Optimized scheduling method and device for comprehensive energy of sewage treatment plant
By constructing a comprehensive energy operation model for wastewater treatment plants and using nonlinear optimization algorithms, the operation of equipment and the scheduling of water storage tanks were optimized, solving the problem of revenue reduction caused by surplus electricity being fed into the grid, and achieving optimal scheduling and revenue maximization of the comprehensive energy system of wastewater treatment plants.
Patent Information
- Application Number
- CN202410959677.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the integrated energy system of wastewater treatment plants, the grid connection of surplus electricity leads to a reduction in integrated energy revenue, and the configuration of energy storage increases investment and operation and maintenance costs. Furthermore, existing optimization scheduling methods fail to effectively take into account the correlation between renewable energy output, wastewater treatment demand, and the power load of process equipment.
A comprehensive energy operation model for wastewater treatment plants is constructed. An optimization objective function is established based on the goal of maximizing revenue. The model is solved using a nonlinear optimization algorithm to optimize the operation of scheduling equipment and the scheduling of water storage tanks, avoid grid connection of surplus electricity, and make full use of renewable energy and wastewater treatment plant resources.
It reduced overall energy operating costs, increased the overall energy revenue of wastewater treatment plants, improved economic efficiency, and optimized energy utilization efficiency.
Smart Images

Figure CN118966629A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of comprehensive energy optimization scheduling, and in particular to a comprehensive energy optimization scheduling method and device for a sewage treatment plant. Background Art
[0002] Integrated Energy System (IES) refers to a system that integrates various energy forms such as electricity and heat through technical integration and system optimization within a certain geographical range to achieve efficient utilization and management of energy. The core of the integrated energy system is to optimize the operating status of various energy facilities, reduce energy consumption, and achieve both economic and environmental benefits through advanced energy management and optimization scheduling technologies.
[0003] Combining distributed photovoltaic, wind power and other technologies with sewage treatment plants to increase the proportion of green energy in sewage treatment plants is a typical application scenario of comprehensive energy in sewage treatment plants. However, the comprehensive energy system of the relevant sewage treatment plant treatment scenario needs to ensure the consumption of electricity produced by renewable energy through the grid connection of surplus electricity and the configuration of energy storage strategies. However, since the grid-connected electricity price is significantly lower than the energy price on the consumer side, the grid connection of surplus electricity will cause a reduction in comprehensive energy benefits, and the increase in energy storage configuration capacity will increase the investment cost and operation and maintenance cost of the comprehensive energy system. Summary of the invention
[0004] In view of this, the present invention provides a method and device for optimizing the scheduling of comprehensive energy of a sewage treatment plant, so as to solve the problem of reduction of comprehensive energy benefits and increase of operating costs of the comprehensive energy system of the relevant sewage treatment plant treatment scenario.
[0005] In a first aspect, the present invention provides a method for optimizing the scheduling of comprehensive energy in a sewage treatment plant, the method comprising:
[0006] Construct a comprehensive energy operation model for a sewage treatment plant; the comprehensive energy operation model for a sewage treatment plant consists of distributed power generation equipment, adjustable process equipment for the sewage treatment plant, and water storage infrastructure for the sewage treatment plant;
[0007] Determine the actual operation data of comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and establish an optimization objective function based on the actual operation data of comprehensive energy with the goal of maximizing the operation benefits of the comprehensive energy system of the sewage treatment plant;
[0008] Obtain equipment operation demand data of comprehensive energy of sewage treatment plants, and establish constraint conditions for optimization objective function based on equipment operation demand data;
[0009] The optimization objective function is solved to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant.
[0010] The present embodiment provides an optimization scheduling method for the comprehensive energy of a sewage treatment plant. The comprehensive energy operation model of the sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant. The comprehensive energy operation model of the sewage treatment plant does not need to be configured with energy storage equipment, which reduces the comprehensive energy operation cost of the sewage treatment plant. The optimization objective function is established based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant, and the optimization objective function is solved to obtain the optimization scheduling result of the comprehensive energy of the sewage treatment plant, thereby realizing the optimal scheduling of the comprehensive energy of the sewage treatment plant and improving the comprehensive energy benefit of the sewage treatment plant.
[0011] In an optional implementation, the actual operation data of the comprehensive energy is determined based on the comprehensive energy operation model of the sewage treatment plant, and the optimization objective function is established based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant, including:
[0012] Based on the comprehensive energy operation model of the sewage treatment plant, the photovoltaic and wind power generation capacity, the new energy power revenue price, the photovoltaic and wind power operation and maintenance cost, the photovoltaic and wind power abandonment penalty cost and the distribution network energy supply cost are obtained;
[0013] Construct a dispatch revenue function based on photovoltaic and wind power generation and new energy power revenue prices;
[0014] Construct a dispatch cost function based on the operation and maintenance costs of photovoltaic and wind power, the penalty costs for photovoltaic and wind power abandonment, and the energy supply costs of the distribution network;
[0015] With the goal of maximizing the operating profit of the integrated energy system of the sewage treatment plant, an optimization objective function is established based on the scheduling profit function and the scheduling cost function.
[0016] This embodiment provides an optimization scheduling method for the comprehensive energy of a sewage treatment plant. A scheduling revenue function and a scheduling cost are constructed through a comprehensive energy operation model of the sewage treatment plant. Then, an optimization objective function is established based on the scheduling revenue function and the scheduling cost function. The optimization objective function takes into account both carbon emission reduction benefits and trading benefits, avoids the grid connection of surplus electricity, reduces the impact on the distribution network, and improves the comprehensive energy benefits of the sewage treatment plant.
[0017] In an optional implementation, the goal is to maximize the operating benefits of the integrated energy system of the sewage treatment plant, and an optimization objective function is established based on the scheduling benefit function and the scheduling cost function. The expression of the optimization objective function is as follows:
[0018] max F=F IES -C IES
[0019] Among them, F represents the net dispatching income of the integrated energy system of the sewage treatment plant, and F IES represents the scheduling profit function, C IES represents the scheduling cost function.
[0020] In an optional implementation, establishing constraints for the optimization objective function based on the equipment operation demand data includes:
[0021] Determine the demand function on the energy consumption side based on the equipment operation demand data, determine the capacity function on the energy supply side based on the photovoltaic and wind power generation data corresponding to the distributed power generation equipment, and the energy supply data of the distribution network, and establish the dispatch power balance constraint based on the demand function on the energy consumption side and the capacity function on the energy supply side;
[0022] Determine the equipment operation power load scheduling function corresponding to the adjustable process equipment of the sewage treatment plant based on the equipment operation demand data, and establish the process equipment operation constraints based on the equipment operation power load scheduling function;
[0023] Determine the operation requirements of the sewage treatment plant water storage infrastructure based on the equipment operation requirement data, and establish the water storage tank capacity constraint based on the operation requirements of the sewage treatment plant water storage infrastructure;
[0024] The scheduling power balance constraint, process equipment operation constraint and reservoir capacity constraint are taken as the constraints of the optimization objective function.
[0025] This embodiment provides an optimized scheduling method for the comprehensive energy of a sewage treatment plant. By constructing scheduling power balance constraints, process equipment operation constraints and reservoir capacity constraints, it fully exploits the adjustable load resources of the sewage treatment plant and the regulation function of the reservoir, maximizes the absorption of random and volatile renewable energy power generation, and helps to improve the economic benefits of the comprehensive energy system of the sewage treatment plant.
[0026] In an optional implementation, the dispatch power balance constraint includes a photovoltaic power generation constraint, a wind power generation constraint, and a distribution network power constraint.
[0027] In an optional implementation, the optimization objective function is solved to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant, including:
[0028] The predicted values of renewable energy power generation and sewage inflow are obtained, and based on the predicted values of renewable energy power generation and sewage inflow, the nonlinear optimization algorithm is used to solve the optimization objective function to obtain the comprehensive energy optimization scheduling results of the sewage treatment plant; wherein, the comprehensive energy optimization scheduling results of the sewage treatment plant include the equipment operation condition optimization scheduling results of the adjustable process equipment of the sewage treatment plant within a preset time period and the water inflow optimization scheduling results of the sewage treatment plant's water storage infrastructure.
[0029] The present embodiment provides an optimization scheduling method for the comprehensive energy of a sewage treatment plant. The optimization objective function is solved by a nonlinear optimization algorithm to obtain the optimization scheduling results of the equipment operating conditions of the adjustable process equipment of the sewage treatment plant within a preset time period and the optimization scheduling results of the water inflow of the sewage treatment plant's water storage infrastructure, thereby achieving the optimal scheduling of the comprehensive energy of the sewage treatment plant.
[0030] In a second aspect, the present invention provides an optimization scheduling device for comprehensive energy of a sewage treatment plant, the device comprising:
[0031] A building module for building a comprehensive energy operation model of a sewage treatment plant; the comprehensive energy operation model of a sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant;
[0032] The first establishment module is used to determine the actual operation data of the comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and to establish an optimization objective function based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant;
[0033] The second establishment module is used to obtain the equipment operation demand data of the comprehensive energy of the sewage treatment plant, and establish constraint conditions for the optimization objective function based on the equipment operation demand data;
[0034] The solution module is used to solve the optimization objective function and obtain the comprehensive energy optimization scheduling result of the sewage treatment plant.
[0035] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for optimizing the scheduling of the comprehensive energy of a sewage treatment plant according to the first aspect or any corresponding embodiment thereof by executing the computer instructions.
[0036] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the method for optimizing the scheduling of integrated energy of a sewage treatment plant according to the first aspect or any corresponding embodiment thereof.
[0037] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the method for optimizing the scheduling of integrated energy for a sewage treatment plant according to the first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 is a flow chart of a method for optimizing the scheduling of comprehensive energy for a sewage treatment plant according to an embodiment of the present invention;
[0040] Figure 2 is a structural schematic diagram of a comprehensive energy operation model of a sewage treatment plant according to an embodiment of the present invention;
[0041] Figure 3 is a flow chart of another method for optimizing the scheduling of comprehensive energy for a sewage treatment plant according to an embodiment of the present invention;
[0042] Figure 4 is a flow chart of another method for optimizing the scheduling of comprehensive energy for a sewage treatment plant according to an embodiment of the present invention;
[0043] Figure 5 is a structural block diagram of a comprehensive energy optimization scheduling device for a sewage treatment plant according to an embodiment of the present invention;
[0044] Figure 6 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0046] Combining distributed photovoltaic, wind power and other technologies with sewage treatment plants to increase the proportion of green energy in sewage treatment plants is a typical application scenario of comprehensive energy in sewage treatment plants. However, in the comprehensive energy system of related sewage treatment scenarios, the correlation between renewable energy output, sewage treatment demand, and process equipment power load is rarely considered at the same time. The balance of renewable energy production is often ensured by connecting surplus power to the grid and configuring energy storage strategies. However, since the grid-connected electricity price is significantly lower than the energy price on the consumer side, connecting surplus power to the grid will cause a reduction in comprehensive energy benefits, and the increase in energy storage configuration capacity will increase the investment cost and operation and maintenance cost of the comprehensive energy system.
[0047] Due to the volatility and randomness of renewable energy output, load demand and sewage inflow, there are risks in promoting the integrated energy operation of sewage treatment plants. Efficient optimization scheduling methods are the key. However, the current research objects of sewage treatment plant optimization scheduling methods are often single-energy power systems, and there are few studies on multi-energy power systems and the scheduling load potential of sewage treatment plants themselves.
[0048] To solve the above problems, an embodiment of the present invention provides an optimization scheduling method for integrated energy of a sewage treatment plant, which is applied to server-type equipment, such as integrated energy management equipment.
[0049] According to an embodiment of the present invention, an embodiment of a method for optimizing the scheduling of integrated energy for a sewage treatment plant is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0050] In this embodiment, a method for optimizing the scheduling of comprehensive energy in a sewage treatment plant is provided, which can be used for the above-mentioned server-type equipment, such as comprehensive energy management equipment. Figure 1 is a flow chart of a method for optimizing the scheduling of comprehensive energy for a sewage treatment plant according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0051] Step S101, constructing a comprehensive energy operation model of a sewage treatment plant; the comprehensive energy operation model of a sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant.
[0052] Specifically, Figure 2 As shown, distributed power generation equipment includes distributed photovoltaic power generation equipment, distributed wind power generation equipment and distribution network, etc.; the adjustable process equipment of the sewage treatment plant is characterized in that the power load of the equipment is adjustable, including the filter grille and the water inlet lifting pump in the water inlet grille and lifting pump link, the stirring pump in the hydrolysis and acidification link, the blower, flow promoter, stirrer, etc. in the biochemical treatment link, the filter and sterilization equipment in the filtration link, the sewage pump equipment in the tail water lifting link, etc.; the water storage infrastructure of the sewage treatment plant can cache process sewage, including the water inlet tank, hydrolysis and acidification tank, biochemical treatment tank, filter tank and tail water tank, etc.
[0053] Step S102, determining the actual operation data of the comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and establishing an optimization objective function based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant.
[0054] Step S103, obtaining equipment operation demand data of the comprehensive energy of the sewage treatment plant, and establishing constraint conditions for the optimization objective function based on the equipment operation demand data.
[0055] Step S104, solving the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant.
[0056] Specifically, the predicted values of renewable energy power generation and sewage inflow are obtained, and based on the predicted values of renewable energy power generation and sewage inflow, a nonlinear optimization algorithm is used to solve the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant; wherein the comprehensive energy optimization scheduling result of the sewage treatment plant includes the equipment operation condition optimization scheduling result of the adjustable process equipment of the sewage treatment plant within a preset time period and the water inflow optimization scheduling result of the sewage treatment plant's water storage infrastructure.
[0057] Furthermore, nonlinear optimization algorithms include, but are not limited to, genetic algorithms, particle swarm optimization algorithms, simulated annealing algorithms, and differential evolution algorithms.
[0058] The present embodiment provides an optimization scheduling method for the comprehensive energy of a sewage treatment plant. The comprehensive energy operation model of the sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant. The comprehensive energy operation model of the sewage treatment plant does not need to be configured with energy storage equipment, which reduces the comprehensive energy operation cost of the sewage treatment plant. The optimization objective function is established based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant, and the optimization objective function is solved to obtain the optimization scheduling result of the comprehensive energy of the sewage treatment plant, thereby realizing the optimal scheduling of the comprehensive energy of the sewage treatment plant and improving the comprehensive energy benefit of the sewage treatment plant.
[0059] In this embodiment, a method for optimizing the scheduling of comprehensive energy in a sewage treatment plant is provided, which can be used for the above-mentioned server-type equipment. Figure 3 is a flow chart of a method for optimizing the scheduling of comprehensive energy for a sewage treatment plant according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:
[0060] Step S301, construct a comprehensive energy operation model of a sewage treatment plant; the comprehensive energy operation model of a sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant. Figure 1 Step S101 of the illustrated embodiment will not be described in detail here.
[0061] Step S302, determining the actual operation data of the comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and establishing an optimization objective function based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant.
[0062] Specifically, the above step S302 includes:
[0063] Step S3021, based on the comprehensive energy operation model of the sewage treatment plant, obtain the photovoltaic and wind power generation power, new energy power revenue price, photovoltaic and wind power operation and maintenance cost, photovoltaic and wind power abandonment penalty cost and distribution network energy supply cost.
[0064] Step S3022, constructing a dispatching revenue function based on photovoltaic and wind power generation power and new energy power revenue price.
[0065] Specifically, the power generation of new energy within the preset scheduling time t is calculated based on the power generation of photovoltaic and wind power. The power generation of new energy within the preset scheduling time t is P IES,t As shown below:
[0066]
[0067] Among them, P pv,k,t represents the photovoltaic power generation within the preset scheduling time t, P w,k,t Represents the wind power generation power within the preset dispatching time t, N pv and N w They respectively represent the number of photovoltaic areas and wind power areas in the comprehensive energy operation model of the sewage treatment plant.
[0068] Furthermore, according to the power generation power P of the new energy within the preset scheduling time t IES,t and the price of renewable energy electricity revenue δ sell Calculate the electricity production income of the comprehensive energy of the sewage treatment plant within the preset scheduling time t, and the electricity production income of the comprehensive energy of the sewage treatment plant within the preset scheduling time t F sup,t The calculation formula is as follows:
[0069] F sup,t =δ sell ×P IES,t (2)
[0070] Furthermore, according to the electricity production income F of the comprehensive energy of the sewage treatment plant within the preset scheduling time t sup,t Calculate the dispatch benefit, dispatch benefit function F IES The expression is as follows:
[0071]
[0072] Wherein, T represents the total scheduling time period of comprehensive energy.
[0073] Step S3023, constructing a dispatch cost function based on photovoltaic and wind power operation and maintenance costs, photovoltaic and wind power curtailment penalty costs, and distribution network energy supply costs.
[0074] Specifically, the scheduling cost function C IES The calculation formula is as follows:
[0075]
[0076] Among them, C pv,k,t , C w,k,t Represent the k-th photovoltaic and wind power operation and maintenance costs, C pv,k,t , C cut,w,k,t represents the penalty cost of photovoltaic and wind power curtailment within the preset dispatch time t, C grid,t Represents the energy supply cost of the distribution network within the preset scheduling time t.
[0077] Step S3024, with the goal of maximizing the operating profit of the integrated energy system of the sewage treatment plant, establish an optimization objective function based on the scheduling profit function and the scheduling cost function.
[0078] Specifically, the expression of the optimization objective function is as follows:
[0079] max F=F IES -C IES (5)
[0080] Among them, F represents the net dispatching income of the integrated energy system of the sewage treatment plant, and F IES represents the scheduling profit function, C IES represents the scheduling cost function.
[0081] Step S303: Obtain equipment operation demand data of the comprehensive energy of the sewage treatment plant, and establish constraint conditions for the optimization objective function based on the equipment operation demand data. Figure 1 Step S103 of the illustrated embodiment will not be described in detail here.
[0082] Step S304, solve the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant. Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.
[0083] This embodiment provides an optimization scheduling method for the comprehensive energy of a sewage treatment plant. A scheduling revenue function and a scheduling cost are constructed through a comprehensive energy operation model of the sewage treatment plant. Then, an optimization objective function is established based on the scheduling revenue function and the scheduling cost function. The optimization objective function takes into account both carbon emission reduction benefits and trading benefits, avoids the grid connection of surplus electricity, reduces the impact on the distribution network, and improves the comprehensive energy benefits of the sewage treatment plant.
[0084] In this embodiment, a method for optimizing the scheduling of comprehensive energy in a sewage treatment plant is provided, which can be used for the above-mentioned server-type equipment. Figure 4 is a flow chart of a method for optimizing the scheduling of comprehensive energy for a sewage treatment plant according to an embodiment of the present invention. Figure 4 As shown, the process includes the following steps:
[0085] Step S401, construct a comprehensive energy operation model of a sewage treatment plant; the comprehensive energy operation model of a sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant. Figure 3 Step S301 of the illustrated embodiment will not be described in detail here.
[0086] Step S402: Determine the actual operation data of the comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and establish an optimization objective function based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant. Figure 3 Step S302 of the illustrated embodiment will not be described in detail here.
[0087] Step S403, obtaining equipment operation demand data of the comprehensive energy of the sewage treatment plant, and establishing constraint conditions for the optimization objective function based on the equipment operation demand data.
[0088] Specifically, the above step S403 includes:
[0089] Step S4031, determine the demand function on the energy consumption side based on the equipment operation demand data, determine the capacity function on the energy supply side based on the photovoltaic and wind power generation data corresponding to the distributed power generation equipment, and the distribution network supply data, and establish a scheduling power balance constraint based on the demand function on the energy consumption side and the capacity function on the energy supply side.
[0090] Specifically, the dispatching power balance constraints include photovoltaic power generation constraints, wind power generation constraints and distribution network power constraints.
[0091] Furthermore, the expression of the scheduling power balance constraint is as follows:
[0092]
[0093] Among them, P grid,buy,t represents the power purchased from the distribution network within the preset dispatch time t, L inpump,t , L hydro , L bioche,t , L filter,t , L tailpump,tThey respectively represent the power load demands of the water inlet grille and lift pump link, hydrolysis acidification link, biochemical treatment pool link, filtration link and tail water lifting link within the preset scheduling time t.
[0094] Furthermore, the photovoltaic power generation power constraint is as follows:
[0095] 0≤P pv,k,t ≤P pv,pre,k,t (7)
[0096] Among them, P pv,pre,k,t It is the maximum planned power generation of photovoltaic power within the preset scheduling time t.
[0097] Furthermore, the wind power generation power constraint is as follows:
[0098] 0≤P w,k,t ≤P w,pre,k,t (8)
[0099] Among them, P w,pre,k,t It is the maximum planned power generation of wind power within the preset scheduling time t.
[0100] Furthermore, the power constraints of the distribution network are as follows:
[0101] 0≤P grid,buy,t ≤P grid,max (9)
[0102] Among them, P grid,max The maximum power supply that the distribution network can provide.
[0103] Step S4032: determining the equipment operation power load scheduling function corresponding to the adjustable process equipment of the sewage treatment plant based on the equipment operation demand data, and establishing the process equipment operation constraints based on the equipment operation power load scheduling function.
[0104] Specifically, the expression of process equipment operation constraints is as follows:
[0105] L min ≤L t ≤L max (10)
[0106] Among them, L t is the equipment operation power load scheduling function of each process link within the preset scheduling time t, L min The minimum power load for equipment operation in each process link, L max It is the maximum power load of the equipment in each process link.
[0107] in,
[0108]
[0109] Step S4033, determining the operation requirements of the sewage treatment plant's water storage infrastructure based on the equipment operation requirement data, and establishing a reservoir capacity constraint based on the operation requirements of the sewage treatment plant's water storage infrastructure.
[0110] Specifically, the expression of the reservoir capacity constraint is as follows:
[0111] V min ≤V t ≤V max (14)
[0112] V t =V t-1 +δV t (15)
[0113] Ht=γL t (16)
[0114] In the above formula, V t is the water storage state of the reservoir within the preset scheduling time t, V min is the minimum water storage capacity of the reservoir, V max is the maximum water storage capacity of the reservoir, V t-1 is the water storage state of the reservoir within the preset scheduling time t-1, δV t is the change in water storage capacity of each reservoir from t-1 to t, H t is the sewage treatment volume within the preset scheduling time t, and γ is the relationship coefficient.
[0115] in,
[0116]
[0117] In the above formula, V inpump,t 、V hydro 、V bioche,t 、V filter,t 、V tailpump,t Respectively represent the water storage status of the water inlet pool, hydrolysis acidification pool, biochemical treatment pool, filtration pool and tailwater pool within the preset scheduling time t; V inpump,min 、V hydro,min 、V bioche,min 、V filter,min 、V tailpump,min Respectively represent the minimum water storage capacity of the inlet pool, hydrolysis acidification pool, biochemical treatment pool, filtration pool and tailwater pool; V inpump,max 、V hydro,max 、V bioche,max 、V filter,max 、V tailpump,max Respectively represent the maximum water storage capacity of the inlet pool, hydrolysis acidification pool, biochemical treatment pool, filtration pool and tailwater pool; δV inpump,t , δV hydro,t, δV bioche,t , δV filter,t , δV tailpump,t They represent the changes in water storage capacity of the inlet pool, hydrolysis acidification pool, biochemical treatment pool, filtration pool and tailwater pool from t-1 to t respectively; H inpump,t , H hydro,t , H bioche,t , H filter,t , H tailpump,t Respectively represent the sewage treatment capacity of the water inlet grille and lifting pump link, hydrolysis and acidification link, biochemical treatment link, filtration and sterilization link, and tail water lifting link; γ inpump,t , γ hydro,t , Y bioche,t , Y filter,t , γ tailpump,t They represent the relationship coefficients between the sewage treatment capacity and the power load in the water inlet grille and lifting pump link, the hydrolysis and acidification link, the biochemical treatment link, the filtration and sterilization link, and the tailwater lifting link; H in,t It represents the sewage inflow of the sewage treatment plant from t-1 to t.
[0118] Step S4034, taking the scheduling power balance constraint, process equipment operation constraint and reservoir capacity constraint as the constraint conditions of the optimization objective function.
[0119] Step S404, solve the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant. Figure 3 Step S304 of the illustrated embodiment will not be described in detail here.
[0120] This embodiment provides an optimized scheduling method for the comprehensive energy of a sewage treatment plant. By constructing scheduling power balance constraints, process equipment operation constraints and reservoir capacity constraints, it fully exploits the adjustable load resources of the sewage treatment plant and the regulation function of the reservoir, maximizes the absorption of random and volatile renewable energy power generation, and helps to improve the economic benefits of the comprehensive energy system of the sewage treatment plant.
[0121] In this embodiment, a sewage treatment plant integrated energy optimization scheduling device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.
[0122] This embodiment provides an optimized scheduling device for comprehensive energy of a sewage treatment plant, such as Figure 5 As shown, including:
[0123] A construction module 501 is used to construct a comprehensive energy operation model of a sewage treatment plant; the comprehensive energy operation model of a sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant;
[0124] The first establishment module 502 is used to determine the actual operation data of the comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and to establish an optimization objective function based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant;
[0125] The second establishment module 503 is used to obtain equipment operation demand data of comprehensive energy of the sewage treatment plant, and establish constraint conditions for the optimization objective function based on the equipment operation demand data;
[0126] The solution module 504 is used to solve the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant.
[0127] In some optional implementations, the first establishing module 502 includes:
[0128] An acquisition unit is used to acquire photovoltaic and wind power generation power, new energy power revenue price, photovoltaic and wind power operation and maintenance cost, photovoltaic and wind power abandonment penalty cost and distribution network energy supply cost based on the comprehensive energy operation model of the sewage treatment plant;
[0129] The first determination unit is used to construct a dispatching revenue function based on photovoltaic and wind power generation power and new energy power revenue price;
[0130] The second determination unit is used to construct a dispatching cost function based on photovoltaic and wind power operation and maintenance costs, photovoltaic and wind power abandonment penalty costs, and distribution network energy supply costs;
[0131] A unit is established for establishing an optimization objective function based on a scheduling benefit function and a scheduling cost function with the goal of maximizing the operating benefit of the integrated energy system of the sewage treatment plant.
[0132] In some optional implementations, the expression of the optimization objective function in the establishment unit is as follows:
[0133] max F=F IES -C IES
[0134] Among them, F represents the net dispatching income of the integrated energy system of the sewage treatment plant, and F IES represents the scheduling profit function, C IES represents the scheduling cost function.
[0135] In some optional implementations, the second establishing module 503 includes:
[0136] The first construction unit is used to determine the energy consumption side demand function based on the equipment operation demand data, determine the energy supply side capacity function based on the photovoltaic and wind power generation data corresponding to the distributed power generation equipment, and the distribution network energy supply data, and establish a dispatch power balance constraint based on the energy consumption side demand function and the energy supply side capacity function;
[0137] The second construction unit is used to determine the equipment operation power load scheduling function corresponding to the adjustable process equipment of the sewage treatment plant based on the equipment operation demand data, and establish the process equipment operation constraints based on the equipment operation power load scheduling function;
[0138] a third construction unit, for determining an operation requirement of a water storage infrastructure of a sewage treatment plant based on the equipment operation requirement data, and establishing a water storage tank capacity constraint based on the operation requirement of the water storage infrastructure of the sewage treatment plant;
[0139] The third determination unit is used to use the scheduling power balance constraint, the process equipment operation constraint and the reservoir capacity constraint as the constraint conditions of the optimization objective function.
[0140] In some optional implementations, the dispatching power balance constraints in the first construction unit include photovoltaic power generation constraints, wind power generation constraints, and distribution network power constraints.
[0141] In some optional embodiments, the solution module 504 is specifically used to obtain the predicted value of renewable energy power generation and the predicted value of sewage inflow, and based on the predicted value of renewable energy power generation and the predicted value of sewage inflow, a nonlinear optimization algorithm is used to solve the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant; wherein the comprehensive energy optimization scheduling result of the sewage treatment plant includes the equipment operation condition optimization scheduling result of the adjustable process equipment of the sewage treatment plant within a preset time period and the water inflow optimization scheduling result of the sewage treatment plant's water storage infrastructure.
[0142] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0143] In this embodiment, an optimization and scheduling device for the comprehensive energy of a sewage treatment plant is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above-mentioned functions.
[0144] The embodiment of the present invention also provides a computer device having the above Figure 5 A comprehensive energy optimization and scheduling device for a sewage treatment plant is shown.
[0145] See also Figure 6 , Figure 6 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 6 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 6 A processor 10 is taken as an example.
[0146] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0147] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0148] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0149] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0150] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0151] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0152] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0153] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for optimizing the scheduling of comprehensive energy in a sewage treatment plant, characterized in that: The method comprises: Constructing a comprehensive energy operation model of a sewage treatment plant; the comprehensive energy operation model of the sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant; Determine the actual operation data of comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and establish an optimization objective function based on the actual operation data of comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant; Acquire equipment operation demand data of comprehensive energy of the sewage treatment plant, and establish constraint conditions for the optimization objective function based on the equipment operation demand data; The optimization objective function is solved to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant.
2. The method according to claim 1, characterized in that The method of determining the actual operation data of the comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and taking the maximum operation benefit of the comprehensive energy system of the sewage treatment plant as the goal, and establishing an optimization objective function based on the actual operation data of the comprehensive energy includes: Based on the comprehensive energy operation model of the sewage treatment plant, the photovoltaic and wind power generation power, the new energy power revenue price, the photovoltaic and wind power operation and maintenance cost, the photovoltaic and wind power abandonment penalty cost and the distribution network energy supply cost are obtained; Constructing a dispatching revenue function based on the photovoltaic and wind power generation power and the new energy power revenue price; Constructing a dispatch cost function based on the photovoltaic and wind power operation and maintenance costs, photovoltaic and wind power abandonment penalty costs, and distribution network energy supply costs; Taking maximizing the operating profit of the integrated energy system of the sewage treatment plant as the goal, the optimization objective function is established based on the scheduling profit function and the scheduling cost function.
3. The method according to claim 2, characterized in that Taking the maximum operating benefit of the integrated energy system of the sewage treatment plant as the goal, the optimization objective function is established based on the scheduling benefit function and the scheduling cost function. The expression of the optimization objective function is as follows: maxF=F IES -C IES Among them, F represents the net dispatching income of the integrated energy system of the sewage treatment plant, and F IES represents the scheduling profit function, C IES represents the scheduling cost function.
4. The method according to claim 1, characterized in that: The establishing of constraint conditions for the optimization objective function based on the equipment operation requirement data includes: Determine the energy consumption side demand function based on the equipment operation demand data, determine the energy supply side capacity function based on the photovoltaic and wind power generation data corresponding to the distributed power generation equipment, and the distribution network energy supply data, and establish and construct the dispatch power balance constraint based on the energy consumption side demand function and the energy supply side capacity function; Determine the equipment operation power load scheduling function corresponding to the adjustable process equipment of the sewage treatment plant based on the equipment operation demand data, and establish the process equipment operation constraints based on the equipment operation power load scheduling function; Determining the operation requirements of the sewage treatment plant water storage infrastructure based on the equipment operation requirement data, and establishing a water storage tank capacity constraint based on the operation requirements of the sewage treatment plant water storage infrastructure; The scheduling power balance constraint, the process equipment operation constraint and the reservoir capacity constraint are used as constraint conditions of the optimization objective function.
5. The method according to claim 4, characterized in that The dispatching power balance constraints include photovoltaic power generation constraints, wind power generation constraints and distribution network power constraints.
6. The method according to claim 1, characterized in that The optimization objective function is solved to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant, including: Obtain the predicted value of renewable energy power generation and the predicted value of sewage inflow, and based on the predicted value of renewable energy power generation and the predicted value of sewage inflow, use a nonlinear optimization algorithm to solve the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant; wherein the comprehensive energy optimization scheduling result of the sewage treatment plant includes the equipment operation condition optimization scheduling result of the adjustable process equipment of the sewage treatment plant within a preset time period and the water inflow optimization scheduling result of the water storage infrastructure of the sewage treatment plant.
7. An optimized dispatching device for comprehensive energy of a sewage treatment plant, characterized in that: The device comprises: A construction module is used to construct a comprehensive energy operation model of a sewage treatment plant; the comprehensive energy operation model of the sewage treatment plant is composed of distributed power generation equipment, adjustable process equipment of the sewage treatment plant and water storage infrastructure of the sewage treatment plant; The first establishment module is used to determine the actual operation data of the comprehensive energy based on the comprehensive energy operation model of the sewage treatment plant, and to establish an optimization objective function based on the actual operation data of the comprehensive energy with the goal of maximizing the operation benefit of the comprehensive energy system of the sewage treatment plant; A second establishment module is used to obtain equipment operation demand data of comprehensive energy of the sewage treatment plant, and establish constraint conditions for the optimization objective function based on the equipment operation demand data; The solution module is used to solve the optimization objective function to obtain the comprehensive energy optimization scheduling result of the sewage treatment plant.
8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for optimizing the scheduling of the comprehensive energy of a sewage treatment plant according to any one of claims 1 to 6 by executing the computer instructions.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the method for optimizing the scheduling of comprehensive energy for a sewage treatment plant according to any one of claims 1 to 6.
10. A computer program product, characterized in that It comprises computer instructions, and the computer instructions are used to enable a computer to execute the method for optimizing the scheduling of the comprehensive energy of a sewage treatment plant according to any one of claims 1 to 6.
Citation Information
Cited By
Method and device for carrying out optimal scheduling on sewage treatment system and storage medium
CN119443419A