Bituminous pavement semi-rigid base loose non-foaming high polymer grouting treatment construction method
Through the non-destructive detection of three-dimensional ground penetrating radar and hammer-type deflector and the method of drilling and grouting of polymer materials without foaming, the construction problem of loose diseases of semi-rigid base layers of asphalt pavement is solved, and rapid, non-destructive and quantitative The treatment effect of the construction qualification rate and road service life have been improved.
Patent Information
- Application Number
- CN202411015543.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-15
AI Technical Summary
When dealing with loose diseases of semi-rigid base layers on asphalt pavement, the excavation scale is large, the construction difficulty is high, the construction qualification rate is insufficient, and the traffic interference is large, and the high expansion polymer grouting materials are controlled in the grouting volume. If it is not suitable, it can easily cause road bulge and top cracks, affecting the repair effect.
Non-destructive detection, positioning and testing are performed using three-dimensional ground penetrating radar and hammer-type deflector. Drilling holes do not foam polymer materials, grouting holes are arranged through plum blossom shapes, and prepolymerization is used for two components A and B polymers. The bulk material is mixed and grouting, the grouting pressure and flow rate are controlled, the grouting holes are closed and the quality inspection is carried out, and the high expansion problem of foamed polymers is avoided.
It realizes rapid, non-destructive, quantitative detection and treatment of loose diseases of semi-rigid bases without destroying the original pavement structure, improves construction qualification rate, avoids pavement bulge and top crack problems, simplifies construction technology, saves resources and The construction period extends the service life of the road surface.
Smart Images

Figure CN118958101A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of repair and reinforcement of asphalt pavement in highway engineering, in particular to a construction method for grouting treatment of loose non-foaming polymer on a semi-rigid base of an asphalt pavement. Background Art
[0002] According to statistics, more than 90% of the expressways under construction or completed in my country are semi-rigid base asphalt roads. The semi-rigid base has good integrity, high bearing capacity, low cost, and can be made from local materials. It also has excellent mechanical properties and road performance. Semi-rigid base materials have been widely used as the base and subbase of roads. The promotion and application of semi-rigid base has played a huge role in my country's expressway construction and economic development.
[0003] Due to the substandard design and construction of some roads, as well as the rapid growth of heavy traffic and traffic volume, the semi-rigid base of many roads has become loose and damaged to varying degrees before reaching its service life. Under the influence of load and environmental changes, the loose parts of the semi-rigid base will shrink structurally and cause cracks, which will eventually lead to the formation of reflective cracks in the road surface. Cracked pavement directly affects the quality and life of the road. Reflective cracks not only affect road performance and driving comfort, but also surface water and natural precipitation will seep through the reflective cracks, further damaging the base, causing the base to lose its bearing capacity and stability, resulting in more serious diseases such as air loss, mud pumping, and road structure damage.
[0004] For the loose disease of semi-rigid base, the commonly used disease treatment measures are: milling the surface layer, directly excavating and replacing the semi-rigid base. This method is time-consuming, labor-intensive, and costly, with a long construction period and a large social impact; another option is to perform cement grouting treatment on the loose diseased parts of the semi-rigid base. This method is a traditional method to solve the loose disease of the semi-rigid base. The basic principle of this method is to use the pressure of the grouting pump to press the mixed grouting material into the base or subbase through the grouting pipe until it penetrates into the roadbed, so as to achieve the purpose of fully filling the pores and consolidating the loose particles. Although this method has a relatively short construction period, it has large grouting holes, which causes certain damage to the road surface, and the grouting pressure is not easy to control. The fluidity of the liquid is not good, a certain amount of curing time is required, and the durability is not good. At present, polymer grouting technology is the most commonly used method for treating loose diseases of semi-rigid base layers. This method uses foamed polyurethane polymer grouting materials to fill, compact and consolidate loose particles of the semi-rigid base layer to achieve the requirements of improving the strength and bearing capacity of the semi-rigid base layer. Due to the high expansion characteristics of foamed polymers, its advantages have turned into unavoidable disadvantages in shallow grouting for pavement disease repair. If the grouting volume is not properly controlled or the surface layer is damaged, the high expansion can easily cause bulging and cracking of the asphalt surface layer, thereby further deepening the pavement disease, making the construction quality difficult to control and the construction qualification rate low.
[0005] Therefore, how to provide a construction method for treating loose non-foamed polymer grouting of semi-rigid base of asphalt pavement and provide a reliable basis for repairing loose diseases of semi-rigid base of asphalt pavement is an urgent problem to be solved by technical personnel in this field. Summary of the invention
[0006] The purpose of the present invention is to provide a construction method for treating loose non-foamed polymer grouting of a semi-rigid base of an asphalt pavement, which solves the industry problems of large excavation scale, great construction difficulty, insufficient construction qualification rate and great interference to traffic in treating loose defects of the semi-rigid base of an asphalt pavement.
[0007] To achieve the above object, the present invention provides a construction method for treating a loose non-foamed polymer grouting of a semi-rigid base of an asphalt pavement, comprising the following steps:
[0008] S1. Nondestructive testing and quantification of loose areas in semi-rigid base: Use three-dimensional ground penetrating radar to collect data, save and process the collected data, and obtain the loose position and depth range of the semi-rigid base;
[0009] S2, drop-hammer deflectometer test: according to the loose position and depth range of the semi-rigid base obtained in step S1, a drop-hammer deflectometer test is carried out on the loose area of the semi-rigid base, and the dynamic deflection value of the pavement before polymer grouting is recorded as l0;
[0010] S3. Arrange grouting holes: Determine the range of grouting holes according to the loose area of the semi-rigid base, and arrange the grouting holes in a plum blossom shape;
[0011] S4. Drilling: Verify the hole layout before drilling. When drilling, align the drill rod of the drilling rig with the center of the hole and be perpendicular to the road surface;
[0012] S5. Hole cleaning: After drilling, first clean the area around the hole to prevent stone chips from falling into the hole and blocking the grouting hole. Then use a hair dryer to clean the dust in the hole to keep the hole unobstructed.
[0013] S6. Install the grouting pipe and grouting head: The grouting pipe is made of PVC pipe. The length of the grouting pipe is the same as the thickness of the road surface. Put the grouting pipe into the grouting hole, clean the polymer consolidation body in the grouting head, and then install the grouting head on the grouting pipe at the hole mouth;
[0014] S7. Non-foaming polymer grouting: Use a clamp to clamp the grouting gun and the grouting head. The proportioning instrument delivers the A and B polymer prepolymer materials to the injection gun nozzle through the feed pipe at a volume ratio of 1:1. The two polymer prepolymer materials are mixed at the grouting gun nozzle and delivered to the loose diseased area through the grouting pipe. The slurry diffuses, fills and consolidates between the pores of the granular materials, so that the loose base material is re-consolidated through the polymer material.
[0015] S8. Close the grouting hole: After the grouting is completed, remove the grouting head, clean the PVC pipe and polymer consolidation body exposed at the grouting port, and use road caulking glue to close the grouting hole;
[0016] S9. Grouting quality inspection: Use a drop-hammer deflectometer to inspect the loose grouting area of the semi-rigid base, and record the dynamic deflection value of the pavement after polymer grouting as l1.
[0017] Preferably, in step S1, three-dimensional ground penetrating radar is used to collect data to quantitatively detect the depth and range of the loose area of the semi-rigid base layer.
[0018] Preferably, in step S2, the antenna system uses an air-coupled butterfly monopole antenna to collect data with a frequency from 100 MHz to 3 GHz.
[0019] Preferably, in step S3, the distance between adjacent grouting holes is The diameter of the grouting holes is 1.6cm to 2.0cm.
[0020] Preferably, when step S3 is implemented: the edge line of the grouting hole layout includes the edge line of the loose area of the semi-rigid base layer, ensuring that the loose disease edge of the semi-rigid base layer is fully grouted.
[0021] Preferably, during the implementation of step S4: when drilling to the location of the loose defect of the semi-rigid base layer, the drilling is lifted and back-drilled more than three times, the drilling depth is determined by the three-dimensional ground penetrating radar detection results according to the loose depth of the semi-rigid base layer, and the bottom of the hole is located at the bottom of the loose area of the semi-rigid base layer.
[0022] Preferably, when step S7 is implemented: the polymer used is a non-foaming polymer grouting material, and the grouting material is composed of two components of raw materials A and B;
[0023] The component A slurry is composed of polymeric polyol, flame retardant, surfactant and catalyst; the polymeric polyol is phthalic anhydride polyester polyol, and its mass fraction is 67.8%; the flame retardant is tri(1-chloro-2-propyl) phosphate, and its mass fraction is 30%; the surfactant is polysiloxane-polychlorinated olefin ether copolymer, and its mass fraction is 1%; the catalyst is triethylenediamine, and its mass fraction is 1.2%;
[0024] The B component slurry is mainly composed of isocyanate and plasticizer; the isocyanate is polyphenylmethane polyisocyanate, and its mass fraction is 70%; the plasticizer is dibutyl phthalate, and its mass fraction is 30%;
[0025] The grouting pressure is 3-5Mpa; the flow rate is controlled at 200-250ml / min; during the grouting process, when slurry emerges from the adjacent grouting holes, stop grouting, turn off the grouting gun safety, wait for 30s, and then slowly separate the grouting gun and grouting head.
[0026] Preferably, when step S9 is implemented: the time interval between the deflection detection time and the grouting end time is greater than 15 minutes.
[0027] Preferably, the reduction value of dynamic deflection of the pavement before and after grouting is If the requirements are met, the grouting is considered qualified. If the requirements are not met, additional injection is performed until the requirements are met.
[0028] Therefore, the present invention adopts the above-mentioned loose non-foaming polymer grouting treatment construction method of a semi-rigid base of an asphalt pavement, and the technical effects are as follows:
[0029] (1) Without destroying the overall structure of the original pavement, a minimally invasive process based on drilling is used to treat the loose disease of the semi-rigid base, and the minimally invasive area is no more than 3% of the total disease area;
[0030] (2) Use rapid non-destructive testing methods such as ground penetrating radar and drop weight deflectometer to accurately detect and quantitatively evaluate the depth, scope, and degree of loose defects in the semi-rigid base layer. At the same time, conduct testing after grouting to effectively control the treatment effect through non-destructive testing measures;
[0031] (3) The polymer material used in the present invention is a non-foaming polymer, which has a good filling and consolidation effect on the loose particles of the semi-rigid base, and the strength index of the consolidated body is not lower than that of the foaming polymer. Compared with the high expansion characteristics of the foaming polymer, the non-foaming polymer avoids the problem of foaming polymer in shallow grouting such as road surface disease repair. If the grouting amount is not properly controlled or the surface layer is damaged, it is very easy to cause bulging and top cracking of the asphalt surface layer;
[0032] (4) The present invention eliminates the need for a jacking monitoring system during foamed polymer grouting, simplifies the construction process, and improves the construction qualification rate.
[0033] Based on the above advantages, the invention discloses a method for treating loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement. The loose disease of the semi-rigid base can be quickly, non-destructively, quantitatively detected and evaluated, accurately treated, and the treatment effect is controllable. The construction process is simple, and the original road surface does not need to be excavated for treatment, and traffic can be quickly opened. At the same time, resources, construction costs and construction period are saved, the integrity of the semi-rigid base structure is enhanced, thereby extending the service life of the road surface, and it has significant economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 The present invention is a flow chart of a construction method for grouting treatment of loose non-foamed polymer on a semi-rigid base of an asphalt pavement. DETAILED DESCRIPTION
[0035] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.
[0036] Unless otherwise defined, technical or scientific terms used in the present invention shall have the common meanings understood by one having ordinary skills in the field to which the present invention belongs.
[0037] Embodiment 1
[0038] like Figure 1 As shown, it is a flow chart of a construction method for grouting treatment of loose non-foamed polymer on a semi-rigid base of an asphalt pavement according to the present invention, which comprises the following steps:
[0039] (1) Nondestructive detection and quantification of loose areas in semi-rigid base: First, a three-dimensional ground penetrating radar is used to quickly, nondestructively, and quantitatively detect the depth and range of loose areas in the semi-rigid base. The antenna system uses an air-coupled butterfly monopole antenna. This ultra-wideband butterfly monopole antenna has a series of continuous frequencies and can collect data from 100 MHz to 3 GHz. The collected data is then saved and processed to obtain the loose position and depth range of the semi-rigid base.
[0040] (2) Drop-hammer deflectometer test: Based on the test results of step (1), a drop-hammer deflectometer test is carried out on the loose area of the semi-rigid base, and the dynamic deflection value of the pavement before polymer grouting is recorded as l0;
[0041] (3) Arrangement of grouting holes: The range of grouting holes is determined according to the loose area of the semi-rigid base. The grouting holes are arranged in a plum blossom pattern, with the spacing between adjacent grouting holes being The diameter of the grouting hole is 1.6cm to 2.0cm. The edge line of the grouting hole layout should include the edge line of the loose area of the semi-rigid base to ensure that the edge of the loose disease of the semi-rigid base is fully grouted;
[0042] (4) Drilling: Before drilling, the hole layout should be verified. When drilling, the drill rod of the drill rig should be aligned with the hole center and perpendicular to the road surface. The drilling speed should be uniform and slow during the drilling process. The drilling depth should reach the bottom of the surface layer and the loose part of the base layer. When drilling to the loose disease position of the semi-rigid base layer, it should be lifted and back-drilled for more than 3 times. The drilling depth should be determined according to the loose depth of the semi-rigid base layer based on the results of the three-dimensional ground penetrating radar detection. The bottom of the hole should be at the bottom of the loose area of the semi-rigid base layer. It should not be over-drilled or under-drilled.
[0043] (5) Hole cleaning: After drilling, first clean the area around the hole to prevent stone chips from falling into the hole and blocking the grouting hole. Then use a hair dryer to clean the dust in the hole to keep the hole unobstructed.
[0044] (6) Install the grouting pipe and grouting head: The grouting pipe is made of PVC pipe. The length of the grouting pipe should be the same as the thickness of the pavement surface. Put the grouting pipe into the grouting hole, clean the polymer consolidation body in the grouting head, and then install the grouting head on the grouting pipe at the hole mouth;
[0045] (7) Polymer grouting: Use a clamp to clamp the grouting gun and the grouting head. The proportioning instrument conveys the two types of polymer prepolymer materials to the injection gun nozzle through the feed pipe according to the proportion. The two prepolymer materials are mixed at the injection gun nozzle and conveyed to the loose diseased area through the grouting pipe. The slurry diffuses, fills and consolidates between the pores of the particles, so that the loose base material is re-consolidated through the non-foaming polymer material, thereby achieving the effect of reinforcing the base. The polymer used is a non-foaming polymer grouting material. The grouting material is composed of two components, A and B. The slurry of component A is mainly composed of polymer polyol, flame retardant, surfactant and catalyst, and the slurry of component B is mainly composed of isocyanate and plasticizer;
[0046] The polymer polyol adopts phthalic anhydride polyester polyol, and its mass fraction is 67.8%; the flame retardant adopts tris (1-chloro-2-propyl) phosphate, and its mass fraction is 30%; the surfactant adopts polysiloxane-polychlorinated olefin ether copolymer, and its mass fraction is 1%; the catalyst adopts triethylene diamine, and its mass fraction is 1.2%;
[0047] The isocyanate is polyphenylmethane polyisocyanate, and its mass fraction is 70%; the plasticizer is dibutyl phthalate, and its mass fraction is 30%;
[0048] The grouting pressure should be determined according to the looseness of the semi-rigid base, and should generally be controlled at 3-5Mpa; the flow rate should be controlled at 200-250ml / min; during the grouting process, when slurry emerges from the adjacent grouting holes, the grouting should be stopped, the grouting gun safety should be turned off, and after waiting for about 30 seconds, the grouting gun and the grouting head should be slowly separated;
[0049] (8) Sealing the grouting hole: After the grouting is completed, remove the grouting head, clean the PVC pipe and polymer consolidation body exposed at the grouting port, and seal the grouting hole with road caulking glue to prevent rainwater from infiltrating and damaging the pavement structure;
[0050] (9) Grouting quality inspection: Use a drop-hammer deflectometer to inspect the loose grouting area of the semi-rigid base and record the dynamic deflection value of the pavement after polymer grouting as l1. The time interval between the deflection inspection and the end of grouting should be greater than 15 minutes;
[0051] Reduction value of dynamic deflection of pavement before and after grouting If the requirements are met, the grouting is judged to be qualified. If the requirements are not met, additional injection should be carried out until the requirements are met.
[0052] The method proposed in the present invention was used to test a road surface with loose semi-rigid base defects. The test results are as follows:
[0053] Table 1 Test results
[0054]
[0055] Therefore, the present invention adopts the above-mentioned loose non-foamed polymer grouting treatment construction method of the semi-rigid base of asphalt pavement, which solves the industry problems of large excavation scale, high construction difficulty, insufficient construction qualification rate and great interference to traffic in the treatment of loose semi-rigid base diseases of asphalt pavement.
[0056] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A construction method for treating loose non-foamed polymer grouting of semi-rigid base of asphalt pavement, characterized in that: The following steps are involved: S1. Nondestructive testing and quantification of loose areas in semi-rigid base: Use three-dimensional ground penetrating radar to collect data, save and process the collected data, and obtain the loose position and depth range of the semi-rigid base; S2, drop-hammer deflectometer test: according to the loose position and depth range of the semi-rigid base obtained in step S1, a drop-hammer deflectometer test is carried out on the loose area of the semi-rigid base, and the dynamic deflection value of the pavement before polymer grouting is recorded as l0; S3. Arrange grouting holes: Determine the range of grouting holes according to the loose area of the semi-rigid base, and arrange the grouting holes in a plum blossom shape; S4. Drilling: Verify the hole layout before drilling. When drilling, align the drill rod of the drilling rig with the center of the hole and be perpendicular to the road surface; S5. Hole cleaning: After drilling, first clean the area around the hole to prevent stone chips from falling into the hole and blocking the grouting hole. Then use a hair dryer to clean the dust in the hole to keep the hole unobstructed. S6. Install the grouting pipe and grouting head: The grouting pipe is made of PVC pipe. The length of the grouting pipe is the same as the thickness of the road surface. Put the grouting pipe into the grouting hole, clean the polymer consolidation body in the grouting head, and then install the grouting head on the grouting pipe at the hole mouth; S7. Non-foaming polymer grouting: Use a clamp to clamp the grouting gun and the grouting head. The proportioning instrument delivers the A and B polymer prepolymer materials to the injection gun nozzle through the feed pipe at a volume ratio of 1:
1. The two polymer prepolymer materials are mixed at the grouting gun nozzle and delivered to the loose diseased area through the grouting pipe. The slurry diffuses, fills and consolidates between the pores of the granular materials, so that the loose base material is re-consolidated through the polymer material. S8. Close the grouting hole: After the grouting is completed, remove the grouting head, clean the PVC pipe and polymer consolidation body exposed at the grouting port, and use road caulking glue to close the grouting hole; S9. Grouting quality inspection: Use a drop-hammer deflectometer to inspect the loose grouting area of the semi-rigid base, and record the dynamic deflection value of the pavement after polymer grouting as l1.
2. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: In step S1, three-dimensional ground penetrating radar is used to collect data to quantitatively detect the depth and range of the loose area of the semi-rigid base.
3. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: In step S2, the antenna system uses an air-coupled butterfly monopole antenna to collect data with a frequency range from 100 MHz to 3 GHz.
4. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: In step S3, the distance between adjacent grouting holes is The diameter of the grouting holes is 1.6cm to 2.0cm.
5. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: When step S3 is implemented: the edge line of the grouting hole layout includes the edge line of the loose area of the semi-rigid base, ensuring that the loose disease edge of the semi-rigid base is fully grouted.
6. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: When step S4 is implemented: when drilling to the location of the loose disease of the semi-rigid base, lift and back drill more than 3 times, the drilling depth is determined by the three-dimensional ground penetrating radar detection results according to the loose depth of the semi-rigid base, and the bottom of the hole is located at the bottom of the loose area of the semi-rigid base.
7. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: When step S7 is implemented: the polymer used is a non-foaming polymer grouting material, and the grouting material is composed of two components of raw materials A and B; The component A slurry is composed of polymeric polyol, flame retardant, surfactant and catalyst; the polymeric polyol is phthalic anhydride polyester polyol, and its mass fraction is 67.8%; the flame retardant is tri(1-chloro-2-propyl) phosphate, and its mass fraction is 30%; the surfactant is polysiloxane-polychlorinated olefin ether copolymer, and its mass fraction is 1%; the catalyst is triethylenediamine, and its mass fraction is 1.2%; The B component slurry is mainly composed of isocyanate and plasticizer; the isocyanate is polyphenylmethane polyisocyanate, and its mass fraction is 70%; the plasticizer is dibutyl phthalate, and its mass fraction is 30%; The grouting pressure is 3-5Mpa; the flow rate is controlled at 200-250ml / min; during the grouting process, when slurry emerges from the adjacent grouting holes, stop grouting, turn off the grouting gun safety, wait for 30s, and then slowly separate the grouting gun and grouting head.
8. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: When step S9 is implemented: the time interval between the deflection detection time and the grouting end time is greater than 15 minutes.
9. The method for treating a loose non-foamed polymer grouting on a semi-rigid base of an asphalt pavement according to claim 1 is characterized in that: Reduction value of dynamic deflection of pavement before and after grouting When the requirements are met, the grouting is judged to be qualified. When the requirements are not met, additional injection is carried out until the requirements are met.