Transformer area high-loss automatic positioning method and device, electronic equipment and storage medium

By obtaining and analyzing real-time power consumption data and topological structure information of the station area, identifying high-loss areas and formulating optimization strategies, the problem of low positioning and optimization efficiency of high-loss areas in the station area is solved, and efficient power management is achieved.

CN118966813AActive Publication Date: 2024-11-15国网山东省电力公司日照供电公司
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410890252.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-15
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

The high-loss areas in the table area are difficult to quickly locate, and the identification efficiency is low and error-prone, resulting in low system work efficiency and optimization efficiency.

Method used

By obtaining real-time electricity consumption data and topological structure information of each area in the station area, classifying and clustering, establishing the correlation between category information and topological structure information, identifying high-loss areas, analyzing the target factors and their correlation relationships, and formulating optimization strategies Perform optimization.

Benefits of technology

It improves the rapid positioning accuracy and optimization efficiency of high-loss areas in the platform area, reduces the system's work difficulty and optimization cost, and improves the efficiency of power management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966813A_ABST
    Figure CN118966813A_ABST
Patent Text Reader

Abstract

The invention relates to the field of data processing, and provides a transformer area high-loss automatic positioning method and device, electronic equipment and a storage medium. According to the application, the real-time power consumption data of each area in the transformer area and the topological structure information of the transformer area are acquired, so that the power consumption data can be processed in a targeted manner, and the incidence relation is performed based on the real-time power consumption data of each area and the topological structure information, so that the high-loss area in the transformer area is determined; the problem that the line loss rate of a transformer area is high but a high-loss area cannot be rapidly positioned is solved, and the working efficiency of the system is improved. Relevant data of the transformer area are acquired and analyzed to determine a target factor corresponding to a high-loss area, and reasons causing line loss rate abnormity are analyzed, so that the inspection optimization efficiency of the transformer area is prevented from being influenced; the target optimization strategy of the high-loss area is determined by analyzing the incidence relation between the target factors, and the high-loss area is optimized according to the target optimization strategy, so that the optimization efficiency of the transformer area can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing, and in particular to a method, a device, an electronic device and a storage medium for automatically locating high-loss stations. Background Art

[0002] At present, in order to understand the power consumption of users and formulate appropriate management strategies, it is very important for power grid companies to obtain real-time power consumption data of users in the substation area. Usually, due to the large number of users in the substation area, the substation terminal communicates with the main station front-end through the wireless public network. The data collection efficiency is slow and it is difficult to ensure the integrity of the collected data. If the collected data is processed as a whole, it will greatly increase the processing difficulty.

[0003] At present, the substation area still has a high line loss rate but cannot quickly locate the high-loss area, which affects the work efficiency of the system. In addition, since the current substation area topology identification mainly relies on manual identification, there are problems such as low identification efficiency and easy errors. At the same time, there is a lack of effective methods to analyze the causes of abnormalities, resulting in low accuracy in locating high-loss areas. Summary of the invention

[0004] In view of this, an embodiment of the present invention provides a method, device, electronic device and storage medium for automatically locating high-loss areas in a substation to solve the problems of low recognition efficiency and easy errors in current methods, as well as the lack of effective methods to analyze the causes of abnormalities, resulting in low accuracy in locating high-loss areas.

[0005] In a first aspect, an embodiment of the present invention provides a method for automatically locating high-loss transmission areas, the method comprising: Acquire real-time power consumption data of each area in the substation and topological structure information of the substation; Based on the real-time power consumption data of each area and the topological structure information, a correlation is made to determine the high-loss area in the substation area; Acquire relevant data of the station area, and analyze the relevant data to determine the target factors corresponding to the high-loss area; The correlation between the target factors is analyzed to determine the target optimization strategy for the high-damage area, and the high-damage area is optimized according to the target optimization strategy.

[0006] Furthermore, the associating the real-time power consumption data of each area with the topological structure information to determine the high-loss area in the substation area includes: The real-time electricity consumption data is used to classify each area to obtain category information corresponding to the area.

[0007] Constructing an association relationship between the category information corresponding to each area and the topological structure information; Searching for target category information with a number of occurrences greater than a preset number of occurrences based on the association relationship; The electric energy loss amount corresponding to the target category information is calculated, and if the electric energy loss amount is greater than a preset loss amount, the area corresponding to the target category information is determined as a high-loss area.

[0008] Furthermore, clustering the real-time power consumption data of each area to obtain a clustering result, and determining the category information corresponding to each area based on the clustering result includes: Clustering is performed based on the real-time electricity consumption data of each area to obtain clustering results; The category information corresponding to each area is determined based on the clustering result.

[0009] Furthermore, after associating the real-time power consumption data of each area with the topological structure information to determine the high-loss area in the substation area, the method further includes: Acquire the geographical location corresponding to the high-loss area and the first loss data; Importing the geographical location corresponding to the high-loss area and the first loss data into the area loss map, and using the first loss data to determine the rendering style corresponding to the high-loss area; The high-loss area in the substation loss map is rendered according to the rendering style to obtain a rendered substation loss map, and the rendered substation loss map is displayed.

[0010] Furthermore, the obtaining of the relevant data of the station area and analyzing the relevant data to determine the target factors corresponding to the high-loss area include: Obtaining preset indicators associated with the substation area, and obtaining relevant data corresponding to each preset indicator, wherein the relevant data includes: operating environment data, equipment status data, and user type data; Analyze the influence of the relevant data corresponding to each of the preset indicators on the high-damage area; The preset indicator whose influence degree is greater than the preset influence degree is used as the target factor.

[0011] Furthermore, the analyzing the correlation between the target factors to determine the target optimization strategy for the high-damage area includes: Analyze the correlation between each of the target factors according to a preset correlation analysis method; constructing a candidate factor group using the two target factors whose correlation degree is greater than a first threshold; Determine a first factor group and a second factor group based on the candidate factor group, wherein the correlation degree between two target factors in the first factor group is greater than the first threshold and less than a second threshold, and the correlation degree between two target factors in the second factor group is greater than the second threshold; Obtaining a first optimization strategy corresponding to the first factor group and a second optimization strategy corresponding to the second factor group; Calculating a first evaluation value corresponding to the first optimization strategy and a second evaluation value corresponding to the second optimization strategy; A first optimization strategy in which the first evaluation value is higher than a preset evaluation value and a second optimization strategy in which the second evaluation value is higher than a preset evaluation value are used as the target optimization strategy.

[0012] Furthermore, after optimizing the high-loss area according to the target optimization strategy, the method further includes: detecting second loss data of the high-loss area; Comparing the second loss data with the historical loss data of the high-loss area to obtain a comparison result; The target optimization strategy is updated according to the comparison result.

[0013] In a second aspect, an embodiment of the present invention provides a high-loss automatic positioning device for a station area, the device comprising: An acquisition module is used to acquire real-time power consumption data of each area in the substation area and topological structure information of the substation area; A first analysis module is used to determine the high-loss area in the substation area based on the real-time power consumption data of each area and the topological structure information. A second analysis module is used to obtain relevant data of the station area and analyze the relevant data to determine the target factors corresponding to the high-loss area; A processing module is used to analyze the correlation between the target factors to determine the target optimization strategy for the high-damage area, and optimize the high-damage area according to the target optimization strategy.

[0014] In a third aspect, an embodiment of the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.

[0015] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the method of the first aspect or any corresponding embodiment thereof.

[0016] The present application obtains the real-time power consumption data of each area in the substation and the topological structure information of the substation, so as to facilitate the targeted processing of the power consumption data, and determines the high-loss area in the substation based on the correlation between the real-time power consumption data of each area and the topological structure information, thereby solving the problem that the high line loss rate in the substation cannot be quickly located despite the high line loss rate, and improving the working efficiency of the system; by obtaining the relevant data of the substation and analyzing the relevant data to determine the target factors corresponding to the high-loss area, the causes of the abnormal line loss rate are analyzed to avoid affecting the inspection and optimization efficiency of the substation; by analyzing the correlation between the target factors to determine the target optimization strategy for the high-loss area, and optimizing the high-loss area according to the target optimization strategy, the optimization efficiency of the substation can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 is a flow chart of a method for automatically locating high-loss stations in a substation according to some embodiments of the present invention; Figure 2 is a flow chart of a method for automatically locating high-loss stations in a substation according to other embodiments of the present invention; Figure 3 is a flow chart of a method for automatically locating high-loss stations according to some embodiments of the present invention; Figure 4 It is a structural block diagram of a high-loss automatic positioning device for a substation according to an embodiment of the present invention; Figure 5 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0020] According to an embodiment of the present invention, a method, device, electronic device and storage medium for automatically locating high-loss areas in a substation are provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer-executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0021] In this embodiment, a method for automatically locating high-loss transmission areas is provided. Figure 1 is a flow chart of a method for automatically locating high-loss stations according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps: Step S11, obtaining real-time power consumption data of each area in the substation and topological structure information of the substation.

[0022] In an embodiment of the present application, the substation refers to the power supply range of the transformer in the power system, which is usually composed of one or more transformers and their ancillary equipment. Electric meters and related sensors are installed in various areas of the substation to measure real-time power consumption data. The electric meter can record information such as power consumption and power, and the sensor can monitor parameters such as current and voltage. Connect the electric meter and the sensor to a data concentrator or gateway. Transmit real-time power consumption data to the server via wired or wireless communication. For example: Ethernet, wireless communication (such as Wi-Fi, LoRaWAN, etc.) or power line communication (PLC). Ensure the stability and security of data transmission. Real-time power consumption data is received on the server. A database management system can be used to organize and store data, and data analysis and processing tools can be used to process and analyze the data. In addition, the topological structure information of the substation can be obtained through field surveys, wiring drawings or other relevant documents. The topological structure information can be combined with real-time power consumption data for more in-depth analysis and management.

[0023] Step S12, associating the real-time power consumption data and topological structure information of each area to determine the high-loss area in the substation area.

[0024] In the embodiment of the present application, the high-loss area in the substation is determined based on the real-time power consumption data and topological structure information of each area. Figure 2 As shown, the following steps A1-A4 are included: Step A1: classify each area using the real-time electricity consumption data to obtain category information corresponding to the area.

[0025] Specifically, clustering is performed according to the real-time electricity consumption data of each area to obtain clustering results, and category information corresponding to each area is determined based on the clustering results, including: clustering is performed according to the real-time electricity consumption data of each area to obtain clustering results; and category information corresponding to each area is determined based on the clustering results.

[0026] Among them, real-time electricity consumption data includes information such as electricity consumption, electricity consumption time, and electricity consumption peak. Use clustering algorithms to process these data, cluster similar areas together, and form different clustering results. The clustering algorithm can determine the method and number of clustering based on the characteristics of the data and the similarity measurement. After obtaining the clustering results, each cluster needs to be analyzed and interpreted to determine the category information corresponding to each area. For example: this can be done by observing the characteristics of the clusters, comparing the differences between different clusters, and combining business knowledge and experience. Category information can be defined based on factors such as electricity consumption patterns, electricity consumption behaviors, and electricity demand, such as residential electricity consumption areas, commercial electricity consumption areas, industrial electricity consumption areas, etc.

[0027] For example: K-Means algorithm is used to cluster real-time power consumption data. First, the number of clusters needs to be determined (select K value), and the data can be clustered into three categories: peak power consumption area, valley power consumption area and stable power consumption area. Select representative data points including peak, valley and stable areas as the initial centroid. According to the Euclidean distance or other similarity measure between the sample and the centroid, assign the sample to the category to which the nearest centroid belongs, and update the centroid for each category. Determine whether convergence is achieved by judging whether the centroid changes or whether the clustering error is less than the threshold. Analyze the clustering results and mark the real-time power consumption data corresponding to each cluster area as a peak power consumption area, a valley power consumption area or a stable power consumption area.

[0028] It should be noted that the clustering result is to divide the areas with similar real-time power consumption data into the same group, and there is a high degree of difference between different groups. Each group represents a category of information, which can be judged and named according to the characteristics of the data in the group, such as peak power consumption area, valley power consumption area, stable power consumption area, etc. Taking the power consumption data of a city as an example, the clustering result may divide the city into different categories such as commercial area, industrial area and residential area.

[0029] Through the above two steps, each region can be classified according to the similarity of its real-time electricity consumption data, and the category information of each region can be determined. Such analysis can help the power sector better understand the electricity consumption characteristics and needs of different regions, thereby optimizing power supply and management strategies.

[0030] Step A2: constructing an association relationship between the category information and the topological structure information corresponding to each area.

[0031] Specifically, the association relationship between the category information and topological structure information corresponding to each area will be established. The category information may include the function, usage mode, type of electrical equipment, etc. of the area, and the topological structure information may include the location of the area in the power network, connection relationship, etc. By establishing this association relationship, the power consumption characteristics and power flow of each area can be better understood.

[0032] Step A3, searching for target category information whose occurrence times are greater than a preset number based on the association relationship.

[0033] Specifically, based on the established association relationship, target category information that appears more than a preset number of times is searched. Description Find the category information that appears frequently under specific conditions. These frequently appearing category information may be associated with high losses because they represent some common power consumption patterns or equipment types that may cause more power loss. For example, if in a certain area, a certain type of power-consuming equipment is frequently used and its number of occurrences is greater than a preset number compared to other areas, then this equipment type may be regarded as target category information.

[0034] Step A4, calculating the power loss amount corresponding to the target category information, and if the power loss amount is greater than a preset loss amount, determining the area corresponding to the target category information as a high-loss area.

[0035] Specifically, for the determined target category information, the corresponding electric energy loss is calculated. The electric energy loss can be obtained by analyzing the operation data of the power system, using electric energy metering equipment, etc. If the electric energy loss corresponding to the target category information is greater than the preset loss, the corresponding area is determined as a high-loss area.

[0036] The embodiment of the present application classifies each area by analyzing the real-time power consumption data, and establishes the correlation between the category information and the topological structure information. This can better understand the power consumption of different areas, thereby optimizing the power management strategy and improving the efficiency of power utilization. Secondly, by finding the target category information that appears more than the preset number of times and calculating the corresponding power loss, it can accurately identify the high-loss area.

[0037] Step S13, obtaining relevant data of the substation area, and analyzing the relevant data to determine the target factors corresponding to the high-loss area.

[0038] In the embodiment of the present application, relevant data of the substation is obtained, and the relevant data is analyzed to determine the target factors corresponding to the high-loss area, such as Figure 3 As shown, the following steps B1-B3 are included: Step B1, obtaining preset indicators associated with the substation, and obtaining relevant data corresponding to each preset indicator, wherein the relevant data includes: operating environment data, equipment status data, and user type data.

[0039] Specifically, preset indicators refer to specific performance or characteristics related to the substation, which can be used to evaluate the operating status, energy efficiency, reliability and other aspects of the substation. For each preset indicator, it is necessary to obtain relevant data for analysis and evaluation. The relevant data may include the following aspects: ① Operating environment data: Environmental conditions in the substation, such as temperature, humidity, altitude, etc. These factors may affect the performance and reliability of the equipment. ② Equipment status data: Operating status information of various equipment in the substation, such as oil temperature, voltage, current, etc. of the transformer, as well as fault information, maintenance records, etc. of other equipment. ③ User type data: Types and load characteristics of users in the substation, such as industrial users, commercial users, residential users, etc. Different types of users may have different electricity usage behaviors and needs.

[0040] By collecting and analyzing these relevant data, we can comprehensively evaluate the performance of the substation and take corresponding measures to optimize the operation and management of the substation and improve energy efficiency and power supply reliability. For example, if the voltage in a substation is found to be unstable, the power quality can be improved by adjusting the tap of the transformer or installing reactive power compensation equipment; if the load in a substation is found to be too large, measures such as load transfer or equipment upgrade can be taken to reduce the load pressure.

[0041] Step B2: Analyze the impact of relevant data corresponding to each preset indicator on the high-damage area.

[0042] Specifically, analyze the impact of the relevant data corresponding to each preset indicator on the high-damage area. In this step, it is necessary to conduct an in-depth analysis of the relevant data of each preset indicator to determine their impact on the high-damage area. The impact can be measured in many ways, such as statistical analysis, data mining, machine learning algorithms, etc.

[0043] For example: ① Data correlation analysis: Calculate the correlation coefficient between each preset indicator and the high-loss area. The correlation coefficient can tell the strength of the linear relationship between the indicator and the high-loss area. A high correlation may mean that the indicator has a greater impact on the high-loss area. Among them, when calculating the correlation coefficient between the preset indicator and the high-loss area, the Pearson correlation coefficient can be used. The Pearson correlation coefficient is a value between -1 and 1, which is used to measure the strength of the linear relationship between variables. If there is a completely positive correlation between the two variables, the correlation coefficient is 1; if there is a completely negative correlation between the two variables, the correlation coefficient is -1; if there is no linear relationship between the two variables, the correlation coefficient is 0. If the correlation coefficient is positive, it indicates that there is a positive correlation between the preset indicator and the high-loss area, that is, as the preset indicator increases, the possibility of the high-loss area will also increase; if the correlation coefficient is negative, it indicates that there is a negative correlation between the preset indicator and the high-loss area, that is, as the preset indicator increases, the possibility of the high-loss area will decrease; if the correlation coefficient is close to 0, it indicates that there is no linear relationship between the preset indicator and the high-loss area.

[0044] ② Regression analysis: A regression model is established, with each preset indicator as an independent variable and the high-damage area as a dependent variable. Through regression analysis, the degree of influence of each indicator on the high-damage area can be determined, and the corresponding regression coefficient can be obtained. In the model, each preset indicator is used as an independent variable, and the high-damage area is used as a dependent variable. Specifically, it is necessary to first collect relevant data, including the values ​​of each preset indicator and the corresponding information of the high-damage area. Then, these data are input into the regression model for data analysis and processing. Through regression analysis, the degree of influence of each indicator on the high-damage area can be determined, which can be reflected by the regression coefficient. The regression coefficient indicates the corresponding change in the dependent variable for each unit change of the independent variable. If the regression coefficient is positive, it means that there is a positive correlation between the independent variable and the dependent variable, that is, the increase of the independent variable will lead to an increase in the dependent variable; if the regression coefficient is negative, it means that there is a negative correlation between the independent variable and the dependent variable, that is, the increase of the independent variable will lead to a decrease in the dependent variable.

[0045] Step B3, taking a preset indicator whose influence degree is greater than a preset influence degree as a target factor.

[0046] Specifically, since the degree of influence of each preset indicator on the high-damage area has been determined. In this step, it is necessary to screen out those indicators whose influence is greater than the threshold from a large number of preset indicators based on the preset influence threshold. These indicators are considered to be target factors that have a significant impact on the high-damage area. The method for determining the preset influence threshold can be selected according to the specific situation. It can be comprehensively considered based on experience, business domain knowledge, data analysis results, etc. Generally speaking, the setting of the threshold should be able to distinguish between indicators that have a significant impact on the high-damage area and indicators with a smaller impact.

[0047] Step S14, analyzing the correlation between target factors to determine the target optimization strategy for the high-damage area, and optimizing the high-damage area according to the target optimization strategy.

[0048] In an embodiment of the present application, the correlation relationship between the target factors is analyzed to determine the target optimization strategy for the high-damage area, including: analyzing the correlation degree between the target factors according to a preset correlation analysis method; constructing a candidate factor group using two target factors with a correlation degree greater than a first threshold; determining a first factor group and a second factor group based on the candidate factor group, wherein the correlation degree between the two target factors in the first factor group is greater than the first threshold and less than the second threshold, and the correlation degree between the two target factors in the second factor group is greater than the second threshold; obtaining a first optimization strategy corresponding to the first factor group and a second optimization strategy corresponding to the second factor group; calculating a first evaluation value corresponding to the first optimization strategy and a second evaluation value corresponding to the second optimization strategy; and using a first optimization strategy having a first evaluation value higher than a preset evaluation value and a second optimization strategy having a second evaluation value higher than a preset evaluation value as target optimization strategies.

[0049] Specifically, correlation analysis is a data analysis method used to study the relationship between variables. In this step, the preset correlation analysis methods, such as correlation analysis, linear regression, etc., are used to analyze each target factor and calculate the degree of correlation between them. The degree of correlation is usually expressed by indicators such as correlation coefficient and determination coefficient. Through correlation analysis, we can understand the relationship between target factors and provide a basis for subsequent factor group construction and optimization strategy.

[0050] Secondly, based on the correlation analysis, two target factors with a correlation greater than the first threshold are selected to construct a candidate factor group. The first threshold is a pre-set value used to screen out target factor pairs with strong correlation. By constructing a candidate factor group, the optimization scope can be further narrowed and the optimization efficiency can be improved.

[0051] Furthermore, in the candidate factor group, the first factor group and the second factor group are further determined. The correlation degree between the two target factors in the first factor group is greater than the first threshold but less than the second threshold; the correlation degree between the two target factors in the second factor group is greater than the second threshold. The second threshold is also a pre-set value used to divide different degrees of correlation. By determining the factor group, the target factors can be divided into different subsets so that different optimization strategies can be adopted for different subsets.

[0052] Next, for the first factor group and the second factor group, the corresponding optimization strategies are obtained respectively. The optimization strategy can be an optimization algorithm based on a mathematical model, or a heuristic method based on experience or expert knowledge. By obtaining the optimization strategy, a basis can be provided for the subsequent evaluation value calculation and the determination of the target optimization strategy. Then, the first evaluation value corresponding to the first optimization strategy and the second evaluation value corresponding to the second optimization strategy are calculated. The evaluation value is an indicator used to evaluate the pros and cons of the optimization strategy, which can be the evaluation value of the objective function, the evaluation value of the cost function, etc. By calculating the evaluation value, the effect of each optimization strategy can be quantified, providing a basis for determining the target optimization strategy.

[0053] Finally, the first optimization strategy whose first evaluation value is higher than the preset evaluation value and the second optimization strategy whose second evaluation value is higher than the preset evaluation value are used as the target optimization strategy. The preset evaluation value is a pre-set value used to judge whether the optimization strategy meets the requirements. By determining the target optimization strategy, the optimal optimization solution can be screened out to provide guidance for practical applications.

[0054] The present application obtains the real-time power consumption data of each area in the substation and the topological structure information of the substation, so as to facilitate the targeted processing of the power consumption data, and determines the high-loss area in the substation based on the correlation between the real-time power consumption data of each area and the topological structure information, thereby solving the problem that the high line loss rate in the substation cannot be quickly located despite the high line loss rate, and improving the working efficiency of the system; by obtaining the relevant data of the substation and analyzing the relevant data to determine the target factors corresponding to the high-loss area, the causes of the abnormal line loss rate are analyzed to avoid affecting the inspection and optimization efficiency of the substation; by analyzing the correlation between the target factors to determine the target optimization strategy for the high-loss area, and optimizing the high-loss area according to the target optimization strategy, the optimization efficiency of the substation can be improved.

[0055] In an embodiment of the present application, after optimizing the high-loss area according to the target optimization strategy, the method also includes: detecting second loss data of the high-loss area; comparing the second loss data with the historical loss data of the high-loss area to obtain a comparison result; and updating the target optimization strategy according to the comparison result.

[0056] Specifically, the second loss data is the data obtained by monitoring the high-loss area after optimizing the high-loss area according to the target optimization strategy. It includes information on energy consumption, material consumption, production efficiency, etc. The second loss data can be detected by using sensors, monitoring equipment, data analysis tools, etc.

[0057] Historical loss data refers to the loss records of high-loss areas over a period of time in the past. This data can provide information about loss patterns and trends, helping to identify anomalies or opportunities for improvement. Compare the secondary loss data with the historical loss data to determine if there are significant differences or changes.

[0058] The comparison results may include the following aspects: Trend of loss increase or decrease: If the second loss data is higher or lower than the historical average, the direction and magnitude of the loss change can be evaluated.

[0059] Loss fluctuation: Compare the fluctuation of the second loss data with the historical data to understand the stability of the loss.

[0060] Outliers: Detects unusual loss values ​​that differ significantly from historical data and may require further investigation and resolution.

[0061] Based on the comparison results, the target optimization strategy can be adjusted and updated. The target optimization strategy is a specific measure and action plan formulated to reduce losses in high-loss areas. ① Determine specific improvement measures for the trend of increasing or decreasing losses. For example: including equipment maintenance, parameter adjustment, operation improvement, etc. ② For situations with large fluctuations in losses, consider taking measures to stabilize equipment operation, such as optimizing control algorithms, strengthening monitoring, or adding spare equipment. ③ Conduct in-depth analysis of outliers, determine the root cause, and take measures to solve the problem. At the same time, establish an abnormal monitoring and alarm mechanism to promptly detect and handle similar situations.

[0062] Based on this, according to the comparison results and the updated strategy, set new goals and indicators to monitor the implementation effect of the optimization strategy. Regularly evaluate the implementation of the optimization strategy and make necessary adjustments and improvements based on the actual results.

[0063] In an embodiment of the present application, after determining the high-loss area in the substation based on the correlation relationship between the real-time electricity consumption data and topological structure information of each area, the method also includes: obtaining the geographical location corresponding to the high-loss area and the first loss data; importing the geographical location corresponding to the high-loss area and the first loss data into the substation loss map, and using the first loss data to determine the rendering style corresponding to the high-loss area; rendering the high-loss area in the substation loss map according to the rendering style to obtain a rendered substation loss map, and displaying the rendered substation loss map.

[0064] Specifically, it is first necessary to determine the geographical location information of the high-loss area, such as longitude and latitude or address. At the same time, it is also necessary to obtain the first loss data related to the area, which may be some numerical values ​​or indicators of energy loss. Import the acquired geographical location and loss data into the substation loss map. This can be achieved by associating or superimposing the data with the map. Then, based on the value or range of the first loss data, determine the rendering style of the high-loss area on the map. For example, colors, icons or other visual methods can be used to represent different degrees of loss. According to the determined rendering style, the high-loss area is rendered on the map. This will display the high-loss area on the map in a specific way, so that it is easier for users to identify and analyze. Finally, the rendered substation loss map is displayed to the user. Users can intuitively understand the location and loss of high-loss areas by viewing the map.

[0065] For example: There is a loss data of an electric power substation, which includes the geographical location and loss amount of each area. You want to make a substation loss map to highlight the areas with higher losses. First, obtain the latitude and longitude coordinates of all high-loss areas and the corresponding loss data. Then, import these data into the substation loss map. Next, according to the size of the loss, a rendering style is determined. For example, the loss is divided into three levels, low-loss areas are represented by green, medium-loss areas are represented by yellow, and high-loss areas are represented by red. Finally, the high-loss areas are rendered according to the determined rendering style, and the rendered substation loss map is obtained and displayed to the user. Users can clearly see the distribution of high-loss areas through the map so that they can take corresponding measures to reduce losses. Such a substation loss map can help power managers quickly locate problem areas, make reasonable decisions, and improve energy efficiency and system reliability.

[0066] In this embodiment, a high-loss automatic positioning device for a station area is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0067] This embodiment provides a high-loss automatic positioning device for a station area, such as Figure 4 As shown, including: An acquisition module 41 is used to acquire real-time power consumption data of each area in the substation area and topological structure information of the substation area; The first analysis module 42 is used to determine the high-loss area in the transformer area based on the real-time power consumption data and topological structure information of each area; The second analysis module 43 is used to obtain relevant data of the substation area and analyze the relevant data to determine the target factors corresponding to the high-loss area; The processing module 44 is used to analyze the correlation between the target factors to determine the target optimization strategy for the high-damage area, and optimize the high-damage area according to the target optimization strategy.

[0068] In the embodiment of the present application, the first analysis module 42 is used to classify each area using real-time power consumption data to obtain category information corresponding to the area. Establish an association relationship between the category information corresponding to each area and the topological structure information; search for target category information whose number of occurrences is greater than a preset number of times based on the association relationship; calculate the power loss corresponding to the target category information, and if the power loss is greater than the preset loss, determine the area corresponding to the target category information as a high-loss area.

[0069] In the embodiment of the present application, the first analysis module 42 is used to cluster the real-time electricity consumption data of each area to obtain a clustering result; and determine the category information corresponding to each area based on the clustering result.

[0070] In an embodiment of the present application, the device also includes: a display module, used to obtain the geographical location corresponding to the high-loss area and the first loss data; import the geographical location corresponding to the high-loss area and the first loss data into the substation loss map, and use the first loss data to determine the rendering style corresponding to the high-loss area; render the high-loss area in the substation loss map according to the rendering style to obtain the rendered substation loss map, and display the rendered substation loss map.

[0071] In an embodiment of the present application, the second analysis module 43 is used to obtain preset indicators associated with the substation, and obtain relevant data corresponding to each preset indicator, wherein the relevant data includes: operating environment data, equipment status data, and user type data; analyze the degree of influence of the relevant data corresponding to each preset indicator on the high-loss area; and use the preset indicators whose influence is greater than the preset influence as target factors.

[0072] In an embodiment of the present application, the processing module 44 is used to analyze the degree of correlation between each target factor according to a preset correlation analysis method; construct a candidate factor group using two target factors with a correlation degree greater than a first threshold; determine a first factor group and a second factor group based on the candidate factor group, wherein the degree of correlation between the two target factors in the first factor group is greater than the first threshold and less than the second threshold, and the degree of correlation between the two target factors in the second factor group is greater than the second threshold; obtain a first optimization strategy corresponding to the first factor group and a second optimization strategy corresponding to the second factor group; calculate a first evaluation value corresponding to the first optimization strategy and a second evaluation value corresponding to the second optimization strategy; and use a first optimization strategy with a first evaluation value higher than a preset evaluation value and a second optimization strategy with a second evaluation value higher than the preset evaluation value as target optimization strategies.

[0073] In the embodiment of the present application, the device further includes: a detection module for detecting second loss data of the high-loss area; comparing the second loss data with historical loss data of the high-loss area to obtain a comparison result; and updating the target optimization strategy according to the comparison result.

[0074] See also Figure 5 , Figure 5 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 5 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 5 A processor 10 is taken as an example.

[0075] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0076] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0077] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created by the use of a computer device based on the presentation of a small program landing page, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0078] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0079] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0080] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0081] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for automatically locating high-loss transformers in a transformer area, characterized in that: The method comprises: Acquire real-time power consumption data of each area in the substation and topological structure information of the substation; Based on the real-time power consumption data of each area and the topological structure information, a correlation is made to determine the high-loss area in the substation area; Acquire relevant data of the station area, and analyze the relevant data to determine the target factors corresponding to the high-loss area; The correlation between the target factors is analyzed to determine the target optimization strategy for the high-damage area, and the high-damage area is optimized according to the target optimization strategy.

2. The method according to claim 1, characterized in that The determining of the high-loss area in the substation area based on the real-time power consumption data of each area and the topological structure information is performed by associating the data, including: Using the real-time electricity consumption data to classify each area, and obtain category information corresponding to the area; Constructing an association relationship between the category information corresponding to each area and the topological structure information; Searching for target category information with a number of occurrences greater than a preset number of occurrences based on the association relationship; The electric energy loss amount corresponding to the target category information is calculated, and if the electric energy loss amount is greater than a preset loss amount, the area corresponding to the target category information is determined as a high-loss area.

3. The method according to claim 2, characterized in that The clustering is performed according to the real-time power consumption data of each area to obtain a clustering result, and the category information corresponding to each area is determined based on the clustering result, including: Clustering is performed based on the real-time electricity consumption data of each area to obtain clustering results; The category information corresponding to each area is determined based on the clustering result.

4. The method according to claim 1, characterized in that: After associating the real-time power consumption data of each area with the topological structure information to determine the high-loss area in the substation, the method further includes: Acquire the geographical location corresponding to the high-loss area and the first loss data; Importing the geographical location corresponding to the high-loss area and the first loss data into a station area loss map, and using the first loss data to determine the rendering style corresponding to the high-loss area; The high-loss area in the substation loss map is rendered according to the rendering style to obtain a rendered substation loss map, and the rendered substation loss map is displayed.

5. The method according to claim 1, characterized in that The obtaining of the relevant data of the station area and analyzing the relevant data to determine the target factors corresponding to the high-loss area includes: Obtaining preset indicators associated with the substation area, and obtaining relevant data corresponding to each preset indicator, wherein the relevant data includes: operating environment data, equipment status data, and user type data; Analyze the influence of the relevant data corresponding to each of the preset indicators on the high-damage area; The preset indicator whose influence degree is greater than the preset influence degree is used as the target factor.

6. The method according to claim 1, characterized in that The analyzing the correlation between the target factors to determine the target optimization strategy for the high-damage area includes: Analyze the correlation between each of the target factors according to a preset correlation analysis method; Constructing a candidate factor group using the two target factors whose correlation degree is greater than a first threshold; Determine a first factor group and a second factor group based on the candidate factor group, wherein the correlation degree between two target factors in the first factor group is greater than the first threshold and less than a second threshold, and the correlation degree between two target factors in the second factor group is greater than the second threshold; Obtaining a first optimization strategy corresponding to the first factor group and a second optimization strategy corresponding to the second factor group; Calculating a first evaluation value corresponding to the first optimization strategy and a second evaluation value corresponding to the second optimization strategy; A first optimization strategy in which the first evaluation value is higher than a preset evaluation value and a second optimization strategy in which the second evaluation value is higher than a preset evaluation value are used as the target optimization strategy.

7. The method according to claim 1, characterized in that After optimizing the high-loss area according to the target optimization strategy, the method further includes: detecting second loss data of the high-loss area; Comparing the second loss data with the historical loss data of the high-loss area to obtain a comparison result; The target optimization strategy is updated according to the comparison result.

8. A high-loss automatic positioning device for a station area, characterized in that: The device comprises: An acquisition module is used to acquire real-time power consumption data of each area in the substation area and topological structure information of the substation area; A first analysis module is used to determine the high-loss area in the substation area based on the real-time power consumption data of each area and the topological structure information. A second analysis module is used to obtain relevant data of the station area and analyze the relevant data to determine the target factors corresponding to the high-loss area; A processing module is used to analyze the correlation between the target factors to determine the target optimization strategy for the high-damage area, and optimize the high-damage area according to the target optimization strategy.

9. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method according to any one of claims 1 to 7 by executing the computer instructions.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Low-voltage transformer area line loss influence factor analysis method based on comprehensive correlation degree

    CN110070282A

  • Power supply topology information correction method, system and device, and storage medium

    CN111509706A

  • Up-down through type line loss active analysis and management method and device and computer equipment

    CN117674402A

  • Transformer area line loss abnormity monitoring method, device and equipment and storage medium

    CN118117582A