Ribbed steel column and beam column connecting structure and construction method for fabricated concrete canopy
Patent Information
- Application Number
- CN202411093896.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-15
AI Technical Summary
[0010]针对上述现有技术存在的上述缺陷,本发明提出了一种用于装配式混凝土雨棚的带肋钢柱梁柱连接结构及工法,用以解决现有技术中装配式混凝土雨棚连接不稳定、施工复杂、成本较高等问题
[0034] Since multiple steel bars are replaced with a hollow steel column, the alignment and pipe threading work of the steel bars is reduced, thus simplifying the construction process. Compared with existing technology, the installation time is shortened by approximately 30-50%, which is based on statistics from simulated construction and actual engineering cases. This streamlined process directly leads to increased construction efficiency.
Smart Images

Figure CN118958512A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a canopy beam-column connection structure, in particular to a ribbed steel column beam-column connection structure and a construction method for an assembled concrete canopy, belonging to the technical field of assembled structures. Background Art
[0002] At present, prefabricated concrete canopies have been widely used in the construction industry. The connection method of this canopy, especially the connection between the ribbed steel columns and the concrete structure, is often a technical challenge. In the prior art, prefabricated concrete canopies generally use grouting sleeve connection or corrugated pipe connection technology when connecting ribbed steel columns. The grouting sleeve connection method involves inserting the steel bar into a sleeve pre-set on the steel column and fixing the steel bar with grouting material. The corrugated pipe connection uses the corrugated pipe as a channel to pass the steel bar through the corrugated pipe for connection. Both methods can provide sufficient connection strength and stability in many cases. For example, CN115898118A discloses a prefabricated and assembled railway platform canopy structure and construction method for medium and high intensity areas, which consists of prefabricated canopy piers and prefabricated canopy beams, and the seismic performance of the node connection is ensured by a combination of steel tube concrete sockets and UHPC grouting corrugated pipes; the prefabricated canopy piers are composed of reserved steel tube concrete, pier longitudinal reinforcement, and pier stirrups; the prefabricated canopy beams are composed of reserved holes and embedded corrugated pipes.
[0003] However, in practical applications, these traditional connection methods have some problems and limitations. First, when the number of steel bars to be connected exceeds 12, the connection operation of the beam-column node becomes complicated and difficult. The connection problem of steel bars and sleeves is particularly prominent, mainly manifested in the following aspects:
[0004] (1) It is difficult to align the steel bars in the sleeve, especially in areas with dense steel bars. The operating space is limited, resulting in low installation efficiency.
[0005] (2) Insufficient fluidity of the grouting material or uneven grouting may affect the reliability of the connection.
[0006] (3) The installation of the corrugated pipe and the passage of the steel bars may be restricted by site conditions, such as narrow space or angle deviation, which increases the difficulty of construction.
[0007] (4) During the construction process, due to the large number of steel bars, quality control of the connection points becomes more difficult and connection defects are prone to occur.
[0008] (5) When the bellows are connected, the bellows channel is generally a through-type pipe, the amount of grouting material used is large, and the grouting cost increases.
[0009] These issues not only increase the complexity and cost of construction, but in some cases may also affect the safety and durability of the structure. Summary of the invention
[0010] In view of the above-mentioned defects of the above-mentioned prior art, the present invention proposes a ribbed steel column beam-column connection structure and construction method for assembled concrete canopies, which are used to solve the problems of unstable connection, complex construction and high cost of assembled concrete canopies in the prior art.
[0011] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0012] A ribbed steel column beam-column connection structure for an assembled concrete canopy, comprising a prefabricated beam and a prefabricated column, wherein the prefabricated beam and the prefabricated column are connected together by a hollow steel column; the hollow steel column is arranged at the bottom of the prefabricated beam, and a plurality of anchor beam steel bars are welded to the top of the hollow steel column, wherein the anchor beam steel bars are extended into and cast in the prefabricated beam, and are welded together with the steel bars in the prefabricated beam;
[0013] The top of the prefabricated column is provided with a cavity, the cavity matches the size of the hollow steel column, and the hollow steel column is butt-jointed and inserted into the cavity;
[0014] The outer wall of the hollow steel column is fixed with multiple groups of steel bar heads by electric welding to form protruding ribs, which are placed between the inner wall of the cavity and the outer wall of the hollow steel column, and high-strength mortar is poured between the cavity and the hollow steel column and inside the hollow steel column.
[0015] Furthermore, the cross-sectional area and strength of the hollow steel column are set by equal area and equal strength substitution, that is, the cross-sectional area and strength of the hollow steel column are respectively equal to the cross-sectional area and strength of multiple connecting steel bars of the original beam-column or multiple anchored beam steel bars.
[0016] Furthermore, the prefabricated beam comprises a supporting beam and a corbel, and the hollow steel column is arranged on the corbel.
[0017] Furthermore, the protruding height of the hollow steel column is 20-30 cm, so as to facilitate docking with the cavity in the lower prefabricated column.
[0018] Furthermore, the diameter of the steel bar head is 10 mm and the length is 15 mm; the ribs are distributed on the outside of the hollow steel column with a horizontal spacing of 5 cm and a vertical spacing of 5 cm, which is used to equivalently replace the anti-pullout effect and enhance the stability and tensile strength of the connection.
[0019] Furthermore, the prefabricated column includes pier body longitudinal reinforcement and pier body stirrups; the pier body longitudinal reinforcement and pier body stirrups are wrapped around the outside of the cavity.
[0020] Furthermore, a mortar pad layer is provided between the prefabricated beams and the prefabricated columns.
[0021] Furthermore, a grouting hole is provided on the prefabricated column outside the cavity for pouring high-strength mortar.
[0022] Furthermore, the bottom of the anchored beam reinforcement is welded to the inner side of the top end of the hollow steel column.
[0023] The construction method of the ribbed steel column beam-column connection structure for the assembled concrete canopy comprises the following steps:
[0024] Step 1:
[0025] Reserve a cavity for the hollow steel column: When processing the lower prefabricated column, reserve a cavity that matches the hollow steel column;
[0026] Step 2:
[0027] Prefabricated beam processing: When processing the upper prefabricated beam, place the hollow steel column at the lower end of the prefabricated beam and make it protrude 20-30cm so as to dock with the cavity of the lower prefabricated column;
[0028] Step 3:
[0029] Docking of precast beams and precast columns: Docking of precast beams and precast columns to ensure that the hollow steel columns are aligned with the cavities of the precast columns;
[0030] Step 4:
[0031] Grouting operation: Grouting is performed into the cavity of the precast column through the reserved grouting holes to form a solid connection between the hollow steel column and the precast column.
[0032] Compared with the prior art, the technical solution of this application has at least one of the following beneficial effects:
[0033] (1) Improve installation efficiency:
[0034] By replacing multiple steel bars with a hollow steel column, the alignment and pipe threading of steel bars are reduced, thus simplifying the construction process. Compared with the existing technology, the installation time is shortened by about 30-50%, which is based on the data statistics of simulated construction and actual engineering cases. This simplified process directly leads to the improvement of construction efficiency.
[0035] (2) Reduce construction difficulty:
[0036] The outer ribs of the hollow steel column are fixed by spot welding, and there is no need to perform complex alignment operations in areas with dense steel bars. The construction difficulty is reduced, allowing unskilled workers to quickly master the construction skills and reduce the rework rate caused by improper operation. According to experimental data, the rework rate is reduced by about 20%.
[0037] (3) Improve connection quality:
[0038] The design of hollow steel columns and outer ribs ensures the uniformity and stability of the connection points. The connection quality is improved. Through comparative experiments, the failure load of the connection points is increased by about 15%, indicating that the connection is more reliable.
[0039] (4) Reduce raw materials and energy consumption:
[0040] Reduced use of steel bars and grouting materials. Compared with existing technologies, the use of raw materials has been reduced by about 40%, and correspondingly, energy consumption has also been reduced by about 30%, based on statistical data on material consumption and construction energy consumption.
[0041] (5) Reduce costs:
[0042] The amount of steel bars and grouting materials used and the construction time were reduced. Taking into account the material cost and labor cost, the construction cost per square meter was reduced by about 20%, which is the data calculated based on the actual project cost.
[0043] (6) Improve environmental performance:
[0044] The consumption of raw materials is reduced, and the waste generated during the construction process is reduced. According to the environmental impact assessment, the waste generated per square meter of construction is reduced by about 25%, which is beneficial to environmental protection.
[0045] (7) Enhance structural stability:
[0046] The design of the outer ribs is equivalent to replacing the tensile strength of the steel bars. Through the structural stability test, it was found that the tensile strength of the nodes of the ribbed steel column connection structure increased by about 10%, improving the overall stability of the structure.
[0047] (8) Reduce labor intensity:
[0048] The construction process has been simplified and complex operations have been reduced. According to feedback from workers, the labor intensity has been reduced by about 35%. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a three-dimensional schematic diagram of the ribbed steel column beam-column connection structure used for the assembled concrete canopy of the present invention;
[0050] Figure 2 yes Figure 1 Schematic diagram of the connection node between the hollow cavity and the hollow steel column;
[0051] Figure 3 yes Figure 2 Schematic diagram of the middle DD section;
[0052] Figure 4 yes Figure 2 Schematic diagram of the EE section;
[0053] Figure 5 yes Figure 1 Schematic diagram of the cross-section of the beam-column connection structure with medium ribbed steel columns. DETAILED DESCRIPTION
[0054] The following is combined with Figure 1-5 The present invention is further described in detail with specific implementations to facilitate a clear understanding of the present invention, but they do not constitute a limitation on the present invention.
[0055] Example 1
[0056] As attached Figure 1-5 As shown, a ribbed steel column beam-column connection structure for a prefabricated concrete canopy in this embodiment includes a prefabricated beam 1 and a prefabricated column 2, and a mortar layer 7 is provided between the prefabricated beam 1 and the prefabricated column 2. The prefabricated beam 1 and the prefabricated column 2 are connected together by a hollow steel column 3. Figure 1 and Figure 4 As shown, the hollow steel column 3 is arranged at the bottom of the precast beam 1, and 12 anchor beam steel bars 4 are welded at the top of the hollow steel column, and the bottom of the anchor beam steel bars 4 is welded to the inner side of the top of the hollow steel column 3. The top of the anchor beam steel bars 4 extends into and is cast in the precast beam 1, and is welded to the steel bars in the precast beam 1.
[0057] In this embodiment, Figure 1 As shown, the prefabricated beam 1 includes a cross-shaped support beam 11 and a corbel 12 , and the hollow steel column 3 is arranged on the corbel 12 .
[0058] A cavity 5 is provided at the top of the prefabricated column 2, and the cavity 5 matches the size of the hollow steel column 3, and the hollow steel column 3 is butted and inserted into the cavity 5. In this embodiment, the cross-sectional area and strength of the hollow steel column 3 are set by equal area and equal strength substitution, that is, the cross-sectional area and strength of the hollow steel column 3 are respectively equal to the cross-sectional area and strength of the 12 anchored beam steel bars 4. In addition, the prefabricated column 2 includes pier longitudinal bars 21 and pier stirrups 22. The pier longitudinal bars 21 and the pier stirrups 22 are wrapped around the outside of the cavity 5.
[0059] like Figure 1-2 As shown in 4-5, multiple groups of steel bar heads are fixed to the outer wall of the hollow steel column 3 by electric welding to form protruding ribs 6, which are placed between the inner wall of the cavity 5 and the outer wall of the hollow steel column 3, and high-strength mortar is poured between the cavity 5 and the hollow steel column 3 and inside the hollow steel column 3. Grouting holes 8 are provided on the prefabricated column 2 outside the cavity 5 for pouring high-strength mortar.
[0060] In this embodiment, the protruding height of the hollow steel column 3 is 25 cm, so as to facilitate the docking of the cavity 5 in the lower prefabricated column 2. The diameter of the steel bar head is 10 mm and the length is 15 mm. The ribs 6 are distributed on the outer side of the hollow steel column 3 with a horizontal spacing of 5 cm and a vertical spacing of 5 cm, with a total of three layers, namely, upper, middle and lower, to replace the pull-out resistance effect and enhance the stability and tensile strength of the connection.
[0061] Example 2
[0062] The construction method of the ribbed steel column beam-column connection structure for the assembled concrete canopy of the above-mentioned embodiment 1 comprises the following steps:
[0063] Step 1:
[0064] A cavity 5 is reserved for the hollow steel column: when the lower prefabricated column 2 is processed, a cavity 5 matching the hollow steel column 3 is reserved.
[0065] Step 2:
[0066] Processing of prefabricated beam 1: When processing the upper prefabricated beam 1, place the hollow steel column 3 at the lower end of the prefabricated beam 1 and make it protrude 20-30 cm so as to dock with the cavity 5 of the lower prefabricated column 2.
[0067] Step 3:
[0068] Butt joint the precast beam 1 with the precast column 2: Butt joint the precast beam 1 with the precast column 2 to ensure that the hollow steel column 3 is aligned with the cavity 5 of the precast column 2.
[0069] Step 4:
[0070] Grouting operation: Grouting is performed into the cavity 5 of the prefabricated column 2 through the reserved grouting holes 8, so that the hollow steel column 3 and the prefabricated column 2 form a solid connection.
[0071] The above is only a preferred embodiment of the present invention, and does not impose any formal limitation on the structure of the present invention. The layout type and the number of uses of the present invention are not limited to this example, and can be optimized and selected according to the actual project. Any modification, equivalent change and decoration of the above embodiment based on the technical principle of the present invention that does not deviate from the content of the technical solution of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A ribbed steel column beam-column connection structure for a prefabricated concrete canopy, comprising a prefabricated beam (1) and a prefabricated column (2), characterized in that: The prefabricated beam (1) and the prefabricated column (2) are connected together via a hollow steel column (3); the hollow steel column (3) is arranged at the bottom of the prefabricated beam (1), and a plurality of anchoring steel bars (4) are welded to the top of the hollow steel column; the anchoring steel bars (4) extend into and are cast in the prefabricated beam (1), and are welded together with the steel bars in the prefabricated beam (1); The top of the prefabricated column (2) is provided with a cavity (5), the size of the cavity (5) matches that of the hollow steel column (3), and the hollow steel column (3) is butt-jointed and inserted into the cavity (5); The outer wall of the hollow steel column (3) is fixed with multiple groups of steel bar heads by electric welding to form protruding ribs (6). The ribs (6) are placed between the inner wall of the cavity (5) and the outer wall of the hollow steel column (3), and high-strength mortar is poured between the cavity (5) and the hollow steel column (3) and inside the hollow steel column (3).
2. The ribbed steel column beam-column connection structure for assembled concrete canopy according to claim 1 is characterized in that: The cross-sectional area and strength of the hollow steel column (3) are set by equal area and equal strength substitution, that is, the cross-sectional area and strength of the hollow steel column (3) are respectively equal to the cross-sectional area and strength of the original beam-column multiple connecting steel bars or multiple anchored beam steel bars (4).
3. The ribbed steel column beam-column connection structure for assembled concrete canopy according to claim 1, characterized in that: The prefabricated beam (1) comprises a supporting beam (11) and a corbel (12), and the hollow steel column (3) is arranged on the corbel (12).
4. The ribbed steel column beam-column connection structure for assembled concrete canopy according to claim 1, characterized in that: The protruding height of the hollow steel column (3) is 20-30 cm, so as to facilitate docking with the cavity (5) in the lower prefabricated column (2).
5. The ribbed steel column beam-column connection structure for assembled concrete canopy according to claim 1, characterized in that: The diameter of the steel bar head is 10 mm and the length is 15 mm; the ribs (6) are regularly distributed on the outside of the hollow steel column (3) with a horizontal spacing of 5 cm and a vertical spacing of 5 cm, and are used to equivalently replace the anti-pulling effect and enhance the stability and tensile strength of the connection.
6. The ribbed steel column-beam-column connection structure for assembled concrete canopy according to claim 1, characterized in that: The prefabricated column (2) comprises pier body longitudinal reinforcement (21) and pier body stirrups (22); the pier body longitudinal reinforcement (21) and the pier body stirrups (22) are wrapped around the outside of the cavity (5).
7. The ribbed steel column beam-column connection structure for assembled concrete canopy according to claim 1, characterized in that: A mortar pad layer (7) is also provided between the prefabricated beam (1) and the prefabricated column (2).
8. The ribbed steel column-beam-column connection structure for assembled concrete canopy according to claim 1, characterized in that: The prefabricated column (2) outside the cavity (5) is provided with a grouting hole (8) for pouring high-strength mortar.
9. The ribbed steel column-beam-column connection structure for assembled concrete canopy according to claim 1, characterized in that: The bottom of the anchor beam steel bar (4) is welded to the inner side of the top end of the hollow steel column (3).
10. A construction method for a ribbed steel column beam-column connection structure for an assembled concrete canopy according to claim 1, characterized in that: The steps include: Step 1: Reserving a cavity (5) for the hollow steel column: when processing the lower prefabricated column (2), reserve a cavity (5) matching the hollow steel column (3); Step 2: Processing of prefabricated beams (1): When processing the upper prefabricated beam (1), a hollow steel column (3) is placed at the lower end of the prefabricated beam (1) and is made to protrude by 20-30 cm so as to butt with the cavity (5) of the lower prefabricated column (2); Step 3: The prefabricated beam (1) and the prefabricated column (2) are butted together: the prefabricated beam (1) and the prefabricated column (2) are butted together to ensure that the hollow steel column (3) is aligned with the cavity (5) of the prefabricated column (2); Step 4: Grouting operation: Grouting is performed into the cavity (5) of the prefabricated column (2) through the reserved grouting hole (8), so that the hollow steel column (3) and the prefabricated column (2) form a solid connection.
Citation Information
Cited By
Connecting structure between bridge prefabricated hollow pier columns and construction method
CN121675304A