Underwater pebble bed under-pressure bin opening and tool changing composite mud film manufacturing method

By constructing a combination of bentonite slurry and gelled slurry in stages, a composite mud film with high strength and low permeability is formed, which solves the problem that traditional underwater mud films cannot stabilize the palm surface in the highly permeable pebble layer. The safety and stability of underwater tunnel construction have been improved.

CN118959001APending Publication Date: 2024-11-15CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411015519.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the highly permeable and water-rich pebbles, traditional underwater mud membranes cannot stabilize the palm surface of the underwater tunnel, and require early drilling and grouting, which cannot be directly applicable to the underwater pressure opening and tool change of shield machines. Operation leads to poor construction safety and stability.

Method used

The penetration belt and sludge film are constructed in stages using bentonite slurries of different viscosity, and reinforced by gelled slurry to form a composite mud film with high strength and low permeability, which is directly suitable for underwater tunnel shield operations. .

Benefits of technology

A stable composite mud film was established, which improved the safety and construction stability of underwater pressure opening, avoided early drilling and grouting, and was suitable for underwater tunnel construction under complex geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959001A_ABST
    Figure CN118959001A_ABST
Patent Text Reader

Abstract

The invention discloses a manufacturing method of an underwater pebble bed under-pressure bin opening and tool changing composite mud film. The manufacturing method comprises the following steps: S1, preparing slurry with different viscosities; s2, constructing a permeable zone type mud film; s3, mud in the bin is replaced; s4, observing the liquid level change of the air cushion bin in a pressure maintaining manner, if the liquid level of the air cushion bin is greater than 2cm / h, firstly mixing the gelling slurry with the original soft film material to establish a composite mud film, carrying out reinforcement treatment, and then continuing to execute the following steps, otherwise, directly executing the following steps; s5, continuously maintaining the pressure and observing the liquid level change of the air cushion bin; s6, medium exchange is conducted, the liquid level and pressure of the muddy water bin are reduced, and a pressure maintaining test is conducted. According to the method, the composite mud film for stabilizing the tunnel face is built on the ultrahigh-permeability water-rich pebble bed, the safety of underwater pressure bin opening is guaranteed, compared with the prior art, the tunnel face does not need to be stabilized through early-stage punching and grouting, only the composite mud film is needed to stabilize the tunnel face, and the method is suitable for the environment with the large underwater permeability coefficient and the poor tunnel face stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shield construction, and in particular to a method for manufacturing a composite mud film for opening and changing cutters in an underwater pebble layer under pressure. Background Art

[0002] At present, the construction of municipal subway tunnels in China is facing complex and ever-changing geological engineering challenges, especially the construction of cross-river tunnels. These projects often need to deal with complex strata such as soft upper and composite lower strata and ultra-high permeability water-rich pebble layers. Slurry shield technology is a common means in the construction of cross-river tunnels. Its core lies in balancing the water and soil pressure at the heading through precise control of mud pressure.

[0003] However, when operating in soft upper and lower composite strata, the cutterhead of the shield machine is very easy to wear, resulting in an abnormal increase in thrust and torque. At this time, the machine must be stopped for opening inspection and necessary tool replacement operations must be performed based on the wear condition of the cutter. Especially in highly permeable and water-rich strata such as pebble layers, in order to ensure the safety of the opening operation and the stability of the heading, the pressurized opening method is often adopted, and efforts are made to construct a mud film that is both stable and high-strength to effectively balance the huge water and soil pressure on the bottom of the water.

[0004] During the underwater operation, the traditional underwater mud membrane, such as the existing patent (patent publication number CN103244135B is a construction method for manufacturing mud membrane in high permeability formations), cannot simply use the mud membrane structure to stabilize the underwater tunnel face during the underwater operation. It still requires preliminary drilling and grouting to ensure normal construction, and is not suitable for underwater pressure opening and tool changing operations performed by existing shield machines.

[0005] To this end, the present application specifically proposes a method for producing a composite mud film with pressure opening and knife changing in an underwater pebble layer to solve the above-mentioned technical problems. Summary of the invention

[0006] The main purpose of the present invention is to provide a method for preparing a composite mud membrane for opening and changing cutters under pressure in an underwater pebble layer. By using low, medium and high viscosity bentonite slurries to construct the mud membrane in stages, cement slurry can be further used to reinforce and strengthen the initially formed soft mud membrane, and finally a high-strength, low-permeability mud-water shield composite mud membrane is obtained, which is convenient and directly applicable to underwater tunnel shield operations.

[0007] The present invention adopts the following technical solutions to solve the above technical problems:

[0008] A method for producing a composite mud film with pressure opening and cutting in an underwater pebble layer, comprising the following specific production steps:

[0009] S1. Prepare mud slurries with different viscosities: Use sodium-based bentonite, calcium-based bentonite and water to prepare mud slurries with low, medium and high viscosities that meet the mud index requirements as the infiltration zone;

[0010] S2. Constructing a permeable zone mud film: using slurries of different viscosities, injecting them into the chamber in three stages, and gradually increasing the pressure in the chamber, the slurries of different viscosities are gradually pressed into the formation to construct a permeable zone, fill the gaps in the pebble layer, and reduce the permeability of the pebble layer;

[0011] S3. When the liquid level in the air cushion tank drops to meet the requirements under the set pressure, the original mud in the tank is replaced with ultra-high viscosity mud. After sampling and testing through the reserved holes in the shield body to meet the indicators for making the soft mud film, the hinge is retracted and the soft mud film is started;

[0012] S4. Maintain the pressure to the set pressure and observe the change of the liquid level in the air cushion tank. If the liquid level in the air cushion tank is greater than 2cm / h, it is necessary to first establish a composite mud film for reinforcement treatment, and then continue to perform the following steps. If the liquid level in the air cushion tank drops below 2cm / h, directly perform the following steps;

[0013] S5: Maintain the pressure to the set pressure and continue to observe the change of the air cushion tank liquid level until the change of the air cushion tank liquid level is less than 20cm / h;

[0014] S6. Carry out medium exchange, lower the liquid level in the mud and water tank to the working surface height, reduce the pressure in the mud and water tank to the opening working pressure, and carry out a pressure maintenance test.

[0015] Preferably, in step S1, sodium bentonite, calcium bentonite and water are used to prepare slurries of different viscosities, and the slurry concentrations are: low viscosity slurry 25±5Pa.S, medium viscosity slurry 50±5Pa.S and high viscosity slurry 70±5Pa.S, and the specific gravity is: 1.15-1.24.

[0016] Preferably, in the process of gradually pressing muds of different viscosities into the formation in step S2, the cutter head rotates once every 2 hours, with a rotation speed of 0.2-0.4 r / min, and the cutter head rotates alternately.

[0017] Preferably, in the step S2, during the three-stage infiltration process of low, medium and high viscosity mud, the working pressure must be maintained for more than 12 hours each time, and when the liquid level drops by more than 50 mm / h, the slurry is replenished in time before the liquid level pressure drop approaches the critical point.

[0018] Preferably, in the step S2, after the permeable zone is constructed, high-viscosity bentonite slurry needs to be added to establish a soft mud film, and the liquid level of the air cushion tank is observed.

[0019] Preferably, during the preparation of the soft mud film in step S3, the cutter head rotates in one direction at a speed of 0.2 to 0.4 r / min.

[0020] Preferably, the viscosity of the ultra-high viscosity mud replaced in step S3 is 120±20 Pa.S.

[0021] Preferably, the specific operation steps of establishing a composite mud film for reinforcement treatment in the step S4 include: injecting a gelatinous slurry into the mud and water bin through the center hole of the cutter disc, and mixing the gelatinous slurry with the original soft film material by rotating the cutter disc, with the injection of the gelatinous slurry and the stirring of the cutter disc, the cutter disc rotates at 0.8 to 1.6 r / min, gradually extending the hinge again, and after the hinge is pushed into the original position, pressurizing the bin, and gradually retracting the hinge, rotating the cutter disc at 0.2 to 0.4 r / min in the same direction, to establish a mud film for the second time, and the established mud film is a composite mud film;

[0022] Preferably, during the injection of cementitious slurry, the torque of the cutter head needs to be observed to ensure that it does not exceed a preset value. At the same time, the injection amount of the cementitious slurry is controlled according to the amount of cementitious material added in combination with the amount of mud in the bin. In addition, the cementitious slurry needs to be completed quickly from injection to completion, and replaced in the bin within 8 hours to replace the cementitious material remaining in the mud and water bin and the air cushion bin to prevent the cutter head from solidifying.

[0023] Preferably, the pressure holding test in S6 includes judging the pressure holding performance of the mud film according to the mud water and gas escape rate, and using slurry gas replacement multiple times to ensure the thickness and strength of the mud film;

[0024] If the gas supply is less than 10% of the gas supply capacity, and the excavation chamber air pressure remains unchanged within 2 hours or fluctuates within the specified range, it indicates that the pressure maintenance test is qualified;

[0025] If the air supply is greater than 50% of the air supply capacity during the air pressure opening process, the air pressure operation shall be stopped and the mud film shall be repaired by slurry gas replacement again until the pressure maintenance test is qualified.

[0026] The present invention provides a method for producing a composite mud film with pressure opening and cutting in an underwater pebble layer. Compared with the prior art, the present invention has the following beneficial effects:

[0027] 1. The present invention establishes a composite mud film to stabilize the tunnel face in the ultra-high permeability water-rich pebble layer, thereby ensuring the safety of underwater pressure opening, providing important technical support and safety guarantee for similar working conditions of river crossing with complex geological pressure opening and tool changing construction. Compared with the prior art, it does not require preliminary drilling and grouting to stabilize the tunnel face, but only requires a composite mud film to stabilize the tunnel face, and can be applied to underwater environments.

[0028] 2. The present invention utilizes three-stage permeation zones of low, medium and high viscosity mud to fill the formation voids densely. The permeation layer can be made in stages. After fully filling the larger voids in the formation, the pressure on the top of the mud and water bin can be gradually increased, so that the bin pressure matches the external pressure, which is convenient for the subsequent establishment and generation of a composite mud film.

[0029] 3. The present invention constructs a mud membrane by using bentonite slurries of low, medium and high viscosities in stages, and can further use cement slurry to reinforce and strengthen the initially formed soft mud membrane, ultimately producing a high-strength, low-permeability mud-water shield composite mud membrane that is conveniently and directly applicable to underwater tunnel shield operations.

[0030] 4. The present invention prepares mud slurries with different viscosities and sequentially constructs permeable zone type mud membrane, mud skin type soft mud membrane and mud skin type composite mud membrane to achieve a multi-level and multifunctional composite mud membrane structure, breaking the conventional pressure-based soft mud membrane construction. It has a good effect on responsible formations, especially on underwater formations with high permeability coefficients, poor face stability, and top covering soil without a waterproof layer. The composite mud membrane significantly improves the stability of the formation structure and the safety of construction, and provides an effective method for the formation of mud membranes in water-rich and high-permeability formations.

[0031] 5. The present invention reinforces the mud film by mixing the gelling slurry with the mud film, thereby converting the original mud film into a composite mud film with strong stability, which can enhance the physical properties and stability of the mud film after its establishment and ensure its quality when stabilizing the underwater face.

[0032] 6. The production method of the present invention can adjust the mud ratio and construction process according to actual engineering needs, has strong adaptability and flexibility, and is suitable for environments with complex ground environments and poor geological conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0034] Figure 1 It is a schematic diagram of the overall process of the method of the present invention;

[0035] Figure 2 It is a schematic diagram of the mud membrane for the slurry shield wall generated in the pebble layer according to the present invention.

[0036] In the figure:

[0037] 1. Shield machine; 2. Mud skin type mud membrane; 3. Permeable zone type mud membrane; 4. High permeability water-rich pebble stratum; 5. Non-water-repellent soil stratum; 6. River water flow. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0039] In the embodiment, see Figure 1 to Figure 2 .

[0040] like Figure 1 The present invention provides a method for producing a composite mud film with pressure opening and cutting in an underwater pebble layer, wherein the composite mud film produced can be used as a reference in the process of use. Figure 2 , because the mud membrane established by conventional pressure opening and cutting is mainly composed of bentonite, the established mud membrane is widely used in strata where the general face is relatively stable or there is an impermeable layer on the upper part. The conventional mud membrane cannot meet the working conditions of the project on which it is based. After the mud membrane is established, it cannot stabilize the face and meet the requirements of airtightness. Therefore, this method conducts indoor tests and field actual operation verification through on-site sampling. On the basis of the original mud membrane, gelling slurry is added to improve the mud membrane into a composite mud membrane with strong stability and airtightness, which can increase the stability of the face.

[0041] The specific production method comprises the following steps:

[0042] S1. Prepare mud slurries with different viscosities: Use sodium-based bentonite, calcium-based bentonite and water to prepare mud slurries with low, medium and high viscosities that meet the mud index requirements as the infiltration zone;

[0043] According to the engineering geological conditions and construction conditions, different viscosity slurries prepared by sodium-based bentonite, calcium-based bentonite and water are used. The slurry concentrations are: low viscosity slurry 25±5Pa.S, medium viscosity slurry 50±5Pa.S and high viscosity slurry 70±5Pa.S, and the specific gravity is: 1.15~1.24;

[0044] S2. Constructing a permeable zone mud film: using slurries of different viscosities, injecting them into the chamber in three stages, and gradually increasing the pressure in the chamber, the slurries of different viscosities are gradually pressed into the formation to construct a permeable zone, fill the gaps in the pebble layer, and reduce the permeability of the pebble layer;

[0045] In the process of gradually pressing muds of different viscosities into the formation, the cutterhead rotates once every 2 hours at a speed of 0.2 to 0.4 r / min, and the cutterhead rotates alternately.

[0046] In addition, it should be noted that during the three-stage infiltration process of low, medium and high viscosity mud, the working pressure must be maintained for more than 12 hours each time, and when the liquid level drops by more than 50mm / h, the slurry should be replenished in time before the liquid level pressure drop approaches the critical point; at the same time, when the infiltration zone is constructed, it is necessary to add high-viscosity bentonite slurry to establish a soft mud film and observe the liquid level of the air cushion tank;

[0047] Therefore, the three-stage permeable zones of low, medium and high viscosity mud are used here to fill the pores of the formation densely. The permeable layers can be made in stages. After the larger pores of the formation are fully filled, the pressure on the top of the mud and water tank is gradually increased, so that the tank pressure matches the external pressure, which is convenient for the subsequent establishment and generation of composite mud film.

[0048] At this time, the penetration of low, medium and high viscosity slurries forms a permeable belt-type mud film in front of the face, which improves the stability of the stratum structure in front of the face. The use of ultra-high viscosity slurry and the supplement of cement slurry form a mud skin-type composite mud film with good stability and high physical properties on the face, which provides a guarantee for opening the warehouse under pressure.

[0049] S3. When the liquid level of the air cushion tank drops to meet the requirements under the set pressure, the original mud in the tank is replaced with ultra-high viscosity mud. The viscosity of the ultra-high viscosity mud to be replaced is 120±20Pa.S. After sampling and testing through the reserved holes of the shield to meet the indicators for making a soft mud film, the hinge is retracted and the soft mud film is started. At this time, during the making of the soft mud film, the cutter head rotates in one direction at a speed of 0.2-0.4r / min;

[0050] S4. Maintain the pressure to the set pressure and observe the change of the liquid level in the air cushion chamber. If the liquid level in the air cushion chamber is greater than 2cm / h, it is necessary to first establish a composite mud film for reinforcement treatment, and then continue to perform the following S5-S6 operations. If the liquid level in the air cushion chamber drops below 2cm / h, directly perform the following S5-S6 operations;

[0051] The specific operation steps of establishing a composite mud film for reinforcement treatment include: after the first bunker soft mud film is established, the pressure in the bunker is maintained, the slurry in the bunker at different positions is taken through the hole on the shield body for measurement, and experiments are conducted to select a reasonable ratio, and the gelling slurry is injected into the mud and water bunker through the center hole of the cutter disc. Combined with the injection situation, the gelling slurry is mixed with the original soft mud film material by rotating the cutter disc and stirring. With the injection of the gelling slurry and the stirring of the cutter disc, the cutter disc rotates at 0.8 to 1.6 r / min. During the rotation of the cutter disc, the hinge is gradually extended again. After the hinge is pushed to the original position, the materials in the bunker are fully mixed by pressurizing the bunker, and the hinge is gradually retracted. The cutter disc is rotated at 0.2 to 0.4 r / min in the same direction to establish the mud film for the second time. The established mud film is a composite mud film.

[0052] It should be noted here that during the injection of the cementitious slurry, the torque of the cutter head needs to be observed to ensure that the torque of the cutter head does not exceed the preset value. At the same time, the injection amount of the cementitious slurry is controlled according to the amount of cementitious material added in the silo in combination with the amount of mud in the silo. In addition, the cementitious slurry needs to be completed quickly from injection to completion, and the silo should be replaced within 8 hours to replace the cementitious material remaining in the mud and water silo and the air cushion silo to prevent the cutter head from solidifying.

[0053] Here, the soft mud membrane is reinforced by mixing the gelling slurry with the soft mud membrane, and the original soft mud membrane is transformed into a composite mud membrane with strong stability, which can enhance the physical properties and stability of the mud membrane after its establishment and ensure its quality when stabilizing the underwater tunnel face;

[0054] Therefore, by using low, medium and high viscosity bentonite slurries to construct mud membranes in stages, cement slurries can be further used to reinforce and strengthen the initially formed soft mud membranes, and finally a high-strength, low-permeability mud shield composite mud membrane is obtained, which is convenient and directly applicable to underwater tunnel shield operations;

[0055] S5: Maintain the pressure to the set pressure and continue to observe the change of the air cushion tank liquid level until the change of the air cushion tank liquid level is less than 20cm / h;

[0056] S6. Carry out medium exchange in accordance with the requirements of the specification, lower the liquid level of the mud and water tank to the height of the working surface, reduce the pressure of the mud and water tank to the opening working pressure, and carry out a pressure holding test, in which the pressure holding test includes judging the pressure holding performance of the mud film according to the mud, water and gas escape rate, and using slurry gas replacement multiple times to ensure the thickness and strength of the mud film;

[0057] Specifically, the pressure test should be carried out in strict accordance with the process flow. If the gas supply is less than 10% of the gas supply capacity, and the gas pressure in the excavation chamber remains unchanged or fluctuates within the specified range within 2 hours, it indicates that the pressure test is qualified. If the gas supply is greater than 50% of the gas supply capacity during the gas pressure opening process, the gas pressure operation should be stopped and the mud film should be repaired by slurry gas replacement until the pressure test is qualified.

[0058] When observing the pressure maintenance here, it is necessary to record the value and change of the bubble tank liquid level and the incision pressure every hour, comprehensively judge the quality of the permeable zone and mud film, and further judge whether grouting is needed;

[0059] In addition, during the pressure maintenance observation process at different stages, the stable value of the pressure on the top of the mud and water silo is determined based on the engineering geological conditions and construction conditions. Similar projects should determine their own stable value of the pressure on the top of the mud and water silo based on actual conditions.

[0060] In summary, by preparing mud slurries with different viscosities and sequentially constructing permeable belt-type mud membranes, mud skin-type soft mud membranes and mud skin-type composite mud membranes, a multi-level and multifunctional composite mud membrane structure is achieved, breaking the conventional pressure-based soft mud membrane establishment method. It has a good effect in complex formations, especially in water-bottom formations with high permeability coefficients, poor face stability, and no impermeable layer on the top cover. The composite mud membrane significantly improves the stability of the formation structure and construction safety, and provides an effective method for the formation of mud membranes in water-rich and high-permeability formations.

[0061] At this time, a composite mud membrane is established in the ultra-high permeability water-rich pebble layer to stabilize the tunnel face, thereby ensuring the safety of underwater pressure opening, providing important technical support and safety guarantee for similar working conditions of river crossing with complex geological pressure opening and tool changing construction. Compared with the prior art (the existing patent mentioned in the background technology: a construction method for manufacturing mud membrane in high permeability formation with patent publication number CN103244135B), there is no need for preliminary drilling and grouting to stabilize the tunnel face, only a composite mud membrane is needed to stabilize the tunnel face, and it can be suitable for underwater environment.

[0062] In addition, it is necessary to explain that during the production process of the above-mentioned mud film, the pressure in the bin needs to be kept stable and ensure that the pressure in the bin is 1 to 1.2 times the working pressure.

[0063] In this embodiment, three kinds of mud slurries with different viscosities, namely 25±5Pa.S low viscosity slurry, 50±5Pa.S medium viscosity slurry and 70±5Pa.S high viscosity slurry, are prepared according to the actual situation of the supporting project. In similar projects, the actual engineering geological conditions of the supporting project should be used as a reference. The proportions of slurries with low, medium and high viscosities and the slurry viscosities should be comprehensively determined through soil sampling and consideration of geological survey status.

[0064] Therefore, the production method of the present invention can adjust the mud ratio and construction process according to actual engineering needs, has strong adaptability and flexibility, and is suitable for environments with complex ground environments and poor geological conditions.

[0065] In this embodiment, due to the excessively large permeability coefficient of the pebble layer, the poor forming state of the mud film and the unstable physical and mechanical properties of the mud film, a composite mud film is used to improve its physical properties and stability. If the formation has the conditions for establishing a soft mud film, the soft mud film is first selected to be established.

[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0067] In addition, it should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0068] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or schemes that A and B meet at the same time. In addition, in the embodiments of the present invention, "multiple" refers to more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

Claims

1. A method for producing a composite mud film with pressure opening and cutting in an underwater pebble layer, characterized in that: The specific production steps include the following: S1. Prepare mud slurries with different viscosities: Use sodium-based bentonite, calcium-based bentonite and water to prepare mud slurries with low, medium and high viscosities that meet the mud index requirements as the infiltration zone; S2. Constructing a permeable zone mud film: using slurries of different viscosities, injecting them into the chamber in three stages, and gradually increasing the pressure in the chamber, the slurries of different viscosities are gradually pressed into the formation to construct a permeable zone, fill the gaps in the pebble layer, and reduce the permeability of the pebble layer; S3. When the liquid level in the air cushion tank drops to meet the requirements under the set pressure, the original mud in the tank is replaced with ultra-high viscosity mud. After sampling and testing through the reserved holes in the shield body to meet the indicators for making the soft mud film, the hinge is retracted and the soft mud film is started; S4. Maintain the pressure to the set pressure and observe the change of the liquid level in the air cushion tank. If the liquid level in the air cushion tank is greater than 2cm / h, it is necessary to first establish a composite mud film for reinforcement treatment, and then continue to perform the following steps. If the liquid level in the air cushion tank drops below 2cm / h, directly perform the following steps; S5: Maintain the pressure to the set pressure and continue to observe the change of the air cushion tank liquid level until the change of the air cushion tank liquid level is less than 20cm / h; S6. Carry out medium exchange, lower the liquid level in the mud and water tank to the working surface height, reduce the pressure in the mud and water tank to the opening working pressure, and carry out a pressure maintenance test.

2. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing cutters as claimed in claim 1, characterized in that: In the step S1, sodium bentonite, calcium bentonite and water are used to prepare slurries of different viscosities, and the concentrations of the slurries are: low viscosity slurry 25±5Pa.S, medium viscosity slurry 50±5Pa.S and high viscosity slurry 70±5Pa.S, and the specific gravity is: 1.15-1.

24.

3. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing cutters as claimed in claim 1, characterized in that: In the process of gradually pressing muds of different viscosities into the formation in step S2, the cutter head rotates once every 2 hours at a rotation speed of 0.2-0.4 r / min, and the cutter head rotates alternately.

4. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing cutters as claimed in claim 1, characterized in that: In the step S2, during the three-stage infiltration of low, medium and high viscosity muds, the working pressure must be maintained for more than 12 hours each time, and when the liquid level drops by more than 50 mm / h, the slurry must be replenished in time before the liquid level pressure drops close to the critical point.

5. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing cutters as claimed in claim 1, characterized in that: In the step S2, after the permeable zone is constructed, it is necessary to add high-viscosity bentonite slurry to establish a soft mud film and observe the liquid level of the air cushion tank.

6. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing blades as claimed in claim 1, characterized in that: During the preparation of the soft mud film in step S3, the cutter head rotates in one direction at a speed of 0.2 to 0.4 r / min.

7. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing cutters as claimed in claim 1, characterized in that: The viscosity of the ultra-high viscosity mud replaced in step S3 is 120±20 Pa.S.

8. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing cutters as claimed in claim 1, characterized in that: The specific operation steps of establishing the composite mud film for reinforcement treatment in step S4 include: Cementitious slurry is injected into the mud and water bin through the center hole of the cutter disc, and the cutter disc is rotated to stir the cementitious slurry and the original soft film material. With the injection of cementitious slurry and the stirring of the cutter disc, the cutter disc rotates at 0.8 to 1.6 r / min, and the hinge is gradually extended again. After the hinge is pushed into the original position, the bin is pressurized and the hinge is gradually retracted. The cutter disc is rotated in the same direction at 0.2 to 0.4 r / min to establish the mud film for the second time. The established mud film is a composite mud film.

9. The method for producing a composite mud film with pressure opening and cutting in an underwater pebble layer according to claim 8, characterized in that: During the injection of cementitious slurry, the cutter head torque needs to be observed to ensure that it does not exceed the preset value. At the same time, the injection amount of cementitious slurry is controlled according to the amount of cementitious material added in the bin. In addition, the cementitious slurry needs to be completed quickly from injection to completion, and replaced in the bin within 8 hours to replace the cementitious material remaining in the mud and water bin and the air cushion bin to prevent the cutter head from solidifying.

10. The method for producing a composite mud film in an underwater pebble layer under pressure opening and changing cutters as claimed in claim 1, characterized in that: The pressure holding test in S6 includes judging the pressure holding performance of the mud film according to the mud water and gas escape rate, and using slurry gas replacement multiple times to ensure the thickness and strength of the mud film; If the gas supply is less than 10% of the gas supply capacity, and the excavation chamber air pressure remains unchanged within 2 hours or fluctuates within the specified range, it indicates that the pressure maintenance test is qualified; If the air supply is greater than 50% of the air supply capacity during the air pressure opening process, the air pressure operation shall be stopped and the mud film shall be repaired by slurry gas replacement again until the pressure maintenance test is qualified.