Environmental dust detection system for building construction

Through real-time detection and distribution feature analysis, combined with the analysis of vertical detection module, targeted dust treatment measures are provided, which solves the problem of poor dust control effect in the existing technology and improves the dust treatment efficiency at the construction site.

CN118961525AInactive Publication Date: 2024-11-15SHANXI YUOUYOU CONSTR ENG CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410951077.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing environmental dust detection system for construction cannot be performed through periodic dust detection parameters, resulting in the inability to optimize the dust treatment measures in a targeted manner, resulting in poor dust control effect.

Method used

A dust detection system including real-time detection module, distribution analysis module and vertical detection module was designed. By detecting multiple dust parameters in real time, calculating detection coefficients, marking abnormal areas and performing distribution characteristics analysis, differentiated dust treatment measures are provided. Optimize dust control strategies.

Benefits of technology

Real-time monitoring and optimization of dust pollution and treatment status in construction areas has been achieved, the dust control effect and treatment efficiency have been improved, and the phenomenon of dust dissipation and spreading is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118961525A_ABST
    Figure CN118961525A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of dust detection, relates to a data analysis technology, and aims to solve the problem of poor dust control effect caused by adopting a single dust treatment mode in the prior art, in particular to an environmental dust detection system for building construction, which comprises a dust detection platform, the dust detection platform is in communication connection with a real-time detection module, a distribution analysis module, a vertical detection module and a storage module; the real-time detection module is used for performing dust detection analysis on the building construction area in real time: dividing the building construction area into a plurality of detection areas, generating a detection period, dividing the detection period into a plurality of detection time periods, and obtaining detection coefficients of the detection areas at the end time of the detection time periods; marking the detection area as a normal area or an abnormal area through the detection coefficient; dust detection analysis can be carried out on the building construction area in real time, the overall dust pollution state of the detection area is fed back through the detection coefficient, and data support is provided for the distribution analysis process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of dust detection and relates to data analysis technology, in particular to an environmental dust detection system for building construction. Background Art

[0002] The generation of dust is a common phenomenon during construction. This dust not only affects the surrounding environment, but also poses a threat to the respiratory health of construction workers and may even cause serious diseases such as pneumoconiosis and lung cancer.

[0003] The environmental dust detection system for construction in the prior art can only detect the dust concentration and perform dust reduction treatment when the dust concentration exceeds the standard. However, the dust control effect produced by a single dust treatment method is limited, and the prior art is unable to perform macroscopic analysis through periodic dust detection parameters and control parameters, and thus is unable to perform targeted optimization of dust treatment measures, resulting in low dust treatment efficiency at the construction site.

[0004] In view of the above technical problems, this application proposes a solution. Summary of the invention

[0005] The purpose of the present invention is to provide an environmental dust detection system for construction, which is used to solve the problem of poor dust control effect caused by the single dust treatment method used in the prior art;

[0006] The technical problem to be solved by the present invention is: how to provide an environmental dust detection system for construction that can adopt targeted dust treatment measures to control dust.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] The environmental dust detection system for construction includes a dust detection platform, wherein the dust detection platform is communicatively connected with a real-time detection module, a distribution analysis module, a vertical detection module and a storage module;

[0009] The real-time detection module is used to perform dust detection and analysis on the construction area in real time: the construction area is divided into several detection areas, a detection cycle is generated and the detection cycle is divided into several detection time periods, and at the end of the detection time period, the silica dust data XC, dust data FC and smoke data YC of the detection area are obtained and numerical calculation is performed to obtain the detection coefficient JC of the detection area within the detection time period; the detection area is marked as a normal area or an abnormal area by the detection coefficient JC; the abnormal area is sent to the distribution analysis module through the dust detection platform;

[0010] The distribution analysis module is used to analyze the distribution characteristics of abnormal areas in the construction area: determine whether all the areas bordering the abnormal area are normal areas: if so, mark the abnormal area as an independent area; if not, form a processing cluster with abnormal areas bordering each other; mark the abnormal area with the largest detection coefficient JC value in the processing cluster as the isolation area of ​​the processing cluster; assign dust reduction treatment measures to all abnormal areas, and assign closed isolation measures to the isolation areas of all processing clusters;

[0011] The vertical detection module is used to perform vertical detection analysis on each detection area within the construction area.

[0012] Furthermore, the process of acquiring silica dust data XC includes: setting a number of detection points in the detection area, acquiring the maximum value of silica dust concentration value generated by the cutting and grinding process of stone, sand and gravel and other materials at the detection point within the detection period and marking it as the silica dust value of the detection point, and marking the maximum value of silica dust value of all detection points as silica dust data XC; the process of acquiring dust data FC includes: marking the sum of cement dust concentration value, asbestos dust concentration value and wood dust concentration value of the detection point in the detection area as the dust value of the detection point, and marking the maximum value of dust values ​​of all detection points in the detection area as dust data FC; the process of acquiring smoke dust data YC includes: marking the maximum value of smoke dust concentration value of the detection point within the detection period as the smoke value of the detection point, and marking the maximum value of smoke dust value of all detection points as smoke dust data YC.

[0013] Furthermore, the specific process of marking the detection area as a normal area or an abnormal area includes: obtaining the detection threshold JCmax through the storage module, and comparing the detection coefficient JC of the detection area with the detection threshold JCmax: if the detection coefficient JC is less than the detection threshold JCmax, it is determined that the dust in the detection area within the detection period meets the requirements, and the corresponding detection area is marked as a normal area; if the detection coefficient JC is greater than or equal to the detection threshold JCmax, it is determined that the dust in the detection area within the detection period does not meet the requirements, and the corresponding detection area is marked as an abnormal area.

[0014] Furthermore, the specific process of the vertical detection module performing vertical detection analysis on each detection area within the construction area includes: obtaining the vertical coefficient and stability coefficient of the detection area at the end of the detection cycle, and comparing the vertical coefficient and stability coefficient with the preset vertical threshold and stability threshold: if the vertical coefficient is less than the vertical threshold and the stability coefficient is less than the stability threshold, the corresponding detection area is marked as a dust core area; if the stability coefficient is greater than or equal to the stability threshold, the corresponding detection area is marked as a dust interference area; the ratio of the number of dust core areas to the number of detection areas is marked as the dust core coefficient, the dust core threshold and the dust interference threshold are retrieved through the storage module, the dust core coefficient is compared with the dust core threshold, and whether the dust control status of the construction area meets the requirements is determined through the comparison result; the dust interference coefficient is compared with the dust interference threshold, and whether the dust treatment status of the construction area meets the requirements is determined through the comparison result.

[0015] Furthermore, the process of obtaining the vertical coefficient and stability coefficient of the detection area includes: at the end of the detection period, the detection areas are arranged in descending order according to the detection coefficient JC values ​​to obtain the detection sequence of the detection period; at the end of the detection cycle, a vertical set of the detection areas is formed by the serial numbers of the detection areas in the detection sequences of all detection periods; the vertical coefficient of the detection area is obtained by summing up and averaging all elements in the vertical set; and the stability coefficient of the detection area is obtained by performing variance calculation on all elements in the vertical set.

[0016] Furthermore, the specific process of comparing the dust core coefficient with the dust core threshold includes: if the dust core coefficient is less than the dust core threshold, it is determined that the dust control status of the construction area meets the requirements; if the dust core coefficient is greater than or equal to the dust core threshold, it is determined that the dust control status of the construction area does not meet the requirements, and a layout optimization signal is generated and sent to the mobile phone terminal of the manager through the dust detection platform.

[0017] Furthermore, the specific process of comparing the dust interference coefficient with the dust interference threshold includes: if the dust interference coefficient is less than the dust interference threshold, it is determined that the dust treatment status in the construction area meets the requirements; if the dust interference coefficient is greater than or equal to the dust interference threshold, it is determined that the dust treatment status in the construction area does not meet the requirements, and a dust reduction optimization signal is generated and sent to the mobile phone terminal of the manager through the dust detection platform.

[0018] Furthermore, the working method of the environmental dust detection system for building construction includes the following steps:

[0019] Step 1: Real-time dust detection and analysis of the construction area: Divide the construction area into several detection areas, generate a detection cycle and divide the detection cycle into several detection periods, obtain the silica dust data XC, dust data FC and smoke data YC of the detection area at the end of the detection period, and perform numerical calculations to obtain the detection coefficient JC;

[0020] Step 2: Mark the detection area as a normal area or an abnormal area through the detection coefficient JC, analyze the distribution characteristics of the abnormal areas in the construction area, and mark the independent areas, processing clusters, and isolation areas;

[0021] Step 3: Assign dust reduction measures to all abnormal areas and closure isolation measures to all isolation areas of the processing cluster;

[0022] Step 4: Conduct vertical detection analysis on each detection area in the construction area and obtain the vertical coefficient and stability coefficient of the detection area at the end of the detection cycle. Use the vertical coefficient and stability coefficient to mark the dust core area and dust interference area;

[0023] Step 5: Determine whether the dust control status and dust treatment status meet the requirements based on the proportion of the dust core area and the dust interference area in the detection area.

[0024] The present invention has the following beneficial effects:

[0025] 1. The real-time detection module can be used to perform dust detection and analysis in construction areas in real time. The multiple dust parameters in the detection period can be numerically extracted and comprehensively calculated to obtain the detection coefficient. The detection coefficient can be used to provide feedback on the overall dust pollution status of the detection area, thereby differentially marking the detection area and providing data support for the distribution analysis process.

[0026] 2. The distribution analysis module can be used to analyze the distribution characteristics of abnormal areas in construction areas and determine whether the abnormal areas constitute a processing cluster, thereby providing differentiated dust treatment measures for the isolation areas within the processing cluster and other abnormal areas. On the basis of regional dust reduction treatment, the isolation areas are closed and isolated to avoid the phenomenon of increasing dust pollution area due to dust escape;

[0027] 3. The vertical detection module can be used to conduct vertical detection and analysis on each detection area in the construction area, and differentiate the detection areas at the end of the detection cycle. In this way, the dust control status and dust treatment status within the detection cycle can be evaluated through the proportion of the number of dust core areas and dust interference areas. According to the evaluation results, corresponding optimization processing decisions are generated to improve the dust control effect and processing efficiency of subsequent detection cycles. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 is a system block diagram of Embodiment 1 of the present invention;

[0030] Figure 2 This is a flow chart of the method of Embodiment 2 of the present invention. DETAILED DESCRIPTION

[0031] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] Embodiment 1

[0033] like Figure 1 As shown, the environmental dust detection system for construction includes a dust detection platform, and the dust detection platform is communicatively connected with a real-time detection module, a distribution analysis module, a vertical detection module and a storage module.

[0034] The real-time detection module is used to perform dust detection and analysis in the construction area in real time: the construction area is divided into several detection areas, a detection cycle is generated and the detection cycle is divided into several detection time periods, and the silica dust data XC, dust data FC and smoke data YC of the detection area are obtained at the end of the detection period. The acquisition process of silica dust data XC includes: setting several detection points in the detection area, obtaining the maximum value of silica dust concentration generated by the cutting and grinding process of stone, sand and gravel and other materials at the detection point during the detection period and marking it as the silica dust of the detection point. value, the maximum value of the silica dust values ​​of all the detection points is marked as silica dust data XC; the process of obtaining dust data FC includes: marking the sum of cement dust concentration value, asbestos dust concentration value and wood dust concentration value of the detection point in the detection area as the dust value of the detection point, and marking the maximum value of the dust values ​​of all the detection points in the detection area as dust data FC; the process of obtaining smoke data YC includes: marking the maximum value of the smoke dust concentration value of the detection point within the detection period as the smoke value of the detection point, and marking the maximum value of the smoke dust values ​​of all the detection points as smoke data YC; through the formula The detection coefficient JC of the detection area within the detection period is obtained, wherein p1, p2 and p3 are all proportional coefficients, and p1>p2>p3>1; the detection threshold JCmax is obtained through the storage module, and the detection coefficient JC of the detection area is compared with the detection threshold JCmax: if the detection coefficient JC is less than the detection threshold JCmax, it is determined that the dust in the detection area within the detection period meets the requirements, and the corresponding detection area is marked as a normal area; if the detection coefficient JC is greater than or equal to the detection threshold JCmax, it is determined that the dust in the detection area within the detection period does not meet the requirements, and the corresponding detection area is marked as an abnormal area; the abnormal area is sent to the distribution analysis module through the dust detection platform; real-time dust detection and analysis is performed on the construction area, and the detection coefficient is obtained by numerically extracting and comprehensively calculating multiple dust parameters within the detection period in a real-time detection manner, and the overall dust pollution state of the detection area is fed back through the detection coefficient, so as to differentiate and mark the detection area, and provide data support for the distribution analysis process.

[0035] The distribution analysis module is used to analyze the distribution characteristics of abnormal areas in construction areas: determine whether all areas bordering the abnormal areas are normal areas: if so, mark the abnormal areas as independent areas; if not, the abnormal areas bordering each other constitute a processing cluster; mark the abnormal area with the largest detection coefficient JC value in the processing cluster as the isolation area of ​​the processing cluster; assign dust reduction treatment measures to all abnormal areas, and assign closed isolation measures to the isolation areas of all processing clusters; analyze the distribution characteristics of abnormal areas in construction areas, and determine whether the abnormal areas constitute a processing cluster, so as to provide differentiated dust treatment measures for the isolation areas and other abnormal areas in the processing cluster, and perform closed isolation treatment on the isolation areas on the basis of regional dust reduction treatment to avoid the phenomenon of increasing dust pollution area due to dust escape.

[0036] The vertical detection module is used to perform vertical detection analysis on each detection area in the construction area: at the end of the detection period, the detection areas are arranged in descending order according to the detection coefficient JC values ​​to obtain the detection sequence of the detection period; at the end of the detection cycle, the vertical set of detection areas is formed by the serial numbers of the detection areas in the detection sequences of all detection periods; all elements in the vertical set are summed and averaged to obtain the vertical coefficient of the detection area; all elements in the vertical set are calculated for variance to obtain the stability coefficient of the detection area; the vertical coefficient and stability coefficient are compared with the preset vertical threshold and stability threshold: if the vertical coefficient is less than the vertical threshold and the stability coefficient is less than the stability threshold, the corresponding detection area is marked as the dust core area; if the stability coefficient is greater than or equal to the stability threshold, the corresponding detection area is marked as the dust interference area; the ratio of the number of dust core areas to the number of detection areas is marked as the dust core coefficient, and the dust core threshold and dust interference threshold are retrieved through the storage module.

[0037] The dust core coefficient is compared with the dust core threshold: if the dust core coefficient is less than the dust core threshold, it is determined that the dust control status of the construction area meets the requirements; if the dust core coefficient is greater than or equal to the dust core threshold, it is determined that the dust control status of the construction area does not meet the requirements, and a layout optimization signal is generated and sent to the mobile phone terminal of the manager through the dust detection platform. After receiving the layout optimization signal, the manager can transfer the dust core area to the edge of the construction area, or optimize the vehicle transportation routes in the construction area.

[0038] The dust interference coefficient is compared with the dust interference threshold: if the dust interference coefficient is less than the dust interference threshold, it is determined that the dust treatment status in the construction area meets the requirements; if the dust interference coefficient is greater than or equal to the dust interference threshold, it is determined that the dust treatment status in the construction area does not meet the requirements, and a dust reduction optimization signal is generated and sent to the mobile phone terminal of the manager through the dust detection platform. The manager can optimize the dust treatment systems such as the spray system and the dust suction system after receiving the dust reduction optimization signal; vertical detection and analysis are performed on each detection area in the construction area, and the detection areas are differentially marked at the end of the detection cycle, so as to evaluate the dust control status and dust treatment status within the detection cycle through the proportion of the number of dust core areas and dust interference areas, and generate corresponding optimization processing decisions according to the evaluation results, so as to improve the dust control effect and processing efficiency of subsequent detection cycles.

[0039] Embodiment 2

[0040] like Figure 2 As shown, the method for detecting environmental dust for construction includes the following steps:

[0041] Step 1: Real-time dust detection and analysis of the construction area: Divide the construction area into several detection areas, generate a detection cycle and divide the detection cycle into several detection periods, obtain the silica dust data XC, dust data FC and smoke data YC of the detection area at the end of the detection period, and perform numerical calculations to obtain the detection coefficient JC;

[0042] Step 2: Mark the detection area as a normal area or an abnormal area through the detection coefficient JC, analyze the distribution characteristics of the abnormal areas in the construction area, and mark the independent areas, processing clusters, and isolation areas;

[0043] Step 3: Assign dust reduction measures to all abnormal areas and closure isolation measures to all isolation areas of the processing cluster;

[0044] Step 4: Conduct vertical detection analysis on each detection area in the construction area and obtain the vertical coefficient and stability coefficient of the detection area at the end of the detection cycle. Use the vertical coefficient and stability coefficient to mark the dust core area and dust interference area;

[0045] Step 5: Determine whether the dust control status and dust treatment status meet the requirements based on the proportion of the dust core area and the dust interference area in the detection area.

[0046] The environmental dust detection system for construction, when working, divides the construction area into several detection areas, generates a detection cycle and divides the detection cycle into several detection time periods, obtains the silica dust data XC, dust data FC and smoke data YC of the detection area at the end of the detection period and performs numerical calculation to obtain the detection coefficient JC; marks the detection area as a normal area or an abnormal area through the detection coefficient JC, performs distribution characteristic analysis on the abnormal area in the construction area and marks the independent area, processing cluster and isolation area; assigns dust reduction treatment measures to all abnormal areas, and assigns closed isolation measures to the isolation areas of all processing clusters; performs vertical detection analysis on each detection area in the construction area and obtains the vertical coefficient and stability coefficient of the detection area at the end of the detection cycle, and marks the dust core area and the dust interference area through the vertical coefficient and the stability coefficient; judges whether the dust control state and the dust treatment state meet the requirements according to the proportion of the number of dust core areas and dust interference areas in the detection area.

[0047] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.

[0048] The above formulas are obtained by collecting a large amount of data and performing software simulation to select a formula close to the actual value. The coefficients in the formula are set by technicians in this field according to actual conditions; for example: Formula A technician in this field collects multiple groups of sample data and sets corresponding detection coefficients for each group of sample data; substitutes the set detection coefficients and the collected sample data into the formula, and any three formulas constitute a three-variable linear equation system. The calculated coefficients are screened and averaged, and the values ​​of p1, p2, and p3 are obtained to be 4.32, 2.81, and 2.65, respectively;

[0049] The size of the coefficient is to quantify each parameter to obtain a specific value for subsequent comparison. The size of the coefficient depends on the amount of sample data and the initial setting of the corresponding detection coefficient for each set of sample data by technical personnel in this field; as long as it does not affect the proportional relationship between the parameter and the quantified value, such as the detection coefficient is proportional to the value of the silica dust data.

[0050] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0051] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. Environmental dust detection system for construction, characterized in that: It includes a dust detection platform, which is communicatively connected with a real-time detection module, a distribution analysis module, a vertical detection module and a storage module; The real-time detection module is used to perform dust detection and analysis on the construction area in real time: the construction area is divided into several detection areas, a detection cycle is generated and the detection cycle is divided into several detection time periods, and at the end of the detection time period, the silica dust data XC, dust data FC and smoke data YC of the detection area are obtained and numerical calculation is performed to obtain the detection coefficient JC of the detection area within the detection time period; The detection area is marked as a normal area or an abnormal area through the detection coefficient JC; the abnormal area is sent to the distribution analysis module through the dust detection platform; The distribution analysis module is used to analyze the distribution characteristics of abnormal areas in the construction area: determine whether all the areas bordering the abnormal area are normal areas: if so, mark the abnormal area as an independent area; if not, form a processing cluster with abnormal areas bordering each other; mark the abnormal area with the largest detection coefficient JC value in the processing cluster as an isolated area of ​​the processing cluster; Allocate dust reduction measures to all abnormal areas and closure isolation measures to all isolated areas of the treatment cluster; The vertical detection module is used to perform vertical detection analysis on each detection area within the construction area.

2. The environmental dust detection system for construction according to claim 1, characterized in that: The process of obtaining silica dust data XC includes: setting a number of detection points in the detection area, obtaining the maximum value of silica dust concentration value generated by the cutting and grinding process of stone, sand and gravel and other materials at the detection point within the detection period and marking it as the silica dust value of the detection point, and marking the maximum value of silica dust value of all detection points as silica dust data XC; the process of obtaining dust data FC includes: marking the sum of cement dust concentration value, asbestos dust concentration value and wood dust concentration value of the detection point in the detection area as the dust value of the detection point, and marking the maximum value of dust value of all detection points in the detection area as dust data FC; the process of obtaining smoke dust data YC includes: marking the maximum value of smoke dust concentration value of the detection point within the detection period as the smoke value of the detection point, and marking the maximum value of smoke dust value of all detection points as smoke dust data YC.

3. The environmental dust detection system for construction according to claim 2, characterized in that: The specific process of marking the detection area as a normal area or an abnormal area includes: obtaining the detection threshold JCmax through the storage module, and comparing the detection coefficient JC of the detection area with the detection threshold JCmax: if the detection coefficient JC is less than the detection threshold JCmax, it is determined that the dust in the detection area during the detection period meets the requirements, and the corresponding detection area is marked as a normal area; if the detection coefficient JC is greater than or equal to the detection threshold JCmax, it is determined that the dust in the detection area during the detection period does not meet the requirements, and the corresponding detection area is marked as an abnormal area.

4. The environmental dust detection system for construction according to claim 3, characterized in that: The specific process of the vertical detection module performing vertical detection analysis on each detection area within the construction area includes: obtaining the vertical coefficient and stability coefficient of the detection area at the end of the detection cycle, and comparing the vertical coefficient and stability coefficient with the preset vertical threshold and stability threshold: if the vertical coefficient is less than the vertical threshold and the stability coefficient is less than the stability threshold, the corresponding detection area is marked as a dust core area; if the stability coefficient is greater than or equal to the stability threshold, the corresponding detection area is marked as a dust interference area; the ratio of the number of dust core areas to the number of detection areas is marked as the dust core coefficient, the dust core threshold and the dust interference threshold are retrieved through the storage module, the dust core coefficient is compared with the dust core threshold, and the comparison result is used to determine whether the dust control status of the construction area meets the requirements; the dust interference coefficient is compared with the dust interference threshold, and the comparison result is used to determine whether the dust treatment status of the construction area meets the requirements.

5. The environmental dust detection system for construction according to claim 4, characterized in that: The process of obtaining the vertical coefficient and stability coefficient of the detection area includes: at the end of the detection period, the detection areas are arranged in descending order according to the detection coefficient JC values ​​to obtain the detection sequence of the detection period; at the end of the detection cycle, the vertical set of the detection areas is formed by the serial numbers of the detection areas in the detection sequences of all detection periods; all elements in the vertical set are summed and averaged to obtain the vertical coefficient of the detection area; and all elements in the vertical set are calculated for variance to obtain the stability coefficient of the detection area.

6. The environmental dust detection system for construction according to claim 5, characterized in that: The specific process of comparing the dust core coefficient with the dust core threshold includes: if the dust core coefficient is less than the dust core threshold, it is determined that the dust control status of the construction area meets the requirements; if the dust core coefficient is greater than or equal to the dust core threshold, it is determined that the dust control status of the construction area does not meet the requirements, and a layout optimization signal is generated and sent to the mobile phone terminal of the manager through the dust detection platform.

7. The environmental dust detection system for construction according to claim 6, characterized in that: The specific process of comparing the dust interference coefficient with the dust interference threshold includes: if the dust interference coefficient is less than the dust interference threshold, it is determined that the dust treatment status in the construction area meets the requirements; if the dust interference coefficient is greater than or equal to the dust interference threshold, it is determined that the dust treatment status in the construction area does not meet the requirements, and a dust reduction optimization signal is generated and sent to the mobile phone terminal of the manager through the dust detection platform.

8. The construction environment dust detection system according to any one of claims 1 to 7, characterized in that: The working method of the environmental dust detection system for building construction includes the following steps: Step 1: Real-time dust detection and analysis of the construction area: Divide the construction area into several detection areas, generate a detection cycle and divide the detection cycle into several detection periods, obtain the silica dust data XC, dust data FC and smoke data YC of the detection area at the end of the detection period, and perform numerical calculations to obtain the detection coefficient JC; Step 2: Mark the detection area as a normal area or an abnormal area through the detection coefficient JC, analyze the distribution characteristics of the abnormal areas in the construction area, and mark the independent areas, processing clusters, and isolation areas; Step 3: Assign dust reduction measures to all abnormal areas and closure isolation measures to all isolation areas of the processing cluster; Step 4: Conduct vertical detection analysis on each detection area in the construction area and obtain the vertical coefficient and stability coefficient of the detection area at the end of the detection cycle. Use the vertical coefficient and stability coefficient to mark the dust core area and dust interference area; Step 5: Determine whether the dust control status and dust treatment status meet the requirements based on the proportion of the dust core area and the dust interference area in the detection area.

Citation Information

Cited By

  • Water quality monitoring management system and method based on municipal sewage pipeline

    CN119886973A

  • A water quality monitoring management system and method based on municipal sewage pipeline

    CN119886973B

  • Security and protection system for construction site construction area based on information digitization

    CN121303857A