Underground water level observation device and method for hydrogeological exploration
By designing a groundwater level observation device for hydrogeological exploration, the design of water level positioning components and collection chambers is used to solve the accuracy of groundwater layer height and water level measurement, and marking the water flow direction through liquid dyeing paint and permeable cotton, the water flow direction is achieved Accurate collection and composition analysis of groundwater.
Patent Information
- Application Number
- CN202411435314.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-10-15
AI Technical Summary
It is difficult to accurately measure the height and water level of the groundwater layer, and it is easy to bring in non-groundwater components during the sampling process, affecting the analysis results.
设计了一种水文地质勘探地下水位观测装置,包括探头和钻杆,探头内设有水位定位组件和收集腔,通过钻杆的刻度测量地下水层高度,利用液态染色涂料和渗透棉标记水流方向, And block the collection port during the back movement to prevent non-groundwater substances from entering.
Accurate measurement of the location, water flow direction, and water level height of the groundwater layer and water sample collection are achieved, ensuring the accuracy of groundwater composition and content analysis.
Smart Images

Figure CN118962834A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geological exploration, and in particular to a groundwater level observation device and method for hydrogeological exploration. Background Art
[0002] Geological exploration is a survey and research activity that uses various means and methods to survey and detect geology, determine the appropriate bearing layer, determine the foundation type based on the bearing capacity of the bearing layer, and calculate the foundation parameters. It is to investigate and study the geological conditions of rocks, strata, structures, minerals, hydrology, landforms, etc. in a certain area in order to find out the quality and quantity of minerals and the technical conditions for mining and utilization, and provide the mineral reserves and geological data required for mine construction design.
[0003] In the prior art, especially in the field of groundwater level exploration of groundwater layers, when exploring groundwater layers, drilling rigs and other related equipment are generally moved to observation points, then drilled into the ground, and then samples are taken from a specified height. This method is repeated and densely sampled at different observation points, and finally the sampled points are connected to obtain the plane range of groundwater. However, in fact, it is difficult to measure data such as the height of the groundwater layer and the water level.
[0004] Therefore, a device and method for observing groundwater level in hydrogeological exploration are proposed. Summary of the invention
[0005] The object of the present invention is to provide a groundwater level observation device and method for hydrogeological exploration to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned object, the present invention provides the following technical solutions: a groundwater level observation device for hydrogeological exploration: comprising a probe, the probe comprising a console and a drill bit, the console and the drill bit are movably connected, and a water level positioning component is arranged in the console, and the bottom surface of the console and the upper end surface of the drill bit are correspondingly provided with induction sheets that can send signals to a ground terminal when in contact;
[0007] A drill rod is arranged above the probe, the drill rod is densely provided with pores for collecting and adhering underground soil layers, the drill rod extends through the console and is slidably connected to the console, the lower end of the drill rod is fixedly connected to the center of the upper end face of the drill bit, the drill rod is square, and a scale for measuring distance is arranged on the side wall of one side of the square drill rod;
[0008] Preferably, the water level positioning assembly includes a control chamber, and the control chambers are divided into four groups and correspond one to one to the four sides of the drill rod. A rectangular opening is provided at the bottom of each control chamber, and an inclined wedge block with an inclined groove on the upper end face is extended through and slidably connected to the rectangular opening. A control block is slidably connected in the control chamber, and an inclined wedge groove is provided on the control block. The position of the inclined wedge groove matches the inclined wedge block. A connecting plate is fixedly connected to the side of the control block close to the drill rod, and a spring is fixedly connected to one side of the connecting plate, and the other end of the spring is fixedly connected to the inner wall of the control chamber.
[0009] Preferably, a needle capable of piercing the ground is fixedly connected to one side of the control block extending out of the control cavity, and the needles are distributed in rectangular shapes with equal spacing on a side wall of one end of the control block.
[0010] Preferably, a collecting chamber is provided in the drill bit, a collecting port is provided on the top of the inner surface of the collecting chamber, a drain port is provided on the side wall of the inner surface of the collecting chamber, and a sealing piston is plugged in the drain port.
[0011] Preferably, an upper tooth plate is fixedly connected to one side of the bottom of the connecting plate, and the upper tooth plate is slidably connected in the control cavity. The upper tooth plate is meshingly connected to a gear, and the gear is rotatably connected to the side wall of the control cavity. The side of the gear away from the upper tooth plate is meshingly connected to a lower tooth plate, and the lower tooth plate is slidably connected in the control cavity. One end of the lower tooth plate is fixedly connected to permeable cotton, and one end of the permeable cotton rests against the side wall of the drill rod.
[0012] Preferably, the width of the permeable cotton corresponds to the side length of the drill rod.
[0013] Preferably, a liquid cavity is provided in the console, four outlets are provided at the bottom of the liquid cavity, each outlet faces a permeable cotton, a liquid outlet for injecting liquid dyeing paint is provided on the side wall of the liquid cavity, and a sealing piston 2 is plugged in the liquid outlet.
[0014] Preferably, one end of the permeable cotton away from the drill rod is fixedly connected to a baffle, the baffle is hard and fixedly connected to the upper end surface of the lower tooth plate.
[0015] Preferably, the console is provided with a gap, which is square and corresponds to the square drill rod, each side of the square gap is fixedly connected to a positioning block, and each side of the drill rod corresponding to the positioning block is provided with a positioning groove for the positioning block to limit the sliding.
[0016] Preferably, a method for observing groundwater level in hydrogeological exploration comprises: S1: finding a fixed point and installing the device: moving the device and a driving source for driving the device to the point to be observed, vertically pointing the probe and the drill rod to the observation point, and correspondingly installing the driving sources on the console and the drill rod respectively;
[0017] S2: Preparatory work, trial operation: driving the console to make the console and the drill bit fit together;
[0018] S3: Groundwater layer positioning and measurement: start the driving source on the console and the drill pipe in sequence, and finally complete the measurement;
[0019] S4: After the measurement is completed, move the drill rod, drill bit and control console back to the ground, then observe the data on the scale on the drill rod and perform calculations.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. The present invention can more accurately measure the position of the groundwater layer through the device, including the water flow direction at each height in the groundwater layer, the height of the groundwater layer from the ground, the overall height of the groundwater layer, the height of the groundwater level, etc., and can sample the explored groundwater to facilitate the subsequent analysis of the composition and content of the groundwater;
[0022] 2. In the present invention, the movement of the control block in the direction away from the drill rod drives the synchronous movement of the needle fixed on the control block, and the needle moves out of the control cavity and pierces the underground soil layer where the control console is located, thereby fixing the control console on the soil layer above the groundwater layer, so as to facilitate the subsequent measurement of the groundwater level;
[0023] 3. The present invention controls the drill rod to move downward by driving the driving source of the drill rod, while the control console is fixed to the soil layer above the upper underground layer, that is, the permeable cotton in the control console is fixed, the drill rod moves downward, and the liquid dyeing paint on the permeable cotton is painted on the outer wall of the drill rod;
[0024] 4. The present invention moves the drill rod downward, and the drill rod moves downward and extends into the groundwater of the groundwater layer. The groundwater enters the collection chamber through the collection port, thereby completing the collection of groundwater, so as to facilitate the subsequent study of the groundwater composition;
[0025] 5. In the process of moving back, the bottom surface of the console and the upper surface of the drill bit are fitted together again. At this time, the collection port is blocked by the console, which can effectively prevent the collected groundwater from containing more non-groundwater substances when collecting groundwater, thereby affecting the subsequent analysis of groundwater composition and content;
[0026] 6. In the process of returning, the bottom surface of the console and the upper surface of the drill bit fit together again, and the collecting port is blocked by the console. This can effectively prevent the collected groundwater from containing more non-groundwater substances, thereby affecting the subsequent analysis of the groundwater composition and content. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is the overall structural view of the present invention;
[0028] Figure 2 It is an overall top view of the present invention;
[0029] Figure 3 is a cross-sectional view of the present invention;
[0030] Figure 4 is a cross-sectional view of the present invention;
[0031] Figure 5 It is a partial cross-sectional view of the present invention;
[0032] Figure 6 A partial cutaway view of the rotating rod of the present invention;
[0033] Figure 7 It is a schematic diagram of the position of the ground to the underground water layer of the present invention.
[0034] In the figure:
[0035] 1. Probe; 11. Control console; 12. Drill bit; 2. Drill rod; 21. Scale; 3. Control chamber; 31. Rectangular opening; 32. Oblique wedge block; 33. Control block; 34. Connecting plate; 35. Spring; 36. Oblique wedge opening; 4. Needle; 5. Collecting chamber; 51. Collecting opening; 52. Drain opening; 53. Sealing piston 1; 6. Upper tooth plate; 61. Gear; 62. Lower tooth plate; 63. Penetration cotton; 7. Liquid chamber; 71. Liquid outlet; 72. Sealing piston 2; 8. Baffle; 9. Gap; 91. Positioning groove; 92. Positioning block. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] See also Figures 1 to 7 , the present invention provides a technical solution:
[0038] A groundwater level observation device for hydrogeological exploration comprises a probe 1, wherein the probe 1 comprises a console 11 and a drill bit 12, wherein the console 11 and the drill bit 12 are movably connected, and a water level positioning component is arranged in the console 11, and a sensing sheet capable of sending a signal to a ground terminal when in contact is arranged correspondingly on the bottom surface of the console 11 and the upper end surface of the drill bit 12;
[0039] A drill rod 2 is arranged above the probe 1, and is densely provided with pores for collecting and adhering underground soil layers. The drill rod 2 extends through the console 11 and is slidably connected to the console 11. The lower end of the drill rod 2 is fixedly connected to the center of the upper end face of the drill bit 12. The drill rod 2 is square, and a scale 21 for measuring distance is provided on the side wall of one side of the square drill rod 2.
[0040] As an embodiment of the present invention, as shown in the figure, the water level positioning assembly includes a control chamber 3, the control chamber 3 is four groups and corresponds to the four side surfaces of the drill pipe 2 one by one, each of the control chambers 3 is provided with a rectangular opening 31 at the bottom, an inclined wedge block 32 with an inclined groove on the upper end face is extended through and slidably connected to the rectangular opening 31, a control block 33 is slidably connected in the control chamber 3, an inclined wedge opening 36 is provided on the control block 33, the position of the inclined wedge opening 36 matches the inclined wedge block 32, a connecting plate 34 is fixedly connected to the side of the control block 33 close to the drill pipe 2, a spring 35 is fixedly connected to one side of the connecting plate 34, and the other end of the spring 35 is fixedly connected to the inner wall of the control chamber 3.
[0041] The control block 33 extends out of the control cavity 3 and is fixedly connected to a pricking needle 4 capable of piercing the ground. The pricking needles 4 are distributed on a side wall of one end of the control block 33 in rectangular shapes with equal spacing.
[0042] During operation, the control console 11 is controlled to move downward by the driving source, and the control console 11, the drill rod 2 and the drill bit 12 fixedly connected to the drill rod 2 move downward. When the drill bit 12 contacts the ground, due to the limit of the ground on the drill bit 12, the control console 11 moves downward, causing the inclined wedge 36 in the control block 33 to move downward and contact the inclined wedge block 32 and be squeezed by the inclined wedge block 32, thereby moving in the direction close to the drill rod 2. The needle 4 fixedly connected to one end of the control block 33 moves and extends into the control cavity 3, which can ensure that the control console 11 and the drill bit 12 are always in contact during the underground movement of the probe 1, so as to prevent the probe 1 from bringing substances in the process of moving into the collection cavity 5 during the process of moving, causing the collected groundwater to contain more substances other than those in the groundwater when collecting groundwater later, thereby affecting the subsequent analysis of the composition and content of the groundwater;
[0043] At this time, when the console 11 and the drill bit 12 are fitted together, the induction sheets on the bottom surface of the console 11 and the upper surface of the drill bit 12 are fitted together and contact each other, and a signal is sent to the ground terminal. At this time, the two induction sheets contact each other for the first time and send out a first signal. At this time, the first signal indicates that the console 11 and the drill bit 12 are in good contact and fit, and the preparation work is completed, and drilling can begin to explore groundwater.
[0044] The driving source connected to the control console 11 drives the control console 11 to move downward, and the control console 11, the drill rod 2 and the drill bit 12 fixedly connected to the drill rod 2 drill into the ground and move downward in the stratum. When the drill bit 12 contacts the groundwater layer, the drill bit 12 first extends into the groundwater layer and separates from the upper soil layer, while the control console 11 is still in the ground soil layer. At this time, the drill bit 12 loses the pressure of the ground soil layer and rebounds under the action of the spring 35, so that the control block 33 and the oblique wedge 36 on the control block 33 move in the direction away from the drill rod 2, thereby squeezing the oblique wedge block 32 to move downward, and the oblique wedge block 32 fixedly connected to the drill bit 12 moves downward;
[0045] The movement of the control block 33 away from the drill rod 2 will drive the synchronous movement of the needle 4 fixed on the control block 33. The needle 4 moves out of the control cavity 3 and penetrates into the underground soil layer where the console 11 is located, thereby fixing the console 11 on the soil layer above the groundwater layer to facilitate the subsequent measurement of the groundwater level.
[0046] As an embodiment of the present invention, as shown in the figure, a collecting chamber 5 is opened in the drill bit 12, a collecting port 51 is opened on the top of the inner surface of the collecting chamber 5, a drain port 52 is opened on the side wall of the inner surface of the collecting chamber 5, and a sealing piston 53 is plugged in the drain port 52.
[0047] An upper tooth plate 6 is fixedly connected to one side of the bottom of the connecting plate 34, and the upper tooth plate 6 is slidably connected in the control chamber 3. The upper tooth plate 6 is meshedly connected to a gear 61, and the gear 61 is rotatably connected to the side wall of the control chamber 3. The side of the gear 61 away from the upper tooth plate 6 is meshedly connected to a lower tooth plate 62, and the lower tooth plate 62 is slidably connected in the control chamber 3. One end of the lower tooth plate 62 is fixedly connected to a permeable cotton 63, and one end of the permeable cotton 63 rests on the side wall of the drill pipe 2.
[0048] The width of the permeable cotton 63 corresponds to the side length of the drill rod 2 .
[0049] A liquid chamber 7 is provided in the console 11, and four outlets are provided at the bottom of the liquid chamber 7, each of which faces a permeable cotton 63. A liquid outlet 71 for injecting liquid dyeing paint is provided on the side wall of the liquid chamber 7, and a sealing piston 72 is plugged in the liquid outlet 71.
[0050] During operation, liquid dyeing paint is placed in the liquid chamber 7, and the liquid dyeing paint flows down through the outlet and is absorbed by the permeable cotton 63. The movement of the control block 33 in the direction away from the drill rod 2 drives the synchronous movement of the upper tooth plate 6 fixedly connected to the control block 33 through the connecting plate 34. The upper tooth plate 6 moves the lower tooth plate 62 in the direction close to the drill rod 2 through the meshing of the gear 61. The permeable cotton 63 fixedly connected to the lower tooth plate 62 moves and finally contacts and fits to the side wall of the drill rod 2.
[0051] When the control console 11 is fixed on the soil layer above the groundwater layer and the drill bit 12 moves downward, the induction sheet on the bottom surface of the control console 11 and the upper end surface of the drill bit 12 are out of contact. When the induction sheet is just out of contact, it is located at the top of the groundwater layer. At this time, the induction sheet sends a second signal to the ground terminal. After the ground terminal receives the signal at this time, it stops the driving source of the control console 11 and controls the driving source of the drill rod 2 to work.
[0052] At this time, the driving source driving the drill rod 2 works to control the drill rod 2 to move downward, while the control console 11 is fixed to the soil layer above the upper underground layer, that is, the permeable cotton 63 in the control console 11 is fixed, the drill rod 2 moves downward, and the liquid dye paint on the permeable cotton 63 is brushed on the outer wall of the drill rod 2;
[0053] The drill rod 2 is driven to move downward, and the drill rod 2 moves downward and extends into the groundwater in the groundwater layer. The groundwater enters the collecting chamber 5 through the collecting port 51, thereby completing the collection of the groundwater, so as to facilitate the subsequent study of the groundwater composition.
[0054] The drill rod 2 is driven to move downwards. After reaching the bottom of the groundwater layer, the drill bit 12 continues to move downwards. After reaching the underground soil layer at the bottom of the groundwater layer and the drill rod 2 also extends into the underground soil layer, the driving source of the drill rod 2 and the driving source of the control console 11 are controlled in turn according to the above principle to control the drill rod 2 and the control console 11 to move back and finally reach the ground.
[0055] During the back movement, the bottom surface of the console 11 and the upper end surface of the drill bit 12 are again fitted together, and the collection port 51 is blocked by the console 11, which can effectively prevent the collected groundwater from containing more non-groundwater substances when collecting groundwater, thereby affecting the subsequent analysis of the groundwater composition and content;
[0056] During the process of returning the bottom surface of the console 11 and the upper end surface of the drill bit 12 to fit together again, the permeable cotton 63 returns and no longer contacts the side wall of the drill rod 2, and the drill rod 2 is no longer coated with liquid dyeing paint, so as to ensure accurate judgment of the direction of water flow after the drill rod 2 is returned to the ground;
[0057] During the process of returning, the bottom surface of the console 11 and the upper end surface of the drill bit 12 are again attached, and the needle 4 is returned to the control cavity 3, thereby releasing the fixation of the console 11, so that the probe 1 and the like can be smoothly returned to the ground;
[0058] After the drill bit 12, the control console 11, the drill rod 2, etc. are moved back to the ground, the groundwater in the collection chamber 5 can be taken out by opening the sealing piston 53, thereby completing the groundwater sampling.
[0059] One end of the permeable cotton 63 away from the drill rod 2 is fixedly connected with a baffle 8 . The baffle 8 is hard and fixedly connected to the upper end surface of the lower tooth plate 62 .
[0060] The console 11 is provided with a gap 9, which is square and corresponds to the square drill rod 2. A positioning block 92 is fixedly connected to each side of the square gap 9, and a positioning groove 91 for the positioning block 92 to limit the sliding of each side of the drill rod 2 corresponding to the positioning block 92 is provided.
[0061] During operation, the gap 9 is designed so that when the drill rod 2 is moved back, the liquid dye paint on the drill rod 2 will not contact the inner wall of the console 11, so that it will retain the state after entering the groundwater, which is convenient for subsequent analysis; after the drill bit 12, the console 11, the drill rod 2, etc. are moved back to the ground, due to the impact of the water flow of the groundwater layer on the side wall of the drill rod 2 coated with the liquid dye paint, the color of the liquid dye paint on the side wall of the drill rod 2 facing the water flow direction is the lightest, and the color of the liquid dye paint on the side wall of the drill rod 2 facing away from the water flow direction is the darkest, that is, the water flow direction at this position is from the lighter color of the liquid dye paint to the darkest color of the liquid dye paint, so that the water flow direction of the groundwater layer can be judged;
[0062] After the drill bit 12, the console 11, the drill rod 2, etc. are moved back to the ground, when the drill bit 12 is moved down to the maximum depth, the scale 21 on the drill rod 2 exposed on the ground reads ha, and when the drill bit 12 is moved down to the top of the groundwater layer when the first signal is received, the scale 21 reads hb; that is, the height h1 of the groundwater layer from the ground is obtained: h1=ha-hb;
[0063] When the drill bit 12 is moved down to the deepest position, the soil layer at the bottom of the groundwater layer will enter the pores of the drill rod 2. At this time, the scale 21 at the top of the soil layer at the bottom of the groundwater layer in the pores, i.e., the water bottom of the groundwater layer, is read as hc, i.e., the overall height h2 of the groundwater layer is obtained: h2=hb-hc;
[0064] When the drill bit 12 is moved down to the deepest position, after being flushed by groundwater, the color of the liquid dye paint on the side wall of the drill rod 2 facing the water flow direction in the same plane is the lightest, while the color of the liquid dye paint on the side wall of the drill rod 2 facing away from the water flow direction is the darkest. That is to say, after being impacted by water flow, the color of the liquid dye paint on the drill rod 2 in the same plane is different in depth. Let the reading of the plane with the same depth of the liquid dye paint on the drill rod 2 (that is, the water surface of the groundwater layer, that is, the water level) be hd, that is, the height of the groundwater level h3: h3=hd-hc;
[0065] This device can be used to more accurately measure the location of the groundwater layer, including the direction of water flow at various heights in the groundwater layer, the height of the groundwater layer from the ground, the overall height of the groundwater layer, the height of the groundwater level, etc. It can also take samples of the explored groundwater to facilitate subsequent analysis of the composition and content of the groundwater.
[0066] A method for observing groundwater level in hydrogeological exploration comprises: S1: finding a fixed point and installing the equipment: moving the device and a driving source for driving the device to a point to be observed, vertically facing the probe 1 and the drill rod 2 to the observation point, and correspondingly installing the driving sources on the console 11 and the drill rod 2;
[0067] S2: Preparatory work, trial operation: driving the console 11 to make the console 11 and the drill 12 fit together
[0068] S3: Groundwater layer positioning and measurement: start the driving sources on the console 11 and the drill pipe 2 in sequence, and finally complete the measurement;
[0069] S4: After the measurement is completed, the drill rod 2, the drill bit 12, and the control console 11 are moved back to the ground, and then the data of the scale 21 on the drill rod 2 is observed and calculated.
[0070] Working principle: when it is necessary to observe the groundwater level, the device and its driving source are moved to the observation point, the probe 1 and the drill rod 2 are vertically facing the observation point, the control console 11 and the drill rod 2 are connected with a driving source for driving them to move downward, the bottom surface of the control console 11 and the upper end surface of the drill bit 12 are provided with corresponding induction plates that can send signals to the ground terminal when in contact, when working, the control console 11 is controlled to move downward by the driving source, and the control console 11, the drill rod 2 and the drill bit 12 fixedly connected to the drill rod 2 move downward, when the drill bit 12 touches the ground, due to the limit of the ground on the drill bit 12, the control console 11 moves downward at this time, causing the inclined notch 36 in the control block 33 to move downward The probe 1 is moved into contact with the inclined wedge block 32 and is squeezed by the inclined wedge block 32 so as to move toward the direction close to the drill pipe 2. The needle 4 fixedly connected to one end of the control block 33 moves and extends into the control cavity 3. The upper tooth plate 6 fixedly connected to one end of the control block 33 through the connecting plate 34 moves, and the lower tooth plate 62 is driven to move away from the drill pipe 2 by the meshing of the gear 61. It can ensure that the control console 11 and the drill bit 12 are always in contact with each other during the underground movement of the probe 1, so as to prevent the probe 1 from bringing substances in the process of moving into the collection cavity 5 during the process of moving, so that when collecting groundwater later, the collected groundwater contains more substances other than those in the groundwater, thereby affecting the subsequent analysis of the composition and content of the groundwater.
[0071] At this time, when the console 11 and the drill bit 12 are fitted together, the induction sheets on the bottom surface of the console 11 and the upper surface of the drill bit 12 are fitted together and contact each other, and a signal is sent to the ground terminal. At this time, the two induction sheets contact each other for the first time and send out a first signal. At this time, the first signal indicates that the console 11 and the drill bit 12 are in good contact and fit, and the preparation work is completed, and drilling can begin to explore groundwater.
[0072] Continue to control the driving source connected to the control console 11 to drive the control console 11 to move downward, the control console 11, the drill rod 2 and the drill bit 12 fixedly connected to the drill rod 2 drill into the ground and move downward in the stratum. When the drill bit 12 contacts the groundwater layer, it first extends into the groundwater layer and separates from the upper soil layer, while the control console 11 is still in the ground soil layer. At this time, the drill bit 12 loses the pressure of the ground soil layer and rebounds under the action of the spring 35, so that the control block 33 and the oblique wedge 36 on the control block 33 move in the direction away from the drill rod 2, thereby squeezing the oblique wedge block 32 to move downward, and the oblique wedge block 32 fixedly connected to the drill bit 12 moves downward;
[0073] The movement of the control block 33 away from the drill rod 2 will drive the synchronous movement of the needle 4 fixed on the control block 33, and the needle 4 moves out of the control cavity 3 and penetrates into the underground soil layer where the control console 11 is located, thereby fixing the control console 11 on the soil layer above the groundwater layer, so as to facilitate the subsequent measurement of the groundwater level;
[0074] Liquid dyeing paint is placed in the liquid chamber 7, and the liquid dyeing paint flows down through the outlet and is absorbed by the permeable cotton 63. The movement of the control block 33 in the direction away from the drill rod 2 will drive the synchronous movement of the upper tooth plate 6 fixedly connected to the control block 33 through the connecting plate 34. The upper tooth plate 6 moves the lower tooth plate 62 in the direction close to the drill rod 2 through the meshing of the gear 61. The permeable cotton 63 fixedly connected to the lower tooth plate 62 moves and finally contacts and fits to the side wall of the drill rod 2.
[0075] When the control console 11 is fixed on the soil layer above the groundwater layer and the drill bit 12 moves downward, the induction sheet on the bottom surface of the control console 11 and the upper end surface of the drill bit 12 are out of contact. When the induction sheet is just out of contact, it is located at the top of the groundwater layer. At this time, the induction sheet sends a second signal to the ground terminal. After the ground terminal receives the signal at this time, it stops the driving source of the control console 11 and controls the driving source of the drill rod 2 to work.
[0076] At this time, the driving source driving the drill rod 2 works to control the drill rod 2 to move downward, while the control console 11 is fixed to the soil layer above the upper underground layer, that is, the permeable cotton 63 in the control console 11 is fixed, the drill rod 2 moves downward, and the liquid dye paint on the permeable cotton 63 is brushed on the outer wall of the drill rod 2;
[0077] The drill rod 2 is driven to move downward, and the drill rod 2 moves downward and extends into the groundwater in the groundwater layer. The groundwater enters the collecting chamber 5 through the collecting port 51, thereby completing the collection of the groundwater, so as to facilitate the subsequent study of the groundwater composition.
[0078] The drill rod 2 is driven to move downwards. After reaching the bottom of the groundwater layer, the drill bit 12 continues to move downwards. After reaching the underground soil layer at the bottom of the groundwater layer and the drill rod 2 also extends into the underground soil layer, the driving source of the drill rod 2 and the driving source of the control console 11 are controlled in turn according to the above principle to control the drill rod 2 and the control console 11 to move back and finally reach the ground.
[0079] During the back movement, the bottom surface of the console 11 and the upper end surface of the drill bit 12 are again fitted together, and the collection port 51 is blocked by the console 11, which can effectively prevent the collected groundwater from containing more non-groundwater substances when collecting groundwater, thereby affecting the subsequent analysis of the groundwater composition and content;
[0080] During the process of returning the bottom surface of the console 11 and the upper end surface of the drill bit 12 to fit together again, the permeable cotton 63 returns and no longer contacts the side wall of the drill rod 2, and the drill rod 2 is no longer coated with liquid dyeing paint, so as to ensure accurate judgment of the direction of water flow after the drill rod 2 is returned to the ground;
[0081] During the process of returning, the bottom surface of the console 11 and the upper end surface of the drill bit 12 are again attached, and the needle 4 is returned to the control cavity 3, thereby releasing the fixation of the console 11, so that the probe 1 and the like can be smoothly returned to the ground;
[0082] After the drill bit 12, the console 11, the drill rod 2, etc. are moved back to the ground, the groundwater in the collection chamber 5 can be taken out by opening the sealing piston 53, thereby completing the groundwater sampling;
[0083] The gap 9 is designed so that when the drill rod 2 is moved back, the liquid dye paint on the drill rod 2 will not contact the inner wall of the console 11, so that it can be retained in the state after entering the groundwater, which is convenient for subsequent analysis;
[0084] After the drill bit 12, the control console 11, the drill rod 2, etc. are moved back to the ground, due to the impact of the water flow of the groundwater layer on the side wall of the drill rod 2 coated with the liquid dye paint, the color of the liquid dye paint on the side wall of the drill rod 2 facing the water flow direction is the lightest, and the color of the liquid dye paint on the side wall of the drill rod 2 facing away from the water flow direction is the darkest, that is, the water flow direction at this position is from the lighter color of the liquid dye paint to the darkest color of the liquid dye paint, so that the water flow direction of the groundwater layer can be determined;
[0085] After the drill bit 12, the console 11, the drill rod 2, etc. are moved back to the ground, when the drill bit 12 is moved down to the maximum depth, the scale 21 on the drill rod 2 exposed on the ground reads ha, and when the drill bit 12 is moved down to the top of the groundwater layer when the first signal is received, the scale 21 reads hb; that is, the height h1 of the groundwater layer from the ground is obtained: h1=ha-hb;
[0086] When the drill bit 12 is moved down to the deepest position, the soil layer at the bottom of the groundwater layer will enter the pores of the drill rod 2. At this time, the scale 21 at the top of the soil layer at the bottom of the groundwater layer in the pores, i.e., the water bottom of the groundwater layer, is read as hc, i.e., the overall height h2 of the groundwater layer is obtained: h2=hb-hc;
[0087] When the drill bit 12 is moved down to the deepest position, after being flushed by groundwater, the color of the liquid dye paint on the side wall of the drill rod 2 facing the water flow direction in the same plane is the lightest, while the color of the liquid dye paint on the side wall of the drill rod 2 facing away from the water flow direction is the darkest. That is to say, after being impacted by water flow, the color of the liquid dye paint on the drill rod 2 in the same plane is different in depth. Let the reading of the plane with the same depth of the liquid dye paint on the drill rod 2 (that is, the water surface of the groundwater layer, that is, the water level) be hd, that is, the height of the groundwater level h3: h3=hd-hc;
[0088] That is, through this device, the position of the groundwater layer can be measured more accurately, including the water flow direction at various heights in the groundwater layer, the height of the groundwater layer from the ground, the overall height of the groundwater layer, the height of the groundwater level, etc., and the explored groundwater can be sampled to facilitate subsequent analysis of the composition and content of the groundwater.
[0089] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A groundwater level observation device for hydrogeological exploration, It is characterized in that include: A probe (1), the probe (1) comprising a console (11) and a drill bit (12), the console (11) and the drill bit (12) being movably connected, a water level positioning component being arranged in the console (11), and sensor sheets capable of sending signals to a ground terminal when in contact being arranged correspondingly on the bottom surface of the console (11) and the upper end surface of the drill bit (12); A drill rod (2) is arranged above the probe (1), the drill rod (2) being densely provided with pores for collecting and adhering underground soil layers, the drill rod (2) extending through the console (11) and being slidably connected to the console (11), the lower end of the drill rod (2) being fixedly connected to the center of the upper end face of the drill bit (12), the drill rod (2) being square, and a scale (21) for measuring distance is arranged on a side wall of one side of the square drill rod (2); The water level positioning assembly comprises a control chamber (3), wherein the control chambers (3) are four groups and correspond one to one to the four side surfaces of the drill rod (2), each of the control chambers (3) is provided with a rectangular opening (31) at the bottom, an inclined wedge block (32) having an upper end surface with an inclined groove extending through the rectangular opening (31) and slidably connected thereto, a control block (33) is slidably connected thereto, an inclined wedge opening (36) is provided on the control block (33), the position of the inclined wedge opening (36) matches that of the inclined wedge block (32), a connecting plate (34) is fixedly connected to one side of the control block (33) close to the drill rod (2), a spring (35) is fixedly connected to one side of the connecting plate (34), the other end of the spring (35) is fixedly connected to the inner wall of the control chamber (3).
2. A groundwater level observation device for hydrogeological exploration according to claim 1, Features: A side of the control block (33) extending out of the control cavity (3) is fixedly connected to a pricking needle (4) capable of piercing the ground, and the pricking needles (4) are distributed in rectangular shapes with equal spacing on a side wall of one end of the control block (33).
3. A groundwater level observation device for hydrogeological exploration according to claim 2, Features: A collecting chamber (5) is provided in the drill bit (12), a collecting port (51) is provided at the top of the inner surface of the collecting chamber (5), a drain port (52) is provided on the side wall of the inner surface of the collecting chamber (5), and a sealing piston (53) is plugged in the drain port (52).
4. A groundwater level observation device for hydrogeological exploration according to claim 3, Features: An upper tooth plate (6) is fixedly connected to one side of the bottom of the connecting plate (34), and the upper tooth plate (6) is slidably connected in the control chamber (3). The upper tooth plate (6) is meshingly connected to a gear (61), and the gear (61) is rotatably connected to the side wall of the control chamber (3). A side of the gear (61) away from the upper tooth plate (6) is meshingly connected to a lower tooth plate (62), and the lower tooth plate (62) is slidably connected in the control chamber (3). One end of the lower tooth plate (62) is fixedly connected to a permeable cotton (63), and one end of the permeable cotton (63) abuts against the side wall of the drill rod (2).
5. A groundwater level observation device for hydrogeological exploration according to claim 4, Features: The width of the permeable cotton (63) corresponds to the side length of the drill rod (2).
6. A groundwater level observation device for hydrogeological exploration according to claim 5, Features: The console (11) has a liquid chamber (7) formed in it, and four outlets formed at the bottom of the liquid chamber (7), each of the outlets facing a permeable cotton (63). A liquid outlet (71) for injecting liquid dyeing paint is formed on the side wall of the liquid chamber (7), and a sealing piston (72) is plugged in the liquid outlet (71).
7. A groundwater level observation device for hydrogeological exploration according to claim 6, Features: One end of the infiltration cotton (63) away from the drill rod (2) is fixedly connected to a baffle (8); the baffle (8) is hard and is fixedly connected to the upper end surface of the lower tooth plate (62).
8. A groundwater level observation device for hydrogeological exploration according to claim 7, Features: The console (11) is provided with a gap (9), the gap (9) being square and corresponding to the square drill rod (2), each side of the square gap (9) being fixedly connected to a positioning block (92), and each side of the drill rod (2) corresponding to the positioning block (92) being provided with a positioning groove (91) for the positioning block (92) to slide in a limited position.
9. A method for observing groundwater level in hydrogeological exploration, applied to the device for observing groundwater level in hydrogeological exploration as claimed in claim 8, It is characterized in that The hydrogeological exploration groundwater level observation method comprises: S1: Positioning and equipment installation: the device and its driving source are moved to the observation point, the probe (1) and the drill rod (2) are vertically aligned with the observation point, and the driving sources on the control console (11) and the drill rod (2) are respectively installed correspondingly; S2: Preparatory work, trial operation: driving the console (11) to make the console (11) and the drill bit (12) fit together; S3: Locating and measuring the groundwater layer: starting the driving sources on the control console (11) and the drill pipe (2) in sequence, and finally completing the measurement; S4: After the measurement is completed, the drill rod (2), the drill bit (12), and the control console (11) are moved back to the ground, and then the data on the scale (21) on the drill rod (2) are observed and calculated.
Citation Information
Patent Citations
Exploration pressure injection instrument and application thereof
CN110080194A
The water-level measuring post is used in the river course flood prevention
CN204514434U
Water level observation device for hydrogeological operation
CN209894302U
Feed sampling device
CN211122027U
Underground water level observation device for hydrogeological exploration
CN216050153U