Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

191 results about "Data Linkage" patented technology

Data linkage is a technique for connecting pieces of information that are thought to relate to the same person, family, place or event.

Method for reducing fraud in government programs

Methods for registering individuals with government programs to eliminate fraud are described herein. The method includes registering a first person with a government entity having a governmental program and issuing an individual identification code (IIC) to the first person, entering the individual identification code (IIC) into an electronic retrieval system and obtaining first data on the first person at a first point in time. The first data can include first biometric data, a first personal identification code, a first electronic signature, and combinations thereof. The method further includes linking the first data to the individual identification code (IIC), and reading second data at a second point in time, wherein the second data can include second biometric data, a second personal identification code, a second electronic signature and combinations thereof, of a second person, and wherein the second point of time is later than the first point of time. The method further includes comparing the second data with the first data to form compared data, determining from the compared data whether the second person is the first person to obtain a verified identity, and making a first transmission of the verified identity to the government entity. The first transmission includes the individual identification code (IIC) and a first query for personal information on the first person. The method further includes making a second transmission from the government entity providing the information requested in the first query and making a third transmission providing updated personal information to the government entity.
Owner:ACCESS SECURITY PROTECTION

Power distribution management information graphic system

The invention relates to an electric power facility computer manage software, namely a power distribution productive management information figure system. The figure system sets a compare geographic entity and a geographical position layer special for existing power distribution network and power distribution facility, establishes five relative figure data modules according with existing management mode, compiles graphics drawing, automatic generating and linkage program. Data in each figure is interrelated, and one data is changed that can realize a plurality of figure data linkage and awoke. The figure system can reflect condition of the power distribution network and facility timely and accurately, particularly a plurality of figure linkage function that can save mass labour resource, increase information instantaneity and reliability, avoid abuse of differ manage information to the figure and easy to oversight, accordingly, provides an advanced computer manage special software to the power distribution productive department. The manage software provided by the invention has important significance for ensuring correctness of power distribution productive commanding and decision-making, realizing scientification and standardization of power distribution productive manage, increasing emergency ability and working efficiency.
Owner:杨志华

Method of wireless electricity transmission based on orthogonal frequency division multiplexing (OFDM)

The invention provides a method of wireless electricity transmission based on orthogonal frequency division multiplexing (OFDM). In terms of structure, based on an idea of saving network nodes and shortening time delay in data transmission, a flat network deploying manner is utilized, four layers of 'a terminal-access equipment-core network equipment-a main station of a power grid' are divided, network equipment is internet protocol (IP)-based and can be identified uniquely through an IP address in the main station of the power grid. In terms of physical channels, three-layer communication protocol systems is built up and comprises a layer of physics, a layer of data linkage and a layer of wireless sources control. Each layer uses a certain technological scheme and performs uploading and downloading of data. All layers converge and are integrated in the core network equipment, and achieve interacting with the main station of the power grid though a manner of wired communication and transmission of power data. According to the method of wireless electricity transmission based on OFDM, OFDM and other key technologies which are in line with the developing trend of the fourth-generation (4G) international main current mobile communication technology are combined with authorized frequency points in the power industry, so that application of an advanced wireless communication technology in data transmission in power service is guided and a reasonable and competitive wire transmission access is built up.
Owner:CHINA GRIDCOM +2

Hazardous chemical substance cabinet management method and system

The invention discloses a hazardous chemical substance cabinet management method and system, and relates to the field of hazardous chemical substance management, and the method comprises the followingspecific steps: (1) providing authorization , and carrying out authorization identification; (2) recording access data and carrying out data linkage with a monitoring center server; (3) recording thereturned data and performing data linkage with a monitoring center server; and (4) performing statistical analysis and comparison on the returned data to realize risk control management. The system comprises a hazardous chemical substance cabinet, an environment monitoring device, an access control device, a server, a monitoring center server, a local area network, an intelligent terminal and a cloud data center. The intelligent terminal can control the environment monitoring device, the access control device and the hazardous chemical substance cabinet through the local area network, the monitoring center server and the server in sequence according to data information transmitted by the environment monitoring device and the access control device, and the aim of intelligently managing thehazardous chemical substance cabinet is achieved. Potential safety hazards caused by manual recording or updating errors and omissions and slowness of hazardous chemicals can be reduced.
Owner:广州仪速安电子科技有限公司

Substation main and auxiliary linkage method and device

The invention provides a substation main and auxiliary linkage method and device. When a measuring point has a remote signaling displacement signal or a fault trip signal, a main control system sendsa linkage message of the measuring point to an auxiliary control system; the auxiliary control system finds the index number of the measuring point in the auxiliary control system according to the index number of the measuring point in the message, obtains a corresponding linkage strategy, and sends a linkage command to a corresponding auxiliary control subsystem according to the linkage strategy,and the linkage strategy is performed by the received auxiliary control subsystem. The linkage system has a simple structure, does not require additional equipment and reduces the cost, and during data linkage processing, the processing procedure is relatively simple. The operation and maintenance personnel in the station can monitor the displacement signal or fault trip signal of the main control system from a main control work station in a monitoring work station in the station and confirm the remote signaling displacement signal or fault trip signal of the main control system, so that information sharing and intelligent linkage between the main and auxiliary systems of the substation are enhanced, and great significance is achieved for improving the safety and reliability of substationoperation.
Owner:XUCHANG XJ SOFTWARE TECH +2

Hydropower station intelligent inspection system

The invention discloses a hydropower station intelligent inspection system. The system comprises a data layer which is used for the collection, convergence, analysis, calculation and storage of the operation parameters and the environment data of the hydroelectric equipment, the real-time recognition, analysis and diagnosis of the images and audio data, and the transmission of the data to an application layer; an application layer which interacts with a user and is used for service agency, engine scheduling, integrated management, identity authentication and authority control; and a client which performs visual display, alarming, linked playback and event recording of the historical data according to the data of the data layer and the application layer. According to the present invention,the state of the hydroelectric equipment is monitored through image acquisition, audio data acquisition, data linkage, data recording and playback, and the machine identification of equipment defectsand faults is realized; the data acquisition and analysis are carried out through the inspection robot, the visible light camera, the infrared thermal imaging device and the audio acquisition device,and the manual inspection work of the hydropower station is replaced.
Owner:国能大渡河瀑布沟发电有限公司

Three-dimensional visual original exploration data management method

The invention relates to a data management technology, and discloses a three-dimensional visual original exploration data management method. The three-dimensional visual original exploration data management method solves the problems that by means of a traditional technology, in the exploration data management process, data are inconvenient to search and easy to lose, and the space correlation among the data cannot be seen visually. The method includes the steps that a, three-dimensional exploration entity identification is built; b, the three-dimensional exploration entity identification is set into a three-dimensional live-action map surface; c, all the three-dimensional identification is associated with corresponding data of a database; d, after the three-dimensional identification is associated with the database, corresponding forms of the database are linked to by clicking the three-dimensional identification, adding, appending, deleting, querying and downloading of the exploration data are achieved; e, selection and storage are conducted, the three-dimensional identification and corresponding data links in a three-dimensional live-action map are stored through independent files. The three-dimensional visual original exploration data management method is suitable for management of engineering geological exploration data.
Owner:POWERCHINA CHENGDU ENG

Method and system for thematically displaying industrial map system projects on basis of data linkage

InactiveCN106202245AExtended multi-dimensionalIntuitive information interactionSpecial data processing applicationsManufacturing planningThematic map
The invention discloses a method and a system for thematically displaying industrial map system projects on the basis of data linkage. The method includes carrying out data combing and warehousing on spatial information processed in a unified manner and thematic planning and manufacturing planning data and storing the spatial information and the planning data in background servers; vectorizing and processing the warehoused data on GIS (geographic information system) platforms, plotting vectorized and processed spatial data on industrial maps, representing the spatial data in a classified manner by the aid of signs when the spatial data are plotted, converting the industrial spatial information into corresponding point, line and surface elements and displaying the point, line and surface elements on electronic maps; configuring data interaction between front-end assemblies and the background servers in B/S (browser/server) architectures and dynamically generating industrial information thematic maps. The method and the system have the advantages that flow data processing modes are established, accordingly, the data utilization rate can be increased, and the aggregation and inline degrees of the data can be improved.
Owner:TAIHUA WISDOM IND GRP CO LTD

Construction management system and method for linking data to a building information model

The invention provides a construction management system and a method for linking data to a building information model. The construction management system (1) for the construction of a structure (30) comprises a plurality of sensor means adapted to detect events at a building site (3) of the structure, a central computing unit (25) providing a building information model comprising a three-dimensional model (35) of the building site or of the structure, and at least one displaying device (20) that is adapted to display the three-dimensional model to a user, characterized in that the plurality of sensor means is adapted for generating data comprising information about a detected event, the system comprises a plurality of communication units adapted to transmit a message comprising the data and a location information to the central computing unit, the system is adapted to assign coordinates in the three-dimensional model according to the location information, the central computing unit has an evaluation algorithm adapted to evaluate options for reacting on the event by analyzing the data, thereby considering information from the building information model, the system is adapted to assign evaluated options to the data, and the at least one displaying device is adapted to display a note which is related to the data and to evaluated options to the user in real-time, wherein the note is displayed at the assigned coordinates in the three-dimensional model.
Owner:HEXAGON TECH CENT GMBH

Water body monitoring video and data linkage early warning method and system

The invention discloses a water body monitoring video and data linkage early warning method which comprises the following steps: S01, according to historical water quality monitoring data, making a risk score table of each river inlet and outlet node; S02, training to obtain a target neural network model according to the historical video data; S03, water quality monitoring and early warning: substituting the monitoring factors of the river inlet and outlet node in the current time period into the risk score table of the node to obtain an early warning level; S04, video monitoring and early warning: processing the monitoring video obtained in the current time period, inputting the processed monitoring video into the target neural network model, outputting an early warning value, and sendingan early warning signal when the early warning value exceeds a threshold value; S05, according to the water quality monitoring early warning level and the video monitoring early warning value, performing comprehensive judgment, and outputting an alarm signal. Artificial intelligence image recognition is utilized, water quality monitoring and video monitoring are combined for discrimination and diagnosis, the false alarm rate caused by other factors such as equipment abnormality is reduced, and the early warning precision is improved; and a water body linkage monitoring alarm system based on videos and data is realized.
Owner:HEFEI INST FOR PUBLIC SAFETY RES TSINGHUA UNIV +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products