Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

4905results about How to "Work less" patented technology

Slope catastrophe early warning method and system

The invention relates to the field of geological disaster monitoring and early warning, in particular to a slope catastrophe early warning method and system. The method comprises the following steps: establishing a space-time database, storing and managing preprocessed slope data from multiple monitoring sources, and sorting to obtain a slope catastrophe data set; performing feature extraction on the slope catastrophe data set to obtain a key information set reflecting slope catastrophe features; analyzing the key information set to obtain a slope catastrophe value; calculating an early warning threshold value and a real-time displacement prediction value of the side slope based on the side slope data in the space-time database, and fusing the real-time displacement prediction value and the side slope catastrophe value to obtain a fusion value; and evaluating the real-time stable state of each monitored section of the slope according to the obtained fusion value and an early warning threshold value, and judging whether to send out an early warning signal and an alarm signal or not according to an evaluation result. According to the invention, accurate identification of the slope catastrophe value and the potential risk area is realized, and the accuracy and reliability of the early warning system are improved.
Owner:ZHONGJIAO ROAD & BRIDGE (HEBEI) CO LTD

Power equipment fault early warning system

The invention discloses a power equipment fault early warning system, and relates to the technical field of fault risk early warning, and the system comprises the following components: Internet of Things sensor network construction, edge computing node deployment, real-time data processing and analysis, fault early warning and decision support, and dynamic optimization and adaptive learning. By integrating the advanced Internet of Things technology and the intelligent analysis algorithm, the system can monitor the operation state of the power equipment in real time, and once abnormity is detected, the system can immediately generate early warning information and inform related personnel. The instant response mechanism greatly shortens the time interval from fault discovery to fault processing, and effectively avoids the adverse effect of fault expansion on the operation of the power grid. Meanwhile, the application of an intelligent analysis algorithm improves the accuracy of fault diagnosis, reduces the situations of false alarm and missing alarm, and ensures that the operation and maintenance personnel can accurately position a fault point and take effective measures to repair the fault point.
Owner:LUOYANG MENGJIN POWER SUPPLY CO OF STATE GRID HENAN ELECTRIC POWER CO

Task allocation method for flexible employment

The invention relates to the technical field of task allocation, in particular to a task allocation method for flexible employment. According to the technical scheme, the method comprises the following steps that a database of related information of tasks and employees is constructed, wherein the database comprises detailed information of the tasks and comprehensive information of the employees; respectively constructing a task model and an employee portrait based on the information in the database; and matching the task with the employee through an intelligent matching algorithm, wherein the intelligent matching algorithm comprises matching algorithm selection and optimization, real-time matching and dynamic adjustment, and multi-objective optimization and tradeoff. According to the method, multiple matching algorithms are combined for optimization, weights are selected and adjusted according to tasks and employee characteristics, accurate matching is achieved, a task model and employee portrait multi-dimension consideration adaptability is achieved, adaptive changes are matched in real time, tasks and multiple aspects of employees are optimized and balanced in a multi-objective mode, the development of rights and interests of the employees is considered, and the matching quality, the working enthusiasm and the stability are improved; flexible employment resources are managed more effectively, and the task allocation effect is improved.
Owner:SUZHOU BUMU NETWORK TECHNOLOGY CO LTD

Wind-solar hydrogen production collaborative optimization strategy considering ALK and PEM electrolytic cell arrays

The invention relates to a wind-solar hydrogen production collaborative optimization strategy considering ALK and PEM electrolytic cell arrays, which comprises the following steps of: based on historical wind-solar power data of a wind-solar hydrogen production system, carrying out grade division according to power, and determining ALK and PEM electrolytic cell array capacity configuration, operation state modes and electrolytic cell array classification; after ALK and PEM electrolytic cell array capacity configuration is determined, the category of the electrolytic cell array is predicted through a classification prediction algorithm, the hydrogen production reference power of the electrolytic cell array is obtained, the power is limited according to the electric heating characteristic of the electrolytic cell, and the response power of the electrolytic cell array of the wind-solar hydrogen production system is further determined; and on the basis of the determined response power of the electrolytic cell array, the running time between the ALK electrolytic cells and the PEM electrolytic cells is balanced through a rotation optimization strategy, the response power of each electrolytic cell is output in real time, power distribution of the ALK electrolytic cells and the PEM electrolytic cells in the wind and light hydrogen production system is achieved, and the heat loss of the electrolytic cell array can be reduced while the wind and light abandoning phenomenon is solved.
Owner:DALIAN MARITIME UNIVERSITY

Multi-underwater robot cooperative control system and method based on predictive control

The invention discloses a multi-underwater-robot cooperative control system and method based on predictive control, and relates to the technical field of cooperative control. During operation of the system, underwater environment data are collected through sensor equipment, an underwater three-dimensional dynamic environment model is generated by using a data fusion technology, and the underwater three-dimensional dynamic environment model is established based on task requirements; tasks are decomposed and distributed to all the robots, through an optimization algorithm, optimal paths of the robots and the mechanical arms are planned, the motion trails of the underwater robot mechanical arms are dynamically optimized based on model predictive control MPC, a real-time control strategy is provided for task division among the multiple mechanical arms, and the real-time control strategy of the underwater robot mechanical arms is provided based on environment modeling and the real-time state. Future motion states of the robot and the mechanical arm of the robot are predicted, an optimization objective function including task completion time, energy consumption and mechanical arm operation precision is constructed, a rolling optimization method is utilized, a control instruction is updated in real time, and real-time data sharing among multiple underwater robots is supported based on an acoustic communication technology.
Owner:YANGJIANG POWER SUPPLY BUREAU OF GUANGDONG POWER GRID

Three-phase inverter direct current side electric leakage fault type discrimination method and electronic equipment

The invention provides a three-phase inverter direct current side electric leakage fault type discrimination method and electronic equipment, and the method comprises the steps: carrying out the frequency spectrum time sequence characteristic analysis of the residual current of the alternating current side of a three-phase inverter, and analyzing the change of the amplitude of the residual current along with the time under different frequencies; the fault type of the direct current side electric leakage of the inverter can be known; by performing continuous energy monitoring on the residual current signal of the inverter, real-time current monitoring on the inverter is realized, and sudden change of the fault type of electric leakage or instantaneous electric leakage can be well monitored and distinguished. Aiming at the specific characteristics of the harmonic component of the leakage current of the inverter, different frequency spectrum characteristics of the leakage current under different fault types are determined, the electric leakage fault type discrimination method based on harmonic time-frequency characteristic extraction is provided on the basis, the specific fault type of the inverter can be discriminated under various working conditions, the position of the electric leakage fault is further positioned, and the reliability of the inverter is improved. The problem of inaccurate electric leakage fault type judgment and positioning in the current engineering application is solved.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Personnel information management system and method based on cloud platform

The invention discloses a personnel information management system and method based on a cloud platform, and relates to the technical field of human resource management, and the main scheme is that the method comprises the steps: obtaining evaluation data, calculating a comprehensive score of application, and carrying out the statistics of passing interviewers; calculating and evaluating a training score according to the training data and the comprehensive employment score, and screening qualified employees; acquiring multiple types of data, calculating influence indexes, and distributing posts for the employees by comparing the influence indexes with a threshold set; recording attendance data and calculating an attendance comprehensive index, calculating a performance evaluation index in combination with historical project data and the attendance comprehensive index, judging a performance risk alarm and generating an adjustment instruction; and according to the employee survey data and the performance evaluation index, the employee prediction wastage rate is calculated, judgment and early warning are performed, a regulation instruction is generated, and the enterprise human resource management efficiency and the intelligent level are improved.
Owner:JILIN COMM POLYTECHNIC

Park management system based on digital twinning

A park management system based on digital twinning relates to the technical field of park management, and constructs a target park digital twinning model according to a dynamic element feature set in a target park and functional features of a plurality of buildings and infrastructures; constructing a dynamic element feature estimation model based on deep learning, and outputting an estimated value time sequence corresponding to each type of dynamic element feature of each digital three-dimensional model in the current monitoring period; and a park comprehensive management platform is constructed, and the park comprehensive management platform feeds back an optimal traffic route to the user according to the behavior characteristic data of the user and the estimated value time sequence corresponding to each type of dynamic element characteristic of each digital three-dimensional model. And each type of dynamic element feature of each digital three-dimensional model in the digital twinborn model is monitored in real time, and emergency maintenance operation is performed on the building or infrastructure corresponding to the digital three-dimensional model according to a real-time monitoring result, so that the overall response speed of the park is improved.
Owner:JINGCAI FUTURE INTELLIGENT TECH CO LTD

Multi-channel power line carrier communication system

The invention relates to the technical field of carrier communication, in particular to a multichannel power line carrier communication system which comprises a data acquisition module, a first determination module, a second determination module, a judgment module, a selection module, a sending module and a correction module. According to the invention, through an accurate data acquisition and real-time determination mechanism, complex environment changes in a power network can be effectively dealt with, stability and high efficiency of communication are ensured, channels with optimal parameters such as signal strength, noise, delay and the like are optimized through multi-stage screening and determination, channels with relatively large interference and noise are effectively avoided, and the communication efficiency is improved. Meanwhile, the correction module can adjust the intensity threshold value in real time, it is guaranteed that the system still maintains excellent communication performance when the number of channels fluctuates and the network load changes, and the problems that due to the fact that the attention degree of the influence of real-time environment changes on signal quality is low, channel selection is inaccurate, and verification results are deviated are effectively solved.
Owner:BEIJING QIANJING WUYOU ELECTRONICS SCI & TECH

Low-temperature aqueous zinc ion hybrid capacitor high-entropy electrolyte

The invention relates to the technical field of low-temperature electrolytes, in particular to a low-temperature aqueous zinc ion hybrid capacitor high-entropy electrolyte. The low-temperature aqueous zinc ion hybrid capacitor high-entropy electrolyte comprises an anion high-entropy electrolyte, a cation high-entropy electrolyte or a solvent high-entropy electrolyte. According to the high-entropy electrolyte disclosed by the invention, the liquid-solid transformation temperature of the electrolyte is reduced, and relatively good low-temperature performance can be obtained; due to the existence of water, a relatively good flame-retardant effect is obtained; and meanwhile, by electrostatic shielding or adjustment of the zinc ion solvation layer, dendritic crystals are inhibited, and the cycle life of the water-based zinc ion hybrid capacitor is prolonged. The high-entropy electrolyte disclosed by the invention is an electrolyte with relatively high mixed entropy, and the liquid-solid transformation temperature of the high-entropy electrolyte can be reduced, so that the high ionic conductivity of the high-entropy electrolyte can be still kept at a low temperature, and furthermore, the water-based zinc ion hybrid capacitor can normally work in a low-temperature environment.
Owner:WUHAN TEXTILE UNIV

Regional power grid flexible interconnection planning method giving consideration to global consumption capability and investment income of new energy

The invention relates to a regional power grid flexible interconnection planning method giving consideration to global consumption capability and investment income of new energy. The method comprises the following steps: firstly, constructing a regional power grid flexible interconnection device locating and sizing and new energy consumption index evaluation system and a to-be-planned interconnection line position-capacity set; secondly, a regional power grid flexible interconnection double-layer planning model is constructed, an upper layer decides an interconnection device locating and sizing scheme, and a lower layer evaluates the system new energy consumption capability after the flexible device is constructed and decides the new energy grid-connected access quantity; and finally, determining a target planning scheme by adopting an improved multi-target particle swarm algorithm. According to the method, the new technology of flexible interconnection between regional power grids is considered, and the model selection, site selection and capacity determination scheme of the cross-regional interconnection line is determined through the new indexes of the node topology connection degree, the neighbor node center support force and the node vulnerability resistance, so that the problem that the traditional regional power grid planning method cannot directly match the source load is solved; and the capability of flexible consumption of new energy and mutual aid of resources among regional power grids is improved.
Owner:STATE GRID JIANGSU ELECTRIC POWER CO LTD +3

Medical beauty equipment cloud management system and management method

The invention relates to the technical field of equipment management, in particular to a medical beauty equipment cloud management system and management method. The method comprises the following steps: acquiring a medical beauty equipment number and medical beauty equipment parameters; carrying out cloud platform data uploading on the medical beauty equipment parameters based on the medical beauty equipment number, and generating medical beauty equipment monitoring data; consumable information digital registration is carried out on the medical beauty equipment monitoring data, and a beauty equipment consumable digital registry is generated; the method comprises the following steps: acquiring beauty equipment consumable data through a beauty equipment consumable digital registry to obtain beauty equipment consumable sensing data; consumable loss influence analysis is carried out on the beauty equipment consumable sensing data, and a consumable state monitoring data set is generated; and performing consumable service life prediction on the consumable state monitoring data set, thereby generating consumable service life early warning data. According to the invention, through real-time monitoring, intelligent analysis and dynamic adjustment of the cloud platform, the accuracy and comprehensiveness of cloud management of the medical beauty equipment are improved.
Owner:CHARISMA TECH

Pipe cutting device for vacuum cup processing

The invention relates to a pipe cutting device for vacuum cup machining, belongs to the field of vacuum cup machining, and aims to solve the problems that an existing pipe cutting device for vacuum cup machining cannot conveniently and stably clamp and position pipes of different specifications and sizes, and cannot automatically polish end openings of the cut pipes. Comprising a bottom plate and a first hydraulic rod, a side plate is fixedly welded to the top end face of the bottom plate, a fixing plate is fixedly welded to the end face of one side of the side plate, a first servo motor is fixedly welded to the fixing plate, an efficient positioning assembly is installed on a mounting plate, and a multifunctional girdling assembly is installed on the mounting plate. According to the pipe cutting device, by means of 90-degree intermittent rotation of the mounting frame, the cutting blade, the grinding disc and the rubber push plate can be driven to move to the pipe one by one, integrated machining treatment such as pipe cutting, cutting port grinding and pushing discharging is achieved, the automation degree of the pipe cutting device is effectively improved, and then the working efficiency of the pipe cutting device is improved.
Owner:ZHEJIANG DAIAN COMMODITY

Method and system for predicting aging life of waterproof coating

The invention relates to the technical field of waterproof coating detection, in particular to a waterproof coating aging life prediction method and system, which not only improve the prediction precision, but also enhance the scientificity and rationality of waterproof coating use. The method comprises the following steps: collecting a use environment parameter set and a use structure vector of a to-be-predicted waterproof coating; the use environment parameter set comprises humidity, temperature, ultraviolet intensity and pH value; the used structure vector comprises a coating area and a coating thickness; taking the use structure vector as a mapping condition, and extracting a corresponding structure aging influence factor from a pre-constructed structure influence factor matrix; obtaining component characteristic information and a standard environment parameter set of the waterproof coating to be predicted; performing deviation analysis on the use environment parameter set and the standard environment parameter set to obtain environment aging influence factors; and performing test analysis on the component characteristic information, and determining the standard service life of the waterproof coating under the standard environment parameter set.
Owner:BNBM YUWANG WATERPROOF TECH GRP CO LTD

Composition for identifying bladder cancer based on urine sample detection and application thereof

The invention relates to a composition for identifying bladder cancer based on urine sample detection and application thereof, and belongs to the technical field of molecular biology. According to the composition disclosed by the invention, the bladder cancer is identified by detecting the expression of one or more of hsa-miR-423-5p, hsa-miR-155-5p and hsa-miR-590-5p in a urine sample; the composition comprises a specific reverse transcription stem-loop primer, a specific detection forward primer, a specific detection probe and a universal reverse primer. According to the composition disclosed by the invention, the expression of hsa-miR-423-5p, hsa-miR-155-5p and hsa-miR-590-5p in a urine sample is detected, and a binomial logistic regression model is combined, so that auxiliary judgment is performed on the bladder cancer, the sensitivity and the specificity are relatively high, and the accuracy of identifying the bladder cancer can be improved. The invention further provides a kit containing the composition, the detection object of the kit is a urine sample, and the kit has the advantages of being small in sample dosage, noninvasive in sampling, convenient, rapid, small in risk and the like.
Owner:长春科技学院

Smart field section management and control method and system suitable for urban rail transit

The invention discloses an intelligent field section management and control method and system suitable for urban rail transit, and belongs to the technical field of rail transit, and the technical key points comprise the steps: arranging various types of sensors for images, positions, states and the like in a field section key area, and collecting the operation, state and environment data of vehicles, equipment and infrastructures in real time; transmitting the collected data to a management and control center in real time through a wired and wireless combined communication network, so that the management and control center analyzes the received data in real time, identifies abnormity, predicts faults and generates a management and control instruction; according to the railway operation and maintenance management system, intelligent execution equipment such as a turnout point switch, a signal machine and vehicle maintenance equipment is automatically controlled according to a management and control instruction, intelligent coordinated management and control of vehicle entering and exiting, parking, maintenance and equipment operation are achieved, and the railway operation and maintenance management system is a highly complex and precise system. And safety, high efficiency and order of railway transportation are ensured.
Owner:南京轨道交通产业发展有限公司 +2

Protection circuit for limiting power output of radio frequency power amplifier and design method

The invention provides a protection circuit for limiting power output of a radio frequency power amplifier and a design method. The protection circuit comprises the radio frequency power amplifier used for amplifying an input radio frequency signal and then outputting the amplified radio frequency signal to a coupler; the coupler outputs a coupling signal to the forward power detection module and outputs a radio frequency signal; the forward power detection module converts an input coupling signal into a voltage signal and outputs the voltage signal to the feedback control circuit; the feedback control circuit sends a power control signal to the bias control circuit when the detected voltage signal exceeds a voltage threshold value; the bias control circuit calculates to obtain a bias value needing to be adjusted and sends a voltage control signal to the adjustable direct-current power supply; the adjustable DC power supply supplies power to the radio frequency power amplifier. According to the invention, the output power of the radio frequency power amplifier can be accurately controlled and kept in a preset range, the radio frequency power amplifier and other related equipment can be effectively protected from overload and damage, the radio frequency power amplifier can work at the optimal efficiency, and energy waste is reduced.
Owner:NANJING RFLIGHT COMM ELECTRONICS CORP

Battery pack multi-layer protection structure, battery pack protection plate, battery pack and electric equipment

The utility model discloses a battery pack multi-layer protection structure, a battery pack protection plate, a battery pack and electric equipment. The battery pack multi-layer protection structure comprises a bottom protection plate; the tray bottom plate is arranged at one end of the bottom protection plate, and a mounting space is defined between the tray bottom plate and the bottom protection plate; the protection assembly is arranged in the installation space and comprises a buffering piece and an elastic piece, one end of the buffering piece is connected with the tray bottom plate, the other end of the buffering piece is connected with one end of the elastic piece, and the other end of the elastic piece is connected to the bottom protection plate. The elastic piece and the buffer piece are arranged between the bottom protection plate and the tray bottom plate, so that the elastic piece and the buffer piece can be used for buffering and absorbing impact force from the outside in sequence, the battery pack can bear larger impact force, the impact force borne by a battery cell can be reduced, the battery pack is further protected, and the service life of the battery pack is prolonged. And the battery pack can work normally.
Owner:BYD CO LTD

Quasi-zero stiffness metamaterial vibration reduction mounting structure of underwater vehicle hydrophone

The invention discloses a quasi-zero stiffness metamaterial vibration reduction mounting structure of an underwater vehicle hydrophone, which belongs to the technical field of underwater vehicles, and comprises an oil seal end cover mounted at the front end of a front fairing of an underwater vehicle, a mounting rack fixed at the front end part of the oil seal end cover, and two quasi-zero stiffness vibration reduction components arranged in front of and behind the mounting rack, the outer side parts of the quasi-zero-stiffness vibration reduction components are connected with the mounting frame, concave parts for clamping the end parts of the hydrophone are formed in the middle parts of the quasi-zero-stiffness vibration reduction components, and a mounting space for arranging the hydrophone is formed between the two quasi-zero-stiffness vibration reduction components; and the two ends of the hydrophone are respectively clamped and clamped in the concave parts of the two quasi-zero stiffness damping components. According to the quasi-zero-stiffness metamaterial damping device, through conformal design, vibration attenuation, structure optimization and energy-saving effects, an efficient, stable and low-noise hydrophone installation solution is provided for an autonomous underwater vehicle, and the performance of the quasi-zero-stiffness metamaterial damping device in underwater detection and signal acquisition is remarkably improved.
Owner:TIANJIN UNIV +1

Connecting device for deformation joint at civil engineering structural plate and using method of connecting device

The invention relates to the technical field of civil engineering structure plate deformation joint connection, and discloses a civil engineering structure plate deformation joint connecting device and a using method thereof.The civil engineering structure plate deformation joint connecting device comprises at least two adjacent concrete plates, and a deformation joint is arranged between the concrete plates; the elastic rubber belt is arranged in the deformation joint, and the elastic rubber belt is arranged in the length direction of the deformation joint and used for connecting the adjacent concrete slabs and providing telescopic connection to adapt to thermal expansion and cold contraction or other deformation of the concrete slabs; the supporting structures are located on the two sides of the elastic rubber belt, and each supporting structure comprises a first supporting plate and a second supporting plate. The elastic rubber belts are arranged in the length direction of the deformation joint, flexible connection can be provided between the concrete slabs, thermal expansion and cold contraction or other displacement deformation of the concrete slabs caused by temperature changes and foundation settlement are effectively absorbed through the design, and therefore the situation that the concrete slabs crack or are unstable in structure is avoided.
Owner:POWERCHINA JIANGXI ELECTRIC POWER ENGINEERING CO LTD

Document automatic generation method, system and device, storage medium and product

The embodiment of the invention relates to the technical field of information, and discloses an automatic document generation method, system and device, a storage medium and a product. The document automatic generation method comprises the following steps: reading a to-be-processed document, and obtaining a document inner tag corresponding to the content of the to-be-processed document; analyzing the label in the document, and managing and adjusting the label in the document to obtain a target document label; filling the target document label into a document template to generate a target document; and carrying out tag classification and integration on the target document, and carrying out document tag management display in a user management interface. According to the method, the key content in the to-be-processed document is extracted, the tagging processing is performed on the document content, and then the document content is filled into the document template, so that the repeated editing work and manual modification time are greatly reduced, and the situation of error information introduced by manual operation is reduced while the document generation efficiency is improved; and the accuracy of automatic generation of the document is improved.
Owner:SHANGHAI KELIANG INFORMATION ENG

Geological map-oriented breakpoint repairing and closed curve reconstruction method and system and medium

The invention discloses a geological map-oriented breakpoint repairing and closed curve reconstruction method and system and a medium. The method comprises the following steps of: preprocessing an original geological map to obtain a grayscale image; carrying out binarization and morphological closed operation processing to obtain a grayscale image of the edge of the smooth contour curve; performing pixel skeletonization to obtain a pixel-level skeleton diagram; performing secondary edge extraction, connected domain marking and endpoint statistics on the pixel-level skeleton diagram, and screening out a non-closed curve and an endpoint set; carrying out nearest neighbor retrieval by adopting KD-Tree to obtain a candidate pairing set of each end point; performing priority pairing in combination with the spatial distance and the direction smoothness; and generating a transition line segment according to a pairing result to supplement the fracture part of the non-closed curve. According to the method, non-closed breakpoints generated by scanning or drawing errors in the geological map can be automatically restored, and a closed curve with topological integrity and a smooth boundary is generated.
Owner:CHINA RAILWAY DESIGN GRP CO LTD

Flotation machine scraper cleaning device

The utility model discloses a flotation machine scraper cleaning device which comprises a mounting plate, a rotating shaft is rotatably connected to the interior of the mounting plate, a rotating roller is fixedly installed at the end of the rotating shaft, when a scraper in a flotation machine needs to be cleaned, the rotating shaft rotates and drives the rotating roller to rotate along with the rotating shaft, and under the action of centrifugal force, the scraper in the flotation machine is cleaned. A limiting groove formed in the outer wall of the scraping plate slides on the outer wall of a limiting block fixedly installed on the inner side of the sliding frame, an I-shaped balancing weight slides in the sleeve frame under the action of centrifugal force and gravity and pushes a limiting plate, the limiting plate and the scraping plate are thrown out of the sleeve frame, the scraping plate can conduct flotation work at the moment, and along with rotation of the scraping plate, the sleeve frame is far away from a flotation tank; at the moment, the I-shaped balancing weight slides towards the interior of the sleeve frame, the limiting plate is driven to slide along with the I-shaped balancing weight, the scraping plate slidably arranged on the inner side of the limiting plate slides towards the interior of the sleeve frame along with the limiting plate, the outer wall of the scraping plate makes contact with the scraping frame arranged on the outer wall of the sleeve frame, and impurities attached to the outer wall of the scraping plate are scraped and cleaned under the limitation of the scraping frame.
Owner:肃北县金鹰黄金有限责任公司

Method and system for detecting metal corrosion depth in real time based on image recognition algorithm

ActiveCN118691554AAccurate and timely corrosion datawork lessImage analysisNeural learning methodsAlgorithmRecognition algorithm
The invention discloses a method and system for detecting the corrosion depth of metal in real time based on an image recognition algorithm, and the method comprises the steps: detecting the corrosion depth through employing the image recognition algorithm, and constructing a database of the morphology features and the corrosion depth of a large-scale metal member according to an existing detection result; and the corrosion depth of the metal component is fed back in real time in a picture matching manner. Long-term stable tracking and prediction of the metal corrosion state and the service life are ensured, accurate and timely corrosion data are provided for real-time detection of a client, and the test working volume and the working cost of field detection are reduced. Compared with a traditional detection method, the method has the advantages that the detection frequency and workload can be greatly reduced, and the corrosion degree can be detected more intelligently in real time. The corrosion morphology is associated with the corrosion depth, and different morphologies have different depths to detect the corrosion depth of the metal component, so that the workload of large-scale field detection is reduced, and meanwhile, a theoretical support for long-term detection is provided.
Owner:CHONGQING JIAOTONG UNIV

Intelligent fire safety pre-judgment linkage management method and platform

The invention relates to the technical field of intelligent fire-fighting processing, in particular to an intelligent fire-fighting safety pre-judgment linkage management method and platform. The method comprises the following steps: collecting circuit data, and carrying out circuit abnormal characteristic analysis according to the circuit data to generate circuit abnormal characteristic data; collecting environment infrared spectrum monitoring data; combustible gas leakage characteristic analysis is carried out based on environment infrared spectrum monitoring, and combustible gas leakage characteristic data are generated; collecting water testing operation monitoring data of the fire hydrant; fire hydrant abnormal characteristic analysis is carried out based on the fire hydrant water test operation monitoring data, and fire hydrant abnormal characteristic data are generated; performing data linkage processing on the circuit abnormal characteristic data, the combustible gas leakage characteristic data and the fire hydrant abnormal characteristic data to generate abnormal fire fighting linkage data; and performing fire-fighting safety pre-judgment demand evaluation on the abnormal fire-fighting linkage data to generate fire-fighting safety pre-judgment demand data. According to the invention, through linkage analysis of fire-fighting data, efficient fire-fighting safety pre-judgment management is realized.
Owner:HUNAN JUNTE INTELLIGENT TECH CO LTD

Dust removal equipment of textile machinery and use method of dust removal equipment

The invention belongs to the technical field of garment manufacturing equipment, and particularly relates to dust removal equipment of textile machinery and a use method thereof.The dust removal equipment comprises a garment manufacturing machine, a top plate fixed to the upper surface of the garment manufacturing machine and a dust removal cover connected to the surface of the top plate through screws, and the surface of the top plate is connected with a dust removal fan through screws; according to the device, by arranging the dust removal mechanism, generated cotton fibers, fine fibers and dust in air can be intercepted and filtered, the working environment is greatly improved, the dust content in the air is reduced, the surface of a dust removal filter element can be automatically cleaned, and the dust removal efficiency is improved. The filtering effect of the dust removal filter element is guaranteed, the situation that dust flows backwards and escapes back to a workshop to pollute the working environment is avoided, a cleaner, healthier and more comfortable working environment is created for workers, the working enthusiasm and working efficiency of the workers are improved, and the health problems such as respiratory diseases caused by dust are solved.
Owner:JIANGSU TANGSHENG TEXTILE TECH CO LTD

Wind turbine generator fault prediction and prevention system and method based on deep learning

The invention discloses a wind turbine generator fault prediction and prevention system based on deep learning. The system comprises a data acquisition and transmission module, a data storage and management module, a data analysis and modeling module, a fault prediction and early warning module and a preventive maintenance decision module. According to the system, through real-time monitoring, prediction and preventive maintenance, stable operation of the wind turbine generator is ensured, and the operation efficiency and reliability of the whole wind power plant are improved. The invention also discloses a wind turbine generator fault prediction and prevention method based on deep learning. The method comprises the following steps: acquiring operation data of a wind turbine generator; acquiring environment data, and constructing a real-time wind turbine generator fault prediction model based on the environment data and the operation data; and inputting the operation data into the wind turbine generator fault prediction model to obtain the fault category of the wind turbine generator, obtaining the historical data of the wind turbine generator, and obtaining the maintenance strategy based on the fault category and the historical data of the wind turbine generator. The method is simple, accurate in wind turbine generator prediction and low in cost.
Owner:HUANENG HEZHANG WIND POWER CO LTD +1

Transform-based abnormal index prediction method for water-turbine generator set

The invention discloses a Transform-based abnormal index prediction method for a water-turbine generator set, and the method comprises the steps: collecting monitoring indexes of multiple dimensions of the water-turbine generator set, enabling the monitoring indexes to comprise temperature, current, voltage, water pressure, water flow, oil pressure and amplitude, carrying out the statistics of the data missing value proportion of the collected monitoring indexes, and carrying out the prediction of the abnormal indexes of the water-turbine generator set. Missing value filling is completed according to the actual storage behavior of the system; a random forest algorithm is adopted, original features of multiple dimensions are screened in combination with the feature cross-correlation matrix, and finally feature information of 10 dimensions is reserved to serve as modeling data input; the method comprises the following steps: constructing a transform model and a generative adversarial network (GAN), and taking the transform model as a generator of the GAN, thereby constructing a TransGAN prediction model; enabling the prediction model to be converged in an optimal state through iterative training; abnormal value prediction is carried out on the collected monitoring data of the multiple dimensions of the water-turbine generator set through the constructed prediction model; the method can improve the detection precision when there is no abnormal value sample.
Owner:CHINA YANGTZE POWER

High-phosphorus-content wastewater treatment and recovery process

The invention belongs to the technical field of phosphorus-containing wastewater treatment, and particularly relates to a high-phosphorus-content wastewater treatment and recovery process which comprises an air flotation shell, a water inlet tank is fixedly connected to one side of the air flotation shell, a water outlet is fixedly connected to the other side of the air flotation shell, a partition plate is fixedly connected to the interior of the air flotation shell, and an air flotation tank is formed in one side of the partition plate; one side of the air floatation shell is fixedly connected with an air compressor, the two ends of the air compressor are fixedly connected with air outlet pipes, the two sides of the inner wall of the air floatation tank are fixedly connected with two positioning frames, and the two air outlet pipes are fixedly connected with the corresponding positioning frames; one side of each positioning frame is fixedly connected with a plurality of iris valves, and through the arrangement of the push plate, the problems that calcium carbonate and calcium phosphate dirt layers are formed at the bottom of the air flotation equipment, so that the running resistance of the equipment is increased, a pump and other power equipment need higher power to maintain normal running, and energy consumption is increased are solved.
Owner:SUZHOU GRAND SYST

Inventory management system and management method based on order data

The invention relates to the technical field of inventory management, and discloses an inventory management system and method based on order data, and the system comprises a data collection unit, an order analysis unit, an inventory prediction unit, and an inventory management unit. According to the invention, commodities are accurately classified according to order data, a detailed basis is provided for inventory management, extensive management is avoided, and the accuracy is improved; inventory demands are predicted according to different commodity characteristics, multiple factors are combined with historical data, actual sales is close, overstock or stockout is reduced, and the turnover rate and the fund utilization rate are increased; the automatic process reduces manpower, monitors the inventory in real time and gives an early warning, replenishes goods in time, enables managers to concentrate on decision making, improves management efficiency, maintains the reasonable level of the inventory, and reduces cost; the inventory supplement signal contains key information and is quickly transmitted to suppliers, so that the suppliers can supply goods in time, collaboration and communication are enhanced, a stable and efficient supply chain is constructed, risks are reduced, and competitiveness is improved.
Owner:JIANGSU CHAOYUAN DATA TECH CO LTD