inspection task receiving module is used to receive the inspection task and the smart electronic lock key information after the inspection task is generated.

[0049] The inspection module is used to open the smart electronic lock for inspection according to the inspection task and smart electronic lock key information received by the inspection task receiving module.

[0050] In this embodiment, the wind power mobile inspection system realizes the specific inspection process through the intelligent electronic lock installation and network connection module, the inspection task receiving module and the inspection module. Figure 1 The specific process is as follows:

[0051] S1. Install smart electronic locks in the target area and connect them to the internal network of the wind farm.

[0052] First, install smart electronic locks in the target area and connect them to the internal network of the wind farm. The target area is the key area of ​​the wind farm that involves personal safety, equipment maintenance, and prohibited unauthorized entry (such as wind turbines, transformers, and fences). Smart electronic locks are equipped with mechanical keys for backup. Smart electronic locks are not only waterproof and anti-theft, but can also be monitored remotely.

[0053] S2. After the inspection task is generated, the inspection task and the smart electronic lock key information are received.

[0054] In this step, the control processing module (such as the software system background server set up on the wind farm computer terminal) first generates an inspection task according to a pre-set time rule. The software system background server set up on the wind farm computer terminal refers to the code program that implements the software system set up on the wind farm computer terminal.

[0055] The pre-set time rules include daily rules, monthly rules and weekly rules. Daily rules refer to the task schedules that need to be performed every day, monthly rules refer to the task schedules that need to be performed every month, and weekly rules refer to the task schedules that need to be performed every week. Inspection tasks include the information of the equipment (such as compressors, impellers, bearings, housings, ducts, fans and motors) that the inspectors need to perform the inspection work.

[0056] Specifically, after the inspection task is generated in this step, the control processing module (for example, the software system set up on the wind farm computer terminal) automatically sends the inspection task and the smart electronic lock key information to the inspection personnel according to the location of the smart electronic lock installed in the target area in step S1 and the identity of the inspection personnel, and the inspection personnel receive the inspection task and the smart electronic lock key information (specifically, the terminal device held by the inspection personnel receives the inspection task and the smart electronic lock key information, and the terminal device held by the inspection personnel is a smart phone or a tablet computer). The software system set up on the wind farm computer terminal is used to communicate with the terminal device held by the inspection personnel and view pages.

[0057] This step requires ensuring that the terminal device held by the inspection personnel and the internal network of the wind farm are in a communication connection state.

[0058] S3. According to the inspection task and smart electronic lock key information received in step S2, open the smart electronic lock for inspection.

[0059] Specifically, in this step, the inspection personnel go to the location where the smart electronic lock is installed in the wind farm according to the inspection task and the smart electronic lock key information received in step S2, and open the smart electronic lock for inspection.

[0060] In this step, if an abnormal situation occurs during the opening of the smart electronic lock, the control processing module (such as the software system background server set up on the computer side of the wind farm) records the abnormal information for analysis and processing by the operation and maintenance personnel.

[0061] This embodiment refers to the embodiment of the wind power mobile inspection method, which will not be described in detail here.

[0062] Example of computer device:

[0063] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the following is achieved:

[0064] S1. Install smart electronic locks in the target area and connect them to the internal network of the wind farm.

[0065] First, install smart electronic locks in the target area and connect them to the internal network of the wind farm. The target area is the key area of ​​the wind farm that involves personal safety, equipment maintenance, and prohibited unauthorized entry (such as wind turbines, transformers, and fences). Smart electronic locks are equipped with mechanical keys for backup. Smart electronic locks are not only waterproof and anti-theft, but can also be monitored remotely.

[0066] S2. After the inspection task is generated, the inspection task and the smart electronic lock key information are received.

[0067] In this step, the control processing module (such as the software system background server set up on the wind farm computer terminal) first generates an inspection task according to a pre-set time rule. The software system background server set up on the wind farm computer terminal refers to the code program that implements the software system set up on the wind farm computer terminal.

[0068] The pre-set time rules include daily rules, monthly rules and weekly rules. Daily rules refer to the task schedules that need to be performed every day, monthly rules refer to the task schedules that need to be performed every month, and weekly rules refer to the task schedules that need to be performed every week. Inspection tasks include the information of the equipment (such as compressors, impellers, bearings, housings, ducts, fans and motors) that the inspectors need to perform the inspection work.

[0069] Specifically, after the inspection task is generated in this step, the control processing module (for example, the software system set up on the wind farm computer terminal) automatically sends the inspection task and the smart electronic lock key information to the inspection personnel according to the location of the smart electronic lock installed in the target area in step S1 and the identity of the inspection personnel, and the inspection personnel receive the inspection task and the smart electronic lock key information (specifically, the terminal device held by the inspection personnel receives the inspection task and the smart electronic lock key information, and the terminal device held by the inspection personnel is a smart phone or a tablet computer). The software system set up on the wind farm computer terminal is used to communicate with the terminal device held by the inspection personnel and view pages.

[0070] This step requires ensuring that the terminal device held by the inspection personnel and the internal network of the wind farm are in a communication connection state.

[0071] S3. According to the inspection task and smart electronic lock key information received in step S2, open the smart electronic lock for inspection.

[0072] Specifically, in this step, the inspection personnel go to the location where the smart electronic lock is installed in the wind farm according to the inspection task and the smart electronic lock key information received in step S2, and open the smart electronic lock for inspection.

[0073] In this step, if an abnormal situation occurs during the opening of the smart electronic lock, the control processing module (such as the software system background server set up on the computer side of the wind farm) is controlled to facilitate analysis and processing by the operation and maintenance personnel.

[0074] This embodiment refers to the embodiment of the wind power mobile inspection method, which will not be described in detail here.

[0075] The computer program may be divided into one or more modules / units, and one or more modules / units are stored in a memory and executed by a processor to implement the wind power mobile inspection method introduced above.

[0076] The computer device may be a desktop computer, a notebook computer, a handheld computer, a cloud server, or other computing devices.

[0077] The processor can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc.

[0078] The memory may be used to store the above-mentioned computer programs and / or modules, and the above-mentioned processor implements various functions of the above-mentioned computer device by running or executing the computer programs and / or modules stored in the above-mentioned memory, and calling the data stored in the memory.

[0079] Embodiments of computer readable storage media:

[0080] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements:

[0081] S1. Install smart electronic locks in the target area and connect them to the internal network of the wind farm.

[0082] First, install smart electronic locks in the target area and connect them to the internal network of the wind farm. The target area is the key area of ​​the wind farm that involves personal safety, equipment maintenance, and prohibited unauthorized entry (such as wind turbines, transformers, and fences). Smart electronic locks are equipped with mechanical keys for backup. Smart electronic locks are not only waterproof and anti-theft, but can also be monitored remotely.

[0083] S2. After the inspection task is generated, the inspection task and the smart electronic lock key information are received.

[0084] In this step, the control processing module (such as the software system background server set up on the wind farm computer terminal) first generates an inspection task according to a pre-set time rule. The software system background server set up on the wind farm computer terminal refers to the code program that implements the software system set up on the wind farm computer terminal.

[0085] The pre-set time rules include daily rules, monthly rules and weekly rules. Daily rules refer to the task schedules that need to be performed every day, monthly rules refer to the task schedules that need to be performed every month, and weekly rules refer to the task schedules that need to be performed every week. Inspection tasks include the information of the equipment (such as compressors, impellers, bearings, housings, ducts, fans and motors) that the inspectors need to perform the inspection work.

[0086] Specifically, after the inspection task is generated in this step, the control processing module (for example, the software system set up on the wind farm computer terminal) automatically sends the inspection task and the smart electronic lock key information to the inspection personnel according to the location of the smart electronic lock installed in the target area in step S1 and the identity of the inspection personnel, and the inspection personnel receive the inspection task and the smart electronic lock key information (specifically, the terminal device held by the inspection personnel receives the inspection task and the smart electronic lock key information, and the terminal device held by the inspection personnel is a smart phone or a tablet computer). The software system set up on the wind farm computer terminal is used to communicate with the terminal device held by the inspection personnel and view pages.

[0087] This step requires ensuring that the terminal device held by the inspection personnel and the internal network of the wind farm are in a communication connection state.

[0088] S3. According to the inspection task and smart electronic lock key information received in step S2, open the smart electronic lock for inspection.

[0089] Specifically, in this step, the inspection personnel go to the location where the smart electronic lock is installed in the wind farm according to the inspection task and the smart electronic lock key information received in step S2, and open the smart electronic lock for inspection.

[0090] In this step, if an abnormal situation occurs during the opening of the smart electronic lock, the control processing module (such as the software system background server set up on the computer side of the wind farm) records the abnormal information for analysis and processing by the operation and maintenance personnel.

[0091] This embodiment refers to the embodiment of the wind power mobile inspection method, which will not be described in detail here.

[0092] The computer program includes computer program code, which may be in source code form, object code form, executable file or some intermediate form.

[0093] Computer-readable storage media may include: any entity or device capable of carrying the computer program code, recording media, USB flash drives, mobile hard disks, magnetic disks, optical disks, computer memories, read-only memories (ROM), random access memories (RAM), electric carrier signals, telecommunication signals, and software distribution media, etc. It should be noted that the contents contained in computer-readable storage media may be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable storage media do not include electric carrier signals and telecommunication signals.

[0094] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A wind power mobile inspection method, characterized in that: The inspection method includes the following steps: 1) Installing smart electronic locks in the target area, wherein the smart electronic locks are connected to the internal network of the wind farm; 2) After the inspection task is generated, receive the inspection task and smart electronic lock key information; 3) According to the inspection task and smart electronic lock key information received in step 2), the smart electronic lock is opened for inspection.

2. The wind power mobile inspection method according to claim 1, characterized in that: In step 2), after the inspection task is generated, the control processing module automatically sends the inspection task and the smart electronic lock key information to the inspection personnel according to the location of the smart electronic lock installed in the target area in step 1) and the identity of the inspection personnel, and the inspection personnel receive the inspection task and the smart electronic lock key information.

3. The wind power mobile inspection method according to claim 2, characterized in that: The target area is a key area of ​​the wind farm involving personal safety, equipment maintenance, and prohibited unauthorized entry.

4. The wind power mobile inspection method according to claim 1, characterized in that: In step 3), if an abnormal situation occurs during the opening of the smart electronic lock, the control processing module records the abnormal information.

5. The wind power mobile inspection method according to claim 1, characterized in that: Each operation of the intelligent electronic lock generates a record and stores it in the database.

6. The wind power mobile inspection method according to claim 5, characterized in that: The database is a MySQL database or a massive database.

7. The wind power mobile inspection method according to claim 1, characterized in that: The intelligent electronic lock is equipped with a mechanical key.

8. A wind power mobile inspection system, characterized in that: It includes intelligent electronic lock installation and network connection module, inspection task receiving module and inspection module; The smart electronic lock installation and network connection module is used to install a smart electronic lock in the target area, and the smart electronic lock is connected to the internal network of the wind farm; The inspection task receiving module is used to receive the inspection task and the smart electronic lock key information after the inspection task is generated; The inspection module is used to open the smart electronic lock for inspection according to the inspection task and smart electronic lock key information received by the inspection task receiving module.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the wind power mobile inspection method according to any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the wind power mobile inspection method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Intelligent computer lock management system for power distribution station house

    CN104268973A

  • Intelligent patrol inspection method and device, intelligent terminal and server

    CN109543992A

  • Intelligent passive inspection lock management system

    CN111784880A

  • A system and method of wind farm safety management

    CN112054599A