Steel pipe pile foundation embedded and fixed in bare rock and construction method
By using the steel pipe pile foundation method embedded in exposed rock in deep water exposed rock formations, the bearing capacity of steel pipe piles is enhanced by using annular rock embedded anchor holes, grouting bodies and underwater concrete, the steel pipe piles cannot be inserted and punched. The problem of major safety risks of underwater blasting has improved construction efficiency and quality.
Patent Information
- Application Number
- CN202411235751.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-15
AI Technical Summary
In deep-water exposed rock formations, steel pipe piles are difficult to penetrate, underwater blasting safety risks, and high difficulty in construction of holes.
The steel pipe pile foundation method embedded in exposed rock is adopted, and the annular rock-embedded anchor hole is formed through the underwater casing, the steel pipe piles are embedded and the grouting body and underwater concrete are filled to enhance the vertical bearing capacity of the steel pipe piles. and stability.
It reduces the loss of drilling teeth and difficulty of hole lead, improves construction efficiency and quality, and reduces construction safety risks.
Smart Images

Figure CN118958355A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of steel pipe pile foundations, and in particular to a steel pipe pile foundation embedded in exposed rock and a construction method. Background Art
[0002] In recent years, with the rapid economic growth, China's infrastructure construction has developed rapidly, especially in the field of transportation construction, and the number of large-scale cross-river bridges has increased. In the construction process, the steel pipe pile foundation has become the most commonly used form of underwater pile foundation. It has the advantages of strong flood resistance, good durability, high safety, low construction space requirements, reusability, and significant environmental protection effects.
[0003] Pile foundation is the most widely used foundation form in deep foundation. It consists of several piles sunk into the soil and a cap or cap beam connecting the top of the piles. The function of the pile foundation is to transfer the load of the upper building to the deep soil layer with strong bearing capacity, or to compact the soft soil layer to improve the bearing capacity of the foundation soil.
[0004] If the pile foundation is in deep water exposed rock or the overburden is thin, the traditional method is to choose bored piles to resist vertical and horizontal forces. If it is a structure that plays the role of anchoring against horizontal forces, the traditional method is to choose frog anchors.
[0005] The bored pile form is adopted, and high-power drilling equipment and mud pools need to be placed in the water platform area. After the casing is lowered to the top of the rock layer, an impact drill bit is selected, and the casing is gradually followed by the rotary head. The rock layer is strong during construction, which requires high power and pressure of the equipment, and also places high demands on the vibration resistance of the equipment. The efficiency of single-hole drilling and pouring is low, and adjacent holes of the pile group foundation cannot be carried out synchronously, and the construction period is long. The wear of the drill teeth is very large during the drilling process, the drill bit is frequently replaced, the mud circulation system needs to work uninterruptedly, and large-diameter piles need to be reinforced with cages and poured with concrete, and the cost of single-pile drilling is high.
[0006] When using frog-type anchors to resist horizontal forces, a prefabrication site is set up on land, and the anchors are prefabricated according to the design. They are hoisted by crane to the anchoring position for barge transportation, and one end is connected to the anchor rope and then sunk into place. Multiple frog-type anchors in parallel can provide a larger horizontal bearing capacity, but the prefabrication period of frog-type anchors is long, which is greatly affected by the acquisition of prefabrication sites. The hoisting and transportation requires maritime coordination to demarcate the occupied area, and the pre-operation preparation time is long, so its construction period is also long, and there are many uncertain factors. The prefabrication site requires land acquisition or leasing of existing sites, and the land acquisition costs and rentals account for a high proportion of the measures costs. Summary of the invention
[0007] The embodiments of the present application provide a steel pipe pile foundation embedded in exposed rock and a construction method to solve the problems in the related art that steel pipe piles cannot be driven into deep-water exposed rock formations, the safety risks of underwater blasting are high, and the construction difficulty of boring operations is high.
[0008] A first aspect of an embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock, comprising:
[0009] Underwater exposed rock, wherein the top of the underwater exposed rock is drilled through a casing to form an annular rock-embedded anchor hole with a set depth, and a cylindrical tube-shaped rock layer with a bottom connected to the underwater exposed rock is reserved in the annular rock-embedded anchor hole;
[0010] A steel pipe pile foundation comprises a steel pipe pile vertically embedded in the annular rock-embedded anchor hole, a grouting body is filled between the outer periphery of the steel pipe pile and the underwater exposed rock, and underwater concrete is poured in the steel pipe pile located at the outer periphery and top of the rock layer in the cylindrical tube.
[0011] In some embodiments: the outer wall of the steel pipe pile is provided with a plurality of grouting pipes with one end extending into the annular rock-embedded anchor hole, and the grouting pipes inject the grouting body into the annular space between the outer periphery of the steel pipe pile and the underwater exposed rock.
[0012] In some embodiments: the diameter of the grouting pipe is 80-150 mm, the number of the grouting pipes is 6-10 and they are evenly connected to the outer wall of the steel pipe pile through a temporary fixing device, and the grouting body is cement slurry or water glass.
[0013] In some embodiments: the underwater concrete partially or completely fills the inner space of the steel pipe pile.
[0014] In some embodiments: a plurality of shear nails embedded in the underwater concrete are welded to the inner wall of the steel pipe pile, and the shear nails are arranged in multiple layers from bottom to top in the steel pipe pile, and the shear nails in each layer are evenly distributed on the inner circumference of the steel pipe pile.
[0015] In some embodiments: an annular retaining ring is welded to the inner wall of the steel pipe pile, the annular retaining ring is located on the top of the rock layer in the cylindrical tube, and a plurality of through holes for flowing underwater concrete are provided on the annular retaining ring.
[0016] A second aspect of the embodiments of the present application provides a construction method for a steel pipe pile foundation embedded in exposed rock, the method using the steel pipe pile foundation embedded in exposed rock described in any of the above embodiments, the method comprising:
[0017] A circular rock-embedded anchor hole with a set depth is formed by drilling a casing through an above-water working platform at the top of the underwater exposed rock, wherein a cylindrical tube-shaped rock layer with a bottom connected to the underwater exposed rock is reserved in the circular rock-embedded anchor hole;
[0018] The steel pipe pile is hoisted to the top of the annular rock-embedded anchor hole by a hoisting device and gradually lowered so that the bottom of the steel pipe pile is embedded in the annular rock-embedded anchor hole, and the verticality of the steel pipe pile is adjusted to a set threshold value;
[0019] A grouting pipe with its bottom extending into the annular rock-embedded anchor hole is arranged on the periphery of the steel pipe pile, and a grouting device is used to fill the annular gap between the periphery of the steel pipe pile and the underwater exposed rock with a grouting body;
[0020] A vertical conduit is arranged inside the steel pipe pile, and the discharge port of the vertical conduit is lifted from bottom to top to pour underwater concrete into the underwater concrete located at the outer periphery and top of the rock layer in the cylindrical pipe.
[0021] In some embodiments: the depth L0 of the annular rock-embedded anchor hole is determined according to the bearing capacity V of the steel pipe pile foundation, the diameter D of the steel pipe pile, and the rock surface compressive strength fr of the underwater exposed rock;
[0022] The bearing capacity of the steel pipe pile foundation is V=fr×D×L0.
[0023] In some embodiments: the height H0 of the underwater concrete is determined according to the vertical bearing capacity ΔN that the underwater concrete needs to bear, the bonding strength between the underwater concrete and the steel pipe pile, and the diameter D of the steel pipe pile;
[0024] The height of the underwater concrete
[0025] In the above formula, D is the inner diameter of the steel pipe pile, and 150 is the bond strength between the steel pipe pile and underwater concrete, in kPa.
[0026] In some embodiments: the grouting pipe is evenly connected to the outer wall of the steel pipe pile through a temporary fixing device, and the grouting pipe is pulled out after the grouting body fills the annular gap between the outer periphery of the steel pipe pile and the underwater exposed rock.
[0027] The beneficial effects of the technical solution provided by this application include:
[0028] The embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock and a construction method. Since the steel pipe pile foundation embedded in exposed rock of the present application is provided with underwater exposed rock, a ring-shaped rock-embedded anchor hole with a set depth is formed by drilling a casing into the top of the underwater exposed rock, and a cylindrical rock layer in a tube with a bottom connected to the underwater exposed rock is reserved in the ring-shaped rock-embedded anchor hole; the steel pipe pile foundation includes a steel pipe pile vertically embedded in the ring-shaped rock-embedded anchor hole, a grouting body is filled between the outer periphery of the steel pipe pile and the underwater exposed rock, and underwater concrete located at the outer periphery and top of the cylindrical rock layer in a tube is poured in the steel pipe pile.
[0029] Therefore, the steel pipe pile foundation embedded in the exposed rock of the present application is formed with an annular rock-embedded anchor hole of a set depth through casing drilling at the top of the underwater exposed rock. The annular rock-embedded anchor hole can not only be used to insert the steel pipe pile to the set depth in the underwater exposed rock, but also reduce the wear of the drill teeth in the process of drilling holes on the underwater exposed rock, and reduce the difficulty and time of drilling holes. The outer periphery of the steel pipe pile and the underwater exposed rock are filled with grouting, and the grouting consolidates the steel pipe pile and the underwater exposed rock. Underwater concrete located at the outer periphery and top of the rock layer in the cylindrical tube is poured in the steel pipe pile, and the underwater concrete is used to enhance the vertical bearing capacity of the steel pipe pile. The present application solves the problems that steel pipe piles cannot be driven in bare rock formations, the safety risk of underwater blasting is high, and the drilling construction is difficult. It improves construction efficiency, improves construction quality, and reduces construction safety risks. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0031] Figure 1 This is a schematic structural diagram of a steel pipe pile foundation according to an embodiment of the present application;
[0032] Figure 2 This is a structural front view of step 101 in the construction method of an embodiment of the present application;
[0033] Figure 3 A top view of the structure of step 101 in the construction method of an embodiment of the present application;
[0034] Figure 4 This is a structural front view of step 102 in the construction method of an embodiment of the present application;
[0035] Figure 5 and Figure 6 This is a structural front view of step 103 in the construction method of an embodiment of the present application;
[0036] Figure 7 This is a structural front view of step 104 in the construction method of an embodiment of the present application.
[0037] Reference numerals:
[0038] 1. Underwater exposed rock; 2. Rock layer in cylindrical tube; 3. Steel pipe pile; 4. Grouting body; 5. Underwater concrete; 6. Shear nails; 7. Annular retaining ring; 8. Annular rock-embedded anchor hole; 9. Grouting pipe; 10. Vertical conduit. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0040] The embodiments of the present application provide a steel pipe pile foundation embedded in exposed rock and a construction method, which can solve the problems that steel pipe piles cannot be driven in deep-water bare rock formations, the safety risks of underwater blasting are high, and the construction of boreholes is difficult.
[0041] See also Figure 1 As shown, the first aspect of the embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock, comprising:
[0042] Underwater exposed rock 1, a ring-shaped rock-embedded anchor hole 8 of a set depth is formed at the top of the underwater exposed rock 1 by casing drilling, and a cylindrical rock layer 2 whose bottom is connected to the underwater exposed rock 1 is reserved in the ring-shaped rock-embedded anchor hole 8. The ring-shaped rock-embedded anchor hole 8 formed by casing drilling is a circular countersunk hole, and the outer diameter of the ring-shaped rock-embedded anchor hole 8 is substantially the same as the outer diameter of the casing, and the inner diameter of the ring-shaped rock-embedded anchor hole 8 is substantially the same as the inner diameter of the casing.
[0043] The steel pipe pile foundation includes a steel pipe pile 3 vertically embedded in an annular rock-embedded anchor hole 8, and the bottom of the steel pipe pile 3 is supported on the bottom of the annular rock-embedded anchor hole 8. A grouting body 4 is filled between the outer periphery of the steel pipe pile 3 and the underwater exposed rock 1, and the grouting body 4 consolidates the steel pipe pile 3 and the underwater exposed rock 1. Underwater concrete 5 located on the outer periphery and top of the rock layer 2 in the cylindrical tube is poured in the steel pipe pile 3, and the underwater concrete 5 is consolidated with the inner wall of the steel pipe pile 3 to enhance the vertical support force of the steel pipe pile 3.
[0044] The steel pipe pile foundation embedded in the exposed rock in the embodiment of the present application is drilled through a casing at the top of the underwater exposed rock 1 to form an annular rock-embedded anchor hole 8 with a set depth. The annular rock-embedded anchor hole 8 can not only be used to insert the steel pipe pile 3 to the set depth in the underwater exposed rock 1, but also has a small cutting area. It can also reduce the wear of the drill teeth during the drilling process on the underwater exposed rock 1, thereby reducing the difficulty and time of drilling on the underwater exposed rock 1.
[0045] The outer periphery of the steel pipe pile 3 and the underwater exposed rock 1 are filled with a grouting body 4, which consolidates the steel pipe pile 3 and the underwater exposed rock 1, thereby improving the structural stability of the steel pipe pile 3 connected to the underwater exposed rock 1. Underwater concrete 5 is poured inside the steel pipe pile 3, which is located on the outer periphery and top of the rock layer 2 in the cylindrical tube, and the underwater concrete 5 is used to enhance the vertical bearing capacity of the steel pipe pile 3. This application solves the problems that steel pipe piles cannot be driven in bare rock formations, the safety risks of underwater blasting are high, and the construction of lead holes is difficult. It improves construction efficiency and construction quality, and reduces construction safety risks.
[0046] In some alternative embodiments: See Figure 5 As shown, the embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock, wherein the outer wall of the steel pipe pile 3 of the steel pipe pile foundation embedded in exposed rock is provided with a plurality of grouting pipes 9 with one end extending into the inside of the annular rock-embedded anchor hole 8. The grouting pipes 9 inject the grouting body 4 into the annular space between the outer periphery of the steel pipe pile 3 and the underwater exposed rock 1. The grouting pipes 9 inject the grouting body 4 into the annular space between the outer periphery of the steel pipe pile 3 and the underwater exposed rock 1 through a pressurizing device to fill the annular space densely.
[0047] The diameter of the grouting pipe 9 is 80-150 mm, the number of the grouting pipes 9 is 6-10 and they are evenly connected to the outer wall of the steel pipe pile 3 through a temporary fixing device, and the grouting body is cement slurry or water glass. The multiple grouting pipes 9 with a diameter of 80-150 mm in the present application can be grouted synchronously, improve the grouting efficiency, and reduce the time of water operation. The cement slurry or water glass in the present application is used as a binder to increase the coagulation effect between the outer periphery of the steel pipe pile 3 and the underwater exposed rock 1, so that the steel pipe pile 3 is anchored on the underwater exposed rock 1, and the interference of the surge on the steel pipe pile 3 is reduced.
[0048] In some alternative embodiments: See Figure 1 As shown, the embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock, wherein the underwater concrete 5 of the steel pipe pile foundation embedded in exposed rock partially or completely fills the internal space of the steel pipe pile 3. After the underwater concrete 5 hardens, it forms a consolidation with the steel pipe pile 3, and the pouring height of the underwater concrete 5 in the steel pipe pile 3 is determined according to the vertical bearing capacity and horizontal bearing capacity of the steel pipe pile foundation. The greater the vertical bearing capacity and horizontal bearing capacity of the steel pipe pile foundation, the greater the filling height of the underwater concrete 5.
[0049] In some alternative embodiments: See Figure 1As shown, the embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock, wherein the inner wall of the steel pipe pile 3 of the steel pipe pile foundation embedded in exposed rock is welded with a plurality of shear nails 6 embedded as one body with underwater concrete 5. The shear nails 6 are provided in multiple layers from bottom to top in the steel pipe pile 3, and each layer of shear nails 6 is evenly distributed on the inner circumference of the steel pipe pile 3. One end of the shear nail 6 is vertically welded to the inner wall of the steel pipe pile 3, and the other end of the shear nail 6 is suspended in the steel pipe pile 3, and a mushroom head is provided at one end of the shear nail 6 away from the steel pipe pile 3.
[0050] After multiple layers of shear nails 6 are welded from bottom to top on the inner wall of the steel pipe pile 3 in advance, and underwater concrete 5 is poured in the steel pipe pile 3 at a later stage, the underwater concrete 5 hardens and is embedded with the shear nails 6 to form a whole. The vertical bearing capacity of the steel pipe pile 3 can be transferred to the underwater concrete 5 through the shear nails 6, and the underwater concrete 5 transfers the vertical bearing capacity to the rock layer 2 in the cylindrical tube. The rock layer 2 in the cylindrical tube finally transfers the vertical bearing capacity to the underwater exposed rock 1, thereby significantly increasing the vertical bearing capacity of the steel pipe pile foundation.
[0051] In some alternative embodiments: See Figure 1 As shown, the embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock, wherein the inner wall of the steel pipe pile 3 of the steel pipe pile foundation embedded in exposed rock is welded with an annular retaining ring 7, and the annular retaining ring 7 is preferably but not limited to an annular steel plate of a set thickness. The annular retaining ring 7 is located at the top of the rock layer 2 in the cylindrical tube, and a plurality of through holes for flowing underwater concrete 5 are provided on the annular retaining ring 7. The distance between the annular retaining ring 7 and the bottom of the steel pipe pile 3 in the steel pipe pile 3 is the same as the depth of the annular rock-embedded anchor hole 8.
[0052] After the annular retaining ring 7 is pre-welded on the inner wall of the steel pipe pile 3, when the steel pipe pile 3 is later inserted into the annular rock-embedded anchor hole 8, the annular retaining ring 7 located inside the steel pipe pile 3 is seated on the top of the rock layer 2 in the cylindrical tube, and the rock layer 2 in the cylindrical tube provides vertical support force for the steel pipe pile 3 through the annular retaining ring 7. The vertical bearing capacity of the steel pipe pile 3 can be directly transferred to the rock layer 2 in the cylindrical tube through the annular retaining ring 7, and the rock layer 2 in the cylindrical tube transfers the vertical bearing capacity to the underwater exposed rock 1, thereby significantly increasing the vertical bearing capacity of the steel pipe pile foundation.
[0053] See also Figures 2 to 7 As shown, a second aspect of the embodiment of the present application provides a construction method of a steel pipe pile foundation embedded in exposed rock, the method using the steel pipe pile foundation embedded in exposed rock described in any of the above embodiments, the method comprising:
[0054] Step 101: Use an above-water working platform to drill a ring-shaped rock-embedded anchor hole 8 with a set depth through a casing on the top of the underwater exposed rock 1. A cylindrical tube-shaped rock layer 2 with a bottom connected to the underwater exposed rock 1 is reserved in the ring-shaped rock-embedded anchor hole 8.
[0055] Step 102: lift the steel pipe pile 3 to the top of the annular rock-embedded anchor hole 8 by lifting equipment and gradually lower it so that the bottom of the steel pipe pile 3 is embedded in the annular rock-embedded anchor hole 8, and adjust the verticality of the steel pipe pile 3 to a set threshold.
[0056] Step 103 , a grouting pipe 9 is arranged on the periphery of the steel pipe pile 3 , the bottom of which extends into the annular rock-embedded anchor hole 8 , and a grouting device is used to fill the annular gap between the periphery of the steel pipe pile 3 and the underwater exposed rock 1 with a grouting body 4 .
[0057] The grouting pipes 9 are evenly connected to the outer wall of the steel pipe pile 3 through temporary fixing devices. When the grouting body 4 fills the annular gap between the outer periphery of the steel pipe pile 3 and the underwater exposed rock 1, the grouting pipes 9 are pulled out.
[0058] Step 104 , a vertical conduit 10 is arranged inside the steel pipe pile 3 , and the discharge port of the vertical conduit 10 is lifted from bottom to top to pour the underwater concrete 5 into the underwater concrete 5 located at the outer periphery and top of the rock layer 2 in the cylindrical tube.
[0059] In some optional embodiments: the embodiment of the present application provides a construction method of a steel pipe pile foundation embedded in exposed rock, in which the depth L0 of the annular rock-embedded anchor hole 8 is determined according to the bearing capacity V of the steel pipe pile foundation, the diameter D of the steel pipe pile 3, and the rock surface compressive strength fr of the underwater exposed rock 1;
[0060] The bearing capacity of steel pipe pile foundation V=fr×D×L0.
[0061] The height H0 of the underwater concrete 5 is determined according to the vertical bearing capacity △N that the underwater concrete 5 needs to bear, the bonding strength between the underwater concrete 5 and the steel pipe pile 3, and the diameter D of the steel pipe pile 3;
[0062] Height of underwater concrete
[0063] In the above formula, D is the inner diameter of the steel pipe pile, and 150 is the bond strength between the steel pipe pile and underwater concrete, in kPa.
[0064] How it works
[0065] The embodiment of the present application provides a steel pipe pile foundation embedded in exposed rock and a construction method. Since the steel pipe pile foundation embedded in exposed rock of the present application is provided with underwater exposed rock 1, a ring-shaped rock-embedded anchor hole 8 with a set depth is formed by drilling a casing into the top of the underwater exposed rock 1, and a cylindrical tube rock layer 2 whose bottom is connected to the underwater exposed rock 1 is reserved in the ring-shaped rock-embedded anchor hole 8; the steel pipe pile foundation includes a steel pipe pile 3 vertically embedded in the ring-shaped rock-embedded anchor hole 8, a grouting body 4 is filled between the outer periphery of the steel pipe pile 3 and the underwater exposed rock 1, and underwater concrete 5 located on the outer periphery and top of the cylindrical tube rock layer 2 is poured in the steel pipe pile 3.
[0066] Therefore, the steel pipe pile foundation embedded in the exposed rock of the present application is formed by drilling a ring-shaped rock-embedded anchor hole 8 with a set depth through a casing at the top of the underwater exposed rock 1. The ring-shaped rock-embedded anchor hole 8 can not only be used to insert the steel pipe pile 3 to the set depth in the underwater exposed rock 1, but also reduce the wear of the drill teeth during the drilling process on the underwater exposed rock 1, and reduce the drilling difficulty and drilling time. The outer periphery of the steel pipe pile 3 and the underwater exposed rock 1 are filled with a grouting body 4, and the grouting body 4 consolidates the steel pipe pile 3 and the underwater exposed rock 1.
[0067] Underwater concrete 5 is poured inside the steel pipe pile 3 and located on the outer periphery and top of the rock layer 2 in the cylindrical tube. The underwater concrete 5 is used to enhance the vertical bearing capacity of the steel pipe pile 3. The present application solves the problems that steel pipe piles cannot be driven into bare rock formations, the safety risk of underwater blasting is high, and the construction difficulty of the lead hole is high. The construction efficiency is improved, the construction quality is improved, and the construction safety risk is reduced.
[0068] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0069] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0070] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A steel pipe pile foundation embedded in exposed rock, characterized in that: include: Underwater exposed rock (1), wherein the top of the underwater exposed rock (1) is drilled through a casing to form an annular rock-embedded anchor hole (8) of a set depth, and a cylindrical tube-shaped rock layer (2) whose bottom is connected to the underwater exposed rock (1) is reserved in the annular rock-embedded anchor hole (8); A steel pipe pile foundation, the steel pipe pile foundation comprising a steel pipe pile (3) vertically embedded in the annular rock-embedded anchor hole (8), a grouting body (4) filled between the outer periphery of the steel pipe pile (3) and the underwater exposed rock (1), and underwater concrete (5) located on the outer periphery and top of the rock layer (2) in the cylindrical tube poured into the steel pipe pile (3).
2. A steel pipe pile foundation embedded in exposed rock as claimed in claim 1, characterized in that: The outer wall of the steel pipe pile (3) is provided with a plurality of grouting pipes (9) with one end extending into the interior of the annular rock-embedded anchor hole (8), and the grouting pipes (9) inject the grouting body into the annular space between the outer periphery of the steel pipe pile (3) and the underwater exposed rock (1).
3. A steel pipe pile foundation embedded in exposed rock as claimed in claim 2, characterized in that: The diameter of the grouting pipe (9) is 80-150 mm, the number of the grouting pipes (9) is 6-10 and they are evenly connected to the outer wall of the steel pipe pile (3) through a temporary fixing device, and the grouting body (4) is cement slurry or water glass.
4. The steel pipe pile foundation embedded in exposed rock according to claim 1, characterized in that: The underwater concrete (5) partially or completely fills the internal space of the steel pipe pile (3).
5. The steel pipe pile foundation embedded in exposed rock according to claim 1, characterized in that: A plurality of shear nails (6) are welded to the inner wall of the steel pipe pile (3) and are embedded in the underwater concrete (5). The shear nails (6) are arranged in multiple layers from bottom to top in the steel pipe pile (3), and the shear nails (6) in each layer are evenly distributed on the inner circumference of the steel pipe pile (3).
6. The steel pipe pile foundation embedded in exposed rock according to claim 1, characterized in that: An annular retaining ring (7) is welded to the inner wall of the steel pipe pile (3), and the annular retaining ring (7) is located on the top of the rock layer (2) in the cylindrical tube. The annular retaining ring (7) is provided with a plurality of through holes for flowing underwater concrete (5).
7. A construction method for a steel pipe pile foundation embedded in exposed rock, characterized in that: The method uses the steel pipe pile foundation embedded in exposed rock according to any one of claims 1 to 6, and the method comprises: An aquatic working platform is used to drill a ring-shaped rock-embedded anchor hole (8) with a set depth through a casing on the top of an underwater exposed rock (1), and a cylindrical tube-shaped rock layer (2) whose bottom is connected to the underwater exposed rock (1) is reserved in the ring-shaped rock-embedded anchor hole (8); The steel pipe pile (3) is hoisted to the top of the annular rock-embedded anchor hole (8) by a hoisting device and gradually lowered so that the bottom of the steel pipe pile (3) is embedded in the annular rock-embedded anchor hole (8), and the verticality of the steel pipe pile (3) is adjusted to a set threshold value; A grouting pipe (9) is arranged on the outer periphery of the steel pipe pile (3) and its bottom extends into the annular rock-embedded anchor hole (8), and a grouting device is used to fill the annular gap between the outer periphery of the steel pipe pile (3) and the underwater exposed rock (1) with a grouting body (4); A vertical conduit (10) is arranged inside the steel pipe pile (3), and the discharge port of the vertical conduit (10) is lifted from bottom to top to pour underwater concrete (5) on the outer periphery and top of the rock layer (2) inside the cylindrical tube.
8. The construction method of a steel pipe pile foundation embedded in exposed rock according to claim 7, characterized in that: The depth L0 of the annular rock-embedded anchor hole (8) is determined according to the bearing capacity V of the steel pipe pile foundation, the diameter D of the steel pipe pile (3), and the rock surface compressive strength fr of the underwater exposed rock (1); The bearing capacity of the steel pipe pile foundation is V=fr×D×L0.
9. The construction method of a steel pipe pile foundation embedded in exposed rock according to claim 7, characterized in that: The height H0 of the underwater concrete (5) is determined according to the vertical bearing capacity ΔN that the underwater concrete (5) needs to bear, the bonding strength between the underwater concrete (5) and the steel pipe pile (3), and the diameter D of the steel pipe pile (3); The height of the underwater concrete (5) In the above formula, D is the inner diameter of the steel pipe pile (3), and 150 is the bonding strength between the steel pipe pile (3) and the underwater concrete (5), in kPa.
10. The construction method of a steel pipe pile foundation embedded in exposed rock according to claim 7, characterized in that: The grouting pipe (9) is evenly connected to the outer wall of the steel pipe pile (3) through a temporary fixing device, and the grouting pipe (9) is pulled out after the grouting body (4) fills the annular gap between the outer periphery of the steel pipe pile (3) and the underwater exposed rock (1).