Method for calculating oil increasing amount of full release of capacity of offshore liquid-limiting oil field

By determining the fluid production capacity and capacity of the oil well in the offshore liquid limit oil field, and using numerical simulation method to prioritize the allocation of liquid volume and adjust the time step, the problem of insufficient oil production in the existing technology is solved, and the full production capacity of the offshore liquid limit oil field is achieved. Reasonable calculation of release and oil increase.

CN118965669AActive Publication Date: 2024-11-15CHINA NATIONAL OFFSHORE OIL (CHINA) CO LTD +1
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202410806000.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-11-15
Estimated Expiration
2044-06-21

AI Technical Summary

Technical Problem

The existing technology failed to fully consider the daily oil production capacity of each production well in offshore limited liquid oil fields, resulting in a low oil production volume in the basic plan, and the large increase in the oil production volume of the liquid release is limited, which limits the sufficient production capacity of the oil field. release.

Method used

By determining the liquid production capacity of oil wells in different water-containing stages, combining the oil well production capacity, the reservoir numerical simulation method is used to predict indicators under unlimited liquid conditions, and priority is given to the release of liquid to wells with lower moisture content, and according to the prediction accuracy and determine the reasonable time step and perform numerical simulation control under liquid limit conditions to achieve full release of production capacity.

Benefits of technology

The maximum utilization of the existing facilities under liquid limit conditions has been achieved. The calculated liquid limit oil field production capacity fully released and the oil increase is more reasonable and reliable, which can effectively guide the transformation of facilities and improve the economic benefits of the oil field.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965669A_ABST
    Figure CN118965669A_ABST
Patent Text Reader

Abstract

The invention discloses a method for calculating the oil increasing amount of full release of production capacity of an offshore liquid-limiting oil field. The method comprises the following steps: determining the liquid production capacity of a research object oil well; determining the maximum daily liquid production capacity and the platform service life for maintaining normal production under the existing facility; determining an index prediction time step length; performing index prediction on the research object under the condition of not limiting liquid by utilizing numerical reservoir simulation; carrying out numerical simulation control condition setting under the liquid limiting condition on the first time step length of liquid limiting; carrying out numerical simulation prediction; carrying out numerical simulation control condition resetting on the newest prediction step length under a liquid limiting condition; calculating the total oil production of each time step under the liquid limiting condition; and calculating the total oil increasing amount of sufficient release of the capacity and the like. When the oil increasing amount of the basic scheme is calculated, the water content of a single well in each time step is considered, the liquid amount is fully endowed to the well with the low water content, the liquid amount of an existing facility under the liquid limiting condition is utilized to the maximum extent, and the calculated liquid limiting oil field capacity is fully released, so that the oil increasing amount is more reasonable and reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oil and gas field exploration and development, and in particular relates to a method for calculating the oil increase amount for fully releasing the production capacity of an offshore liquid-limited oil field. Background Art

[0002] The liquid production of offshore oil fields needs to go through a series of processes such as processing and external transportation. Due to the constraints of economic costs, the reserved capacity of the scheme design is limited. After the understanding of geological reservoirs changes, the liquid processing and transportation capacity is often limited, which restricts the release of oil field production capacity. It is necessary to transform the processing and external transportation equipment to further release the production well capacity and improve the ultimate economic benefits of the oil field. It is of great and practical significance to reasonably predict the increase in oil production under the release of production capacity.

[0003] At present, the basic plan for capacity release generally limits liquid in proportion to the liquid production index, and determines the increased oil production by capacity release on this basis. Since the liquid production index does not take into account the daily oil production capacity of each production well, the oil production of the basic plan is relatively small, and there is a phenomenon that the increased oil production by liquid production release is relatively large.

[0004] Therefore, it is urgent to establish a method for calculating the oil production increase for fully releasing the production capacity of offshore liquid-limited oil fields to guide the preparation of oil production increase plans for fully releasing the production capacity of offshore liquid-limited oil fields. Summary of the invention

[0005] The present invention is proposed to solve the problems existing in the prior art, and its purpose is to provide a method for calculating the oil increase amount for fully releasing the production capacity of an offshore liquid-limited oil field.

[0006] The present invention is achieved through the following technical solutions:

[0007] A method for calculating the oil production increase amount when the production capacity of an offshore liquid-limited oil field is fully released, comprising:

[0008] (I) Determine the liquid production capacity of the oil well at different water-containing stages:

[0009] Calculate the dimensionless liquid production index of different water-cut stages of the oil field according to the determined oil-water relative permeability curve, and calculate the liquid production capacity of the research object oil well at different water-cut stages in combination with the oil well productivity;

[0010] (i) Determine the oil well productivity of the research object oil well

[0011] a. The production capacity of the wells that have been put into production shall be based on the actual production capacity after production;

[0012] b. The production capacity of wells that have not been put into production is determined by analogy:

[0013] First, determine the analog oil well; then, use the mobility correction method to determine the oil well productivity of the research object oil well.

[0014] (ii) Determine the oil-water relative permeability curve of the research object oil well

[0015] a. If there is a measured oil-water relative permeability curve, use the measured curve;

[0016] b. If there is no measured oil-water relative permeability curve, the analogy method is used to determine it;

[0017] (II) Determine the maximum daily production volume and platform life span to maintain normal production under existing facilities

[0018] The specific method is: systematically sort out the liquid processing capacity and logistics trends of the oil field to determine the maximum daily liquid production that can maintain normal production under the existing facilities; the platform life is determined according to the scheme design, and the platform life is used to determine the predicted years;

[0019] (III) Comprehensive prediction accuracy and prediction complexity to determine the index prediction time step

[0020] When using reservoir numerical simulation method to calculate the increase in oil production, it is necessary to determine a reasonable time step. The determination of the time step is affected by the prediction accuracy and prediction complexity. The smaller the time step, the higher the calculation accuracy and the higher the calculation complexity. The larger the time step, the lower the calculation accuracy and the lower the calculation complexity.

[0021] (IV) Using reservoir numerical simulation to predict the indicators of the research object under unlimited liquid conditions;

[0022] Specifically, according to the liquid production capacity of the oil well of the research object calculated in step (I), a numerical simulation calculation is carried out under the condition of unlimited liquid, and the daily liquid production of any time step is output; the daily liquid production of the oil field is compared with the maximum daily liquid production under the existing facilities to maintain normal production, and the first time step exceeding the maximum daily liquid production under the existing facilities to maintain normal production is selected as the first time step of limited liquid, and the oil production of any time step is output, and the total oil production of each time step under the condition of unlimited liquid is calculated;

[0023] (V) Setting the control conditions for numerical simulation under liquid-limited conditions for the first time step of liquid-limited conditions

[0024] Specifically, the total amount of liquid that can be released in the first time step of liquid limitation is calculated compared with the previous time step. This value is the difference between the maximum daily liquid production that can maintain normal production under the existing facilities and the daily liquid production of the oil field in the previous time step. If the first time step of liquid limitation is the first time step, that is, there is no daily liquid production prediction result of the previous time step, then the daily liquid production of the oil well in the previous time step is treated as zero, and then the oil wells are sorted from low to high according to the water content of the single well in the first time step of liquid limitation, and the amount of liquid that needs to be released from each oil well in the first time step of liquid limitation is calculated. The amount of liquid that each oil well needs to release in the first time step of liquid limitation is the difference between the daily liquid production capacity of each oil well under the water content of the first time step of liquid limitation and the daily liquid production of the well in the previous time step; the releasable liquid is preferentially allocated to wells with low water content until the total amount of releasable liquid is allocated;

[0025] (VI) Carry out numerical simulation prediction for the step length after the numerical simulation control conditions are set, and judge whether the prediction period has been reached. If the prediction period has been reached, proceed to step (VIII). If the prediction period has not been reached, carry out numerical simulation prediction for the next time step, and proceed to step (VII);

[0026] (VII) resetting the control conditions of numerical simulation under limited liquid conditions for the latest prediction step;

[0027] The specific method is as follows: after the numerical simulation control conditions are set, the daily liquid production of the next time step is judged to see whether it reaches the maximum daily liquid production that can maintain normal production under the existing facilities. If it reaches the maximum daily liquid production that can maintain normal production under the existing facilities, the numerical simulation control conditions are kept unchanged and the process returns to step (VI). If it does not reach the maximum daily liquid production that can maintain normal production under the existing facilities, it is judged whether the daily liquid production of all wells has reached the maximum liquid production capacity. If the daily liquid production of all wells has reached the maximum liquid production capacity, the numerical simulation control conditions are kept unchanged and the process returns to step (VI). If there are still some If the daily liquid production of the wells does not reach the maximum liquid production capacity, the total liquid volume that can be released in the time step is calculated. The value is the difference between the maximum daily liquid production that can maintain normal production under the existing facilities and the daily liquid production of the oil field in the time step. The oil wells are sorted from low to high according to the water content of the single wells in the time step, and the liquid volume that needs to be released from each oil well in the time step is calculated. The liquid volume that needs to be released from each oil well in the time step is the difference between the daily liquid production capacity under the water content of the time step and the daily liquid production of the well in the time step. The releasable liquid volume is preferentially allocated to the wells with low water content until the total releasable liquid volume is allocated, and the step (VI) is entered;

[0028] (VIII) Calculating the total oil production of each time step under the limited liquid condition: Accumulating the oil production of all time steps under the limited liquid condition to obtain the total oil production of each time step under the limited liquid condition;

[0029] (IX) Calculation of total oil increase to fully release production capacity

[0030] The total oil production increase after full release of the production capacity is equal to the total oil production of each time step under the unlimited liquid condition obtained in step (IV) minus the total oil production of each time step under the limited liquid condition obtained in step (VIII).

[0031] The beneficial effects of the present invention are:

[0032] The present invention provides a method for calculating the oil increase amount when the production capacity of an offshore liquid-limited oilfield is fully released. When calculating the oil increase amount of a basic plan, the water content of a single well in each time step is considered, and the liquid volume is fully allocated to the wells with a lower water content, thereby achieving maximum utilization of the liquid volume of existing facilities under liquid-limited conditions. The calculated oil increase amount when the production capacity of the liquid-limited oilfield is fully released is more reasonable and reliable, and can effectively guide the transformation of liquid-limited oilfield facilities. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a flow chart of a method for calculating the amount of oil increase when the production capacity of an offshore liquid-limited oil field is fully released according to the present invention.

[0034] For ordinary technicians in this field, other relevant drawings can be obtained based on the above drawings without any creative work. DETAILED DESCRIPTION

[0035] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0036] Example 1

[0037] According to Figure 1 The process shown in the figure adopts the method for calculating the oil increase amount when the production capacity of offshore liquid-limited oil fields is fully released to calculate the oil increase amount of Bohai X oilfield, which specifically includes the following steps:

[0038] (I) Calculate the dimensionless liquid production index of the oil field at different water content stages based on the oil-water relative permeability curve of the determined research object, and calculate the liquid production capacity of the oil well at different water content stages of the research object in combination with the oil well production capacity of the research object:

[0039] Bohai X Oilfield will be put into production in 2022, with a total of 8 oil wells, of which 4 oil wells H1, H3, H4 and H7 will be put into production in 2022, and the other 4 oil wells H2, H5, H6 and H8 will be put into production in 2023. The daily oil production capacity of H1, H2, H3, H4, H5, H6, H7 and H8 in the first year of production is 90 cubic meters, 102 cubic meters, 90 cubic meters, 100 cubic meters, 137 cubic meters, 110 cubic meters and 90 cubic meters respectively. 4 cubic meters and 105 cubic meters. There are 5 measured oil-water relative permeability curves in Bohai X Oilfield. The liquid production capacity of the oil wells is determined according to the normalized results of the 5 measured oil-water relative permeability curves and the oil well productivity. The maximum daily liquid production capacity of H1, H2, H3, H4, H5, H6, H7 and H8 after production is 620 cubic meters, 589 cubic meters, 502 cubic meters, 622 cubic meters, 658 cubic meters, 651 cubic meters, 600 cubic meters and 651 cubic meters respectively;

[0040] (II) Determine the maximum daily liquid production and platform life to maintain normal production under existing facilities:

[0041] The maximum liquid treatment capacity of Bohai X Oilfield is 4,500 cubic meters per day, and the maximum external transmission capacity is 4,000 cubic meters per day. Therefore, the maximum daily liquid production that Bohai X Oilfield can maintain normal production is 4,000 cubic meters per day, and the platform life is designed to be 15 years.

[0042] (III) Comprehensive prediction accuracy and prediction complexity to determine the index prediction time step:

[0043] Based on the comprehensive prediction accuracy and prediction complexity, the prediction time step of Bohai X oilfield index is determined to be 1 year;

[0044] (IV) Using reservoir numerical simulation to predict the indicators of the research object under unlimited liquid conditions:

[0045] The prediction results of the development index of Bohai X Oilfield under the condition of unlimited liquid are shown in Table 1. Comparing the daily liquid production of Bohai X Oilfield and the maximum daily liquid production that can maintain normal production under existing facilities, the daily liquid production of the oilfield in 2026 is 4419 cubic meters / day, which exceeds the maximum daily liquid production of Bohai X Oilfield that can maintain normal production of 4000 cubic meters / day. Therefore, 2026 is the first time step under limited liquid. By summing up the oil production over the years, the total oil production of Bohai X Oilfield under the condition of unlimited liquid at each time step is 1.8568 million cubic meters;

[0046] (V) Setting the control conditions for numerical simulation under liquid-limited conditions for the first time step of liquid-limited conditions

[0047] Table 1 Prediction results of development indexes under unlimited liquid conditions in Bohai X Oilfield

[0048]

[0049]

[0050] From Table 1, it can be seen that the daily liquid production of Bohai X Oilfield in 2025 is 3709 cubic meters per day in the previous time step of the first time step of liquid limitation, and the total liquid volume that can be released in 2026 is 291 cubic meters per day. The water cuts of H1, H2, H3, H4, H5, H6, H7 and H8 in 2026 are 94.2%, 87.8%, 87.4%, 92.6%, 91.3%, 86.7%, 83.1% and 86.7% respectively. The order of priority liquid release from low to high is as follows: H7, H6, H8, H2, H3, H5, H4 and H1, the amount of liquid that needs to be released by H7, H6, H8, H2, H3, H5, H4 and H1 in the first time step of liquid limitation is 89 cubic meters / day, 120 cubic meters / day, 129 cubic meters / day, 52 cubic meters / day, 118 cubic meters / day, 82 cubic meters / day and 0 cubic meters / day respectively. The releasable liquid amount of 291 cubic meters / day is preferentially allocated to H7, H6 and H8. The liquid amount allocated to H7, H6 and H8 is 89 cubic meters / day, 120 cubic meters / day and 82 cubic meters / day respectively.

[0051] (VI) Carry out numerical simulation prediction for the step length after the numerical simulation control conditions are set to determine whether the prediction period has been reached. If the prediction period has been reached, the total oil production at each time step under the condition of limited liquid is calculated. If the prediction period has not been reached, the numerical simulation control conditions under the condition of limited liquid are reset for the latest prediction step length;

[0052] (VI) Carry out numerical simulation prediction for the step length after the numerical simulation control conditions are set, and judge whether the prediction period has been reached. If the prediction period has been reached, proceed to step (VIII). If the prediction period has not been reached, carry out numerical simulation prediction for the next time step, and proceed to step (VII);

[0053] (VII) resetting the control conditions of numerical simulation under limited liquid conditions for the latest prediction step;

[0054] After setting the numerical simulation control conditions for the liquid limit time step of Bohai X Oilfield in 2026, a numerical simulation prediction is carried out. 2026 is the fifth year of the scheme prediction, and the prediction period has not been reached. The numerical simulation prediction for 2027 is carried out, and step (VII) is entered to judge the daily liquid production of the next time step after the numerical simulation control conditions are set to see whether it reaches the maximum daily liquid production that can maintain normal production under the existing facilities. The daily liquid production of Bohai X Oilfield in 2027 is 4000 cubic meters / day, which reaches the maximum daily liquid production that can maintain normal production. The numerical simulation control conditions are kept unchanged and returned to step (VI). 2027 is the sixth year of the scheme prediction, and the prediction period has not been reached. The numerical simulation prediction for 2028 is carried out, and the process proceeds to step (VII). The daily liquid production of Bohai X Oilfield in 2028 is 4,000 cubic meters per day, reaching the maximum daily liquid production that can maintain normal production. The numerical simulation control conditions are kept unchanged, and the process returns to step (VI). 2028 is the seventh year of the program prediction, and the prediction period has not been reached. The numerical simulation prediction for 2029 is carried out, and the process proceeds to step (VII). The daily liquid production of Bohai X Oilfield in 2029 is 4,000 cubic meters per day, reaching the maximum daily liquid production that can maintain normal production. The numerical simulation control conditions are kept unchanged, and the process returns to step (VI). 2029 is the eighth year of the program prediction, and the prediction period has not been reached. The numerical simulation prediction for 2030 was carried out, and the process entered into step (VII). The daily liquid production of Bohai X Oilfield in 2030 was 4000 cubic meters / day, reaching the maximum daily liquid production that can maintain normal production. The numerical simulation control conditions were kept unchanged, and the process returned to step (VI). 2030 was the 9th year of the scenario prediction, and the prediction period was not reached. The numerical simulation prediction for 2031 was carried out, and the process entered into step (VII). The daily liquid production of Bohai X Oilfield in 2031 was 4000 cubic meters / day, reaching the maximum daily liquid production that can maintain normal production. The numerical simulation control conditions were kept unchanged, and the process returned to step (VI). 2031 was the 10th year of the scenario prediction, and the prediction period was not reached. By the forecast period, numerical simulation forecast for 2032 was carried out, and the step (VII) was entered. The daily liquid production of Bohai X Oilfield in 2032 was 3380 cubic meters / day, which did not reach the maximum daily liquid production that could maintain normal production under the existing facilities. The main reason was that H1 reached the shut-in condition and was shut in. The daily liquid production of H2, H3, H4, H5, H6, H7 and H8 did not reach the maximum liquid production capacity. The total liquid volume that could be released in this time step was calculated to be 620 cubic meters / day. The water cuts of H2, H3, H4, H5, H6, H7 and H8 in 2032 were 93.5%, 93.3%, 97.9%, 93.9%, 95.9%, 93.4% and 92.9%. The order of priority release of liquid from low to high is H8, H3, H7, H2, H5, H6 and H4. The liquid volumes that H8, H3, H7, H2, H5, H6 and H4 need to release in 2032 are 149 cubic meters / day, 52 cubic meters / day, 192 cubic meters / day, 129 cubic meters / day, 118 cubic meters / day, 171 cubic meters / day and 82 cubic meters / day respectively. The releasable liquid volume of 620 cubic meters / day will be allocated to H8, H3, H7, H2 and H5 in priority. The liquid volumes allocated to H8, H3, H7, H2 and H5 are 149 cubic meters / day, 52 cubic meters / day, 192 cubic meters / day, 129 cubic meters / day and 98 cubic meters / day respectively.

[0055] After setting the numerical simulation control conditions for the liquid limit time step of Bohai X Oilfield in 2032, numerical simulation prediction was carried out. 2032 is the 11th year of the scheme prediction, which has not reached the prediction period. The numerical simulation prediction for 2033 was carried out and entered step (VII). The daily liquid production of Bohai X Oilfield in 2033 was 3460 cubic meters / day, which did not reach the maximum daily liquid production that could maintain normal production under the existing facilities. The main reason was that H4 reached the shut-in condition and was shut in. The daily liquid production of H5 and H6 did not reach the maximum liquid production capacity. The total liquid volume that can be released in this time step is calculated to be 540 cubic meters / day. The water cuts of H2, H3, H5, H6, H7 and H8 in 2033 were 94.4 and 96.3 respectively. %, 93.8%, 94.2%, 96.6%, 93.3% and 94.0%. The order of priority liquid release from low to high is H7, H3, H8, H5, H2 and H6. The liquid volumes that need to be released by H7, H3, H8, H5, H2 and H6 in 2033 are 0 cubic meters / day, 0 cubic meters / day, 0 cubic meters / day, 20 cubic meters / day, 0 cubic meters / day and 171 cubic meters / day respectively. The releasable liquid volume of 620 cubic meters / day is preferentially allocated to H5 and H6. The liquid volumes allocated to H5 and H6 are 20 cubic meters / day and 171 cubic meters / day respectively. So far, all single wells have reached the maximum daily liquid production. The numerical simulation control conditions remain unchanged and the numerical simulation study is carried out until the predicted period is reached.

[0056] (VIII) Calculate the total oil production at each time step under liquid-limited conditions;

[0057] The oil production of all time steps under the limited liquid condition is accumulated to obtain the total oil production of each time step under the limited liquid condition; the oil production of all time steps of Bohai X Oilfield is accumulated to obtain the total oil production of each time step under the limited liquid condition, which is 1.796 million cubic meters;

[0058] (IX) Calculate the total increase in oil production when production capacity is fully released.

[0059] The total oil production of each time step under the condition of unlimited liquid in Bohai X Oilfield obtained in step (IV) is 1.8567 million cubic meters. After deducting the total oil production of each time step under the condition of limited liquid obtained in step (VIII), the total oil production increase under the condition of full release of production capacity is 60,700 cubic meters.

[0060] When calculating the oil increase of the basic scheme, the method of the present invention performs numerical simulation condition control in time steps, distributes the releasable liquid volume according to the water content and liquid production capacity of the single well, realizes the maximum utilization of the liquid volume of the facility under liquid-limited conditions, and the calculation results are more real and reliable. The existing methods rarely consider the liquid volume distribution according to the oil production and liquid production capacity of a single well, and the evaluation results of the present invention are more reasonable and reliable.

[0061] The applicant declares that the above is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Those skilled in the art should understand that any changes or substitutions that can be easily thought of by those skilled in the art within the technical scope disclosed by the present invention are within the protection scope and disclosure scope of the present invention.

Claims

1. A method for calculating the amount of oil increase when the production capacity of an offshore liquid-limited oil field is fully released, characterized in that: The following steps are involved: (I) Determine the liquid production capacity of the oil well of the research object: Calculate the dimensionless liquid production index of the oil field at different water content stages based on the determined oil-water relative permeability curve of the research object, and calculate the liquid production capacity of the oil well of the research object at different water content stages in combination with the oil well production capacity of the research object; (II) Determine the maximum daily liquid production and platform life span to maintain normal production under existing facilities; (III) Comprehensive prediction accuracy and prediction complexity to determine the index prediction time step; (IV) Using reservoir numerical simulation to predict the indicators of the research object under unlimited liquid conditions; (V) setting the control conditions for numerical simulation under liquid-limited conditions for the first time step of liquid-limited conditions; (VI) carrying out numerical simulation prediction for the step length after the numerical simulation control conditions are set, and judging whether the prediction period has been reached, and if so, proceeding to step (VIII); if not, proceeding to step (VII); (VII) resetting the control conditions of numerical simulation under limited liquid conditions for the latest prediction step; (VIII) Calculate the total oil production at each time step under liquid-limited conditions; (IX) Calculate the total increase in oil production when production capacity is fully released.

2. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1 is characterized in that: When the research object is a well that has been put into production, the oil well production capacity in step (I) shall be based on the actual production capacity after production; when the research object is a well that has not been put into production, the oil well production capacity in step (I) shall be determined by analogy based on the actual production capacity after production.

3. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1 is characterized in that: If the research object has a measured oil-water relative permeability curve, the oil-water relative permeability curve of the research object in step (I) adopts the measured curve; if the research object does not have a measured oil-water relative permeability curve, the oil-water relative permeability curve of the research object in step (I) is determined by analogy.

4. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1 is characterized in that: The maximum daily liquid production in step (II) is determined by systematically sorting out the liquid processing capacity and logistics trends of the oil field; the platform life is determined according to the scheme design.

5. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1 is characterized in that: The specific method of step (IV) is as follows: according to the liquid production capacity of the oil well of the research object calculated in step (I), a numerical simulation calculation is carried out under unlimited liquid conditions, and the daily liquid production of any time step is output; the daily liquid production of the oil field is compared with the maximum daily liquid production for maintaining normal production under the existing facilities, and the first time step that exceeds the maximum daily liquid production for maintaining normal production under the existing facilities is selected as the first time step with limited liquid, and the oil production of any time step is output, and the total oil production of each time step under unlimited liquid conditions is calculated.

6. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1 is characterized in that: The specific method of step (V) is: (i) Calculate the total amount of liquid that can be released in the first time step of the liquid limit compared with the previous time step; (ii) sorting the oil wells from low to high according to the water cut of the single well within the first time step of liquid limitation, and calculating the amount of liquid that needs to be released from each oil well within the first time step of liquid limitation; (iii) The releasable liquid volume is preferentially allocated to wells with low water content until the total releasable liquid volume is distributed.

7. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 6 is characterized in that: The total amount of liquid that can be released in the first time step of liquid limitation compared with the previous time step is the difference between the maximum daily liquid production that can maintain normal production under existing facilities and the daily liquid production of the oil field in the previous time step. If the first time step of liquid limitation is the first time step, the daily liquid production of the oil well in the previous time step is treated as zero; the amount of liquid that needs to be released from each oil well in the first time step of liquid limitation is the difference between the daily liquid production capacity of each oil well under the water content in the first time step of liquid limitation and the daily liquid production of the well in the previous time step.

8. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1 is characterized in that: The specific method of resetting the step (VII) is as follows: determine whether the daily liquid production of the next time step after the numerical simulation control condition is set reaches the maximum daily liquid production for maintaining normal production under the existing facilities. If it reaches, keep the numerical simulation control condition setting unchanged and return to step (VI); if it does not reach, determine whether the daily liquid production of all wells reaches the maximum liquid production capacity. If it reaches the maximum liquid production capacity, keep the numerical simulation control condition setting unchanged and return to step (VI). If there are wells that have not reached the maximum liquid production capacity, calculate the total liquid volume that can be released in the time step. The total releasable liquid volume is the difference between the maximum daily liquid production volume that can maintain normal production under the existing facilities and the daily liquid production volume of the oil field at this time step. The oil wells are sorted from low to high according to the water content of the single well in this time step, and the liquid volume that needs to be released from each oil well in this time step is calculated. The liquid volume that needs to be released from each oil well in this time step is the difference between the daily liquid production capacity under the water content of this time step and the daily liquid production of the well at this time step. The releasable liquid volume is preferentially allocated to wells with low water content until the total releasable liquid volume is allocated, and the process proceeds to step (VI).

9. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1, characterized in that: The total oil production at each time step under liquid-limited conditions in step (VIII) is obtained by accumulating the oil production at all time steps under liquid-limited conditions.

10. The method for calculating the amount of oil increase for fully releasing the production capacity of an offshore liquid-limited oil field according to claim 1, characterized in that: The total oil production increase in step (IX) when the production capacity is fully released is equal to the total oil production of each time step under the unlimited liquid condition obtained in step (IV) minus the total oil production of each time step under the limited liquid condition obtained in step (VIII).

Citation Information

Patent Citations

  • Method for determining oil well liquid production capacities by determining water injection capacities of one-injection and multi-production well group

    CN103939066A

  • Method for determining productivity of new wells in old area of offshore oilfield based on multiple factors

    CN106285621A

  • Collection method of wellhead liquid production capacity based on pump indicator diagram

    CN110206536A

  • System and method for predicting wellhead water content of low gas yield oil wells based on deep long-term and short-term memory networks

    CN110630256A

  • Method and device for determining single-well liquid production capacity of oil field in different water cut periods

    CN112487599A