Nuclear power overhaul ray management and control system and method

Through the automated ray flaw detection control system, the problem of low efficiency in sorting out the list of ray flaw detection and planning in nuclear power overhaul was solved, and the work order changes were quickly tracked and the omissions were reduced, and the efficiency of overhaul was improved.

CN118942746APending Publication Date: 2024-11-12CNNC NUCLEAR POWER OPERATION MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410905966.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The collection and planning of existing nuclear power overhaul ray flaw detection lists relies on manual labor, resulting in omissions and inefficiency, affecting the arrangement of key paths for overhaul.

Method used

Provide a nuclear power overhaul ray control system, including an automatic generation module for ray flaw detection lists, a plan automatic generation module and an implementation module. Through automated processes, a radiation flaw detection list, planning and isolation scheme are generated and implemented to reduce manual operations.

Benefits of technology

Quickly sort out the list of ray flaw detection, timely track changes in work orders, reduce work omissions, improve overhaul work efficiency, save human resources, and reduce the burden on management and control personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118942746A_ABST
    Figure CN118942746A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of nuclear power overhaul and provides a nuclear power overhaul ray management and control system which aims at solving the problems that an existing overhaul ray inspection list is difficult to sort, manual sorting cannot track work order changes in time, work omission is caused, and an overhaul key path is affected. The screening module is used for screening a work order list needing radiographic inspection from overhaul work orders; the radiographic inspection plan automatic generation module is used for automatically scheduling according to the radiographic inspection list and generating a radiographic inspection plan arrangement according to a preset rule; and the radiographic inspection implementation module is used for implementing related operations according to the completion plan of the radiographic inspection plan. According to the method, the overhaul radiographic inspection list can be quickly sorted, work order changes can be tracked in time, and work omission is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear power overhaul, and in particular to a nuclear power overhaul radiation control system and method. Background Art

[0002] Radiographic testing has the characteristics of simple method, intuitive results, strong objectivity, and little influence from the external environment. It is particularly suitable for occasions with complex microstructures and numerous defects, such as castings and welds. It is the most commonly used method to inspect internal defects in welds. In each nuclear power overhaul, the results of many welding work need to be verified by radiographic testing.

[0003] The current overhaul radiation control method has the following problems: First, the collection of the radiation flaw detection list mainly relies on manual collection and statistics, which is prone to omissions, resulting in the temporary arrangement of unplanned flaw detection projects during the overhaul, making the plan difficult to arrange, and in serious cases, causing delays in the critical path. Second, the preparation of the radiation flaw detection plan, the preparation of the flaw detection isolation plan, the application for the flaw detection permit, the release of the flaw detection announcement and the notification of the results are also done manually, which consumes a lot of manpower and material resources and is inefficient, which is not conducive to the efficient development of the overhaul work. Summary of the invention

[0004] The main purpose of the present invention is to provide a nuclear power overhaul radiation control system and method to solve the problem that it is difficult to sort out the existing overhaul radiation flaw detection list, and manual sorting cannot track the changes in work orders in time, resulting in work omissions and affecting the overhaul key path.

[0005] Another object of the present invention is to provide a nuclear power overhaul radiation control system and method to solve the problems of low efficiency in the preparation and implementation of existing overhaul radiation flaw detection plans and cumbersome manual operations.

[0006] In order to achieve the above object, the present invention provides the following technical solutions:

[0007] In one aspect, the present invention provides a nuclear power overhaul radiation control system, comprising:

[0008] The module for automatically generating the radiographic flaw detection list is used to select the work order list that needs to be radiographically inspected from the overhaul work order;

[0009] The automatic generation module of radiographic flaw detection plan is used to automatically schedule according to the radiographic flaw detection list and generate the radiographic flaw detection plan according to the preset rules;

[0010] The radiographic flaw detection implementation module is used to implement related operations according to the completion plan of the radiographic flaw detection plan.

[0011] In some embodiments, the module for automatically generating a radiographic flaw detection list reads all the work orders of the overhaul and the three-dimensional pipeline diagrams of the equipment corresponding to the work orders from the overhaul work order system, and based on this information and preset rules, preliminarily generates a list of work orders that require radiographic flaw detection and the reasons for requiring flaw detection.

[0012] In some embodiments, the input information of the automatic generation module of the radiographic flaw detection plan includes the time required for the equipment to be restored to availability read from the work order scheduling system, and the radiographic flaw detection human resource situation input manually.

[0013] In some embodiments, the X-ray flaw detection implementation module creates a flaw detection isolation plan database based on historical flaw detection data, and saves the flaw detection isolation plan information corresponding to each room.

[0014] In another aspect, the present invention provides a nuclear power overhaul radiation control method, comprising the following steps:

[0015] Step 1: Enter the overhaul work order list into the nuclear power overhaul radiation control system;

[0016] Step 2: Produce a radiographic inspection list based on the work order list;

[0017] Step 3: Generate a flaw detection plan based on the X-ray flaw detection list;

[0018] Step 4: Carry out the X-ray inspection implementation process according to the inspection plan.

[0019] In some embodiments, the data entered into the system include a three-dimensional diagram of equipment pipelines, historical data of radiographic inspection isolation plans, KRT probe data, a list of radiographic inspection staff, a list of personnel notified of radiographic inspection results, and a plant layout diagram.

[0020] In some embodiments, step 2 specifically includes:

[0021] Step 2.1: Read the overhaul work order list;

[0022] Step 2.2: Select the work order list that needs non-destructive testing according to the work content and work procedures;

[0023] Step 2.3: Read the three-dimensional pipeline diagram corresponding to each work order equipment;

[0024] Step 2.4: Automatically generate a radiographic flaw detection list using rules;

[0025] Step 2.5: Generate the official version of the list after review.

[0026] In some embodiments, whether each work order needs to be inspected by radiography is automatically determined based on the three-dimensional image information and work order data. For work orders with a nuclear safety level of level 2, they are directly added to the inspection list. For work orders with a nuclear safety level of level 3, 10% of the work orders are randomly selected and added to the inspection list. For other work orders, it is manually determined whether radiography is required based on the temperature and pressure corresponding to each work order. When the temperature and pressure exceed the set value, it is considered that the work order needs to be inspected by radiography and is added to the inspection list.

[0027] In some embodiments, step 3 specifically includes:

[0028] Step 3.1: Read the official version of the X-ray inspection work order list and group them by room number;

[0029] Step 3.2: Read the X-ray worker information;

[0030] Step 3.3: Read the overhaul plan information in the project management software PRIMAVERY PROJECT MANAGER;

[0031] Step 3.4: Generate the first version of the radiographic inspection plan according to the rules;

[0032] Step 3.5: Generate the official version of the NDT plan after review.

[0033] In some embodiments, step 4 specifically includes:

[0034] Step 4.1: Read the X-ray flaw detection list for the day and group them by room;

[0035] Step 4.2: Read the historical isolation plan according to the room number;

[0036] Step 4.3: Generate the official version of the NDT isolation plan after review;

[0037] Step 4.4: Generate a list of KRT probes that are affected by radiographic inspection in each room;

[0038] Step 4.5: Generate application for radiographic inspection license;

[0039] Step 4.6: Review and approve the radiographic inspection license;

[0040] Step 4.7: Publish the radiographic inspection announcement;

[0041] Step 4.8: Notify the radiographic inspection results.

[0042] Compared with the prior art, the nuclear power overhaul radiation control system and method provided by the present invention has the following beneficial effects:

[0043] The present invention can quickly sort out the overhaul radiographic flaw detection list, timely track changes in work orders, and significantly reduce work omissions.

[0044] The present invention automatically generates an overhaul radiographic flaw detection list, a radiographic flaw detection plan, the preparation of an isolation plan, a flaw detection permit application, a flaw detection announcement, and flaw detection results through information technology, thereby alleviating the work of control personnel, reducing human errors, and saving overhaul critical path time. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the technical solution of the present invention, the following briefly introduces the drawings required for the technical description.

[0046] Figure 1 A block diagram of the nuclear power overhaul radiation control system provided by the present invention;

[0047] Figure 2 A flow chart of the nuclear power overhaul radiation control method provided by the present invention;

[0048] Figure 3 A schematic diagram of a process flow for generating radiographic flaw detection provided by the present invention;

[0049] Figure 4 A schematic diagram of the process of generating a radiographic flaw detection plan provided by the present invention;

[0050] Figure 5 The present invention provides a schematic diagram of the implementation process of the radiographic flaw detection. DETAILED DESCRIPTION

[0051] The following is further explained in detail through specific implementation methods.

[0052] like Figure 1 As shown, the present invention provides a nuclear power overhaul radiation control system, which automatically generates the radiation flaw detection list, flaw detection plan, flaw detection isolation plan and other documents according to the overhaul work order for each overhaul, simplifies manual operation and improves the overhaul work efficiency. This system is a part of the overhaul management system, including a radiation flaw detection list automatic generation module, a radiation flaw detection plan automatic generation module and a radiation flaw detection implementation module, the output of the radiation flaw detection list automatic generation module is used as the input of the radiation flaw detection plan automatic generation module, and the output of the radiation flaw detection plan automatic generation module is used as the input of the radiation flaw detection implementation module.

[0053] The module for automatically generating a radiographic flaw detection list is used to filter the list of work orders that need to be radiographically inspected from the overhaul work orders. The module for automatically generating a radiographic flaw detection list reads all the work orders for this overhaul and the three-dimensional pipeline diagrams of the equipment corresponding to the work orders from the overhaul work order system (a submodule of the nuclear power plant production information management system N1-EAM, which mainly manages nuclear power work orders, including overhaul and daily work orders, where the work orders for a single overhaul can be filtered by the overhaul code). Based on this information and preset rules, a preliminary list of work orders that need to be radiographically inspected and the reasons for the need for inspection are generated. To avoid omissions, the screening rules are set relatively loosely, so all suspected ones are considered to require radiographic inspection. After the initial version of the list is generated, the final list is generated by manual review, and this list is used as the input of the module for automatically generating a radiographic flaw detection plan.

[0054] The automatic generation module of radiographic flaw detection plan is used to automatically schedule according to the radiographic flaw detection list and generate radiographic flaw detection plan arrangements according to preset rules. The rules need to consider the room number of the flaw detection equipment and arrange the equipment in the same room together. They also need to consider the time when the equipment needs to be restored to use and the work balance of the flaw detection personnel. In addition to the radiographic flaw detection list, the input information of the automatic generation module of radiographic flaw detection plan also includes the time when the equipment needs to be restored to use read from the work order scheduling system and the manually input radiographic flaw detection human resources. Based on the above conditions, the start and completion time of each work order radiographic flaw detection and personnel arrangements are determined to generate a detailed flaw detection plan. At the same time, in order to ensure the accuracy of the plan, it is necessary to manually review it before generating the formal version of the plan as the input information of the flaw detection implementation module.

[0055] The radiographic flaw detection implementation module is used to implement related automatic operations according to the completion plan of the radiographic flaw detection plan, including the generation of flaw detection isolation plan, application for radiographic flaw detection license, flaw detection announcement and publication of results. The radiographic flaw detection implementation module creates a flaw detection isolation plan database based on historical flaw detection data, and saves the flaw detection isolation plan information corresponding to each room. Therefore, the historical isolation plan can be searched according to the room number in the flaw detection plan. If it can be found, the above plan will be used. If it cannot be found, a plan will be formulated according to the preset rules or generated manually during manual review. After the plan is determined, the radiographic flaw detection implementation module transmits the radiographic flaw detection information and isolation plan to the radiographic flaw detection management system, automatically generates the flaw detection license application process, and publishes the flaw detection announcement on the company's intranet homepage after the license is approved.

[0056] like Figure 2 As shown, the present invention also provides a nuclear power overhaul radiographic flaw detection control method, which is a fully automatic management method for overhaul radiographic flaw detection, comprising the following steps:

[0057] Step 1: Enter the overhaul work order list into the nuclear power overhaul radiation control system.

[0058] Before the operation of the nuclear power overhaul radiation control system, the following data needs to be prepared and manually entered into the nuclear power overhaul radiation control system. The data includes three-dimensional diagrams of equipment pipelines, historical data of radiation flaw detection isolation plans, KRT probe data, a list of radiation flaw detection staff, a list of personnel notified of radiation flaw detection results, and a plant layout diagram.

[0059] The three-dimensional diagram of the equipment pipeline contains the equipment code, nuclear safety level, pipeline specifications, materials, working pressure, working temperature and other information.

[0060] The historical data of the radiographic flaw detection isolation plan is the historical data accumulated during the radiographic flaw detection of each room in the power plant during previous overhauls, including room number, radiation source type, intensity, isolation drawings, etc. It should be noted that since the radioactive dose rate at the location where the radiographic flaw detection is carried out is relatively high, it is necessary to isolate the surrounding rooms to prevent other personnel from entering, so an isolation plan needs to be prepared.

[0061] KRT probe data includes the following information: the number of the flaw detection room, the list of KRT probes affected by the flaw detection, whether there is linkage, the position number of the linked valve, whether shielding measures need to be taken, whether I0 (equipment unavailable) is caused, etc. KRT probes are used to detect the radioactivity of the plant when the unit is operating normally. When an abnormal accident occurs and the radioactivity of the plant increases, the KRT probe will generate an alarm, and some probes will also cause the corresponding valve to operate. However, normal radiographic flaw detection operations will also cause the radioactivity of the plant to increase, resulting in false alarms that interfere with the normal operation of the unit. Therefore, protective measures must be taken for KRT probes.

[0062] The list of radiographic inspection personnel includes information such as personnel name, work authorization, age, etc.

[0063] The list of personnel notified of the X-ray detection results includes personnel involved in overhaul planning, maintenance, operation, etc. who are concerned about X-ray detection work. The notification content includes the personnel's name, department, and email address.

[0064] The plant layout drawing is the layout drawing of the power plant building, which includes the floor plan of each floor and marked with room numbers, in dwg format.

[0065] Step 2: Generate a radiographic flaw detection list based on the work order list. The process of generating a radiographic flaw detection list is as follows: Figure 3 As shown, the specific steps include:

[0066] Step 2.1: Read the overhaul work order list. The overhaul work order list is saved in the work order management system of the power plant. The information of each work order includes the work content, equipment code, work location, specific work steps, maintenance procedures, corresponding main isolation number and other information.

[0067] Before the overhaul begins, the overhaul management reads the work order information from the power plant production information management system as the basic data for generating the X-ray flaw detection list. In addition, the new work orders added during the overhaul implementation will also enter the nuclear power overhaul X-ray control system in real time as the data source for adjusting the flaw detection list.

[0068] Step 2.2: Select the work order list that needs non-destructive testing based on the work content and work procedures. First, search for the two keywords "welding" or "non-destructive testing" in the work content field of the work order. If there are two keywords, add them to the candidate list of radiographic inspection. If not, continue to search for the two keywords "welding" or "non-destructive testing" in the maintenance procedures of the work order. If there are two keywords, add them to the candidate work order. The detailed work steps of some work orders may not be in the work order content, so you need to read the implementation plan or maintenance procedures in the work order attachment to find relevant content. After all work orders are searched, a candidate list of radiographic inspection work orders is generated.

[0069] Step 2.3: Read the three-dimensional pipeline diagram corresponding to each work order equipment. After traversing the candidate list of radiographic inspection work orders, the nuclear power overhaul radiographic control system reads the corresponding three-dimensional pipeline diagram according to the equipment code of each work order, and extracts the nuclear safety level pipeline specifications, materials, working temperature, working pressure, welding type and other data corresponding to each work from the three-dimensional pipeline diagram.

[0070] Step 2.4: Automatically generate a radiographic flaw detection list using rules. The nuclear power overhaul radiographic control system automatically determines whether each work order needs radiographic flaw detection based on the three-dimensional image information and work order data. For work orders with a nuclear safety level of level 2, they are directly added to the flaw detection list. For work with a nuclear safety level of level 3, work orders are randomly selected at a ratio of 10% and added to the flaw detection list. For other work orders, it is manually determined whether radiographic flaw detection is required based on the temperature and pressure setting values ​​corresponding to each work order. When the temperature and pressure exceed the set values, it is considered that the work order needs radiographic flaw detection and is added to the flaw detection list. A preliminary radiographic flaw detection list is automatically generated based on the above rules.

[0071] Step 2.5: Generate the official version of the list after manual review. The service inspection engineer logs in to the nuclear power overhaul radiographic control system, verifies and confirms the items in the generated preliminary list one by one, modifies and saves them, and generates the official version of the flaw detection list. The official radiographic flaw detection list mainly contains the following information: work order number, equipment code, work content, room number, and number of welds. It should be noted that a work order represents a job, and a job may include many welds that need to be radiographically inspected.

[0072] Step 3: Generate a flaw detection plan based on the X-ray flaw detection list. The process of generating a X-ray flaw detection plan is as follows: Figure 4 As shown, the specific steps include:

[0073] Step 3.1: Read the official version of the X-ray inspection work order list and group them by room number. X-rays in the same room can be done together, so all X-ray work should be grouped by room number first.

[0074] Step 3.2: Read the information of the radiographic workers. Read the total number of radiographic workers and calculate the maximum number of welds that can be inspected by radiography every day = total number of workers * 2, which is the upper limit of the number of radiographic work per day.

[0075] Step 3.3: Read P6 overhaul plan information. Read the overhaul plan information from the project management software P6, and read the main isolation release time corresponding to each work order according to the work order number, as the time when the work order must be completed and the time when the radiographic work must be completed.

[0076] Step 3.4: Generate the first version of the X-ray inspection plan according to the rules. The rules are built into the overhaul management system, as follows: the inspections in the same room or nearby areas are put together to share the isolation range; the inspections with earlier completion time are arranged first; the workload of the staff is balanced, and the maximum number of X-rays per night is <= the number of staff * 2.

[0077] Step 3.5: Generate the formal version of the flaw detection plan after manual review. After the initial version of the plan is generated, the service inspection engineer logs into the system and generates the formal version of the flaw detection plan after modification and improvement. The formal version of the flaw detection plan contains the following main information: work order number, equipment code, work content, room number, number of welds, X-ray start date, and name of the person in charge of the X-ray work.

[0078] Step 4: Carry out the radiographic inspection implementation process according to the inspection plan. Figure 5 As shown, the specific steps include:

[0079] Step 4.1: Read the day's X-ray flaw detection list and group them by room. Read the day's X-ray flaw detection list in the official version of the flaw detection plan. Since multiple X-ray flaw detection works in the same room only need to apply for one permit, in this step, the day's X-ray flaw detection list is grouped by room.

[0080] Step 4.2: Read the historical isolation plan according to the room number. The details are as follows:

[0081] Search historical isolation plans using room number as keyword;

[0082] If it can be found, the historical isolation plan will be used directly.

[0083] If no historical isolation plan is found, the plant layout diagram is read and an isolation plan is automatically generated based on predefined rules. Rooms starting with R directly isolate the entire R plant, rooms starting with M directly isolate the entire conventional island plant, and isolation plans for other rooms are manually uploaded by service inspection personnel based on the plant layout diagram.

[0084] Step 4.3: Generate the formal version of the NDT isolation plan after manual review. The radiography staff logs into the system to modify and improve the generated plan and generate a formal isolation plan.

[0085] Step 4.4: Generate a list of KRT probes affected by radiographic flaw detection in each room. The nuclear power overhaul radiographic control system searches for corresponding data by room number, and automatically generates corresponding work orders for KRT probes that require shielding measures.

[0086] Step 4.5: Generate a radiographic inspection license application. The nuclear power overhaul radiographic inspection control system automatically generates a radiographic inspection license application according to the room number. Each room has one license application, which includes the work order number from the inspection plan, the equipment code, the room number, the isolation plan and KRT information generated in Sections 4.3 / 4.4, as well as the manually entered inspection time, inspection source type, inspection source strength and other information. The radiographic staff logs into the system and generates a formal license application after confirming the accuracy of the information.

[0087] Step 4.6: Each responsible person shall review and approve the radiographic inspection permit. According to the management process, the service inspection engineer, radiation protection engineer, and overhaul planning engineer shall log in to the system to complete the review and approval process.

[0088] Step 4.7: Publish the radiographic inspection announcement. After the approval is completed, the radiographic inspection announcement will be automatically generated. The announcement content includes the time and place of the inspection, the scope of impact, and the contact information of the staff, and will be published on the company's homepage.

[0089] Step 4.8: Notify the X-ray inspection results. After the X-ray inspection is completed, the inspection personnel will enter the inspection results, and the system will automatically notify the relevant personnel by SMS or email. The personnel list is pre-set in the overhaul management system.

[0090] Through the application of the above processes, the nuclear power overhaul radiation control system has achieved automation in various processes of radiation flaw detection through digital means, greatly improving work efficiency and avoiding human errors.

[0091] Therefore, the present invention traverses all overhaul work orders, and automatically determines whether the work order requires nondestructive testing and the method of nondestructive testing through the work content of the work order and the material, temperature, pressure and other characteristics of the target equipment, combined with the requirements of regulations, and generates a flaw detection work list. According to the location of the flaw detection work, the manpower situation of the flaw detection personnel and the workload, the radiographic flaw detection plan is automatically generated. According to the plant layout diagram, combined with historical records, the flaw detection isolation diagram is automatically generated. According to the flaw detection location, combined with the layout diagram of the plant equipment, the KRT affected by the flaw detection is automatically determined, and a list of equipment and precautions for temporary lockout that need to be executed is generated. Before the flaw detection, the flaw detection announcement is automatically published on the company's homepage, and after the flaw detection is completed, a notification is sent to the relevant personnel set up in the system.

[0092] The present invention automatically generates a radiographic flaw detection list by reading the work content of the work order and the three-dimensional diagram of the equipment; automatically generates a flaw detection plan based on the radiographic flaw detection list; automatically generates a radiographic flaw detection isolation map and a radiographic flaw detection impact KRT list based on the radiographic flaw detection room and historical data, and automatically publishes a radiographic flaw detection announcement and radiographic flaw detection results.

[0093] The present invention provides a fully automated overhaul radiographic management process through information technology, which automatically completes the preparation of overhaul radiographic flaw detection lists, radiographic flaw detection plans, flaw detection isolation plans, the application for flaw detection permits, flaw detection announcements and the release of flaw detection results, reduces manual labor, and greatly improves the efficiency of overhaul radiographic flaw detection work management. The present invention is suitable for the efficient management of nuclear power overhaul radiographic flaw detection work.

[0094] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A nuclear power overhaul radiation control system, characterized in that: include: The module for automatically generating the radiographic flaw detection list is used to select the work order list that needs to be radiographically inspected from the overhaul work order; The automatic generation module of radiographic flaw detection plan is used to automatically schedule according to the radiographic flaw detection list and generate the radiographic flaw detection plan according to the preset rules; The radiographic flaw detection implementation module is used to implement related operations according to the completion plan of the radiographic flaw detection plan.

2. The nuclear power overhaul radiation control system according to claim 1, characterized in that: The module for automatically generating a radiographic flaw detection list reads all the work orders for this overhaul and the three-dimensional pipeline diagrams of the equipment corresponding to the work orders from the overhaul work order system. Based on this information and preset rules, it preliminarily generates a list of work orders that require radiographic flaw detection and the reasons for the need for flaw detection.

3. The nuclear power overhaul radiation control system according to claim 1, characterized in that: The input information of the automatic generation module of the radiographic flaw detection plan includes the time required for the equipment to be restored to availability, which is read from the work order scheduling system, and the radiographic flaw detection human resource situation which is manually input.

4. The nuclear power overhaul radiation control system according to claim 1, characterized in that: The X-ray flaw detection implementation module creates a flaw detection isolation plan database based on historical flaw detection data, and saves the flaw detection isolation plan information corresponding to each room.

5. A nuclear power overhaul radiation control method, characterized in that: The following steps are involved: Step 1: Enter the overhaul work order list into the nuclear power overhaul radiation control system; Step 2: Produce a radiographic inspection list based on the work order list; Step 3: Generate a flaw detection plan based on the X-ray flaw detection list; Step 4: Carry out the X-ray inspection implementation process according to the inspection plan.

6. The nuclear power overhaul radiation control method according to claim 1, characterized in that: Before step 1, the data entered in advance into the nuclear power overhaul radiation control system include the three-dimensional diagram of the equipment pipeline, the historical data of the radiation detection isolation plan, the KRT probe data, the list of radiation detection staff, the list of personnel notified of the radiation detection results, and the plant layout diagram.

7. The nuclear power overhaul radiation control method according to claim 1, characterized in that: Step 2 specifically includes: Step 2.1: Read the overhaul work order list; Step 2.2: Select the work order list that needs non-destructive testing according to the work content and work procedures; Step 2.3: Read the three-dimensional pipeline diagram corresponding to each work order equipment; Step 2.4: Automatically generate a radiographic flaw detection list using rules; Step 2.5: Generate the official version of the list after review.

8. The nuclear power overhaul radiation control method according to claim 7, characterized in that: In step 2.4, it is automatically determined whether each work order needs radiographic inspection based on the three-dimensional image information and work order data. For work orders with a nuclear safety level of level 2, they are directly added to the inspection list. For work with a nuclear safety level of level 3, work orders are randomly selected at a ratio of 10% and added to the inspection list. For other work orders, it is manually determined whether radiographic inspection is required based on the temperature and pressure corresponding to each work order. When the temperature and pressure exceed the set value, it is considered that the work order needs radiographic inspection and is added to the inspection list.

9. The nuclear power overhaul radiation control method according to claim 1, characterized in that: Step 3 specifically includes: Step 3.1: Read the official version of the X-ray inspection work order list and group them by room number; Step 3.2: Read the X-ray worker information; Step 3.3: Read the overhaul plan information in the project management software; Step 3.4: Generate the first version of the radiographic inspection plan according to the rules; Step 3.5: Generate the official version of the NDT plan after review.

10. The nuclear power overhaul radiation control method according to claim 1, characterized in that: Step 4 specifically includes: Step 4.1: Read the X-ray flaw detection list for the day and group them by room; Step 4.2: Read the historical isolation plan according to the room number; Step 4.3: Generate the official version of the NDT isolation plan after review; Step 4.4: Generate a list of KRT probes that are affected by radiographic inspection in each room; Step 4.5: Generate application for radiographic inspection license; Step 4.6: Review and approve the radiographic inspection license; Step 4.7: Publish the radiographic inspection announcement; Step 4.8: Notify the radiographic inspection results.