Sewage pool reverse hanging membrane covering device and method
By using a modular assembly and optimized construction sequence for a wastewater tank inverted membrane covering device and method, the problems of poor construction safety and high cost in existing technologies have been solved, achieving efficient and safe installation of PVDF membrane materials.
Patent Information
- Application Number
- CN202411083570.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-15
AI Technical Summary
Existing construction methods for inverted membrane structures in sewage treatment plants suffer from problems such as poor safety, cumbersome construction process, difficulty in quickly completing membrane installation, and high on-site construction costs.
By adopting a fan-shaped membrane connection method, the membrane is assembled in sections according to the shape of the steel frame. By setting up a pressure-bearing rope net, membrane fixing mechanism and temporary tensioning tools, the construction sequence is optimized and the installation process of PVDF membrane is simplified.
It improved the safety and efficiency of construction, reduced the burden on workers, lowered construction costs, ensured the tensioning and fixing effect of PVDF membrane material, and achieved efficient and safe installation.
Smart Images

Figure CN118958767A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of sewage treatment plant construction, and in particular relates to a sewage pool inverted hanging film covering device and method. Background Art
[0002] Sewage pool is a necessary facility in the sewage treatment process. It is mainly used to separate and remove suspended solids and pollutants in wastewater by physical and biological means, effectively purify water sources and protect the environment. In order to ensure the activity of aerobic microorganisms, traditional sewage pools generally adopt an open sewage pool design when in use, that is, they are placed in the open air without covering the sewage pool to make it fully exposed to ensure the activity and purification effect of aerobic microorganisms. However, due to the odor and earthy smell that will be volatilized during the sedimentation and degradation of sludge in the sewage pool, it is easy to affect the surrounding environment; and in the absence of a cover, rainwater will enter the sewage pool on rainy days and mix with the sludge, which will not only pollute the water source again, but also easily occupy the storage space of the sludge, thereby reducing the space utilization rate of the sewage pool.
[0003] The reverse hanging membrane structure refers to the method of reverse hanging the membrane material of the sewage pool and placing the steel structure outside to seal the waste gas in the sewage pool to prevent the waste gas from spreading and polluting the surrounding environment. It mainly includes skeleton membrane structure, tension membrane structure and inflatable membrane structure. The skeleton membrane structure is also called steel frame reverse hanging membrane and steel structure reverse hanging membrane. It mainly uses membrane materials with strong corrosion resistance to cover the waste gas, and the steel structure suspends the membrane outside. The membrane layer also has high-strength low-yarn polyester filaments, high-quality PVC coatings and UV light curing treatment, which not only exerts the corrosion resistance of the membrane material, but also fundamentally solves the corrosion problem of the steel structure due to contact with corrosive gases. During the construction of the reverse suspended membrane: (1) Since all the working surfaces of the membrane structure installation, including the membrane nodes and the tensioning installation of the membrane structure roof, are all carried out in the air, and there is no steel structure support structure or erection conditions on the upper part of the main steel structure roof for the erection and installation of the membrane structure, how to effectively ensure the safe construction of the suspended membrane has become an important link in the installation process of the suspended membrane. In addition, the diameter of the circular sewage treatment tank is large, and the steel frame cannot be assembled in the air, resulting in construction difficulties; (2) During the installation of the suspended membrane, in order to ensure the waterproof effect and membrane surface safety of the suspended membrane, the membrane surface needs to be radially tensioned and fixed; in the traditional suspended membrane construction process, ladders are generally used to assist construction workers in construction. Although it can reduce the burden of on-site construction workers and quickly complete the installation and fixation of the suspended membrane, the ladders often collide with the suspended membrane keels when in use, and it is not convenient to send workers to the intersection of some suspended membrane keels and ladders, resulting in workers needing to use other tools to complete the fixation of the suspended membrane, which makes the construction process cumbersome and inconvenient to quickly complete the installation of the suspended membrane, and at the same time causes high on-site construction costs.
[0004] Therefore, the present invention proposes a sewage pool reverse hanging membrane covering device and method to solve the problems existing in the above-mentioned prior art. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the shortcomings of the prior art, the present invention provides an inverted membrane covering device and method for a sewage pool, which takes into account the connection of fan-shaped membranes, assembles the membranes in blocks according to the shape of a steel frame, and monitors the tension stress of the assembled membranes. It has the advantages of simple construction process, good construction safety and good tensioning and fixing effect on PVDF membrane materials, and solves the problems of poor safety, complicated construction process, difficulty in effectively setting up an operating platform, inconvenience in quickly completing the installation of the suspended membrane, and high on-site construction costs in the existing construction process of the inverted membrane structure for sewage pools.
[0007] (II) Technical solution
[0008] In order to achieve the above-mentioned purpose of installing PVDF membrane materials efficiently and safely, the present invention provides the following technical solutions:
[0009] The present invention seeks protection for a first solution: a construction method for a sewage pool inverted membrane covering device, comprising:
[0010] Step 1: Install the steel frame keel
[0011] Step 2: Preparation before membrane installation
[0012] Step 2.1: Check the surface of the steel frame keel;
[0013] Step 2.2: Technical briefing and training for construction personnel;
[0014] Step 3: Set up a pressure rope net on the lower side of the steel frame keel;
[0015] Step 4: Lift the membrane material into place;
[0016] Step 5: Unfold the PVDF membrane package;
[0017] Step 6: Set up a windproof rope net on the outside of the PVDF membrane;
[0018] Step 7: Temporarily fix the PVDF membrane;
[0019] Step 8: Make a waterproof membrane on the outside of the PVDF membrane;
[0020] Step 9: Carry out water spraying test and safety measures on the installed PVDF membrane;
[0021] Step 10: After the PVDF membrane material tensioning construction is completed, transparent tempered glass is laid on the steel frame platform (17).
[0022] As a preferred embodiment of the present invention: the installation process of the steel frame keel includes:
[0023] Step 1.1: Before installing the steel frame keel, assemble the steel frame keel in blocks on the ground, and hoist the steel frame platform at the same time, wherein the steel frame platform spans the upper center position of the sewage pool;
[0024] Step 1.2: Hoist the steel frame keel and connect the steel frame keels of various parts, fix the steel frame keel on the embedded parts at the upper opening of the sewage pool, and install hydraulic parts on the lower side of the center of the steel frame keel. The lower end of the hydraulic parts acts on the steel frame platform, and the hydraulic parts are used to fine-tune the steel frame keel.
[0025] As a preferred embodiment of the present invention: when the pressure rope net is installed, a rope belt is pulled every 3m in the longitudinal direction, and the two ends of the rope are tightly connected to the membrane material fixing mechanisms at the east and west ends through a rope tightening machine; when the horizontal rope net is pulled, three ropes are pulled in each span unit, and after the rope net is installed, a force is applied to the rope through a rope tightening machine to prevent the membrane surface from contacting the steel frame keel during the traction process; the exposed sharp parts of the rope tightening machine are wrapped with cotton cloth;
[0026] The windproof rope net is stretched longitudinally every 4 meters.
[0027] As a preferred embodiment of the present invention: the process of unfolding the PVDF membrane package includes:
[0028] Step 4.1: According to the installation requirements of PVDF membrane materials, place several membrane fixing mechanisms and temporary tensioning tools every 3 to 4 meters;
[0029] Step 4.2: Distribute the hand tools for installing PVDF membrane materials to each team;
[0030] All personnel involved in the PVDF membrane work must wear soft-soled rubber shoes;
[0031] Step 4.3: First, find the end mark of the PVDF membrane and use manpower to pull and unfold the PVDF membrane; finally, the operator pulls the PVDF membrane through the rope tightening machine, and the workers on both sides use ropes to tighten the membrane fixing mechanism and shake the PVDF membrane to assist in pulling the PVDF membrane (9).
[0032] As a preferred embodiment of the present invention: the process of temporarily fixing the PVDF membrane material comprises:
[0033] After the PVDF membrane material is unfolded, the arranged rope tightener and membrane material fixing mechanism are used to temporarily fix the membrane around the compression ring beam membrane fixing circular tube, radial cable membrane fixing circular tube and inner ring cable membrane fixing circular tube, and the rope tightener is used to perform preliminary tensioning on the PVDF membrane material.
[0034] The present invention seeks to protect a second solution: a sewage pool inverted hanging membrane covering device, which is arranged on the upper side of the sewage pool and includes a steel frame keel, a steel frame platform and a PVDF membrane material;
[0035] The steel frame keel is arranged on the sewage pool through the embedded parts on the upper side of the sewage pool, and is located on both sides of the steel frame platform. A membrane material fixing mechanism is also arranged on the steel frame keel for use in conjunction with the PVDF membrane material.
[0036] The steel frame platform is arranged on the upper side of the sewage pool, straddling the upper center of the sewage pool, and is connected to the steel frame keel through hydraulic components, and bridge frame locking membrane nodes are arranged on both sides of the steel frame platform for use with PVDF membrane materials;
[0037] The PVDF membrane material is arranged on the lower side of the steel frame keel and the steel frame platform by the reverse hanging membrane method, and is sealed and connected to the steel frame keel, the sewage pool and the steel frame platform.
[0038] As a preferred embodiment of the present invention: the membrane material fixing mechanism includes a first membrane locking node, a second membrane locking node, a third membrane locking node, a fourth membrane locking node, a fifth membrane locking node and a sixth membrane locking node, the first membrane locking node is arranged on the first steel connecting rod of the steel frame keel, the second membrane locking node is arranged on the second steel connecting rod of the steel frame keel, the third membrane locking node is arranged on the compression ring beam membrane fixing circular tube of the steel frame keel, the fourth membrane locking node is arranged on the radial cable membrane fixing circular tube of the steel frame keel, the fifth membrane locking node is arranged on the inner ring cable membrane fixing circular tube of the steel frame keel, and the sixth membrane locking node is arranged on the third steel connecting rod of the steel frame keel.
[0039] As a preferred embodiment of the present invention: the first film locking node, the second film locking node, the third film locking node, the fourth film locking node, the fifth film locking node and the sixth film locking node all include:
[0040] The stiffening steel plate and the steel stiffening bar are both arranged outside the sleeve ring, and the steel stiffening bar is arranged on one side of the stiffening steel plate;
[0041] Aluminum strips are arranged inside the bend of the PVDF membrane and matched with the steel pressure plate and the steel stiffening strips;
[0042] The steel pressure plate is arranged on one side of the steel stiffening bar and connected to the steel stiffening bar by connecting bolts, so that the PVDF membrane material is clamped between the steel pressure plate and the steel stiffening bar;
[0043] The sleeve ring is matched with the compression ring beam membrane fixing circular tube, the first steel connecting rod, the second steel connecting rod, the radial cable membrane fixing circular tube, the third steel connecting rod and the inner ring cable membrane fixing circular tube.
[0044] As a preferred embodiment of the present invention: the pressure ring beam membrane fixing circular tube is arranged at the upper end opening of the sewage pool and is connected to the sewage pool through embedded parts; the radial cable membrane fixing circular tube is arranged in the middle part of the pressure ring beam membrane fixing circular tube and is connected to the pressure ring beam membrane fixing circular tube through the first steel connecting rod and the second steel connecting rod; the inner ring cable membrane fixing circular tube is arranged on the lower side of the middle part of the radial cable membrane fixing circular tube and is connected to the radial cable membrane fixing circular tube through the third steel connecting rod.
[0045] As a preferred embodiment of the present invention: the bridge frame locking film nodes are symmetrically arranged on both sides of the steel frame platform, including
[0046] Aluminum strips are clamped at the bend of the PVDF membrane and used in conjunction with steel pressure plates and supporting angle steels;
[0047] A steel pressure plate is arranged on one side of the supporting angle steel and is connected to the supporting angle steel by fastening screws;
[0048] Support angle steel, welded on the steel frame platform.
[0049] (III) Beneficial effects
[0050] Compared with the prior art, the present invention provides a sewage pool reverse hanging membrane covering device and method, which has the following beneficial effects:
[0051] 1. This construction process adopts the steps of setting up a pressure rope net, a membrane material fixing mechanism and a temporary tensioning tool. When unfolding and tensioning the PVDF membrane material, it can not only ensure the convenience of the operation of the PVDF membrane material, but also fix the PVDF membrane material through the membrane material fixing mechanism, thereby reducing the burden on workers and ensuring the safety of workers' construction; it solves the problems of unreasonable construction technology and poor construction safety in the existing sewage pool reverse hanging membrane structure construction technology;
[0052] 2. This construction process can make the installation process of PVDF membrane simple and convenient, effectively optimize the construction sequence, improve the construction efficiency, and solve the problem of cumbersome construction process and inconvenience in quickly completing the installation of membrane in the existing sewage pool reverse hanging membrane structure construction process.
[0053] 3. This construction process creates a good working platform. Construction workers can assemble and weld steel frame keels on the ground, saving a lot of time. During the lifting process, it can be reliably fixed at any position in the air for a long time, and the elevation and axis during the lifting process can be checked at any time, and problems can be corrected in time. During the construction of large-span cantilever steel structures, the stress and deformation of key truss members can be monitored in real time, and the actual stress and deformation conditions of the cantilever structure during the construction process as well as the health level of the entire structure can be analyzed, so as to make a correct assessment of the design and construction quality of the entire structure, improve the overall safety of the structure after installation, and achieve the purpose of efficient and safe installation of PVDF membrane materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 It is a flow chart of the construction process of the reverse hanging membrane structure of the sewage pool of the present invention;
[0055] Figure 2 It is a top view of the protective device for the inverted membrane sewage pool of the present invention;
[0056] Figure 3 It is a front view of the protective device for the inverted membrane sewage pool of the present invention;
[0057] Figure 4 It is a cross-sectional view of the protective device for the inverted membrane sewage pool of the present invention;
[0058] Figure 5 It is a top view of the steel frame keel of the present invention;
[0059] Figure 6 It is the layout diagram of the embedded parts of the present invention;
[0060] Figure 7 It is a structural schematic diagram of the first film locking node of the present invention;
[0061] Figure 8 It is a structural schematic diagram of the second film locking node of the present invention;
[0062] Fig. 9 It is a structural schematic diagram of the third film locking node of the present invention;
[0063] Fig.10 It is a structural schematic diagram of the fourth film locking node of the present invention;
[0064] Fig.11 It is a structural schematic diagram of the fifth film locking node of the present invention;
[0065] Fig.12 It is a structural schematic diagram of the sixth film locking node of the present invention;
[0066] Fig.13 It is a structural schematic diagram of the bridge frame locking membrane node of the present invention.
[0067] In the figure: 1. Compression ring beam membrane fixing round tube; 2. First steel connecting rod; 3. Second steel connecting rod; 4. Embedded parts; 5. Radial cable membrane fixing round tube; 6. Third steel connecting rod; 7. Inner ring cable membrane fixing round tube; 8. Drain pipe; 9. PVDF membrane material; 10. Stiffening steel plate; 11. Aluminum strip; 12. Steel pressure plate; 13. Connecting bolts; 14. Sleeve ring; 15. Steel stiffening strip; 16. Sewage tank; 17. Steel frame platform; 18. Hydraulic parts; 19. Fastening screws; 20. Support angle steel. DETAILED DESCRIPTION
[0068] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0069] Example 1: Please refer to Figure 1-Figure 13 , the present invention provides a technical solution:
[0070] A construction method for a sewage pool inverted membrane covering device, comprising:
[0071] Step 1: Install the steel frame keel
[0072] Step 1.1: Before installing the steel frame keel, the steel frame keel is assembled in blocks on the ground, and at the same time, the steel frame platform 17 is hoisted and installed, and the steel frame platform 17 spans the upper center position of the sewage pool 16, and the steel frame platform 17 is fixed;
[0073] Step 1.2: hoist the steel frame keel, connect the steel frame keels of various parts, fix the steel frame keel on the embedded part 4 at the upper opening of the sewage pool 16, and install the hydraulic component 18 on the lower side of the center of the steel frame keel. The lower end of the hydraulic component 18 acts on the steel frame platform 17, and adjust the telescopic length of the hydraulic component 18 to fine-tune the position and height of the steel frame keel;
[0074] Step 2: Preparation before membrane installation
[0075] Step 2.1: Check the surface of the installed steel frame keel
[0076] First, check the installed steel frame keel, complete the installation and welding, polish the welds and finish the surface coating; install the PVDF membrane material 9 after confirming that the installation requirements are met; if there are weld nodules, leaks, incomplete coating, sharp protrusions on the steel frame keel welds, and parts that are easy to cause damage to the PVDF membrane material 9, the relevant management personnel should be notified in time to rectify and repair the steel structure surface until the membrane installation requirements are met;
[0077] Step 2.2: Provide technical briefing and training to construction personnel
[0078] When installing PVDF membrane material 9, in order to ensure the construction quality of PVDF membrane material 9, construction personnel should be trained before construction work, requiring each construction personnel to master the installation process of PVDF membrane material 9 and conduct technical briefing to the construction team; important measures such as clothing for installing PVDF membrane material 9, safety protection measures, precautions during membrane installation, and protection of PVDF membrane material 9 during installation should be explained to the operators one by one, and training records should be kept.
[0079] Step 3: Set up the pressure rope net
[0080] Before laying the PVDF membrane material 9, a rope net needs to be installed on the lower side of the steel frame keel as a support for the membrane when it is unfolded; the rope net material of this embodiment is φ16 nylon rope; when the rope net is installed, a rope belt is pulled every 3m in the longitudinal direction, and the two ends of the rope are tightly connected to the membrane material fixing mechanisms at the east and west ends through a rope tightening machine; when the horizontal rope net is pulled, three ropes should be pulled in each span unit. After the rope net is installed, sufficient force is applied to the rope through the rope tightening machine to avoid the membrane surface from contacting the steel frame keel during the traction process, causing damage or contamination to the PVDF membrane material 9; the exposed sharp parts of the rope tightening machine are wrapped with cotton cloth.
[0081] Step 4: Install the membrane material in place
[0082] Find the membrane package with the same number according to the installation position of the membrane surface; use special tooling for membrane lifting and use two 180-ton truck cranes to lift the membrane package of PVDF membrane material 9 to the roof in place.
[0083] Step 5: Unfold the PVDF membrane 9 package
[0084] Table 1: Necessary conditions for membrane material development
[0085]
[0086] Step 5.1: According to the installation requirements of the PVDF membrane material 9, a certain number of membrane material fixing mechanisms and temporary tensioning tools are placed approximately every 3 to 4 meters;
[0087] The membrane material fixing mechanism includes a first membrane locking node, a second membrane locking node, a third membrane locking node, a fourth membrane locking node, a fifth membrane locking node, a sixth membrane locking node and a bridge frame membrane locking node; the temporary tensioning tool includes a rope tightening machine, a wire rope tightening machine, a tightening clamp and a φ14 nylon rope;
[0088] Step 5.2: Distribute the manual tools for installing the PVDF membrane material 9 to each team;
[0089] Hand tools include pliers, wrenches and tool bags with safety hooks; all personnel involved in the work of PVDF membrane material 9 must wear soft-soled rubber shoes;
[0090] Step 5.3: First, find the end mark of the PVDF membrane 9, and use manpower to pull and unfold the PVDF membrane 9; finally, the operator pulls the PVDF membrane 9 through the rope tightening machine, and the workers on both sides tighten the membrane fixing mechanism with ropes, shaking the PVDF membrane 9, and assisting the pulling of the PVDF membrane 9;
[0091] During the pulling process, a dedicated person shall be responsible for the unified command of the pulling process; the speed of the pulling process shall be consistent to ensure that the PVDF membrane material 9 is horizontally unfolded forward; when the PVDF membrane material 9 is unfolded, the appearance quality of the membrane cloth shall be checked at any time, and when damage, hooking and indelible stains caused by production are found, they shall be handled in time;
[0092] Step 6: Set up the windbreak rope net
[0093] After the PVDF membrane 9 is pulled, in order to prevent the PVDF membrane 9 from being damaged by the wind, a reverse rope net should be immediately installed on the outside of the PVDF membrane 9. When the reverse rope net is pulled, it should be stretched every 4 meters in the longitudinal direction.
[0094] Step 7: Temporarily fix the PVDF membrane 9
[0095] After the PVDF membrane material 9 is unfolded, the membrane periphery is temporarily fixed on the compression ring beam membrane fixing circular tube 1, the radial cable membrane fixing circular tube 5 and the inner ring cable membrane fixing circular tube 7 by using the pre-arranged rope tightener and membrane material fixing mechanism, and the PVDF membrane material 9 is initially tensioned by the rope tightener. Sufficient force must be applied to the PVDF membrane material 9 to ensure that the membrane surface has a certain stress level and is not damaged under climatic conditions such as wind, rain and snow. After the membrane is unfolded, if the temporary fixation has not been completed when the work time comes, the construction personnel should be arranged to work overtime, or additional personnel should be added to temporarily fix the membrane firmly to ensure the safety of the membrane.
[0096] Step 8: Make a waterproof membrane on the outside of the PVDF membrane 9
[0097] After the two adjacent PVDF membranes 9 are fixed and installed, the supporting aluminum plate should be installed, and then the waterproof membrane should be installed; before the waterproof membrane is constructed, the dust in the welding area should be wiped clean with a rag; the two ends of the waterproof membrane should be stretched with a rope tightener, straight and without wrinkles; the workers should be given a good technical briefing for the waterproof membrane welding, and a welding test should be carried out before welding to obtain the corresponding welding parameters. The operators must operate carefully and seriously, and the welding must be firm and reliable;
[0098] Step 9: Perform water spraying test and safety measures on the installed PVDF membrane material 9
[0099] Water spray test: (1) In order to ensure that the PVDF membrane material 9 can be used normally on rainy days, a fire-fighting or aerial ladder can be used. Workers stand in the aerial ladder basket, fasten their safety belts, and hang lifelines. At least 5 to 6 people form a working group; (2) 2 people are on top to flush water, and one of them is a safety guard. A special person is arranged to open and close the water gate at the bottom water valve. 1 to 2 people are arranged under the membrane surface as observers to observe whether there is backflow or leakage; (3) There is also a full-time safety officer who coordinates and commands in a unified manner, and does a good job in safety training, safety precautions and safety warnings;
[0100] Table 2: Equipment used in the water spray test
[0101]
[0102]
[0103] Step 10: After the PVDF membrane material 9 is tensioned, transparent tempered glass is laid on the steel frame platform 17 to ensure the sealing effect on the top of the sewage pool 16.
[0104] As a preferred implementation scheme, the sewage pool inverted membrane structure construction process described in this embodiment also includes a tension force inspection process during the PVDF membrane material 9 tensioning construction process, specifically including:
[0105] (1) Due to the plasticity and tensioning properties of PVDF membrane material 9, an adjustment margin is generally reserved at the adjustment node when tensioning. After multiple tensioning, a professional prestressed tensile gauge is used to check whether the tension of the membrane structure reaches the design strength;
[0106] (2) Since the PVDF membrane material 9 nodes in this embodiment are designed to be non-adjustable, the membrane material needs to be pre-tensioned before leaving the factory. After arriving at the site, the installation effect is achieved by evenly tensioning the membrane material by fixing the membrane material on one side and all around.
[0107] As a preferred embodiment, the safety measures for the construction process of the sewage pool reverse hanging membrane structure in the membrane structure tensioning process described in this embodiment include:
[0108] (1) Before going to work every day, we will conduct group briefings and make the division of labor and positions clear;
[0109] (2) The operating platform and safety guardrails set up at the construction site should be safe, reliable and free of potential accidents;
[0110] (3) On-site safety facilities must be set up by full-time personnel and no one else may dismantle or loosen them at will; safety facilities must be inspected and maintained before construction every day;
[0111] (4) When lifting the membrane surface, the safety of the membrane surface must be ensured; pay attention to the weather forecast, and do not operate when the wind force is strong or level 4; when lifting the membrane surface, there must be a dedicated person in charge to command to prevent the membrane surface from getting out of control or being damaged or torn;
[0112] (5) Arrange the construction time of each membrane unit. According to the weather conditions, when a membrane is unfolded, the periphery of the membrane surface should be effectively connected on the same day, and work should be started early and ended late to grasp the effective working time;
[0113] (6) When working at height, it is strictly forbidden to throw objects downwards. Tools used should be tied with ropes, safety belts or tool bags to prevent them from falling;
[0114] (7) Small tools must be placed in tool bags, and all loose parts must be collected in containers and not exceed the flat top. Scattering is strictly prohibited. It is not allowed to lift objects with both hands or use defective tools.
[0115] (8) High-altitude operators must meet the physical requirements for ultra-high-altitude construction, and are strictly prohibited from working under the influence of alcohol;
[0116] (9) During construction, strictly abide by all fire prevention regulations on site, focus on prevention, and prevent fire;
[0117] (10) The installed diaphragms should be inspected regularly until completion;
[0118] Table 3: Equipment used in the tensioning process of PVDF membrane 9
[0119] Name, brand, origin Quantity (unit) Where are you now Planned usage time Electric welding machine 5 units on site 30 days Hand hoist 30 units on site 30 days Hand Chain Hoist 18 units on site 30 days Hand drill 50 on site 30 days Total Station 1 unit on site 30 days Level 5 units on site 30 days Tensioner 220 units on site 30 days pulley 12 units on site 30 days
[0120] The quality requirements of the construction process described in this embodiment include:
[0121] 1. Code for Loads on Building Structures (GB50009-2012);
[0122] 2. Technical Specification for Membrane Structures (CECS158-2015)
[0123] 3. "Safety Code for Power Supply and Use at Construction Engineering Site" (GB 50194-2014);
[0124] 4. Construction Safety Inspection Standard (JGJ59-2011);
[0125] 5. Technical Specifications for Safety of Height Operations in Construction (JGJ 80-2016).
[0126] As a preferred embodiment, Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, the steel frame keel is symmetrically arranged along both sides of the steel frame platform 17, including a compression ring beam membrane fixing circular tube 1, a radial cable membrane fixing circular tube 5 and an inner ring cable membrane fixing circular tube 7. The compression ring beam membrane fixing circular tube 1 is fixedly arranged at the upper end opening of the sewage tank 16 through an embedded part 4, the radial cable membrane fixing circular tube 5 is arranged in the middle of the compression ring beam membrane fixing circular tube 1, and is connected to the compression ring beam membrane fixing circular tube 1 through a first steel connecting rod 2 and a second steel connecting rod 3 arranged upwardly inclined, and the inner ring cable membrane fixing circular tube 7 is arranged on the lower side of the middle of the radial cable membrane fixing circular tube 5, and is connected to the radial cable membrane fixing circular tube 5 through a third steel connecting rod 6 inclined downward;
[0127] In this embodiment, the steel frame keel of the dome is formed by connecting the compression ring beam membrane fixing circular tube 1, the first steel connecting rod 2, the second steel connecting rod 3, the radial cable membrane fixing circular tube 5, the third steel connecting rod 6 and the inner ring cable membrane fixing circular tube 7. During construction, it can be assembled and welded according to design requirements, and the overall weight is light, which is convenient for installation and use.
[0128] As a preferred embodiment, Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the first film locking node is arranged on the first steel connecting rod 2, the second film locking node is arranged on the second steel connecting rod 3, the third film locking node is arranged on the compression ring beam film fixing circular tube 1, the fourth film locking node is arranged on the radial cable film fixing circular tube 5, the fifth film locking node is arranged on the inner ring cable film fixing circular tube 7, the sixth film locking node is arranged on the third steel connecting rod 6, and the first film locking node, the second film locking node, the third film locking node, the fourth film locking node, the fifth film locking node and the sixth film locking node are all used in conjunction with the PVDF film material 9 to fix the PVDF film material 9 on the inner side of the steel frame keel;
[0129] In this embodiment, by setting the first film locking node, the second film locking node, the third film locking node, the fourth film locking node, the fifth film locking node and the sixth film locking node, the corresponding film locking nodes can be flexibly installed on the steel frame keel to fix the PVDF membrane material 9, and the entire construction process is simple and flexible to operate.
[0130] As a preferred embodiment, Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 and Fig.12 As shown, the first locking film node, the second locking film node, the third locking film node, the fourth locking film node, the fifth locking film node and the sixth locking film node all include a stiffening steel plate 10, an aluminum bar 11, a steel pressure plate 12, a sleeve ring 14 and a steel stiffening bar 15; wherein
[0131] The stiffening steel plate 10 and the steel stiffening bar 15 are both welded to the outside of the sleeve ring 14, and the steel stiffening bar 15 is welded on one side of the stiffening steel plate 10;
[0132] The aluminum strip 11 is clamped at the bend of the PVDF membrane 9 to limit the position of the PVDF membrane 9;
[0133] The steel pressing plate 12 is arranged on one side of the steel stiffening bar 15 and connected to the steel stiffening bar 15 by connecting bolts 13, so that the PVDF membrane material 9 is clamped between the steel pressing plate 12 and the steel stiffening bar 15 to fix the PVDF membrane material 9;
[0134] In this embodiment, the sleeve ring 14 of the first film locking node is used in conjunction with the first steel connecting rod 2, the sleeve ring 14 of the second film locking node is used in conjunction with the second steel connecting rod 3, the sleeve ring 14 of the third film locking node is used in conjunction with the compression ring beam membrane fixed circular tube 1, the sleeve ring 14 of the fourth film locking node is used in conjunction with the radial cable membrane fixed circular tube 5, the sleeve ring 14 of the fifth film locking node is used in conjunction with the inner ring cable membrane fixed circular tube 7, and the sleeve ring 14 of the sixth film locking node is used in conjunction with the third steel connecting rod 6. During installation, the sleeve ring 14 is sleeved on the corresponding steel connecting rod and fixed circular tube and can be moved. After moving, the PVDF membrane material 9 is fixed, and the operation is simple and flexible.
[0135] As a preferred embodiment, Fig.13 As shown, the bridge frame locking film node is symmetrically arranged on both sides of the steel frame platform 17, and is used in conjunction with the PVDF membrane material 9 to lock the PVDF membrane material 9, including an aluminum strip 11, a steel pressure plate 12, a fastening screw 19 and a supporting angle steel 20;
[0136] The aluminum strip 11 is clamped at the bend of the PVDF membrane 9 to limit the position of the PVDF membrane 9;
[0137] The steel pressing plate 12 is arranged on one side of the supporting angle steel 20, and the PVDF membrane material 9 is clamped between the steel pressing plate 12 and the supporting angle steel 20 by fastening the screws 19 and the supporting angle steel 20, so as to fix the PVDF membrane material 9;
[0138] The support angle steel 20 is welded on the steel frame platform 17;
[0139] In this embodiment, the PVDF membrane material 9 is locked and fixed on both sides of the steel frame platform 17 in the length direction through the connection of the aluminum strip 11, the steel pressure plate 12, the fastening screws 19 and the supporting angle steel 20.
[0140] As a preferred embodiment, Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11and Fig.12 As shown, due to the different positions of the fixing points, the shape of the stiffening steel plate 10 can be designed to include various shapes.
[0141] As a preferred embodiment, Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 , Fig.12 and Fig.13 As shown, the aluminum strip 11 is clamped at the bend of the PVDF membrane 9 and is used in conjunction with the steel pressing plate 12 and the steel stiffening strip 15 .
[0142] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0143] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction method for a sewage pool inverted membrane covering device, characterized in that: include: Step 1: Install the steel frame keel Step 2: Preparation before membrane installation Step 2.1: Check the surface of the steel frame keel; Step 2.2: Technical briefing and training for construction personnel; Step 3: Set up a pressure rope net on the lower side of the steel frame keel; Step 4: The membrane material is hoisted into place; Step 5: unfolding the PVDF membrane (9) membrane package; Step 6: Arrange a windproof rope net outside the PVDF membrane (9); Step 7: temporarily fixing the PVDF membrane (9); Step 8: Making a waterproof membrane on the outside of the PVDF membrane (9); Step 9: Perform a water spray test and safety measures on the installed PVDF membrane (9); Step 10: After the PVDF membrane (9) is tensioned, transparent tempered glass is laid on the steel frame platform (17).
2. A sewage pool inverted membrane covering device and method as claimed in claim 1, characterized in that: The installation process of the steel frame keel includes: Step 1.1: Before installing the steel frame keel, assemble the steel frame keel in blocks on the ground, and hoist the steel frame platform (17) at the same time, wherein the steel frame platform (17) spans the upper center position of the sewage pool (16); Step 1.2: hoist the steel frame keel and connect the steel frame keels of various parts, fix the steel frame keel on the embedded part (4) at the upper opening of the sewage pool (16), and install the hydraulic component (18) on the lower side of the center of the steel frame keel. The lower end of the hydraulic component (18) acts on the steel frame platform (17), and the hydraulic component (18) is used to fine-tune the steel frame keel.
3. A sewage pool inverted membrane covering device and method as claimed in claim 1, characterized in that: When installing the pressure rope net, a rope belt is pulled every 3m in the longitudinal direction, and the two ends of the rope are tightly connected to the membrane material fixing mechanisms at the east and west ends through a rope tightening machine; when the horizontal rope net is pulled, three ropes are pulled in each span unit. After the rope net is installed, a force is applied to the rope through a rope tightening machine to prevent the membrane surface from contacting the steel frame keel during the traction process; the exposed sharp parts of the rope tightening machine are wrapped with cotton cloth; The windproof rope net is stretched longitudinally every 4 meters.
4. A sewage pool inverted membrane covering device and method as claimed in claim 1, characterized in that: The process of unfolding the PVDF membrane (9) package includes: Step 4.1: According to the installation requirements of the PVDF membrane material (9), a number of membrane material fixing mechanisms and temporary tensioning tools are placed every 3 to 4 meters; Step 4.2: Distribute the manual tools for installing the PVDF membrane material (9) to each team; All personnel involved in the work of PVDF membrane materials (9) must wear soft-soled rubber shoes; Step 4.3: First, find the end mark of the PVDF membrane (9), and use manpower to pull and unfold the PVDF membrane (9); finally, the operator pulls the PVDF membrane (9) through the rope tightening machine, and the workers on both sides use ropes to tighten the membrane fixing mechanism and shake the PVDF membrane (9) to assist in the pulling of the PVDF membrane (9).
5. A sewage pool inverted membrane covering device and method as claimed in claim 1, characterized in that: The process of temporarily fixing the PVDF membrane material (9) includes: After the PVDF membrane material (9) is unfolded, the membrane is temporarily fixed around the membrane to the compression ring beam membrane fixing circular tube (1), the radial cable membrane fixing circular tube (5) and the inner ring cable membrane fixing circular tube (7) using the arranged rope tightener and membrane material fixing mechanism, and the PVDF membrane material (9) is initially tensioned using the rope tightener.
6. A sewage pool inverted membrane covering device obtained based on the construction method according to claim 1, arranged on the upper side of the sewage pool (16), characterized in that: It includes a steel frame keel, a steel frame platform (17) and a PVDF membrane material (9); The steel frame keel is arranged on the sewage pool (16) through the embedded parts (4) on the upper side of the sewage pool (16), and is located on both sides of the steel frame platform (17), and a membrane material fixing mechanism is also arranged on the steel frame keel for use in conjunction with the PVDF membrane material (9); The steel frame platform (17) is arranged on the upper side of the sewage pool (16), straddling the upper center position of the sewage pool (16), and is connected to the steel frame keel through a hydraulic component (18), and bridge frame locking membrane nodes are arranged on both sides of the steel frame platform (17) for use with the PVDF membrane material (9); The PVDF membrane material (9) is arranged on the lower side of the steel frame keel and the steel frame platform (17) by means of the reverse hanging membrane method, and is sealedly connected to the steel frame keel, the sewage pool (16) and the steel frame platform (17).
7. A sewage pool inverted membrane covering device as claimed in claim 6, characterized in that: The membrane material fixing mechanism comprises a first membrane locking node, a second membrane locking node, a third membrane locking node, a fourth membrane locking node, a fifth membrane locking node and a sixth membrane locking node, wherein the first membrane locking node is arranged on a first steel connecting rod (2) of a steel frame keel, the second membrane locking node is arranged on a second steel connecting rod (3) of a steel frame keel, the third membrane locking node is arranged on a compression ring beam membrane fixing circular tube (1) of a steel frame keel, the fourth membrane locking node is arranged on a radial cable membrane fixing circular tube (5) of a steel frame keel, the fifth membrane locking node is arranged on an inner ring cable membrane fixing circular tube (7) of a steel frame keel, and the sixth membrane locking node is arranged on a third steel connecting rod (6) of a steel frame keel.
8. A sewage pool inverted membrane covering device as claimed in claim 7, characterized in that: The first film locking node, the second film locking node, the third film locking node, the fourth film locking node, the fifth film locking node and the sixth film locking node all include: The stiffening steel plate (10) and the steel stiffening bar (15) are both arranged outside the sleeve ring (14), and the steel stiffening bar (15) is arranged on one side of the stiffening steel plate (10); An aluminum strip (11) is arranged inside the bend of the PVDF membrane (9) and matches the steel pressure plate (12) and the steel stiffening strip (15); A steel pressure plate (12) is arranged on one side of the steel stiffening bar (15) and is connected to the steel stiffening bar (15) via a connecting bolt (13), so that the PVDF membrane material (9) is clamped between the steel pressure plate (12) and the steel stiffening bar (15); The sleeve ring (14) matches the compression ring beam membrane fixing circular tube (1), the first steel connecting rod (2), the second steel connecting rod (3), the radial cable membrane fixing circular tube (5), the third steel connecting rod (6) and the inner ring cable membrane fixing circular tube (7).
9. A sewage pool inverted membrane covering device as claimed in claim 7, characterized in that: The compression ring beam membrane fixing circular tube (1) is arranged at the upper end opening of the sewage tank (16) and is connected to the sewage tank (16) through an embedded part (4); the radial cable membrane fixing circular tube (5) is arranged in the middle of the compression ring beam membrane fixing circular tube (1) and is connected to the compression ring beam membrane fixing circular tube (1) through a first steel connecting rod (2) and a second steel connecting rod (3); the inner ring cable membrane fixing circular tube (7) is arranged at the lower side of the middle of the radial cable membrane fixing circular tube (5) and is connected to the radial cable membrane fixing circular tube (5) through a third steel connecting rod (6).
10. A sewage pool inverted membrane covering device as claimed in claim 6, characterized in that: The bridge frame locking film nodes are symmetrically arranged on both sides of the steel frame platform (17), including The aluminum strip (11) is clamped at the bend of the PVDF membrane (9) and is used in conjunction with the steel pressure plate (12) and the supporting angle steel (20); A steel pressing plate (20) is arranged on one side of the supporting angle steel (20) and is fastened to the supporting angle steel (20) by means of fastening screws (19); The supporting angle steel (20) is welded on the steel frame platform (17).