The invention discloses a full-space
bolting-grouting cooperative control method for roadway surrounding rock gradient damage, belongs to the technical field of mine roadway surrounding rock control, and solves the problems that a traditional
bolting-grouting process is low in step-by-step construction efficiency, poor in
slurry and gradient fracture adaptability, prone to failure of the end of an anchor rod cable and the like. According to the method, grouting sleeves with different lengths are additionally arranged at the end of the anchor rod cable, so that the anchor rod cable has the grouting capacity, and
bolting and grouting collaborative operation is achieved; the method comprises the following steps: firstly, actually measuring gradient distribution of surrounding rock fractures to determine the length of a sleeve, then installing the sleeve with a hole sealing sleeve, applying a pre-tightening force, injecting common
cement paste into a shallow part by using a short sleeve, injecting superfine
cement paste into a deep part by using a long sleeve, and meanwhile, dynamically monitoring the surrounding rock fractures and triggering supplementary grouting. Gradient precise grouting is achieved, the
shear resistance of the anchor rod cable is enhanced, the integrality of surrounding rock is improved,
slurry waste is reduced, and the construction efficiency and the reliability and long-term stability of a
supporting system are improved.