Engineering material management method, system, equipment and medium
By using a modular system to manage engineering materials based on the correlation between the project contract and budget payment and combined with the residual value status of the inventory materials, the problem of the inability to automatically manage engineering materials in the existing technology is solved, and effective material consumption and fund allocation planning is achieved , meets the needs of cost management and control of the entire process of engineering and improves the scientific nature of management.
Patent Information
- Application Number
- CN202410927219.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-15
AI Technical Summary
The existing technology cannot automatically manage engineering materials, which makes it difficult to achieve material consumption analysis and price control in long-term projects, and cannot effectively and reasonably carry out material consumption and fund allocation planning, and cannot meet the needs of cost management and control throughout the project process.
By determining the time to purchase engineering materials based on the project start time information in the project contract and the budget payment time, the time to purchase engineering materials is determined, and the purchase plan and use plan are corrected in combination with the residual value status of the inventory materials, and the material review and Allocation management, monitoring the modification of the project contract to redetermine the budget and material relationship.
It realizes the automated management of engineering materials, provides residual value data of residual materials, can effectively and reasonably carry out material consumption and fund allocation planning, reduce material waste, meet the needs of cost management and control of the entire process of the project, and improves engineering material management scientific nature.
Smart Images

Figure CN118966600A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of material preservation management, and in particular to a method, system, equipment and medium for engineering material management. Background Art
[0002] Construction materials usually refer to consumable materials in construction projects, such as steel, cement, fly ash, wood, fuel, civil explosives, oil and other consumable materials. The construction materials management system is a management system for incoming and outgoing materials used in the entire construction phase. It is an important subsystem in construction management, which involves the entire process of in-and-out management of consumable materials during the entire project, including material purchase registration, material distribution, inventory of materials in stock, etc. The existing technical solution only relies on manual management using EXCEL office software.
[0003] However, long-term projects have a long time span, and the building materials consumed are time-sensitive and not suitable for long-term storage. In addition, the prices of such consumable materials are constantly changing with the market. The analysis of material consumption requires conversion of the same period and the same caliber, and price changes cannot be automatically analyzed for early warning to control the purchase price. Therefore, the workload is very large if only the EXCEL office software is used manually for analysis, and it is difficult to effectively and reasonably plan the material consumption and fund allocation, which cannot meet the needs of cost management and control throughout the project. Summary of the invention
[0004] To solve the above problems, the present invention provides a construction material management method, system, equipment and medium, which can effectively and reasonably plan material consumption and fund allocation, reduce material waste, meet the needs of cost management and control throughout the project, and further increase the scientific nature of construction material management.
[0005] To achieve the above object, the present invention adopts the following technical solution:
[0006] In a first aspect, the present invention provides a construction material management method, comprising:
[0007] According to the project start time information in the project contract, determine the time sequence for purchasing project materials and link it with the time when the budget funds are in place;
[0008] Review the inventory materials according to the engineering material information in the engineering contract and determine the residual value status of the inventory materials;
[0009] Revise the purchase plan and usage plan of engineering materials based on the residual value status of inventory materials.
[0010] Furthermore, according to the project start time information in the project contract, the time for purchasing project materials is determined and associated with the time when the budget funds are in place, which also includes:
[0011] According to the project contract content, the corresponding project is decomposed into one or more sub-projects, and the hierarchical information of all sub-projects is determined;
[0012] According to the hierarchical information of all sub-projects, the workload information is associated with the construction progress;
[0013] Based on the start time information of all sub-projects, the time for purchasing construction materials is determined and linked to the time when the budget funds are in place.
[0014] Furthermore, after determining the time for purchasing engineering materials and associating it with the time for the budget to be in place based on the project start time information in the project contract, it also includes:
[0015] Define the corresponding basic material coding library according to the content of the engineering data in the engineering contract;
[0016] Determine the contract material code corresponding to the engineering contract based on the material type, quantity and input time in the engineering data.
[0017] Furthermore, based on the engineering material information in the engineering contract, the inventory materials are reviewed to determine the residual value status of the inventory materials, which also includes:
[0018] At predetermined time intervals, based on the engineering material information in the engineering contract, regular audits are conducted on inventory materials to determine the residual value status of the inventory materials.
[0019] Furthermore, according to the residual value of inventory materials, the purchase plan and use plan of engineering materials are revised, including:
[0020] The data of inventory materials and the residual value status of inventory materials are displayed through the display device, and text files can be exported;
[0021] Based on the inventory material data and the residual value status of the inventory materials, combined with the engineering material information in the engineering contract, the purchase plan and use plan of the engineering materials are revised.
[0022] Furthermore, the method further comprises:
[0023] Monitor whether the project contract has been modified. If the project contract has been modified, determine the time for purchasing project materials based on the modified project contract and the start time information of the decomposed sub-projects and associate it with the time when the budget funds are in place. If the project contract has not been modified, output the inventory material data and the residual value status of the inventory materials based on the completion status of the construction tasks.
[0024] Furthermore, monitoring whether the engineering contract has been modified also includes:
[0025] If the modification of the engineering contract involves most of the sub-projects, the new engineering contract will replace the original engineering contract and the original engineering contract will be stored;
[0026] Compare the new project contract with the original project contract to determine the changes in cost, progress workload, unit projects, visas, and investment caused by the changes in the project contract, and redefine the relationship between the project budget and materials.
[0027] In a second aspect, the present invention further provides a construction material management system, comprising:
[0028] The determination module is used to determine the time for purchasing engineering materials based on the project start time information in the engineering contract and associate it with the time when the budget funds are in place;
[0029] The audit module is used to audit the inventory materials according to the engineering material information in the engineering contract and determine the residual value status of the inventory materials;
[0030] The correction module is used to correct the purchase plan and use plan of engineering materials according to the residual value status of inventory materials.
[0031] In a third aspect, the present invention further provides an electronic device, comprising: a processor and a memory;
[0032] The processor is coupled to the memory;
[0033] The processor is used to read and execute the program or instructions stored in the memory, so that the device executes the method of the first aspect.
[0034] In a fourth aspect, the present invention further provides a computer-readable storage medium storing a computer program, which implements the method of the first aspect when executed by a processor.
[0035] In summary, the technical solution provided by this application has at least the following technical effects or advantages:
[0036] The technical solution of the present invention solves the problem of the inability to automatically manage materials for construction units through the management of engineering materials and general equipment, and provides residual value data of remaining materials when the project is completed. According to the residual value data, material consumption and fund allocation can be effectively and reasonably planned to reduce material waste, meet the needs of cost management and control throughout the project, and further increase the scientific nature of engineering material management.
[0037] Other features and advantages of the present disclosure will be described in the following description, and partly become apparent from the description, or be understood by implementing the present disclosure. The purpose and other advantages of the present disclosure can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0039] Figure 1 A method for managing construction materials provided by an embodiment of the present invention;
[0040] Figure 2 A construction material management system provided by an embodiment of the present invention;
[0041] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present disclosure. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.
[0043] Engineering materials usually refer to consumable materials in construction projects, such as steel, cement, fly ash, wood, fuel, civil explosives, oil and other consumable materials. In environmental protection municipal engineering, consumable materials also include pipes and inspection wells. The management system of engineering materials is a management system for incoming and outgoing materials used in the entire construction phase. It is an important subsystem in engineering construction management, which involves the entire process of in-and-out management of consumable materials during the entire project, including material purchase registration, material distribution, inventory of materials in stock, etc.
[0044] Long-term projects have a long time span, and the building materials consumed are time-sensitive and not suitable for long-term storage. In addition, the prices of such consumable materials are constantly changing with the market. The analysis of material consumption requires conversion of the same period and the same caliber, and price changes cannot be automatically analyzed for early warning to control the purchase price. Therefore, the workload is very large if only the EXCEL office software is used manually for analysis, and it is difficult to effectively and reasonably plan the material consumption and fund allocation, which cannot meet the needs of cost management and control throughout the project.
[0045] In order to solve the defects of the prior art, the existing material management system has been improved. The technical solution provided by the present disclosure can automatically manage the above-mentioned engineering materials and general equipment, and provide the residual value data of the remaining materials when the project is completed. According to the residual value data, the material consumption and fund allocation can be effectively and reasonably planned, reducing the waste of materials, meeting the needs of the whole process of engineering cost management and control, and further increasing the scientific nature of engineering material management. General equipment usually refers to equipment used in the process of engineering that does not need to be assembled or needs simple assembly, such as office equipment, automobiles, air conditioners, etc., and is also a consumable equipment with a relatively large time discount rate.
[0046] Figure 1 A method for managing construction materials provided by an embodiment of the present invention, as shown in the figure, includes:
[0047] S101. According to the project start time information in the project contract, determine the time for purchasing project materials and associate it with the time when the budget funds are in place;
[0048] Exemplary also include:
[0049] According to the project contract content, the corresponding project is decomposed into one or more sub-projects, and the hierarchical information of all sub-projects is determined;
[0050] According to the hierarchical information of all sub-projects, the workload information is associated with the construction progress;
[0051] Based on the start time information of all sub-projects, the time for purchasing construction materials is determined and linked to the time when the budget funds are in place.
[0052] Exemplarily, after step S101, the method further includes:
[0053] Define the corresponding basic material coding library according to the content of the engineering data in the engineering contract;
[0054] Determine the contract material code corresponding to the engineering contract based on the material type, quantity and input time in the engineering data.
[0055] S102. Review the inventory materials according to the engineering material information in the engineering contract and determine the residual value status of the inventory materials;
[0056] Exemplary also include:
[0057] At predetermined time intervals, based on the engineering material information in the engineering contract, regular audits are conducted on inventory materials to determine the residual value status of the inventory materials.
[0058] S103. According to the residual value status of inventory materials, revise the purchase plan and use plan of engineering materials.
[0059] Exemplary also include:
[0060] The data of inventory materials and the residual value status of inventory materials are displayed through the display device, and text files can be exported;
[0061] Based on the inventory material data and the residual value status of the inventory materials, combined with the engineering material information in the engineering contract, the purchase plan and use plan of the engineering materials are revised.
[0062] Exemplarily, the above-mentioned construction material management method further includes:
[0063] Monitor whether the project contract has been modified. If the project contract has been modified, determine the time for purchasing project materials based on the modified project contract and the start time information of the decomposed sub-projects and associate it with the time when the budget funds are in place. If the project contract has not been modified, output the inventory material data and the residual value status of the inventory materials based on the completion status of the construction tasks.
[0064] Monitoring whether the engineering contract has been modified also includes:
[0065] If the modification of the engineering contract involves most of the sub-projects, the new engineering contract will replace the original engineering contract and the original engineering contract will be stored;
[0066] Compare the new project contract with the original project contract to determine the changes in cost, progress workload, unit projects, visas, and investment caused by the changes in the project contract, and redefine the relationship between the project budget and materials.
[0067] Figure 2 An engineering material management system provided by an embodiment of the present invention, as shown in the figure, includes:
[0068] The determination module is used to determine the time for purchasing engineering materials based on the project start time information in the engineering contract and associate it with the time when the budget funds are in place;
[0069] The audit module is used to audit the inventory materials according to the engineering material information in the engineering contract and determine the residual value status of the inventory materials;
[0070] The correction module is used to correct the purchase plan and use plan of engineering materials according to the residual value status of inventory materials.
[0071] It should be noted that, for the sake of convenience, Figure 2 For example, only the main modules of the construction material management system are shown. In actual applications, the system may also include modules or components not shown in the figure; the system is not limited to the above module structure, but may also be other module structures that implement the above method embodiments.
[0072] As described above, a construction material management system also includes: a construction contract management module, a construction management module, a material input module, a material review module, and a material distribution module, and each module interacts with each other through a data interface.
[0073] The project contract management module is used to input the content of the project contract and provide the project data corresponding to the project contract to other modules in the system. Project data includes project name, workload information, project material information, project start time information, etc. Project material information includes: material type, quantity, storage time, expected storage time, shelf life, etc. If the project in the project contract can be decomposed into multiple sub-projects, the project data of all sub-projects can be obtained, and the hierarchical information of all projects can be obtained. In addition, the workload information in the project contract is associated with the construction progress in the construction management module, and according to the project start time information, the time to purchase the project materials is determined and associated with the time when the budget is in place, as well as the material procurement time period and time cutoff point, and the same type of project materials can be purchased multiple times.
[0074] The construction management module is used to input the construction progress and provide construction progress information to other modules in the system.
[0075] The material input module obtains the engineering data in the engineering contract from the engineering contract management module, defines the corresponding basic material coding library based on the content in the engineering data, and then defines the material coding matrix and the general list of materials. The basic material coding matrix is stored for unified use by all engineering projects. The material code includes: name description, hierarchy type, hierarchy code, interval character layer number, applicable scope, etc. Each segment of the code has 1-3 characters, or more characters. The material coding matrix includes: character segments representing the quantity of a batch of materials and the description of the material type. Each part of the material code has a substantial meaning, and when combined together, it constitutes a complete description of a certain material or a certain material that needs to be used in a certain stage. The material coding matrix can ensure the uniformity of the material coding, and each code is logical and practical. Exemplarily, in the material coding matrix, the material type code uses "1" to represent steel, "A" to represent steel, and "01-09" respectively represent the steel sections with rectangular, circular, I-beam, angle, and threaded steel sections (such as Figure 2 shown).
[0076] The engineering data in the engineering contract is input into the system, and the contract material code of each material is given based on the material type, quantity and input time in the engineering contract. The engineering data in the engineering contract can be automatically input into the system through a computer program or manually input into the system by a manager.
[0077] The material audit module audits the inventory materials according to the engineering material information in the engineering contract, obtains the audit results, and enters the audit results into the system. The audit results include: inventory material data and actual status of inventory materials. Inventory material data include: material type, quantity, entry time, estimated exit time, and shelf life. The material audit module can also obtain the engineering data in the engineering contract at predetermined time intervals, and perform regular audits on the inventory materials according to the engineering material information in the engineering data to obtain the actual status of the inventory materials, that is, the preservation of the materials with time and the residual value status after some of them fail.
[0078] The material distribution module obtains the status of inventory materials, which includes: the audit results of the inventory materials by the material audit module, that is, the inventory material data and the residual value status of the inventory materials. The material distribution module obtains the engineering data in the engineering contract, and recommends the order of calling materials based on the engineering material information in the engineering data, combined with the inventory material data and the residual value status of the inventory materials. The material distribution module outputs the inventory material data and the residual value status of the inventory materials, and issues a material purchase notice in combination with the engineering material information in the engineering contract. The output inventory material data can be displayed through a display device, and supports the export of text files, so that managers can monitor the changes in material distribution and warehouse storage materials through the display device, and then promptly revise the material purchase plan and use plan.
[0079] When inputting the contract content, the project contract management module monitors whether the project contract has been modified. If the contract has been modified, the time for purchasing project materials is determined based on the modified project contract and the start time information of the decomposed sub-projects, and is associated with the time when the budget funds are in place. If the contract has not been modified, the material distribution module monitors the construction tasks corresponding to the project contract, and after completing the contract construction tasks, outputs the data of inventory materials and the residual value status of inventory materials.
[0080] The engineering contract management module inputs the engineering contract. If the modification of the engineering contract only involves some sub-projects, only the contract modification part involving the sub-projects is input; if the modification of the engineering contract involves most sub-projects, that is, the modification involves more than half of all sub-projects, the new engineering contract replaces the original engineering contract; and the original engineering contract is stored. The new engineering contract is compared with the original engineering contract to determine the changes in cost, progress workload, unit engineering, visa, and investment caused by the change in the engineering contract, and to redefine the association between the engineering budget and materials. After the system receives the message of the engineering contract modification, it executes the contract authentication confirmation to determine the contract modification. The modified contract has the legal authentication of the input personnel and the approval personnel. The difference between the original contract and the new contract is marked, and the time for purchasing additional materials is re-determined based on the engineering contract and the decomposed sub-project start time information, and it is associated with the time of the arrival of the budget. It should be pointed out that after the engineering contract is changed, it is usually impossible to change the completed engineering workload. Even if the modification of the contract causes part of the original workload to be scrapped. Therefore, the modification of the project contract will inevitably lead to changes in the project budget. This change is generally an additional budget, and the direct result is a corresponding increase in the total project budget and an extension of the construction period. In summary, the modification of the project contract must be strictly followed, and the instructions of the responsible personnel must be confirmed. After confirming the modification of the contract, the project budget and project period will also undergo specific changes.
[0081] The disclosed system also includes a project material receiving module, which is used to provide inventory information of materials in the purchase order. It also provides information on the arrival and submission of materials. When receiving, each item is checked according to the contract. The material abnormality report describes the situation of more, less and damaged materials when receiving, and generates the corresponding material quantity. At the same time, the material abnormality report also provides a description of the status of violating the terms of the contract, lacking explanatory documents, and affecting other businesses or progress. The warehouse allocates materials to contractors, manufacturers or other departments that need such materials. Generate an allocation report to provide formal documents on the in and out situation of warehouse materials and track the whereabouts of materials. The total amount of project materials can be counted at any time for the construction contract, current location, quantity and status of the material supply. The location of materials can be divided into construction site warehouse, factory, in transit or for contractor use. Based on this, the total amount of supply of sub-items in the material supply contract can be compared to control the total amount. The total amount statistical processing flow is to summarize all materials available within the entire project. In this way, the materials allocated to the contractor are coordinated and optimized through this process. In addition, based on the difference between the supply price of the sub-items in the material supply contract and the actual purchase cost, the material price difference can be calculated, which is then linked to cost control.
[0082] The above technical solution exemplarily describes the management of construction materials during the construction process, and is also applicable to general equipment management during the construction process.
[0083] In summary, the technical solutions in the embodiments of the present application have at least the following technical effects or advantages:
[0084] The technical solution of the present invention solves the problem of the inability to automatically manage materials for construction units through the management of engineering materials and general equipment, and provides residual value data of remaining materials when the project is completed. According to the residual value data, material consumption and fund allocation can be effectively and reasonably planned to reduce material waste, meet the needs of cost management and control throughout the project, and further increase the scientific nature of engineering material management.
[0085] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present disclosure.
[0086] like Figure 3 As shown, the electronic device includes: a processor and a memory;
[0087] The processor is used to read and execute programs and instructions stored in the memory, so that the electronic device executes the above method embodiment.
[0088] It should be noted that, for the sake of convenience, Figure 3 Only the main components of the electronic device are shown. In practical applications, the electronic device may also include components or assemblies not shown in the figure.
[0089] The present disclosure also provides a computer-readable storage medium storing a program or instruction. When a computer reads and executes the program or instruction, the computer executes the above method embodiment.
[0090] Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present disclosure.
Claims
1. A method for managing construction materials, characterized in that: include: According to the project start time information in the project contract, determine the time to purchase project materials and link it with the time when the budget funds are in place; Review the inventory materials according to the engineering material information in the engineering contract and determine the residual value status of the inventory materials; According to the residual value status of the inventory materials, the purchase plan and use plan of the engineering materials are revised.
2. The construction material management method according to claim 1, characterized in that: The method of determining the time for purchasing engineering materials according to the engineering start time information in the engineering contract and associating it with the time for the budget to be in place also includes: According to the project contract content, the corresponding project is decomposed into one or more sub-projects, and the hierarchical information of all sub-projects is determined; According to the hierarchical information of all sub-projects, the workload information is associated with the construction progress; Based on the start time information of all sub-projects, the time for purchasing construction materials is determined and linked to the time when the budget funds are in place.
3. The construction material management method according to claim 1, characterized in that: After determining the time for purchasing engineering materials according to the engineering start time information in the engineering contract and associating it with the time for the budget to be in place, the method further includes: Define the corresponding basic material coding library according to the content of the engineering data in the engineering contract; Determine the contract material code corresponding to the engineering contract based on the material type, quantity and input time in the engineering data.
4. The construction material management method according to claim 1, characterized in that: The said reviewing of inventory materials according to the engineering material information in the engineering contract and determining the residual value status of the inventory materials also includes: At predetermined time intervals, based on the engineering material information in the engineering contract, regular audits are conducted on inventory materials to determine the residual value status of the inventory materials.
5. The construction material management method according to claim 1, characterized in that: The method of revising the purchase plan and use plan of engineering materials according to the residual value status of the inventory materials also includes: The data of inventory materials and the residual value status of inventory materials are displayed through the display device, and text files can be exported; Based on the inventory material data and the residual value status of the inventory materials, combined with the engineering material information in the engineering contract, the purchase plan and use plan of the engineering materials are revised.
6. The construction material management method according to claim 1, characterized in that: The method further includes: Monitor whether the project contract has been modified. If the project contract has been modified, determine the time for purchasing project materials based on the modified project contract and the start time information of the decomposed sub-projects and associate it with the time when the budget funds are in place. If the project contract has not been modified, output the inventory material data and the residual value status of the inventory materials based on the completion status of the construction tasks.
7. The construction material management method according to claim 6, characterized in that: The monitoring of whether the engineering contract is modified also includes: If the modification of the engineering contract involves most of the sub-projects, the new engineering contract will replace the original engineering contract and the original engineering contract will be stored; Compare the new project contract with the original project contract to determine the changes in cost, progress workload, unit projects, visas, and investment caused by the changes in the project contract, and redefine the relationship between the project budget and materials.
8. A construction material management system, characterized in that: include: The determination module is used to determine the time for purchasing engineering materials based on the project start time information in the engineering contract and associate it with the time when the budget funds are in place; The audit module is used to audit the inventory materials according to the engineering material information in the engineering contract and determine the residual value status of the inventory materials; The correction module is used to correct the purchase plan and use plan of engineering materials according to the residual value status of the inventory materials.
9. An electronic device, characterized in that: include: Processor and memory; The processor is coupled to a memory; The processor is used to read and execute the program or instruction stored in the memory, so that the device executes the method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: A computer program is stored, and when the program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
System for managing construction project contracting
CN102955982A
Project cost accounting management system
CN114049150A
Engineering project field material whole-process management system
CN117474494A
Element BIM project safety early warning management method
CN117522111A
Automatic engineering cost material accounting method and system
CN117829864A