Hammering energy acquisition system for standard penetration test and standard penetration test method

By using accelerometers and strain sensors in the standard penetration test, combined with a data acquisition unit and a terminal analysis and display unit, the problem of correcting the hammer impact number N was solved, enabling accurate measurement of hammer impact energy and improving the test depth and testing capability in complex formations.

CN118958252APending Publication Date: 2024-11-15POWER CHINA KUNMING ENG CORP LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411221679.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In existing standard penetration tests, the correction of the number of blows N limits the test depth and application scope. In particular, it is difficult to accurately measure the attenuation law of the blow energy in ultra-deep and complex strata, which affects the accuracy of the test results and the basis for correction.

Method used

Using an integrated adapter with an accelerometer and strain sensor, and through a data acquisition unit and a terminal analysis and display unit, the acceleration, hammering force, and hammering energy during the hammering process are measured in real time. The standard penetration test is then conducted using the free-fall hammer method with automatic unhooking, and the hammering energy data is recorded.

Benefits of technology

It improves the metrological accuracy of standard penetration test results, can accurately measure the attenuation law of hammer impact energy, provides a basis for correction in ultra-deep formations, and enhances the testing depth and testing capability in complex formations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958252A_ABST
    Figure CN118958252A_ABST
Patent Text Reader

Abstract

The invention provides a hammering energy acquisition system for a standard penetration test and a standard penetration test method, the system comprises an integrated adapter, a data acquisition unit and a terminal analysis display unit, the integrated adapter comprises an acceleration sensor, a strain sensor, a movable cover plate, an upper joint, a lower joint, an exhaust hole and a water stop rubber ring; the acceleration sensor and the strain sensor are fixed in the integrated adapter; the upper joint and the lower joint are located at upper and lower ends of the integrated adapter; the exhaust hole is located in the lower end of the integrated adapter and connected with a center hole of the drill rod. The water stop rubber ring is positioned between the integrated adapter and the movable cover plate; the data acquisition unit is connected with the acceleration sensor and the strain sensor; and the terminal analysis display unit is connected with the data acquisition unit. According to the invention, the acceleration and the hammering force of the standard penetration test in the hammering process can be measured, so that the hammering energy is obtained, and the accuracy of standard penetration test result metering is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of in-situ testing of geotechnical engineering geological survey, and in particular to a hammer energy collection system for a standard penetration test and a standard penetration test method. Background Art

[0002] The standard penetration test is the most widely used test method in geotechnical engineering in-situ tests because of its simple test principle and low test cost. The principle is to use a 63.5kg hammer to freely fall from a height of 76cm to hammer a standard model penetrator into the soil layer. The physical and mechanical properties of the soil are calculated and obtained based on the number of hammer blows N at a depth of 30cm through empirical formulas. It is especially suitable for non-cohesive strata where it is difficult to obtain original samples.

[0003] In the current test specifications, it is generally believed that the hammer number N value with a penetration depth of 30cm should be considered according to specific engineering problems and with reference to relevant specifications to consider whether to make rod length correction or other corrections. For example, rod length correction is required when considering the empirical relationship between N value and soil parameters and bearing capacity; rod length correction is not performed when assessing sand liquefaction in seismic specifications. In addition to rod length correction, there are also corrections for soil layer depth and groundwater level. According to Newton's collision theory, the mass of the rod length system shall not exceed twice the weight of the hammer, so that the depth of the standard penetration test shall not exceed 21m, but the actual test depth is far more than 100m. Therefore, the correction of the hammer number N value has become the main factor restricting the promotion and application of the standard penetration test. From the perspective of hammer energy testing, the hammer energy attenuation law during the standard penetration test is accurately measured, which provides a correction basis for the standard penetration test in ultra-deep and complex formations. It has good engineering application value and will also have a global and far-reaching impact on the development of in-situ testing technology. Summary of the invention

[0004] In view of this, the present invention provides a hammer energy collection system and a standard penetration test method for a standard penetration test, which can measure the acceleration and hammer force during the hammering process of the standard penetration test, and then obtain the hammer energy, thereby improving the accuracy of the measurement of the standard penetration test results. The hammer energy test results can be used for depth correction of the standard penetration test results of deep buried strata.

[0005] To achieve the above object, the technical solution provided by the present invention is as follows:

[0006] A hammer energy collection system for a standard penetration test, characterized in that it comprises an integrated adapter, a data collection unit and a terminal analysis and display unit, wherein the integrated adapter comprises an acceleration sensor, a strain sensor, a movable cover plate, an upper joint, a lower joint, an exhaust hole and a waterproof rubber ring; the acceleration sensor and the strain sensor are fixed inside the integrated adapter; the movable cover plate is connected to the middle part of the integrated adapter by bolts; the upper joint and the lower joint are located at the upper and lower ends of the integrated adapter; the exhaust hole is located at the lower end of the integrated adapter and is connected to the center hole of the drill pipe; the waterproof rubber ring is located between the integrated adapter and the movable cover plate; the data collection unit is connected to the acceleration sensor and the strain sensor through cables; and the terminal analysis and display unit is connected to the data collection unit.

[0007] Furthermore, the hammer energy collection system for standard penetration test is characterized by comprising a movable cover plate which can be connected to the integrated adapter by bolts, so as to enable installation and maintenance of the acceleration sensor and strain sensor.

[0008] Furthermore, the hammer energy collection system for standard penetration test is characterized in that the upper joint and the lower joint can be directly connected to the geological drill pipe, and the exhaust hole formed by the middle cavity of the lower joint is connected to the center hole of the geological drill pipe.

[0009] Furthermore, the hammer energy collection system for standard penetration test is characterized in that it includes an acceleration sensor and a strain sensor, the sensors are fixed inside the integrated adapter, and a sealing ring is formed by the water-stop rubber ring.

[0010] Furthermore, the hammer energy collection system for standard penetration test is characterized by comprising a data collection unit, and the data collection unit is connected to the acceleration sensor and the strain sensor through the small hole on the movable cover plate.

[0011] Furthermore, the hammer energy collection system for standard penetration test is characterized by comprising a terminal analysis and display unit, and the terminal analysis and display unit is connected to the data collection unit via a cable.

[0012] A standard penetration test method is performed using the above system, and the method comprises the following steps:

[0013] Step S1: Connect the acceleration sensor, strain sensor, data acquisition unit and terminal analysis and display unit 5 to debug the integrated adapter and ensure that all components of the system are operating normally;

[0014] Step S2: After pre-drilling to the depth to be tested using a geological drill, two hammer energy collection systems are connected to the lower part of the impact hammer and the upper end of the standard penetration device respectively, and the geological drill rod and impact hammer of each standard penetration test are ensured to be tightly connected, and the sensor is zeroed;

[0015] Step S3: Perform a standard penetration test using an automatically unhooked free-fall hammer method according to the standard method, with a hammer rate of 15 to 30 hammers per minute, and count the cumulative number of hammers that penetrate 30 cm, and at the same time count the acceleration, hammer force and hammer energy data of each hammer recorded by the hammer energy acquisition system;

[0016] Step S4: Pull out the SPD and the hammer energy collection system, take out the soil sample in the middle of the SPD, and describe the soil sample according to the specification;

[0017] Step S5: Repeat the above operations according to steps S2 to S4 until the predetermined test depth is reached, and the test is terminated.

[0018] The beneficial effects of the present invention are:

[0019] 1. By installing the acceleration sensor and strain sensor inside the integrated adapter, and connecting the external data acquisition unit and terminal analysis and display unit through wires, the acceleration, hammer force and hammer energy of the standard penetration test during the hammering process can be accurately measured and displayed. Two hammer energy collection systems are installed at the bottom of the standard penetration hammer and the top of the standard penetration device. By comparison, the energy attenuation law of the standard penetration test under the influence of different depths, soil layers and groundwater levels can be obtained.

[0020] 2. By making a groove in the middle of the integrated transformer and setting a movable cover, the acceleration sensor and strain sensor can be installed and maintained.

[0021] 3. By setting an exhaust hole in the lower joint and connecting it to the center hole of the geological drill pipe, the smooth penetration of the standard penetration device into the soil is ensured during the standard penetration test.

[0022] 4. By setting a water-stop rubber ring at the internal groove of the integrated adapter, the waterproofness of the inside of the probe is ensured, and the waterproof safety of the acceleration sensor and strain sensor is protected. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] By reading the detailed description of the preferred embodiment below, various other advantages and benefits will become clear to those of ordinary skill in the art. The accompanying drawings are only used for the purpose of illustrating the preferred embodiment and are not considered to be limitations of the present invention. In addition, the same reference symbols are used to represent the same components throughout the accompanying drawings.

[0024] Figure 1 A structural cross-sectional view of a hammer energy collection system for a standard penetration test provided by an embodiment of the present invention;

[0025] Figure 2 This is a top view of the structure.

[0026] Description of reference numerals:

[0027] 1—integrated adapter, 2—acceleration sensor, 3—strain sensor, 4—data acquisition unit, 5—terminal analysis and display unit, 1-1—movable cover, 1-2—upper joint, 1-3—lower joint, 1-4—exhaust hole, 1-5—water-stop rubber ring. DETAILED DESCRIPTION

[0028] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation method, structure, features and effects of a hammer energy collection system for a standard penetration test proposed by the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "embodiment" do not necessarily refer to the same embodiment. In addition, specific features, structures, or characteristics in one or more embodiments may be combined in any form.

[0029] The term "and / or" in this article is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B. Specifically, it is understood that: A and B may be included at the same time, A may exist alone, or B may exist alone, and any of the above three situations may be met.

[0030] See also Figure 1 An embodiment of the present invention provides a hammer energy collection system for a standard penetration test, comprising an integrated adapter 1, a data collection unit 4, and a terminal analysis and display unit 5.

[0031] The integrated adapter 1 includes an acceleration sensor 2, a strain sensor 3, a movable cover plate 1-1, an upper joint 1-2, a lower joint 1-3, an exhaust hole 1-4 and a waterproof rubber ring 1-5; the acceleration sensor 2 and the strain sensor 3 are fixed inside the integrated adapter 1; the movable cover plate 1-1 is connected to the middle part of the integrated adapter 1 by bolts; the upper joint 1-2 and the lower joint 1-3 are located at the upper and lower ends of the integrated adapter 1; the exhaust hole 1-4 is located at the lower end of the integrated adapter 1 and is connected to the center hole of the drill pipe; the waterproof rubber ring 1-5 is located between the integrated adapter 1 and the movable cover plate 1-1; the data acquisition unit 4 is connected to the acceleration sensor 2 and the strain sensor 3 through a cable; the terminal analysis and display unit 5 is connected to the data acquisition unit 4.

[0032] The movable cover plate 1 - 1 can be connected to the integrated adapter 1 by bolts. In this case, the acceleration sensor 2 and the strain sensor 3 can be installed and maintained.

[0033] The upper joint 1-2 and the lower joint 1-3 can be directly connected to the geological drill pipe, and the central cavity of the lower joint 1-3 forms the exhaust hole 1-4 connected to the central hole of the geological drill pipe. In this case, the smooth penetration of the standard penetration device in the soil during the standard penetration test is guaranteed.

[0034] The acceleration sensor 2 and the strain sensor 3 are fixed inside the integrated adapter 1, and the waterproof rubber rings 1-5 form a sealing ring. In this case, the waterproof safety of the acceleration sensor and the strain sensor is protected.

[0035] The terminal analysis and display unit 5 is connected to the data acquisition unit 4 via a cable. In this case, the dynamic changes of acceleration, hammer force and hammer energy during the standard penetration test can be displayed in real time.

[0036] The embodiment of the present invention further provides a standard penetration test method, which is performed using the above system, and the method comprises the following steps:

[0037] Step S1: Connect the acceleration sensor 2, the strain sensor 3, the data acquisition unit 4 and the terminal analysis and display unit 5, debug the integrated adapter, and ensure that all components of the system are operating normally.

[0038] Step S2: After pre-drilling to the depth to be tested using a geological drill rig, connect the two hammer energy collection systems to the lower part of the impact hammer and the upper end of the standard penetration device respectively, ensure that the geological drill rod and impact hammer of the standard penetration test are tightly connected, and zero the sensor.

[0039] Step S3: Perform a standard penetration test using an automatically unhooked free-fall hammer method in accordance with standard methods, with a hammer rate of 15 to 30 blows per minute, and count the cumulative number of hammer blows that penetrate 30 cm. At the same time, count the acceleration, hammer force and hammer energy data of each hammer recorded by the hammer energy collection system.

[0040] Step S4: Pull out the standard penetration device and the hammer energy collection system, take out the soil sample in the middle of the standard penetration device, and describe the soil sample according to the specifications.

[0041] Step S5: Repeat the above operations according to steps S2 to S4 until the predetermined test depth is reached, and the test is terminated.

[0042] The beneficial effects of the present invention are:

[0043] 1. By installing the acceleration sensor and strain sensor inside the integrated adapter, and connecting the external data acquisition unit and terminal analysis and display unit through wires, the acceleration, hammer force and hammer energy of the standard penetration test during the hammering process can be accurately measured and displayed. Two hammer energy collection systems are installed at the bottom of the standard penetration hammer and the top of the standard penetration device. By comparison, the energy attenuation law of the standard penetration test under the influence of different depths, soil layers and groundwater levels can be obtained.

[0044] 2. By making a groove in the middle of the integrated transformer and setting a movable cover, the acceleration sensor and strain sensor can be installed and maintained.

[0045] 3. By setting an exhaust hole in the lower joint and connecting it to the center hole of the geological drill pipe, the smooth penetration of the standard penetration device into the soil is ensured during the standard penetration test.

[0046] By providing a waterproof rubber ring at the internal groove of the integrated adapter, the waterproofness of the inside of the probe is ensured, and the waterproof safety of the acceleration sensor and the strain sensor is protected.

[0047] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0048] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A hammer energy collection system for standard penetration test, characterized in that: It includes an integrated adapter, a data acquisition unit and a terminal analysis and display unit, wherein the integrated adapter includes an acceleration sensor, a strain sensor, a movable cover, an upper joint, a lower joint, an exhaust hole and a waterproof rubber ring; the acceleration sensor and the strain sensor are fixed inside the integrated adapter; the movable cover is connected to the middle part of the integrated adapter by bolts; the upper joint and the lower joint are located at the upper and lower ends of the integrated adapter; the exhaust hole is located at the lower end of the integrated adapter and is connected to the center hole of the drill pipe; the waterproof rubber ring is located between the integrated adapter and the movable cover; the data acquisition unit is connected to the acceleration sensor and the strain sensor through cables; the terminal analysis and display unit is connected to the data acquisition unit.

2. A hammer energy collection system for standard penetration test according to claim 1, characterized in that: It comprises a movable cover plate, which is connected to the middle part of the integrated adapter by bolts and is used for installing and maintaining the acceleration sensor and the strain sensor.

3. A hammer energy collection system for standard penetration test according to claim 1, characterized in that: The upper joint and the lower joint are directly connected to the geological drill rod, and the central cavity of the lower joint forms the exhaust hole which is connected to the central hole of the geological drill rod.

4. A hammer energy collection system for standard penetration test according to claim 1, characterized in that: It comprises an acceleration sensor and a strain sensor, wherein the sensor is fixed inside the integrated adapter, and the water-stop rubber ring forms a sealing ring.

5. The hammer energy collection system for standard penetration test according to claim 1, characterized in that: It comprises a data acquisition unit, and the data acquisition unit is connected with the acceleration sensor and the strain sensor through the small hole on the movable cover plate.

6. The hammer energy collection system for standard penetration test according to claim 1, characterized in that: It includes a terminal analysis and display unit, which is connected to the data acquisition unit via a cable.

7. A standard penetration test method, characterized in that: The method is performed using the system according to any one of claims 1 to 6, and comprises the following steps: Step S1: Connect the acceleration sensor, strain sensor, data acquisition unit and terminal analysis and display unit 5 to debug the integrated adapter and ensure that all components of the system are operating normally; Step S2: After pre-drilling to the depth to be tested using a geological drill, two hammer energy collection systems are connected to the lower part of the impact hammer and the upper end of the standard penetration device respectively, and the geological drill rod and impact hammer of each standard penetration test are ensured to be tightly connected, and the sensor is zeroed; Step S3: Perform a standard penetration test using an automatically unhooked free-fall hammer method according to the standard method, with a hammer rate of 15 to 30 hammers per minute, and count the cumulative number of hammers that penetrate 30 cm, and at the same time count the acceleration, hammer force and hammer energy data of each hammer recorded by the hammer energy acquisition system; Step S4: Pull out the SPD and the hammer energy collection system, take out the soil sample in the middle of the SPD, and describe the soil sample according to the specification; Step S5: Repeat the above operations according to steps S2 to S4 until the predetermined test depth is reached, and the test is terminated.

Citation Information

Cited By

  • Automatic in-situ test method and system, program product and electronic equipment

    CN121275520A

  • Standard penetration test device, method and system based on energy measurement

    CN121473310A