Assembling method of ship water inlet flow channel
By dividing the ship's water inlet runner into multiple parts, pre-assembled on the tire frame and assembled on the ship platform, MIG welding technology is used to solve the welding deformation problem, and the assembly efficiency and navigation performance are improved.
Patent Information
- Application Number
- CN202411210177.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, welding deformation is prone to occur during the assembly process of the ship's inlet runner, which affects the structural quality and assembly efficiency, and leads to poor navigation performance.
The water inlet runner is divided into four parts: thruster housing, elbow, runner cylinder and stern tube. The flow path cylinder is pre-assembled on the tire frame through multiple runner shell plates, and assembled on the boat platform. , MIG welding is used for positioning welding and double-sided welding to ensure structural accuracy and strength.
The deformation of the runner cylinder during the installation process is avoided, the assembly efficiency is improved, and the quality of the inlet runner and the propulsion and navigation performance of the ship are ensured.
Smart Images

Figure CN118953650A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ship construction, and in particular to an assembling method of a ship water intake channel. Background Art
[0002] The water jet boat absorbs water from the suction port under the bottom or side of the boat, and then sprays it out from the spray port. The reaction force generated by the water spray can propel the boat forward. The water inlet channel is the flow passage for water absorption, and its quality directly affects the propulsion and navigation performance of the boat. Since the water inlet channel has a complex curved surface, a special structure, and is made of aluminum alloy, in the existing technology, multiple loose parts are directly welded on the slipway, which is prone to welding deformation during the production process, affecting the structural quality and assembly efficiency.
[0003] Therefore, there is an urgent need for an assembly method for a ship water inlet channel to solve the above problems. Summary of the invention
[0004] The purpose of the present invention is to provide an assembly method for a ship water inlet channel, so as to solve the deformation problem during the assembly of the water inlet channel, thereby improving the quality and assembly efficiency of the water inlet channel and ensuring the propulsion and navigation performance of the ship.
[0005] To achieve this object, the present invention adopts the following technical solutions:
[0006] A method for assembling a water inlet channel of a ship, wherein the water inlet channel comprises a propeller housing, an elbow, a channel cylinder and a stern tube, wherein the elbow connects the propeller housing and the channel cylinder, the propeller housing is in a bell-mouth shape, and its small end faces the elbow, the stern tube is connected to the channel cylinder, and the channel cylinder comprises a plurality of channel shell plates, and the assembling method comprises:
[0007] A plurality of the flow channel shell plates are placed on the tire frame, the plurality of the flow channel shell plates are overlapped with each other, and the plurality of the flow channel shell plates are welded to form the flow channel cylinder;
[0008] The flow channel cylinder is removed from the tire frame and placed at a preset installation position on the slipway;
[0009] Welding the reinforcement assembly to the flow channel cylinder;
[0010] The transition plate is welded between the flow channel cylinder and the outer hull plate.
[0011] In some possible implementations, when welding a plurality of the flow channel shell plates, the process includes:
[0012] MIG welding is used for assembly and positioning welding of the butt joints, with a positioning welding length of 40mm-100mm and a spacing of 150mm-400mm;
[0013] Use semi-automatic MIG welding or automatic MIG welding for double-sided welding.
[0014] In some possible implementations, the reinforcement assembly includes a first part and a second part, the first part is close to the stern tube, and the second part is far away from the stern tube. When the reinforcement assembly is welded to the flow channel cylinder, it includes:
[0015] Welding the second portion to the flow channel barrel;
[0016] Welding the stern tube to the flow channel cylinder;
[0017] The first portion is welded to the flow channel cylinder.
[0018] In some possible implementations, before welding the second part to the flow channel barrel, the method further includes:
[0019] The flow channel cylinder is provided with intersecting holes;
[0020] The installation lines of the reinforcement components are marked on the flow channel cylinder and the hull outer plate.
[0021] In some possible implementations, when the stern tube is welded to the flow channel cylinder, the steps include:
[0022] hoisting the stern tube to an installation position;
[0023] Adjusting and trimming the intersecting hole according to the center line of the stern tube so that the center lines of the two coincide with each other, and realizing the positioning and installation of the stern tube;
[0024] Cutting the stern tube so that the stern tube has a preset length and the stern tube does not protrude from the inner wall of the flow channel cylinder;
[0025] The stern tube is welded to the flow channel cylinder.
[0026] In some possible implementations, the plurality of flow channel shell plates overlap each other to form a transverse annular butt seam and a longitudinal butt seam. When welding the plurality of flow channel shell plates to form a flow channel cylinder, the longitudinal butt seam is welded first and then the transverse annular butt seam is welded.
[0027] In some possible implementations, when welding the longitudinal butt seam and the transverse annular butt seam, a split-center back-welding method is used to weld from the middle toward the bow and stern, and an even number of welders perform welding symmetrically at the same time.
[0028] In some possible implementations, the transverse annular butt joint is divided into two symmetrical butt joints, and the butt joint is divided into six sections, which are symmetrically arranged from the middle to both sides as the first section, the second section, and the third section; when welding the transverse annular butt joint, the following steps are included:
[0029] Start welding from the two first sections facing away from each other toward the middle;
[0030] Start welding from the two second sections facing away from each other toward the middle;
[0031] Start welding the two third sections away from each other and work your way toward the center.
[0032] In some possible implementations, the following further includes:
[0033] Determine the longitudinal reference line on the hull;
[0034] Correcting the stern sealing plate of the thruster housing so that the verticality between the center line of the flow channel hole on the stern sealing plate and the mounting surface is less than a preset value;
[0035] Positioning and installing the tooling of the elbow;
[0036] Lifting the flow channel cylinder to the installation position;
[0037] Welding the flow channel cylinder to the hull stern tube to the flow channel cylinder;
[0038] The two ends of the elbow are connected to the propeller housing and the flow channel cylinder respectively.
[0039] In some possible implementations, the verticality between the center line of the flow channel hole on the stern seal plate and the mounting surface is less than 5 mm.
[0040] Beneficial effects of the present invention:
[0041] The present invention provides an assembly method for a water inlet channel of a ship, wherein the water inlet channel is divided into four parts, namely a thruster shell, an elbow, a channel cylinder and a stern pipe; the channel cylinder is divided into a plurality of channel shell plates, which are pre-assembled on a tire frame to form a channel cylinder, and then assembled with other structures. This can avoid the problem of deformation of the channel cylinder during the installation process, ensure the quality requirements of the channel cylinder, and then ensure the quality requirements of the water inlet channel, ensure the propulsion and navigation performance of the ship, and improve the assembly efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 is a cross-sectional view of a water inlet channel provided by a specific embodiment of the present invention;
[0043] Figure 2 is a cross-sectional view of a flow channel cylinder provided by a specific embodiment of the present invention;
[0044] Figure 3 It is a flow chart of an assembly method of a ship water intake channel provided by a specific embodiment of the present invention;
[0045] Figure 4 It is a schematic diagram of the welding sequence of the transverse annular butt joint provided by a specific embodiment of the present invention.
[0046] In the figure:
[0047] 1. Propeller housing; 11. Stern cover plate; 2. Elbow; 3. Flow channel cylinder; 31. Flow channel shell plate; 32. Transverse annular butt joint; 321. First section; 322. Second section; 323. Third section; 33. Longitudinal butt joint; 4. Stern tube; 5. Reinforcement assembly; 51. Transverse reinforcement; 52. Longitudinal reinforcement; 6. Transition plate. DETAILED DESCRIPTION
[0048] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0049] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0050] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0051] like Figure 1-Figure 3 As shown, this embodiment provides an assembly method for a water inlet channel of a ship, wherein the water inlet channel comprises a propeller housing 1, an elbow 2, a channel cylinder 3 and a stern tube 4, wherein the elbow 2 connects the propeller housing 1 and the channel cylinder 3, the propeller housing 1 is in a bell-mouth shape, with its small end facing the elbow 2, the stern tube 4 is connected to the channel cylinder 3, and the channel cylinder 3 comprises a plurality of channel shell plates 31. The assembly method comprises the following steps:
[0052] S1. Multiple flow channel shell plates 31 are placed on the tire frame, and the multiple flow channel shell plates 31 are overlapped with each other, and the multiple flow channel shell plates 31 are welded to form the flow channel cylinder 3; optionally, the flow channel shell plates 31 are welded according to the "assembly and welding" process method, and the welding shrinkage area is determined on site according to the structural layout. The seams of the flow channel shell plates 31 are temporarily overlapped as much as possible. After the welding of each shrinkage area is completed, the overlap seams are cut and welded to ensure the main size of the flow channel cylinder 3.
[0053] S2, the flow channel cylinder 3 is removed from the tire frame and placed at a preset installation position on the slipway;
[0054] S3, welding the reinforcing assembly 5 to the flow channel cylinder 3;
[0055] S4, welding the transition plate 6 between the flow channel cylinder 3 and the outer hull plate.
[0056] The water inlet channel is divided into four parts: the propeller housing 1, the elbow 2, the channel cylinder 3 and the stern tube 4. The channel cylinder 3 is divided into a plurality of channel shell plates 31. The plurality of channel shell plates 31 are pre-assembled on the tire frame to form the channel cylinder 3, and then assembled with other structures, which can avoid the problem of deformation of the channel cylinder 3 during the installation process, ensure the quality requirements of the channel cylinder 3, and then ensure the quality requirements of the water inlet channel, ensure the propulsion and navigation performance of the ship, and improve the assembly efficiency. The tire frame is a universal tire frame and will not be repeated.
[0057] Multiple flow channel shell plates 31 overlap each other to form transverse annular butt seams 32 and longitudinal butt seams 33. When welding multiple flow channel shell plates 31 to form the flow channel cylinder 3, the longitudinal butt seams 33 are welded first, and then the transverse annular butt seams 32 are welded. Optionally, the structural fillet welds on the flow channel shell plates 31 are welded last. When welding the longitudinal butt seams 33 and the transverse annular butt seams 32, the split-center back-welding method is used to weld from the middle to the bow and stern. An even number of welders weld symmetrically at the same time to avoid welding deformation. Control the deformation of the outer plate in a timely manner during the welding process, and do a good job of batch grinding after the butt weld is formed. Figure 4 As shown, for example, the transverse annular butt joint 32 is divided into two symmetrical butt joints, and the butt joint is divided into six sections, which are symmetrically arranged from the middle to both sides, namely, the first section 321, the second section 322 and the third section 323; when welding the transverse annular butt joint 32, it includes:
[0058] S11, welding starts from the sides of the two first sections 321 facing away from each other toward the middle; specifically, four welders weld the four first sections 321 located in the middle at the same time.
[0059] S12, welding starts from the sides of the two second sections 322 facing away from each other toward the middle; specifically, four welders weld the four second sections 322 simultaneously.
[0060] S13, welding starts from the sides of the two third sections 323 that are away from each other toward the middle. Specifically, four welders weld the four third sections 323 located at both ends simultaneously.
[0061] In other embodiments, the transverse annular butt seam 32 can be divided into two symmetrical butt seams, and the butt seam can be divided into two sections, four sections or eight sections, etc., without limitation, and four welders weld simultaneously.
[0062] When welding multiple flow channel shell plates 31, MIG welding is used for assembly positioning welding of the butt joints. The positioning welding length is 40mm-100mm, which can be 40mm, 50mm, 60mm, 70mm, 80mm, 90mm or 100mm, etc., and the spacing is 150mm-400mm, which can be 150mm, 200mm, 250mm, 300mm, 350mm or 400mm, etc., and can be appropriately encrypted according to the specific situation. After the positioning welding is completed, semi-automatic MIG welding or automatic MIG welding is adopted according to the relevant process requirements. Then, semi-automatic MIG welding or automatic MIG welding is adopted for double-sided welding. Specifically, the plate seams and butt joints of the flow channel shell plates 31 are semi-automatic MIG welding or automatic MIG welding for double-sided welding. By assembling positioning welding first, the structural positioning is realized, and then double-sided welding is performed to ensure the structural accuracy, facilitate welding, and ensure the structural strength.
[0063] Optionally, in step S1, mark the center line and rib inspection line corresponding to the tire frame, pull the steel wire and hang the plumb bob, mark the segmented rib inspection line with a punch mark, and mark the center line inspection line parallel to the center line at a position 100mm away from the center line. Mark the installation line of the reinforcement assembly 5 and other parts on the runner outer plate according to the drawing information, and the marking should be accurate and complete.
[0064] When welding the reinforcement assembly 5, the following installation welding sequence is included: welding the fillet welds between the transverse reinforcement member 51, such as the rib T-shaped web and the flow channel shell plate 31, welding the fillet welds between the longitudinal reinforcement member 52, such as the T-shaped web and the flow channel shell plate 31, and welding the butt joints between the transverse rib T-shaped profile and the longitudinal T-shaped profile.
[0065] The assembly method of the ship water inlet channel also includes the following steps:
[0066] S100, determining a longitudinal reference line on the hull. Specifically, according to the result of the shaft system illumination, determining the longitudinal reference line on the hull, pulling a steel wire and hanging a plumb bob, and marking a flow channel installation positioning reference line according to the technical requirements of the drawing;
[0067] S200, correcting the stern sealing plate 11 of the thruster housing 1, so that the verticality between the center line of the flow channel hole on the stern sealing plate 11 and the mounting surface is less than a preset value; illustratively, the verticality between the center line of the flow channel hole on the stern sealing plate 11 and the mounting surface is less than 5 mm. Furthermore, the verticality within a range of 150 mm around the flow channel hole is also less than 5 mm.
[0068] S300, positioning and installing the tooling of elbow 2;
[0069] S400, hoist the flow channel cylinder 3 to the installation position, and calibrate and assemble it according to the tooling of the elbow 2; adjust the lateral position, height position, and longitudinal position of the flow channel cylinder 3, and after completing the positioning of the flow channel cylinder 3, trim the lower weld margin and complete the welding.
[0070] S500, welding the flow channel cylinder 3 to the hull stern tube 4 to the flow channel cylinder 3;
[0071] S600, connecting the two ends of the elbow 2 to the propeller housing 1 and the flow channel cylinder 3 respectively.
[0072] Specifically, the propeller housing 1, elbow 2, flow channel cylinder 3 and stern tube 4 are all made of aluminum alloy and are manufactured by processing and welding. Among them, the propeller housing 1 is in a bell-mouth shape and is manufactured by machining. The elbow 2 component is composed of three sections of round tubes welded by rolling and processing of aluminum alloy sheets. The flow channel cylinder 3 is assembled and welded on the tire frame. The stern tube 4 is processed into semicircles from two aluminum plates and then welded. Each part is prepared in advance to ensure the structural accuracy of each part and avoid deformation. After that, it is assembled on the slipway to ensure the accuracy of the connection of each part, thereby ensuring the overall structural accuracy and preventing deformation.
[0073] The reinforcement component 5 includes a first part and a second part, the first part is close to the stern tube 4, and the second part is far from the stern tube 4. When the reinforcement component 5 is welded to the flow channel barrel 3, it includes: welding the second part to the flow channel barrel 3; welding the stern tube 4 to the flow channel barrel 3; after the welding of the stern tube 4 is completed, welding the first part to the flow channel barrel 3. Prevent the reinforcement component 5 from affecting the installation and welding of the stern tube 4.
[0074] Before welding the second part to the flow channel cylinder 3, it also includes: opening intersecting holes in the flow channel cylinder 3 to facilitate hole opening and prevent the reinforcement component 5 from affecting the hole opening; marking the installation line of the reinforcement component 5 on the flow channel cylinder 3 and the hull outer plate to ensure installation accuracy.
[0075] When the stern tube 4 is welded to the flow channel cylinder 3 in step S500, the following steps are included:
[0076] S501, hoisting the stern tube 4 to the installation position;
[0077] S502, adjusting and cutting the intersecting holes according to the center line of the stern tube 4, so that the center lines of the two coincide, and realizing the positioning and installation of the stern tube 4 to ensure the installation accuracy;
[0078] S503, cutting the stern tube 4 so that the stern tube 4 has a preset length and the stern tube 4 does not protrude from the inner wall of the flow channel cylinder 3, ensuring that the inner wall of the flow channel cylinder 3 is smooth and reducing water flow resistance;
[0079] S504, welding the stern tube 4 to the flow channel barrel 3. After the stern tube 4 is installed, the first part of the reinforcement component 5 is installed near the stern tube 4. The above structures are welded in a side-by-side welding manner. When welding the structures, the welding is performed symmetrically from the middle to the surroundings to reduce welding deformation.
[0080] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A method for assembling a ship water inlet channel, characterized in that: The water inlet flow channel comprises a propeller housing (1), an elbow (2), a flow channel cylinder (3) and a stern tube (4); the elbow (2) connects the propeller housing (1) and the flow channel cylinder (3); the propeller housing (1) is in a bell-mouth shape, with its small end facing the elbow (2); the stern tube (4) is connected to the flow channel cylinder (3); the flow channel cylinder (3) comprises a plurality of flow channel shell plates (31); and the assembling method comprises: A plurality of the flow channel shell plates (31) are placed on a tire frame, the plurality of the flow channel shell plates (31) are overlapped with each other, and the plurality of the flow channel shell plates (31) are welded to form the flow channel cylinder (3); The flow channel cylinder (3) is removed from the tire frame and placed at a preset installation position on the slipway; Welding the reinforcement component (5) to the flow channel barrel (3); A transition plate (6) is welded between the flow channel cylinder (3) and the outer hull plate.
2. The method for assembling a ship water intake channel according to claim 1, characterized in that: When welding a plurality of the flow channel shell plates (31), the process includes: MIG welding is used for assembly and positioning welding of the butt joints, with a positioning welding length of 40mm-100mm and a spacing of 150mm-400mm; Use semi-automatic MIG welding or automatic MIG welding for double-sided welding.
3. The method for assembling a ship water intake channel according to claim 1, characterized in that: The reinforcing assembly (5) comprises a first part and a second part, wherein the first part is close to the stern tube (4) and the second part is far from the stern tube (4). When the reinforcing assembly (5) is welded to the flow channel barrel (3), it comprises: Welding the second part to the flow channel barrel (3); Welding the stern tube (4) to the flow channel cylinder (3); The first part is welded to the flow channel cylinder (3).
4. The method for assembling a ship water intake channel according to claim 3, characterized in that: Before welding the second part to the flow channel barrel (3), the method further comprises: An intersecting hole is provided in the flow channel cylinder (3); The installation line of the reinforcement component (5) is marked on the flow channel cylinder (3) and the hull outer plate.
5. The method for assembling a ship water intake channel according to claim 4, characterized in that: When the stern tube (4) is welded to the flow channel cylinder (3), it includes: Lifting the stern tube (4) to an installation location; Adjusting and trimming the intersecting hole according to the center line of the stern tube (4) so that the center lines of the two coincide with each other, and achieving positioning and installation of the stern tube (4); Cutting the stern tube (4) so that the stern tube (4) has a preset length and the stern tube (4) does not protrude from the inner wall of the flow channel cylinder (3); The stern tube (4) is welded to the flow channel barrel (3).
6. The method for assembling a ship water intake channel according to claim 1, characterized in that: The plurality of flow channel shell plates (31) are overlapped with each other to form a transverse annular butt joint (32) and a longitudinal butt joint (33). When the plurality of flow channel shell plates (31) are welded to form a flow channel cylinder (3), the longitudinal butt joint (33) is welded first and then the transverse annular butt joint (32) is welded.
7. The method for assembling a ship water intake channel according to claim 6, characterized in that: When welding the longitudinal butt joint (33) and the transverse annular butt joint (32), a split-center back-welding method is used to weld from the middle toward the bow and stern, and an even number of welders perform welding symmetrically at the same time.
8. The method for assembling a ship water intake channel according to claim 7, characterized in that: Dividing the transverse annular butt joint (32) into two symmetrical butt joints, and dividing the butt joint into six sections, which are symmetrically arranged from the middle to both sides, namely, the first section (321), the second section (322), and the third section (323); When welding the transverse annular butt joint (32), the method comprises: Welding from the two first sections (321) away from each other toward the middle; Welding the two second sections (322) from the sides facing away from each other toward the middle; The welding is started from the sides of the two third sections (323) facing away from each other toward the middle.
9. The method for assembling a ship water intake channel according to any one of claims 1 to 8, characterized in that: Also includes: Determine the longitudinal reference line on the hull; Correcting the stern sealing plate (11) of the thruster housing (1) so that the verticality between the center line of the flow channel hole on the stern sealing plate (11) and the mounting surface is less than a preset value; Positioning and installing the tooling of the elbow (2); Lifting the flow channel cylinder (3) to an installation location; The flow channel cylinder (3) is welded to the stern tube (4) of the ship hull and welded to the flow channel cylinder (3); The two ends of the elbow (2) are respectively connected to the propeller housing (1) and the flow channel cylinder (3).
10. The method for assembling a ship water intake channel according to claim 9, characterized in that: The verticality between the center line of the flow channel hole on the stern sealing plate (11) and the mounting surface is less than 5 mm.
Citation Information
Patent Citations
Auxiliary manufacturing device for inflow pipeline for water spraying propelling device and manufacturing method
CN105234631A
Ship water inlet passage and manufacturing and installation method
CN108609147A
Reinforcing structure for water spraying propelling device
CN109455285A
Method for building water jet ship
JP2012076526A
Suction casing of water-jet propulsion unit
JP2014031059A