Protective device for hanging basket construction

By designing a protective device with movable and connectable columns and flexible netting, the problem of inconvenient dismantling of protective devices during bridge construction, such as during bridge closure or in windy weather, was solved. This enabled efficient dismantling and storage, reduced the risk of device damage, improved construction efficiency, and saved resources.

CN118958164APending Publication Date: 2024-11-15JINAN COMM DEV INVESTMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411319049.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-21
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

Existing bridge construction protection devices are inconvenient to dismantle and store during bridge closure or in windy weather, and are easily damaged by wind, resulting in low construction efficiency and waste of resources.

Method used

The protective device is designed with a combination of a protective net, posts, and a flexible net. The posts can be movably connected to the crossbeams, and the flexible net deforms with the posts for easy storage. Combined with reinforcing rods and locking screw holes, stability is ensured and the impact of wind is reduced.

Benefits of technology

It simplifies the dismantling and storage process of protective devices, reduces manpower and material consumption, improves construction efficiency, reduces the risk of device damage, and saves construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958164A_ABST
    Figure CN118958164A_ABST
Patent Text Reader

Abstract

The invention relates to the field of bridge hanging basket construction, in particular to a hanging basket construction protection device which comprises a protection net, and the protection net comprises cross beams, stand columns and a flexible net. The cross beam is installed on the sliding cantilever, the stand column is movably connected to the cross beam, and the flexible net is installed on the stand column. The protection device has the effect that the protection device can be conveniently detached and stored under the influence of bridge section closure or strong wind weather.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of bridge hanging basket construction, and in particular to a protective device for hanging basket construction. Background Art

[0002] During the construction of a bridge, the piers are usually constructed first and then the bridge body is constructed in sections based on the piers. The construction of the bridge is completed by connecting several sections of the bridge body in sequence.

[0003] In the existing related technologies, the construction of the bridge body is generally carried out by the hanging basket method, that is, by setting a sliding cantilever on the top of the bridge body, using the sliding cantilever to suspend and fix the inner formwork, outer formwork, construction platform and safety guardrail, and the construction workers complete the pouring construction of the bridge body between the inner formwork and the outer formwork under the protection of the construction platform and the safety guardrail. For details, please refer to the utility model patent with publication number CN 217203660 U, entitled a device for protecting the bottom slat of a bridge continuous beam during hanging basket construction.

[0004] Furthermore, in order to prevent construction materials from falling from a height and ensure the safety of construction workers working on the construction platform, the sliding cantilever is usually also equipped with a protective device, which includes a protective net and a bottom plate. The protective net is assembled by steel pipes, steel mesh, iron wire and clamps, and the protective net is installed on the sliding cantilever by bolts. The height dimension of the protective net is close to the height dimension of the bridge body, and the inner formwork, outer formwork, construction platform and safety guardrail are all located in the area enclosed by the protective net, so that construction workers are not likely to fall. The bottom plate is installed at the bottom of the protective net by bolts, and the inner formwork, outer formwork, construction platform and safety guardrail are all located on the top of the bottom plate, so as to receive the fallen construction materials through the bottom plate. Specifically, it can be combined with reference to the publication number CN 11517367 A, named a utility model patent for a hanging basket with low clearance construction structure.

[0005] With regard to the above-mentioned related technologies, the protective device is large in size and has many parts, which makes it inconvenient to remove or store the protective device when the bridge end is closed or affected by strong winds (winds above level 6). Summary of the invention

[0006] In order to facilitate the removal and storage of the protective device during the closure of bridge sections or under the influence of strong winds, the present application provides a protective device for hanging basket construction.

[0007] The protective device for hanging basket construction provided in this application adopts the following technical solution: A protective device for hanging basket construction, comprising a protective net, wherein the protective net comprises a crossbeam, a column and a flexible net; The crossbeam is installed on the sliding cantilever, the column is movably connected to the crossbeam, and the flexible net is installed on the column.

[0008] By adopting the above technical solution, when the protective device needs to be dismantled and stored, the column is moved toward the position of the beam, and the flexible net is deformed accordingly with the movement of the column, so that the column, flexible net and beam are stored. As a result, the protective device is easier to dismantle and store when the bridge section is closed or in windy weather, and there is no need to dismantle a large number of steel pipes, steel meshes, iron wires and hoops one by one, which saves manpower and material resources in bridge construction and improves the construction efficiency of the bridge.

[0009] In addition, by reducing the difficulty of storing columns, beams and flexible nets in windy weather, the situation where columns, beams and flexible nets are significantly affected by wind and easily damaged by wind due to the open bridge construction site, high working surface height and large wind resistance of flexible nets is reduced, thereby reducing the loss of bridge construction.

[0010] 021 Optionally, the column is rotatably matched with the beam.

[0011] By adopting the above technical solution, the connection relationship between the column and the beam is relatively simple, which is convenient for adjusting the posture of the column for storage and for ensuring the stability of the column and the beam as a whole.

[0012] 032 Optionally, there are a plurality of columns, and the plurality of columns are distributed along the length direction of the crossbeam. One end of the column is rotatably engaged with the crossbeam, and the other end of the column is provided with a connecting seat, and the connecting seat is detachably mounted on the sliding cantilever.

[0013] By adopting the above technical solution, after a number of columns are installed on the sliding cantilever, the connection relationship between the beam and the column can be stable, and there is no need to further perform secondary assembly between the beam and the column.

[0014] 043 Optionally, a connecting seat is installed on the top of the column, and the connecting seat is provided with a connecting through hole. The column is installed on the sliding cantilever by means of bolts passing through the connecting through hole.

[0015] By adopting the above technical solution, the column is installed on the sliding cantilever by bolts, which is convenient for ensuring the stability of the connection and also convenient for disassembly and assembly of the column.

[0016] 051 Optionally, the flexible net has mesh holes, and the mesh hole diameter of the flexible net is less than 50 mm.

[0017] By adopting the above technical solution, the wind resistance of the flexible net is reduced while ensuring the protective effect of the flexible net on construction workers.

[0018] 061 Optionally, the column is equipped with a hanging ring.

[0019] By adopting the above technical solution, the hanging ring makes it easy for the flexible net to be installed on the column, and it is convenient for construction workers to assemble the flexible net on site.

[0020] 071 Optionally, the column is equipped with a reinforcement rod, and the reinforcement rod is installed on the crossbeam.

[0021] By adopting the above technical solution, the reinforcement rods reinforce the columns and beams, so that the connection between the columns and beams is more stable, and it is not easy to be damaged by the pulling of the flexible net under the action of strong winds.

[0022] 087 Optionally, the reinforcement rod is rotatably connected to the column.

[0023] By adopting the above technical solution, the connection relationship between the column and the reinforcement rod is relatively simple, which is convenient for adjusting the posture of the reinforcement rod for storage, and is also convenient for ensuring the stability of the column, beam and reinforcement rod as a whole.

[0024] 098 Optionally, one end of the reinforcement rod is rotatably engaged with the column, and the other end of the reinforcement rod is provided with a reinforcement hole, and the reinforcement rod is installed on the crossbeam by means of bolts passing through the reinforcement hole.

[0025] By adopting the above technical solution, the reinforcement rod is rotated to the position of the crossbeam, and then installed on the crossbeam by bolts. The operation is simple and the difficulty of removing and storing the protective device is reduced.

[0026] 109 Optionally, the crossbeam is provided with a locking screw hole.

[0027] By adopting the above technical solution, when the protective device is stored, the reinforcement rod is rotated to the position of the locking screw hole, and then the reinforcement rod is locked and installed on the beam, so that the column, reinforcement rod and flexible net are not easily loosened under the influence of external force or wind.

[0028] In summary, the present application includes at least one of the following beneficial technical effects: 1. When the protective device needs to be dismantled and stored, the column moves toward the position of the beam, and the flexible net deforms accordingly with the movement of the column, so that the column, flexible net and beam are stored. This makes it easier to dismantle and store the protective device when the bridge section is closed or in windy weather. There is no need to dismantle a large number of steel pipes, steel meshes, iron wires and hoops in sequence, which saves manpower and material resources for bridge construction and improves the construction efficiency of the bridge; In addition, by reducing the difficulty of storing the vertical columns, cross beams and flexible nets in strong wind weather, the situation where the vertical columns, cross beams and flexible nets are significantly affected by the wind force and easily damaged by the wind force due to the open construction site of the bridge, the high working surface height and the large wind resistance of the flexible nets is reduced, thereby reducing the loss of bridge construction. Brief Description of the Drawings

[0029] Figure 1 is the first schematic diagram of the protective device for hanging basket construction in an embodiment of the present application.

[0030] Figure 2 is the second schematic diagram of the protective device for hanging basket construction in an embodiment of the present application.

[0031] Figure 3 is the overall schematic diagram of the cross beam, vertical column and reinforcement rod in an embodiment of the present application.

[0032] Description of the reference numerals: 1, protective net; 101, reinforcement hole; 102, locking screw hole; 11, cross beam, 12, vertical column; 121, connecting seat; 122, hanging ring; 123, reinforcement rod; 13, flexible net; 2, bottom hopper plate. Detailed Description of the Embodiment

[0033] The following will further describe the present application in detail Figure 1-3 with reference to the accompanying drawings.

[0034] An embodiment of the present application discloses a protective device for hanging basket construction. Referring to Figure 1 and Figure 2 , the protective device for hanging basket construction is installed at the bottom of the sliding cantilever. The protective device for hanging basket construction includes a protective net 1 and a bottom hopper plate 2. There are three protective nets 1, and the three protective nets 1 are distributed in a "U" shape, and the three protective nets 1 enclose the construction platform and the safety guardrail. The height dimension of the protective net 1 is greater than the height dimension of the safety guardrail, so that construction workers are not likely to have safety accidents due to climbing over the safety guardrail. The bottom hopper plate 2 is located at the bottom of the protective net 1, and the bottom hopper plate 2 is installed on the construction platform by bolts, and the three protective nets 1 are all located within the area enclosed by the bottom hopper plate 2.

[0035] Referring to Figure 1 , Figure 2 and Figure 3 , the protective net 1 includes a cross beam 11, a vertical column 12 and a flexible net 13. The cross beam 11 is provided with two bolt holes, and the two bolt holes are respectively located at both ends of the cross beam 11. The cross beam 11 is installed on the construction platform by bolts passing through the bolt holes, so that the cross beam 11 is installed on the sliding cantilever through the construction platform, so that the cross beam 11 moves along the bridge length direction together with the sliding cantilever.

[0036] There are two upright posts 12, which are located at the two ends of the beam 11, and both upright posts 12 are located at the two ends of the beam 11. The bottom end of the upright post 12 is movably connected to the beam 11, so that the upright post 12 can move toward the beam 11. In the present application, the active connection between the upright post 12 and the beam 11 can be: sliding fit, rotation fit and / or elastic fit. The sliding fit between the upright post 12 and the beam 11 can be achieved by a slide rail and / or a slide groove; The rotational cooperation between the column 12 and the beam 11 can be realized by a rotation shaft and / or a rotation groove. It should be noted that the rotational cooperation method referred to in this application is not limited to a single-direction rotation method around a single rotation shaft, but also includes a multi-directional rotation method such as a rotation through a universal ball; The elastic fit between the column 12 and the cross beam 11 can be achieved by rubber blocks, elastic sheets and / or springs. In addition, a driving member can be provided between the column 12 and the cross beam 11 so that the column 12 and the cross beam 11 can move automatically through the driving member. The driving member can be a motor, an oil cylinder and / or an air cylinder.

[0037] Specifically in the embodiment of the present application, the movable connection method between the column 12 and the beam 11 is rotational cooperation, and the rotational cooperation between the column 12 and the beam 11 is realized by direct connection through a rotating shaft, and no driving part is provided between the column 12 and the beam 11, so as to reduce the manufacturing cost, use cost and maintenance cost of the protective net 1, so that the protective net 1 is not easily damaged in severe weather such as heavy rain, wind and snow.

[0038] Reference Figure 3 A connection seat 121 is fixedly mounted on the top of the column 12, and the connection seat 121 is detachably mounted on the sliding cantilever. The detachable connection between the connection seat 121 and the sliding cantilever can be achieved by a pin, a bolt, a nut and / or a rope bundle.

[0039] Specifically, in the embodiment of the present application, the connection seat 121 is provided with a plurality of connection holes along its thickness direction. The column 12 is mounted on the sliding cantilever by bolts passing through the connection holes, so that the column 12 and the beam 11 are firmly mounted on the sliding cantilever, reducing the shaking of the beam 11.

[0040] Reference Figure 3The column 12 is fixedly mounted with a plurality of hanging rings 122, which are distributed along the length direction of the column 12, and the flexible net 13 is mounted on the column 12 through the hanging rings 122. The connection between the flexible net 13 and the hanging ring 122 can be achieved through a hook, a spring buckle and / or a rope bundle, and specifically in the embodiment of the present application, the flexible net 13 is mounted on the hook through a plurality of spring buckles (not shown in the figure) fixedly mounted on the flexible net 13, so that when the bridge section is closed or affected by strong winds, the flexible net 13 can be removed separately and urgently, so as to reduce the situation where the protective device hinders the closing or is damaged.

[0041] The flexible net 13 is flexible, and the flexible net 13 has meshes, and the mesh diameter of the flexible net 13 is less than 50 mm. In the present application, the flexible net 13 is flexible means that the flexible net 13 can be bent and twisted only by manpower, and the flexible net 13 can be restored to its original state only by manpower after bending and twisting. The flexible net 13 can be formed by directly opening meshes in a flexible material, or woven by a flexible material. The flexible material can be: natural material and / or artificial material. Natural materials include cotton or linen. Artificial materials include nylon, polyester fiber, polypropylene, polyethylene and aramid. Specifically in the embodiment of the present application, the flexible net 13 is woven by nylon rope.

[0042] Reference Figure 3 The column 12 is installed with a reinforcing rod 123, and one end of the reinforcing rod 123 away from the column 12 is installed on the cross beam 11. When the reinforcing rod 123 is installed on the cross beam 11, the column 12, the reinforcing rod 123 and the cross beam 11 are distributed in a triangle to ensure the stability between the column 12, the reinforcing rod 123 and the cross beam 11. The connection between the reinforcing rod 123 and the column 12 can be: sliding fit, rotation fit and / or disassembly fit. For the connection between the reinforcing rod 123 and the column 12 in a disassembly fit manner, it can be achieved by bolts and / or pins, and preferably by bolt connection.

[0043] Specifically in the embodiment of the present application, one end of the reinforcement rod 123 is rotatably engaged with the column 12, and a reinforcement hole 101 is opened at the other end of the reinforcement rod 123. The reinforcement hole 101 is arranged through the thickness direction of the reinforcement rod 123, and the reinforcement rod 123 is installed on the beam 11 by a bolt passing through the reinforcement hole 101, so that the reinforcement rod 123 can be stored or unfolded by rotating the reinforcement rod 123. When the reinforcement rod 123 needs to be stored, it is only necessary to rotate the bolt at one end of the reinforcement rod 123 to store the reinforcement rod 123, which is convenient and quick, and reduces the time for construction personnel to work at heights in bad weather.

[0044] Reference Figure 3The cross beam 11 is provided with a locking screw hole 102, which is arranged near the middle of the cross beam 11. When the reinforcing rod 123 needs to be stored, the column 12 and the reinforcing rod 123 are rotated so that the reinforcing rod 123 is installed in the locking screw hole 102 by means of bolts, thereby the reinforcing rod 123 locks the rotation of the column 12, and the flexible net 13 between the column 12 and the cross beam 11 is clamped by the column 12 and is not easily blown away by wind.

[0045] The implementation principle of a protective device for hanging basket construction in the embodiment of the present application is: When installing the guard: S1. Install the cross beam 11 on the construction platform by bolts, and install the bottom plate 2 on the bottom of the construction platform by bolts; S2, rotating the column 12, and then installing it on the sliding cantilever through the bolts penetrating the connecting seat 121, so that the flexible net 13 is unfolded; S3, rotating the reinforcing rod 123, and then installing the reinforcing rod 123 on the crossbeam 11 by means of bolts.

[0046] When removing the guard: S1, turning the bolts to remove the reinforcing rod 123 from the beam 11; S2, turn the bolts to remove the self-sliding cantilever of the column 12; S3, rotate the column 12 toward the position of the beam 11, and install the reinforcing rod 123 in the locking screw hole 102 by bolts, so that the column 12 and the flexible net 13 are not easy to loosen, and the flexible net 13 is stored, so that it is not easy to be damaged by strong wind.

[0047] S4. Remove the cross beam 11 and the bottom plate 2 so that the protective device will not easily hinder the construction when the bridge section is connected.

[0048] Therefore, the present application reduces the difficulty of removing the protective device through the easy-to-remove and rotatable columns 12 and the flexible net 13 that can be deformed with the rotation of the columns 12, so that under the influence of strong winds, only the columns 12 need to be disassembled and assembled to fold and store the flexible net 13 that is greatly affected by the wind, thereby reducing the damage to the protective device. Moreover, when the bridge section is closed, only the crossbeam 11 and the bottom plate 2 need to be further removed to complete the removal of the entire protective device, without the need to remove a large number of steel pipes, steel meshes, iron wires, and clamps in sequence, thus saving manpower and material resources for bridge construction and improving the construction efficiency of the bridge, thereby facilitating the removal and storage of the protective device when the bridge section is closed or under the influence of strong winds.

[0049] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A protective device for hanging basket construction, characterized in that: It comprises a protective net (1), wherein the protective net (1) comprises a crossbeam (11), a column (12) and a flexible net (13); The crossbeam (11) is installed on the sliding cantilever, the column (12) is movably connected to the crossbeam (11), and the flexible net (13) is installed on the column (12).

2. The protective device for hanging basket construction according to claim 1 is characterized in that: The upright column (12) is rotatably matched with the cross beam (11).

3. A protective device for hanging basket construction according to claim 2, characterized in that: A plurality of the columns (12) are provided, and the plurality of the columns (12) are distributed along the length direction of the cross beam (11). One end of the column (12) is rotatably matched with the cross beam (11), and the other end of the column (12) is installed with a connecting seat (121), and the connecting seat (121) can be detachably installed on the sliding cantilever.

4. The protective device for hanging basket construction according to claim 3 is characterized in that: A connecting seat (121) is installed on the top of the column (12), the connecting seat (121) is provided with a connecting through hole, and the column (12) is installed on the sliding cantilever by means of bolts passing through the connecting through hole.

5. The protective device for hanging basket construction according to claim 1 is characterized by: The flexible net (13) has meshes, and the mesh diameter of the flexible net (13) is less than 50 mm.

6. The protective device for hanging basket construction according to claim 1 is characterized by: The upright post (12) is provided with a hanging ring (122).

7. The protective device for hanging basket construction according to claim 1 is characterized by: The upright column (12) is provided with a reinforcing rod (123), and the reinforcing rod (123) is installed on the crossbeam (11).

8. The protective device for hanging basket construction according to claim 7 is characterized by: The reinforcement rod (123) is rotatably connected to the column (12).

9. The protective device for hanging basket construction according to claim 8, characterized in that: One end of the reinforcing rod (123) is rotatably engaged with the column (12), and the other end of the reinforcing rod (123) is provided with a reinforcing hole (101). The reinforcing rod (123) is mounted on the crossbeam (11) via a bolt passing through the reinforcing hole (101).

10. The protective device for hanging basket construction according to claim 9, characterized in that: The crossbeam (11) is provided with a locking screw hole (102).