Hanging basket counter-force pre-pressing method and device based on BIM + simulation analysis

Through the combination of BIM+ simulation analysis and jack, the safety risks and high cost of traditional hanging basket prepression methods are solved, and the rapid, accurate and synchronous application of hanging basket prepression is achieved, ensuring construction quality.

CN118965739APending Publication Date: 2024-11-15CHINA RAILWAY ERJU 1ST ENG CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411007877.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The traditional hanging basket prepression method has problems such as high safety risks, high construction costs, long time consuming and difficult to simulate the actual working state.

Method used

The hanging basket reaction force pre-pressure method and device based on BIM+ simulation analysis are adopted. Through three-dimensional modeling and jack combination, the pre-pressure simulation is real, fast and accurate, and the load and unload are applied simultaneously, replacing the traditional stacking method.

Benefits of technology

Accurate measurement of pre-pressure of hanging baskets is achieved, reducing construction risks and costs, improving construction efficiency and accuracy, and ensuring the pre-pressure quality of brackets and hanging baskets.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965739A_ABST
    Figure CN118965739A_ABST
Patent Text Reader

Abstract

The invention provides a hanging basket counter-force prepressing method and device based on BIM + simulation analysis, and relates to the technical field of hanging basket prepressing, the hanging basket counter-force prepressing device comprises a mounting mechanism, a hanging basket is built on the front side of a main body, a jack is arranged between a triangular bracket and a beam plate on the hanging basket, a prepressing load is applied to the beam plate through the counter acting force of the jack, and the hanging basket is mounted on the main body; the pre-pressing load is transmitted to the frame body of the hanging basket, so that the deformation data and rule of each part of the hanging basket under the action of the load can be measured, the gravity center position of the prefabricated section can be accurately obtained by utilizing the BIM + simulation analysis technology, and the pre-pressing load of the hanging basket can be accurately measured by matching with the jack. The method can replace a traditional direct stacking method that a hanging basket is pre-pressed with a pre-pressing block, a sand bag, a water tank and the like, the pre-pressing load of the hanging basket is accurately measured, and the traditional direct stacking method that the hanging basket is pre-pressed with the pre-pressing block, the sand bag, the water tank and the like is solved. The problems of high safety risk, high construction cost, long pre-pressing time consumption, difficulty in simulating the actual working state of the hanging basket and the like exist in the pre-pressing process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of hanging basket preloading, and in particular to a hanging basket reaction force preloading method and device based on BIM+ simulation analysis. Background Art

[0002] In the construction of national highways, it is common to use the hanging basket cantilever casting method to construct the upper structure of concrete continuous beams. The key to the hanging basket cantilever casting method is the hanging basket, and the preloading of the hanging basket is an indispensable step in the construction process. The purpose of the hanging basket preloading is mainly to verify the reliability of the hanging basket and eliminate its inelastic deformation. At the same time, the actual deformation value of the hanging basket under different load conditions is measured to provide a basis for correcting the formwork elevation. However, traditional hanging basket preloading methods include direct loading methods such as preloading blocks, sand bags, and water tanks. There are problems such as high safety risks, high construction costs, long preloading time, and difficulty in simulating the actual working state of the hanging basket during the preloading process. Summary of the invention

[0003] In view of the above problems, the present invention proposes a hanging basket reaction preloading method and device based on BIM+ simulation analysis, and proposes a hanging basket reaction preloading construction based on BIM+ simulation analysis technology in combination with the actual situation of the project. This technology has been used in the hanging basket preloading of the project, and realizes the preloading simulation of real, fast, accurate, synchronous application of load and unloading, etc., while also ensuring the preloading construction quality of the bracket and the hanging basket.

[0004] In a first aspect, the present disclosure provides a method and device for preloading a hanging basket reaction force based on BIM+ simulation analysis, specifically comprising: a mounting mechanism; the mounting mechanism comprises a main body, a mounting plate and a connecting block, the main body being a rectangular structure as a whole; the mounting plate is symmetrically fixedly mounted at the two ends of the top of the main body, and a rectangular groove is provided inside the upper end of the mounting plate; the connecting blocks are symmetrically arranged at the two ends of the rectangular groove inside the mounting plate; a frame connection component is provided on the mounting mechanism, the frame of the frame connection component is arranged at the upper end of the main body, and the two ends of the rear side of the frame are slidably matched with the rectangular groove in the mounting plate, and the connecting groove on the rear side of the frame is slidably matched with the connecting block, and the beam plate, cushion beam and distribution beam at the lower end of the frame are all located at the lower end of the main body; the mounting mechanism is provided with an external The connecting component includes a bracket, a guide groove and a fastening bolt B. The bracket is a triangular structure, and a rectangular groove is opened at the bottom of the bracket, and the bracket is symmetrically arranged on the front side of the main body; the guide groove is opened on both sides of the rectangular groove at the bottom of the bracket; the fastening bolt B is threadedly installed on the inner side of the bracket, and the lower end of the fastening bolt B is arranged in the rectangular groove at the bottom of the bracket; the frame connecting component is provided with a reaction force component, and the reaction force component includes a base and an adjustment block, a rectangular through groove is opened inside the base, and the base is placed on the distribution beam at the lower end of the frame, and the base is at the lower end of the bracket, and the flip rod on the rear side of the base is ringed on the inner side of the bracket; the adjustment block is movably installed on the inner rear side of the base through a screw rod, and a slope is provided on the front side of the adjustment block.

[0005] Optionally, the frame connection assembly includes: a frame body, a connecting groove and a fastening bolt A; the frame body is made of metal; the connecting groove is opened at the rear bottom of the frame body; the fastening bolt A is threadedly installed at both ends of the rear side of the frame body, and the fastening bolt A passes through the bottom of the frame body.

[0006] Optionally, the rack assembly includes: a transverse plate and an insertion rod; the transverse plate is fixedly mounted on both ends of the inner side of the frame; and the insertion rods are symmetrically arranged on both sides of the transverse plate.

[0007] Optionally, the rack assembly includes: a fixing block and a fixing hole; the fixing block is symmetrically arranged at two sides between the two groups of transverse plates; the fixing holes are opened on both sides inside the fixing block, and the fixing block is plug-fitted with the plug rod.

[0008] Optionally, the frame connection assembly includes: a beam plate and connection holes; the beam plate is installed on the two sets of fixed blocks and the bottom of the frame through round rods; the connection holes are equidistantly arranged inside the beam plate.

[0009] Optionally, the framing assembly includes: a pad beam and a distribution beam; the pad beam is overlapped between two groups of beam plates at equal intervals longitudinally, and the circular rod at the bottom of the pad beam is plugged into the connection hole; the distribution beam is overlapped at the upper end of the pad beam laterally.

[0010] Optionally, the external component includes: a telescopic plate and a side rod; the telescopic plate is slidably installed in a rectangular groove at the bottom of the bracket; the side rod is fixedly installed on both sides of the telescopic plate, and the side rod is slidably matched with the guide groove.

[0011] Optionally, the reaction force component includes: a lifting platform and a jack; the lifting platform is slidably installed on the front inner end of the base, and the upper end of the lifting platform extends from the inside of the base, and the rear side of the lower end of the lifting platform has an inclined surface, and the inclined surface on the rear side of the bottom of the lifting platform is in contact with the inclined surface on the front side of the adjusting block; the jack is fixedly installed on the top of the lifting platform.

[0012] Optionally, the reaction force assembly includes: a flip rod and a pin plate; the flip rod is rotatably mounted at both ends of the rear side of the base, and a circular hole is opened at the top of the flip rod; the pin plate is arranged on the inner side of the top of the flip rod, and the circular rod at the bottom of the pin plate is inserted into the circular hole at the top of the flip rod.

[0013] The method for preloading the cradle reaction force based on BIM+ simulation analysis comprises the following steps:

[0014] 1. Install the frame onto the main body through the mounting plate, and set the beam plate at the bottom of the frame and the horizontal plate so that the beam plate is at the lower end of the main body;

[0015] 2. Use BIM to perform 3D modeling of the preset segment and calculate its center of gravity. Set a bracket on the front side of the main body so that the bracket is exactly at the center of gravity of the preset segment. Pull out the telescopic plate in the bracket and tighten the fastening bolts B to fix it.

[0016] 3. Overlap the base on the distribution beam on the beam plate, move the jack to the middle of the cushion beam, make the distance between the two sides of the jack and the beam plate equal, move the adjustment block in the base to adjust the height of the lifting platform, and put the upper end of the jack against the lower end of the telescopic plate, so that the contact position between the jack and the telescopic plate is exactly at the center of gravity of the preset segment;

[0017] 4. Use a jack to apply a downward preload to the beam and slab. After the load is applied, continue for 20 minutes. Use a level to observe the points on the front upper end of the frame and the front beam and slab, and calculate and analyze the preload deformation data. After the preload meets the requirements, unload synchronously and evenly, observe and record the rebound data after unloading.

[0018] The present invention provides a method and device for preloading a cradle reaction force based on BIM+ simulation analysis, which has the following beneficial effects:

[0019] 1. The present invention sets up an installation mechanism, establishes a model of the prefabricated segment through three-dimensional software, and calculates the center of gravity position and deadweight load of the prefabricated segment. After the main body is constructed, a triangular bracket is installed at the web position of the main body so that the position of the triangular bracket is at the center of gravity position of the prefabricated segment. A hanging basket is built on the front side of the main body, and a jack is set between the triangular bracket and the beam plate on the hanging basket. A preload is applied to the beam plate through the reverse force of the jack, and the preload is transmitted to the frame of the hanging basket. In this way, the deformation data and rules of various parts of the hanging basket under the action of load can be measured. The center of gravity position of the prefabricated segment can be accurately obtained by using BIM+ simulation analysis technology. Combined with the use of jacks, it can replace the traditional hanging basket preloading method of direct loading such as preloading blocks, sand bags, water tanks, etc., and accurately measure the preload of the hanging basket.

[0020] 2. The present invention sets an external component, sets a rectangular groove at the bottom of the bracket, and slides the telescopic plate into the rectangular groove on the bottom side of the bracket. During the subsequent repeated use, the support range of the bracket is adjusted by pulling the telescopic plate to adapt to the center of gravity position of different prefabricated segments, thereby solving the problem of poor adaptability of traditional support plates due to the inability to adjust the length of the bottom.

[0021] 3. The present invention provides a reaction force component, and sets flip rods at both ends of the rear side of the base, and opens round rods on the flip rods. When in use, the two groups of flip rods are flipped up and assembled, and the two groups of flip rods are looped on the bracket, and the pin plates are inserted into the flip plates to fix the two groups of flip plates. In this way, even if the hanging basket encounters an accident or tilts, the jack will be hung on the bracket through the base and will not slip off the hanging basket.

[0022] 4. The present invention provides a reaction force component, and an adjusting block with an inclined surface is movably installed inside the base through a screw rod, and a lifting platform with a jack fixed thereon is slidably installed on the base, and the inclined surface of the lifting platform is fitted with the inclined surface of the adjusting block. When in use, the adjusting block is made to slide inside the base by rotating the screw rod, and the lifting platform is pushed by the adjusting block to move up and down, thereby replacing the traditional gasket method to adjust the distance from the jack to the bracket, thereby facilitating the test of the preload. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The following drawings will provide a better understanding of the present disclosure and more clearly demonstrate the advantages of the present disclosure. The drawings described herein are for illustrative purposes only of selected embodiments, not all possible implementations, and are not intended to limit the scope of the present disclosure.

[0024] In the attached picture:

[0025] Figure 1 A schematic diagram of a three-dimensional structure according to an embodiment of the present invention is shown.

[0026] Figure 2 A schematic diagram of the top rear stereoscopic structure according to an embodiment of the present invention is shown.

[0027] Figure 3 A schematic diagram of a decomposed structure according to an embodiment of the present invention is shown.

[0028] Figure 4 A schematic diagram of the bottom side stereoscopic structure according to an embodiment of the present invention is shown.

[0029] Figure 5 A schematic diagram of a top partial cross-sectional structure according to an embodiment of the present invention is shown.

[0030] Figure 6 A schematic diagram of a partial cross-sectional structure of a side end of a racking assembly according to an embodiment of the present invention is shown.

[0031] Figure 7 A schematic diagram of the exploded structure of an external component and a reaction force component according to an embodiment of the present invention is shown.

[0032] Figure 8 A schematic cross-sectional structure diagram of an external component according to an embodiment of the present invention is shown.

[0033] Fig. 9 A schematic cross-sectional structure diagram of a reaction force assembly according to an embodiment of the present invention is shown.

[0034] Fig.10 A schematic diagram of a partial cross-sectional structure of the top of a reaction force assembly according to an embodiment of the present invention is shown.

[0035] Reference numerals list

[0036] 1. Installation mechanism;

[0037] 101. main body; 102. mounting plate; 103. connecting block;

[0038] 2. Rack-connect components;

[0039] 201, frame; 2011, connecting groove; 2012, fastening bolt A;

[0040] 202, horizontal board; 2021, plug-in rod;

[0041] 203, fixing block; 2031, fixing hole;

[0042] 204, beam and slab; 2041, connection hole;

[0043] 205, cushion beam; 206, distribution beam;

[0044] 3. External components;

[0045] 301, bracket; 3011, guide groove; 3012, fastening bolt B;

[0046] 302, telescopic plate; 3021, side rod;

[0047] 4. Reaction component;

[0048] 401, base; 4011, adjustment block;

[0049] 402, lifting platform; 4021, jack;

[0050] 403, flip rod; 4031, pin plate. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0052] Example 1: Please refer to Figures 1 to 10 As shown:

[0053] The present invention provides a method and device for preloading a hanging basket reaction force based on BIM+ simulation analysis, comprising: a mounting mechanism 1; the mounting mechanism 1 comprises a main body 101, a mounting plate 102 and a connecting block 103, the main body 101 being a rectangular structure as a whole; the mounting plate 102 is symmetrically fixedly mounted at the two ends of the top of the main body 101, and a rectangular groove is provided inside the upper end of the mounting plate 102; the connecting block 103 is symmetrically arranged at the two ends of the rectangular groove inside the mounting plate 102; a frame connection component 2 is provided on the mounting mechanism 1, a frame 201 of the frame connection component 2 is arranged at the upper end of the main body 101, and the two ends of the rear side of the frame 201 are slidably matched with the rectangular groove in the mounting plate 102, and the connecting groove 2011 on the rear side of the frame 201 is slidably matched with the connecting block 103, and the beam plate 204, the cushion beam 205 and the distribution beam 206 at the lower end of the frame 201 are all located at the lower end of the main body 101; an external connection component 3 is provided on the mounting mechanism 1, and the external connection component 3 comprises a bracket 30 1. Guide groove 3011 and fastening bolt B3012. The bracket 301 is a triangular structure, and a rectangular groove is provided at the bottom of the bracket 301. The bracket 301 is symmetrically arranged on the front side of the main body 101. The guide groove 3011 is provided on both sides of the rectangular groove at the bottom of the bracket 301. The fastening bolt B3012 is threadedly installed on the inner side of the bracket 301, and the lower end of the fastening bolt B3012 is arranged in the rectangular groove at the bottom of the bracket 301. A reaction force is provided on the bracket assembly 2. Component 4, reaction force component 4 includes a base 401 and an adjusting block 4011, a rectangular through groove is opened inside the base 401, and the base 401 is placed on the distribution beam 206 at the lower end of the frame 201, and the base 401 is at the lower end of the bracket 301, and the flip rod 403 on the rear side of the base 401 is looped on the inner side of the bracket 301; the adjusting block 4011 is movably installed on the inner rear side of the base 401 by a screw rod, and the front side of the adjusting block 401 is provided with an inclined surface.

[0054] In the present disclosure, Figures 2 to 6As shown, the rack assembly 2 includes: a frame 201, a connecting groove 2011 and a fastening bolt A2012; the frame 201 is made of metal; the connecting groove 2011 is opened at the rear bottom of the frame 201; the fastening bolt A2012 is threadedly installed at both ends of the rear side of the frame 201, and the fastening bolt A2012 passes through the bottom of the frame 201; a transverse plate 202 and an insertion rod 2021; the transverse plate 202 is fixedly installed at both ends of the inner side of the frame 201; the insertion rod 2021 is symmetrically arranged on both sides of the transverse plate 202; a fixing block 203 and a fixing hole 2031; the fixing block 203 is symmetrically arranged on both sides between the two sets of transverse plates 202 ; The fixing holes 2031 are provided on both sides of the interior of the fixing block 203, and the fixing block 203 is plugged into the plug rod 2021; the beam plate 204 and the connecting hole 2041; the beam plate 204 is installed at the bottom of the two sets of fixing blocks 203 and the frame 201 through the round rod; the connecting hole 2041 is equidistantly provided inside the beam plate 204; the cushion beam 205 and the distribution beam 206; the cushion beam 205 is longitudinally equidistantly overlapped between the two sets of beam plates 204, and the round rod at the bottom of the cushion beam 205 is plugged into the connecting hole 2041; the distribution beam 206 is horizontally overlapped at the upper end of the cushion beam 205; the frame 201 is set, and the beam plate 204 can be installed at the bottom of the frame 201 ; A triangular connecting groove 2011 is provided, and by slidingly matching the connecting groove 2011 with the connecting block 103, the frame 201 can be slidably connected to the mounting plate 102; a fastening bolt A2012 is provided, and by tightening the fastening bolt A2012, the frame 201 can be fixed on the mounting plate 102; a rectangular transverse plate 202 is provided, and the fixing block 203 can be installed on the frame 201 through the transverse plate 202; a cylindrical insertion rod 2021 is provided, and when two sets of transverse plates 202 are assembled, the insertion rod 2021 can be inserted into the fixing hole 2031, so that the fixing block 203 can be fixed inside the transverse plate 202; A rectangular fixing block 203 is provided, and the beam plate 204 can be installed at the bottom of the fixing block 203; a circular fixing hole 2031 is provided, and the fixing block 203 can be fixed to the horizontal plate 202 by plugging and matching the fixing hole 2031 with the plug rod 2021; a rectangular beam plate 204 is provided, and a pre-compression load can be applied through the beam plate 204 and the frame body 201; a circular connecting hole 2041 is provided, and the cushion beam 205 can be fixed on the beam plate 204 by plugging and matching the circular connecting hole 2041 with the circular rod at the bottom of the cushion beam 205; a distribution beam 206 is provided, and the base 401 can be placed on the top of the cushion beam 205 through the distribution beam 206.

[0055] As the second embodiment of the present application, based on the first embodiment, Figure 7 and 8As shown, the external component 3 includes: a telescopic plate 302 and a side rod 3021; ​​the telescopic plate 302 is slidably installed in the rectangular groove at the bottom of the bracket 301; the side rod 3021 is fixedly installed on both sides of the telescopic plate 302, and the side rod 3021 is slidably matched with the guide groove 3011.

[0056] The present application sets a triangular bracket 301, which can apply a preload to the beam plate 204 when the jack 4021 pushes the bracket 301; sets a rectangular guide groove 3011, and makes the guide groove 3011 slidably connected to the side rod 3021; ​​the telescopic plate 302 can be slidably installed to the bottom of the bracket 301 through the guide groove 3011; sets a fastening bolt B3012, and by rotating the fastening bolt B3012, the fastening bolt B3012 is pressed against the telescopic plate 302, so that the telescopic plate 302 can be fixed inside the bracket 301; sets a cylindrical side rod 3021, and by slidingly connecting the side rod 3021 with the guide groove 3011, the movement range of the telescopic plate 302 in the bracket 301 can be limited.

[0057] As the third embodiment of the present application, based on the first embodiment, Fig. 9 and 10 As shown, the reaction force assembly 4 includes: a lifting platform 402 and a jack 4021; the lifting platform 402 is slidably installed on the front inner end of the base 401, and the upper end of the lifting platform 402 extends from the inside of the base 401, and the rear side of the lower end of the lifting platform 402 has an inclined surface, and the inclined surface on the rear side of the bottom of the lifting platform 402 fits with the inclined surface on the front side of the adjustment block 4011; the jack 4021 is fixedly installed on the top of the lifting platform 402; a flip rod 403 and a pin plate 4031; the flip rod 403 is rotatably installed at both ends of the rear side of the base 401, and a circular hole is opened on the top of the flip rod 403; the pin plate 4031 is arranged on the inner side of the top of the flip rod 403, and the circular rod at the bottom of the pin plate 4031 is inserted into the circular hole at the top of the flip rod 403.

[0058] The present application sets a rectangular base 401, and a lifting platform 402 with a jack 4021 can be set on the base 401; sets an adjusting block 4011, and by making the inclined surface on the adjusting block 4011 contact with the inclined surface on the bottom side of the lifting platform 402, the lifting platform 402 can be lifted and lowered inside the base 401 when the adjusting block 4011 is moved; sets a jack 4021, and by fixing the jack 4021 on the lifting platform 402 and making the jack 4021 push the bracket 301, a pre-compression load can be applied to the beam plate 204; sets an L-shaped flip rod 403, and by putting two groups of flip rods 403 inside the bracket 301, the base 401 will not fall when the beam plate 204 is skewed; sets a pin plate 4031, and by inserting the round rod on the pin plate 4031 into the round hole of the flip rod 403, the two groups of flip rods 403 can be fixed.

[0059] Among them, Figure 1-10 As shown in the figure, the method of preloading the reaction force of the hanging basket based on BIM+ simulation analysis includes the following steps:

[0060] 1. Install the frame 201 on the main body 101 through the mounting plate 102, and set the beam plate 204 at the bottom of the frame 201 and the horizontal plate 202, so that the beam plate 204 is at the lower end of the main body 101;

[0061] 2. Use BIM to perform 3D modeling on the preset segment and calculate its center of gravity. Set the bracket 301 on the front side of the main body 101 so that the bracket 301 can be exactly at the center of gravity of the preset segment. Pull out the telescopic plate 302 in the bracket 301 and then tighten the fastening bolts B3012 to fix it.

[0062] 3. Overlap the base 401 on the distribution beam 206 on the beam plate 204, move the jack 4021 to the middle of the cushion beam 205, make the distances between the two sides of the jack 4021 and the beam plate 204 equal, move the position of the adjustment block 4011 in the base 401 to adjust the height of the lifting platform 402, and push the upper end of the jack 4021 against the lower end of the telescopic plate 302, so that the contact position between the jack 4021 and the telescopic plate 302 is exactly at the center of gravity of the preset segment;

[0063] 4. Use jack 4021 to apply a downward preload to the beam slab 204. After the load is applied, continue for 20 minutes. Use a level to observe the points on the front upper end of the frame 201 and the front beam slab 204, and calculate and analyze the preload deformation data. After the preload meets the requirements, unload synchronously and evenly, observe and record the rebound data after unloading.

[0064] The specific usage and function of this embodiment are as follows:

[0065] In the present invention, Figure 1-10As shown, after the main body 101 is cast, the precast segment is modeled according to the three-dimensional simulation software, and the center of gravity of the precast segment is calculated, and the bracket 301 with the telescopic plate 302 is fixedly installed to the front side of the web of the main body 101, so that the bracket 301 is located at the center of gravity of the precast segment simulated by the three-dimensional software, and two groups of mounting plates 102 are fixedly installed on the upper end of the main body 101, and the frame 201 is installed on the main body 101 through the mounting plates 102, and a transverse plate 202 is set on the inner side of the frame 201, and a beam plate 204 is installed at the lower end of the frame 201 where the transverse plate 202 is expected, so that the beam plate 204 is located at the lower end of the main body 101, and the cushion beam 205 is overlapped between the two groups of beam plates 204, and the distribution beam 206 is overlapped on the cushion beam 205, and the base 401 is placed. On the distribution beam 206, install the jack 4021 on the lifting platform 402 in the base 401, move the adjustment block 4011, adjust the distance between the jack 4021 and the bracket 301, adjust the front and rear positions of the jack 4021, so that the contact position between the top and the bracket 301 coincides with the center of gravity of the prefabricated segment, and then start the jack 4021 to push the bracket 301 and apply a preload to the beam plate 204. The beam plate 204 transfers the preload to the frame 201. After the load is applied, it lasts for 20 minutes. Then, use a level to observe the points arranged on the front upper end of the frame 201 and the front beam plate 204, calculate and analyze the preload deformation data, and after the preload meets the requirements, unload synchronously and evenly, observe and record the rebound data after unloading.

[0066] In this article, there are a few points to note:

[0067] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.

[0068] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.

[0069] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.

Claims

1. A hanging basket reaction preloading device based on BIM+ simulation analysis, comprising: The mounting mechanism (1) comprises a main body (101), a mounting plate (102) and a connecting block (103); the main body (101) is a rectangular structure as a whole; the mounting plate (102) is symmetrically fixedly mounted at the two ends of the top of the main body (101), and a rectangular groove is provided inside the upper end of the mounting plate (102); the connecting block (103) is symmetrically arranged at the two ends of the rectangular groove inside the mounting plate (102); the mounting mechanism (1) is characterized in that a frame connecting component (2) is provided on the mounting mechanism (1), and the frame connecting component (2) The frame (201) is arranged at the upper end of the main body (101), and the two ends of the rear side of the frame (201) are slidably matched with the rectangular grooves in the mounting plate (102), and the connecting groove (2011) on the rear side of the frame (201) is slidably matched with the connecting block (103), and the beam plate (204), the cushion beam (205) and the distribution beam (206) at the lower end of the frame (201) are all located at the lower end of the main body (101); the mounting mechanism (1) is provided with an external component (3), and the external component (3) includes a bracket (301), a guide groove (3011) and a fastening bolt B (3012), the bracket (301) is a triangular structure, and a rectangular groove is provided at the bottom of the bracket (301), and the bracket (301) is symmetrically arranged on the front side of the main body (101); the guide groove (3011) is provided on both sides of the rectangular groove at the bottom of the bracket (301); the fastening bolt B (3012) is threadedly installed on the inner side of the bracket (301), and the lower end of the fastening bolt B (3012) is arranged in the rectangular groove at the bottom of the bracket (301); the frame connection component (2) is provided with a reaction force component (4), The reaction force assembly (4) comprises a base (401) and an adjustment block (4011); a rectangular through slot is provided inside the base (401); the base (401) is placed on a distribution beam (206) at the lower end of a frame (201); the base (401) is located at the lower end of a bracket (301); a flip rod (403) at the rear side of the base (401) is sleeved on the inner side of the bracket (301); the adjustment block (4011) is movably mounted on the inner rear side of the base (401) by means of a screw rod, and an inclined surface is provided on the front side of the adjustment block (4011).

2. According to claim 1, a hanging basket reaction force preloading device based on BIM+ simulation analysis is characterized in that: The frame connection assembly (2) comprises: a frame body (201), a connection groove (2011) and a fastening bolt A (2012); the frame body (201) is made of metal; the connection groove (2011) is arranged at the rear bottom of the frame body (201); the fastening bolt A (2012) is threadedly mounted at both ends of the rear side of the frame body (201), and the fastening bolt A (2012) passes through the bottom of the frame body (201).

3. The hanging basket reaction force preloading device based on BIM+ simulation analysis according to claim 2 is characterized in that: The rack connection assembly (2) comprises: a transverse plate (202) and an insertion rod (2021); the transverse plate (202) is fixedly mounted on both ends of the inner side of the frame body (201); and the insertion rod (2021) is symmetrically arranged on both sides of the transverse plate (202).

4. The hanging basket reaction force preloading device based on BIM+ simulation analysis according to claim 3 is characterized in that: The scaffolding assembly (2) comprises: a fixing block (203) and a fixing hole (2031); the fixing block (203) is symmetrically arranged at two sides between two groups of transverse plates (202); the fixing hole (2031) is provided at two sides inside the fixing block (203), and the fixing block (203) is plugged into and matched with the insertion rod (2021).

5. The hanging basket reaction force preloading device based on BIM+ simulation analysis according to claim 4 is characterized in that: The frame connection assembly (2) comprises: a beam plate (204) and connection holes (2041); the beam plate (204) is installed on two groups of fixing blocks (203) and the bottom of the frame body (201) through round rods; the connection holes (2041) are equidistantly arranged inside the beam plate (204).

6. The hanging basket reaction force preloading device based on BIM+ simulation analysis according to claim 5 is characterized in that: The framing assembly 2 comprises: a cushion beam (205) and a distribution beam (206); the cushion beam (205) is longitudinally equidistantly overlapped between two groups of beam plates (204), and the round rod at the bottom of the cushion beam (205) is plugged into and matched with the connection hole (2041); the distribution beam (206) is transversely overlapped on the upper end of the cushion beam (205).

7. The hanging basket reaction force preloading device based on BIM+ simulation analysis according to claim 1 is characterized in that: The external connection component (3) comprises: a telescopic plate (302) and a side rod (3021); the telescopic plate (302) is slidably mounted in a rectangular groove at the bottom of the bracket (301); the side rod (3021) is fixedly mounted on both sides of the telescopic plate (302), and the side rod (3021) is slidably matched with the guide groove (3011).

8. The hanging basket reaction force preloading device based on BIM+ simulation analysis according to claim 1 is characterized in that: The reaction force assembly (4) comprises: a lifting platform (402) and a jack (4021); the lifting platform (402) is slidably mounted on the front inner end of the base (401), and the upper end of the lifting platform (402) extends out from the inside of the base (401), and the rear side of the lower end of the lifting platform (402) has an inclined surface, and the inclined surface on the rear side of the bottom of the lifting platform (402) is in contact with the inclined surface on the front side of the adjustment block (4011); the jack (4021) is fixedly mounted on the top of the lifting platform (402).

9. The hanging basket reaction force preloading device based on BIM+ simulation analysis according to claim 1 is characterized in that: The reaction force assembly (4) comprises: a flip rod (403) and a pin plate (4031); the flip rod (403) is rotatably mounted at both ends of the rear side of the base (401), and a circular hole is opened at the top of the flip rod (403); the pin plate (4031) is arranged on the inner side of the top of the flip rod (403), and the circular rod at the bottom of the pin plate (4031) is inserted into the circular hole at the top of the flip rod (403).

10. A method for preloading a cradle reaction force based on BIM+ simulation analysis according to any one of claims 1 to 9, characterized in that: The method for preloading the cradle reaction force based on BIM+ simulation analysis comprises the following steps: 1) The frame (201) is mounted on the main body (101) through the mounting plate (102), and a beam plate (204) is arranged at the bottom of the frame (201) and the transverse plate (202), so that the beam plate (204) is located at the lower end of the main body (101); 2) Using BIM to perform three-dimensional modeling of the preset segment and calculate the center of gravity position thereof, a bracket (301) is arranged on the front side of the main body (101) so that the bracket (301) can be exactly located at the center of gravity position of the preset segment, and the telescopic plate (302) in the bracket (301) is pulled out, and then the fastening bolts B (3012) are tightened to fix it; 3) Overlap the base (401) on the distribution beam (206) on the beam plate (204), move the jack (4021) to the middle of the cushion beam (205), make the distances between the two sides of the jack (4021) and the beam plate (204) equal, move the adjustment block (4011) in the base (401) to adjust the height of the lifting platform (402), and make the upper end of the jack (4021) against the lower end of the telescopic plate (302), so that the contact position between the jack (4021) and the telescopic plate (302) is exactly at the center of gravity of the preset segment; 4) Use a jack (4021) to apply a downward preload to the beam plate (204). After the load is applied, the load is applied for 20 minutes. Use a level to observe the points arranged on the front upper end of the frame (201) and the front beam plate (204). Calculate and analyze the preload deformation data. After the preload meets the requirements, unload the load synchronously and evenly, observe and record the rebound data after unloading.