Whole-station debugging system of transformer substation
By connecting substation equipment as a whole and using commissioning equipment and controllers to achieve automatic parameter feedback and modification, the problem of complexity and inefficiency in existing substation commissioning systems is solved, and a fast and accurate commissioning process is achieved.
Patent Information
- Application Number
- CN202411001002.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-12
AI Technical Summary
The existing substation commissioning system requires all equipment to be commissioned and adjusted one by one, which is a complicated and lengthy process. Equipment with incorrect parameters also needs to be retested one by one, resulting in low efficiency.
By integrating the main transformer, load equipment, busbars, and switchgear into a single unit, and connecting it with the protection devices, auxiliary equipment, and main equipment, the system utilizes commissioning equipment and controllers to achieve automatic parameter feedback and modification until successful commissioning.
It improves debugging speed and accuracy, directly identifies and corrects devices with incorrect parameters, reduces repetitive testing steps, and enhances debugging efficiency.
Smart Images

Figure CN118943928A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of transformer substation debugging system, and in particular to a transformer substation whole station debugging system. Background Art
[0002] The substation debugging system is an integrated experimental platform for testing various parts of the power system, including main transformers, busbars, switchgear, load equipment, protection equipment, etc. The system can debug and test the entire power system by connecting different equipment configurations, including the measurement and analysis of electrical parameters, debugging of protection devices, testing of communication networks, etc. In the existing substation debugging system, all equipment in the substation needs to be debugged one by one, and then the equipment with incorrect parameters needs to be adjusted, and then all equipment needs to be tested again one by one. The entire debugging process is too complicated and lengthy. Summary of the invention
[0003] The purpose of the present invention is to provide a substation debugging system to solve the above problems. The system is composed of a main transformer, load equipment, busbar and switch equipment as a whole, which is connected to the whole composed of protection devices, auxiliary equipment and main equipment. The two wholes are connected to the debugging mechanism at the same time. When any equipment parameter is incorrect, it is fed back to the debugging device to modify the parameter. The debugging device then restarts the substation through the first controller to debug until the debugging is successful.
[0004] The present invention achieves the above-mentioned purpose through the following technical solutions:
[0005] A whole-station debugging system for a substation, comprising: a second controller, a debugging device, a first controller, a main transformer, a load device, a busbar, a switch device, a protection device, an auxiliary device, and a main device;
[0006] The second controller is connected to the debugging device, the debugging device is connected to the first controller, the first controller is connected to the main transformer, the main transformer is connected to the load device and the busbar respectively, the busbar is connected to the switchgear, the switchgear is connected to the protection device, the protection device is connected to the auxiliary device, and the auxiliary device is connected to the main device.
[0007] Furthermore, the debugging equipment is used to perform electrical performance tests, insulation tests, and overload tests on the main transformer and other equipment to ensure their normal operation and reliability.
[0008] Furthermore, the main transformer is the core equipment in the substation, responsible for converting high-voltage electric energy into low-voltage electric energy to supply various equipment in the substation.
[0009] Furthermore, the load equipment is the terminal equipment of the substation power transmission system, and the debugging equipment will test the electrical performance and operating status of the load equipment to ensure normal power supply and load balance.
[0010] Furthermore, the busbar is connected to various load devices and other devices through switch devices to close or disconnect the circuit and control the transmission and distribution of electricity.
[0011] Furthermore, when a fault or abnormal situation occurs, the protection device can cut off the fault circuit in time to protect the safety of equipment and personnel. The debugging equipment usually tests the logic control, action speed and sensitivity of the protection device to ensure its reliability.
[0012] Furthermore, the auxiliary equipment includes a monitoring system, a control system, and a communication device, and the main equipment and the devices included in the auxiliary equipment are connected.
[0013] With the above structure, when it is necessary to debug the equipment in the power station, the second controller first issues instructions to the debugging device, and then the debugging device issues instructions to the first controller, and the first controller starts the main transformer. When the main transformer is started, it will be connected to the load equipment, and the load equipment will adjust the balance of power supply and demand. Finally, the main transformer will open the switch device through the bus. When the power passes through the protection device, the protection device will detect the switch device. If there is a problem, the switch device will be closed. Finally, the monitoring system and control system in the auxiliary equipment start working. The system in the auxiliary equipment is connected to the main equipment to debug and monitor the power supply and demand of the main equipment. When any of the above items fails or has parameter problems, the problem will be passed to the debugging device, which will be fed back to the second controller. Finally, the staff will debug and change the equipment parameters and restart the debugging device for observation and adjustment, and finally complete the debugging of the substation system.
[0014] In summary, the beneficial effects of the present invention are: the second controller operates the first controller that controls the substation through the debugging device, and the first controller starts the equipment in the substation. When a problem occurs in the data of one of the equipment, resulting in a shutdown, the debugging device is directly notified, and the debugging device notifies the second controller of the specific equipment, and the staff restarts the first controller after debugging, and re-debugs it. The debugging device directly controls the first controller and accurately knows the equipment with problems in specific parameters, thereby improving the debugging speed and accurately modifying the equipment that needs to change parameters. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a flow chart of the present invention.
[0017] The following are the descriptions of the reference numerals:
[0018] 1. Second controller; 2. Debugging equipment; 3. First controller; 4. Main transformer; 5. Load equipment; 6. Busbar; 7. Switchgear; 8. Protection device; 9. Auxiliary equipment; 10. Main equipment. DETAILED DESCRIPTION
[0019] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.
[0020] See also Figure 1 As shown, the present invention provides a substation whole station debugging system, including: a second controller 1, a debugging device 2, a first controller 3, a main transformer 4, a load device 5, a bus 6, a switch device 7, a protection device 8, an auxiliary device 9, and a main device 10;
[0021] The second controller 1 is connected to the debugging device 2, the debugging device 2 is connected to the first controller 3, the first controller 3 is connected to the main transformer 4, the main transformer 4 is connected to the load device 5 and the bus 6 respectively, the bus 6 is connected to the switch device 7, the switch device 7 is connected to the protection device 8, the protection device 8 is connected to the auxiliary device 9, the auxiliary device 9 is connected to the main device 10, wherein the main transformer 4, the load device 5, the bus 6 and the switch device 7 are a whole and connected to the debugging device 2. When there is a problem with the internal device data and parameters, the data will be transmitted to the debugging device 2 through this whole, and the protection device 8, the auxiliary device 9 and the main device 10 are a whole, which is also connected to the debugging device 2, and has the same function as the above-mentioned whole. When the internal data deviates, it will be fed back to the debugging device 2. After one of the wholes feeds back the problem to the debugging device 2, the staff will modify the data, and the second controller 1 will operate the first controller 3 through the debugging device 2 again to restart the internal equipment for debugging.
[0022] Furthermore, the debugging device 2 is used to perform electrical performance tests, insulation tests, and overload tests on the main transformer 4 and other equipment to ensure their normal operation and reliability, and the debugging device 2 is connected to two entities headed by the main transformer 4 and the protection device 8. When there is equipment data abnormality in these two entities, it will be directly transmitted to the debugging device 2, and the debugging device 2 will again issue a stop command to the first controller 3, and the staff will debug the equipment with abnormal data.
[0023] Furthermore, the main transformer 4 is the core equipment in the substation, responsible for converting high-voltage electric energy into low-voltage electric energy to supply various equipment in the substation. The main transformer 4 is connected to the bus 6 through the high-voltage side and the low-voltage side, converts high-voltage electric energy into low-voltage electric energy to supply various equipment in the substation, and cooperates with the load equipment 5 to balance the power, control and adjust the power consumption.
[0024] Furthermore, the load device 5 is a terminal device of the substation transmission system. The debugging device 2 will test the electrical performance and operating status of the load device 5 to ensure normal power supply and load balance. The load device 5 is usually interconnected with the main transformer 4 in the substation. The low-voltage electric energy output by the main transformer 4 is converted into a voltage suitable for supplying the load device 5, and the negative voltage is responsible for converting electric energy and performing work in the power system. The load device 5 and the main power transformer are interconnected through power lines such as cables and wires to receive electric energy and perform corresponding work.
[0025] Furthermore, the busbar 6 is connected to each load device 5 and other equipment through the switch device 7 to close or disconnect the circuit and control the transmission and distribution of electricity. The busbar 6 is a major component of the power system in the substation. The debugging device 2 will test the busbar 6 connectors, switch contacts, and grounding wires to ensure reliable connections and flexible operations.
[0026] Furthermore, when a fault or abnormal situation occurs, the protection device 8 can cut off the fault circuit in time to protect the safety of equipment and personnel. The debugging device 2 usually tests the logical control, action speed and sensitivity of the protection device 8 to ensure its reliability. The protection device protects the entire line power transportation to the auxiliary equipment 9 and subsequent equipment actually used to avoid damage to the auxiliary equipment 9 and the main equipment 10 due to data problems. The protection device is connected to the debugging device 2 and controlled by the first controller 3.
[0027] Furthermore, the auxiliary device 9 includes a monitoring system, a control system, and a communication device. The main device 10 is connected to the devices included in the auxiliary device 9. The system and equipment in the auxiliary device 9 are used for direct application of electricity and main device 10, providing power to the main device 10 while monitoring and controlling the status of the main device 10. The auxiliary device 9 and the main device 10 are connected as a whole to the debugging device 2, and the debugging device 2 can directly monitor and control the internal auxiliary device 9 and debugging device 2.
[0028] With the above structure, when it is necessary to debug the equipment in the power station, the second controller 1 first issues an instruction to the debugging device 2, and then the debugging device 2 issues an instruction to the first controller 3, and the first controller 3 starts the main transformer 4. The main transformer 4 will be connected to the load device 5 when starting, and the load device 5 will adjust the balance of power supply and demand. Finally, the main transformer 4 will open the switch device 7 through the bus 6. When the power passes through the protection device 8, the protection device 8 will detect the switch device 7. If there is a problem, the switch device 7 will be closed. Finally, the monitoring system and control system in the auxiliary device 9 start to work. The system in the auxiliary device 9 is connected to the main equipment 10 to debug and monitor the power supply and demand of the main equipment 10. When a fault or parameter problem occurs in the above item, the problem will be transmitted to the debugging device 2, and the debugging device 2 will feed back to the second controller 1. Finally, the staff will debug and change the equipment parameters and restart the debugging device 2 for observation and adjustment, and finally the substation system is debugged.
[0029] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A substation debugging system, characterized in that: include: The second controller (1), the debugging equipment (2), the first controller (3), the main transformer (4), the load equipment (5), the busbar (6), the switch equipment (7), the protection device (8), the auxiliary equipment (9), and the main equipment (10); The second controller (1) is connected to the debugging device (2), the debugging device (2) is connected to the first controller (3), the first controller (3) is connected to the main transformer (4), the main transformer (4) is connected to the load device (5) and the busbar (6), the busbar (6) is connected to the switch device (7), the switch device (7) is connected to the protection device (8), the protection device (8) is connected to the auxiliary device (9), and the auxiliary device (9) is connected to the main device (10).
2. According to claim 1, a substation debugging system is characterized in that: The debugging equipment (2) is used to perform electrical performance tests, insulation tests, and overload tests on the main transformer (4) and other equipment to ensure their normal operation and reliability.
3. According to claim 1, a substation debugging system is characterized in that: The main transformer (4) is the core equipment in the substation and is responsible for converting high-voltage electric energy into low-voltage electric energy to supply various equipment in the substation.
4. According to claim 1, a substation debugging system is characterized in that: The load device (5) is a terminal device of the power transmission system of the substation. The debugging device (2) will test the electrical performance and operating status of the load device (5) to ensure normal power supply and load balance.
5. According to claim 1, a substation debugging system is characterized in that: The busbar (6) is connected to each load device (5) and other devices through a switch device (7) to close or disconnect the circuit and control the transmission and distribution of electric power.
6. According to claim 1, a substation debugging system is characterized in that: When a fault or abnormal situation occurs, the protection device (8) can cut off the fault circuit in time to protect the safety of equipment and personnel. The debugging device (2) usually tests the logic control, action speed and sensitivity of the protection device (8) to ensure its reliability.
7. According to claim 1, a substation debugging system is characterized in that: The auxiliary equipment (9) includes a monitoring system, a control system, and a communication device, and the main equipment (10) is connected to the equipment included in the auxiliary equipment (9).